Decision Memo · Wall Ranger District · updated 6/25/2025
Approximately 20 miles Southwest of Wall, SD · Pennington, South Dakota
Improvement of rangeland infrastructure and water sources for the use of livestock grazing as a vegetation management tool in the Imlay West Pasture of the Buffalo Gap National Grassland.
Grazing management
Comment Period
04/21/2025
Decision
06/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); Fsa 7 Cfr 779.32 E(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | T 4S R13E Sec. 11, 14, and 23 |
Decision Memo · Fort Pierre Ranger District · updated 6/16/2025
Throughout the Fort Pierre National Grassland. · Lyman; Stanley, South Dakota
Special use authorization for the installation of 28.77 miles of fiber optic cable in existing road rights-of-way adjacent to USFS System lands.
Special use management
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fall River Ranger District · updated 6/10/2025
Approximately 0.25 miles northwest of French Creek Campground on the Buffalo Gap National Grassland. · Custer, South Dakota
Installation of structural guides or boundaries to designate two parking areas along a US Forest Service road.
Recreation management
Decision
06/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fall River Ranger District · updated 5/28/2025
Approximately 2 miles Southeast of Farmingdale, SD. · Pennington, South Dakota
The purpose of the project is to bring a reliable livestock watering source to the Gilmore Allotment on the Buffalo Gap National Grassland by installing 2 buried water lines and 2 water tanks.
Grazing managementVegetation management (other than forest products)
Decision
05/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Nebraska National Forest All Units · updated 2/10/2025
Campgrounds at Nebraska and Samuel R. McKelvie National Forests and Oglala and Buffalo Gap National Grasslands · Blaine; Cherry; Dawes; Sioux; Thomas; Custer, Nebraska; South Dakota
Replace 14 existing toilets and install one new one with modern facilities.
Recreation management
Decision
02/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Nebraska National Forest |
| Districts | Nebraska National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Nebraska National Forest All Units · updated 1/22/2025
Buffalo Gap National Grassland, six locations south of State Highway 44, north of Lower Spring Creek Road, and west of Creston Road. · Custer; Fall River; Pennington, South Dakota
Issue a special use permit for army national guard to conduct aviation training.
Special use management
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District; Wall Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fall River Ranger District · updated 10/30/2024
Portions of Moss Agate Creek in the Ellison Dam and Beebe Markey allotments, SW South Dakota near the Wyoming border. · Fall River, South Dakota
Build 5 exclosures and plant native trees and shrubs in them along Moss Agate Creek.
Wildlife, fish, rare plantsGrazing managementVegetation management (other than forest products)
Decision
10/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | T8S, R1E, Section 17 |
Decision Memo · Fall River Ranger District · updated 10/28/2024
Approximately 3 miles west of Rumford, SD. · Fall River, South Dakota
Prescribed fire within the Crow Dam pasture, designated a special plant and wildlife habitat area, to enhance native vegetation and reduce invasive and/or non-native grass species.
Vegetation management (other than forest products)Fuels management
Decision
10/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Rangeland Vegetation Improvements |
| Crowe Dam Habitat Improvement Project | Decision Signed Date: 10/16/2024 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Ridge Ranger District · updated 8/14/2024
Toadstool Campground, Oglala National Grasslands · Sioux, Nebraska
Add 10 camp sites within the established campground area by adding gravel camping pads, fire rings, grills, picnic tables, and pavilions.
Recreation management
Decision
08/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | 33N/53W/5 |
Environmental Assessment · Fall River Ranger District · updated 7/29/2024
In the Red Shirt Allotment, east of Hermosa, South Dakota, on Highway 40. · Custer, South Dakota
Install 1.25 miles of underground water line and one permanent stock tank.
Grazing managementVegetation management (other than forest products)
Comment Period
01/10/2024
Objection Period Start
06/06/2024
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | T4S R9E sec. 1, 12, 13 |
Decision Memo · Wall Ranger District · updated 7/25/2024
Highway 73 on National Forest System lands from south of the White River to Kadoka · Jackson, South Dakota
Issue 3 special use permit amendments to perform shoulder work on Highway 73, which results in the need to move a fiberoptic cable and a water line that serves the Oglala Sioux Tribe.
Special use management
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 40 Cfr 1506.3(D) |
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Ridge Ranger District · updated 7/19/2024
Forest Road 723 between Kings Canyon Road (Forest Road 718) to the Cliffs Picnic Area and the Bordeaux area · Dawes, Nebraska
Change designation of Forest Road 723 from Open to Highway Legal Only to Open to all Vehicles.
Road managementRecreation management
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fall River Ranger District · updated 7/18/2024
Portions of Moss Agate Creek in the Ellison Dam and Beebe Markey allotments, SW South Dakota near the Wyoming border. · Jackson, South Dakota
Project #66550 was canceled because the same project (#66549) already exists on the SOPA. Those interested in this project should refer to project ID #66549.
Wildlife, fish, rare plantsGrazing managementVegetation management (other than forest products)
Scoping Start
07/2024 (Estimated)
Decision
09/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | T8S, R1E, Section 17 |
Decision Memo · Pine Ridge Ranger District · updated 6/27/2024
(1) Aristocrat T32N, R48W, Sections 5 & 6; T33N, R48W, Sections 33 ; (2) West Ash T31N, R51W, Sections 13, 24, 25, & 26; T31N, R50W, Sections 18, 19, 29, 30, 31, & 32; (3) Coffee Mill Butte T31N, R49W · Dawes, Nebraska
Hand plant 112 container ponderosa pine seedlings throughout & near various areas where forest fires consumed ponderosa pine forested stands & their seed source. Approximately 50-200 seedlings/ac would be planted depending on terrain & microclimates.
Fuels managementLand management planningVegetation management (other than forest products)
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Fall River Ranger District · updated 6/24/2024
Fall River County, South Dakota. Fall River Ranger District · Fall River, South Dakota
Analyze and disclose environmental effects that may result from implementing one vertical oil and natural gas well. Project includes proposed construction, drilling, completion, production and reclamation.
Minerals and geology
Comment Period
09/06/2022
Objection Period Start
07/2023 (Estimated)
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Natural Gas; Oil |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | 11 S 1 E Section 9 |
Environmental Assessment · Bessey Ranger District · updated 4/8/2024
Eastern end of Forest Road (FR) 224, the southern part of off-highway vehicle (OHV) Trail 112 (portions of T21N, R26W, Sec. 11, 12, 13 and T21N, R25W, Sec. 18), and the portion of FR 277 in section 13 · Blaine; Thomas, Nebraska
Improve motorized access along and in the vicinity of the Whitetail Road, including to Whitetail Campground.
Recreation managementRoad management
Comment Period
10/20/2023
Objection Period Start
02/15/2024
Decision
04/2024 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Travel Management |
| Whitetail Road (FR 224) Travel Management Project | Decision Signed Date: 04/08/2024 |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | T21N, R26W, Sec. 11, 12, 13 and T21N, R25W, Sec. 18 |
Decision Memo · Fall River Ranger District · updated 4/4/2024
Section 16, Township 9S, Range 1E · Fall River, South Dakota
Road Access Permit to reach oil and gas well pad on adjacent state property.
Special use management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 4/4/2024
Approximately 1 mile southwest of Halsey, NE on the Nebraska National Forest. · Blaine; Thomas, Nebraska
Removal of fire damaged timber, minor infrastructure repairs, and reduction of fuel loading to allow for future management actions.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels managementForest products
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage) |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 4/4/2024
Portions of Steer Creek, South Falls, Ranger Station, and Schotes Allotments on the Samuel R. McKelvie National Forest · Cherry, Nebraska
Removal of invading eastern red cedar in areas identified on the Samuel R. McKelvie National Forest to improve timber stand and grassland health.
Fuels managementWildlife, fish, rare plants
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Woody Encroachment Project | Decision Signed Date: 06/23/2014 |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fort Pierre Ranger District · updated 4/4/2024
Areas within the boundary of the Fort Pierre National Grasslands occurring along 225th and 226th streets, and along 235th Street starting at Angus Drive. · Jones, South Dakota
Installation of fiber optic line within the boundaries of the Fort Pierre National Grasslands. Installation will occur within the existing road right-of-way.
Special use management
Decision
08/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 4/4/2024
Nebraska State 4-H Camp, Bessey Division of the Nebraska National Forest · Thomas, Nebraska
Modification of the Nebraska State 4-H Camp's Special Use Permit to include the development and use of a zipline as a part of the camps activities.
Special use management
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Nebraska State 4-H Camp Special Use Permit Modification Zipline | Decision Signed Date: 08/05/2014 |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Section 4, T 23N, R 26W, Sixth Principle Meridian |
Environmental Assessment · Pine Ridge Ranger District · updated 4/4/2024
National Forest System Lands in Dawes County between Crawford and Chadron Nebraska. · Dawes, Nebraska
The project is largely aimed at improving undesired conditions created by the 2006 Spotted Tail Fire and the 2012 West Ash Fire and reducing the threat of stand-replacing wildfires in those few areas not impacted by those large wildfires.
Fuels managementVegetation management (other than forest products)
Comment Period
06/07/2014
Objection Period Start
12/01/2014
Decision
01/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Rangeland Vegetation Improvements |
| Pine Ridge Landscape Restoration | Decision Signed Date: 01/12/2015 |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Ridge Ranger District · updated 4/4/2024
T31N, R51W, Sections 24,25,26; T31N, R50W, Section35 · Dawes, Nebraska
construct 4 miles of trails in order to enhance public access and recreational opportunities on the Pine Ridge Ranger District.
Recreation management
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Great Plains Trail Additions | Decision Signed Date: 10/22/2019 |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fort Pierre Ranger District · updated 4/4/2024
Approximately 17 miles south of Fort Pierre, SD · Lyman, South Dakota
Permitting the construction of a 2,000,000-gallon inground storage reservoir by the Bureau of Reclamation.
Special use management
Decision
02/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wall Ranger District · updated 12/8/2023
Hanson pasture of the Kadoka South allotment, which is two to five miles south of Kadoka, South Dakota. · Jackson, South Dakota
Remove 3 miles of existing fence and replace with 1/4 mile of wildlife-friendly fence.
Wildlife, fish, rare plants
Decision
12/2023 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Rangeland Vegetation Improvements; Grazing Structural Improvements |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | T3S R22E Sections 7 and 18 |
Decision Memo · Bessey Ranger District · updated 9/19/2023
Nebraska HWY 86B Spur Road Right-of-Way from transmission line located at approx.(41.903861, -100.315600) to vicinity of Scott Lookout Tower. · Thomas, Nebraska
Replacement of damaged utilities from the 2022 Bovee Fire within the Bessey Ranger District of the Nebraska National Forest.
Facility management
Decision
09/2023 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Wall Ranger District · updated 8/2/2023
Approximately 6 miles south of Wall, South Dakota · Pennington, South Dakota
Manage recreational opportunities while continuing to protect natural, cultural, and recreational resources in the Pinnacles area.
Recreation management
Comment Period
01/14/2023
Objection Period Start
03/31/2023
Decision
07/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fall River Ranger District · updated 6/29/2023
From SD/WY state line along US HWY 18 to Edgemont, SD · Fall River, South Dakota
Placement of new fiber optic lines using duct system and hand holes. Placement would primarily be within existing SD Department of Transportation and County right-of-ways with small portions intersecting USFS property.
Special use management
Decision
04/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Township: 9S Range: 1E Sections: 1-6 9S 2E 3-4, 6-8 |
Environmental Assessment · Bessey Ranger District · updated 6/28/2023
East and northeast portions of the Nebraska National Forest impacted by the 2022 Bovee Fire. · Thomas, Nebraska
Bovee wildfire restoration and hazardous trees, snags and fuels reduction.
Recreation managementFuels management
Scoping Start
07/2023 (Estimated)
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Rangeland Vegetation Improvements |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Fort Pierre Ranger District · updated 3/7/2023
Lyman, Jones, and Stanley Counties, South Dakota · Jones; Lyman; Stanley, South Dakota
The purpose of this project is to improve access to recreational fisheries. The project proposes installation of fishing pods, a boat dock, several boat ramps, and several road reroutes.
Recreation managementRoad managementWildlife, fish, rare plants
Comment Period
10/07/2022
Objection Period Start
01/07/2023
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Dispersed Recreation Mgmt.; Road Improvements/Construction |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Fort Pierre National Grassland |
Decision Memo · Fall River Ranger District · updated 2/2/2023
11 miles southwest of Provo, SD · Fall River, South Dakota
Analyze and disclose environmental effects that may result from implementing two vertical oil and natural gas wells in previously authorized locations. Project includes proposed construction, drilling, completion, production and reclamation.
Minerals and geology
Decision
02/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (17), 36 Cfr 220.6(E)(17) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Natural Gas; Oil |
| Simms # 11 & 12 Project | Decision Signed Date: 02/01/2023 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Ridge Ranger District · updated 11/29/2022
34 miles of trails within the Pine Ridge Ranger District south of Chadron, NE. · Dawes, Nebraska
The Pine Ridge Ranger District is proposing to expand 25.4 miles of <50" trail and 8.7 miles of motorcycle trail to accommodate off-highway vehicle's (OHV) <64".
Recreation management
Comment Period
06/15/2022
Decision
11/2022 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Fort Pierre Ranger District · updated 10/3/2022
FPNG's Farlow Winter 1/4 Allotment on upper intermittent reaches of East War Creek · Jones, South Dakota
Construct rock reinforced ford in historic creek crossing, for USFS authorized use only, to reduce environmental impacts, stream degradation, and erosion to complete vegetation management activities.
Vegetation management (other than forest products)Watershed management
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Rangeland Vegetation Improvements; Watershed Improvements |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | SE 1/4 S18 T2N R31E |
Decision Memo · Fort Pierre Ranger District · updated 10/3/2022
Jones County, South Dakota · Jones, South Dakota
This project is designed to reduce fine fuels before repairing Lower Booth Dam
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Lower Booth Dam Project | Decision Signed Date: 07/01/2022 |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Wall Ranger District · updated 8/5/2021
Project occurs in the Missile, Hillary, Wall-Quinn, and South Whitewater 1 allotments within Pennington County, SD on Wall Ranger District. · Pennington, South Dakota
This project proposes 6.37 miles of waterline and twelve water tanks on four grazing allotments in Pennington County, SD on the Wall Ranger District. New tank locations and pipelines will provide reliable water sources and management of resources.
Grazing managementWatershed managementVegetation management (other than forest products)
Comment Period
02/26/2021
Objection Period Start
06/10/2021
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Fort Pierre Ranger District · updated 4/26/2021
The Prairie Restoration Research Project is located across the Fort Pierre Ranger District in central South Dakota · Jones; Lyman, South Dakota
Approximately 50% of the Grassland is now dominated by invasive, cool-season exotic grasses, particularly smooth brome and Kentucky bluegrass. The proposed project aims to identify techniques to restore a dominance of native vegetation on the FPRD.
Vegetation management (other than forest products)ResearchWildlife, fish, rare plantsSpecial area managementLand management planning
Comment Period
12/15/2020
Objection Period Start
02/05/2021
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Research And Development; Rangeland Vegetation Improvements; Grazing Structural Improvements |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Fall River Ranger District · updated 12/15/2020
SE SE NE Section 8-T11S-R1E Fall River County, South Dakota · Fall River, South Dakota
Analyze and disclose environmental effects that may result from implementing one vertical oil and natural gas well. Project includes proposed construction, drilling, completion, production and reclamation.
Minerals and geology
Comment Period
08/28/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations; Natural Gas; Oil; Road Improvements/Construction |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | SE SE NE Section 8 T11S R1E |
Environmental Impact Statement · R2 - Rocky Mt. Region All Units · updated 12/10/2020
Linear transmission lines located in Colorado, Utah, and Nebraska · Dawes; Daggett; Uintah; Chaffee; Delta; Dolores; Eagle; Grand; Gunnison; Jackson; Lake; La Plata; Larimer; Mesa; Montrose; Routt; Saguache; San Juan, Colorado; Nebraska; Utah
Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation.
Special use management
NOI in Federal Register
04/08/2010
DEIS NOA in Federal Register
09/27/2013
FEIS NOA in Federal Register
12/10/2020
Objection Period Start
08/10/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| WAPA Right-of-Way Maintenance and Reauthorization | Decision Signed Date: 11/17/2020 |
| Forests | Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Nebraska National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Ashley National Forest |
| Districts | Grand Valley Ranger District; Norwood Ranger District; Gunnison Ranger District; Paonia Ranger District; Yampa Ranger District; Hahns Peak/Bears Ears Ranger District; Pine Ridge Ranger District; Boulder Ranger District; Canyon Lakes Ranger District; Sulphur Ranger District; Salida Ranger District; Mancos/Dolores Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District; Ashley National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Bessey Ranger District · updated 11/24/2020
Samuel R. McKelvie National Forest and Bessey Division of the Nebraska National Forest · Blaine; Cherry; Thomas, Nebraska
Analysis of the effects of authorizing motorized travel on selected, existing user created routes on the Samuel R. McKelvie National Forest and the Bessey Division of the Nebraska National Forest.
Road management
Comment Period
04/14/2013
Decision
09/2013 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Bessey Travel Management Review Project | Decision Signed Date: 09/06/2013 Legal Notice Date: 09/06/2013 |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
Decision Memo · Pine Ridge Ranger District · updated 9/28/2020
Agate, Boardgate and Rock Bass Reservoirs on the Oglala National Grassland · Dawes; Sioux, Nebraska
Repair and protect Agate, Rock Bass and Bordgate Reservoirs in order to enhance riparian and pond habitat on the Oglala National Grassland.
Grazing managementFacility managementWatershed managementRecreation managementWildlife, fish, rare plants
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 6/18/2020
The entirety of the Samuel R. McKelvie National Forest in Cherry County, Nebraska. · Cherry, Nebraska
The purpose of this project is to restore and or maintain the functional ecological value of the native grasslands and hand-planted forests in the Samuel R. McKelvie National Forest.
Fuels managementForest products
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Green) |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Wall Ranger District · updated 2/11/2020
Wall, SD · Pennington, South Dakota
Range Allotment Management Plan
Grazing management
Comment Period
01/25/2016
Objection Period Start
06/29/2016
Decision
10/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Fort Pierre Ranger District · updated 9/9/2019
The project proposes installing up to two vault restrooms at Richland Dam. · Jones, South Dakota
The proposed action is to install one or two vault restrooms at Richland Dam
Recreation management
Comment Period
04/17/2019
Objection Period Start
07/19/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | Section 8, T2N, R31E, Black Hills Meridian |
Environmental Assessment · Pine Ridge Ranger District · updated 7/12/2019
The project location in across the western half of National Forest System Lands impacted by the wildfires of 2012 on the Pine Ridge Ranger District. · Dawes; Sioux, Nebraska
vegetation treatments on approximately 19,200 acres of Forest Service land within the Pine Ridge Ranger District. Treatments would include prescribed fire, thinning, understory vegetation control, meadow and riparian enhancement.
Watershed managementFuels managementWildlife, fish, rare plantsForest productsRoad management
Comment Period
09/30/2018
Objection Period Start
06/05/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 8/17/2018
At the intersection of State Spur 86B, Forest Road 223, and Powerline Trail 113 · Blaine; Thomas, Nebraska
Construct a 1-acre parking lot and trailhead for access to the motorized trail system.
Recreation management
Decision
08/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | T22N, R26W, Sec. 9, 10 |
Decision Memo · Wall Ranger District · updated 8/15/2018
The Wall Ranger District excluding any designated Roadless Areas. The project area is primarily composed of mixed grass prairie. · Jackson; Pennington, South Dakota
The US Forest Service is evaluating the potential use of multiple plague management tools which could be used on the Wall Ranger District to combat plague with the objective of enhancing black-footed ferret habitat, and for public health and safety.
Wildlife, fish, rare plants
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Plague Management Project | Decision Signed Date: 07/16/2018 |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Fort Pierre Ranger District · updated 4/5/2018
Approximately 9 miles north of Vivian, South Dakota · Lyman, South Dakota
Authorize use of prescribed burning and mowing as well as installing additional water sources to improve vegetative composition and structure. Authorize new access routes to fishing ponds and creation of a new parking area.
Recreation managementVegetation management (other than forest products)
Objection Period Start
01/04/2018
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Rangeland Vegetation Improvements |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
Decision Memo · Bessey Ranger District · updated 3/29/2018
Forest Road 603 about three miles west of State Spur 16F · Cherry, Nebraska
Proposes to add 1/2 mile of road to the MVUM for the Samuel R. McKelvie National Forest for the purpose of accessing the Chat Canyon Wildlife Management Area, owned and operated by Nebraska Game and Parks Commission.
Road management
Decision
01/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | T32N, R32W, Section 3, NW 1/4 |
Decision Memo · Bessey Ranger District · updated 8/2/2017
Steer Creek Campground, southwest corner of the Samuel R. McKelvie National Forest. · Cherry, Nebraska
Construct an 8-pen corral at the Steer Creek Campground.
Recreation management
Scoping Start
02/2017 (Estimated)
Decision
03/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Wall Ranger District · updated 7/20/2017
The project is in Pennington County, southwest of Wall, SD in T1S, R 14 and 15E, Black Hills Principal Meridian. · Pennington, South Dakota
The project proposal includes installing approximately 9 miles of buried pipeline, including 11 permanent stock tanks and 2 meter pits from an existing West River/Lyman-Jones Rural Water Systems, Inc. meter pit on private property.
Grazing management
Comment Period
02/01/2017
Objection Period Start
06/01/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 10/27/2016
National Forest System lands in the Bessey Ranger District; specifically the 23 miles of designated motorized trails. · Blaine; Thomas, Nebraska
A proposal to designate the existing motorized trails for vehicles 64 inches wide or less. It is currently 50 inches wide or less.
Recreation management
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bessey Ranger District · updated 8/26/2016
National Forest System lands in Thomas and Blaine Counties · Blaine; Thomas, Nebraska
Removing Eastern red cedar from grasslands
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements; Rangeland Vegetation Improvements |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Nebraska National Forest All Units · updated 3/25/2016
East of Olerichs South Dakota · Fall River, South Dakota
A proposed land exchange between the Buffalo Gap National Grasslands and White Ranch near Oelrichs, South Dakota. The purpose of the land exchange is to consolidate landownerships.
Land ownership management
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | Black Hills Meridian; 10S, R9E, portions of Secs 18, 17, and 19; T11S, R9E, Sec 18; T11S, R8E, portions of sec 1, 10, 11; T10S, R8E, portions of Secs 36, 27. |
Environmental Assessment · Nebraska National Forest All Units · updated 7/7/2015
The Federal parcels proposed for exchange are located across the Buffalo Gap National Grassland from the Towns of Hots Springs to Kadoka. All legal descriptions reference the Black Hills Meridian and · Fall River, South Dakota
A proposed land exchange between The Nature Conservancy, a Not for Profit Corporation and the Forest Service. The primary purpose of the Cain Creek Land Exchange exchange is to consolidate land ownership where private and National Forest System (NFS
Land ownership management
Comment Period
09/16/2013
Objection Period Start
04/03/2015
Decision
07/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Land Exchanges |
| Forests | Nebraska National Forest |
| Districts | Nebraska National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Ridge Ranger District · updated 11/24/2014
Burned forested areas with the West Ash Fire on Pine Ridge RD · Dawes, Nebraska
The reforestation and site prep work on 1873 acres on the Pine Ridge RD within the West Ash Fire 2012
Fuels managementVegetation management (other than forest products)Land management planning
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| West Ash Reforestation | Decision Signed Date: 10/31/2014 Legal Notice Date: 10/31/2014 |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | T31N,R49W,Sec 8,9,13; T32N, R49W, Sec 13,23,24,26,35; T31N, R50W, Sec 28,33,34; 6th Prin Meridian; Dawes County |
Decision Memo · Pine Ridge Ranger District · updated 11/13/2014
Oglala National Grassland · Dawes; Sioux, Nebraska
Russian olive will be removed mechanically or by hand. All cut trees will be piled and burned.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | SIXTH PRINCIPAL MERIDIAN DAWES & SIOUX COUNTIES T. 33N, R. 53W Sec. 17, 20, & 25 T. 33N, R. 52W Sec. 28, 30, 31, 32, 33, & 34 |
Decision Memo · Nebraska National Forest All Units · updated 11/10/2014
Near Badlands National Park. · Pennington, South Dakota
The U.S. Forest Service is proposing to convey 632.95 acres to Don Kelly in exchange for 666.89 acres of private land. The private lands are located in Badlands National Park and would be conveyed to the USA, National Park Service.
Land ownership management
Decision
11/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Kelly Land Exchange Decision Memo | Decision Signed Date: 11/04/2014 |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | T1S,R16E, Sec. 6&31; T2S, R15E, Sec. 1,2, 12. |
Decision Memo · Fall River Ranger District · updated 8/27/2014
Middle pasture of Antelope Allotment · Fall River, South Dakota
Drilling of one exploratory oil well to depth of 3850 ft. Includes constrution of 140' x 220' well pad.
Minerals and geology
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (17), 36 Cfr 220.6(E)(17) |
| Special Authority | Not Applicable / Other; Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Peter K. Roosevelt Application for Permit to Drill | Decision Signed Date: 08/04/2014 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | 11S, R1E, BHM, S33 |
Decision Memo · Fort Pierre Ranger District · updated 6/10/2014
Project is located on the Fort Pierre National Grassland south of Fort Pierre, SD and north of I-90. Proposed roads are scattered across the grassland at the legals listed below. · Jones; Lyman; Stanley, South Dakota
The Nebraska National Forests and Grasslands, Fort Pierre Ranger District, proposes to issue special use permits on four existing two-track, dirt roads to three private landowners who are land locked by Forest System lands.
Special use management
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| 2014 Private Road Special Use Permit | Decision Signed Date: 04/30/2014 |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | T 109N R 78W NE ¼ of Section 29; T 2N R 31E NW ¼ of Section 31; T 2N R 31E NW ¼ of Section 30; T 3N R 31E NE ¼ of Section 17 |
Decision Memo · Fall River Ranger District · updated 6/6/2014
Eastern Fall River County South of US Highway 18 and South eastern Custer County · Custer; Fall River, South Dakota
Plaqcement of 10-12 pallets of bee hives (4 hives to pallet) on 12 locations within the Buffalo Gap National Grassland
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ingalls Apiary Special Use Permit | Decision Signed Date: 06/03/2014 Legal Notice Date: 06/06/2014 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | T 10 S, R 8 E, Sec 22; T 10 S, R ( E, Sec 17, 18, 19, 20, 28,31,32,33; T 6 S, R 8 E, Sec 10; T 5 S, R 9 E, Sec 31 |
Decision Memo · Fall River Ranger District · updated 5/27/2014
East of the town of Fairburn, SD along East French Creek Road · Custer, South Dakota
Modify existing Special Use Permit to allow the crossing of an additional 4.5 miles of Buffalo Gap National Grassland along the East French Creek Road to replace aging copper facility and improve service
Special use management
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| FORT RANDALL FIBER OPTIC SPECIAL USE PERMIT MODIFICATION | Decision Signed Date: 05/13/2014 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | T 4 S, R 9 E; Sections 32, 33,34, and 35 |
Environmental Impact Statement · Fall River Ranger District · updated 11/14/2013
All allotments on the Oglala National Grassland in Dawes and Sioux Counties, Nebraska and all allotments in the West Geographic Area of the Buffalo Gap National Grassland in Fall River County, SD · Dawes; Sioux; Fall River, Nebraska; South Dakota
Analyze the grazing allotments on the Oglala NG and Buffalo Gap NG (West GA) to determine the difference between existing conditions and desired conditions, and make adjustments to implement the new Forest Plan direction.
Vegetation management (other than forest products)Watershed managementGrazing managementWildlife, fish, rare plants
NOI in Federal Register
06/11/2010
DEIS NOA in Federal Register
07/20/2012
FEIS NOA in Federal Register
09/25/2013
Decision
09/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Grazing Authorizations; Rangeland Vegetation Improvements; Grazing Structural Improvements |
| Buffalo Gap and Oglala National Grasslands RAMP | Decision Signed Date: 09/25/2013 Legal Notice Date: 09/27/2013 |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District; Fall River Ranger District |
Environmental Assessment · Fort Pierre Ranger District · updated 9/24/2013
Southwest corner of the Fort Pierre National Grassland, approximately eight miles northwest of Vivian, SD and 24 miles south of Fort Pierre, SD. Located on FS Road 227 · Jones; Lyman, South Dakota
Install 3.6 miles of water pipeline with 5 stock tanks, move one existing fence from Lower Booth Dam north of FSR 227 and convert an electric fence to barbwire in the Camp Flat Allotmen all in the southwest corner of the Fort Piere National Grassland
Grazing management
Comment Period
03/15/2009
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Structural Improvements |
| Southwest Fence Relocation and Pipeline | Decision Signed Date: 09/23/2013 Legal Notice Date: 09/23/2013 |
| Forests | Nebraska National Forest |
| Districts | Fort Pierre Ranger District |
| Legal Land Description | T106N R79W Sections 6,7,8; T107N R79W Sections 28,31, 33; T1N R31E Sections 22, 27, 34 |
Decision Memo · Fall River Ranger District · updated 8/2/2013
Middle Pasture of the Antelope Allotment · Fall River, South Dakota
Drilling of one exploratory oil well to depth of 3750' and one re-entry to 3708'. Re-entry is previous Piggy Wig Well. Includes construction of 950' of new road and 150' x 240' well pad on Alkali Fed 2-33 and 100' x 40' pit on Alakali Fed 3-33.
Minerals and geology
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (17), 36 Cfr 220.6(E)(17) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Application for Permit Drilling Alkali Federal | Decision Signed Date: 07/29/2013 Legal Notice Date: 08/02/2013 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District |
| Legal Land Description | T11S, R1E, BHM, S33 |
Environmental Assessment · Pine Ridge Ranger District · updated 7/17/2013
Ogalal National Grassland - Sioux and Dawes County · Dawes; Sioux, Nebraska
The Forest Service proposes a land exchange of approximately 760 acres of national grassland located in Sioux County for 800 acres of land in Sioux and Dawes County owned by Walter Whitcher of Buffalo Gap National Grassland.
Land ownership management
Comment Period
05/12/2010
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | NonFed -T33N, R52W, Sec 33,;T33N, R53W,Secs 21,22,27,28. Fed land T32N, R53W, Sec 2,11,14 and T33N, R52W, Sec 31 |
Decision Memo · Pine Ridge Ranger District · updated 7/16/2013
Roberts Tract Area of the Pine Ridge Ranger District · Dawes, Nebraska
The purpose of this project is to reforest the Roberts Tract area of the Pine Ridge Ranger District with ponderosa pine seedlings. This area was hit with two large fires in the past which have changed the landscape from forest to grassland.
Vegetation management (other than forest products)
Comment Period
04/12/2013
Decision
06/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | T. 31N; R. 50W; Sections 11 & 12 |
Decision Memo · Pine Ridge Ranger District · updated 7/16/2013
This is the Roundtop/Eagle Eye Rock area of the Oglala National Grassland. · Sioux, Nebraska
Ther purpose of this project is to reforest the roundtop/eagle eye rock area of the Oglala National Grassland with pine seedlings. This area burned during the 2012 Douthit wildfire.
Vegetation management (other than forest products)
Comment Period
04/12/2013
Decision
06/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
| Legal Land Description | T. 33N; R. 53 W Sections 19, 20, 30, 31, & 32 |
Environmental Impact Statement · Bessey Ranger District · updated 9/5/2012
All of the Samuel R. McKelvie National Forest, approximately 40 miles southwest of Valentine, NE · Cherry, Nebraska
Determine the difference between existing and desired conditions on all grazing allotments on the SR McKelvie NF and implement grazing strategies to move toward desired conditions as outlined in the Forest Plan.
Vegetation management (other than forest products)Grazing management
NOI in Federal Register
10/17/2008
DEIS NOA in Federal Register
03/12/2010
FEIS NOA in Federal Register
08/10/2012
Decision
08/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements |
| Allotment Management Planning on the McKelvie Geographic Area | Decision Signed Date: 08/27/2012 Legal Notice Date: 08/29/2012 |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
Environmental Assessment · Bessey Ranger District · updated 3/15/2012
Bessey Ranger District and Bessey Nursery Administrative Complex · Thomas, Nebraska
Construction of the following facilities: warehouse building, new road intersection at the Road 86B Spur for new shop access, new cooler/concrete slabs near the nursery packing shed, drainage catchment in the recreaton complex and four new greenhouse
Facility management
Comment Period
09/27/2011
Decision
03/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Bessey Complex Drainage/District Shop/Greenhouse | Decision Signed Date: 03/09/2012 |
| Forests | Nebraska National Forest |
| Districts | Bessey Ranger District |
| Legal Land Description | N1/2 of the SE 1/4, Section 2; T22N; R26W; P.M.BH |
Environmental Assessment · Pine Ridge Ranger District · updated 1/9/2012
Project is within the Hudson-Meng Special Interest Area, Oglala National Grasslands, Sioux County Nebraska · Sioux, Nebraska
Drilling of a new replacement well
Facility managementWatershed management
Comment Period
11/17/2010
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Heritage Resource Management; Facility Maintenance |
| Forests | Nebraska National Forest |
| Districts | Pine Ridge Ranger District |
Decision Memo · Wall Ranger District · updated 7/14/2011
Richland Dam is located on the western edge of the Fort Pierre National Grassland off county road 286th Ave. · Jones, South Dakota
The purpose of this project is to repair years worth of erosion damage done to the grade and spillway which currently is jeopardizing the dam's stability.
Watershed management
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Nebraska National Forest |
| Districts | Wall Ranger District |
| Legal Land Description | The project is located in Township 2 N Range 31 E in the east half of Section 8 of Jones County. |
Environmental Impact Statement · Nebraska National Forest All Units · updated 4/7/2011
Buffalo Gap National Grassland, Wall RD, Bessey Ranger District & Samuel R. McKelvie National Forest, Pine Ridge Ranger District & Oglala National Grassland, Buffalo Gap National Grassland · Blaine; Cherry; Dawes; Sioux; Thomas; Custer; Fall River; Jackson; Pennington, Nebraska; South Dakota
Update: The Forest will produce one EIS with one decision for all affected units. The decision will be made by the Forest Supervisor instead of individual District Rangers, as previously planned.
Road managementRecreation management
NOI in Federal Register
01/11/2008
DEIS NOA in Federal Register
09/25/2009
FEIS NOA in Federal Register
04/23/2010
Decision
04/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Travel Management Plan | Decision Signed Date: 04/13/2010 Legal Notice Date: 04/30/2010 |
| Forests | Nebraska National Forest |
| Districts | Nebraska National Forest All Units |
| Legal Land Description | That portion of the Buffalo Gap National Grassland primarily lying east of the Cheyenne River in SD, Bessey Ranger District including the Samuel R. Mckelvie National Forest, Buffalo Gap NG west of the |
Environmental Assessment · Wall Ranger District · updated 9/21/2009
Fed land is approx. 8 miles east of Fairburn, SD. Non-Fed land is approx 7-10 miles west of Scenic, SD · Custer; Jackson; Pennington, South Dakota
Propose to Exchange 3801.38 acres of National Grassland in Custer County for 2956.50 acres of land in Pennington County and Jackson County owned by Dakota Partnership of Rapid City SD
Land ownership management
Comment Period
11/05/2004
Decision
07/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| Decision Notice & FONSI for the Indian Creek Land Exchange | Decision Signed Date: 07/13/2009 Legal Notice Date: 07/16/2009 |
| Forests | Nebraska National Forest |
| Districts | Fall River Ranger District; Wall Ranger District |
| Legal Land Description | Fed: parts of T3S, R11E, Sec 26,35. T4S,R9E, SE3-5,6-10, 15,20,21,28,29. Non-Fed parts of T3S.,R11E,Sec 25, T3S, R12E, Sec 19,20,22,28,29,30-33, 35,36. T4S, R12E, Sec 2. |
Environmental Impact Statement · Nebraska National Forest All Units · updated 8/19/2008
Primary location of the project is the Buffalo Gap, Fort Pierre and Oglala National Grasslands. · Blaine; Cherry; Dawes; Sioux; Thomas; Custer; Fall River; Jackson; Jones; Lyman; Pennington; Stanley, Nebraska; South Dakota
To amend the LRMP to specify a desired range of acres of prairie dog colonies to meet various multiple use objectives, and to identify what actions may be taken if the acreage substantially falls below or exceeds the desired range.
Land management planningWildlife, fish, rare plants
NOI in Federal Register
09/29/2006
DEIS NOA in Federal Register
06/08/2007
FEIS NOA in Federal Register
08/15/2008
Decision
07/2008 (Estimated)
Implementation
12/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Plan Amendment |
| Black-tailed Prairie Dog Management on the Nebraska National Forest | Decision Signed Date: 07/17/2008 Legal Notice Date: 08/15/2008 |
| Forests | Nebraska National Forest |
| Districts | Nebraska National Forest All Units |
Environmental Impact Statement · Nebraska National Forest All Units · updated 9/29/2005
Buffalo Gap and Fort Pierre National Grasslands in South Dakota and the Oglala National Grassland, and Nebraska and Samuel R. McKelvie National Forests in Nebraska · Blaine; Cherry; Dawes; Sioux; Thomas; Custer; Fall River; Jackson; Jones; Lyman; Pennington; Stanley, Nebraska; South Dakota
Conserving black-tailed prairie dogs while reducing unwanted prairie dog colonization on adjoining lands using a variety of tools and methods.
Wildlife, fish, rare plants
NOI in Federal Register
11/01/2004
DEIS NOA in Federal Register
03/04/2005
FEIS NOA in Federal Register
08/19/2005
Decision
08/2005 (Estimated)
Implementation
09/2005 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Area Management |
| Black-tailed Prairie Dog Conservation and Management on the NNF and Assoc. Units Including LRMP Amendment 1 Record of Decision | Decision Signed Date: 08/03/2005 Legal Notice Date: 08/12/2005 |
| Forests | Nebraska National Forest |
| Districts | Nebraska National Forest All Units |
Detail fetch failed: 404 Client Error for https://www.fs.usda.gov/r02/nebraska/projects/16
Thank you for your continued interest in the projects occurring on your National Forests. The Nebraska National Forests and Grasslands has decided to utilize GovDelivery, an electronic messaging program that allows us to provide better communication with interested members of public like you. This new program allows you the ability to manage subscriptions to Forest Service project electronic mailing list(s) and access immediate electronic information to project documents. To sign up, please follow the link "Transition to GovDelivery" above. After you sign up, don't forget to click on the "Add Subscriptions" tab to select your areas of interest to ensure you are kept up to date on upcoming projects.
Land management planning