Decision Memo · Conasauga Ranger District · updated 5/28/2026
Chestnut Mountain is located in Gordon and Whitfield Counties west of Resaca. · Gordon; Whitfield, Georgia
The primary objective of this project is to restore and maintain native forest communities, reduce stand density in pine and pine-oak stands to improve forest health, expand prescribed fire use, and enhance terrestrial and aquatic habitat diversity.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed management
Decision
05/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green); Watershed Improvements |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Conasauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chattooga River Ranger District · updated 5/27/2026
Rabun County, Georgia · Rabun, Georgia
The Chattooga River Ranger District is proposing activities to improve watershed conditions, including water quality, and to promote both game and non-game aquatic organism habitat, including native brook trout (Salvelinus fontinalis).
Wildlife, fish, rare plantsWatershed management
Decision
05/2026 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Conasauga Ranger District · updated 5/13/2026
Walker County, GA · Walker, Georgia
Windstream proposes to install or replace existing fiber optic communications infrastructure, including but not limited to installation or replacement of underground fiber, utility cabinets, fiber on existing above-ground utility lines, guylines, and poles already supporting wired infrastructure.
Special use management
Finding/Decision Date
3/18/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 3/18/2026 |
Categorical Exclusion · Chattooga River Ranger District · updated 5/13/2026
White and Habersham counties, GA · Habersham; White, Georgia
Windstream proposes to upgrade and install fiber optic cable and supporting infrastructure along existing road rights-of-way and utility corridors on NFS lands of the Chattahoochee-Oconee NF in White and Habersham counties, Georgia on the Chattooga River Ranger District.
Special use management
Finding/Decision Date
3/18/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 3/18/2026 |
Categorical Exclusion · Blue Ridge Ranger District · updated 5/13/2026
Union and Lumpkin counties in Georgia · Lumpkin; Union, Georgia
Windstream proposes to install or replace existing fiber optic communications infrastructure, including but not limited to installation or replacement of underground fiber, utility cabinets, fiber on existing above-ground utility lines, guylines, and poles already supporting wired infrastructure.
Special use management
Finding/Decision Date
3/18/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 3/18/2026 |
Categorical Exclusion · Conasauga Ranger District · updated 5/11/2026
Lake Conasauga Recreation Area · Murray, Georgia
Proposed actions include maintenance and rehabilitation of existing assets to include water supply line replacements, toilet replacements, lake retaining wall repairs and beach hardening, shelter repairs, picnic area replacements, campground maintenance and signage replacement.
Recreation management
NEPA Start Date
10/30/2025
Finding/Decision Date
4/14/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
| Decision Signed Date | 4/14/2026 |
Decision Memo · Blueridge Ranger District · updated 4/23/2026
This project would contribute to the restoration, maintenance, and enhancement of aquatic habitats on the Blue Ridge Ranger District. · Fannin; Gilmer; Lumpkin; Towns; Union, Georgia
The purpose of the project is to enhance stream habitat conditions for trout and other aquatic species, which would move these areas toward the desired conditions stated in the Forest Plan.
Wildlife, fish, rare plantsWatershed management
Decision
04/2026 (Estimated)
Implementation
09/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Blueridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chattooga River Ranger District · updated 3/25/2026
This project is located in Rabun County, Georgia. This is the continuation of a long standing prescribed burning project to improve wildlife habitat and reduce fuels in the Wildland Urban Interface. · Rabun, Georgia
This is to continue burning of the Chestnut Mountain Burn Unit aimed at wildlife habitat improvement. This unit was last burned in 2015/2016.
Vegetation management (other than forest products)
Comment Period
11/30/2022
Decision
03/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Conasauga Ranger District · updated 3/3/2026 · decision 6/2026 (Estimated)
Chattooga County, GA · Chattooga, Georgia
Windstream proposes to install or replace existing fiber optic communications infrastructure, including but not limited to installation or replacement of underground fiber, utility cabinets, fiber on existing above-ground utility lines, guylines, and poles already supporting wired infrastructure.
Special use management
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
Decision Memo · Blueridge Ranger District · updated 2/25/2026
Union County, Georgia · Fannin; Gilmer; Lumpkin; Murray; Rabun; Towns; Union, Georgia
Spring 2025 outfitter and guide special use permits on the Blue Ridge Ranger District.
Special use management
Decision
02/2026 (Estimated)
Implementation
03/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Conasauga Ranger District; Blueridge Ranger District; Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Oconee Ranger District · updated 2/20/2026
Putnam County, Georgia · Baldwin; Jasper; Jones; Putnam, Georgia
Windstream proposes to install or replace existing fiber optic communications infrastructure, including but not limited to installation or replacement of underground fiber, utility cabinets, fiber on existing above-ground utility lines, guy lines, and poles already supporting wired infrastructure.
Special use management
NEPA Start Date
1/21/2026
Finding/Decision Date
2/13/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 2/13/2026 |
Environmental Assessment · Chattahoochee-Oconee National Forest All Units · updated 1/7/2026
The project is located in the Chattahoochee-Oconee National Forests. It includes a portion of the Cohutta WMA, and Dawson, Fannin, Gilmer, Habersham, Lumpkin, Murray, Rabun and White Counties. · Dawson; Fannin; Gilmer; Habersham; Lumpkin; Murray; Rabun; White, Georgia
The purpose of this project is to maintain or restore biologic integrity, connectivity, resilience, and soil and water quality on the 157,625 acres of the Foothills Landscape. More at: www.fs.usda.gov/goto/Foothills
Recreation managementWildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Comment Period
07/14/2021
Objection Period Start
10/27/2021
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Improvements/Construction; Watershed Improvements |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Conasauga Ranger District; Blueridge Ranger District; Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Conasauga Ranger District · updated 10/10/2025
41,503 acres of National Forest System lands on the Armuchee unit of the Conasauga Ranger District, located in Chattooga, Floyd, Gordon, and Walker counties. · Chattooga; Floyd; Gordon; Walker, Georgia
The primary objectives of this project are to restore and maintain native forest communities, reduce stand density in pine and pine-oak stands, expand prescribed fire use, enhance terrestrial and aquatic habitat diversity, and refine the road system.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Comment Period
05/28/2024
Objection Period Start
08/14/2024
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Watershed Improvements |
| Decision Notice and Finding of No Significant Impact for the Armuchee Ridge | Decision Signed Date: 04/06/2025 |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Conasauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Blueridge Ranger District · updated 9/19/2025
Fannin County, Georgia · Fannin, Georgia
The Blue Ridge Ranger District is evaluating a permit application to install a private gate on Sourwood Cove Lane in Morganton, GA.
Special use management
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Blueridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chattooga River Ranger District · updated 9/10/2025
Stephens County, Georgia · Stephens, Georgia
The District is considering an application from Georgia Gwinnett College for the construction and subsequent use of a research field station located within the Lake Russell Wildlife Management Area.
Special use management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Conasauga Ranger District · updated 9/9/2025
The Pocket Recreation Area is located off Pocket Road and includes a developed campground and a day-use area. · Floyd, Georgia
The Conasauga Ranger District received funding through the Emergency Relief for Federally Owned Roads (ERFO) program to repair Pocket Recreation Area infrastructure damaged from a flood event in 2022.
Recreation management
Decision
08/2025 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Conasauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Chattooga River Ranger District · updated 8/26/2025
This project is located in portions of Habersham, Stephens, and Banks Counties, Georgia, primarily within the Lake Russell WMA. · Banks; Habersham; Stephens, Georgia
Integrated resource management project aimed to improve forest health, return fire back to the landscape, improve habitat for rare plants, and conduct road improvement projects in the area.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementRoad management
Comment Period
07/11/2024
Objection Period Start
05/29/2025
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chattooga River Ranger District · updated 8/12/2025
Rabun County, Georgia · Rabun, Georgia
The District is considering an application for a multiyear special use permit, authorizing the Sky-to-Summit recreation event.
Special use management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Chattooga River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Blueridge Ranger District · updated 6/23/2025
Fannin County, Georgia · Fannin, Georgia
The District proposes conducting a combination of commercial vegetation treatments, noncommercial vegetation treatments, and prescribed fire to promote desirable native vegetation and improve habitat conditions for wildlife.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementRoad management
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Blueridge Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chattooga River Ranger District · updated 4/1/2025
Habersham County, Georgia · Habersham, Georgia
The Chattooga River Ranger District is proposing to close the entirety of Panther Creek Recreation Area to public use for a period of up to two years to protect human health and safety due to damage that was sustained during Hurricane Helene.
Regulations, directives, orders
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Order Creation/Modification |
| Decision Decided Date | 04/01/2025 |
| Forests | Chattahoochee-Oconee National Forests |
| Districts | Chattooga River Ranger District |
| Legal Land Description | Not Applicable |