Categorical Exclusion · Ketchikan - Misty Ranger District · updated 6/16/2026
Located in Ketchikan, the first mile of the Dear Mountain trail · Ketchikan Gateway, Alaska
Project will complete trail maintenance and repairs on the Deer Mountain Trail from the trailhead to the first overlook, a distance of approximately one mile. Trail maintenance may include brushing and logging out the trail, and cleaning culverts and drainage ditches.
Recreation management
NEPA Start Date
1/30/2026
Finding/Decision Date
5/5/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-26d-USFS |
| Decision Signed Date | 5/5/2026 |
Categorical Exclusion · Sitka Ranger District · updated 6/16/2026
At the end of Harbor Mountain Road on the Sitka Ranger District. · Sitka, Alaska
Monitoring equipment includes a fiberglass electronics enclosure, mounted rain gauge, a Temp/RH sensor and three instrumented soil profiles. The monitoring equipment functions year-round with occasional maintenance. The USGS is requesting authorization to have the equipment on site for 10 years.
Special use management
NEPA Start Date
1/21/2026
Finding/Decision Date
4/1/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 4/1/2026 |
Categorical Exclusion · Admiralty National Monument · updated 6/12/2026 · decision 10/2026 (Estimated)
Between Wastewater Treatment Plant 58.115264°, -134.749959° & Mean High Water Hawk Inlet 58.115309°, -134.755586° Copper River Meridian T43S R65E sec 26 & 27 · Juneau, Alaska
Hecla Greens Creek Mining Co. proposes to install 14-inch dia. 1474-foot long treated water outfall pipeline, within their existing, permitted 30' wide ROW on NFS lands.
Minerals and geologySpecial use management
NEPA Start Date
4/17/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-01d-FSA |
Categorical Exclusion · Hoonah Ranger District · updated 6/12/2026 · decision 2/2026 (Estimated)
FS Road 8576, -1 135.4671539°W 57.9652996°N · Hoonah-Angoon, Alaska
To make 70 acres available for community access to small-scale timber sales utilizing ground-based logging systems without the use of heavy machinery to harvest. Multiple small sales provide for opportunities for harvest of firewood, sawlogs and other timber products for commercial use.
Forest products
NEPA Start Date
8/29/2025
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-35d-USFS |
Categorical Exclusion · Juneau Ranger District · updated 6/5/2026
Trail between the Bonnie Brae neighborhood and Treadwell Ditch Trail on Douglas Island in Juneau, Alaska. · Juneau, Alaska
Bonnie Brae Trail Rehabilitation project will rehabilitate and harden an existing trail mostly within the existing trail prism, except where minor reroutes or switchbacks are needed. This trail connects the Bonnie Brae area to Treadwell Ditch Trail.
Recreation management
Finding/Decision Date
6/5/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-26d-USFS |
| Decision Signed Date | 6/5/2026 |
Environmental Impact Statement · Ketchikan - Misty Ranger District · updated 6/4/2026 · decision 8/2020 (Estimated)
Ketchikan Gateway Borough, Alaska · Ketchikan Gateway, Alaska
The Forest Service is proposing a multi-year project involving a variety of timber harvest, road construction, watershed restoration and recreation activities.
Forest productsRecreation managementRoad managementWildlife, fish, rare plants
Project documents
Environmental Impact Statement · Thorne Bay Ranger District · updated 6/4/2026 · decision 9/2022 (Estimated)
Twin Mountain II is on Prince of Wales Island within the Tongass National Forest, about 75 to 100 miles west of Ketchikan, Alaska. The project is comprised of two separate areas – the Red Bay area on the north end of Prince of Wales Island, and the Staney area near Naukati on the west-central portion of the Island. · Prince of Wales-Hyder, Alaska
The proposed action is expected to produce about 26.8 million board feet of timber from approximately 1,655 acres of National Forest System lands in the Staney and Red Bay areas within the Thorne Bay RD. Other activities include road construction, reconstruction, maintenance and decommissioning.
Forest productsRoad management
NEPA Start Date
9/14/2020
Project documents
Environmental Impact Statement · Tongass National Forest · updated 6/1/2026
Tongass National Forest · Haines; Hoonah-Angoon; Juneau; Ketchikan Gateway; Petersburg; Prince of Wales-Hyder; Sitka; Skagway; Wrangell; Yakutat, Alaska
Land management plan revision for the Tongass National Forest under the 2012 Planning Rule.
Land management planning
Project documents
Environmental Assessment · Juneau Ranger District · updated 5/29/2026
The cabin site is 13 miles north of the Juneau International Airport approximately 1 mile from the terminus of the Herbert Glacier. · Juneau, Alaska
Construct a new recreation cabin accessible to the public by helicopter or by foot via a 4.4-mile hike on the Herbert Glacier Trail. Other infrastructure includes a vault-style outhouse, a gathering area, a helicopter landing site and access trails.
Recreation management
Comment Period
04/12/2025
Objection Period Start
01/24/2026
Decision
05/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Tongass National Forest |
| Districts | Juneau Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Yakutat Ranger District · updated 5/28/2026
FS Road 9965 · Yakutat, Alaska
The overall objective of this project is to create a small-scale timber sale opportunity that benefits local operators and sawmills, while addressing ongoing environmental and safety issues. In addition to utilizing the naturally available salvage material, the project will facilitate access to the
Forest products
NEPA Start Date
11/21/2025
Finding/Decision Date
5/26/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-36d-USFS |
| Decision Signed Date | 5/26/2026 |
Categorical Exclusion · Sitka Ranger District · updated 5/27/2026
Re-issue special use permit for coho rearing facility- run by NSRAA
Project documents
Categorical Exclusion · Sitka Ranger District · updated 5/27/2026
Re-Issue of special use permit for a salmon hatchery run by Northern Southeast Regional Aquaculture Association.
Project documents
Categorical Exclusion · Hoonah Ranger District · updated 5/22/2026
The exploration project is located on the Hoonah Ranger District of the Tongass National Forest on Chichagof Island, approximately two miles southwest of the town of Pelican, Alaska. · Hoonah-Angoon, Alaska
The activity for the Apex-El Nido Exploration project entails conducting hard rock exploration through diamond core drilling. It is anticipated a maximum of 15 holes will be drilled.
Minerals and geology
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-32d-USFS |
Categorical Exclusion · Tongass National Forest · updated 5/22/2026
59.30369N, 139.11509W · Yakutat, Alaska
Proposal to modify an existing permitted use within the authorized area, with minor additions and improvements to existing facilities.
Special use management
NEPA Start Date
2/20/2026
Finding/Decision Date
2/25/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 2/25/2026 |
Decision Memo · Juneau Ranger District · updated 5/21/2026
USDA Forest Service, Juneau Ranger District administrative site. · Juneau, Alaska
Install an underground Forest Service-owned and operated fiber optic cable between the district office building and Bunkhouse A, and between Bunkhouses A and B.
Facility management
Decision
05/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Tongass National Forest |
| Districts | Juneau Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Thorne Bay Ranger District · updated 5/21/2026
Within 8 miles of the community of Whale Pass, Prince of Wales Island, Alaska. Harvest would occur along National Forest System roads 25, 2505, 27, 2730, 2730200 and 2720. · Prince of Wales-Outer, Alaska
Harvest approximately 70 acres of live young-growth trees.
Forest products
Decision
05/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Green) |
| Forests | Tongass National Forest |
| Districts | Thorne Bay Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Tongass National Forest · updated 5/7/2026
59.15603N, 138.54384W
Proposal to modify an existing permitted use within the authorized area, with minor additions and improvements to existing facilities.
Special use management
NEPA Start Date
2/20/2026
Finding/Decision Date
2/25/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 2/25/2026 |
Decision Memo · Wrangell Ranger District · updated 5/6/2026
The plan of operations pertains to federal mining lode claims in the northwest part of Zarembo Island, south of St John Harbor. The Frenchie claims are in the area of St. John and Frenchie Creeks. · Wrangell-Petersburg, Alaska
Proposal to continue authorizing exploration activities by Zarembo Minerals Co. on Zarembo Island until July 2023. Activities to continue include surface exploration and drilling, use of a closed spur road, and onsite storage of drilling equipment.
Minerals and geology
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Tongass National Forest |
| Districts | Wrangell Ranger District |
| Legal Land Description | Sections 8, 9, 16 and 17, Township 63 South, Range 80 East, Copper River Meridian |
Categorical Exclusion · Juneau Ranger District · updated 5/6/2026
parallel and north of Backloop Rd. and east of Backloop bridge approx. 1,500 feet. · Juneau, Alaska
Due to the increasing annual glacial outburst flood event, the City and Borough of Juneau proposes emergency flood barrier construction of either HESCO barriers or a berm/levee parallel to the north of Backloop Road extending approximately 1,500 feet east of the bridge on state ROW and NFS lands.
Land management planning
Finding/Decision Date
5/6/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-25d-RD |
| Decision Signed Date | 5/6/2026 |
Decision Memo · Petersburg Ranger District · updated 4/29/2026
Cabin is on a small peninsula on the west side of Duncan Canal, near Castle Islands, on Kupreanof Island. From Petersburg, the site is 15 miles by float plane or 25 miles by boat. · Wrangell-Petersburg, Alaska
Proposal to replace the existing Breiland Slough public use recreation cabin and improve access to the site.
Recreation management
Decision
01/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Tongass National Forest |
| Districts | Petersburg Ranger District |
| Legal Land Description | Latitude: 56.63811, Longitude: -133.16031 |
Categorical Exclusion · Sitka Ranger District · updated 4/14/2026
False Island and Corner Bay · Sitka, Alaska
Improvements at the existing False Island and Corner Bay administrative sites.
Facility management
NEPA Start Date
4/16/2025
Finding/Decision Date
3/27/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-43d-USFS |
| Decision Signed Date | 3/27/2026 |
Categorical Exclusion · Thorne Bay Ranger District · updated 4/2/2026
Eastern Prince of Wales Island, approximately 0.4 miles northwest of Thorne Bay, AK. T71S, R84E, Section 21: CRM · Prince of Wales-Hyder, Alaska
This project includes construction of 1 new temporary road on Forest Service lands and reconstruction of 1 existing temporary road on Forest Service lands for easement access to State of Alaska planned timber sales. Anticipated timing is summer FY26 & FY27.
Special use management
NEPA Start Date
10/1/2025
Finding/Decision Date
4/2/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 4/2/2026 |
Decision Memo · Juneau Ranger District · updated 1/7/2026
Trailhead is outside of Juneau, Alaska, at mile 28 Glacier Highway. The trail is on land managed by the USDA Forest Service and the State of Alaska, Division of Parks and Outdoor Recreation. · Juneau, Alaska
Improve Amalga Trail from mile 1.45 to mile 5.56, known as sections 3 to 6. Other improvements include improving signage, and establishing several rest areas along the trail.
Recreation management
Decision
12/2025 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Tongass National Forest |
| Districts | Juneau Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Admiralty Island National Monument · updated 1/6/2026
Greens Creek Mine, Admiralty Island, Alaska · Juneau, Alaska
Hecla Greens Creek Mining Company proposes to extend their surface exploration authorization by five years and incorporate new areas of interest.
Minerals and geology
Comment Period
09/27/2023
Objection Period Start
10/01/2025
Decision
01/2026 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Tongass National Forest |
| Districts | Admiralty Island National Monument |
| Legal Land Description | Not Applicable |
Decision Memo · Wrangell Ranger District · updated 11/25/2025
All 3 sites are on alpine mountain tops. Etolin at 3,116 ft elevation on Etolin Island; Farragut at 3,946 ft elevation on the mainland; Fools at 3,481 ft elevation on Wrangell Island. · Wrangell-Petersburg, Alaska
Replace and improve three helicopter pads at the existing Etolin, Farragut, and Fools radio repeater administrative sites.
Facility management
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Tongass National Forest |
| Districts | Wrangell Ranger District |
| Legal Land Description | Etolin: Lat/Long 56 degrees 8' 49.00"N, 132 degrees 37' 23.00"W; Farragut: Lat/Long 57 degrees 7' 20.70"N, 133 degrees 2' 41.17"W; Fools: Lat/Long 56 degrees 12' 54.01"N, 131 degrees 58' 33.01"W |
Decision Memo · Juneau Ranger District · updated 11/25/2025
Near the Herbert Glacier trail, NW of Juneau, Alaska. · Juneau, Alaska
Installation and maintenance of 1 stream gauge and 2 meteorological stations to gather environmental data in support of the New Amalga Gold Mine.
Special use management
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Minerals Or Geology Plans Of Operations |
| Forests | Tongass National Forest |
| Districts | Juneau Ranger District |
| Legal Land Description | Met. Station 1 and Stream gauge: T39S, R65E, Section 5 Met Station 2: T38S, R65E, Section 33 |
Decision Memo · Wrangell Ranger District · updated 11/25/2025
At mile post 0.5 on Pats Creek Road (NFS road 6259), approximately 10 miles south of the town of Wrangell on Wrangell Island. · Wrangell-Petersburg, Alaska
Construct a group shelter and three-sided shelter at existing roadside day use sites adjacent to Pats Lake. Both sites would include a vault toilet and parking area.
Recreation management
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Tongass National Forest |
| Districts | Wrangell Ranger District |
| Legal Land Description | Township 64S; Range 84E; Section 5 |
Decision Memo · Wrangell Ranger District · updated 11/25/2025
Near Pats Lake on Wrangell Island on National Forest System road 6259. Approximately 10 miles south of the town of Wrangell. · Wrangell-Petersburg, Alaska
Construct 1/2 mile of trail to connect existing Pats Creek Trail to National Forest System road 6259. Construction includes aggregate, concrete steps and elevated boardwalk. Up to three spur trails proposed leading to wildlife viewing platforms.
Recreation management
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Tongass National Forest |
| Districts | Wrangell Ranger District |
| Legal Land Description | Township 64S; Range 84E; Section 5 |
Environmental Assessment · Thorne Bay Ranger District · updated 10/20/2025
Project area is about 26,371 acres of NFS land and 3,604 acres of land of other ownership (non-NFS land) on the eastern side of Prince of Wales Island, near Thorne Bay, Alaska. · Prince of Wales-Outer, Alaska
This project would improve wildlife habitat, provide commercial young-growth harvest opportunities, implement riparian and road restoration activities in the project areas, as well as to provide support for employment and economic growth.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Watershed managementRoad managementClimate change adaptation
Comment Period
09/17/2023
Objection Period Start
03/28/2025
Decision
10/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Biomass; Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Tongass National Forest |
| Districts | Thorne Bay Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Yakutat Ranger District · updated 9/26/2025
The Cannon Beach parking expansion site is located 4.9 road miles south of Yakutat, Alaska. · Yakutat, Alaska
Expand existing parking lot, add new parking areas, and construct about 750 feet of new road to improve traffic flow and user safety, and meet capacity demands at the Cannon Beach Recreation Site.
Recreation managementRoad management
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Road Maintenance; Road Improvements/Construction |
| Forests | Tongass National Forest |
| Districts | Yakutat Ranger District |
| Legal Land Description | SE 1/4 of NW 1/4 Section 18, T.28S, R.33E, Copper River Meridian |
Decision Memo · Hoonah Ranger District · updated 9/26/2025
The project area is about 23 miles from Hoonah, Alaska, approximately 1 mile north of False Bay. · Skagway-Hoonah-Angoon, Alaska
Proposed salvage timber sale within in a blow down area adjacent to NFS road 8530. The harvest area would include 3 units and provide approximately 88 thousand board feet of timber from about 25 acres.
Forest products
Decision
09/2025 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Tongass National Forest |
| Districts | Hoonah Ranger District |
| Legal Land Description | T45S R65E, Sections 18 and 19 |
Environmental Assessment · Hoonah Ranger District · updated 9/3/2025
Located on Chichagof Island, at False Bay along FS Road 8530 approximately 25 miles from Hoonah. · Skagway-Hoonah-Angoon, Alaska
Construct a new recreation cabin at False Bay, on Chichagof Island, approximately 25 miles from Hoonah Alaska on FS Road 8530. Proposed features include: cabin, vault toilet, woodshed, picnic table/fire ring, parking area, access trails and buoy.
Recreation management
Comment Period
09/04/2024
Objection Period Start
06/28/2025
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Tongass National Forest |
| Districts | Hoonah Ranger District |
| Legal Land Description | 57.953253, -134.938116 approx. location |
Decision Memo · Petersburg Ranger District · updated 7/18/2025
The Kake Road System on Kupreanof Island · Wrangell-Petersburg, Alaska
Annually, for the next 5 yrs, extract 200 to 300 native western redcedar seedlings growing on the roadbed of National Forest System road 6041. Plant along the Kake road system in areas disturbed by management activities. Only handtools would be used.
Vegetation management (other than forest products)
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Population Enhancements |
| Forests | Tongass National Forest |
| Districts | Petersburg Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Yakutat Ranger District · updated 7/17/2025
Bad Day Creek and Colorado Road Stream corridors north of the Yakutat Airfield. · Yakutat, Alaska
Remove culverts and replace with new structures at 2 sites, add large wood to stream channel and remove aggregate fill from the floodplain. Hand crews would complete most of the work, but heavy equipment and blasting may be needed to remove culverts.
Wildlife, fish, rare plantsWatershed management
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Tongass National Forest |
| Districts | Yakutat Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Thorne Bay Ranger District · updated 7/9/2025
10 miles south of Naukati, Alaska. · Prince of Wales-Outer, Alaska
The Thorne Bay Ranger District is proposing to harvest approximately 125 acres of old growth live trees due to interest received from a prospective purchaser located on Prince of Wales Island. The area is 10 miles south of Naukati.
Forest products
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Green) |
| Southside Helicopter Sale Decision Memo | Decision Signed Date: 07/08/2025 |
| Forests | Tongass National Forest |
| Districts | Thorne Bay Ranger District |
| Legal Land Description | T70S R80E Sections 20, 29 & 36 T71S R80E Section 1 |
Decision Memo · Thorne Bay Ranger District · updated 6/30/2025
Five sites along National Forest System rds on POW Island near Neck Lake and the community of Whale Pass (3 rock pits on Neck Lake Rd, 1 rock pit on Snoose Ck Rd and 1 site at Whale Pass LTF). · Prince of Wales-Outer, Alaska
Proposal to establish 5 temporary storage and stockpile sites on National Forest System land in support of the Neck Lake Rd reconstruction project. Site areas total about 3.25 acres. Materials and improvements would be removed upon permit expiration.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Tongass National Forest |
| Districts | Thorne Bay Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Juneau Ranger District · updated 6/18/2025
At the mouth of Taku Inlet. Approximately 12 air miles southwest of Juneau, Alaska. · Wrangell-Petersburg, Alaska
Request from the US Border Patrol for a 10-year special use permit to install and maintain cameras to monitor vessels entering and exiting the Taku Inlet.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Tongass National Forest |
| Districts | Juneau Ranger District |
| Legal Land Description | Section 12, T.42S., R.69E., and Section 23, T.42S., R.69E., Copper River Meridian |
Decision Memo · Yakutat Ranger District · updated 6/16/2025
Within the Yakutat Beach Recreation area, a 5-mile drive from the town of Yakutat, Alaska. · Yakutat, Alaska
Proposal to convert a developed campsite within the Yakutat Beach Recreation Area into a public use recreation cabin site.
Recreation management
Decision
06/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Tongass National Forest |
| Districts | Yakutat Ranger District |
| Legal Land Description | T.28S, R.33E, Section 12, SE 1/4 of Copper River Meridian |
Environmental Impact Statement · Admiralty Island National Monument · updated 11/7/2024
Greens Creek Mine, Admiralty Island, Alaska · Juneau, Alaska
Hecla Greens Creek Mining Company proposes to extend the existing dry-stack tailings disposal facility and incorporate waste rock co-disposal techniques in a northward direction for additional tailings and waste rock storage capacity.
Minerals and geology
NOI in Federal Register
10/09/2020
DEIS NOA in Federal Register
03/24/2023
FEIS NOA in Federal Register
02/02/2024
Objection Period Start
02/02/2024
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Tongass National Forest |
| Districts | Admiralty Island National Monument |
| Legal Land Description | Not Applicable |
Environmental Assessment · Craig Ranger District · updated 10/1/2024
Maybeso Experimental Forest research station, an administrative Forest Service site near Hollis, AK on Prince of Wales Island · Prince of Wales-Outer, Alaska
Replace the potable water system for several Forest Service administrative buildings and a small school. Includes improvement of water reservoir, channel spillway and filtration treatment system.
Facility managementResearch
Comment Period
06/15/2022
Objection Period Start
07/17/2024
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction; Facility Maintenance; Research And Development |
| Maybeso Experimental Forest Administrative Site Potable Water Project | Decision Signed Date: 09/27/2024 |
| Forests | Tongass National Forest |
| Districts | Craig Ranger District |
| Legal Land Description | T74S, R84E, Sec 4, Copper River Meridian |
Decision Memo · Wrangell Ranger District · updated 8/14/2024
Work will be accomplished on NFS Road 6267 Nemo-Skip Creek Loop Road & associated spur roads 50033 and 50035 (roads to Anita Bay & Highline Recreation Areas). · Wrangell-Petersburg, Alaska
Approximately 5 miles of FS Road 6265 (Nemo-Skip Loop Road) & associated culverts will be repaired. Current wood waste road base will be replaced with more stable gravel surface, as well as other activities associated with road stabilization.
Road management
Decision
07/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 07/09/2021 |
| Forests | Tongass National Forest |
| Districts | Wrangell Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Admiralty Island National Monument · updated 8/9/2024
The area is referred to collectively as Cube Cove on the western side of Admiralty Island, extending from Cube Cove (proper) in the north to the Lake Florence watershed. · Juneau, Alaska
Following the purchase of 22,890 acres, the District proposes to restore and preserve wilderness character in the Cube Cove portion of the Kootznoowoo Wilderness through re-establishing hydrologic function.
Watershed managementWildlife, fish, rare plantsProjects that may affect wilderness (for mailing list contacts)
Comment Period
06/22/2022
Objection Period Start
03/23/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Species Habitat Improvements; Watershed Improvements; Wilderness Management |
| Cube Cove Restoration Project | Decision Signed Date: 08/09/2024 |
| Forests | Tongass National Forest |
| Districts | Admiralty Island National Monument |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Juneau Ranger District · updated 12/19/2023
Mendenhall Glacier Recreation Area is located 12 miles from downtown Juneau, in Mendenhall Valley. · Juneau, Alaska
Constructing facility improvements within the Mendenhall Glacier Recreation Area to accommodate anticipated visitor growth.
Recreation managementSpecial area managementFacility management
NOI in Federal Register
12/16/2020
DEIS NOA in Federal Register
03/04/2022
FEIS NOA in Federal Register
05/12/2023
Objection Period Start
05/13/2023
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Trail Management; Special Area Management |
| Forests | Tongass National Forest |
| Districts | Juneau Ranger District |
| Legal Land Description | Not Applicable |