Los Padres National Forest — Project Detail

114 projects with crawled detail · milestones · contacts · documents

Los Padres National Forest

R05 Pacific Southwest · 114 projects · crawled 2026-08-01
Completed 105 Cancelled 9
Decision Memo 87 Environmental Assessment 22 Environmental Impact Statement 5
114 with documents 36 with comments page
Decision Memo · Monterey Ranger District · updated 3/3/2025
Chalk Peak Inventoried Roadless Area near boundary with Fort Hunter Liggett · Monterey, California

Drill up to four test wells at the proposed fire station rebuild site along the Nacimiento-Fergusson Road to determine whether adequate water is present to support fire station operations.

Facility management
Scoping Start
12/13/2023
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
Gregory Thompson · gregory.thompson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionSW 1/4 S.29 and SE 1/4 S.30, T.22S, R.6E, Mt. Diablo Meridian
Decision Memo · Monterey Ranger District · updated 10/4/2024
Various locations in the Monterey Ranger District · Monterey, California

Authorize, via special use permit, operation, maintenance, and repair of eight existing ALERT flood warning installations. Four of the flood warning installations are located in the Ventana Wilderness, and four are located outside of wilderness.

Special use managementProjects that may affect wilderness (for mailing list contacts)
Scoping Start
09/13/2023
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
John Eifert · john.eifert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Santa Lucia Ranger District · updated 6/26/2024
Los Padres National Forest, San Luis Obispo and Santa Barbara Counties, California. Approximately 15 miles east of Santa Maria. · San Luis Obispo; Santa Barbara, California

Proposal to authorize continued grazing on the Porter, Pine Canyon and South Fork La Brea Allotments.

Grazing management
Scoping Start
04/08/2009
Comment Period
11/15/2022
Objection Period Start
09/2024 (Estimated)
Decision
12/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Coy Burnett · Coy.Burnett@usda.gov
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT32S, R17 &18E, MDM and T9,10,11&12N, R30,31 &32W SBM
Decision Memo · Mt. Pinos Ranger District · updated 6/26/2024
Dick Smith Wilderness/Santa Barbara Canyon Trail near Malduce Camp · Santa Barbara, California

Construct a 0.92 mile reroute around a failed section of trail between Santa Barbara Canyon Trailhead and Malduce Camp. Decommission .47 miles of existing trail.

Recreation management
Scoping Start
09/25/2023
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Logan Mikus · Logan.Mikus@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Barbara Ranger District · updated 6/25/2024
Hilton Spring is located · Santa Barbara, California

Renewal of expired water system permit - Special Use Permit to include: spring diversion at Hilton Spring, waterline, 2 water storage tanks, water treatment facility and access road to tank and treatment facility.

Special use management
Scoping Start
08/2021 (Estimated)
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Veronica Garza · veronica.garza@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionSection 32, Township 6N., Range 29W.
Environmental Assessment · Santa Lucia Ranger District · updated 6/24/2024
1.5 miles west off Hwy 101 in San Luis Obispo County, 3 miles north of the City of San Luis Obispo. · San Luis Obispo, California

Improve resource conditions and protect the Cuesta Botanical Special Interest Area on West Cuesta Ridge by providing sustainable managed recreation activities consistent with Los Padres LMP, to include designating 10 mountain bike trails.

Recreation management
Scoping Start
08/05/2019
Comment Period
01/2024 (Estimated)
Objection Period Start
03/2024 (Estimated)
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Bert Fuiava · Bert.Fuiava@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Trail Management; Scenery Management; Travel Management
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT30S, R12E, SBBM
Environmental Assessment · Los Padres National Forest All Units · updated 4/3/2024
The 4-proposed pads to be drilled are about 5 miles north of Fillmore in the Sespe oil field. All located in Sec.29, T.5N, R.19W, SBBM. · Ventura, California

Carbon California is requesting to drill 8 oil and gas wells at 4 existing well pads, installation of 7,960 feet of new pipeline, a 400 barrel emergency tank, a transfer pump, three pressure vessels, and 2 master headers in the Sespe Oil Field.

Minerals and geology
Scoping Start
05/08/2014
Comment Period
11/15/2021
Objection Period Start
08/2021 (Estimated)
Decision
10/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
Jonathan Schwartz · jonathan.schwartz@usda.gov
NEPA / regulatory detail
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390); Forest Service Energy Implementation Plan
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityNatural Gas; Oil
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionT5N, R19W, Section 29, SBBM
Decision Memo · Ojai Ranger District · updated 2/26/2024
Wheeler Gorge Fire Station off Highway 33. · Ventura, California

Replace existing, obsolete communication tower at administrative facility with a new tower similar in size, scope, and dimension to improve communications and reliability.

Facility management
Scoping Start
01/24/2024
Decision
02/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
Steven Yamshon · Steven.Yamshon@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Monterey Ranger District · updated 10/4/2023
Ventana Wilderness / Big Sur Wild River Corridor near Barlow Flat Camp · Monterey, California

Construct a crib wall to reopen a 0.26-mile section of the Pine Ridge Trail near Barlow Flat Camp to pedestrian traffic, thereby allowing hikers to bypass the two seasonal river crossings that are on the main route.

Recreation managementProjects that may affect wilderness (for mailing list contacts)
Scoping Start
08/11/2023
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Chevene Simmons · Chevene.Simmons@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionSE 1/4 S.26, T.19S, R.2E, Mt. Diablo Meridian
Environmental Impact Statement · Santa Barbara Ranger District · updated 9/26/2023
West of Hwy 154 on W. Camino Cielo, 5 mi. north of Goleta. · Santa Barbara, California

Proposal to issue a permit for ongoing operation of exisitng target range. Previously an EA (project #2147) overturned on appeal. Project is in or adjacent to Tequepis IRA.

Special use managementRecreation management
NOI in Federal Register
04/27/2012
DEIS NOA in Federal Register
12/2021 (Estimated)
FEIS NOA in Federal Register
01/2022 (Estimated)
Objection Period Start
09/2021 (Estimated)
Decision
01/2022 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
Daryl Hodges · daryl.hodges@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionSec 18 & 19 T5N, R28W; Sec 13 & 24 T5N, R 29W, SBM
Decision Memo · Santa Barbara Ranger District · updated 8/2/2023
Located along the East Camino Cielo road that lies on the ridge of the Santa Ynez Mountains North of the communities of Goleta, Santa Barbara, and Montecito of Santa Barbara County. · Santa Barbara, California

The proposed action includes the construction and maintenance of barriers to reverse and prevent further resource damage caused by user created trails and group congregation locations that were established in areas impacted by the 2009 Jesusita Fire

Watershed managementWildlife, fish, rare plants
Scoping Start
03/06/2023
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Valerie Hubbartt · valerie.hubbartt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 5/15/2023
Approximately 15 miles southeast of Pozo, CA in San Luis Obispo County · San Luis Obispo, California

SLO County proposes to install a 100' tower on 23.5' x 23.5' concrete pad within the existing footprint of the communications site.

Special use management
Scoping Start
06/06/2022
Decision
05/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
David Betz · david.betz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT31S, R17E, Sec. 15, Mt. Diablo Meridian
Decision Memo · Los Padres National Forest All Units · updated 2/27/2023
Along Pine Mountain Ridge to Reyes Peak. · Ventura, California

In the Reyes Peak Ridge Area, treatments would be completed to reduce surface and ladder fuels, reduce potential fire intensities and make the area more resilient to wildfire for community protection, forest health, and to protect wildlife habitat.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels management
Scoping Start
05/27/2020
Decision
09/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
Gregory Thompson · gsthompson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Noxious Weed Treatments; Timber Sales (Salvage); Timber Sales (Green)
ForestsLos Padres National Forest
DistrictsOjai Ranger District; Mt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Monterey Ranger District · updated 9/28/2022
Ventana Wilderness / Big Sur Wild River Corridor near Barlow Flat Camp · Monterey, California

Construct a 0.4-mile reroute around a failed section of the Pine Ridge Trail near Barlow Flat Camp.

Recreation management
Scoping Start
04/12/2019
Decision
09/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Thomas Murphey · tmurphey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionSE 1/4 S.26, T.19S, R.2E, Mt. Diablo Meridian
Decision Memo · Los Padres National Forest All Units · updated 9/28/2022
Kern County, Tecuy Ridge · Kern, California

Healthy Forest Thinning Project within areas at risk or currently being impacted by insects.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
03/14/2018
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Gregory Thompson · gsthompson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Noxious Weed Treatments; Timber Sales (Salvage); Timber Sales (Green)
Tecuya Ridge Shaded Fuelbreak Project - Revised Decision MemoDecision Signed Date: 07/01/2022
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT9N, R19W, Sec. 18,28,29,30,31,32,33 SBM. T9N, R20W, Sec. 18,19,20,21,22,23,24,25,27,28,29 SBM. T9N, R21W, Sec. 13,14,15,23,24 SBM.
Environmental Assessment · Los Padres National Forest All Units · updated 8/23/2022
W of Hwy 154 on W Camino Cielo, 5 mi. N of Goleta · Santa Barbara, California

Proposal to issue a permit for ongoing operation of existing target range; previously an EA overturned on appeal. Project has been re-initiated as an EIS, and is in or adjacent to theTequepis IRA.

Recreation managementSpecial use management
Scoping Start
07/12/2002
Comment Period
12/08/2006
Decision
05/2007 (Estimated)
Implementation
06/2007 (Estimated)
Project documents
Jeff Bensen · jbensen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDirective Creation/Modification
Winchester Canyon Gun Club EADecision Signed Date: 05/23/2007 (Reversed in Appeal (215)) Legal Notice Date: 05/30/2007
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionSec 18&19, T5N, R28W; Sec 13&24, T5N, R29W;SBM
Decision Memo · Ojai Ranger District · updated 8/22/2022
All hiking trails located on the Ojai Ranger District, Los Padres National Forest. · Ventura, California

The Ojai Ranger District proposes to perform Level 1 & 2 maintenance on all of existing trails within the existing trail corridors.

Recreation management
Scoping Start
05/22/2018
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Diane Cross · dcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mt. Pinos Ranger District · updated 6/3/2022
Cuddy Valley, Mount Pinos Ranger District, Los Padres National Forest · Kern, California

Healthy Forest Thinning Project within areas at risk or currently being impacted by insects.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)Forest productsFuels management
Scoping Start
03/14/2018
Decision
11/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Gregory Thompson · gsthompson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Noxious Weed Treatments; Timber Sales (Green)
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT9N, 20W, Sec. 30, 31, 32, MDBM. T9N, R21W, Sec. 23, 24, 25, 26, 35, 36 SBM.
Decision Memo · Santa Lucia Ranger District · updated 3/14/2022
Approximately 14 miles east of Santa Margarita in San Luis Obispo County, CA · San Luis Obispo, California

New Cingular Wireless proposes to replace their existing 60' tower with a new 80' tall 3-leg lattice tower. The existing equipment cabinet would be replaced with a new 11'x 25' building, and the existing generator and propane tank would be replaced.

Special use management
Scoping Start
05/21/2021
Decision
02/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
David Betz · dbetz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT29S, R15E, Sec. 15, MDBM
Decision Memo · Los Padres National Forest All Units · updated 12/14/2021
The project will take place on the Santa Lucia, Santa Barbara and Mt. Pinos Ranger Districts on level 2 roads that are open for green sticker use. · Kern; San Luis Obispo; Santa Barbara; Ventura, California

The action is to complete road maintenance on 37 level 2 roads, approximately 183.20 miles, that are open to green sticker vehicles on the Santa Lucia, Santa Barbara and Mt. Pinos Ranger Districts

Road management
Scoping Start
09/24/2021
Decision
12/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Alicia Sanchez Scott · alicia.sanchezscott@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Santa Lucia Ranger District · updated 10/4/2021
Approximately 3-1/2 miles west of Santa Margarita, CA in San Luis Obispo County · San Luis Obispo, California

San Luis Obispo County proposes to replace their existing 50' tower with a new 100' tower on an approximately 20' by 20' concrete pad within the existing footprint of the communications site.

Special use management
Scoping Start
02/25/2021
Decision
10/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
David Betz · dbetz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT29S, R12E, Section 35, Mt. Diablo Meridan
Decision Memo · Los Padres National Forest All Units · updated 7/15/2021
Approximately 1.4 miles east of Big Sur in Monterey County, California. It's on a ridgeline approximately 1/2-mile south of Manuel Peak in T19S, R2E, Sec. 20, MDM. · Monterey, California

Pacific Bell Telephone Company proposes to install a 35' tall, 3-leg lattice tower on 14' x 14' concrete foundation. In addition, a 10'4" tall x 6'8" wide solar array would be installed on six 24"-diameter concrete piers.

Special use management
Scoping Start
03/20/2021
Decision
06/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
David Betz · david.betz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT19S, R2E, Sec. 20, Mt. Diablo Meridian
Decision Memo · Santa Barbara Ranger District · updated 2/5/2021
Rancho Alegre Boy Scout Camp private land west of Hwy 154 near Lake Cachuma. Pipe line from ranch crossing segments of National FS lands to the top of the waterfall in Tequepis Creek. · Ventura, California

A redwood-settling tank at the top of the waterfall in Tequepis Creek provides for water to be gravity fed through a pipe to Rancho Alegre Boy Scout Camp. The line system is cast iron 2" and 3" pipeline. The line is approximately 1.5 mile in length.

Special use management
Scoping Start
08/14/2020
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rancho Alegre SUP Water System Special Use Permit ReissuanceDecision Signed Date: 01/04/2021
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Los Padres National Forest All Units · updated 9/14/2020
All National Forest System lands part of and administered by the Los Padres National Forest. · Kern; Los Angeles; Monterey; San Luis Obispo; Santa Barbara; Ventura, California

Formerly called the Forest-Wide Noxious Weed Program. The intent of the project is to control targeted invasive plant species throughout the Los Padres National Forest using an integrated treatment approach.

Watershed managementWildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Scoping Start
05/30/2017
Comment Period
05/20/2019
Objection Period Start
03/23/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityNoxious Weed Treatments
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Santa Lucia Ranger District · updated 6/2/2020
26 miles east of Santa Maria, CA along N.Fork La Brea Creek. · Santa Barbara, California

Restore access opportunity, watershed stability and ecological protection to the N. Fork of La Brea Creek area following damage caused by the 2009 La Brea Fire & subsequent flooding events that resulted in extensive road damage and sediment loading.

Wildlife, fish, rare plantsWatershed managementRecreation managementRoad management
Scoping Start
02/22/2017
Comment Period
07/23/2018
Objection Period Start
08/16/2019
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Maintenance; Travel Management; Watershed Improvements
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT.10N.,R.31W.SBBM
Decision Memo · Los Padres National Forest All Units · updated 4/7/2020
The project is located 5 miles north of Fillmore in the Sespe oil field. · Ventura, California

Issuance of three new special use permits for a new term to replace three expired special use permits with only administrative changes. There are no changes to the authorized facilities or increase in the scope or intensity of activities.

Special use managementMinerals and geology
Scoping Start
11/21/2013
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionSections 29, 30, 31, 32 & 33, T.5 N., R. 19 W., SBM
Decision Memo · Monterey Ranger District · updated 3/18/2020
The Grizzly mine is located in Alder Creek about 1/4 mile above Alder campground in Monterey County in the Monterey District, Los Padres NF. · Monterey, California

Installation of three bat gates on three adits at the Grizzly mine to prevent human - bat interaction. Project will improve bat habitat and reduce safety risk to visitors.

Wildlife, fish, rare plants
Scoping Start
10/01/2019
Decision
02/2020 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Grizzly Mine ClosureDecision Signed Date: 02/11/2020
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Lucia Ranger District · updated 12/10/2019
Black Mountain Communication Site · San Luis Obispo, California

CHP requested authorization to replace the Forest Service building and tower at Black Mtn Communication Site and to co-locate with the Forest Service and other public agencies in the new facility. Within or adjacent to Black Mtn. IRA.

Special use managementFacility management
Scoping Start
09/10/2010
Comment Period
05/31/2012
Decision
01/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Vicki Collins · vcollins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DGS/CHP Communications Use Lease Black Mountain Communications Site SouthDecision Signed Date: 01/10/2013 Legal Notice Date: 01/16/2013
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionSection 15, T29S, R15E, MDM
Decision Memo · Ojai Ranger District · updated 12/10/2019
Sespe Oil Field, 5 miles north of Fillmore, CA. · Ventura, California

To greatly reduce risk of line failure and for safer operations, Seneca has requested authorization to relocate select lines along existing roads and relocate old swing tanks to a centralized treating facility with newer & safer tanks.

Minerals and geologySpecial use management
Scoping Start
07/16/2012
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
Decision Memo - Seneca 2012 pipeline Relocation ProjectDecision Signed Date: 03/24/2014
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionSections 28, 29, 31, 32 & 33, T5N, R19W, SBM
Decision Memo · Ojai Ranger District · updated 12/10/2019
four weeper dams / catchment basins located within Upper Maple Creek, Upper Tar Creek, and two basins within Fourfork Creek in the Sespe oil field. · Ventura, California

On-going maintenance work on four weeper dams / catchment basins located within the Sespe oil field in order to protect lower habitat in case of oil spill. The total area of all four catchment basins is 0.228 acres.

Minerals and geology
Scoping Start
02/09/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (3)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance; Minerals Or Geology Plans Of Operations; Oil; Road Maintenance
Seneca Weeper Dams Maintenance ProjectDecision Signed Date: 06/04/2015
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 12/10/2019
The project is located within an unnamed tributary to the Cuyama River (T8N, R24W, Section 34). Access to the site is off State Highway 33,4.6 mile northwest of the Lockwood Valley Road intersection. · Ventura, California

The action is to repair a 20-inch high pressure gas pipeline within an unnamed tributary to the Cuyama River. The action includes replacing 74 feet of mostly exposed pipleine with 83 linear feet of underground pipeline.

Minerals and geologySpecial use management
Scoping Start
02/26/2015
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Authorization for Maintenance Repair Project on Southern CA Gas CompanyDecision Signed Date: 04/24/2015
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Barbara Ranger District · updated 10/24/2019
Cold Springs Trail (26W10) within the Gibraltar Reservoir sediment bed. · Santa Barbara, California

Proposal to reroute an approximate one-mile section of the Cold Spring Trail (26W01) out of the Gibraltar Reservoir sedimentation bed to an upland location that will provide more sustainability and improve the trail user experience.

Recreation management
Scoping Start
11/06/2018
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
John Smith · jsmith03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Lucia Ranger District · updated 7/11/2019
Sunset Valley Road between Davy Brown and Nira Campgrounds. · Santa Barbara, California

Proposal to remove one concrete low-water crossing on Munch Creek and complete channel restoration, and replace two low-water crossings on Davy Brown Creek with stream-spanning bridges to improve aquatic organism passage.

Wildlife, fish, rare plantsWatershed management
Scoping Start
11/15/2017
Decision
07/2019 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Kristie Klose · kristieaklose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 6/17/2019
National Forest System trails on the Santa Lucia, Santa Barbara, Ojai, and Mount Pinos Ranger Districts, Los Padres National Forest. · Kern; San Luis Obispo; Santa Barbara; Ventura, California

The Ventura Chapter of the Sierra Club submitted a proposal to change their existing temporary Special Use Permit to a term permit.

Recreation managementSpecial area management
Scoping Start
12/04/2018
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Diane Cross · dcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
Sierra Club Outfitter & Guide Term Special Use PermitDecision Signed Date: 06/17/2019
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District; Santa Barbara Ranger District; Ojai Ranger District; Mt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 4/29/2019
Designated communications sites and single use communications sites on all units of Los Padres National Forest · Kern; Monterey; San Luis Obispo; Santa Barbara; Ventura, California

Multiple authorizations for existing communication facilities that support AM/FM radio, television, cellular service, and other uses will expire soon. The proposal is to re-issue authorizations for these existing uses for new terms as they expire.

Special use management
Scoping Start
06/06/2018
Decision
04/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Vicki Collins · vcollins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 3/28/2019
SCE facilities are on Santa Barbara, Ojai and Mt. Pinos Ranger Districts. PGE facilities are on Santa Barbara, Mt. Pinos, Santa Lucia and Monterey Ranger Districts. · Santa Barbara, California

Approve continued operation, maintenance and use of existing distribution and transmission powerlines and infrastructure for SCE and PGE located within existing corridors on the Los Padres National Forest

Special use management
Scoping Start
03/12/2018
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
Spencer Bleadorn · sbleadorn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
To Reissue & Administratively Combine SCE & PGE Master Permits and EasementDecision Signed Date: 02/15/2019
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Ojai Ranger District · updated 3/13/2019
The Blue Point Campground and Day Use Area Removal and Restoration Project (Blue Point Project) is located 13 miles north of Piru, California and 2 miles north of Piru Reservoir in Ventura County, CA. · Ventura, California

The Ojai Ranger District proposes to decommission the campground and infrastructure (parking, spurs, campsites, concrete ford, and rip-rap bank protection) utilizing heavy equipment to remove infrastructure and restore area to natural conditions.

Recreation managementWildlife, fish, rare plantsFacility managementWatershed managementRoad management
Scoping Start
07/23/2014
Comment Period
09/21/2017
Objection Period Start
05/16/2018
Decision
07/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Diane Cross · dcross@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Species Habitat Improvements; Species Population Enhancements; Scenery Management; Travel Management; Watershed Improvements
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionSW1/4, Sec. 10, T5N R18W SBBM
Environmental Impact Statement · Monterey Ranger District · updated 11/13/2018
Monterey County, California, on the northern portion of the Monterey Ranger District of the Los Padres National Forest · Monterey, California

To re-establish and maintain 24.1 miles of historically used fuelbreaks, all of which originated as firelines within the wildland urban interface threat zones on NFS lands; approximately 7.5 miles in wilderness and 16.6 miles outside of wilderness.

Fuels managementVegetation management (other than forest products)
NOI in Federal Register
12/28/2012
DEIS NOA in Federal Register
01/27/2017
FEIS NOA in Federal Register
05/23/2018
Objection Period Start
05/23/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Nic Elmquist · nelmquist@fs.fed.us
NEPA / regulatory detail
Special AuthorityNational Fire Plan - Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Wilderness Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionPortions of T18S, R2E, 3E, 4E; T20S, R2E, 3E; Mount Diablo Meridian
Decision Memo · Monterey Ranger District · updated 8/9/2018
Bottchers Gap Campground located at top of Palo Colorado; Ponderosa and Nacimiento Campgrounds located along Nacimiento-Fergusson Road. · Monterey, California

Selectively remove bay and tanoak trees in Bottchers, Ponderosa, and Nacimiento campgrounds to prevent dispersion of disease spores to adjacent disease-vulnerable native oak trees. Treat cut stems with herbicide to prevent re-sprouting.

Fuels managementRecreation managementVegetation management (other than forest products)
Scoping Start
05/05/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Jeff Kwasny · jkwasny@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Monterey Ranger District · updated 7/23/2018
Throughout the District · Monterey; San Luis Obispo, California

Perform level 1 and level 2 maintenance on National Forest System trails in the Monterey Ranger District.

Recreation management
Scoping Start
09/05/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Thomas Murphey · tmurphey@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mt. Pinos Ranger District · updated 3/6/2018
Buried fiber optic cable located within existing AT&T R/W along Cuddy Valley Rd and Mil Potrero Hwy. Above ground cable collocated on existing SCE power poles. · Kern, California

AT&T requests the reissuance of 2 fiber optic line permits - MPD11001 and MPD429401. The entire length of the cable is approximately 15.23 miles of which 6.93 miles are on NF lands. All line exists within Kern Co Rd RoW on existing power poles.

Special area management
Scoping Start
05/19/2016
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionMPD429401 - Sec.19,29,32,33,35, T9N, R20W, and Sec.22,23,24, T9N, R21W, SBM MPD11001 - Sec. 14,15,23,24, T9N, R22W, SBM, FIBER OPTIC ROUTE FOLLOWS CUDDY VALLEY ROAD AND MIL POTRERO HWY
Decision Memo · Santa Barbara Ranger District · updated 10/13/2017
Along West Camino Cielo Road near Brush Peak. · Santa Barbara, California

Proposal to issue a short-term (one year or less) special use permit for the interim operation of the target range, which has been operating under Forest Service special use authorization since 1969, until analysis of a long-term permit is complete.

Special use managementRecreation management
Scoping Start
08/28/2017
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Jeff Bensen · jbensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Winchester Canyon Gun Club 2017-2018 Temp Special Use PermitDecision Signed Date: 10/06/2017
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionT5N, R29W, Section 24 SBBM
Decision Memo · Santa Lucia Ranger District · updated 9/25/2017
Approximately 21 miles East of Arroyo Grande on Huasna Rd. Near Agua Escondido Camp · San Luis Obispo, California

PG&E proposes to remove soil material, over a 6,312 square foot area by grading down 1 to 3 feet under the transmission line. Excavated material will be spread on site within the right-of-way.

Special use management
Scoping Start
01/13/2017
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Melody Fountain · mfountain@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT.32S,R.16E,sec 1, MDM
Decision Memo · Santa Barbara Ranger District · updated 7/18/2017
Road access is located approx. 2 miles off of Hwy 154 on the north side of E. Camino Cielo Rd. · Ventura, California

The Santa Barbara Ranger District proposes to reissue a private road permit for an existing dirt access road to private property. Road is accessed from East Camino Cielo across NFS land to a private land inholding. L=2495', W=20', Ac =1.15

Special use management
Scoping Start
02/27/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionT.5 N., R.28 W., SEC.15
Decision Memo · Los Padres National Forest All Units · updated 7/18/2017
All LPNF OHV system trails on the Santa Lucia, Santa Barbara, Ojai, and Mt. Pinos Ranger Districts will be analyzed. This area extends north from the Pozo area down south to Ojai east to Frazier Park. · Kern; Los Angeles; San Luis Obispo; Santa Barbara; Ventura, California

The proposed action is to complete level 1 and 2 trail maintenance on all LPNF OHV system trails on the Santa Lucia, Santa Barbara, Ojai, and Mt. Pinos Ranger Districts. The repair work will be completed with hand tools and mechanized equipment.

Recreation management
Scoping Start
02/03/2017
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Alicia Sanchez · aliciasanchez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District; Santa Barbara Ranger District; Ojai Ranger District; Mt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Barbara Ranger District · updated 3/22/2017
The mountain communities are located off Painted Cave Road and East Camino Cielo, Highway 154 and Old San Marcos Road, West Camino Cielo, Highway 154 and Stagecoach Road and Refugio Road. · Santa Barbara, California

The Santa Barbara Ranger District proposes to conduct vegetation management to improve defensible space near the communities of Painted Cave, San Marcos Trout Club, Haney Tract, Rosario Park, West Camino Cielo and Refugio Canyon.

Fuels managementVegetation management (other than forest products)
Scoping Start
09/30/2015
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
John Smith · jsmith03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Santa Barbara Mountain Communities Defense ZoneDecision Signed Date: 03/21/2017
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionT5N R28W Sections 8, 17, 18, 22, 23 and 27, T5N R32W Sections 16, 17, 18, 22, 23 and 24, T5N R31W Section 13 and T4N R31W Section 7. San Bernardino Base & Meridian, Santa Barbara County, California
Decision Memo · Los Padres National Forest All Units · updated 3/21/2017
Approximately 2 miles east of Big Sur, CA in NE 1/4 of the NW 1/4 of Section 20, T19S, R2E, Mt. Diablo Meridian. · Monterey, California

AT&T proposes to replace the existing 12' by 8' passive reflector at Manuel Peak with a new 24' by 20' reflector. A new reflector is urgently needed to provide critical infrastructure to the Big Sur area including 911 emergency phone service.

Special use management
Scoping Start
10/21/2016
Decision
02/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
David Betz · dbetz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Monterey Ranger District · updated 1/30/2017
The project is located at the boundary between Pfeiffer Big Sur State Park and the Los Padres National Forest in Big Sur, CA, near Highway 1. · Monterey, California

Reroute approximately 520 feet of Pfeiffer Falls Trail and rebuild the observation deck at Pfeiffer Falls; both on National Forest. The trail originates within Pfeiffer Big Sur State Park. Work would be performed by California State Parks.

Recreation management
Scoping Start
02/08/2016
Decision
01/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Jeff Kwasny · jkwasny@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Barbara Ranger District · updated 12/12/2016
Near Carpinteria, California. · Santa Barbara, California

Reopen the portion of the Franklin Trail on NFS lands from the Los Padres National Forest boundary to the top of the ridge, connecting it with the Divide Peak OHV route. The lower end of the trail connects to a Santa Barbara County trail easement.

Recreation management
Scoping Start
03/23/2016
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
John Smith · jsmith03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Santa Barbara Ranger District · updated 12/9/2016
The allotment project area is located on the Santa Barbara and Santa Lucia Ranger Districts of the Los Padres National Forest in Santa Barbara County, California. · Santa Barbara, California

Proposal to authorize livestock use on the Happy Canyon Grazing Allotment for a new 10 year Term. This project replaces the prior Happy Canyon Grazing Allotment EA or project number 33801, since that decision was withdrawn. Within De La Guerra IRA.

Grazing management
Scoping Start
01/31/2011
Comment Period
06/04/2015
Objection Period Start
03/13/2016
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Valerie Hubbartt · vhubbartt@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionSections 4, 5, 6, 7, 8, 9, 10, 15, 16, 17, 18, 31, 32 and 33 Township 7 North, Range 29 West, San Bernardino Base & Meridian, Santa Barbara County, California
Decision Memo · Los Padres National Forest All Units · updated 12/7/2016
Forest wide · Monterey; San Luis Obispo; Santa Barbara; Ventura, California

Proposal to issue one special use permit (SUP) to the U.S. Geological Survey to operate and maintain 11 existing seismic instruments located throughout the forest. The SUP will also provide for removal of the instruments when appropriate.

Minerals and geologySpecial use management
Scoping Start
04/22/2016
Decision
06/2016 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Los Padres National Forest All Units · updated 11/16/2016
Piru Creek, Sespe Creek, Lockwood Creek, Santa Ynez River, Sisquoc River, Arroyo Seco River Watersheds along stream channels · Monterey; San Luis Obispo; Santa Barbara; Ventura, California

An effort to remove tamarisk from all watersheds where it occurs in the Los Padres National Forest. For the targeted waterways, project is in or adjacent to the Sespe-Frazier, Juncal, Camuesa, and La Brea IRA's.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
NOI in Federal Register
02/16/2012
DEIS NOA in Federal Register
06/10/2016
FEIS NOA in Federal Register
09/11/2016
Objection Period Start
09/11/2016
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Lloyd Simpson · lsimpson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Watershed Improvements; Wilderness Management
Los Padres National Forest Tamarisk Removal ProjectDecision Signed Date: 11/14/2016
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 10/27/2016
Forest wide - all ranger districts · Santa Barbara, California

Issue Forest wide concessionaire special use permit to replace expiring permits.

Recreation management
Scoping Start
09/02/2016
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Jeff Bensen · jbensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
SUP for Concession Management of Campgrounds and Other Developed Rec. SitesDecision Signed Date: 10/26/2016
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 10/20/2016
West of Lake Piru and road 4N13. · Ventura, California

Approx. twenty 5x5 meter study plots will be delineated with pin flags. Plots will be raked to remove leaf litter & stimulate seed bank, invasive weeds removed by hand, seed collected, & germination techniques tested. Partnership with UCSB & NFWF.

Vegetation management (other than forest products)
Scoping Start
09/29/2016
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments
Evaluation and restoration of degraded chaparral within the Piru Fire perimDecision Signed Date: 10/20/2016
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionT5N, R18W, sections 15, 22, 27 S.B.B.M.
Decision Memo · Mt. Pinos Ranger District · updated 8/2/2016
Approximately 20 miles West of Frazier Park, CA. · Kern, California

Renewal of permit for the existing communication site at Cerro Noroeste occupying 0.5 acre in T9N, R22W, Sec 26, SBBM. These facilities have been in place since 1961. The facilities include a 30' tall tower, building, solar panels, and fencing.

Special use management
Scoping Start
01/01/2016
Decision
06/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
David Betz · dbetz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT9N, R22W, Sec. 26, SBBM
Decision Memo · Santa Lucia Ranger District · updated 5/3/2016
The project location is approximately 17 miles east of the Santa Margarita community and south of Highway 58 and is within the Pozo/ La Panza Place and has a Land-Use Zone of Back Country. · San Luis Obispo, California

The USFS in partnership with the Central Coast Motorcycle Association, proposes to re-route 11-12 motorized trails in the Pozo/La Panza area in order to reduce soil erosion and sediment delivery as well as improve OHV trail system usability.

Recreation management
Scoping Start
02/01/2013
Decision
04/2016 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Alicia Sanchez · aliciasanchez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionSections 25, 26, 27, T29S, R15E; Sections 20, 21, 27, 28, 31, 32, 33, 34, T29S, R16E; Section 3, T30S, R16E.
Decision Memo · Los Padres National Forest All Units · updated 4/26/2016
450 feet northeast of Alder Creek Camp Ground · Monterey, California

Closure of an adit and two shafts using bat gates in order to: 1. Reduce the safety risks to the public posed by the open adit, tunnels and shafts 2. Implement measures intended to protect bats and their habitat

Minerals and geologyWildlife, fish, rare plants
Scoping Start
08/10/2015
Decision
04/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT24S,R5E, NW Section 1, Mount Diablo
Decision Memo · Santa Lucia Ranger District · updated 3/28/2016
Approximately 6 miles SW of Santa Margarita, CA. · San Luis Obispo, California

SBA Towers proposes to reinforce the foundation of their existing authorized tower at the communication site at Cuesta Peak. 4 pieces of concrete will be installed between the 4 legs of the existing tower, and diagonal braces installed in 4 places.

Special use management
Scoping Start
09/21/2015
Decision
11/2015 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
David Betz · dbetz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT29S, R12E, Sec. 35, MDBM
Environmental Assessment · Santa Barbara Ranger District · updated 1/13/2016
Santa Barbara Ranger Distirct · Santa Barbara, California

The US Forest Service, on behalf of the Santa Barbara County Trail Council, proposes to construct a 3.5-mile non-motorized trail in the Gaviota region of the Santa Ynez Mountains in the Santa Barbara Front.

Recreation management
Scoping Start
02/27/2012
Comment Period
02/05/2015
Decision
07/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
John Smith · jsmith03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management
Trail Construction and Maintenance of the Baron Ridge TrailDecision Signed Date: 07/28/2015
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionT 5N R 31W Sections 16 and 21
Decision Memo · Santa Lucia Ranger District · updated 12/10/2015
Approximately 20 miles east of Santa Margarita on the south side of Forest Road 28SS02 (Fernandez Rd)at T29S,R15E,NW 1/4,SE 1/4 section 12 MDBM · San Luis Obispo, California

Project involves replacement of underground tank for wildlife guzzler utilizing hand tools. In addition cleaning and patching of the asphalt water collection apron, repair of the barbed wire fence and sign installation will occur.

Wildlife, fish, rare plants
Scoping Start
11/10/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Melody Fountain · mfountain@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Fernandez #65 Guzzler Tank Replacement Decision MemoDecision Signed Date: 12/10/2015
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Monterey Ranger District · updated 10/26/2015
Los Padres National Forest System lands, Monterey Ranger District, Monterey County, California · Monterey, California

Re-fill lower lake to provide year-round available water for use in emergency wildfire situations

Watershed management
Scoping Start
03/01/2011
Comment Period
10/24/2013
Objection Period Start
09/03/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Peter Harris · peterharris@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT19S, R4E, Section 36, SE 1/4
Environmental Impact Statement · Cleveland National Forest All Units · updated 8/26/2015
Angeles, Cleveland, Los Padres, and San Bernardino National Forests · Kern; Los Angeles; Monterey; Orange; Riverside; San Bernardino; San Diego; San Luis Obispo; Santa Barbara; Ventura, California

The Angeles, Cleveland, Los Padres, and San Bernardino national forests propose to amend their land management plans with new guidance for roadless area management and land management plan monitoring.

Land management planning
NOI in Federal Register
04/27/2012
DEIS NOA in Federal Register
02/15/2013
FEIS NOA in Federal Register
11/22/2013
Objection Period Start
01/17/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Robert Hawkins · rhhawkins@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment; Roadless Area Management
Cleveland National Forest Land Management Plan AmendmentDecision Signed Date: 10/23/2014
Angeles National Forest Land Management Plan AmendmentDecision Signed Date: 10/29/2014
San Bernardino National Forest Land Management Plan AmendmentDecision Signed Date: 10/28/2014
Los Padres National Forest Land Management Plan AmendmentDecision Signed Date: 10/30/2014
ForestsAngeles National Forest; Cleveland National Forest; Los Padres National Forest; San Bernardino National Forest
DistrictsAngeles National Forest All Units; Cleveland National Forest All Units; Los Padres National Forest All Units; San Bernardino National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Ojai Ranger District · updated 3/25/2015
The Sespe River floodplain along State Route 33 (Milepost 36) on the Wheeler Springs USGS topographic quadrangle. · Ventura, California

The Ojai Ranger District proposes to remove trespass structures near State Route 33 and rehabilitate the site with mechanical equipment.

Wildlife, fish, rare plantsRecreation management
Scoping Start
05/14/2012
Comment Period
05/09/2014
Objection Period Start
07/24/2014
Decision
10/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Irvin Fox Fernandez · isfoxfernandez@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments; Scenery Management; Watershed Improvements
Cabin Trespass Removal and Restoration ProjectDecision Signed Date: 10/17/2014
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionNW¼ SE¼, Sec 21, T6N R23W San Bernardino Base Meridian
Decision Memo · Los Padres National Forest All Units · updated 10/20/2014
Forest wide · Kern; San Luis Obispo; Santa Barbara; Ventura, California

Actions include blading the roadbed and restoring proper drainage on National Forest System roads.

Road management
Scoping Start
07/03/2014
Decision
08/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Nancy Arkin · narkin@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District; Santa Barbara Ranger District; Ojai Ranger District; Mt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Monterey Ranger District · updated 9/23/2014
Both stations are located on the Brazil Ranch; one is adjacent to buildings within the administrative area and the other is located out of public view in a canyon above Hurricane Point. · Monterey, California

Renew an expired special use authorization for two weather monitoring stations operated by NASA Ames Research Center on the Brazil Ranch. The two weather stations are for long-term monitoring of climate change. Each creates a 3 foot square footprint.

Special use management
Scoping Start
05/29/2014
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Jeff Kwasny · jkwasny@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT.18S, R.1E, Sec.17 SW1/4 and Sec.20 SW1/4
Decision Memo · Los Padres National Forest All Units · updated 6/12/2014
Mulitple road locations forest wide. · Monterey; San Luis Obispo; Santa Barbara; Ventura, California

The proposed action is to complete repairs to 12 roads at 31 different sites across the forest. These roads sustained damage from natural events and are approved for repair under the U.S. Federal Highways approved ERFO program.

Road management
Scoping Start
08/01/2013
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Los Padres National Forest All Units · updated 5/2/2014
Zaca Fire and Piru Fire Burn Areas · Santa Barbara; Ventura, California

Trails within the burned areas have been damaged by erosion resultant from the removal of native vegetation by the fires. The purpose of this project is to repair the trails within the exisiting trail corridors.

Recreation management
Scoping Start
02/27/2014
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District; Santa Barbara Ranger District; Ojai Ranger District; Mt. Pinos Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ojai Ranger District · updated 8/20/2013
Ventura River Preserve · Ventura, California

The Ojai Valley Land Conservancy proposes to reduce fuels on the east side of the Ventura River Preserve along the interface between the wildlands and developed areas. All of the area to be treated is nonfederal lands.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Scoping Start
02/13/2012
Comment Period
04/19/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Julie Uyehara · juyehara@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management
Ventura River Preserve Fuels' Management ProjectDecision Signed Date: 07/22/2013 Legal Notice Date: 08/08/2013
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionT 4N, R 23W Rancho Santa Ana
Environmental Assessment · Santa Lucia Ranger District · updated 8/16/2013
San Luis Obispo County · San Luis Obispo, California

Re-establish 1,214 feet of single track OHV trail from private property to it's original location on NFS lands. The Las Chiches Trail is located within the La Panza IRA and the proposed trail re-establishment will be constructed within the same IRA.

Recreation management
Scoping Start
11/10/2011
Comment Period
05/29/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Alicia Sanchez · aliciasanchez@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Las Chiches Cutoff Re-establishment Decision NoticeDecision Signed Date: 07/29/2013 Legal Notice Date: 08/16/2013
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT. 29S., R.16E, section 32
Decision Memo · Mt. Pinos Ranger District · updated 8/1/2013
Project is located within an unnamed tributary to the Cuyama River, approximately half a mile northwest of the intersection of State Highway 33 and Lockwood Valley Road. At 34.7360 N & -119.4089 W · Ventura, California

Hand removal of overburdened soil that is putting pressure on the pipeline and distorting its integrity. Removed sediment would be placed in upland areas where it cannot wash back into the channel. Vegetation removal is not anticipated.

Special use managementMinerals and geology
Scoping Start
06/11/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (3)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
Maintenance Repair Project on Southern California Gas Company's Line 8109Decision Signed Date: 07/29/2013
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT8N, R24W, Section 34
Decision Memo · Ojai Ranger District · updated 6/28/2013
The project is north of Quail Run Ranch (formerly Oma-Pacific Ranch), Ojai, CA, east of State Route 33, and north of Forest boundary. · Ventura, California

The Ojai Ranger District proposes the reissuance of a special use permit for an existing water diversion, transmission pipeline, access road, and associated structures.

Special use management
Scoping Start
02/08/2013
Comment Period
02/08/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Mike Cromer - Quail Run Ranch Special Use Permit Re-issuance ProjectDecision Signed Date: 06/13/2013 Legal Notice Date: 06/28/2013
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionMatilija, USGS Quadrangle, Sec. 26, T5N R23W SBBM
Environmental Assessment · Santa Barbara Ranger District · updated 6/17/2013
The allotment project area is located on the Santa Barbara Ranger District of the Los Padres National Forest in Santa Barbara County, California. · Santa Barbara, California

Proposal to authorize livestock use on the Happy Canyon Grazing Allotment for a new 10 year Term. This re-inititiates the prior Happy Canyon Allotment Reauthorization EA. Project in the De La Guerra IRA.

Grazing management
Scoping Start
01/31/2011
Comment Period
05/02/2012
Decision
09/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Valerie Hubbartt · vhubbartt@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Authorizations
Happy Canyon AllotmentDecision Signed Date: 09/20/2012 (FS Withdrawn) Legal Notice Date: 10/13/2012
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionSections 3, 4, 5, 6, 7, 8, 9, 10, 15, 16, 17, and 18, Township 7 North, Range 29 West, San Bernardino Base & Meridian, Santa Barbara County, California
Decision Memo · Santa Barbara Ranger District · updated 3/20/2013
Paradise Road, approximately 3 miles northeast of the junction with State Route 154 · Santa Barbara, California

Repair or relocation of a portion of Paradise Road adjacent to Fremont Recreation Residence Tract to repair subsidence of the roadbed due to undercutting from the Santa Ynez River.

Special use management
Scoping Start
07/11/2011
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionSection 4, T5N, R28W, SBB&M
Decision Memo · Santa Lucia Ranger District · updated 3/7/2013
7220 Toro Creek Rd., Atascadero, CA 93422 · San Luis Obispo, California

Renewal of 3 expired Special Use Permits (SUP) for a 2" gas pipeline and a road. No new ground disturbance will take place. The pipeline is buried under an existing paved road and the only changes are administrative.

Special use managementMinerals and geology
Scoping Start
10/01/2012
Comment Period
11/13/2012
Decision
12/2012 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Natural Gas; Road Maintenance
SOUTHERN CALIFORNIA GAS COMPANY & COSGROVE SPECIAL USE AUTHORIZATION RENEWADecision Signed Date: 12/14/2012
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT.28 S., R.11 E., MDB&M, Sec. 26, NW 1/4 SW 1/4
Decision Memo · Monterey Ranger District · updated 2/27/2013
Cone Peak Gradient Research Natural Area adjacent to Lime Kiln State Park · Monterey, California

Replace a 177-ft section of the Stone Ridge Trail with a 366-ft section to reduce the worst-case grade from approximately 55% to less than 30% and to reduce the average grade from approximately 35% to approximately 20%.

Recreation management
Scoping Start
08/15/2012
Comment Period
12/20/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Thomas Murphey · tmurphey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Stone Ridge Trail Reroute ProjectDecision Signed Date: 02/19/2013 Legal Notice Date: 02/26/2013
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionNW 1/4 Sec. 3, T22S, R4E, Mt. Diablo Meridian
Frazier Park PUD Completed
Decision Memo · Mt. Pinos Ranger District · updated 12/12/2012
Around the town of Frazier Park · Kern, California

Reissue special use authorization for community water storage and distribution system, to include access roads. No change in level or type of use is proposed.

Special use management
Scoping Start
05/15/2012
Comment Period
08/24/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Erik Van Walden · evanwalden@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Frazier Park Public Utility District Special Use Permit ReissuanceDecision Signed Date: 11/16/2012 Legal Notice Date: 12/07/2012
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT 8N, R 19W, sec. 6; T9N, R20W sec. 25, 26, 35 SBBM
Decision Memo · Santa Lucia Ranger District · updated 12/11/2012
Approximately 20 miles East of Hwy 101 on Hwy 166. · Santa Barbara, California

This proposal has been modified due to a recent court ruling & now is focused solely on rerouting the 1st quarter mile of the Willow Spring trail. NEPA for repair & maintenance of the trailhead and 6-miles of trail has been completed under a 32.12 CE

Recreation management
Scoping Start
09/01/2011
Comment Period
10/13/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Alicia Sanchez · aliciasanchez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Willow Spring Trail Re-route ProjectDecision Signed Date: 11/30/2012 Legal Notice Date: 12/04/2012
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT12N, R31W, section 32, 33, 35 SBBM; and T11N, R31W, section 3
Decision Memo · Santa Lucia Ranger District · updated 10/25/2012
Section 30, T10N, R31W, SBM · Santa Barbara, California

Reissue Santa Barbara County communication uses lease at Tepusquet Peak Communications Site. The county has requested reissuance of lease and road use permit, and authorization to complete a minor expansion to their existing building.

Facility managementSpecial use management
Scoping Start
04/11/2012
Comment Period
07/28/2012
Decision
10/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Vicki Collins · vcollins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Santa Barbara County Communications Use Lease - Tepusquet Peak Com SiteDecision Signed Date: 10/22/2012 Legal Notice Date: 10/24/2012
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionTepusquet Peak Communication Site
Decision Memo · Monterey Ranger District · updated 9/24/2012
Los Padres National Forest System lands, Monterey Ranger District, along Highway 1 Big Sur coast. · Monterey, California

Replace two existing bathroom buildings with two new buildings containing new vault toilets

Recreation management
Scoping Start
08/31/2011
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Thomas Murphey · tmurphey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT.22S, R.4E, Section 26, SE 1/4
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Decision Memo · Mt. Pinos Ranger District · updated 6/29/2012
Mt. Able (Cerro Noroeste) Summit adjacent to Campo Alto Campground · Kern, California

Issuance of Communication Use Lease for existing communication site facilities. This project was cancelled and is now back in progress.

Special use management
Scoping Start
06/30/2004
Decision
04/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT9N, R22W, Sec 26, SBBM
Decision Memo · Santa Barbara Ranger District · updated 6/29/2012
State Highway 154, San Marcos Pass Road, junction of Painted Cave Road · Santa Barbara, California

In Jan 2005 Caltrans closed SH154 due to extensive storm damage. Some of the damaged area crosses NFS lands included in a special use permit. Emergency repairs extended slightly beyond the existing right of way, requiring a permit amendment.

Special use management
Scoping Start
01/10/2005
Decision
03/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Veronica Garza · vgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionNE1/4 NE1/4 Section 27, T5N, R28W, SBM
Environmental Assessment · Santa Barbara Ranger District · updated 6/4/2012
Cherry Creek Pond, Corrales Canyon, Santa Barbara County, California · Santa Barbara, California

Mechanically remove vegetation from a pond to improve breeding habitat for California red-legged frogs. This project was previously listed in the SOPA as the Ranger Peak Pond Restoration Project. Project in the De La Guerra IRA.

Wildlife, fish, rare plants
Scoping Start
05/15/2008
Comment Period
06/25/2009
Decision
05/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Valerie Hubbartt · vhubbartt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Population Enhancements
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionNE 1/4, Sec 6, T7N, R29W, SBBM
Decision Memo · Santa Barbara Ranger District · updated 5/31/2012
Santa Barbara Ranger District north of the crest of the Santa Ynez Mtn Range · Santa Barbara, California

Level 1 and 2 trail maintenance in the Santa Barbara back country. Includes trails within the San Rafael and Dick Smith Wilderness, and within the following IRA's: Tequepis, Diablo, Mono, Camuesa, Malduce Buckhorn, Little Pine, and Santa Cruz.

Recreation management
Scoping Start
12/14/2011
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Douglas Dodge · douglasdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Santa Barbara Backcountry Ongoing Trail MaintenanceDecision Signed Date: 05/30/2012
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Environmental Assessment · Mt. Pinos Ranger District · updated 5/29/2012
Frazier Mountain approximately 1 & 1/2 miles south of Frazier Park · Kern; Ventura, California

Proposal to reduce fuels and fire hazard risk; manage the top of Frazier Mtn for the health of the old growth Jeffrey pine/white fir forest; and establish and maintain a healthy Jeffrey pine/pinyon pine forest along Frazier Mtn Road corridor.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
09/13/2010
Objection Period Start
02/03/2012
Decision
05/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Gregory Thompson · gsthompson@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Frazier Mountain ProjectDecision Signed Date: 05/29/2012
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Legal Land DescriptionT8N,R19W,Sec7&8;T8N,R20W,Sec9,10,11,12,13,14,15,16,21,22,23,27&28;SBBM
Decision Memo · Santa Barbara Ranger District · updated 4/2/2012
Santa Barbara Ranger District · Santa Barbara, California

The Forest Service proposes to replace a portion of the existing sewer pipes in the employee housing trailer park.

Facility management
Scoping Start
08/01/2011
Decision
03/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Douglas Dodge · douglasdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
Sewer line repair project in trailer park (admin. site) at Los PrietosDecision Signed Date: 03/28/2012
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionT5N R28W Section 3, UTM NAD 27 11N 0243738mE 3825795mN
Environmental Assessment · Santa Lucia Ranger District · updated 2/13/2012
Pozo/LaPanza area approximately 17 miles east of Santa Margarita, CA on south side of Hwy 58 · San Luis Obispo, California

The proposal is to redesign the staging area to provide designated overnight/day use sites, parking area, children's riding area, and barriers; decommission Friis and Navajo Campgrounds; close Friis Rd the last half mile north of Navao Bypass Trail.

Recreation management
Scoping Start
09/21/2009
Comment Period
08/05/2011
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Alicia Sanchez · aliciasanchez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
Navajo Flat Staging Area Re-designDecision Signed Date: 02/10/2012 Legal Notice Date: 02/13/2012
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT29S, R16E, Sec 29 MDBM
Decision Memo · Santa Lucia Ranger District · updated 1/27/2012
Plowshare Peak, Sierra Madre Ridge approximately 8 miles south of SH166 and 25 air miles NE of Santa Maria, CA · Santa Barbara, California

Request for special use permit for replacement of back up power generator and fuel tank on existing concrete pad near an existing facility owned by American Tower Corp. at Plowshare Peak Communication Site.

Special use management
Scoping Start
01/09/2012
Decision
01/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Vicki Collins · vcollins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Verizon Wireless Emergency Power Supply at Plowshare Communication SiteDecision Signed Date: 01/27/2012
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionSection 4, T11N, R30W, SBM
Decision Memo · Santa Lucia Ranger District · updated 1/11/2012
Cuesta Peak Communication Site · San Luis Obispo, California

Request for special use permits for back up power generators on existing concrete pads near an existing facility owned by SBA Network Services

Special use management
Scoping Start
11/17/2011
Decision
01/2012 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
Vicki Collins · vcollins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Permit for Verizon Wireless Emergency Power Supply at West CuesDecision Signed Date: 01/09/2012
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionSection 35,T29S, R12E, MDM
Decision Memo · Los Padres National Forest All Units · updated 12/15/2011
The new line would start at approximately 34° 28’ 20.52” N, 118° 53’ 11.98” W (about 5 ml. north of Fillmore), and extend 3,800 feet in length to the Hansen/Whitestar Facility. · Ventura, California

The current Whitestar line is located in an area that is subject to landslides. In order to reduce the risk of a line failure the LP NF is proposing to relocate the line along existing roads and in an area that can more easily be monitored.

Minerals and geologySpecial use management
Scoping Start
09/22/2011
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil
Relocation of the Whitestar Pipeline in the Sespe Oil FieldDecision Signed Date: 11/17/2011
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Legal Land DescriptionTownship 5N, Range 19W, Section 32
Environmental Assessment · Ojai Ranger District · updated 11/18/2011
National Forest System land west and north of Lake Piru. · Los Angeles; Ventura, California

Analysis to determine whether to authorize livestock grazing on all, some portion or none of the Piru, Pothole and Temescal Allotments. Project is in the Sespe-Frazier IRA

Grazing management
Scoping Start
06/02/2003
Comment Period
09/02/2010
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
Lower Piru Rangelands ProjectDecision Signed Date: 09/27/2011 Legal Notice Date: 10/03/2011
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionT5N, R18W, SBBM.
Decision Memo · Santa Lucia Ranger District · updated 11/7/2011
The project location is in the Sierra Madre road (32S13), just south of highway 166 · Santa Barbara, California

In this project no new ground disturbance will take place. This is only an administrative change of a SUP that was issued to 'All American Pipeline Company' and being renewed to 'Plains Pipeline L.P.'.

Special use management
Scoping Start
10/04/2011
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Jonathan Schwartz · jonathanschwartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Renewing SUA for an existing telephone & electric underground cableDecision Signed Date: 11/03/2011
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT. 32 S., R. 18 E., Sec. 30,31 & 32
Decision Memo · Monterey Ranger District · updated 9/27/2011
State Route 1, post mile 0.3 and 0.9, about 9 miles south of Gorda and 3.5 miles north of San Carpoforo Creek bridge · Monterey, California

CALTRANS requested authorization to replace two culverts along State Route 1 near the Monterey/San Luis Obispo county line. This will require a special use road permit for an expansion to the existing right of way.

Special use management
Scoping Start
09/01/2011
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Vicki Collins · vcollins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Caltrans Culvert Replacements on State Route 1Decision Signed Date: 09/09/2011
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionSection 32, T24S, R6E, MDM
Decision Memo · Santa Lucia Ranger District · updated 8/23/2011
San Rafael Wilderness · Santa Barbara, California

Level 1 and 2 trail work on the Sisquoc Trail from Sycamore Camp to Alamar Camp; the Judell Trail, The Sweetwater Trail, the Jackson Trail, and the Manzana Trail between S. Fork Cabin and White Ledge Camp.

Watershed managementRecreation management
Scoping Start
03/16/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Ken Kunert · kkunert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Sisquoc Trails Maintenance ProjectDecision Signed Date: 08/10/2011
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionBald Mtn., Big Pine Mtn., Hurricane Deck, and Salsbury Potero Quads
Decision Memo · Monterey Ranger District · updated 8/3/2011
Anderson Peak Communication Site · Monterey, California

PG&E requested to convert an existing aerial distribution line providing power to Anderson Peak Communication Site into a buried line using an existing utility trench and requested a new Special Use Authorization.

Special use management
Scoping Start
03/30/2011
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Donna Toth · dtoth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
PG&E Reissuance of Special Use Permit and Burial of Distribution PowerlineDecision Signed Date: 07/28/2011
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionSection 21 & 28, T20S, R3E, MDM
Decision Memo · Santa Barbara Ranger District · updated 7/26/2011
Santa Barbara Ranger District, Lower Oso Bridge · Santa Barbara, California

An emergency repair is needed to the Lower Oso Bridge footings due to channel bottom erosion under the bridge and associated undermining of the eastern bridge abutment footing.

Road management
Scoping Start
07/12/2011
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Douglas Dodge · douglasdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionT5N R27W Section 1
Decision Memo · Santa Barbara Ranger District · updated 6/29/2010
North slope of the Santa Ynez Mountain Range from the eastern end of Paradise Road to Divide Peak OHV route. · Santa Barbara, California

The proposal is to issue a temporary permit to Blacksmith Endurance Co. to conduct a foot race event on National Forest System trails and roads on the Santa Barbara Ranger District. The proposal is very similiar to last years permitted event.

Special use managementRecreation management
Scoping Start
02/23/2010
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Blue Canyon Trail Race, Letter to FileDecision Signed Date: 05/12/2010
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionStart and finish point T5N, R28W Section 1; half-way point T5N, R26W Section 35
Decision Memo · Santa Barbara Ranger District · updated 6/29/2010
Paradise Canyon to Little Pine Mountain to the north slope of the Santa Ynez Mountain Range · Santa Barbara, California

The proposal is to issue a temporary special use permit to Blacksmith Endurance Co. to conduct a foot race event on National Forest System trails and roads on the Santa Barbara Ranger District.

Recreation managementSpecial use management
Scoping Start
02/24/2010
Decision
05/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Kyle Kinports · kkinports@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Santa Barbara Ultra (foot) RaceDecision Signed Date: 05/12/2010
ForestsLos Padres National Forest
DistrictsSanta Barbara Ranger District
Legal Land DescriptionStart of the even in T6N, R27W Section 31; half way point T5N, R25W Section 36.
Decision Memo · Ojai Ranger District · updated 6/22/2010
Site 1 is in the Devils Heart Peak USGS quadrangle. Site 2-5 are in the Fillmore USGS quadrangle. · Ventura, California

The purpose of the five apiaries, approximately 0.5 acres each, is the production of honey. The special use permit authorizing this use would be for a 10-year term.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Request to Reauthorize Five Apiary SitesDecision Signed Date: 09/29/2009
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionSites 1-5 are respectively located in SBBM in the 1) NW1/4, S20, T5N R19W, 2) NW1/4, S31, T5N R19W, 3) NW1/4, S31, T5N R19W, 4) SW 1/4 S30 T5N R19W, and 5) SW1/4 S29 T5N R19W
Decision Memo · Ojai Ranger District · updated 6/22/2010
Site 1 is within the Wheeler Springs USGS quad. Site 2 is within the Matilija USGS quad. · Ventura, California

The apiaries are for the production of honey. Type conversion of this land to apiaries occurred at the inception of the permit, and has been maintained as such ever since. The special use permit authorizing this use would be for a 10-year

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Request to Reauthorize Two Apiary SitesDecision Signed Date: 09/29/2009
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionRespectively, Sites 1 and 2 are located in 1) NW1/4NE1/4, Sec.15, T5N R23W SBBM, and 2) SW1/4SE1/4, Sec.19, T5N R23W SBBM.
Decision Memo · Ojai Ranger District · updated 6/22/2010
The existing corral and outbuildings are located near the Santa Barbara-Ventura County line north of State Route 150 on the White Ledge Peak USGS quadrangle. · Ventura, California

The purpose of the 3.5 acre corral and outbuildings is to provide for an existing livestock grazing area, to store cattle hay, to store water for fire protection in the large water tank, and to achieve access to these facilities via the access road.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionThey are located in the SE1/4, Sec. 25, T4N R25W SBBM.
Decision Memo · Ojai Ranger District · updated 6/22/2010
North of Rose Valley near the Sespe River · Ventura, California

This 1.21 mile long, 16 foot wide access road is to provide access to private property. Type conversion of this land to an access road occurred upon inception of this permit, and has been maintained as an access road since issuance of this permit.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Request to Reauthorize an Access RoadDecision Signed Date: 09/29/2009
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionIt is located in the N1/2, Sec. 4, T5N R22W SBBM.
Decision Memo · Ojai Ranger District · updated 6/21/2010
It is south of the west end of the Nordoff Ridge Forest Road (5N08). · Ventura, California

A special use permit for this 0.52 acre orchard was originally issued in 1963 for this use. The purpose of the orange orchard is to grow and harvest oranges, as part of the ongoing agricultural activities of the applicant.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionIt is located in the NW1/4SE1/4, Sec. 28, T5N R23W SBBM.
Environmental Assessment · Los Padres National Forest All Units · updated 6/15/2010
Federal property at 1616 Carlotti Drive, Santa Maria, CA · Santa Barbara, California

Proposal to construct Forest Headquarters (SO) at Santa Lucia District office property and colocate SO and District employees in the same building.

Facility management
Scoping Start
10/05/2009
Comment Period
03/23/2010
Decision
06/2010 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Bruce Emmens · bemmens@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
Construction of Los Padres National Forest HeadquartersDecision Signed Date: 06/08/2010 Legal Notice Date: 06/12/2010
ForestsLos Padres National Forest
DistrictsLos Padres National Forest All Units
Environmental Assessment · Los Padres National Forest All Units · updated 4/23/2010
Mt Pinos Ranger Station, 34580 Lockwood Valley Road, Frazier Park, CA 93225 · Ventura, California

Proposal to reconstruct the administrative office buildings at the Mt Pinos Ranger District compound known as Chuchupate Station

Facility management
Scoping Start
10/05/2009
Comment Period
03/08/2010
Decision
04/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Bruce Emmens · bemmens@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
Mount Pinos Ranger District Administrative Site ReconstructionDecision Signed Date: 04/14/2010 Legal Notice Date: 04/21/2010
ForestsLos Padres National Forest
DistrictsMt. Pinos Ranger District
Environmental Assessment · Los Padres National Forest All Units · updated 4/22/2010
Monterey Ranger District office, 406 S Mildred Ave, King City, CA 93930 · Monterey, California

Proposal to reconstruct the administrative office buildings at the Monterey Ranger District office compound in King City, CA

Facility management
Scoping Start
10/05/2009
Comment Period
03/08/2010
Decision
04/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Bruce Emmens · bemmens@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
Monterey Ranger District Administrative Site ReconstructionDecision Signed Date: 04/14/2010 Legal Notice Date: 04/21/2010
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Environmental Assessment · Monterey Ranger District · updated 9/30/2009
Monroe Canyon, 5 miles west of Greenfield · Monterey, California

Review and analyze status of livestock grazing on the Monroe Special Use Allotment to determine if conditions are consistent with the Los Padres National Forest Land Management Plan and applicable laws and regulations.

Grazing management
Scoping Start
06/02/2008
Comment Period
05/21/2009
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Jeff Kwasny · jkwasny@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Decision Notice and Finding of No Significant ImpactDecision Signed Date: 09/25/2009 Legal Notice Date: 09/30/2009
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT.20S, R.6E, N 1/2 of S 1/2 of Sec. 11, E 1/2 of Sec. 13, E 1/2 of Sec. 24, N 1/2 of N 1/2 of Sec. 25.
Decision Memo · Ojai Ranger District · updated 9/30/2009
The residence and maintenance yard is located in McDonald Canyon northeast of Meiners Oaks, California in the Matilija USGS quadrangle. · Ventura, California

The purpose of the camp caretaker's residence is to provide a residence and maintenance yard for the caretaker, as part of the general maintenance of an existing camp. The original SUP issuance occurred on 29 June, 1981.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Request to Reauthorize Non-rec CaretakerDecision Signed Date: 09/29/2009
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionIt is located in the SW1/4SW1/4, Sec. 35, T5N R23W SBBM.
Decision Memo · Ojai Ranger District · updated 9/30/2009
The facilities are located north of Fillmore, California near Oak Flat on the Fillmore USGS quadrangle. · Ventura, California

The purpose of the gas compressor station, flare stack, and associated water lines is to service gas pipelines in the Sespe oil field. The original SUP for these facilities was issued to Shell Oil Company in December 1967.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Request to Reauthorize a Gas Compressor Station and FacilitiesDecision Signed Date: 09/29/2009
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionIt is located in the W1/2NE1/4, Sec. 32, T5N R19W SBBM.
Decision Memo · Ojai Ranger District · updated 9/30/2009
The access road is located 5 miles north of Fillmore near Oak Flat in the Fillmore USGS quadrangle. · Ventura, California

The purpose of the 0.25 mile access road is to gain access from Shale Ridge Road across Seneca Resources Corporation's Seltzer oil and gas lease to Seneca's Hansen lease in the Sespe oil field.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionIt is located in the SW1/4NE1/4, Sec. 32, T5N R19W SBBM.
Decision Memo · Ojai Ranger District · updated 9/30/2009
The access road is between State Route 33 and Reyes Peak Campground within the Reyes Peak USGS quadrangle. · Ventura, California

The purpose of the 1.5 mile road is to provide access to private property. Type conversion of this road access to private land occurred prior to inception of this permit, and has been maintained as such ever since.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionAll in the SBBM, it is located in the SW1/4, Sec. 6, T6N R23W; the SE1/4, Sec. 1, T6N R24W; and the NW1/4 Sec. 12, T6N R24W.
Decision Memo · Ojai Ranger District · updated 9/30/2009
The apiary site is located north of Piru Reservoir along Forest Road 4N13 before Blue Point on the Cobblestone Mountain USGS quadrangle. · Ventura, California

The purpose of the approximate 0.5 acre apiary site is to produce honey. Type conversion to an apiary occurred at the inception of the permit, and has been maintained as such ever since. The SUP authorizing this use would be for a 10-year term.

Special use management
Scoping Start
09/01/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Irvin Fernandez · ifernandez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLos Padres National Forest
DistrictsOjai Ranger District
Legal Land DescriptionThe site is in the NW1/4NW1/4, Sec. 15, T5N R18W SBBM.
Environmental Assessment · Monterey Ranger District · updated 9/30/2009
The approximate 750 acres of National Forest used within the Sweetwater allotment are located adjacent to private property between Vaquero and Sweetwater Canyons eight miles west of Greenfield. · Monterey, California

Review and analyze status of livestock grazing on the Sweetwater Allotment to determine if conditions are consistent with the Los Padres National Forest Land Management Plan, applicable laws, and regulations.

Grazing management
Scoping Start
07/19/2007
Comment Period
05/21/2009
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Jeff Kwasny · jkwasny@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Decision Notice and Finding of No Significant ImpactDecision Signed Date: 09/25/2009 Legal Notice Date: 09/30/2009
ForestsLos Padres National Forest
DistrictsMonterey Ranger District
Legal Land DescriptionT20S. R6E, NE 1/4 & SW 1/4 Sec. 4, NE 1/4 Sec. 5.
Decision Memo · Santa Lucia Ranger District · updated 9/9/2009
The Deer Trail Mine is located about 20 miles due east of Arroyo Grande. · San Luis Obispo, California

Istallation of bat gates, steel slated barrier, at the entrance to old mine adits and/or tunnels to keep people out and still allow bat passage.

Wildlife, fish, rare plants
Scoping Start
07/29/2009
Decision
09/2009 (Estimated)
Implementation
12/2009 (Estimated)
Project documents
Kathleen Phelps · mfountain@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsLos Padres National Forest
DistrictsSanta Lucia Ranger District
Legal Land DescriptionT32S, R16E, Section 32 MDB&M.