Beaverhead-Deerlodge National Forest — Project Detail

362 projects with crawled detail · milestones · contacts · documents

Beaverhead-Deerlodge National Forest

R01 Northern · 362 projects · crawled 2026-08-01
In Progress 1 Developing Proposal 1 Completed 314 Cancelled 46
186 Decision Memo 156 Environmental Assessment 16 Environmental Impact Statement 4
176 with documents 44 with comments page 186 fetch errors
Environmental Impact Statement · Madison Ranger District · updated 5/27/2026
Barnett, Black Butte, Coal Creek, Cottonwood, Fossil, Hellroaring, Lyon, Wolverine, Poison Basin and portions of the Upper Ruby allotments in the Gravelly Mountains. · Madison, Montana

The Strawberry to Cascade Allotment Management Plan is currently on hold. Due to shifts in agency priorities, NEPA projects not specifically tied to timber and vegetation management objectives will be completed as limited staffing and resources allow

Grazing management
NOI in Federal Register
09/14/2018
Project documents
Allison Landro · Allison.Landro@usda.gov
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Goose Fire Fences Completed
Decision Memo · Madison Ranger District · updated 9/29/2025
T13S R1E Sec 5, 7 & 9; T12S R1E Sec 32, 34 · Madison, Montana

Reconstruct fence burned in the 2021 Goose fire and extend portions of four fences where the fire removed natural barriers to livestock movement. Fences will be wildlife friendly and total 1.83 miles. Includes fence segments in RNA and IRA boundaries

Grazing management
Scoping Start
11/07/2024
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Jacob Stewart · jacob.stewart@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management; Grazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Clementine Mine Completed
Decision Memo · Wisdom Ranger District · updated 6/6/2025
The Clementine Mine project is in Silverbow County 5.2 miles north-northeast of Dewey, MT at Township 1 north, Range 10 west, Sections 10 & 11 of the Montana Principal Meridian. · Beaverhead, Montana

The proposed action is to approve a Plan of Operation to drill one core hole using a track or trailer mounted drilling rig, and less than 1 mile of temporary road construction. The road would be reclaimed upon project completion.

Minerals and geology
Scoping Start
04/23/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Erik Torgerson · erik.torgerson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Wigwam Fire Fences Completed
Decision Memo · Madison Ranger District · updated 12/17/2024
Township 8 south, Range 2 west, Sections 7 and 8 and Township 8 south, Range 3 west, Section 13 · Madison, Montana

The Forest Service proposes to approve the Wigwam Trail C&H livestock allotment permittee to construct approximately 0.51 miles of fence at three different locations in the Wigwam Creek watershed to divert livestock from wet areas and Wigwam Creek.

Grazing managementWatershed management
Scoping Start
11/07/2024
Decision
12/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Samuel Tripp · Samuel.Tripp@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Wisdom Ranger District · updated 12/9/2024
Township 3 south, Range 12 west, Sections 6 and 33 of the Montana Principal Meridian · Beaverhead, Montana

Construct two wooden fish barriers using standard practices, one on Mono Creek and another on Lacy Creek within the West Pioneer IRA. Construction would take place in late summer or fall when stream flows are low.

Wildlife, fish, rare plants
Scoping Start
11/07/2024
Decision
12/2024 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Michael Gatlin · michael.gatlin@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 11/26/2024
T1S, R19W, sections 14, 23, 25; T1S, R18W, sections 30, 31, 32; T2S, R18W, sections 4, 5, 9. 15. 14, 13; and T2S, R17W, sections 16, 17, 18, 21, 22. Montana Principal Meridian. · Beaverhead, Montana

Southern Montana Telephone will be permitted to construct approximately 16 miles of underground fiber optic cable along highway 43 and Trail Creek Road.

Special use management
Scoping Start
10/07/2024
Decision
11/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Jeff Ingalls · jeff.ingalls@usda.gov
NEPA / regulatory detail
Categorical ExclusionBia_L(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 9/13/2024
Project is located approximately 11 air miles west southwest of Earthquake Lake and 44 miles south of Ennis, Montana. Proposed actions are located in the Madison Landscape, Lobo Mesa Management Area. · Madison, Montana

Reestablish bridge on motorized trail 6700 at the West Fork Madison River crossing

Recreation managementWatershed management
Scoping Start
06/25/2024
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Joel Sather · joel.sather@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 7/8/2024
The project is located 8.5 miles northwest from Ennis, MT on the southeast edge of the Tobacco Root mountains. · Madison, Montana

The project proposes to reroute existing trail, build new trail to connect a trail loop, and decommission portions of trail that are not up to forest standards.

Road managementRecreation management
Scoping Start
08/15/2023
Decision
07/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Joel Sather · joel.sather@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Travel Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionTownship 4 south, Range 2 west, Section 33 of the Montana Principal Meridian.
Decision Memo · Butte Ranger District · updated 6/24/2024
Township 4N or S, Range 5W, Section 31 · Silver Bow, Montana

The project proposes fence improvements within the Whitetail Reservoir Exclosure and is also part of the South Pony grazing allotment. There is a need to limit unauthorized routes adjacent to FSR 8695 that have been created within the riparian area.

Wildlife, fish, rare plantsRecreation managementGrazing management
Scoping Start
01/31/2024
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Randie Adams · randie.adams@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Scenery Management; Grazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 6/18/2024
The South Fork Jack Creek Headgate and Ditch project is 12 miles east-southeast of Ennis, MT in the Lee Metcalf Wilderness in the vicinity of non-motorized trail 6317. · Madison, Montana

Proposal from Cedar Lake Irrigation Association to access their point of diversion on the South Fork of Jack Creek to install a new headgate, clean the culvert, manipulate the stream channel, and clear sediment and debris from the irrigation ditch.

Special use management
Scoping Start
02/13/2024
Decision
06/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Joel Sather · joel.sather@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT6S , R2E, Sec(s) 28 & 29; of the Montana Principal Meridian
Environmental Assessment · R1 - Northern Region All Units · updated 6/12/2024
The Nez Perce National Historic Trail is approximately 2,184 miles, extending from the vicinity of Wallowa Lake in eastern Oregon to the Bear Paw Battlefield, about 16 miles south of Chinook, MT. · Clark; Clearwater; Fremont; Idaho; Lemhi; Lewis; Nez Perce; Beaverhead; Blaine; Carbon; Chouteau; Fergus; Gallatin; Golden Valley; Lewis and Clark; Missoula; Phillips; Ravalli; Stillwater; Wheatland; Yellowstone; Wallowa; Asotin; Park; Teton, Idaho; Montana; Oregon; Washington; Wyoming

This analysis identifies the visitor use capacity on National Forest System lands only, on the Nez Perce National Historic Trail to assist in the protection and management of trail resources.

Heritage resource managementRecreation management
Scoping Start
06/03/2022
Comment Period
06/03/2022
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Sandra Broncheau-Mcfarland · sandra.broncheau-mcfarland@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Custer Gallatin National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Shoshone National Forest; Salmon-Challis National Forest; Caribou-Targhee National Forest; Wallowa-Whitman National Forest
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Custer Gallatin National Forest All Units; Lewis And Clark National Forest All Units; Plains/Thompson Falls Ranger District; Nez Perce-Clearwater National Forest All Units; Shoshone National Forest All Units; Salmon-Challis National Forest All Units; Caribou-Targhee National Forest All Units; Wallowa-Whitman National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Butte Ranger District · updated 5/17/2024
Southwest of Boulder, MT; NENE of Section 4 T5N R5W · Silver Bow, Montana

The project moves a fence between two range pastures that currently lies within an increasingly popular, dispersed camp site. By moving the fence away from the recreation site, it should reduce the amount of recreation and livestock conflicts.

Grazing management
Scoping Start
01/31/2024
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Randie Adams · randie.adams@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Grazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Dillon Ranger District · updated 5/14/2024
The Lima Tendoy Landscape primarily in the Selway-Saginaw and Horse Prairie North management areas (MAs). A smaller portion is planned in the Big Hole Landscape, West Big Hole Flats MA. · Beaverhead, Montana

Project to move conditions toward Forest Plan Timber, Vegetation, and Fuel Management Goals and Objectives using commercial timber harvest, precommercial thinning, and conifer expansion treatments.

Forest productsVegetation management (other than forest products)
Scoping Start
09/09/2020
Comment Period
06/23/2023
Objection Period Start
06/23/2023
Decision
05/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Carly Gibson · carly.gibson@usda.gov
NEPA / regulatory detail
Special AuthorityIra - Inventoried Roadless Area Activities Requiring Chief's Approval
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green); Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionTownship 7 & 8 South, Range 14, 15 & 16 West
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 5/7/2024
These projects are located about 14 miles Southwest from Philipsburg, MT. · Granite, Montana

The purpose of the fencing projects is to improve cattle distribution and forage utilization by increasing the ability to control cattle movement as well as to exclude cattle along Meadow Creek near the bridge in the Blue Grotto Pasture.

Grazing management
Scoping Start
01/04/2024
Decision
04/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Alicia Snow · Alicia.Snow@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Wisdom Ranger District · updated 4/9/2024
The project is located along Trapper Creek, 7 miles west of Melrose, Montana. · Beaverhead, Montana

Establish fish barrier in Trapper Creek constructed with lumber, fill, rip-rap and concrete for the conservation of Westslope Cutthroat Trout. An excavator will be used for site preparation and barrier construction.

Wildlife, fish, rare plants
Scoping Start
03/04/2024
Decision
04/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Michael Gatlin · michael.gatlin@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pintler Ranger District · updated 2/27/2024
Approximately 12 miles west of Philipsburg, Montana. · Beaverhead, Montana

Ken Lutz of Philipsburg Montana has submitted a Plan of Operations to explore for minerals on unpatented mining claims, digging four test pits located approximately 12 miles west of Philipsburg, Montana. Access includes use of FS Road 78562.

Minerals and geology
Scoping Start
01/04/2024
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Steve Kelley · steve.l.kelley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 2/13/2024
The project is located 40.5 miles South from Alder. Approximately 300 feet West of Centennial-Divide Road at FS/BLM Boundary. · Beaverhead, Montana

This project proposes to improve a hardened crossing in an allotment on Pole Creek to alleviate excess sedimentation and provide a preferred crossing for cattle.

Vegetation management (other than forest products)Grazing managementWildlife, fish, rare plants
Scoping Start
08/15/2023
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Jacob Stewart · jacob.stewart@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionTownship 12 south, Range 4 west, Section 36 of the Montana Principal Meridian.
Decision Memo · Madison Ranger District · updated 2/13/2024
The new location for repeater is 12 miles northwest of Ennis, MT on top of South Baldy peak near the end of motorized trail 6361, north of and above South Meadow Lake. · Madison, Montana

This project proposes to relocate an emergency and safety radio communications repeater from a poor signal site to a location with better coverage on South Baldy Mountain.

Facility management
Scoping Start
08/15/2023
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Robert Morris · robert.j.morris@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
South Baldy Repeater Decision MemoDecision Signed Date: 02/13/2024
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionTownship 4 north, Range 3 west, Section 24 of the Montana Principal Meridian.
Decision Memo · Butte Ranger District · updated 2/5/2024
10 miles north of Whitehall, Montana in the North Bull Mountains Management Area · Jefferson, Montana

There is a need to relieve riparian systems of grazing pressure and promote livestock dispersal in upland forage. A pipeline extension would supply two new water troughs on NFS and private land.

Vegetation management (other than forest products)Grazing management
Scoping Start
08/01/2022
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Lucas Phillips · lucas.phillips@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRangeland Vegetation Improvements; Grazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT4N, R3W, Sec 31; T4N, R4W, Sec 36; T3N, R4W, Sec 1
Environmental Assessment · Pintler Ranger District · updated 1/11/2024
The project area is located 13.5 miles southwest from Philipsburg, MT, across from the West Fork of Rock Creek rental cabin. · Granite, Montana

Proposal to authorize permittee to construct 100 feet by 100 feet wooden or metal corral to temporarily hold cattle while finalizing allotment cleanup

Grazing management
Scoping Start
10/05/2023
Comment Period
10/05/2023
Objection Period Start
11/2023 (Estimated)
Decision
01/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Alicia Snow · Alicia.Snow@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Jefferson Ranger District · updated 1/8/2024
Tobacco Root Landscape Brown Back Management Area south east of Whitehall · Beaverhead, Montana

This proposal would authorize planting 250 whitebark pine trees per acre in what was a Whitebark pine dominated site prior to the Pony fire in 2012. Inventories show that regeneration of the Whitebark pine forest-type is not happening as predicted.

Vegetation management (other than forest products)
Scoping Start
04/01/2014
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Anton Brennick · abrennick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pintler Ranger District · updated 1/8/2024
Upper Rock Creek Landscape, Stony Management Area, approximately 200 yards upstream of the Stony Creek Campground · Granite, Montana

We propose to authorize Anthony Marletto to replace an existing makeshift diversion dam with a vortex rock weir including a fish screen and associated fish bypass structure.

Wildlife, fish, rare plants
Scoping Start
08/25/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Sara Rouse · srouse@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Stony Creek Diversion Reconstruction and Fish ScreenDecision Signed Date: 10/10/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT7N, R16 W, NE,SE,NW of Section 21
Decision Memo · Dillon Ranger District · updated 11/6/2023
Pioneer landscape, Torrey Mountain Recommended Wilderness and East Face Management Areas. · Beaverhead, Montana

We propose to work with Montana Fish Wildlife & Parks to modify the existing waterfall on Willow Creek to become a fish barrier to contribute toward future native fish restoration and benefit existing restoration projects.

Wildlife, fish, rare plants
Scoping Start
04/19/2017
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Kevin Weinner · kevin.weinner@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT4S, R10W, Section 18
Decision Memo · Dillon Ranger District · updated 10/4/2023
Township 4 south, Range 12 west, Section 31 and Township 5 south, Range 12 west, Section 6. · Beaverhead, Montana

This is a project to permit improvements to the existing spring in order to provide safe drinking water to Maverick Mountain facilities for use by recreationists.

Special use management
Scoping Start
08/15/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Gail Plovanic · gail.l.plovanic@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionTownship 4 south, Range 12 west, Section 31 Township 5 south, Range 12 west, Section 6
Decision Memo · Madison Ranger District · updated 9/29/2023
The project is located approximately 41 miles Southwest from Ennis, and 40 miles South from Alder, in the Upper West Fork Madison River downstream from confluence with Fox Creek. · Madison, Montana

This project proposes to construct a wooden fish barrier on the Upper West Fork Madison River to aid in the conservation of westslope cutthroat trout.

Wildlife, fish, rare plants
Scoping Start
08/15/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Monica Berreman · Monica.Berreman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionTownship 12 south, Range 3 west, Section 14
Sheridan Fiber Completed
Decision Memo · Madison Ranger District · updated 8/22/2023
The proposed route for the new fiber optic cable is 20 miles southeast of Alder, MT and follows the Upper Ruby Road into the Gravelly Mountain Range. · Madison, Montana

This project proposes an amendment to the Three Rivers master permit, granting a Right-of-Way for the purpose of installing fiber optic cable along about four miles of road on Forest Service land to bring needed services to rural communities

Special use management
Scoping Start
08/10/2023
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Mandalyn Child · mandalyn.child@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sheridan Fiber Decision MemoDecision Signed Date: 08/22/2023
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionTownship 9 south, Range 3 west, Sections 7, 17, 18, 20, 28, & 34; Township 10 south, Range 3 west, Sections 3, 4, & 9 of the Montana Principal Meridian.
Environmental Assessment · Butte Ranger District · updated 7/20/2023
The project area is located 12 miles south of Butte, Montana within Silver Bow County. · Silver Bow, Montana

The project is to protect the Basin Creek Municipal Watershed by restoring and improving the characteristics of forest composition and structure to help reduce the risk of uncharacteristic wildfire effects.

Fuels managementWatershed management
Scoping Start
12/14/2022
Comment Period
05/21/2023
07/20/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Michelle Peterson · Michelle.Peterson@usda.gov
NEPA / regulatory detail
Special Authority2021 Infrastructure: Emergency Actions
Notice and Comment Regulation2021 Infrastructure: Emergency Actions
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Roadless Area Management; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT 2N, R 7W sections: 29, 31, & 32; T 2N, R 8W sections: 21, 26, 27, 28, 29, 33, 34, & 35; T 1N, R 7W sections: 5, 6, 7, 8, 17, 18, 19, 20, 30, 31, & 32; T 1N, R 8W sections: 1, 2, 3, 4, 9, 10, 11, 12,
Decision Memo · Pintler Ranger District · updated 3/6/2023
The project area is located approximately ten miles north of Philipsburg, Montana and three miles west of Maxville, Montana in the Flint Foothills Management Area of the Clark Fork Flint Landscape. · Granite, Montana

Treatment of 70 ac. of NFS lands via commercial thinning of overstocked stands. Thinning would occur in areas with a target basal area of approx. 40 to 80 sq. ft. per acre and implemented through mechanical harvest. UR8-416A would be decommissioned.

Forest productsRoad managementVegetation management (other than forest products)
Scoping Start
03/07/2022
Decision
03/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Cameron Rasor · cameron.rasor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Timber Sales (Green)
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT.8N., R.14W., Section 1 and T.8N., R.13W., Section 6
Primozic STA Completed
Decision Memo · Wisdom Ranger District · updated 2/6/2023
21 miles SW of Butte, MT in the Fleecer Landscape, approximately 4 miles up Jerry Creek Road #1204. · Beaverhead, Montana

The proposed action is to convey approximately .50 acres of NFS lands in the Jerry Creek watershed to John and Debbie Primozic under the Small Tracts Act.

Land ownership management
Scoping Start
08/19/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Gina Fleming · gina.fleming@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT1N, R10W, Section 19 Montana Prime Meridian
Decision Memo · Madison Ranger District · updated 2/3/2023
13 miles NW of Ennis, MT in the Tobacco Root Mountains, in the Washington Bar Area, access via private road. · Madison, Montana

The Forest Service is considering the conveyance of approximately 4 acres of NFS lands in the Upper North Meadow Creek to Reed Montana Holdings, LLC under the Small Tracts Act

Land ownership management
Scoping Start
08/19/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Gina Fleming · gina.fleming@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments
Reed Montana Holdings, LLC STA DMDecision Signed Date: 02/03/2023
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R2W, Sections 4 & 9 Montana Prime Meridian
Romy Lake STA Completed
Decision Memo · Madison Ranger District · updated 2/3/2023
19 miles SW of Ennis, MT in the Gravelly Range Mountains, approximately 9 miles up Timber Creek Road #8325. · Madison, Montana

The Forest Service is considering the conveyance of approximately 4.2 acres of NFS land in the Warm Springs Creek watershed to Mary Jane Spain under the Small Tracts Act

Land ownership management
Scoping Start
08/19/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Gina Fleming · gina.fleming@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments
Romy Lake STA DMDecision Signed Date: 02/03/2023
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT8S, R3W, Sections 23 & 26 Montana Prime Meridian
Decision Memo · Dillon Ranger District · updated 1/27/2023
The Yellowband mine is 6 miles west and north of Argenta, MT in the Pioneer Landscape, East Face Management area. · Beaverhead, Montana

The Forest Service is considering the Plan of Operations for drilling 14 holes and the potential for 14 mud pits within existing mine road footprint at the Yellowband Mine.

Minerals and geology
Scoping Start
07/12/2022
Decision
01/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Erik Torgerson · erik.torgerson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Yellowband Mine Drilling Program Decision MemoDecision Signed Date: 01/27/2023
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT6S, R11W, Sections 1, 2, 11 Montana Prime Meridian
Decision Memo · Pintler Ranger District · updated 8/25/2022
Both trails are located in the Warm Springs drainage between Anaconda and Georgetown Lake in the Flint Uplands Management Area and Warm Springs Management Area of the Clark Fork Flint Landscape. · Deer Lodge, Montana

Portions of the Foster Cr. and Twin Lakes Trails (No. 8045 and 8044) do not meet FS standards for width and grade. 2,100 ft. of reroutes on 3 segments would be done for Twin Lakes Trail and 3,000 ft. of reroutes on 5 segments of Foster Creek Trail.

Recreation managementFacility management
Scoping Start
03/07/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Joshua Lattin · Joshua.Lattin@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Facility Maintenance; Trail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT.6N., R.12W., Section 32; T.5N., R.12W., Section 5; and T.4N., R.13W., Sections 3, 4, 28, and 29.
Decision Memo · Madison Ranger District · updated 7/18/2022
Project site is located approximately 10 miles Northwest of McCallister, MT in the Saw Log Creek area. · Madison, Montana

The Saw Log Placer Project is testing for placer deposits. The claimant plans to dig 3 test holes during this operation. Each test hole will be 6ft to 10ft wide, 10ft long, and 5ft to 10ft deep.

Minerals and geology
Scoping Start
07/11/2019
Decision
01/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Erik Torgerson · etorgerson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S R2W Sec. 16
Decision Memo · Madison Ranger District · updated 7/18/2022
Gravelly Landscape, Upper Ruby Management Area · Madison, Montana

We propose to use bioengineering techniques to create up to 20 pool habitats to improve stream habitat condition and water quality to improve long-term persistence of westslope cutthroat trout in their native range.

Wildlife, fish, rare plantsGrazing management
Scoping Start
05/17/2017
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Grazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT12S R3W Sec 12 and T12S R2W Sec 7
Decision Memo · Pintler Ranger District · updated 6/14/2022
Flint Foothills Management Area of the Clark Fork Flint Landscape on the Pintler Ranger District. · Granite, Montana

The proposed action is to reroute 2 segments of NFS Road 1589, which is the only motorized access to Maywood Ridge. Activities include moving the existing road out of the bottom of the draw, increasing curve radius on a switchback, and a new culvert.

Road management
Scoping Start
03/07/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Cameron Rasor · cameron.rasor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R12W, Secs 14 and 24
Decision Memo · Pintler Ranger District · updated 6/14/2022
East Deerlodge Management Area of the Clark Fork Flint Landscape on the Pintler Ranger District. · Deer Lodge, Montana

NFS Road 5165 is a native surface road composed of decomposed granitic soils that are highly erosive. Three sections exceed FS specifications for maximum grade. Reroute these segments would decrease gradients from 14-17% to an average of 6% slope.

Road management
Scoping Start
03/07/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Cameron Rasor · cameron.rasor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT5N R9W, Secs 26, 27
Decision Memo · Wisdom Ranger District · updated 6/1/2022
The project area falls within the Tie-Johnson and Trail Creek Management Areas just north of MT Hwy 43 within the Trail Creek Fire perimeter on the Wisdom Ranger District. · Beaverhead, Montana

Salvage dead and dying trees on no more than 250 acres of National Forest System (NFS) lands on the Beaverhead-Deerlodge National Forest (BDNF) just north of MT Hwy 43 within the Trail Creek Fire perimeter.

Vegetation management (other than forest products)Forest products
Scoping Start
01/13/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Molly Ryan · molly.ryan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT.2 S., R.17 W., Sections 9, 10, 15, 16, 21, 22, and 23.
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 5/27/2022
Lima Tendoy Landscape, Horse Prairie North Management Area along Montana State Highway 278 near Big Hole Pass. · Beaverhead, Montana

Vigilante Electric proposes to rebuild an existing 69kV overhead transmission line. The new overhead transmission line runs across approximately 4,224 feet of NFS lands in a 50 foot wide corridor.

Special use management
Scoping Start
02/04/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Jeff Ingalls · jeff.ingalls@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionSection 8, T.6S., R.13W.
Environmental Impact Statement · Madison Ranger District · updated 1/7/2022
South end of the Gravelly and Snowcrest Mountains, Beaverhead and Madison Counties, Montana · Beaverhead; Madison, Montana

Review grazing practices and infrastructure for 4 domestic livestock grazing allotments (Eureka Basin, Pole Creek, Southwest Corner and Robb Creek)to ensure compliance with applicable Forest Plan direction.

Grazing management
NOI in Federal Register
02/04/2016
DEIS NOA in Federal Register
01/14/2017
FEIS NOA in Federal Register
12/2018 (Estimated)
Objection Period Start
10/2018 (Estimated)
Decision
01/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
Jacob Stewart · jwstewart@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Tendoy Project Completed
Environmental Assessment · Dillon Ranger District · updated 10/13/2021
Two locations are being considered: BLM surface location is Shearing Pen Gulch with access from Big Sheep Creek Road. USFS surface location is White Pine Ridge with access from Little Sheep Creek Road · Beaverhead, Montana

The BLM Dillon Field Office and Dillon Ranger District are starting the Environmental Assessment(EA) on Applications for Permit to Drill, submitted by the Lima Exploration Company, LLC.

Minerals and geology
Scoping Start
10/30/2015
Comment Period
11/25/2019
Objection Period Start
05/14/2021
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Licette Hammer · licette.hammer@usda.gov
NEPA / regulatory detail
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityOil
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionNot Applicable
Upper Willow Creek Completed
Decision Memo · Pintler Ranger District · updated 9/10/2021
Upper Willow Creek Management Area on the Pintler Ranger District in Granite County, MT. T. 8 N., R. 15 W., Sections 4 and 9 and T. 9 N., R. 15 W., Sections 18, 19, 20, and 33. · Granite, Montana

Removal of dead, dying, structurally weakened, infested and/or infected, and at-risk adjacent live trees on up to 250 acres on 12 units through the use of mechanical harvest and ground-based skidding adjacent to County Road No. 88 and private land.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
04/23/2021
Decision
09/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT. 8 N., R. 15 W., Sections 4 and 9 and T. 9 N., R. 15 W., Sections 18, 19, 20, and 33.
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 9/9/2021
20 existing administrative radio repeater sites located across the Beaverhead-Deerlodge National Forest. · Beaverhead; Deer Lodge; Gallatin; Granite; Jefferson; Madison; Powell; Silver Bow, Montana

A total of 20 repeater sites are located on the BDNF. These existing sites require annual maintenance to provide for critical communications across the Forest that support wildland fire suppression, SAR, and the health and safety of our employees.

Facility management
Scoping Start
12/01/2020
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Mike Goicoechea · mgoicoechea@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
Decision Decided Date09/09/2021
ForestsBeaverhead-Deerlodge National Forest
DistrictsBeaverhead-Deerlodge National Forest All Units
Legal Land DescriptionNot Applicable
Pintler Face Completed
Environmental Assessment · Beaverhead-Deerlodge National Forest All Units · updated 9/9/2021
Fishtrap-Mt. Haggin and Pintler Face Management Areas within the Big Hole Landscape. · Beaverhead; Deer Lodge, Montana

Purpose is to achieve Forest Plan Goals including timber management, aquatic improvement, wildlife habitat improvement. Proposed activities include commercial timber harvest, travel management, and reduction of conifer encroachment in sagebrush.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Watershed managementRoad management
Scoping Start
04/15/2016
Comment Period
07/07/2016
Objection Period Start
04/25/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Pamela Fletcher · pamfletcher@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsWise River Ranger District; Wisdom Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Jefferson Ranger District · updated 8/20/2021
Boulder River Landscape, Basin-Cataract Management Area · Jefferson, Montana

Permit vehicle access to private property through across 56 feet of National Forest land. It would allow the holder to improve, use and maintain a private driveway.

Special use management
Scoping Start
04/29/2015
Decision
11/2015 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
David Sabo · dsabo@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT7N, R5 W, Section 21
Decision Memo · Butte Ranger District · updated 8/17/2021
This project is located on the Butte and Pintler Ranger Districts in T. 4 N., R. 9 W., Sec. 12 and T. 5 N., R 9 W., Sec. 27 to the east of US Hwy 90 and northwest of Hail Columbia. · Deer Lodge; Silver Bow, Montana

Reconstruction of a 1-mile long segment of existing 16" steel gas pipeline, owned and operated by NorthWestern Energy. Total temporary disturbance would occur on approximately 13 acres of NFS lands located on the Butte and Pintler Ranger Districts.

Special use management
Scoping Start
07/29/2020
Decision
11/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Margaret Schmidt · Margaret.Schmidt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Natural Gas; Timber Sales (Green)
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District; Pintler Ranger District
Legal Land DescriptionT. 4 N., R. 9 W., Sec. 12 and T. 5 N., R 9 W., Sec. 27
Decision Memo · Pintler Ranger District · updated 8/16/2021
East of Deer Lodge, MT · Powell, Montana

The Forest Service proposes to issue a Private Road Special Use Permit authorizing the landowner to use an existing road to access their property. The portion of the road on NFS land is approximately 1,200 feet in length and 14 feet in width.

Special use management
Scoping Start
05/07/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Cameron Rasor · cameron.rasor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT.7N., R.8W., Sec. 10
Moose Addition Completed
Decision Memo · Pintler Ranger District · updated 6/14/2021
Moose Lake Recreation Residence Tract · Granite, Montana

The Forest Service proposes to authorize a recreation residence special use permit holder to construct a 17'x18' addition to her cabin. Less than 50 hazard trees will be removed in conjunction with construction.

Special use management
Scoping Start
05/06/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Cameron Rasor · cameron.rasor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT.3N., R.16W., Sec. 1
Decision Memo · Pintler Ranger District · updated 5/10/2021
The project area is located on the east side of the Flint Creek mountain range, approximately 9 miles west-northwest of Deer Lodge, MT and 8 miles south of Gold Creek, MT. · Powell, Montana

The proposed action would conduct vegetation management activities to promote resilience to insects and disease. Treatments would include timber harvest and removal of conifer encroachment from aspen stands.

Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
03/13/2019
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Daniel Pliley · Daniel.Pliley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 12/17/2020
Tobacco Root Landscape, Meadow Creek Management Area · Madison, Montana

This project is a proposal to issue a special use permit to allow connection of a pipeline to the overflow of a water trough on NFS lands and install approximately 2000 feet of subsurface line to water livestock on adjacent private land.

Special use management
Scoping Start
05/16/2016
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Jacob Stewart · jwstewart@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R2W, section 21
Decision Memo · Madison Ranger District · updated 12/17/2020
Cameron Montana · Madison, Montana

The purpose of this project is to protect over 6 miles of Westslope Cutthroat Trout occupied habitat in the Wall Creek drainage, by constructing a fish passage barrier near the downstream Forest boundary.

Wildlife, fish, rare plants
Scoping Start
04/24/2019
Decision
11/2020 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT10S R1W Sec 23
Decision Memo · Pintler Ranger District · updated 11/10/2020
Section 21, T. 7N., R. 16 W. (Stony Creek Allotment) and Section 29, T. 7N., R. 16 W (Cornish Gulch Pasture, FS Road No. 5012). · Granite, Montana

Installation of a new fence approximately 0.4 miles long and extension of existing fence by 0.3 miles in Stony Creek and construction of a 40 ft. x 80 ft. corral adjacent to NFS Road No. 5012 in Cornish Gulch for loading and unloading cattle.

Grazing management
Scoping Start
08/13/2020
Decision
11/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Alicia Goodman · alicia.goodman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionSection 21, T. 7N., R. 16 W. and Section 29, T. 7N., R. 16 W
Decision Memo · Pintler Ranger District · updated 11/4/2020
Moose Lane in Granite County (near Georgetown) within approximately 1/4 mi of Discovery and Red Lion roads. · Granite, Montana

Issuance of special use permit(s) authorizing up to two landowners to access their private property and maintain existing routes (operation and maintenance of an existing 750 ft. long segment and improvement and maintenance of a 30 ft. driveway).

Special use management
Scoping Start
08/13/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Margaret Schmidt · Margaret.Schmidt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT.5N., R.13W., Section 5 and T.6N., R.13W., Section 32.
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 5/15/2020
Pintler Ranger District horse pasture behind Forest Service housing compound. · Granite, Montana

A .75 mile extension of an existing non-motorized recreation and outdoor education trail from the Philipsburg, Montana town park and back. The trail traverses the Pintler Ranger District horse pastures.

Recreation management
Scoping Start
12/01/2017
Decision
03/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
William Shoutis · wshoutis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT 16N R14W, section 36
Decision Memo · Madison Ranger District · updated 5/13/2020
Gravelly Landscape, Chain of Lakes Management Area · Madison, Montana

We propose to rebuild the dam on Narrows Pond to newly acquired design specifications, in order to store adequate water to support embryo development and fry emergence of Arctic Grayling and Westslope Cutthroat Trout in Elk Lake.

Wildlife, fish, rare plants
Scoping Start
05/16/2016
Decision
09/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT16N, R41E, section 29
Decision Memo · Wisdom Ranger District · updated 2/13/2020
Approximately 15 miles west of Wisdom, MT · Beaverhead, Montana

We seek to improve riparian vegetation structure and composition in the Trail Creek area, proactively removing expanding conifers in this area would ensure this valuable riparian shrub/willow component is maintained and allowed to improve overtime.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
05/04/2018
Decision
01/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Molly Ryan · mollymryan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Butte Ranger District · updated 1/31/2020
Thompson Park, approximately 9 miles south of Butte. T1N R7W Sections 3 and 4 · Silver Bow, Montana

Proposal would manage several trails in and adjacent to Thompson Park for non-motorized winter recreation opportunities by continuing to groom approximately 12 miles of trail and adding another 1.10 miles of route to the groomed trail system

Recreation management
Scoping Start
09/13/2019
Decision
11/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT1N R7W Sections 3 and 4
Decision Memo · Butte Ranger District · updated 9/16/2019
Upper Clark Fork Landscape , Backyard Butte Management Area0 · Silver Bow, Montana

This project would permit continued maintenance and grooming of about 15 kilometers (9 miles) of non-motorized trails for cross country skiing from December 1st through March depending on conditions.

Recreation management
Scoping Start
02/24/2017
Decision
03/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT4N, R7W, Sections 7,18 and T3N, R7W, Section 19
Environmental Assessment · Butte Ranger District · updated 8/28/2019
Project area is located in the Boulder River landscape, primarily northwest of I-15 near the towns of Bernice and Basin. · Jefferson, Montana

Reduce stand density and increase age class, size class, and species diversity; reduce conifer encroachment; provide forest products.

Forest productsVegetation management (other than forest products)
Scoping Start
03/16/2017
Comment Period
02/15/2018
Objection Period Start
03/09/2019
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
David Sabo · dsabo@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 8/15/2019
Gravelly Landscape, Ruby-Horse Creek and Johnny Gulch Management Areas inside the Monument Fire perimeter. · Madison, Montana

Planting the burned area from the 2018 Monument Fire with native Whitebark pine in order to help the species establish during the period of little competition from vegetation post-fire.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
04/15/2019
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Jeremy Keys · jeremykeys@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Population Enhancements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT9S, R2W, Sections 10, 11, 15, 14, 21, 22, & 27
Decision Memo · Dillon Ranger District · updated 8/14/2019
T8S, R15W, SW corner of the NW corner of Section 35 · Beaverhead, Montana

We propose building a fish barrier in Selway Creek to support a MTFWP project to reintroduce native westslope cutthroat trout and improve habitat for an existing population of Forest Service listed sensitive species of Western Pearl Shell Mussels

Wildlife, fish, rare plants
Scoping Start
07/10/2019
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Kevin Weinner · kweinner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance; Road Maintenance
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT8S R15W SW of the NW of Sec 35
Decision Memo · Dillon Ranger District · updated 6/20/2019
Selway Saginaw Management Area in the Lima-Tendoy and Big Hole Landscapes · Beaverhead, Montana

Proposal to expand up to four existing gravel pits in the Selway and Bloody Dick Drainages over the next 20 years for road improvement projects. Two pits are in the Tash Peak and one in the West Big Hole IRA. See scoping letter and maps.

Road managementFacility management
Scoping Start
08/31/2018
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Clifford Stout · cliffordstout@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance; Road Maintenance
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionJunction Pit:T8S, R15W, S27 Kitty Creek Pit: T9S, R15W, S3 Selway Pit: T8S, R15W, S26,27,35,34 Mile Post 12 Pit: T07S, R14W, S28
Decision Memo · Wise River Ranger District · updated 5/6/2019
Pioneer Landscape, West Pioneer Wilderness Study Area · Beaverhead, Montana

We plan to decommission the lower portion of Schwinegar Lake Trail #2259 that is eroding and causing resource damage. We propose to reroute about three quarters of a mile of trail along the contour line of the slope to tie in with Trail #2758.

Recreation management
Scoping Start
04/25/2017
Decision
06/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Roger Anderson · rogeranderson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsWise River Ranger District
Legal Land DescriptionT3S, R13W, Sections PB 39&8
Decision Memo · Dillon Ranger District · updated 2/15/2019
Lima Tendoy Landscape, Selway Saginaw Management Area · Beaverhead, Montana

We propose to install up to three hardened stream crossings and sections of fence at primary livestock crossing sites on the lower reach of Selway Creek. The project would protect streambanks, reduce sediment, and narrow the stream channel.

Watershed management
Scoping Start
04/19/2017
Decision
02/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Kyle Schmitt · kschmitt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT8S, R15W, Sections 14 & 23
Decision Memo · Wisdom Ranger District · updated 1/31/2019
Multiple management areas in the Big Hole Landscape as shown on map. · Beaverhead, Montana

This project will remove dead, dying, and structurally unsound trees within 150 of either side of identified Forest Services roads and a portion of MT Highway 43 to reduce the hazard they pose to the travelling public.

Road management
Scoping Start
11/14/2016
Decision
07/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Leaf Magnuson · lmagnuson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 11/20/2018
Big Hole Landscape, Ruby Management Area · Beaverhead, Montana

Removal of hazard trees along the Montgomery, Slag-A-Melt, and Low Furley north and south ditches on approximately 3.2 miles of the ditch easement within one tree length, (50 to 150 feet) from both sides of the ditch.

Vegetation management (other than forest products)Special use management
Scoping Start
10/14/2016
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Jessica Dhaemers · jdhaemers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionSlag-A-Melt: T5S,R16W,Sections 8, 17,& 18; Low Furley N&S & Lower Montgomery: T4S,R16W,Section 32; and Montgomery: T5S R16W,Sections 5 & 6.
Decision Memo · Butte Ranger District · updated 9/14/2018
Project area is located in the Northeast Fleecer Management Area in the Big Hole Landscape, west of I-15. Proposed project reach(es) are upstream of South Fork Reservoir. · Silver Bow, Montana

The S Fk-N Fk of Divide Creek has reaches with alterations such as straightened stream channels and ditches. Potential restoration activities include reconnecting altered channel to existing, original channel and adding woody debris for habitat.

Wildlife, fish, rare plants
Scoping Start
06/06/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Erin Ryan · eryan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT1N R9W Sec 7
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 8/28/2018
Gravelly Landscape, Snowcrest Mountain Recommended Wilderness Management Area, along the Ruby River. · Madison, Montana

This project proposes to improve 325-acres of winter habitat for moose along the Ruby River in the Gravelly Landscape, Snowcrest Mountain Recommended Wilderness Area.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
01/13/2017
Decision
03/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Jenna Roose · jmroose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT9S R3W, Sec. 33, T10S R3W Sections 3, 4, 9, 16, 21, 29 and 32
Decision Memo · Madison Ranger District · updated 7/25/2018
The project is located at T4S, R2W, Sec(s) 19 & 30 in the Tobacco Root Landscape in the Tobacco Root Peaks and Meadow Creek Management Area. · Madison, Montana

The proposal is to remove 8000 tons of mine waste material from multiple sites in the South Meadow Creek area. Access and waste rock material haulage will be primarily along forest roads #9648, 9649, 9649a, 1224 and 1221.

Minerals and geology
Scoping Start
10/01/2015
Decision
07/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Sonny Thornborrow · sthornborrow@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Decision Memo for MT58 Voigt Plan of Operations.Decision Signed Date: 07/21/2017
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 1/29/2018
Upper Clark Fork Landscape and Backyard Butte Management Area · Silver Bow, Montana

We propose to issue a permit to NorthWestern Energy for installation of 1100 feet of power line from an overhead power line on Poormans Road to private property. The line will be buried in an existing roadbed.

Special use management
Scoping Start
09/13/2013
Comment Period
11/18/2013
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
Don Despain · ddespain@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Poorman's Underground Power LineDecision Signed Date: 01/06/2014 Legal Notice Date: 01/08/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT4N, R8W, Sec 36
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 9/27/2017
Pioneer Landscape, Torrey Mountain Recommended Wilderness Management Area · Beaverhead, Montana

This project is proposed to remove the deteriorated and failing dam on Tendoy Lake to ensure water that leaves the lake stays in the Willow Creek drainage. The project is intended to benefit native fish and won't change water levels in the lake.

Watershed managementWildlife, fish, rare plants
Scoping Start
04/19/2017
Decision
09/2017 (Estimated)
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Kevin Weinner · kweinner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
Tendoy Dam RemovalDecision Signed Date: 09/27/2017
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT4S, R11W, Section 4
Decision Memo · Dillon Ranger District · updated 9/27/2017
Lima Tendoy Landscape, Selway Saginaw Management Area · Beaverhead, Montana

We propose this project to clean, maintain, and repair failures in existing irrigation ditches and replace 3 diversion structures with structures that meet standards. We also plan to reconnect two historic channels to the main stem of Selway Creek.

Grazing managementWatershed management
Scoping Start
04/19/2017
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Kevin Weinner · kweinner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT8S R15W Sec 2, 11, and 14
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 9/18/2017
Tobacco Root Landscape, South Boulder Management Area · Madison, Montana

This proposal would convey a .73 acre isolated tract of land to Mr. & Mrs. McGraw under the Small Tract Act. There are no ground disturbing activities proposed, and the current uses would remain the same.

Land ownership management
Scoping Start
02/02/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
David Sabo · dsabo@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT2S, R3W, Section 18, Government Lot 12
Decision Memo · Pintler Ranger District · updated 7/28/2017
Georgetown Lake Management Area, Clark Fork Flint Landscape · Granite, Montana

This project involves replacement and upgrade of an existing overhead electric distribution system with a buried distribution system.

Special use management
Scoping Start
06/06/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionSec. 6 T5N R13W, Sec. 11, 12, 14, 22 T5N R14W
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 7/19/2017
Lima-Tendoy and Big Hole Landscapes · Beaverhead, Montana

Amend the terms of an existing permit under a National Memorandum of Understanding, to allow the Natural Resources Conservation Service to automate 2 existing snow courses (Dad Creek and Slag-a-Melt)to Snotel sites.

Special use management
Scoping Start
05/14/2014
Decision
07/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Alex Dunn · adunn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District; Wisdom Ranger District
Legal Land DescriptionT12S, R12W, Sec 19; T6S, R17W, Sec 29
Decision Memo · Pintler Ranger District · updated 3/3/2017
Clark Fork - Flints Landscape, Flint Foothills Management Area, approximately 1.5 miles northwest of Maxville, Montana. · Granite, Montana

We propose to permit a mineral company to dig five exploration test trenches about 4 feet deep, 15 feet wide and 316 to 1202 feet long. Total disturbance would be approximately 3 acres.

Minerals and geology
Scoping Start
10/28/2016
Decision
02/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R13W, Sections 5, 6 and 7
Decision Memo · Dillon Ranger District · updated 11/30/2016
Lima Tendoy Landscape, Selway Saginaw Management Area · Beaverhead, Montana

Cleaning, maintenance, or repair of ditches, and replacement of diversion structures as needed on irrigation ditches in Selway Meadows.

Facility managementWatershed managementGrazing management
Scoping Start
05/20/2016
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Kyle Schmitt · kschmitt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT8S, R15W, Sections 1,12, 13, & 24
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 11/23/2016
Big Hole Landscape, Ruby Management Area, next to Isaac Meadows 13 miles southwest of Wisdom, MT. · Beaverhead, Montana

We propose to remove the remaining dead and dying lodgepole pine adjacent to separate portions of the Moosehorn Ditch to protect the integrity of the ditch should wind damage occur. For details please see the scoping letter on this project website.

Special use managementVegetation management (other than forest products)
Scoping Start
09/27/2016
Decision
11/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Russell Riebe · rriebe@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT3S, R17W, west edge Section 27, across the SE corner Section 28
Decision Memo · Pintler Ranger District · updated 11/14/2016
Upper Rock Creek Landscape, Sapphire Mountains Wilderness Study Area and Ross Fork MAs in the Sapphire Inventoried Roadless Area. · Granite, Montana

We propose to construct 4.7 miles of new trail and obliterate 1.4 miles of the old trail tread, in order to reroute the Whetstone Ridge Trail to resolve safety, erosion and public access concerns posed at the existing location.

Recreation management
Scoping Start
04/17/2015
Decision
11/2016 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
David Rouse · dmrouse@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT4N, R16 W, Sections 4,9,29 and T4N, R17 W, Section 36
Decision Memo · Dillon Ranger District · updated 11/8/2016
Pioneer Landscape, Pioneer Mountains Scenic By-Way · Beaverhead, Montana

This project involves only the administrative change of issuing a new authorization for a private road access on the Lightning Ridge Road and associated two track to a private cabin.

Special use management
Scoping Start
05/20/2016
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Kyle Schmitt · kschmitt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Dillon Ranger District · updated 11/8/2016
Lima Tendoy Landscape, Lima Peaks Management Area · Beaverhead, Montana

This is a proposal to re-authorize a new 10-year term special use permit to Snowline Grazing Association for continued use of existing structures and use on NFS lands. There are no changes proposed to the expiring permit.

Special use management
Scoping Start
05/20/2016
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Kyle Schmitt · kschmitt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT4S,R12W, E half of NE quarter of Section 21
Decision Memo · Dillon Ranger District · updated 11/8/2016
Lima Tendoy Landscape, Horse Prairie North Management Area · Beaverhead, Montana

This proposal considers re-authorizing a special use permit for a new 10-year term for existing structures and uses on NFS lands.

Special use managementGrazing management
Scoping Start
05/20/2016
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Kyle Schmitt · kschmitt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Authorizations; Special Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT6S, R13W, Section 22
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 10/17/2016
Pioneer Landscape, East Face Management Area · Beaverhead, Montana

This project iwould move the Dry Hollow storage tank point of diversion in the Electric Fence pasture about 1740 feet, add a trough, and reconstruct 1.11 mi. of existing pipeline to protect a resource at the original point of diversion.

Grazing management
Scoping Start
05/23/2016
Decision
08/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Juliana Willsen · jiwillsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsWise River Ranger District
Legal Land DescriptionT2S, R10W, Sections 12, 13, 14 & 18
Environmental Impact Statement · Beaverhead-Deerlodge National Forest All Units · updated 10/11/2016
Entire Beaverhead-Deerlodge National Forest, southwestern Montana · Beaverhead; Deer Lodge; Gallatin; Granite; Jefferson; Madison; Powell; Silver Bow, Montana

Preparation of a supplemental analysis for the Corrected FEIS for revision of the Beaverhead and Deerlodge Forest Plans into the 2009 BDNF Forest Plan, in response to an August 27, 2015 Order from the U.S. District Court for the District of Montana.

Land management planning
NOI in Federal Register
09/11/2015
DEIS NOA in Federal Register
12/05/2015
FEIS NOA in Federal Register
05/20/2016
Objection Period Start
05/21/2016
Decision
10/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Jan Bowey · jbowey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsBeaverhead-Deerlodge National Forest
DistrictsBeaverhead-Deerlodge National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 8/9/2016
Upper Clark Fork Landscape Backyard Butte Management Area · Silver Bow, Montana

This project would issue a special use permit to Mr. Murphy for construction of a 300 foot driveway off a closed route and allow NorthWest Energy to bury an underground residential powerline for 900 feet across NFS to the private building site.

Special use management
Scoping Start
05/17/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Lucas Phillips · ljphillips@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT4N, R8W, Sec36
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 7/27/2016
Not in a Landscape or Management Area. This isolated parcel is the hill next to the interchange for Interstates 15 and 90 on the southwest side. · Silver Bow, Montana

NorthWest Energy is replacing three power poles along their line from Butte to Ramsey on a small isolated Forest Service parcel at Nissler Junction near the intersection of Interstates 15 and 90.

Special use management
Scoping Start
05/17/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Lucas Phillips · ljphillips@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionHalf on T3N, R9W, Section 13 the other half on T3N, R8W, Section
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 7/22/2016
Boulder River Landscape, Basin- Cataract Management Area · Jefferson, Montana

The proposal would convey two mineral fraction parcels totaling 3.08 acres to Montana Resources under the Small Tracts Act

Land ownership management
Scoping Start
05/31/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT6N, R5W, section 7, SE quarter
Decision Memo · Jefferson Ranger District · updated 7/8/2016
Jefferson River Landscape, Bull Mountains Management Area · Jefferson, Montana

The Forest Service proposes to issue a term special use permit for installation, use, and maintenance of a waterline system.

Special use management
Scoping Start
04/29/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Lucas Phillips · ljphillips@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT3N R4W Section 14 NW 1/4
Decision Memo · Pintler Ranger District · updated 7/8/2016
Clark Fork Flints Landscape, Georgetown Lake Management Area · Granite, Montana

The proposed action is to issue a 30 year Communication Use Lease to Rfwave for a single use facility located adjacent to Denton%u2019s Marina on Georgetown Lake.

Special use management
Scoping Start
05/11/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT5N R14W, Section 24
Decision Memo · Pintler Ranger District · updated 7/8/2016
Clark Fork Flint Landscape, Georgetown Lake Management Area · Granite, Montana

The proposed action is to authorize T-Mobile to install equipment at the established Rumsey Mountain Communication Site. This use would be authorized as a Communication Site Lease with a 30 year term.

Special use management
Scoping Start
05/11/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
T-Mobile Communication Use Lease for Cellular EquipmentDecision Signed Date: 07/07/2016
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT6N, R13W, Section 20
Decision Memo · Dillon Ranger District · updated 6/29/2016
Lima Tendoy Landscape, Selway-Saginaw Management Area · Beaverhead, Montana

This project is proposed to begin restoring a declining willow population and improve stream function on Selway Creek. The Beaverhead-Deerlodge Working Group, The Nature Conservancy, FWP, volunteers and staff will help do the planting with the FS.

Watershed management
Scoping Start
05/20/2016
Decision
07/2016 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Kevin Weinner · kweinner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 6/23/2016
Pioneer Landscape, West Pioneer Wilderness Study Management Area · Beaverhead, Montana

Reroute and reconstruct approximately 4 switchbacks/climbing turns on about a half mile of non-motorized FS System Trail #3010 to the Odell Mountain Lookout in the West Pioneers.

Recreation management
Scoping Start
05/23/2016
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Roger Anderson · rogeranderson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT3N, R13W, Section 18
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 6/8/2016
Upper Clark Fork Landscape, Stony Management Area · Granite, Montana

The proposal would authorize NorthWest Energy & Blackfoot Telephone Co. a right-of-way approximately 1,850 feet long by 2 feet wide in order to bury electric and phone conduits for a private residence 3 feet deep in the Stony Creek Roadbed.

Special use management
Scoping Start
10/26/2015
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Patty Bates · pbates@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Permit AmendmentsDecision Signed Date: 06/08/2016
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT7N, R16E, Sec 21
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 5/5/2016
Tobacco Root Landscape %u2013 Tobacoo Root Peaks Management Area · Madison, Montana

Proposal to exchange a permit for motorized access to private land on 1320 feet of an old jeep road closed to motorized traffic for an easement across private land for the same distance to maintain public access along the Ramshorn Creek Trail #6016

Special use management
Scoping Start
09/23/2015
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Kevin Suzuki · ksuzuki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R3W, Sec 29
Environmental Impact Statement · Wisdom Ranger District · updated 3/25/2016
On the Wisdon and Wise River Ranger Districts of the Beaverhead-Deerlodge NF · Beaverhead; Deer Lodge, Montana

Updating the allotment management plans for 11 grazing allotments.

Grazing management
NOI in Federal Register
08/17/2012
DEIS NOA in Federal Register
03/28/2014
FEIS NOA in Federal Register
08/25/2015
Objection Period Start
10/10/2015
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Jessica Dhaemers · jdhaemers@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Butte Ranger District · updated 10/2/2015
The federal land is located about 5 miles north of Butte, and the non-federal land is located in the Boulder Mountains around Delmoe Lake. · Jefferson; Silver Bow, Montana

This project would exchange Federal lands north of Butte for private lands near Delmoe Lake.

Land ownership management
Scoping Start
08/02/2004
Comment Period
05/18/2012
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Karen Gallogly · kgallogly@fs.fed.us
NEPA / regulatory detail
Notice and Comment Regulation215
Project ActivityLand Exchanges
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District; Jefferson Ranger District
Legal Land DescriptionFederal land is located in T3N,R8W;T4N,R8W;T4N,R7W
Decision Memo · Dillon Ranger District · updated 10/2/2015
Selway Creek Area of Dillon Ranger District · Beaverhead, Montana

Remove hazard trees adjacent to several high-use system roads on the Dillon Ranger District using commercial timber sale.

Road management
Scoping Start
03/31/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Alex Dunn · adunn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Madison Ranger District · updated 7/27/2015
Road 1237B is in the Ramshorn management Area, Tobacco Root Landscape. Road 9677 is in the Gravelly Landscape, Ruby-Centennial Corridor Management Area · Madison, Montana

Road 1237B, (0.5 miles) will require complete obliteration. Road closure devices, water bars, tread scarification and re-contouring will discourage motorized use and promote re-vegetation. Road 9677, (1.6 miles) will require only a closed sign.

Recreation managementWatershed management
Scoping Start
02/20/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Kevin Suzuki · ksuzuki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning
Madison Road Decommissioning Identified in 2011 Summer Motorized Travel EADecision Signed Date: 07/24/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT5S, R3W, Sections 6 & 7 T9S, R3W, Section 28
Decision Memo · Madison Ranger District · updated 7/8/2015
Smith Lake in the Gravelly Landscape in the West Fork Madison Management Area · Madison, Montana

Construct and install a 12 foot denil fish ladder attached to a 7'x7' concrete head wall. The top of the fish ladder will be covered to prevent blockage. The contractor would use a tracked excavator to do the work.

Wildlife, fish, rare plants
Scoping Start
02/20/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Smith Lake Dam Fish LadderDecision Signed Date: 07/07/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Wise River Ranger District · updated 7/5/2015
Deer Camp site is in the West Pioneer Inventoried Roadless Area (WSA Management Area) in the Pioneer Landscape. Dickie Peak site is in the South Fleecer Management Area in the Big Hole Landscape. · Beaverhead; Deer Lodge; Silver Bow, Montana

Proposal to convert 2 communication sites, identified in the Beaverhead-Deerlodge Forest Plan as "proposed" to permanent administrative sites. Equipment is in place and the conversion is an administrative exercise.

Special use management
Scoping Start
03/26/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Bill Given · bgiven@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Internal Memo for Dickie Peak and Deer Camp Repeaters DecisionDecision Signed Date: 06/05/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsWise River Ranger District
Legal Land DescriptionDeer Camp T4S, R14W, NENW Sec 16; Dickie Peak T2N, R11W, SWNW Sec 28
Decision Memo · Pintler Ranger District · updated 6/23/2015
Upper Rock Creek Landscape, Upper Willow Management Area, Quigg IRA, about 15 miles northwest of Philipsburg, Montana. · Granite, Montana

proposal to permit mineral exploration in an unpatented mining claim using a backhoe to excavate 8 trenches. Trenches will be opened one at a time and reclaimed before excavating the next. Samples would be removed and processed off-site.

Minerals and geology
Scoping Start
12/16/2014
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R15W, Sections 18 &19 and T8N, R16W, Sections 13 & 24
Decision Memo · Wisdom Ranger District · updated 6/10/2015
Big Hole Landscape, West Big Hold Flats Management Area · Beaverhead, Montana

Reauthorize an expired 10-year Livestock Area Special Use Permit to Candland Olsen. The permit allows constructing part of a fence on National Forest because the site on his property is too wet to construct a fence

Grazing management
Scoping Start
04/21/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Russell Riebe · rriebe@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Olsen Livestock Area Special Use PermitDecision Signed Date: 06/09/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT7N, R15E, Sections 7,8,18,19,& 20
Decision Memo · Wisdom Ranger District · updated 6/5/2015
Big Hole Landscape, West Big Hole Flats Management Area, south of Jackson, Montana. · Beaverhead, Montana

This proposal is to build a structure at the outlet of Van Houten Lake to block non-native trout passage upstream into the lake.

Vegetation management (other than forest products)
Scoping Start
05/14/2014
Decision
06/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Daniel Downing · ddowning@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Van Houten Fish BarrierDecision Signed Date: 06/05/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT22N, R15W, Section 8
Decision Memo · Wisdom Ranger District · updated 6/5/2015
West Big Hole and West Big Hole Flats Management Area, Big Hole Landscape. Includes a portion of the West Big Hole Inventoried Roadless Area. · Beaverhead, Montana

Project to reconstruct sections of formerly motorized routes on 10.5 combined miles of trail in the Berry, Janke, Hamby, and Pioneer creek drainages (closed by the February 2010 Record of Decision) to Non-motorized Class 3 Trail standards.

Recreation management
Scoping Start
08/23/2011
Decision
02/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Nathan Gassmann · ngassmann@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT22N, R16W, Section 8
Decision Memo · Jefferson Ranger District · updated 5/28/2015
Pipestone Management Area, Jefferson River Landscape · Jefferson, Montana

This project involves maintenance and construction on approximately 3.6 miles of existing motorized use trail. New construction would replace eroded sections with steep grades, unsafe switchbacks and move the trail away from wet areas.

Recreation management
Scoping Start
05/20/2011
Decision
02/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT1N R6W, Sections 5, 4, 8 and T2N R6W Sections 29, 31, 32.
Decision Memo · Madison Ranger District · updated 4/21/2015
South Willow Creek - Tobacco Root Mountains · Madison, Montana

Fencing a spring, installing a collection basin, 1000 ft of 1.25 inch pipeline, and 2 tan fiberglass stock water troughs with float valve shut-offs. The pipeline will cross a steam at one point. Purpose is to reduce riparian grazing impact.

Grazing management
Scoping Start
06/03/2009
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
James Stewart · jstewart@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRangeland Vegetation Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionPMM, MT. T 3S, R 3W, Section(s)13, 14
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 4/21/2015
Upper Rock Creek Landscape, West Fork Rock Creek, Ross Fork, Sapphires WSA, East Fork, and Anaconda-Pintler Recommended Wilderness Additions management areas · Granite, Montana

Renew a 10-year special use permit for Royal Tine Outfitting and Guide School

Special use management
Scoping Start
03/03/2015
Decision
04/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
David Rouse · dmrouse@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Internal Memo of Decision, Pintler Outfitter & Guide Permits - Royal TineDecision Signed Date: 04/16/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 3/18/2015
Medicine Lodge-Tendoy Management Area in the Lima Tendoy Landscape · Beaverhead, Montana

We propose to use a mini excavator to restore 100 feet of stream bank washed out by flooding, do minor trail repair, and barricade a non-motorized route while the excavator is in use to bury a pipe for a water development to protect a spring.

Watershed management
Scoping Start
03/19/2014
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Katie Bonogofsky · kjbonogofsky@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Upper Wilson Creek Stream Restoration and Water DevelopmentDecision Signed Date: 03/17/2015
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT13S, R11W, Section 16 and 17
Environmental Assessment · Wise River Ranger District · updated 3/3/2015
East Pioneer Mountains about 10 miles southeast of Wise River, MT. · Beaverhead, Montana

This revised proposal includes removal of colonizing conifers on 3338 acres of riparian vegetation, mountain mahogany, and sagebrush/grass parks using slashing and burning, broadcast burning, or lop and scatter to meet Forest Plan objectives

Vegetation management (other than forest products)
Scoping Start
02/26/2010
Comment Period
04/30/2014
Objection Period Start
08/22/2014
Decision
12/2014 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Alex Dunn · adunn@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements
Trapper Creek Vegetation Management ProjectDecision Signed Date: 12/01/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District; Wise River Ranger District
Legal Land DescriptionT. 1 S., 2 S., 3 S.; R. 10 W., 11 W.
Decision Memo · Pintler Ranger District · updated 12/17/2014
Clark Fork Flint Landscape, Flint Uplands MA · Granite, Montana

We propose to issue a Private Road Special Use Permit authorizing the Nut Pine Lode LLC to access their private property. The project would including the repair, by the LLC, of a collapsed culvert.

Special use management
Scoping Start
03/22/2013
Decision
11/2014 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Nut Pine Private Road Special Use PermitDecision Signed Date: 11/07/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT6N, R12W, Sections 7, 17 &18
Decision Memo · Madison Ranger District · updated 12/16/2014
Mill Creek Corridor Management Area in the Tobacco Root Landscape, northeast of Sheridan, MT. · Beaverhead, Montana

This proposal is to remove of a portion of the small earthen dam at Lower Branham Lake in order to restore the outlet channel. Excavated material will be used to make minor repairs to the dam on Upper Brahnam Lake and the bridge will be replaced.

Wildlife, fish, rare plants
Scoping Start
05/30/2014
Decision
12/2014 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Upper Branham Lake Dam Repair and Lower Branham Lake Dam Removal ProjectDecision Signed Date: 12/11/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R3W, Section 5
Decision Memo · Jefferson Ranger District · updated 7/31/2014
Boulder River Landscape, Little Boulder-Galena Gulch MA in the North Fork Little Boulder River watershed. · Jefferson, Montana

This proposal would authorize development of a spring water source with a headbox, pipeline, and two water tanks in the Little Galena pasture of the Galena allotment. Tanks would be placed 50 and 1400 ft from the source.

Grazing management
Scoping Start
04/01/2014
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Kyler McCarrel · kmccarrel02@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT5N, R5W, Sec 3
Decision Memo · Dillon Ranger District · updated 7/21/2014
Dillon and Wisdom Ranger Districts: Big Hole Divide, Bull Creek, Saginaw Creek, Skinner Meadows. · Beaverhead, Montana

Proposal involves removal of hazard trees within falling distance of 45 miles of high-priority Forest System Roads on the Wisdom and Dillon Ranger Districts. Trees will be removed within a narrowly specified corridor using commercial timber sales.

Road management
Scoping Start
03/20/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Alex Dunn · adunn@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT.21, 23, 24N, R.13W; T.24, 25, R.14W; T.22N, R.13, 15, 16W
Decision Memo · Jefferson Ranger District · updated 7/15/2014
T7N, R7W, Section 36 · Beaverhead, Montana

Justin Hanninen of Butte, Montana has submitted a Plan of Operations to explore for minerals on unpatented mining claims located in T7N, R7W, section 36, approximately 8.5 miles northwest of Basin, Montana.

Minerals and geology
Scoping Start
02/04/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Pride 4 & 6 Placer Exploration Decision MemoDecision Signed Date: 07/08/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 7/3/2014
Georgetown Lake Management Area in the Clark Fork Flint Landscape · Granite, Montana

Proposal issue a Private Road Special Use Permit to Danny Villa and Lisa Jesse authorizing operation and maintenance of an existing road crossing NFS land to access private property.

Special use management
Scoping Start
02/26/2014
Decision
04/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT5N, R14W, Section 14
Decision Memo · Jefferson Ranger District · updated 5/15/2014
Jefferson River Landscape, Whitetail & Pipestone Management Areas · Jefferson, Montana

Mr Monforton requests we renew a private road special use permit, authorized since 2001, for a mile behind a locked gate on FS Road #173. His property is surrounded by National Forest System lands.

Special use management
Scoping Start
02/27/2012
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Don Despain · ddespain@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT3N, R5W, Sec(s) 10, & 3
Decision Memo · Pintler Ranger District · updated 5/13/2014
Clark Fork Flint Landscape, Georgetown Lake Management Area · Granite, Montana

This proposal is to issue a Private Road Special Use Permit to Danny Villa and Lisa Jesse for operation and maintenance of 160 feet of existing road across NFS land to access their private property.

Special use management
Scoping Start
02/26/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT5N, R14W, Section 14
Decision Memo · Madison Ranger District · updated 2/25/2014
Snowcrest Recommended Wilderness Management Area, Gravelly Landscape · Madison, Montana

We propose to cut Douglas-fir trees encroaching on 0.78 acres of riparian area to use as a barrier along Romy Creek. A strategic opening will funnel them to the historic road crossing and reduce trampling on about 60 yards of streambank.

Grazing management
Scoping Start
03/07/2012
Decision
04/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Arthur Hall · athall@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT9S, R3W Sections 32 &33
Decision Memo · Pintler Ranger District · updated 2/3/2014
Smart Creek drainage approximately 10 miles north of Philipsburg, Montana. · Granite, Montana

Frank Antonioli of Butte has submitted a Plan of Operations (POO) to explore for minerals on unpatented mining claims located in T8N, R13W, section 6, approximately 10 miles north of Philipsburg, Montana.

Minerals and geology
Scoping Start
05/23/2011
Comment Period
07/01/2011
Decision
08/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Smart Creek Exploration ProjectDecision Signed Date: 08/30/2011 Legal Notice Date: 08/31/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R13W, section 6
Decision Memo · Madison Ranger District · updated 1/21/2014
Southwest of Antone Cabin, in the Snowcrest Recommended Wilderness Management Area, Gravelly Landscape · Beaverhead, Montana

We propose to harden an existing eroding livestock crossing a by installing grade control structures and using compacted gravel over cobble on approaches. Jackleg fences will keep stock in the crossing.

Grazing management
Scoping Start
03/07/2012
Comment Period
04/22/2013
Decision
01/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Arthur Hall · athall@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
West Fork Blacktail Deer Creek Hardnened CrossingDecision Signed Date: 01/13/2014 Legal Notice Date: 01/19/2014
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT12S, R4W, Section 30
Decision Memo · Madison Ranger District · updated 1/16/2014
Gravelly Landscape, Chain of Lakes Management Area · Madison, Montana

Proposal to construct by hand tools, a mile and a half of interpretive trail between the Riverview and Madison campgrounds. Interpretive material will explain land use over time, local geology, wilderness managment, and living with grizzly bears

Recreation management
Scoping Start
02/15/2011
Decision
06/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Jonathan Klein · jklein@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityOrder Creation/Modification
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT11S, R1E, Sections 14 & 15
Environmental Assessment · Beaverhead-Deerlodge National Forest All Units · updated 12/4/2013
18 miles northwest of Wise River, Montana, Bighole Landscape, Fishtrap Mt Haggin and South Fleecer Management Areas · Deer Lodge; Silver Bow, Montana

Locate and construct approximately 12 miles of the Continental Divide National Scenic Trail (CDNST). The Forest Service proposes to construct a non-motorized trail to meet the intent of the CDNST Comprehensive Plan

Recreation managementSpecial area management
Scoping Start
01/21/2011
Comment Period
03/05/2013
Decision
08/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Nathan Gassmann · ngassmann@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Special Area Management
Seymour-Tenmile CDNST Trail ProjectDecision Signed Date: 08/16/2013 Legal Notice Date: 08/16/2013
Seymour-Tenmile Continental Divide National Scenic Trail projectDecision Signed Date: 08/16/2013 Legal Notice Date: 08/16/2013
ForestsBeaverhead-Deerlodge National Forest
DistrictsBeaverhead-Deerlodge National Forest All Units
Legal Land DescriptionT2N, R11W, Sections 12 & 13; T3N, R13W, Sections 1, 11-14 and 22; T3N, R12W Sections 3-6
Decision Memo · Madison Ranger District · updated 11/22/2013
Several roads in the Meadow Creek, Alder Gulch, Madison River-Ennis Lake, Willow Creek, and Standard Creek watersheds; several roads in the East Fork Rock Creek Watershed · Granite; Madison, Montana

Remove dead, dying, or structurally unsound trees determined to pose a hazard along several system roads on the Madison and Pintler Ranger Districts. Method of removal will likely involve commercial timber sales.

Road management
Scoping Start
04/17/2013
Comment Period
04/17/2013
Decision
11/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Alex Dunn · adunn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District; Pintler Ranger District
Legal Land DescriptionT. 3 S., R. 3 W.; T. 4 S, R 2 W.; T. 5 S, R 2 W; T. 3 N., R. 15 W.; T. 4 N., R. 14 & 15 W.; T 5 N., R 14 W.
Decision Memo · Madison Ranger District · updated 7/16/2013
Gravelly Landscape, Chain of Lakes Managment Area · Madison, Montana

Originally proposed as a package named Madison FY12 Trails Projects package in 2012. This proposal now only involves the rerouting 5000 feet and maintenance on the rest of Meridian Trail 6019, open to hikers, bikers, stock and motorcycle riders.

Recreation management
Scoping Start
12/14/2011
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Jonathan Klein · jklein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionMeridian Creek: T13S, R1E, Sections 5, 4, & 3;
Decision Memo · Wise River Ranger District · updated 6/26/2013
Fishtrap-Mount Haggin Management Area in the Big Hole Landscape · Deer Lodge, Montana

Proposal to treat seven aspen units for a total of 160 acres to enhance the health and viability of aspen clones along the Lower Dry Creek road.

Vegetation management (other than forest products)
Scoping Start
08/18/2011
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Matthew Nelson · mlnelson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsWise River Ranger District
Legal Land DescriptionT3W, R12N, Sections 29,31,32
Decision Memo · Madison Ranger District · updated 6/26/2013
Gravelly Landscape, Wall Creek Management Area · Madison, Montana

Construction of two 1.25 inch livestock pipelines and troughs. The Wall Creek Pipeline Extension is .5 miles long off an existing pipeline. Hyde Creek Pipeline extends 0.1 mile from a spring.

Grazing management
Scoping Start
01/21/2010
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Kevin Suzuki · ksuzuki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT10S, R1W, Sec. 7 and T9S, R1W, Sec. 32
Decision Memo · Jefferson Ranger District · updated 6/7/2013
Jefferson Landscape: Whitetail and Pipestone Management Areas · Jefferson, Montana

The proposed action is to bury 1600 feet of 1.5 inch plastic pipe, from the existing water tank in Section 6 to a new water tank located on BLM ground in Section 7. Approximately 1200? of the pipeline is located on National Forest.

Grazing management
Scoping Start
09/03/2010
Comment Period
04/26/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kyler McCarrel · kmccarrel02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT2N R5W Sec. 6 and 7
Decision Memo · Jefferson Ranger District · updated 6/7/2013
Jefferson Landscape: Whitetail and Pipestone Management Areas · Jefferson, Montana

Proposal would bury 3000’ of 1 ½” plastic pipe from the existing water tank (Section 15) to a new water tank on BLM land (Section 14). Approximately a 2800' of pipeline would be buried on National Forest.

Grazing management
Scoping Start
09/03/2010
Comment Period
04/26/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kyler McCarrel · kmccarrel02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Structural Improvements
Tebay Pipeline Extention ProjectDecision Signed Date: 06/04/2013 Legal Notice Date: 06/07/2013
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT2N, R6W, Sections 14 and 15
Decision Memo · Pintler Ranger District · updated 2/4/2013
Clark Fork Flint Landscape, Flint Uplands Management Area · Deer Lodge; Granite, Montana

The Lost Creek Trail is acessible from the Lost Creek State Park and the Warm Springs Road. The trail needs work to bring it up to trail standards. Originally proposed as Lost and Foster Creek trails. Decision affects only Lost Creek Trail.

Recreation management
Scoping Start
02/06/2012
Comment Period
12/18/2012
Decision
01/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Jennifer Blake · jbblake@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Reconstruction of Lost Creek TrailDecision Signed Date: 01/31/2013 Legal Notice Date: 02/04/2013
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT5N, R11W, Sections 6 and T6N, R12W, Section 16, 17, 21, 27, 28, 35, 36
Decision Memo · Jefferson Ranger District · updated 1/30/2013
Elkhorn Management Areas C6 and C7 · Jefferson, Montana

This project involves maintenance and reconstruction along 3.7 miles of the existing trail tread in the Elkhorn Mountain Range. New trail tread shall be 48 inches in width. No changes in travel managment are proposed. The trail is open to ATVs.

Recreation management
Scoping Start
02/27/2012
Comment Period
11/08/2012
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Rawhide Trail #7073 Maintenance and ReconstructionDecision Signed Date: 01/25/2013 Legal Notice Date: 01/30/2013
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT6N, R3W, Sections 8,9, and16, T6N, R4W, Sections 7,8,17, and 18
Montana 4X4 Ride In Progress
Decision Memo · Jefferson Ranger District · updated 9/11/2012
Forest Service routes to be used include 78289, 125, 965, 8695, 125A, 8596, 8600, 160, 1579, 1007, 9377, 173, 19722, UR7-20, 8599, 9605, 1009, 86, 222, 5158, 82, and Trail No. 7227 · Jefferson; Madison, Montana

The Montana 4x4 Association proposes to sponsor a statewide family ride July 24-29, 2012 on the Jefferson and Madison Ranger Districts. The Association would lead up to 15 vehicles on roads and one trail that are open to fullsize motorized vehicles.

Special use management
Scoping Start
06/18/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District; Jefferson Ranger District
Legal Land DescriptionVarious
Decision Memo · Madison Ranger District · updated 9/11/2012
Noble Fork drainage in the Tobacco Root Mountains · Madison, Montana

The Noble Lake Dam was damaged in the spring of 2011 due to heavy runoff and ice plugging the spillway. The owners have proposed repair of the dam by restoring the structure to the original construction design parameters.

Special use management
Scoping Start
07/13/2012
Comment Period
07/20/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Kevin Suzuki · ksuzuki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Nobel Lake Dam RepairDecision Signed Date: 09/06/2012 Legal Notice Date: 09/09/2012
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT3S, R4W, Section 22
Decision Memo · Madison Ranger District · updated 7/30/2012
An administrative site on Mill Creek in the town of Sheridan, MT · Madison, Montana

This project would remove the remaining streambank and vegetative material that sloughed into Mill Creek last year and stabilize the banks with rocks, root wads, and native plants to protect the existing bank from further erosion and scouring

Facility management
Scoping Start
03/07/2012
Comment Period
06/21/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R5W, Sec 26
Decision Memo · Jefferson Ranger District · updated 7/26/2012
South Fork Red Rock Creek, approximately 8.5 miles northwest of Basin, Montana · Jefferson, Montana

Joel Silver of Butte, Montana has submitted a Plan of Operations (POO) to explore for minerals on unpatented mining claims. His proposal includes excavating eight placer exploration test pits using an excavator to test for valuable minerals.

Minerals and geology
Scoping Start
03/14/2012
Comment Period
06/11/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT6N, R7W, sections 1 and 2
Decision Memo · Jefferson Ranger District · updated 5/16/2012
Tobacco Root Landscape, Brownback Management Area · Jefferson, Montana

Maintain and reconstruct 1 mile of Pole Canyon Trail #157 and 1 mile of Pyramid Trail #163.

Recreation management
Scoping Start
02/27/2012
Comment Period
04/11/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Pole Canyon Trail #157 and Pyramid Trail #163 Maintenance and ConstructionDecision Signed Date: 05/14/2012 Legal Notice Date: 05/16/2012
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT1S, R4W, Sections 23 and 24
Decision Memo · Wisdom Ranger District · updated 4/20/2012
West Big Hole and West Big Hole Flats Management Areas, Big Hole Landscape · Beaverhead, Montana

Reconstruct two and a half miles of OHV trail along Slag-a-melt Creek to All Terrain Vechicle Trail Class 3 standards.

Recreation management
Scoping Start
08/23/2011
Comment Period
02/19/2012
Decision
04/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Nathan Gassmann · ngassmann@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Slag-A-Melt OHV Trail ReconstructionDecision Signed Date: 04/18/2012 Legal Notice Date: 04/20/2012
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT5S, R17W, Section 27
Decision Memo · Wisdom Ranger District · updated 4/19/2012
West Face and West Pioneer Wilderness Study Area (WSA) Management Area , Pioneer Landscape · Beaverhead, Montana

Reconstruct 3.5 miles of the Stone Lakes Trail to meet Motorcycle Trail Class 2 standards.

Recreation management
Scoping Start
08/23/2011
Comment Period
03/02/2012
Decision
04/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Nathan Gassmann · ngassmann@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityPlan Amendment
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land Descriptioncorrected: T2S, R14W, Sections 35 and 2, in the West Face Management Area and Sections 36, and Section 1 in the West Pioneer WSA
Decision Memo · Butte Ranger District · updated 3/12/2012
East of I-90 at the Continental Drive Interchange. The project extends from the Maud S Canyon Trailhead east to the top of the Continental Divide where it meets with the newly constructed CDNST. · Silver Bow, Montana

Relocate and construct 2 miles of trail on the upper portion of Trail 815 to connect with the CDNST and obliterate the old trail tread.

Recreation management
Scoping Start
09/01/2010
Decision
03/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT 2 N, R 7 W. sec. 27 and 34
Decision Memo · Butte Ranger District · updated 3/12/2012
Upper Clark Fork Landscape, Backyard Butte Management Area · Silver Bow, Montana

This project will reroute .55 of the 1.75 mile Maud S Canyon Trail onto National Forest Lands to provide a connection to a loop trail, reduce an unsafe grade, and prevent erosion. The East Ridge Foundation is a partner in the project.

Recreation management
Scoping Start
05/20/2011
Decision
03/2012 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT3N, R7W, Section 34
Environmental Assessment · Wisdom Ranger District · updated 3/12/2012
Approximately 12 miles NW of Wisdom, Montana · Beaverhead, Montana

Salvage harvest of dead and dying timber within the Rat Creek Fire (2007) perimeter. The project includes approximately 2,500 acres of salvage harvest and 10 miles of temporary road construction.

Forest products
Scoping Start
04/09/2008
Comment Period
04/20/2009
Decision
07/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Alex Dunn · adunn@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT1S; R16, 17 & 18 W; T2S, R17 & 18W
Decision Memo · Jefferson Ranger District · updated 2/17/2012
Jefferson Landscape: Whitetail and Pipestone Management Areas · Jefferson, Montana

This proposal would relocate approximately 2,500 feet of Spring Creek Trail no. 7093 from private land to National Forest. Approximately 2300 feet of new trail would be constructed on National Forest.

Recreation management
Scoping Start
09/01/2010
Decision
09/2010 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Spring Creek Trail #7093 RelocationDecision Signed Date: 09/30/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT3N, R5W, Sections 10 and 15
Environmental Assessment · Butte Ranger District · updated 12/20/2011
located approximately 7 miles north of Butte, Montana · Silver Bow, Montana

Salvage of dead and dying lodgepole pine on about 400 acres with several aquatic projects to improve habitat conditions for westslope cutthroat trout.

Wildlife, fish, rare plantsForest products
Scoping Start
04/25/2008
Comment Period
06/2012 (Estimated)
Decision
01/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Jan Bowey · jbowey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Timber Sales (Salvage)
North Butte Salvage and Aquatics Improvements ProjectDecision Signed Date: 10/08/2010 (FS Withdrawn) Legal Notice Date: 10/08/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT4N, R8W, Sections 3, 9, 10, 11, 13, 14, 15, 24, 26, 27, 28, 33, 34, 35 & T4N, R7W, Section 18
Decision Memo · Pintler Ranger District · updated 12/20/2011
Clark Fork-Flints Landscape, John Long Management Area · Granite, Montana

The proposed action is to install a collection box at a spring source and pipe water to a 500 gallon livestock water trough via 500 to 700 feet of poly pipe 1.5 inches in diameter. The spring source would be fenced to protect it from trampling.

Grazing management
Scoping Start
01/18/2011
Decision
12/2011 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
Cameron Rasor · crasor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT9N, R14W Section 19 SW1/4
Decision Memo · Pintler Ranger District · updated 11/30/2011
Clark Fork-Flints Landscape,Warm Springs Management Area · Deer Lodge, Montana

Replace five undersized culverts with bridges, or larger culverts to allow upstream movement for all life stages of fish and other aquatic organisms and pass projected 100 year flood events.

Road management
Scoping Start
01/05/2011
Decision
09/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Steven Gerdes · sgerdes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Warm Springs Creek Culvert ReplacementDecision Signed Date: 09/22/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT5N, R12W, Sections 18 and 19, and T6N, R12W, Sections 19 and 20
Environmental Assessment · Beaverhead-Deerlodge National Forest All Units · updated 11/17/2011
South Meadow Creek watershed on the east slope of the Tobacco Root Mtns., about 6 miles north of Ennis, MT. · Madison, Montana

Commercial thinning of Douglas-fir and salvage lodgepole pine on 300 acres of National Forest System lands.

Fuels managementVegetation management (other than forest products)Forest products
Scoping Start
01/10/2011
Comment Period
06/23/2011
Decision
11/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
Karen Gallogly · kgallogly@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage); Timber Sales (Green)
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT.4S, R.2W., Sections 21,28, and 29.
Decision Memo · Pintler Ranger District · updated 11/15/2011
Upper Rock Creek Landscape ,Middle Fork Rock Creek Management Area · Granite, Montana

Cut down and slash non-merchantable lodgeploe pine trees in areas where they are overtopping aspen across 250 acres. Most trees that will be cut are less than 6 inches in diameter at breast height.

Vegetation management (other than forest products)
Scoping Start
10/03/2011
Comment Period
10/04/2011
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Steven Gerdes · sgerdes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityScenery Management
Middle Fork Conifer Slashing ProjectDecision Signed Date: 11/07/2011 Legal Notice Date: 11/07/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT 4N, R15W, Section 18
Decision Memo · Madison Ranger District · updated 9/20/2011
Gravelly Landscape, Chain of Lakes Management Area · Madison, Montana

This project is proposed to enhance spawning and rearing habitat in Narrows Creek and an existing spring creek, by piping reservoir outlet flows about 2,800 feet down to critical spawning habitat. Some construction on the creek would be required.

Wildlife, fish, rare plants
Scoping Start
02/15/2011
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Darin Watschke · dwatschke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT16N, R41E, Sec 29
Decision Memo · Pintler Ranger District · updated 9/8/2011
Approximately 10 miles north of Philipsburg, Montana · Granite, Montana

Based on geological indicators, one specific site would be core drilled to determine if a mineral ore body exists. The results of this exploration would determine whether additional drilling, to define the ore body, would be needed.

Minerals and geology
Scoping Start
07/01/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Smart Creek Minerals ExplorationDecision Signed Date: 08/30/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R13W, section 6
Decision Memo · Butte Ranger District · updated 8/19/2011
Northeast Fleecer Management Area, Upper Clark Fork Landscape · Silver Bow, Montana

This project would reroute 1.5 and reconstruct .5 miles of Norton Trail #95 from the terminus of Norton I to the forest boundary to move the trail away from the Creek and an unauthorized trail on private land.

Recreation management
Scoping Start
05/20/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Norton Creek Trail #4095 IIDecision Signed Date: 08/09/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT2N, R10W, Sec 1
Decision Memo · Wise River Ranger District · updated 8/11/2011
Several roads in the Wise River, Big Hole River-Fishtrap, and Deep Creek watersheds · Beaverhead; Deer Lodge; Silver Bow, Montana

Remove dead, dying, or structurally unsound trees determined to pose a hazard along several system roads on the Wise River, Wisdom, and Dillon Ranger Districts. Method of removal will likely involve commercial timber sales.

Road management
Scoping Start
06/06/2011
Comment Period
06/06/2011
Decision
08/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Cheryl Martin · cmartin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District; Wise River Ranger District; Wisdom Ranger District
Legal Land DescriptionT. 1 N., R. 15 W.; T. 1 N, R 13 W.; T. 2 N., R 12 W.; T 3 N., R 13 W.; T. 2 S., R. 12 W.; T. 3 S., R. 12 & 13 W.; T 4 S., R 12 W.
Decision Memo · Jefferson Ranger District · updated 6/17/2011
Jefferson River Landscape –Bull Mountains Management Area · Jefferson, Montana

The BLM proposes to bury 900’ of 1 ½” plastic pipe between the water source in Section 34 and a new water tank on the BLM in Section 4. Approximately 500’ of pipeline will be bured on National Forest.

Grazing management
Scoping Start
09/03/2010
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Robert McCray · rlmccray@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT5N, R4W, Sec 33 and T4N, R4W, Sec 4
Decision Memo · Jefferson Ranger District · updated 3/7/2011
Jefferson River Landscape, Pipestone Management Area · Jefferson, Montana

A portion of Rader Creek Road will be seasonally closed to vehicles and used as a cross country ski trail. A 3500 foot winter bypass for only ATV and snowmobile use will be designated around that portion. This includes 200 feet of new trail.

Land management planning
Scoping Start
12/03/2010
Comment Period
12/06/2010
Decision
01/2011 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Radar Creek Road Winter Bypass Trail ProjectDecision Signed Date: 01/20/2011 Legal Notice Date: 01/25/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsJefferson Ranger District
Legal Land DescriptionT2N, R6W, Sections 20 & 29
Environmental Assessment · Madison Ranger District · updated 3/3/2011
Entire Madison Ranger District · Madison, Montana

NEPA analysis for the designation of motorized use on the Madison RD of the Beaverhead-Deerlodge NF.

Recreation management
Scoping Start
08/08/2007
Comment Period
01/10/2010
Decision
03/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
Sue Heald · sheald@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Travel Management
Designation of Summer Motorized Travel on the Madison Ranger DistrictDecision Signed Date: 03/03/2011 Legal Notice Date: 03/03/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Decision Memo · Butte Ranger District · updated 2/22/2011
Moulton Ski Area, approximately 5 miles north of Butte in the Moulton Reservoir · Silver Bow, Montana

Reroute approximately 1,100 feet of the Neversweat trail with a new route approximately the same distance that would be cleared and groomed for cross country skiing. The trail would be cleared 10 in width to accommodate the snowmobile groomer.

Recreation management
Scoping Start
11/25/2008
Scoping Start
11/25/2008
Decision
02/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Moulton Cross Country Ski Trail RelocationDecision Signed Date: 02/01/2011
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT4N, R7W. sec. 19
Wisner Placer Exploration Project Developing Proposal
Decision Memo · Wise River Ranger District · updated 2/2/2011
Master Mine Area · Granite, Montana

Proponent proposes to excavate 11 test trenches to bedrock to test for valuable minerals. Trenches will be 50 ft wid X 75 ft long.

Minerals and geology
Scoping Start
04/2010 (Estimated)
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Steve Kelley · steve.l.kelley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R12W, Section 1
Decision Memo · Madison Ranger District · updated 12/17/2010
Mill Creek Drainage in Tobacco Root Mountains West of Sheridan · Madison, Montana

Approves an ammended plan of operations to establish a new portal to access the old mine workings and complete bulk sampling. This is the next step in the development of the mine.

Minerals and geology
Scoping Start
10/22/2009
Decision
10/2010 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
Kevin Suzuki · ksuzuki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Smuggler Mine Bulk SamplingDecision Signed Date: 10/06/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R4W, Section 13
Decision Memo · Madison Ranger District · updated 12/7/2010
Tobacco Root Landscape, South Willow Corridor and Tobacco Root Peaks Management Areas · Madison, Montana

Project will relocate apx 5,000 ft of Potosi Trail #6303 on five segments which are steep and trenched from erosion. Some of the trail will be restored to the original tread.

Recreation management
Scoping Start
11/10/2009
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Jonathan Klein · jklein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Potosi Trail Reconstruction and MaintenanceDecision Signed Date: 06/21/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT3S, R3W, Section(s) 1, 2, 11, 12, 13, 14.
Decision Memo · Dillon Ranger District · updated 12/2/2010
Pioneer Landscape, East Face Management Area · Beaverhead, Montana

This action would permit a road and well to services a private residence on a patented claim.

Special use management
Scoping Start
08/24/2010
Decision
12/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Thomas Osen · tosen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Spanish Lode Special Use Road and Well PermitDecision Signed Date: 12/02/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionPMM, MT. T6S, R11W, Section 24
Decision Memo · Pintler Ranger District · updated 11/22/2010
Ross Fork Tributary of Rock Creek in Ross Fork and Sapphire Wilderness Study Managment Areas in the Upper Rock Creek Landscape · Granite, Montana

The proposal would rehabilitate or relocate the Ross Fork Trail from aboutl 1 mi east of Fox Creek to Abundance Saddle. It would also relocate the Bitterroot Divide trail from Abunance Saddle to the Rooster Comb Saddle.

Recreation management
Scoping Start
02/09/2009
Decision
11/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Jenni Blake · jblake01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Ross Fork / Bitterroot Divide Trails Rehabilitation and RelocationDecision Signed Date: 11/21/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT4N, R17W, Sections 20, 29, 30 & 31 and T3N, R18W, Sections 1 & 2
Decision Memo · Wisdom Ranger District · updated 9/30/2010
Big Hole Landscape, Tie Johnson Management Area · Beaverhead, Montana

Install in two locations, a water collection box, approximately 100 feet of 1.5 inch plastic pipe (buried 6 to 12 inches) and one water trough with wildlife mitigation. Spring source would be fenced off with jack pole fencing

Grazing management
Scoping Start
03/02/2009
Decision
09/2010 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
Kevin Greenwood · kgreenwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Mussigbrod Allotments Water DevelopmentsDecision Signed Date: 09/29/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT1S, R16W, Section 6, SW ¼; and T1S, R17W, Section 12, NE ¼.
Decision Memo · Wisdom Ranger District · updated 9/30/2010
Big Hole Landscape, Big Hole Flats Management Area · Beaverhead, Montana

Build 0.5 miles of log-worm or jack & pole type fence between the upper and lower Little Lake Management Unit pasture in the Twin Lakes Allotment. The new fence would connect to an existing fence on the north side of Little Lake Creek.

Grazing management
Scoping Start
03/02/2009
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Kevin Greenwood · kgreenwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Twin Lakes Allotment Fence ReconstructionDecision Signed Date: 09/30/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT5S, R16W, Sections 29 and 32.
Decision Memo · Butte Ranger District · updated 9/28/2010
Upper Clark Fork Landscape, Northeast Fleecer Management Area · Silver Bow, Montana

Telephone to bury new fiber optic cable to replace existing telephone lines on Butte and Wise River Ranger Districts in existing right-of-ways.

Special use management
Scoping Start
09/01/2010
Decision
09/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionT1N, R9W, Sec. 4, 5, 8, 9, and T2N., R9W, sec. 33 and 34
Decision Memo · Butte Ranger District · updated 9/13/2010
Approximately 20 miles south of Butte · Silver Bow, Montana

Relocate and construct segments of Norton Creek Trail #95 to address private land and resource damage concerns. The Norton Creek Trail #95 is approximately 20 miles south of Butte in the Northeast Fleecer Management Area.

Recreation management
Scoping Start
10/16/2009
Decision
09/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Jocelyn Dodge · jdodge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Norton Creek Trail #95 RelocationDecision Signed Date: 09/01/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District
Legal Land DescriptionPMM, MT. T2N, R9W, Section(s)1 and 7
Decision Memo · Dillon Ranger District · updated 8/31/2010
Pioneer Landscape , East Face Management Area · Beaverhead, Montana

Phase 1 involves trail maintenance and reconstruction from the trailhead to Waukena Lake. Phase 2 involves trail reconstrction from Waukena Lake to Tahepia Lake. It includes blasing within a half mile east of Waukeena pass.

Recreation management
Scoping Start
10/26/2009
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Gordon Ash · gash@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Waukeena Trail Relocation and ReconstructionDecision Signed Date: 08/19/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT3S, R11W, Sections 22,23, and 32
Decision Memo · Wisdom Ranger District · updated 8/30/2010
Bighole Landscape, Trail Creek Management Area · Beaverhead, Montana

Proposal is for a small-scale placer exploration program. A total of 25 small pits, or holes (6’ long x 4’ wide x 5’ deep), would be excavated using hand tools such as picks and shovels.

Minerals and geology
Scoping Start
03/02/2009
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Kevin Greenwood · kgreenwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Marty LorentzDecision Signed Date: 07/16/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsWisdom Ranger District
Legal Land DescriptionT2S, R19W, Section 12, SE 1/4
Decision Memo · Pintler Ranger District · updated 8/30/2010
Clarkfork Flint Landscape, Warm Springs Management Area · Deer Lodge, Montana

Project decommissions approximately 3.5 miles of road and convert it to a single track trail. This converted road would then become part of the Twin Lakes Trail #8044 and the Fourmile Basin Trail #8113.

Recreation management
Scoping Start
02/09/2009
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Jenni Blake · jblake01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Twin Lakes / Fourmile Basin Road to Trail ConversionDecision Signed Date: 07/20/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT4N, R13W, Sections 3, 4 & 9
Decision Memo · Madison Ranger District · updated 8/26/2010
Lee Metcalf Recommended Wilderness Addition Management Area on the north end of the Madison Range · Madison, Montana

Reroute and reconstruct the Pot Trail loop to high country in the Bear Trap Canyon Wilderness and adjacent BLM lands. Project includes a short section of private land and over 3 miles of trail through the Beaverhead-Deerlodge National Forest.

Recreation management
Scoping Start
12/08/2009
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Jonathan Klein · jklein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Pot/Trail Creek Trail ReconstructionDecision Signed Date: 07/26/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionTownship 4 S., Range 1 E., sections 9, 10, 15, 16, 17, 20, 21, 28, 29, 30, 31 & 32.
Decision Memo · Pintler Ranger District · updated 8/24/2010
Master Mine Area · Granite, Montana

The proponent will excavate 8 test trenches to bedrock to test for valuable minerals. Trenches will be 50 ft wide x 75 ft long.

Minerals and geology
Scoping Start
04/02/2006
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Pineau #2 Placer ExplorationDecision Signed Date: 08/20/2010 Legal Notice Date: 08/24/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R12W, Section 11
Decision Memo · Pintler Ranger District · updated 7/6/2010
Several system roads on the Pintler, Jefferson, and Butte Ranger Districts · Deer Lodge; Granite; Jefferson; Powell, Montana

Remove dead and dying trees along Forest roads that pose a hazard to the public. Method for removal will likely involve commercial timber sales.

Road management
Scoping Start
04/13/2010
Comment Period
04/16/2010
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Cheryl Martin · cmartin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District; Jefferson Ranger District; Pintler Ranger District
Legal Land DescriptionT. 4 N., T. 5 N., R 13 W., R 14 W.; T 5 N., R 6 W.; T. 8 N., T. 9 N., R 11 W., R 12 W., R 13 W.
Decision Memo · Madison Ranger District · updated 3/31/2010
Ruby Centennial Corridor Management Area · Madison, Montana

Project analyzes issuance of a SUP authorizing access to private land on an existing road and replacement of an existing bridge over the Ruby River.

Special use management
Scoping Start
11/10/2009
Decision
03/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Gene Hardin · ghardin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ludwick Bridge Replacement and Road Special Use PermitDecision Signed Date: 03/26/2010
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT 10 S, R 3 W, Section 9 NW
Environmental Assessment · Pintler Ranger District · updated 9/29/2009
Approximately 16 miles northwest of Deer Lodge, Montana in the Master Mine area · Deer Lodge, Montana

Robert Waller of Bozeman, MT has submitted a Plan of Operations (POO) to explore for minerals by excavating a trench 40' by 200' to bedrock on unpatented claims. The area is located approx 16 miles northwest of Deer Lodge, MT in the Master Mine area.

Minerals and geology
Scoping Start
02/18/2009
Comment Period
06/17/2009
Decision
07/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Steve Kelley · slkelley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Pineau Mine Exploration ProjectDecision Signed Date: 07/27/2009 Legal Notice Date: 07/31/2009
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT8N, R12W, Section 11
Decision Memo · Jefferson Ranger District · updated 9/2/2009
Several system roads on Butte, Jefferson, and Pintler ranger districts · Deer Lodge; Jefferson; Silver Bow, Montana

Remove dead and dying trees along Forest roads that pose a hazard to the public. Method for removal will likely involve commercial timber sales.

Road management
Scoping Start
06/13/2009
Comment Period
06/13/2009
Decision
08/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Cheryl Martin · cmartin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance
ForestsBeaverhead-Deerlodge National Forest
DistrictsButte Ranger District; Jefferson Ranger District; Pintler Ranger District
Legal Land DescriptionT4N, T5N, T6N, T7N; R6W, R7W, R8W
Environmental Assessment · Dillon Ranger District · updated 6/30/2009
Ellis Peak in the Tendoy Mountains about 36 miles southwest of Dillon, MT · Beaverhead, Montana

The BDNF is considering issuing a special use permit for the construction and operation of an Interoperability Montana (IM) communication site on Ellis Peak.

Special use management
Scoping Start
07/21/2008
Comment Period
12/22/2008
Decision
04/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Reyer Rens · rrens@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Interoperable Montana Communications Project Southwest LoopDecision Signed Date: 04/21/2009 Legal Notice Date: 04/22/2009
ForestsBeaverhead-Deerlodge National Forest
DistrictsDillon Ranger District
Legal Land DescriptionT12S, R12W, Sec. 36
Decision Memo · Beaverhead-Deerlodge National Forest All Units · updated 6/25/2009
145 Recreation Residences located in 17 recreation residence tracts and 8 isolated tracts. · Beaverhead; Deer Lodge; Granite; Jefferson; Madison; Powell; Silver Bow, Montana

Rcreation residence permits issued for 145 recreation residence lots on the Beaverhead-Deerlodge National Forest, that expired on Dec 31, 2008. Total area is 100 acres including 17 tracts and 8 isolated tracts.

Special use management
Scoping Start
01/28/2008
Decision
03/2009 (Estimated)
Implementation
03/2009 (Estimated)
Project documents
Patty Bates · pbates@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsBeaverhead-Deerlodge National Forest
DistrictsBeaverhead-Deerlodge National Forest All Units
Legal Land DescriptionLegal Descriptions may be obtained from project proponent.
Decision Memo · Pintler Ranger District · updated 5/24/2007
Middle Fork Rock Creek about 17 miles southwest of Philipsburg, Montana. · Granite, Montana

Re-establish riparian shrub community & enhance stream channel stability. Remove riparian conifers on 18 ac., plant willows, place large woody debris along stream, fence to exclude livestock/big game, build livestock watering site outside exclosure.

Wildlife, fish, rare plants
Scoping Start
06/08/2006
Comment Period
03/27/2007
Decision
05/2007 (Estimated)
Implementation
07/2007 (Estimated)
Project documents
Steven Gerdes · sgerdes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityStewardship Contract, Consolidated Appropriations Resolution Of 2003
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Middle Fork Rock Creek Riparian EnhancementDecision Signed Date: 05/14/2007 Legal Notice Date: 05/16/2007
ForestsBeaverhead-Deerlodge National Forest
DistrictsPintler Ranger District
Legal Land DescriptionT4N, R15W, Sec. 18
Decision Memo · Madison Ranger District · updated 12/26/2006
6 miles northwest of Ennis, Montana · Madison, Montana

Reduce hazardous fuel accumulation by thinning from below and prescribed fire in the South Meadow Creek area (Tobacco Root Mountains) on less than 900 acres

Fuels management
Scoping Start
03/04/2004
Decision
10/2006 (Estimated)
Implementation
12/2006 (Estimated)
Project documents
Brian Anderson · beanderson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (10)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Meadow Creek Fuels ReducationDecision Signed Date: 12/20/2006 (FS Withdrawn)
ForestsBeaverhead-Deerlodge National Forest
DistrictsMadison Ranger District
Legal Land DescriptionT4S, R2W, Sec 20, 21, 28, 29 & 33
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/32751 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Preparing an supplemental analysis for the Fleecer Mountains Project under the US District Court, District of Montana 2013 Court Order. Documents will be available on this site when completed.

Vegetation management (other than forest products)Wildlife, fish, rare plantsForest products
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/30511 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Non-commercial treatment of 21 units from 1 to 102 acres to improve helath and viability of aspen clones by falling encroaching conifers.

Vegetation management (other than forest products)
2011 Aspen Release Cancelled
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34720 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project proposes treatment of 507 acres of conifer encroachment to improve health and viability of aspen clones comprising 21 units of 2 to 56 acres.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/42146 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Planting 6300 white bark pine seedlings in dry sites on 45 acres in the Mussigbrod burn of 2000 to increase weak whitebark pine regeneration. No mechanized equipment will be used and woody debris will be used to shade the seedlings.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/43607 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

This proposal would authorized planting 12,500 Whitebark pine (WBP)seedlings in a former WBP dominated site where the species is not coming back as well as predicted after the Mussigbrod Fire in 2000. Planting would take place in May or June.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/61716 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Permits for 2022 commercial mushroom harvesting and designated camp areas for commercial harvesters for resource protection and sanitation.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/60802 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

3 Rivers Communications proposes to bury fiber optic cable along the shoulder of existing roads to replace the existng underground copper telephone wire near Melrose, MT. The project involves approximately 8,485 feet across Forest Service Lands.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/20534 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Reduce Hazardous fuels and the risk of loss to infrastructure on the Anaconda Job Corps site. 660 acres of commercial thinning, cutting of dead and dying, slashing and burning of small diameter trees within conifer and grassland stands.

Fuels management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49371 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

We propose development of eight springs and installation 1.5 miles of fence in two sections on the Andrus Allotment to help distribute cattle and allow the permit holder the flexibility to meet allowable use levels on streams in the allotment.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/53601 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This project proposes to develop 10 springs, construct two drift fences totaling 1.5 miles of fence on the allotments, and install a hardened water crossing at the fence line's water gap on Bailey Creek.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/48001 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Proposal to install a water storage tank to increase the efficiency of the current stock water pipeline, converting the majority of the pipeline to a gravity run system instead of a electric pump driven system.

Grazing management
Apex Exploration Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/36692 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Based on geological indicators, 12 specific sites would be core drilled to determine if a mineral ore body exists. The results of this exploration would determine whether additional drilling, to define the ore body, would be needed.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34984 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal is for a multifaceted treatment to enhance aspen and large diameter Douglas-fir trees on the Cliff Lake Bench. area encompasses approximately 150 acres.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46477 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Project is proposed to reissue an existing special use permit.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/43168 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Analysis of a permit for up to nine test sampling pits south of Aurora Creek in sample pit sites tested in the 70-80s. Testing would involve a rubber tired backhoe and a portable wash plant plant. Water will be returned to the source pit to settle.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/63832 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Activities to enhance shrub and grassland dependent wildlife habitat and to improve upland vegetation and composition in the project area by using prescribed fire.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34214 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal will provide a separate non-motorized loop opportunity starting near the Baldwin Park Trailhead, a route will be marked from the Baldwin Park Trail #6424 to an old abandoned trail on the north side of North Meadow Creek.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/35780 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This project is proposed to evaluate impacts and feasibility of thinning non-merchantable conifers on approximately 75 out of 380 acres near Barker Lakes in an old burn area where conifers are crowding out whitebark pine and quaking aspen.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37926 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal would authorized a private road special use permit to Louis Bartolleti for access across approximately 350 feet of National Forest System lands on an existing road in the Bear Gulch area.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49393 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

The proposal is to do exploration digging into collapsed tunnels using a mini excavator, skid-steer and posthole digger (1-3 person crew). A trommel would be used to investigation diggings. Reclamation of all areas will be done upon completion.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65543 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The project is to improve existing water sources for livestock aiming to encourage pasture utilization. The spring within the site has been drying out for years, resulting in livestock concentrating in riparian areas.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65545 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The project is to provide reasonable access to a landlocked parcel owned by Fred Beal. The road will provide a route across forest land for the landowner to construct a cabin on private land and provide motorized access.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33492 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Issue a term private road special use permit to use and maintain an existing non-system road on 60 feet of NFS land, to access private land,just off State Highway 2, approximately 17 miles west of Whitehall.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/41308 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

We propose to complete maintenance and construction along approximately 6.6 miles of trail from Forest Service road #556. About 4.6 miles of new trail construction will replace steep eroded sections and move away from creeks and wet areas

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38962 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

The proposal would issue a special use permit to authorize structures on National Forest System Lands that have been in place for over 20 years. They include fences, a water diversion ditch, well, and buried water and electrical lines.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33507 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

The proposal is to issue a permit for continued use of a solar repeater site for Beaverhead County on top of Table Mountain, a designated electronic site, for Beaverhead County use for work and emergency services communication

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58702 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Construction of underground power and fiber optic lines to the Wise River Radio Site. Installation of VHF antennae and associated equipment for enhancing 911 services for Beaverhead County.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34727 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

The Dillon District Ranger is considering a proposal from the Beaverhead SnoRiders to authorize grooming of several existing roads and trails for snowmobile use. Routes are proposed in areas allocated to winter motorized use in the Forest Plan.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/56926 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

This analysis is to determine whether increasing service days for commercial outfitters and guides on National Forest System (NFS) lands may significantly affect the quality of the human environment.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/51223 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

We propose to install a fish barrier to support MTFWP work to restore westslope cutthroat trout. It is in the Big Hole River drainage.

Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37792 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The Discovery Ski Team proposes to bury 3000 feet of cable for electronic timing equipment for nationally sanctioned ski races. The computer network cable would be encased in 1 inch conduit bured 6 inches underground by a ditchwitch.

Special area management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58478 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

We propose to construct fish barriers on Browns Creek and Buffalo Creek to protect and conserve two important populations of Westslope Cutthroat Trout.

Wildlife, fish, rare plantsSpecial area management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46366 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Renewal of ten year Special Use Permit for Priority Use Outfitting and Guiding

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/59459 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

New owners propose to install a 1500 gal underground gray water storage tank, drill a new water well, and build a utility shed in the existing footprint of the special used permit for the residencde.

Special use management
Birch-Willow-Lost Cancelled
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/35859 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Vegetation management treatments to meet Forest Plan desired conditions including removing encroaching conifers in Sagebrush, Aspen, Mountain Mahogany, thinning Douglas-fir, daylighting Whitebark Pine.

Watershed managementVegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34196 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This project is proposed to Improve health and viability of aspen clones and mountain mahogany by removing colonizing conifers on 415 acres with 17 quaking aspen treatment units from 3 to 76 acres and one 106 acre mountain mahogany unit.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46368 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Proposal to authorize the BLM to install a permanent repeater under a special use permit at the Black Pine Ridge site which is authorized under the Beaverhead-Deerlodge Forest Plan.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/61753 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Upgrading existing telecommunications lines to fiber optic. Includes issuance of a special use permit authorizing the installation, operation, and maintenance of 126,480 linear feet of fiber optic cable within a 10 ft. corridor.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65380 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The project proposes Blackfoot Telephone Cooperative (BTC) to obtain an amendment to PIN21007 special use permit, for Phase 3, to plow/bury fiber optic cables from Echo Lake to the top of Discovery Ski Basin, Rumsey Mountain Communication Site.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/63772 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Authorization to bury fiber optic cables parallel to existing roads which travel through NFS lands on the Beaverhead-Deerlodge National Forest, Pintler Ranger District to provide broadband internet services to the community.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/45691 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Thin Douglas-fir stands, hand fall encroaching conifers in and around aspen clones, meadows and sagebrush parks. Prescribed burn upland forest stands with pre-treatment (slash/fell conifers) along private boundaries

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/39130 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project involves one 25 acre designated areas for post and pole cutting. Permit holders would be allowed to drive to the area and cut post and pole sized trees with a chainsaw and pile the slash for the Forests Service to burn when appropriate.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/47023 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The purpose of the project is to increase the resiliency of the area to insect and disease infestations and reduce the risk of wildfire to local communities and surrounding lands (federal, state and private).

Fuels managementVegetation management (other than forest products)Forest products
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38094 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Upgrading and expanding a developed camp ground and some dispersed camp sites

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38747 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Salvage by clearcut regeneration harvest, and conduct biomass removal, commercial thinning, prescribed fire, and quaking aspen restoration on 24,939 acres (346 units) of Beaverhead-Deerlodge National Forest System Lands north of Whitehall, MT.

Forest productsVegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46464 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Proposal to install an amateur radio repeater adjacent to the existing equipment at the Donald R. Communication Site, currently occupied by Quest Corporation.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46463 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Project was cancelled because the same project (#46464) already exists on the SOPA. Those interested in information related to this project, should refer to project ID # 46464.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/50524 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

We propose to extend the existing fence about 1100 feet with wildlife friendly barbed wire fence to keep livestock from trailing back and forth between pastures. If the initial route doesn't work we will add the second extension shown on the map.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37508 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

The proposal will relocate and reconstruct fences resulting in the removal of 4000 ft of buck and wire or 4-strand barbed wire femce in the Elkhorn Wildlife Management Area and replacing it with 2400 ft of 3-strand wildlife friendly fence.

Special area management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/43970 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Drought conditions demonstrate the need for improved developed livestock water sources in the Browns Canyon allotment to make livestock management work better for livestock distribution to benefit vegetation.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/62100 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

We propose to construct a wooden fish barrier along Bryant Creek to expand and protect Westslope Cutthroat Trout habitat by 13 miles within the Bryant Creek watershed.

Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/41363 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Binon Engineering/GMM propose to excavate 4 to 7exploration holes in order to physically identify and sample the geological anomalies indicated by previous exploration and geophysical surveys.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49436 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This project proposes development of four springs on the Bull Creek Grazing Allotment in order to better distribute cattle and grazing use which will allow the permittee more flexibility to meet allowable use levels.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44991 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This proposal would permit water collection from the spring on NFS thru 150 ft. of perforated pipe surrounded by washed gravel to a point of use on private land. Water rights will remain with the USFS as long the private landowner hold the SUP.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37637 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Selective slashing or burning of non-merchantable conifers encroaching into sage/grass communities to restore forage production for wildlife on 5,010 acres on the Bull Mountain Game Range. Project involves no road building or commercial harvest.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/66153 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The project proposes to reduce hazardous fuels, improve wildlife habitat, increase aspen, and improve/maintain resilient forest conditions. Actions include a combination of slashing, pre-commercial thinning, and prescribed fire on 33,430 acres.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/35069 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Butte Highlands JV, LLC of Butte, Montana has submitted a Plan of Operations (POO) to use National Forest System roads for activities that are incidental to their mining operations on private land.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38960 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Authorization of the Butte 100 mountain bike race from Homestake Pass to Pipestone Pass and Wulf's run, a marathon event that starts at Homestake Pass. Both races are planned for July.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/40985 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Review of authorization of two five-year term special use permits for the annual Elk Park Snowmobile Fun Run and the annual Mining City Trail Riders ATV Fun Run. A one year permit is proposed for the Butte Police Protection Association ATV Fun Run.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/41256 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

This proposal involves authorization of two 5-year term permits and one temporary permit for three non-motorized recreation events under one decision. The events are for runners, horse riders, and mountainbikes as described in the scoping document.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/53418 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The project would address public safety for CDNST users for safe ingress/egress at Pipestone Pass. The Proposed Action would construct a new trailhead approximately 1,000 feet east of the current location for 10 vehicles and 4 truck/trailers.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/55623 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

The California Creek Placer Test is designed to sample a cross-section at regular intervals across the mineral deposit. The claimant plans to dig 22 holes during this operation. Each test hole will be 5ft wide, 10ft long, and 3ft to 5ft deep.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34951 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal would repair stretches of Harris and California creeks damaged by ATVs & 4x4s with onsite native materials and hand scarification of rutted areas. Onsite material would be used to improve stream habitat condition in affected reaches.

Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44327 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wise River Ranger District

US Tungsten Corporation would like to drill six to nine exploration core holes using a track-mounted drilling rig. The purpose of proposed core drilling would be to determine if there is a minable deposit of tungsten remaining at the historical site.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44428 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wise River Ranger District

US Tungsten Corp proposes 6 to 9 core holes with a track-mounted drill rig to determine if a minable deposit of tungsten remains at the site. Holes would range from about 250 to 500 feet deep and drill pads would be placed for minimal disturbance.

Minerals and geology
CancelledNotch Cancelled
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/64605 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project proposes to rebuild the rental cabin in the Snowcrest Mountain Range that burned down in the fall of 2019.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46466 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Relocation and construction of 1600 ft. of new trail, maintenance and tread work on restoration on 1420 ft. of existing trail, obliteration of 1590 ft. of old trail, installation of a 30 ft. rock turnpike, and hardening of one stream crossing.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49437 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This project would authorize a new 20-year term special use permit for the use of the Carroll Hill Spring to the new owners of the Bull Creek Ranch. No ground disturbing activities or additional structures are proposed.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46312 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Mine dumps and waste rock from mine sites will be hauled to a processing site on private land. All transportation on public land would be under permit on existing open routes on the BDNF and BLM. This project will be done in a single field season.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/56035 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wise River Ranger District

Construct a 1/2 mile reroute of Bear Gulch Trail #2089 so people can safely access Cherry Creek Trail #2123.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34215 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal is to reroute sections of three ATV Trails in order to reduce grades, improve trail utility, enhance public safety, and reduce resource impacts associated with poor drainage on steep slopes causing rutting and erosion.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/36827 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Remove hazard trees over the course of 10 years, to reduce the risk posed to skiers and hikers on this trail system (over 7000 visitors annually) by commercial means if possible. Force account or service contracts will be employed otherwise.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/36828 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Project would re-shaping the existing road prism on the old log hauling routes used as ski trails and dig stumps on approximately 32 kilometers of cross country ski trails and construct a connector trail between Moose and Sentinel Meadow trails.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/35917 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

The Forest Service received a Plan of Operation to explore for minerals on unpatented mining claims located in T8N, R12W, section 11 approximately 16 miles northwest of Deer Lodge, Montana in the Master Mine area.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/54037 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Hand cut or burn conifers seedlings and saplings expanding into 11 units in Christiansen Creek as displayed in the Project Area Map in order to move conditions toward forest plan vegetation goals.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49438 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

This project is proposed to issue a new 10 year Livestock Area Special Use Permit to the new owner of the Circle S Ranch.

Special use managementGrazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44416 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This project would authorize the Bureau of Reclamation to excavate a trench 100 by 5 feet, up to 8 feet deep in order define fault rupture lengths, fault activity rates, and locations near Clark Canyon Dam.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49361 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wise River Ranger District

Clementine Exploration LLC Proposes to core drill(2 holes one location) and access for continuing geological work on the Clementine Exploration LLC mining claims. The project is estimated to take 10 days to complete.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/59721 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

The Madison Ranger District on the Beaverhead-Deerlodge National Forest (BDNF) is proposing to expand two parking areas and create a safe and functional day use area at the Cliff Lake Day Use/Boat Launch site.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65507 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

The Forest Service proposes to create safe functional parking and traffic flow as well as a centralized host site to allow for effective recreation site management at Cliff Lake and Wade Lake.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/36066 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

This project involves maintenance and construction to repair eroded sections of motorized trail on 8 miles of existing trail between Mill Canyon and Brownback Gulch Trailheads in the North Tobacco Root Mountains..

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/39507 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Tom Collins of Missoula has submitted a Plan of Operations (POO) to build an access road across National Forest System (NFS) lands to explore for minerals on his patented mining claim (private land).

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33424 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wise River Ranger District

Transfer a temporary permits to a Transitional Permit for up to 2 years. If performance is satisfactory, a Prioirty permit may be issued for 8 years. No changes are proposed for this Transitional permit

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/1635 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Bitterroot National Forest All Units

For the section of CDT between Gibbons Pass north to the Anaconda Pintler boundary. Trail reconstruction and relocation. Previously listed as Continental Divide National Scenic Trail Travel Management.(18720 -Shultz Saddle East incorporated)

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/41333 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

We propose to construct approximately 10 miles of new, non-motorized trail, to connect the existing Continental Divide National Scenic Trail along the East Ridge to the Nez Perce Trail #4092.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/4177 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Construction of new trail and reconstruction of existing trail, about 18 miles total.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/61754 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Installation of developed recreation site infrastructure including designating individual campsites, signs, hardened parking areas, picnic tables, toilets, and kiosks. The project area is currently being used as an overflow camping area.

Recreation managementFacility management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/53790 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The proposed action would authorize Mr. Nelson to placer mine a pile of material that measures approximately 20 feet wide, 40 feet long and 10 feet high.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58777 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Conveyance of an isolated tract of 0.72 acres of NFS lands under the Small Tracts Act of January 12, 1983, as amended. The tract is an isolated mineral fraction surrounded by private located in the Tobacco Root Mountains near the town of Mammoth.

Land ownership management
Cow Fly Salvage Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/12254 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Salvage dead, dying and insect damaged tress (primarily Douglas-fir) in the West Fork Madison area. Yarding would be done by helicopter to existing road system.

Forest products
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34987 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project is intended to remove all conifers and slash (except limber pine) from the understory in identified whitebark pine stands in order to reduce competition and increase sunlight so that the WBP reproduces fully and faster.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/41341 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

We propose to relocate and construct about a half mile of the trail in to replace three sections that do not meet Forest Service design standards.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34185 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Install grade control structures on each side of an exising creek crossing. Lower the banks to a 1:4 grade and spread cobble and gravel on the approaches to stabilize soil. Install a jackleg fence to keep cows from walking up or down the creek.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34184 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Install a headbox and 1.5 inch pipeline to two water troughs located on ridges in the Pole Long Creek C&H Allotment to water the cattle away from the creek in order to reduce impacts

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65504 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Proposal to replace the crossing of Forest Service Road 381 over Darkhorse Creek to improve stream habitat, fish passage, public safety, and infrastructure resilience.

Recreation managementRoad managementWildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33389 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

West of the lake, construct and reestablish apx 3/4 mile of trail from 20% to an 8 to 12 % grade using switchbacks and climbing turns. The same is planned east of the lake for 3 1/2 miles.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49430 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This project proposes to issue a Private Road Special Use Permit authorizing new land owners to access their private property. It includes basic maintenance to FS standards for resource protection.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/28553 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

NEPA analysis for designating wheeled motorized use on the Dillon, Wisdom and Wise River ranger districts of the Beaverhead-Deerlodge NF.

Recreation managementRoad management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/56668 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Complete projects in the ski area permit boundary for public safety improvements for the main road, parking, trails, and chairlift operations. It will also install underground power lines for chairlift operation and equipment maintenance

Special area management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49428 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

This proposal is to approve a ski area permit amendment allowing construction of three emergency evacuation trails on the north side in case of lift breakdown. It would also allow construction of a new Discovery Ski Education Foundation building.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46479 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Project proposed to reduce steep sections of trail and address public safety concerns and reduce sedimentation in a fish key watershed by moving the trail away from the stream. The replaced sections of original tread would be obliterated.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37900 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

We propose to enhance an existing natural barrier on North Divide Creek to preclude brook trout from passing upstream where they could hybridize a population of westslope cutthroat trout. Fish will be marked and moved to test for success.

Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34997 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Project proposes a special use permit authorizing Joseph Morris to maintain a domestic waterline from Squaw Creek to his private land. The 1.4 pvc pife is inplace for 150 ft across NFS. The permit will include fencing at the point of diversion.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/56509 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Propose to install a fish barrier on Doolittle Creek to support MTFWP work to restore westslope cutthroat trout. The project is in the Big Hole River drainage.

Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49403 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

This project is to construct about 2,280 ft. of non-motorized trail parallel to the road from the Eagles Nest Trailhead to the picnic area. The trail will provide a safer route for bikers, hikers, and horseback riders who currently use the road.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/25807 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Purpose is to achieve Forest Plan Goals including Timber management, Aquatic Improvement, Wildlife Habitat improvement. Proposed activities include timber salvage, commercial thinning, sediment reduction, fish passage, road and trail decommissioning

Vegetation management (other than forest products)Wildlife, fish, rare plantsForest products
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34712 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal is to reroute overly steep sections of trail in order to reduce erosion, improve trail safety, and utility. The project will relocate and construct approximately four miles of trail to replace approximately three

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/54136 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The purpose of this project is to restore a natural functioning wetland system to East Fork Divide Creek. Beaver analog structures will promote increased connectivity to the floodplain and groundwater storage, re-wetting the broad riparian corridor.

Watershed management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38977 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The Pintler Ranger District proposes to issue a special use permit to DNRC for the construction of a vertical fixed panel fish screen designed to accommodate a 200 cfs flow.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65428 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The project involves maintenance and reconstruction of the dam within footprint of a special use designation.Activities include removal and replacement of spillway and building a new bridge across spillway, including a short re-route of FSR 5141.

Special use managementRoad management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58127 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Proposal includes 900 acres of treatment on Forest Service land to reduce conifer encroachment in sagebrush/grasslands using chainsaws and prescribed fire. Treatment areas include Forest Service and Bureau of Land Management Dillon Field Office lands

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58661 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Development of three new groomed routes within the Echo Lake Basin Nordic trail system to enhance winter non-motorized recreation by providing additional loop opportunities for cross-country skiers.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/50555 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

We propose to create safer winter parking in a cleared area near the Echo Lake Cross Country Ski Trails. We would clear debris in the parking space and the quarter mile connection to the ski trail system.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/52771 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Approving a term special use permit for a Ski Trail Warming Hut at Midway Parking area on the Echo Lake Cross-Country Ski Trail System.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44425 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Proposal is to permit full size vehicle access to private land inholdings in the North Meadow Creek Drainage. Landowner would pay the cost of improvements required on portions of the trail.

Special use management
Elkhorn Mine Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/62465 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

The proposal involves removing waste rock and ore piles. A trench will be excavated to test ore potential.Equipment would be staged at a previously disturbed area.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38191 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Remove the existing tower and base at the Emerine Lookout and install a new 6’ x ‘ x 8’ steel radio shelter 100 ft west of the Emerine Lookout Cabin.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46315 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Whitebark pine seedlings will be planted in 2015 contingent upon snow conditions and access at elevation ranges from 8060 to 9260 feet in the Eureka Fire Area. UTVs or ATVs will be used to transport the seedlings to planting areas.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46001 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Finley Mining Inc.proposes to drill 12 exploration holes using a track mounted drill rig that can be dismantled for use with a helicopter. If the 4 drill sites are encouraging then up to 6 more sites maybe drilled. Roads will not be constructed.

Minerals and geology
Firewater Spring Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/56557 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

To construct a collection box along side the road with a fence around it protecting the area, and bury the water line along side and then under the road that will lead to a water trough approximately 100 feet on the other side of road 241.

Grazing managementRoad management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/59143 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The proposal is to make improvements to existing water developments located at Five Trough Spring, which would result in improved livestock distribution and water availability within the allotment.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49407 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

The proposal would convey a 2.05 acre tract to Jeffery and Rebecca Nicholls under the Small Tract Act to resolve an unintentional mining trespass on NFS.

Land ownership management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65544 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The project will install a collection mat and storage tank and plumb it into the existing water trough to help augment the water that is produced at the spring source.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/36779 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This proposal includes redesign of campsites, replacement of all furniture, barriers, fire rings, and wooden valut toilets. Maintenance or repair of driving surfaces, relocation of some sites, and a new well with accessible hanpump are also included.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33238 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

1) Salvage dead and dying lodgepole pine 2) Commercial thin ponderosa pine and Douglas-fir 3) Use prescribed fire in low and mid-elevation mixed conifer stands to promote resiliency 4) Pre-commercial thin young stands

Forest productsVegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/50067 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Supplemental analysis for the 2009 FEIS approving the Beaverhead-Deerlodge Forest Plan in response to a June 14, 2016 Court Order to disclose potential environmental affects from interagency MOUS dated 2002 and 2008 for a bighorn sheep transplant

Land management planning
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/42302 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Supplemental Analysis for Forest Plan EIS

Land management planning
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/27499 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Remove dead and dying trees that pose a hazard to the public in all Forest developed recreation sites across the Forest. A variety of methods for removal would be used including FS crews, contractors, and commercial timber sales depending on the site

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/59206 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Issuance of a private road special use permit authorizing the landowner to construct and use a road to access their private inholding. The route will be approximately 300 ft. long and 14 ft. in width and constructed to FS standards.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/60621 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The Foster Creek Trail #8045 is a non-motorized Forest Service system trail located in the Flint Creek Range, north of the Anaconda Job Corps Center. The trail currently utilizes a stream ford of Foster Creek that is coincident with NFSR #195.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58390 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

The Wise River Ranger District on the Beaverhead-Deerlodge National Forest (BDNF) is proposing stream restoration work in conjunction with Montana Fish Wildlife and Parks and Big Hole Watershed Committee

Wildlife, fish, rare plantsWatershed management
Gehrke Exploration Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/63807 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Michael Gehrke of Townsend Montana has submitted a Plan of Operations to explore for minerals on unpatented mining claims located approximately 6 miles northwest of Deer Lodge, Montana.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33384 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Proposal to issue a term special use permit to John and Donna George to continue use of a 650' x 10' water transmission line and spring box for domestic water use. This permit was issued to the George’s and has expired.

Regulations, directives, orders
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/38192 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Big Sky Recreation seeks renewal of their special use authorization to operate and maintain campgrounds, developed sites, and facilities at Georgetown Lake. No changes to the operation, authorized facilities or increase in the scope are proposed.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/4150 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Reduce hazardous fuels in urban interface around Georgetown and Echo Lakes; improve condition classes in areas outside urban interface. Prescribed fire treatments on 568 ac.; mechanical treatments on 997 ac.; 1.5 miles temporary road construction.

Fuels management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65166 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This project is needed to improve trail conditions around the popular Georgetown Lake area. Trail work expected is a combination of winter cross-country skiing, hiking, biking, and ATV trail.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/24970 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
WO - Washington Office - National headquarters

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33385 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

The Butte District proposes to re-issue a term special use authorization for a water transmission line in an area of 300 x 20 feet, with two collection boxes at the Girl Scout Camp, appx 5 miles south of Butte in Basin Creek.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/61755 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Prescribed fire over multiple years on approximately 1,200 acres of NFS lands. The prescription would include low to moderate fire intensity but allow for small patches of high severity in order to achieve a mosaic effect on the landscape.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65386 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The project involves a plan of operations to explore for minerals on unpatented mining claims, digging four test pits approximately 7 miles northwest of Deer Lodge, Montana.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34197 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wise River Ranger District

Relocate 2 miles of trail and restore 4 miles of existing trail along Gold Creek in the East Pioneers to meet the needs of hikers and stock users. Work includes rolling dips, switchbacks climbing turns, signs and rock blasting.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49432 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This project proposes to decommission an irrigation water system consisting of a diversion, ditch, flume and reservoir to resolve safety concerns and restore the natural water flow.

Facility managementWatershed management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/46827 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

The Gunsinger Group proposes to core drill 8 exploration holes with a truck mounted drill rig and dig a 4 by 50 foot trench about 16 feet deep using a backhoe. Drill sites are about 800 feet from a County Road. No road construction is necessary.

Minerals and geology
Goldschmidt Mine Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/64757 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Mining plan of operations at Goldschmidt Mine

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/56257 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Trail repair and 2 reroutes to rehabilitate burned sections of the Park Creek, Continental Divide National Scenic Trail and Eunice Creek Trails. Two rerouting will move the trail out of a waterlogged section onto a sideslope to prevent erosion.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/59216 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

The Dillon Ranger District on the Beaverhead-Deerlodge National Forest (BDNF) is proposing to plant whitebark pine seedlings on up to 364 acres within the 2018 Goldstone Fire perimeter.

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33400 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

The proponent proposes a phased exploration which includes core drilling to test for vein extension trend, opening existing protals for bulk sampling, conducting three placer tests and exploration work to remove old mine dumps for sampling.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/51206 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

This proposal would authorize a private landowner for private road access across National Forest to private property under a special use permit. The permit includes basic road maintenance.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65546 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Guiding Light Land, LLC requests to construct and maintain a 0.13 mile private access road across National Forest System (NFS) lands to provide ingress and egress for the inholding.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/61266 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Issuance of a private road special use permit authorizing the holder to use an existing road (UR8-265) to access a private inholding year-round. The permit would also authorize operation and maintenance of the road--a total of 751 ft.--on NFS lands.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/59421 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

The Happy Tails 2020 Plan of Operations is to remove existing tailings piles and recontour area to surrounding grade.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/25629 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Proposal is to reopen a collapsed mine adit (approx 25 feet) to expose a mineral-bearing quartz vein. About 25-30 cubic yards of material would be removed and deposited at existing dump site. No new disturbance. No new road or trail construction.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33420 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Wisdom Ranger District

Renew an expired Plan of Operationsfor a small-scale lode exploration program where an existing mine adit would be reopened using hand tools such as picks and shovels.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/61757 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Exploration for minerals on unpatented mining claims including digging 5 test pits measuring 20ft x 50ft long to bedrock with an excavator. Access to the site would be via cross-country travel and include removal of trees to open 14' x 450' corridor.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44537 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project would breach the Hill Reservoir Dam using explosives to create a V-shaped notch followed by hadwork to stabilize the banks and put the outlet back to the original stream channel grade. The reservoir is no longer used for water storage.

Wildlife, fish, rare plants
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49422 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project proposes the same work attempted in 2014 under a previous decision to breach the dam with explosives. It wasn't completed because of a constriction in the culvert. This revision of the proposal is to do the same work with an excavator.

Watershed management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44134 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Proposal to issue a Private Road Special Use Permit to Mike D. Hogan Jr. authorizing the operation and maintenance of an existing road crossing NFS land to access private property.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44449 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This proposal would authorize a Private Road Special Use Permit to Mike D. Hogan Jr. for the operation and maintenance of 115 feet of an existing paved road, north of the Red Bridge Boat Launch on Georgetown Lake.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34186 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Install a headbox on a spring in the Hogback Pasture of the Snowcrest Creek C&H allotment. Bury the pipline approximately 1/2 mile to the west to an existing trough and fence the spring out with barbed wire.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/64600 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Project to issue new permit with construction of corral facilities to improve safety in trailing cattle between pastures.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37641 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Proposal to cut down non-merchantable conifers across 7 units, (600 acres) where they overtop aspen along the boundary between open sagebrush parks and lodge pole pine dominated forest. The proposal requires no road construction or commercial harvest

Vegetation management (other than forest products)
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33523 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

The proposal would ammend a special use permit issued to the Homestake Lodge owner to maintain and groom approximately 3.23 miles of cross country ski trail with a 10 foot wide groomer.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/43049 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

Proposal to permit installation of a new service line to Homestake Lodge under a 2-track route off Forest Road 240 that drops down to the Homestake Rest Area. Installers will bore under a wet area between the rest area and the 2-track to the lodge.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/42789 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

We propose to permit NorthWest Energyt to bury 3720 feet of powerline from the existing dip pole at the Homestake Rest area under the road bed to Homestake Lodge.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/25131 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Salvage dead and dying lodgepole pine affected by mountain pine beetle on about 257 acres; maintain grass/shrub/aspen communities by slashing/burning encroaching conifers on about 593 acres; Lion Gulch riparian habitat and stream channel restoration

Vegetation management (other than forest products)Fuels managementForest productsWatershed management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33521 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Proposal to relocate two segments of Homestake Trail #7071 in the Whitetail-Pipestone Area move it off of the the Burlington Northern Santa Fe Railroad Tracks.

Heritage resource management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/33497 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Gary and Sharon Howard have applied for a private road special use authorization to construct approximatel 150 yards of road from the Toll Mountain Road across NFS lands to their private land.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34046 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

This proposal is to dig 6 to 10 test pits, approximately10 feet long, down to bedrock using a backhoe. The project will take about a week and prosepector will reclaim each hole after samples are taken.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58985 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

Issuance of a special use permit authorizing construction and maintenance of a road 30 ft. wide and approximately 40 ft. long or 0.027 acres to provide access to a private landowner's inholding.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34193 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

Apply carbaryl, verbenone, and MCH to lodgepole pine, ponderosa pine, whitebark pine (carbaryl and verbenone), and Douglas-fir (MCH) trees in recreation sites to prevent tree mortality from mountain pine and Doulgas-fir bark beetle attacks.

Facility management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34928 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Jackson Park Ranches requests a private road special use permit authoriziing access on ¼ mile of two track on National Forest System (NFS) lands between two of their parcels. One parcel is completely surrounded by NFS lands.

Special use management
Jubilee Trail Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37774 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

This proposal would add a winter ski trail at Discovery Ski Area from the Sapphire to the Jubilee run in order to reduce conflict and congestion below the lodge. This route will be about 350 feet and require removal of about 100 trees.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/57069 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Beaverhead-Deerlodge National Forest All Units

The Kennecott Exploration Company submitted a Plan to the Forest Service proposing to explore for minerals on unpatented mining claims. The Phase 3 Exploration project proposes drilling a total of 36 exploration holes over a five-year period.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/49423 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This project to decommission the Klatt Dam is proposed to prevent failure should the old corroded culvert should a heavy snow or rain event clog the piped causing water to overflow the dam. An excavator would be used to breach it at the outlet.

Watershed management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/40498 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Exploration to quantify the extent, volume, grade, and type of mineralization in the claims block to determine if further exploration and/or mining activities are warranted. Drilling involves a 200 foot hole and a 400 foot hole at each of 2 sites.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/44316 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

The purpose of the exploration plan is to collect samples in-situ underground and past stockpiled material sources from the now closed adit. Material will be used to determine the grade and mineralogy to assess the economic potential of the site.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/37929 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Madison Ranger District

This proposal would replace the existing repeater facility with a new 6 x 6 x 8 foot steel radio shelter and 40 foot tower at a new site 2000 feet south of the current location.

Facility management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/29118 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Dillon Ranger District

Revision of grazing allotment management plans on the Dillon Ranger District

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/65547 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Butte Ranger District

This project proposes to expand the popular Lion's Den Parking in Thompson Park to help address the overflow parking onto the shoulder of Montana Highway 2.

Recreation management
Little Gem #1 Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/35011 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

Russell Hage of Missoula, Montana has submitted a Plan of Operations to mine crystals on unpatented mining claims located in T2N, R6W, section 33, in the Radar Creek area approximately 11 miles northeast of Butte.

Minerals and geology
Little Gem Mine Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/51996 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Jefferson Ranger District

The proposal is to approve the continued use of an excavator and front end loader to move overburden and large boulders covering an area on an unpatented mining claim to mine for crystals.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/53959 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Beaverhead - Deerlodge National Forest is proposing to salvage 1,531 acres of dead, dying or imminently dead timber from the Little Hogback and Meyers fires of 2017.

Forest products
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/28586 after 3 attempts: HTTPSConnectionPool(host='www.fs.usda.gov', port=443): Read timed out. (read timeout=30.0)
Pintler Ranger District

Gain McIntyre of Philipsburg, Montana has submitted a Plan of Operations (POO) to placer mine sapphires on unpatented mining claims, approximately 3/4 acre, located in the Little Moffat Gulch drainage approximately 15 miles southwest of Philipsburg.

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34188 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/34188
Madison Ranger District

Install grade control structures on each side of an existing crossing. Lower banks to a 1:4 grade and spread cobble and gravel on the approaches to stabilize the soil. Install a jackleg fence to keep cattle moving up or down the creek.

Grazing management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58660 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/beaverhead-deerlodge/projects/58660
Pintler Ranger District

Reduction of conifer encroachment in parklands through hand thinning, burning hand piles, and broadcast burning as well as with the use of small equipment (e.g., Skid Steer).

Vegetation management (other than forest products)