Lake Tahoe Basin Management Unit — Project Detail

103 projects with crawled detail · milestones · contacts · documents

Lake Tahoe Basin Management Unit

R05 Pacific Southwest · 103 projects · crawled 2026-08-01
Completed 88 Cancelled 15
Decision Memo 68 Environmental Assessment 30 Environmental Impact Statement 5
103 with documents 40 with comments page
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 5/2/2025
South Lake Tahoe, CA · El Dorado, California

Project will construct erosion control improvements in the urban area of the Upper Bijou Park Creek, addressing flooding issues and needed roadway improvements. Creek channel will also be restored upstream and downstream of Pioneer Trail

Watershed management
Scoping Start
11/30/2022
Decision
04/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Theresa Cody · theresa.cody@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/15/2025
Many locations throughout El Dorado County. · El Dorado, California

The special use permits for El Dorado County have expired and an application for their renewal has been submitted. The permits authorize erosion control improvements on National Forest System lands.

Special use management
Scoping Start
09/30/2020
Decision
02/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Karen Kuentz · karen.kuentz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 3/19/2025
Approx 1.7 miles length from the North Tahoe Regional Park in Tahoe Vista to Carnelian Bay Ave., Carnelian Bay, CA · Placer, California

Process special use permit application for construction of Segment 1 (1.7 miles; 2.88ac. on federal lands) of paved, non-motorized, multi-use North Tahoe Regional Trail connecting Kings Beach and Tahoe City.

Special use management
Scoping Start
03/01/2022
Decision
02/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
Karen Kuentz · karen.kuentz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 3/11/2025
Lake Tahoe Basin · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Designate roads, trails, and areas where OSV use is in accordance with Subpart C of the Travel Management Rule. Create snow-play areas, expand parking lots, and groom motorized and non-motorized trails. Add a Forest Plan Amendment.

Land management planningRecreation managementFacility managementRoad management
Scoping Start
09/20/2019
Comment Period
01/2025 (Estimated)
Objection Period Start
04/2025 (Estimated)
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Ashley Sibr · ashley.sibr@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Facility Maintenance; Plan Amendment; Travel Management
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 1/14/2025
SR 28 Secret Harbor Parking Lot on East Shore of Lake Tahoe · Carson City (city), Nevada

Determination of NEPA Adequacy to move the proposed location of the SR 28 Secret Harbor Parking lot to the south along FS Road in the location of a previous fuels project landing on NFS road 1556

Recreation management
Scoping Start
12/2023 (Estimated)
Comment Period
12/2023 (Estimated)
Objection Period Start
01/2024 (Estimated)
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Michael Gabor · michael.gabor@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 12/16/2024
Zephyr Cove Resort including the Zephyr Shoals property (formerly known as Dreyfus Estate) · Douglas, Nevada

Current work is determining the scope and scale of future improvements at Zephyr Cove Resort. There are no specific projects proposed yet. Project description will be updated when actual projects are developed.

Recreation managementSpecial use managementFacility management
Scoping Start
01/2026 (Estimated)
Decision
12/2026 (Estimated)
Implementation
01/2027 (Estimated)
Project documents
Daniel Cressy · daniel.cressy@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance; Road Improvements/Construction
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/13/2024
Stateline, NV · Douglas, Nevada

Restoration of Burke Creek through Rabe Meadow to the mouth at Lake Tahoe. Existing Jennings Pond will be returned to a natural floodplain meadow. A new channel and mouth will be constructed adjacent to the campground. Fill Kahle ditch.

Watershed management
Scoping Start
02/21/2023
Decision
04/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Theresa Cody · theresa.cody@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
BURKE CREEK RABE MEADOW RIPARIAN RESTORATION PROJECTDecision Signed Date: 04/02/2024
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/3/2024
City of South Lake Tahoe, Bijou Area · El Dorado, California

The Project proposes to replace the existing, failing drainage system with an underground double box culvert (7-foot wide x 2.5-foot wide) from the meadow to Lake Tahoe.

Watershed management
Scoping Start
09/07/2007
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Theresa Cody · theresa.cody@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Bijou Culvert Replacement ProjectDecision Signed Date: 07/29/2010
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 7/11/2024
The access road extends from the end of Michael Court to the STPUD water tank in South Lake Tahoe, CA. · El Dorado, California

Renew the special use permit (SUP) for the expired Angora water tank access road. The application proposes that the road be added via amendment to an existing SUP that authorizes all STPUD water system improvements.

Special use management
Scoping Start
09/30/2020
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Lindsay Gusses · lindsay.gusses@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 6/28/2024
Suitable habitat areas within Lake Tahoe Basin including the Lake itself, tributaries and adjacent marshes of Lake Tahoe and the Truckee River as it flows into and out of Lake Tahoe · Douglas; Washoe; Carson City (city); El Dorado; Placer, California; Nevada

Conduct aquatic plant control and management throughout suitable habitat areas in Lake Tahoe, California and Nevada and the Truckee River. Partners with Tahoe Resource Conservation District and Tahoe Regional Planning Agency.

Vegetation management (other than forest products)Wildlife, fish, rare plantsWatershed management
Scoping Start
02/13/2019
Comment Period
08/14/2020
Objection Period Start
03/19/2021
Decision
01/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Sarah Muskopf · sarah.muskopf@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments; Watershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/28/2024
Marsh areas and shallow water tributaries to Lake Tahoe on National Forest System land. · Douglas; Washoe; Carson City (city); El Dorado; Placer, California; Nevada

Use mechanical methods for control of target invasive fish in the Lake Tahoe regions. Target invasive fish species are species that contribute to declines in native and desirable recreational non-native fish.

Wildlife, fish, rare plants
Scoping Start
11/12/2019
Decision
01/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Sarah Muskopf · sarah.muskopf@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/28/2024
The project is on NFS lands in four sites along the Truckee River from approximately 1.3 miles below Lake Tahoe Dam to just upstream of Alpine Meadows Road. · Placer, California

The proposed project will protect and restore approximately 900 lineal feet of stream bank, riparian and wet meadow habitat. It will also provide conservation and protection for approximately 2,000 lineal feet of river.

Watershed managementVegetation management (other than forest products)
Scoping Start
11/24/2014
Decision
12/2019 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
Joey Keely · joseph.keely@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Lake Tahoe Basin Mgt Unit · updated 6/26/2024
Lake Tahoe Basin Management Unit · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Preparation of a revised land management plan (forest plan) and will also prepare an environmental impact statement (EIS) for this revised plan.

Land management planning
NOI in Federal Register
03/19/2010
DEIS NOA in Federal Register
06/01/2012
FEIS NOA in Federal Register
07/17/2015
Objection Period Start
11/22/2013
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Denise Downie · dedownie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Creation/Revision
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
North of Tahoe City along Fiberboard Hwy and Hwy 267 corridor from Kings Beach to Truckee. · Placer, California

Rebuild existing power lines from Truckee to Kings Beach and Kings Beach to Tahoe City. Including an upgrade in capacity from 60kV to 120kV. Relocate most of Kings Beach to Tahoe City line.

Special use management
NOI in Federal Register
04/10/2012
DEIS NOA in Federal Register
11/08/2013
FEIS NOA in Federal Register
09/19/2014
Objection Period Start
09/19/2014
Decision
07/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Robert Rodman Jr · rrodmanjr@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
Heavenly Mountain Resort near South Lake Tahoe, CA. · Douglas; Alpine; El Dorado, California; Nevada

This project is intended to enhance summer activities in response to the USDA Forest Service Ski Area Recreational Enhancement Act of 2011.

Recreation managementSpecial use management
NOI in Federal Register
11/19/2013
DEIS NOA in Federal Register
09/03/2014
FEIS NOA in Federal Register
02/25/2015
Objection Period Start
02/25/2015
Decision
04/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Matt Dickinson · mattdickinson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Special Use Authorizations
Heavenly Mountain Resort Epic Discovery ProjectDecision Signed Date: 04/29/2015
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
The project is located at Heavenly Mountain Resort near the Adventure Peak area at the Top of the Gondola. · Douglas; El Dorado, California; Nevada

Construction of a permanent ticket sales kiosk, relocation of the Red Fir handle tow lift, installation of a Magic Carpet surface lift, obstacle removal and widening of the Tamarack Return Trail and tree removal under the Blue Streak Zipline.

Recreation managementSpecial use management
Scoping Start
12/03/2015
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Matt Dickinson · mattdickinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
This project is located off of State Route 431 in Washoe County, Nevada. The reservoir and dams are situated on Assessor Parcel Number 048-041-15, at an elevation of approximately 8,317 feet. · Washoe, Nevada

The goal of this project is to improve public safety and provide a sustainable hydrologic system. The proposed action is to remove the dam and restore the area.

Watershed managementFacility management
Scoping Start
06/14/2013
Comment Period
05/07/2014
Objection Period Start
09/03/2014
Decision
01/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Matt Dickinson · mattdickinson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Facility Maintenance; Watershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
National Forest System lands of the Lake Tahoe Basin. · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

The LTBMU Proposes recurring maintenance, upgrades, operation, administration, and uses of existing roads, trails and facilities located on NFS lands in the Lake Tahoe Basin.

Recreation managementSpecial use managementFacility managementRoad management
Scoping Start
01/01/2016
Comment Period
04/01/2016
Objection Period Start
01/04/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Ashley Sommer · asommer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Developed Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Special Use Authorizations; Facility Maintenance; Trail Management; Road Maintenance; Road Improvements/Construction
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
Areas of El Dorado county, CA; Douglas and Carson City counties, NV within the Lake Tahoe Basin. · Douglas; Carson City (city); El Dorado, California; Nevada

Use prescribed fire to treat previously treated areas and introduce fire into fire adapted ecosystems.

Fuels management
Scoping Start
01/28/2008
Comment Period
05/07/2008
Decision
07/2008 (Estimated)
Implementation
11/2008 (Estimated)
Project documents
Duncan Leao · dleao@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Lake Tahoe Ecosystem Underburn ProjectDecision Signed Date: 07/17/2008 Legal Notice Date: 07/23/2008
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionEl Dorado Co.- Cold Creek Blvd and Pioneer Tr to Pioneer Tr and Hwy 50; Douglas Co.- Logan Creek area; Carson City Co.- Hwy 50 and Hwy 28 to Secret Harbor Parking lot
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
ElDorado & Placer Counties, California · El Dorado; Placer, California

Vegetation and fuels treatments in urban defense zone. Treatments may include thinning of live trees and brush, chipping, piling, and prescribed burning.

Vegetation management (other than forest products)Fuels management
Scoping Start
05/12/2003
Comment Period
04/15/2005
Decision
07/2005 (Estimated)
Implementation
07/2005 (Estimated)
Project documents
David Fournier · dfournier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
Project runs north along the east shore of Lake Tahoe from Pittman Terrace, bordering Glenbrook, Spooner Summit, Skunk Harbor, Secret Harbor, and Thunderbird Lodge · Douglas; Washoe; Carson City (city), Nevada

Combination of mechanical and hand treatments, biomass utilization, and prescribed burning in order to reduce forest surface fuels and conifer density within the WUI surrounding the communities and infrastructure around Spooner and Glenbrook areas.

Vegetation management (other than forest products)Fuels management
Scoping Start
03/20/2009
Decision
01/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Duncan Leao · dleao@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Spooner Hazardous Fuels Reduction and Healthy Forest Restoration ProjectDecision Signed Date: 01/13/2010
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionTownship 14 N, Range 18E; Sections 1,2,3,4,7,13,14,26 and 27, T15N, R18E; Sec 11,12,14,23,26,27 and 34.
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/11/2024
The project is located on the West Shore of Lake Tahoe, from Emerald Bay in the south, extending to Burton Creek State Park in the north. · El Dorado; Placer, California

The West Shore Wildland Urban Interface (WUI) Hazardous Fuels Reduction project proposes vegetation and fuels treatments to reduce stand densities, reduce fuel loading and continuity.

Fuels management
Scoping Start
04/09/2016
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Kyle Jacobson · kjacobson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 3/29/2024
LTBMU wide · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Programmatic treatments to address ongoing fuels and forest health needs on NFS urban forest parcels and within WUI Defense Zone.

Vegetation management (other than forest products)Fuels management
Scoping Start
08/06/2021
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Brian Garrett · brian.garrett@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
IVGID Dog Park Cancelled
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 3/26/2024
Incline Village, NV, on parcel APN 131-110-04, adjacent to Village Blvd · Washoe, Nevada

The Incline Village General Improvement District requests a special use permit to construct a dog park with fencing, parking, trails, and restrooms on approx. 3 acres of a 13-acre parcel.

Special use management
Scoping Start
12/2021 (Estimated)
Decision
04/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Karen Kuentz · karen.kuentz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/24/2022
Zephyr Cove, NV, adjacent to Round Hill Pines Beach Resort. · Douglas, Nevada

Renew the expired special use permit for Round Hill General Improvement District. Proposed new facilities include a secondary 150,000 gallon water storage tank, security fencing and employee bathroom.

Special use management
Scoping Start
09/30/2020
Decision
08/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Kimberly Felton · kimberly.felton@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
RHGID Additional Facilities 30-year Special Use Permit AuthorizationDecision Signed Date: 08/11/2021
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/24/2022
The retaining wall would be located off Keller Avenue in South Lake Tahoe, CA. · El Dorado, California

South Tahoe Public Utility District proposes to build a new retaining wall to support a new water tank located on private land. Add the retaining wall via amendment to an existing special use permit for STPUD water system improvements.

Special use management
Scoping Start
09/30/2020
Decision
12/2020 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Lindsay Gusses · lindsay.gusses@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Keller Tank Maintenance Improvements - STPUD Amendment to Special Use AuthDecision Signed Date: 12/23/2020
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/20/2022
Ellis Peak and Knee Ridge areas and along Knee Ridge to North Bowl · El Dorado, California

Continue use of national forest lands for guided cat-ski tour operations in Ellis Peak and Knee Ridge areas for tours, adding a route that extends eastward along Knee Ridge to North Bowl.

Special use management
Scoping Start
06/15/2021
Decision
11/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
Gabriela Yanez · gabriela.yanez@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/20/2022
Power transmission corridors on east side of the Lake Tahoe basin within Nevada. · Douglas; Washoe; Carson City (city), Nevada

Approximately 5,300 acres, the project consists of vegetation treatments in forest corridors adjacent to Nevada Energy transmission power lines. Improves wildlife habitat, forest health, and fuel reduction. COMMENT PERIOD BEGINS 11/20/20.

Vegetation management (other than forest products)Fuels management
Scoping Start
06/30/2020
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Victor Lyon · victor.lyon@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsHumboldt-Toiyabe National Forest; Lake Tahoe Basin Mgt Unit
DistrictsCarson Ranger District; Lake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/18/2022
The bike path would extend from East San Bernardino Ave to West San Bernardino Ave in the Meyers area of South Lake Tahoe, CA. · Placer, California

Amendment to existing special use permit that authorizes other El Dorado County bike paths. Proposal to construct 0.23 miles of new Class 1 shared use path, referred to as the San Bernardino Bike Path from East San Bernardino Ave

Special use management
Scoping Start
09/30/2020
Decision
12/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Lindsay Gusses · lindsay.gusses@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
San Bernardino Bike Path El Dorado County Amendment to Special Use AuthDecision Signed Date: 12/21/2021
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/18/2022
Located off Pioneer Trail near Garbage Dump Road and Southern Pines Drive in South Lake Tahoe, CA. · El Dorado, California

Construct new erosion control structures to reduce stormwater runoff. Add the structures via amendment to an existing special use permit that authorizes El Dorado County erosion control improvements.

Special use management
Scoping Start
09/30/2020
Decision
02/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
Lindsay Gusses · lindsay.gusses@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Oflyng Erosion Control Project %u2013 El Dorado CountyDecision Signed Date: 02/07/2022
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 8/1/2022
The project includes approximately 1,528 acres of National Forest System (NFS) lands burned during the Caldor Fire and approximately 50 acres of NFS lands damaged during Caldor Fire suppression action · El Dorado, California

Reductions in fuel loading, replanting, remove fire-killed trees, trees that are likely to die because of fire damage, & other trees that pose a hazard to roads, trails, private property & in developed recreation sites impacted by the Caldor Fire

Fuels managementVegetation management (other than forest products)
Scoping Start
02/11/2022
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Victor Lyon · victor.lyon@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 7/28/2022
Tahoe Mountain, South lake Tahoe, CA · El Dorado, California

The Tahoe Mountain Communications Site Project consists of installation of a new 130-foot tall monopine tower, an equipment shelter, electrical power lines, and access road improvements to increase cell phone coverage for South Lake Tahoe users.

Special use management
Scoping Start
09/30/2020
Decision
10/2020 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Karen Kuentz · kkuentz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Carson Ranger District · updated 9/13/2021
West side of Carson City Nevada, from Voltaire Canyon heading west across U.S. Highway 50 to the intersection of Nevada State Route 28 and Spooner Summit, then parallels old Highway 50 to Glenbrook. · Douglas; Carson City (city), Nevada

Rebuild approximately 9.23 mile, 60 kilovolt (kV) transmission line within the existing right-of-way between the Voltaire Substation in Carson City, Nevada and Glenbrook Substation, Douglas County, Nevada.

Special use management
Scoping Start
04/10/2020
Decision
09/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Marnie Bonesteel · marnie.bonesteel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsHumboldt-Toiyabe National Forest; Lake Tahoe Basin Mgt Unit
DistrictsCarson Ranger District; Lake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/17/2021
Near State Route 28 at Marlette Creek · Washoe, Nevada

Construct erosion control improvements on national forest lands near State Route 28 at Marlette Creek. Purpose is to reduce the quantity of fine sediment discharge reaching Marlette Creek and Lake Tahoe from NDOT right-of-way.

Special use management
Scoping Start
07/2021 (Estimated)
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Gabriela Yanez · gabriela.yanez@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 6/9/2021
Project area surrounds communities along the north shore of Lake Tahoe including Cedar Flat, Carnelian Bay, Tahoe Vista, and Kings Beach within the WUI · Placer, California

Combination of mechanical, hand, and prescribed burning treatments to reduce surface fuels and conifer density within the WUI surrounding communities of Cedar Flat, Carnelian Bay, Tahoe Vista, and Kings Beach.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
05/17/2010
Objection Period Start
07/13/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Denise Downie · dedownie@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Carnelian Hazardous Fuels Reduction and Healthy Forest Restoration ProjectDecision Signed Date: 08/20/2012
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionTownship 16 N. Range 17 E. Sections 8,9,10,16,17,18,19,20, and 21; T 17N. R 6E. Sections 1,2,5 and 6
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 11/23/2020
Spooner summit, junction of Highway 50 and 28, unincorporated Douglas County, NV · Douglas, Nevada

Install a new 65-foot tall monopole tower and an equipment shelter to increase cell phone coverage for Spooner area users. A helicopter would be used during construction to transport the equipment up to the site.

Special use management
Scoping Start
09/30/2020
Decision
11/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Gabriela Yanez · gabriela.yanez@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 11/18/2020
Assessor Parcel Numbers 048-140-04 and 048-042-03 · Washoe, Nevada

The project will amend the Forest Plan to designate 400 acres of the project area as backcountry management area, as well as project-specific management actions related to roads and trails, travel management, restoration and vegetation management.

Recreation managementRoad managementWatershed managementFuels managementWildlife, fish, rare plantsLand management planningVegetation management (other than forest products)
Scoping Start
11/29/2017
Comment Period
04/27/2018
Objection Period Start
06/27/2018
Decision
11/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Ashley Sibr · asibr@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Plan Amendment; Trail Management; Roadless Area Management; Road Maintenance; Travel Management; Watershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 11/18/2020
Along SR28 from Sand Harbor to intersection of Hwy 50 at Spooner Summit · Douglas; Washoe; Carson City (city), Nevada

Continuation of Stateline to Stateline bike path from Sand Harbor to Spooner Summit. Remove highway parking, co-locate utilities with bikeway, improve existing parking lots and create new parking, highway pull-outs, water quality BMPs.

Road managementRecreation managementFacility management
Scoping Start
11/22/2017
Comment Period
07/11/2019
Objection Period Start
01/23/2020
Decision
11/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Michael Gabor · mgabor@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Facility Maintenance; Trail Management; Road Improvements/Construction; Scenery Management
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 11/3/2020
Lands special use projects occur throughout the LTBMU on NFS lands. · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Every year the LTBMU evaluates multiple lands projects for issuance of a special use permit. A list of the projects and contacts can be found here http:/www.fs.usda.gov/goto/ltbmu/ongoingprojects.

Road managementVegetation management (other than forest products)Land ownership managementSpecial use managementFacility management
Scoping Start
05/2020 (Estimated)
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Brian Hansen · bchansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments; Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 8/26/2020
Within Heavenly Ski Resort leased land · Douglas; El Dorado, California; Nevada

To authorize a new communication facility lease (ELD402502) for thirty years to install a Distributed Antenna System (DAS) to serve the Heavenly Ski Resort area and an amendment to ELD409201 Liberty Utilities for additional fiber optic cable.

Special use management
Scoping Start
06/03/2019
Decision
08/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Kimberly Felton · kimberlyfelton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 7/17/2020
This permit covers 6.6 miles of National Forest System (NFS) Road 73 (Fiberboard Freeway) near Brockway Summit. · Placer, California

Permit will authorize Far West Nordic Ski Education to conduct a 1-day xc ski and snowshoe race (max. 300 participants) on NFS lands for 5 years. Race is over snow with required snow depth of 12 inches; no ground disturbing activity authorized.

Special use managementRecreation management
Scoping Start
01/09/2015
Decision
12/2019 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionSec. 8, 13, 17, 18,23, 24, 26, 35, T. 16 N., R. 17 E., MT. DIABLO MERIDIAN
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 5/5/2020
Multiple locations throughout El Dorado and Placer Counties, California; and Carson City and Douglas, · Douglas; Carson City (city); El Dorado; Placer, California; Nevada

Project intends to use hand thinning and prescribed fire to restore priority meadows to reduce conifer encroachment, improve native riparian/wetland plant abundance and vigor, and improve habitat for native riparian dependant species.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plantsWatershed management
Scoping Start
06/12/2012
Comment Period
01/07/2015
Objection Period Start
01/27/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Sarah Muskopf · smuskopf@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Roadless Area Management
Restoration Fire Adapted EcosystemsDecision Signed Date: 04/25/2016
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/28/2019
Please see project maps · Washoe; El Dorado; Placer, California; Nevada

Approximately 6,300 acres, the project consists of vegetation treatments in 55 miles of forest corridors adjacent to Liberty Utility power lines. These treatments would occur in untreated areas and would also connect previously treated areas.

Fuels managementVegetation management (other than forest products)
Scoping Start
04/19/2019
Decision
10/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Karen Vyverberg · kvyverberg@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/18/2019
Lake Tahoe · Douglas; Washoe; Carson City (city); El Dorado; Placer, California; Nevada

Issuance of an event special use permit for 400 mile multi-sport event on system roads and trails (including Tahoe Rim Trail) on the LTBMU, Eldorado National Forest, and Tahoe National Forest. Event is scheduled for August 20-28.

Recreation managementSpecial use management
Scoping Start
08/2019 (Estimated)
Decision
09/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/18/2019
South Lake Tahoe · El Dorado, California

Issuance of an 5 year event special use permit for 200 mile run utilizing National Forest system roads and trails (including Tahoe Rim Trail) on both the LTBMU and Eldorado National Forest. Event is scheduled yearly during September.

Recreation managementSpecial use management
Scoping Start
06/03/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Kimberly Felton · kimberlyfelton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 8/19/2019
Meeks Meadow is located on the West Shore of Lake Tahoe, West of Meeks Bay. · El Dorado, California

This project is designed to serve as a pilot project for meadow restoration. The project will reinitiate cultural stewardship practices to restore the meadow ecosystem. The project will reduce hazardous fuel loadings and restore native vegetation.

Vegetation management (other than forest products)
Scoping Start
05/29/2008
Comment Period
08/27/2008
Decision
10/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Stephanie Heller · sheller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT14N, R17E, Sec. 29.
Environmental Impact Statement · Lake Tahoe Basin Mgt Unit · updated 8/19/2019
Emerald Bay to Stateline Nevada · El Dorado, California

Vegetation and fuels treatment in urban defense zones.Treatments may include thinning of live trees and brush, chipping, mastication, pilling and prescribed burning.

Fuels managementVegetation management (other than forest products)
NOI in Federal Register
01/16/2008
DEIS NOA in Federal Register
05/10/2009
FEIS NOA in Federal Register
09/27/2011
Objection Period Start
09/28/2011
Decision
01/2012 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Duncan Leao · dleao@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
South Shore Fuel Reduction and Healthy Forest Restoration ProjectDecision Signed Date: 01/10/2012
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 8/14/2019
10,000 acres spread across the urban defense done on the southern side of Lake Tahoe. · Douglas; El Dorado, California; Nevada

Haz fuels reduction & healthy forest activities in the urban defense zone on 3,800 acres. Mechanical treatments up to 3,000 ac. Thinning, aspen & meadow health, prescribed fire, forest health activities, re-entry in past treatment areas.

Vegetation management (other than forest products)Fuels management
Scoping Start
01/19/2018
Decision
04/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Jason Pollard · jpollard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
South Tahoe Fuels Treatment Project Decision MemoDecision Signed Date: 04/14/2018
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 7/31/2019
Heavenly Mountain Resort, California and Nevada. · Douglas; El Dorado, California; Nevada

Construct a Lodge at the top of the Gondola, replace Galaxy ski lift, 4 new ski trails in the Galaxy pod, new snowmaking in the Galaxy pod, Implement hazard reduction on portions of California trail, relocate the umbrella bar to snow beach.

Special use managementRecreation management
Scoping Start
11/30/2009
Comment Period
03/13/2010
Decision
05/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Matt Dickinson · mattdickinson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Road Improvements/Construction
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 7/31/2019
The project area is located in the upper Cold Creek Watershed. The Cold Creek Watershed is located in the southeast portion of the Lake Tahoe Basin. · El Dorado, California

The objective is to assign management direction, restore the historic stream channel in High Meadows, reduce conifer encroachment into the meadow, and plan the road and trail system to minimize resource damage.

Fuels managementVegetation management (other than forest products)Recreation managementWatershed managementRoad management
Scoping Start
03/07/2008
Comment Period
05/23/2009
Decision
07/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Matt Dickinson · mattdickinson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Plan Amendment; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Watershed Improvements
High Meadow Restoration ProjectDecision Signed Date: 07/22/2009 Legal Notice Date: 07/22/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT12N R18E Sections 12 and 13
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 7/30/2019
South Shore of Lake Tahoe within Angora Fire perimeter · El Dorado, California

Project to restore components of wildlife habitat, vegetation, forest fuels, water quality, recreation, and transportation within the Angora Fire perimenter. Pre-NEPA public scoping occurring in Spring 2008 would determine scope of project activities

Fuels managementWatershed managementRoad managementVegetation management (other than forest products)Recreation management
Scoping Start
02/11/2009
Comment Period
03/12/2010
Decision
07/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Duncan Leao · dleao@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Research And Development; Road Improvements/Construction; Scenery Management; Travel Management
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT 12 N. R 17E. Sections 6,7,8,12,13,18, and T 11N. R 17E. Sections 24 and 25
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 7/30/2019
South Shore Lake Tahoe, CA · El Dorado, California

An EA associated with proposed water quality, safety, utility and accessibility retrofits and vehicle circulation for campground areas and parking areas within the resort.

Facility management
Scoping Start
03/13/2009
Comment Period
02/13/2013
Decision
09/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Daniel Cressy · dcressy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Watershed Improvements
Camp Richardson Resort Campground and Vehicle Circulation BMP Retrofit ProjDecision Signed Date: 09/23/2013 (Reversed in Appeal (215)) Legal Notice Date: 09/25/2013
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 4/18/2019
NFS lands on West and North Shores of Lake Tahoe · Washoe; El Dorado; Placer, California; Nevada

This is a duplicate project. Correct project is Travel Analysis for E-bikes on Forest Service Trails and PALS number is 54566.

Recreation management
Scoping Start
01/2019 (Estimated)
Comment Period
03/2019 (Estimated)
Objection Period Start
06/2019 (Estimated)
Decision
08/2019 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Jacob Quinn · jmquinn@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Watershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/18/2019
El Dorado County · El Dorado, California

Project consists of erosion control improvements.Proposed use of two urban lots requiring an SUP

Special use management
Scoping Start
04/01/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Brian Hansen · bchansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 11/2/2018
The project area is defined as the Wildland Urban Interface (WUI), approximately 1/4 mile surrounding the Upper Echo Lake recreation residence cabins. · El Dorado, California

Treat areas within the WUI defense zone to reduce potential for catastrophic wildland fire by reducing wildland fire intensity and potential for sustained crown fire and long-range spotting. Also to provide defensible space adjacent to communities.

Fuels management
Scoping Start
07/15/2011
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Brian Garrett · bdgarrett@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 11/2/2018
The pier lies adjacent to Valhalla Hall and Boathouse Theater within the Tallac Historic Site. · El Dorado, California

Protect long-term water quality of Lake Tahoe by reducing existing sediment source near the Valhalla Pier and provide access to the pier consistent with Forest Service Outdoor Recreation Accessibility Guidelines (FSORAG).

Recreation managementFacility managementWatershed management
Scoping Start
05/01/2009
Decision
06/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
Cheryl Schumacher · csschumacher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Watershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 12/7/2017
Lake Tahoe · El Dorado, California

Issuance of an event special use permit authorizing multiple TAMBA events.

Special use managementRecreation management
Scoping Start
12/03/2015
Comment Period
11/28/2016
Objection Period Start
01/04/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Integrated Management and Use of Trails, Roads, and FacilitiesDecision Signed Date: 05/12/2017
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/7/2017
Tallac Historic Site · El Dorado, California

Issuance of an event special use permit authorizing commercial activities (e.g. vendor and food and beverage sales) within the Tallac Historic Site

Special use managementRecreation management
Scoping Start
12/03/2015
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 12/6/2017
Fallen Leaf Lake · El Dorado, California

Issuance of a 5 year event special use permit authorizing 5k, 10k, and half-marathon in the Fallen Leaf area. Event is typically scheduled around October 4.

Recreation managementSpecial use management
Scoping Start
12/03/2015
Comment Period
11/28/2016
Objection Period Start
01/04/2017
Decision
05/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Integrated Management and Use of Roads, Trails, and FacilitiesDecision Signed Date: 05/12/2017
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/6/2017
Glen Alpine Creek · El Dorado, California

The proposal intends to restore habitat for LCT utilizing manual removal of nonnative fish from Glen Alpine Creek from Modjeska Falls downstream to Fallen Leaf Lake including Lily Lake

Wildlife, fish, rare plants
Scoping Start
02/02/2016
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Sarah Muskopf · smuskopf@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
Lahontan Cutthroat Trout Restoration and Fishery Management PlanDecision Signed Date: 03/02/2016
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 12/6/2017
Round Hill Pines Resort · Douglas, Nevada

Redevelopment of day use facilities within Round Hill Pines Resort including parking lot, food and beverage service building, swimming pool and tennis court area, and enhancement to entrance road.

Facility managementRecreation managementSpecial use management
Scoping Start
12/03/2015
Comment Period
11/28/2016
Objection Period Start
01/04/2017
Decision
05/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Ashley Sommer · asommer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Special Use Authorizations
Integrated Management and Use of Trails, Roads, and Facilities DN/FONSIDecision Signed Date: 05/12/2017
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/5/2017
South Lake Tahoe · Douglas; El Dorado, California; Nevada

Issuance of an event special use permit for hike from Kingsbury South TH to Big Meadows TH

Recreation managementSpecial use management
Scoping Start
12/03/2015
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 7/18/2017
Zephyr Cove. · Douglas, Nevada

Proposes placing two infiltration basins on the Zephyr Cove Resort,requires a SUP.

Special use management
Scoping Start
01/31/2014
Decision
08/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Brian Hansen · bchansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 3/14/2017
Taylor and Tallac creek watersheds · El Dorado, California

Ecosystem restoration in Taylor and Tallac creek watersheds.

Vegetation management (other than forest products)Watershed managementRecreation managementFacility managementWildlife, fish, rare plants
Scoping Start
10/23/2014
Comment Period
06/14/2016
Objection Period Start
09/28/2016
Decision
11/2016 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Mike LeFevre · mlefevre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Facility Maintenance; Trail Management; Watershed Improvements
Taylor and Tallac Restoration ProjectDecision Signed Date: 11/29/2016
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 10/3/2016
Burke Creek is a small stream in the Lake Tahoe Basin which passes just north of the intersection of HWY 50 and Kahle Drive in Douglas County, NV. · Douglas, Nevada

The goal of the project is to restore ecological function and processes within the Burke Creek channel and its adjacent floodplain, reduce pollutant loading to Lake Tahoe, and improve public safety on Highway 50 related to flooding.

Watershed management
Scoping Start
03/26/2015
Comment Period
04/01/2016
Objection Period Start
07/13/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Sue Norman · snorman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityWatershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 10/3/2016
Lake Tahoe Wide · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Development of a LTBMU-wide events and outfitting and guiding strategy.

Special use managementRecreation management
Scoping Start
07/2015 (Estimated)
Comment Period
10/2015 (Estimated)
Objection Period Start
11/2015 (Estimated)
Decision
02/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 2/23/2016
Truckee River after it flows out of Lake Tahoe through the dam at Tahoe City · Placer, California

The project will protect and restore approximately 900 lineal feet of stream bank, riparian and wet meadow habitat.

Watershed management
Scoping Start
11/24/2014
Decision
02/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Stephanie Heller · sheller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 1/26/2016
Camp Richardson Resort. · El Dorado, California

5-year issuance of the Camp Richardson Resort special use permit.

Recreation managementSpecial use management
Scoping Start
08/05/2015
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 1/26/2016
North Shore, Lake Tahoe · Placer, California

To reissue special use permit TAH405001 for 10 years.

Recreation management
Scoping Start
04/01/2010
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/1/2015
Angora Lakes · El Dorado, California

Project will replace the existing obsolete and inadequate restrooms with a new restroom facility. The new facility will increase capacity and meet ABA requirements. The existing restroom facility will be removed once the new facility is complete.

Facility managementSpecial use managementRecreation management
Scoping Start
07/01/2015
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/15/2015
This permit covers 204 acres of NFS land adjacent to private land owned by Homewood Village Resorts, LLC. This area is also known as the Quail Lake Parcel. · Placer, California

Permit will authorize operation and maintenance of the ski runs known as Main Cirque, 55 Chutes, Wally's Folly, The Shoulder, Third Creek, and Nooncester Traverse.

Special use managementRecreation management
Scoping Start
05/31/2013
Decision
12/2014 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionSE1/4SE1/4 Sec. 11, T. 14 N., R. 16 E., MT. DIABLO MERIDIAN, SW1/4SW1/4 Sec. 12, T. 14 N., R. 16 E., MT. DIABLO MERIDIAN
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 1/8/2015
Camp Richardson Corral lies northeast of Fallen Leaf Lake along State Route 89. · El Dorado, California

The purpose of this project is to reissue a Special Use Permit for Camp Richardson Corral

Special use managementRecreation management
Scoping Start
08/15/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Megan Mullowney · mcmullowney@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNot Applicable
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/30/2013
National Forest Lands in the Wildland Urban Interface surrounding the community of Incline Village in Washoe County Nevada · Washoe, Nevada

Vegetation and fuels treatments within the wildland urban interface directly adjacent to the community of Incline Village in Nevada. Treatments include a combination of tree thinning, biomass removal, prescribed burning, chipping, and mastication.

Vegetation management (other than forest products)Fuels management
Scoping Start
09/09/2011
Comment Period
09/07/2012
Decision
02/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Paul Guarnaccia · pguarnaccia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (4)
Special AuthorityLake Tahoe Basin Hazardous Fuel Reduction Projects (P.l. 111-8 Sec. 423)
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Incline Hazardous Fuels Reduction and Forest Health Restoration ProjectDecision Signed Date: 02/15/2013 Legal Notice Date: 02/15/2013
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 9/24/2013
Fallen Leaf Lake · El Dorado, California

This project will redevelop the trail systems within the project boundaries in order to establish a sustainable trail system that meets current and future needs.

Special use managementRecreation management
Scoping Start
11/23/2011
Comment Period
09/12/2012
Decision
09/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Jacob Quinn · jmquinn@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Trail Management; Watershed Improvements
Fallen Leaf Lake Trail Access and Travel Management ProjectDecision Signed Date: 09/18/2013 Legal Notice Date: 09/21/2013
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/26/2013
El Dorado County · El Dorado, California

SUP to install erosion control practices on FS urban lots.

Special use management
Scoping Start
07/01/2009
Comment Period
09/07/2012
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Barbara Shanley · bshanley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Montgomery Estates (Area 2) Erosion Control Project SUPDecision Signed Date: 06/19/2013 Legal Notice Date: 06/19/2013
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 5/30/2013
The Meeks Creek Watershed is located on the western shore of Lake Tahoe . · El Dorado, California

Restoration of Meeks Meadow ecosystem through Lodgepole pine encroachment removal, prescribed burning and debris removal.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/22/2012
Comment Period
03/30/2013
Decision
05/2013 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Sarah Muskopf · smuskopf@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Heritage Resource Management; Noxious Weed Treatments; Watershed Improvements
Meeks Creek Meadow Ecosystem Restoration ProjectDecision Signed Date: 05/20/2013
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/19/2013
Heavenly Mountain Resort near South Lake Tahoe, CA. · Douglas; El Dorado, California; Nevada

Additional summer uses in the Adventure Peak area at the top of the Gondola such as a new climbing wall, ziplines, canopy tour, adventure course and aerial challenge park are proposed by Heavenly Mountain Resort.

Special use managementRecreation management
Scoping Start
11/16/2012
Comment Period
01/23/2013
Decision
04/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations
Heavenly’s 2013 Summer Activities ProjectsDecision Signed Date: 04/12/2013 Legal Notice Date: 04/19/2013
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 3/29/2012
Reaches 5&6 of the Upper Truckee River in the Sunset Stables area near the South Lake Tahoe Airport. · El Dorado, California

The Sunset Reach of the Upper Truckee River is planned for restoration activities to improve the natural geomorphic function of the channel by raising the bed elevation and reducing channel size.

Watershed management
Scoping Start
11/14/2008
Comment Period
04/22/2011
Decision
03/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Theresa Loupe · tloupe@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
Upper Truckee River Sunset Stables Restoration ProjectDecision Signed Date: 03/20/2012 Legal Notice Date: 03/28/2012
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 3/12/2012
The trail is proposed to go from Sierra Tract to Van Sickle Bi-State Park through the City of South Lake Tahoe. · El Dorado, California

This project consists of approximately 3.9 miles of Class 1 or better trail linking Sierra Tract with Van Sickle Bi-State Park. Approximately .26 miles are on National Forest System land.

Recreation managementSpecial use management
Scoping Start
06/01/2011
Comment Period
06/01/2011
Decision
03/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Garrett Villanueva · gvillanueva@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Trail Management
Revised South Tahoe Greenway Shared Use Trail ProjectDecision Signed Date: 03/01/2012 Legal Notice Date: 03/07/2012
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 10/28/2011
Johnson Pass Road at Echo Summit on the Lake Tahoe Basin Management Unit (LTBMU) · El Dorado, California

Issue a new 10-year permit to the California Alpine Club to maintain and operate the existing Lodge and associated facilities. No changes are proposed with continued use of the facilities.

Special use management
Scoping Start
10/14/2011
Decision
10/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Lori Allessio · lallessio@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 6/29/2011
Lake Parkway in Stateline, NV to Round Hill Pines Resort · Douglas, Nevada

This project would allow construction and maintenance of a 10-foot-wide paved path with 2-foot shoulders on both sides across National Forest System land between Roundhill pines and the NV/CA border at Stateline, NV.

Special use managementRecreation management
Scoping Start
08/27/2009
Comment Period
01/12/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Garrett Villanueva · gvillanueva@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations; Trail Management
Nevada Stateline to Stateline Bikeway South Demonstration ProjectDecision Signed Date: 06/20/2011 Legal Notice Date: 06/24/2011
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 5/20/2011
Heavenly Mountain Resort, South Lake Tahoe California and Stateline Nevada. · Douglas; El Dorado, California; Nevada

Continued implementation of Heavenly's Master Development Plan.Projects include tree removal for run widening, trail and access improvements, Kids Adventure Zone at Adventure Peak, and replacement of ski school facilities at the top of the Gondola.

Recreation managementSpecial use management
Scoping Start
04/15/2011
Decision
05/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Decision Memo for Implementation of HeavenlyDecision Signed Date: 05/16/2011
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 5/12/2011
Meeks Bay Resort · El Dorado, California

Implement water quality BMP's at the resort

Facility management
Scoping Start
03/02/2011
Decision
05/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Ashley Sommer · asommer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
Decision Memo for Implementation of the Meeks Bay Resort BMP RetrofitDecision Signed Date: 05/09/2011
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/30/2010
Lake Village is located on the South shore of Lake Tahoe. · Douglas, Nevada

Provide funding for implementation of a project that will reduce erosion on existing road shoulders, reduce peak storm flows, maximize infiltration opportunities and attempt to help meet regulatory requirements to the greatest extent practicable.

Watershed managementRoad management
Scoping Start
06/01/2007
Decision
03/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Genevieve Villemaire · gvillemaire@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
Lake Village Phase II Water Quality Improvement ProjectDecision Signed Date: 03/29/2010
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 4/30/2010
USFS Work Center, Meyers, California. · El Dorado, California

Reconfigure work center parking to provide water quality protection BMP measures and efficient vehicle circulation.

Facility management
Scoping Start
03/25/2010
Decision
04/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Daniel Cressy · dcressy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
Meyers Work Center Parking BMP Retrofit ProjectDecision Signed Date: 04/29/2010
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 2/25/2010
Nevada Beach Campground and Day Use Area is located approximately 1 mile North of Stateline, NV on the South Shore of Lake Tahoe. · Douglas, Nevada

Reduce coverage, relocate campsites out of SEZ's, install BMP's and provide accessibility upgrades. Consider opportunities for slight capacity increase.

Facility management
Scoping Start
06/10/2009
Decision
02/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Daniel Cressy · dcressy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance; Watershed Improvements
Nevada Beach Campground and Day Use Area BMP Retrofit ProjectDecision Signed Date: 02/24/2010
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT13N, R18E Sec. 22, 23
Baldwin Allotment Completed
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 9/30/2009
Fallen Leaf Management Area, Tallac Creek drainage. · El Dorado, California

Conduct NEPA analysis to determine what level of grazing, if any, is suitable for the Baldwin Grazing Allotment.

Vegetation management (other than forest products)Watershed managementGrazing managementWildlife, fish, rare plants
Scoping Start
02/09/2009
Comment Period
07/24/2009
Decision
09/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Sarah Muskopf · smuskopf@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Baldwin Grazing Allotment Management ProjectDecision Signed Date: 09/29/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT13N R17E Sec 26 and 35
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/25/2009
The Ward Creek Watershed · Placer, California

Restore natural drainage patterns by breaching a ditch berm in 2-3 locations within a reach of approximately 70 feet and constructing 3-5 waterbars on an abandoned logging road on a terrace above Ward Creek near the Stanford Rock Road crossing.

Watershed management
Scoping Start
06/30/2009
Decision
09/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Stephanie Heller · sheller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Implementation of the Ward Creek Watershed Ecosystem Restoration ProjectDecision Signed Date: 09/01/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNW ? Section 23 of the Tahoe City, California Quadrangle map
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 8/25/2009
Lake Tahoe Basin, Basin-Wide. · Douglas; Washoe; El Dorado; Placer, California; Nevada

Remove encroaching conifers from aspen stands identified in the 2002-2007 Aspen Stand inventory as being at high and highest risk of loss.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
08/22/2008
Decision
07/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Victor Lyon · vlyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (10)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
Decision Memo for Implementation of the Aspen Community Restoration ProjectDecision Signed Date: 07/24/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 7/16/2009
Fallen Leaf Campground · El Dorado, California

Reduce coverage, relocate campsites out of SEZ's, Install BMP's and provide accessibility upgrades. Maintain capacity.

Facility management
Scoping Start
06/10/2009
Decision
06/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Daniel Cressy · dcressy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance; Watershed Improvements
Fallen Leaf Campground Best Management Practices Retrofit ProjectDecision Signed Date: 06/29/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT13N, R17E Sec. 36
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/29/2009
LTBMU wide · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Annual maintenance of LTBMU roads.

Road management
Scoping Start
05/15/2009
Decision
06/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
Paul Potts · ppotts@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Implementation of the LTBMU Road MaintenanceDecision Signed Date: 06/29/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/29/2009
Basin wide · Douglas; Washoe; Carson City (city); Alpine; El Dorado; Placer, California; Nevada

Implement guidelines for preventive and corrective maintenance of existing trails with the LTBMU trail system

Watershed management
Scoping Start
05/01/2009
Decision
06/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Jacob Quinn · jmquinn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Implementation of the Trails Maintenance ProgramDecision Signed Date: 06/25/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 3/31/2009
The Lower Truckee Management Area, located in the Northwest portion of the Lake Tahoe Basin Management Unit in Placer County, California. · Placer, California

Bank stabilization and flood plain restoration to match the upstream and downstream floodplain morphology. Denuded areas will be revegetated through seeding with naturally occurring weed free grasses.

Watershed management
Scoping Start
12/02/2008
Decision
03/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
James Harris · jsharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Lower Truckee River Bank Restoration ProjectDecision Signed Date: 03/26/2009
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 1/21/2009
This project is located near Daggett Summit, approximately 4 miles east of Statline, NV. · Douglas, Nevada

The Daggett Summit Trail System Project (formerly Tahoe Rim Trail Daggett Summit Project) will relocate the existing Daggett area TRT from paved streets to forested land, provide loop trail opportunities, and connect the TRT to Van Sickle State Park.

Road managementRecreation management
Scoping Start
10/26/2007
Comment Period
11/25/2008
Decision
01/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
Garrett Villanueva · gvillanueva@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Trail Management; Roadless Area Management
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT13N, R18E, Sections 24, 25, 26; T13N, R19E, Sections 18, 19, 30.
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/29/2008
Project is located immediately below Meiss Meadows to approximately 2.5 miles downstream. · El Dorado, California

Reclaim Lahontan Cutthroat Trout (LCT) habitat in the Upper Truckee River (below Meiss Meadows) by removing non-native trout species. Project will utilize manual fish control measures.

Wildlife, fish, rare plants
Scoping Start
07/17/2008
Decision
10/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Richard Vacirca · rvacirca@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT10N R18E Sec. 9
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/25/2008
Project area extends from Spooner Summit north to Chimney Beach and from waters edge to Nevada State Park lands. · Douglas; Washoe; Carson City (city), Nevada

The LTBMU is proposing to redevelop the trail systems within the project boundaries in order to establish a sustainable trail system that meets current and future needs.

Recreation managementWatershed management
Scoping Start
03/04/2008
Decision
08/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Garrett Villanueva · gvillanueva@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management; Watershed Improvements
Implementation of the East Shore Beachse Trail Access and Travel ManagementDecision Signed Date: 08/29/2008
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 9/25/2008
LTBMU Desolation Wilderness, Ralston, Tamarack, Cagwin, Magerery, Lucille, Le Conte, Jabu Lakes. · El Dorado, California

A combination of gill netting and electrofishing to remove introduced brook trout and rainbow trout will occur within selected lakes in Desolation Wilderness to restore habitat for mountain yellow-legged frog (Rana muscosa).

Wildlife, fish, rare plants
Scoping Start
07/23/2008
Decision
09/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Sarah Muskopf · smuskopf@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
For Implementation of the Sierra Nevada Yellow-Legged Frog Habitat RestoratDecision Signed Date: 09/23/2008
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 9/22/2008
West Shore Lake Tahoe, CA, Blackwood Watershed · Placer, California

Restoration of approximately 3.5 miles of stream channel in Blackwood Valley. Project areas are upstream and downstream of the Barker Pass road crossing.

Wildlife, fish, rare plantsWatershed management
Scoping Start
01/24/2008
Comment Period
05/29/2008
Decision
07/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Craig Oehrli · coehrli@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
Blackwood Creek Phase III Restoration ProjectDecision Signed Date: 07/22/2008 Legal Notice Date: 07/23/2008
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 3/24/2008
Within the perimeter of the Angora Fire, within 150 feet of forest system roads and forest system trails. · El Dorado, California

Use commercial removal and non-commercial hazard mitigation of standing hazard trees in the Angora Fire area on approximately 255 acres that pose risk to human life and property along Forest Service system roads and trails.

Recreation managementForest productsRoad management
Scoping Start
07/25/2007
Comment Period
10/25/2007
Decision
03/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Duncan Leao · dleao@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment Regulation215
Project ActivityTrail Management; Timber Sales (Salvage)
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionT12N, R18E, Sections 6, 7, 8, 17, 18 ; T 12N, R17E, Sections 12, 13, 23, 24, 25, 26.
Environmental Impact Statement · R5 - Pacific Southwest Region All Units · updated 12/28/2007
Along Sierra Nevada chain from Oregon/California border to south of Lake Isabella as well as lands in western Nevada · Douglas; Esmeralda; Mineral; Alpine; Amador; Butte; Calaveras; El Dorado; Fresno; Inyo; Kern; Lassen; Madera; Mariposa; Modoc; Mono; Nevada; Placer; Plumas; Shasta; Sierra; Siskiyou; Tulare; Tuolumne; Yuba, California; Nevada

Amend Land and Resource Management Plans for ten (10) Forests within the Sierra Nevada region by modifying Management Indicator Species (MIS) lists and associated monitoring strategies.

Wildlife, fish, rare plantsLand management planning
NOI in Federal Register
04/30/2007
DEIS NOA in Federal Register
07/13/2007
FEIS NOA in Federal Register
12/28/2007
Decision
12/2007 (Estimated)
Implementation
01/2008 (Estimated)
Project documents
Diana Craig · dcraig01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityPlan Amendment
Sierra Nevada Forests Management Indicator Species AmendmentDecision Signed Date: 12/14/2007 Legal Notice Date: 12/21/2007
ForestsEldorado National Forest; Inyo National Forest; Lassen National Forest; Modoc National Forest; Plumas National Forest; Sequoia National Forest; Sierra National Forest; Stanislaus National Forest; Tahoe National Forest; Lake Tahoe Basin Mgt Unit
DistrictsEldorado National Forest All Units; Inyo National Forest All Units; Lassen National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Sierra National Forest All Units; Stanislaus National Forest All Units; Tahoe National Forest All Units; Lake Tahoe Basin Mgt Unit
Environmental Assessment · Lake Tahoe Basin Mgt Unit · updated 12/19/2007
North Shore of Lake Tahoe Basin · Placer, California

Environmental Review for providing a trail transportation system that allows for public recreation opportunities by designating recreation uses while minimizing adverse impacts to water quality, vegetation, wildlife, fisheries and cultural resources.

Recreation management
Scoping Start
11/05/2005
Comment Period
07/30/2007
Decision
10/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
Garrett Villanueva · gvillanueva@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Watershed Improvements
North Shore Trail Access and Travel Management PlanDecision Signed Date: 10/10/2007 Legal Notice Date: 10/15/2007
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 6/29/2007
Nevada Beach is located approximately 2 miles north of Stateline, NV on the East shore of Lake Tahoe. Baldwin Beach is located 4 miles west of the City of South Lake Tahoe, CA on the South Shore. · Douglas; El Dorado, California; Nevada

Replace existing entry kiosk buildings at Baldwin and Nevada beaches. Remove limited asphalt at Baldwin Beach parking area.

Facility managementRecreation management
Scoping Start
03/06/2007
Decision
04/2007 (Estimated)
Implementation
05/2007 (Estimated)
Project documents
Daniel Cressy · dcressy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Maintenance
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit
Legal Land DescriptionNevada Beach - T13N R18E Sec. 22; Baldwin Beach - T13N R17E Sec. 26
Decision Memo · Lake Tahoe Basin Mgt Unit · updated 12/7/2005
Meeks Bay, West Shore, Lake Tahoe · El Dorado, California

Redevelopment of the exisiting campgrounds, utilities and restroom.

Recreation management
Scoping Start
12/15/2004
Decision
11/2005 (Estimated)
Implementation
09/2006 (Estimated)
Project documents
Daniel Cressy · dcressy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Meeks Bay Resort Bampground BMP UpgradesDecision Signed Date: 11/07/2005
ForestsLake Tahoe Basin Mgt Unit
DistrictsLake Tahoe Basin Mgt Unit