Environmental Assessment · Saco Ranger District · updated 4/17/2026
Off High Street, just past High Street Cemetary in Albany, Carroll County, New Hampshire. · Carroll, New Hampshire
Cutting about 50 red pine trees over three inch or larger diameter at breast height and removing fill in about a 100 by 100-foot area on the north side of the pit to establish the Government Pit mineral collection site.
Minerals and geology
Scoping Start
09/2025 (Estimated)
Comment Period
09/2025 (Estimated)
Objection Period Start
03/2026 (Estimated)
Decision
06/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 4/8/2025
Eight hundred feet of the Lincoln Woods Trail starting about one-half mile from the Lincoln Woods Trailhead in Lincoln, Grafton County, New Hampshire. · Grafton, New Hampshire
Installation of slope stability measures and a retaining wall along eight hundred feet of the Lincoln Woods Trail.
Recreation management
Decision
04/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 4/7/2025
AMC Galehead Hut in Lincoln, New Hampshire · Grafton, New Hampshire
AMC proposes to install 6 flat-plate style solar thermal collectors on the roof of the Galehead Hut to reduce propane used to heat water.
Special use management
Decision
04/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 3/14/2025
The Success Trailhead sign on Ingalls Valley Road just off Success Pond Road in Success Township, Coos County, New Hampshire · Coos, New Hampshire
The Androscoggin Ranger District proposes the removal of three culverts on the dead-end Ingalls Valley Road located off Success Pond Road.
Wildlife, fish, rare plantsWatershed management
Decision
03/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 3/5/2025
Project is in the towns of Landaff, Waterville Valley, Benton, Easton, and Orford, Grafton County, New Hampshire. · Grafton, New Hampshire
Grafton County proposes to install about 9.5 miles of fiber optic line, about 7.2 miles aerially on existing utility poles and about 2.3 miles in new buried conduit.
Special use management
Decision
03/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 2/7/2025
Fabyans Cabin off Old Cherry Mountain Road in Carroll, Grafton County, New Hampshire · Grafton, New Hampshire
The Pemigewasset Ranger District proposes to redevelop Fabyans cabin into a rental camp, along with additional administrative uses.
Recreation management
Decision
02/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 1/22/2025
About one quarter of a mile of the established Beebe to North Woodstock transmission line going through Campton, Thornton, and Woodstock, Grafton County, New Hampshire. · Grafton, New Hampshire
The Eversource Energy company proposes to replace five wooden H-frame structures with new, steel H-frame structures along 0.28 of a mile of the Right-Of-Way within the White Mountain National Forest.
Special use management
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 1/8/2025
The main hill of the Attitash Ski Resort in Jackson, Carroll County, New Hampshire. · Carroll, New Hampshire
Removal of the existing Summit Triple lift and replacing with a four or six passenger high speed chairlift at the Attitash Ski Resort.
Recreation management
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 12/11/2024
Three locations: one location at Blackberry Crossing Campground and Covered Bridge parking lot and Covered Bridge Campground along the Kancamagus Highway, as well as along the Conway burn units. · Carroll, New Hampshire
in 2020 spongy moth caused heavy mortality in Conway and Albany. Dead oaks near the road in the Moat area and in the Blackberry Crossing Campground are a hazard and need to be removed. This project will remove ash trees from Covered Bridge Campground
Forest productsVegetation management (other than forest products)
Decision
12/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 12/4/2024
About 750 acres of the Wildland-Urban Interface on National Forest System lands in Albany and Hales Location, New Hampshire. · Carroll, New Hampshire
Apply fire to 725 acres across five units and conduct about 235 acres of timber harvesting across thirteen units to reduce fuel loads.
Fuels management
Decision
12/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 12/4/2024
About seven miles of the Whitefield to Berlin (S-136) transmission line in Jefferson, Randolph, and Gorham; Coos County, New Hampshire · Coos, New Hampshire
Eversource, permit holder for utility lines across the WMNF, has identified 214 existing structures that need to be replaced within the existing right of way (ROW) of the S-136 transmission line in Whitefield, Jefferson, Randolph, and Gorham NH.
Special use managementFacility management
Decision
12/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 12/4/2024
Saco Ranger District, located west of Forest roads 227 and 380 and east of high School Loop and Tent Boulder bike trails in Albany and Hales Location, Carroll County, New Hampshire. · Carroll, New Hampshire
Apply fire to 913 acres across two units in Albany and Hales Location to reduce hazardous fuel loading and remove suppressed or overstocked tree species. Hazard trees would be identified during site preparation and removed before burning begins.
Fuels management
Comment Period
04/03/2023
Decision
12/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 10/17/2024
Falling Waters Trail off Franconia Notch State Park along Interstate 93 in the town of Franconia. · Grafton, New Hampshire
Relocate about 5100 feet of the Falling Waters trail to a more sustainable grade and location, along with construction of a new 1900-foot spur trail to Cloudland Falls. Work would be done by the Appalachian Mountain Club.
Recreation management
Decision
10/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 9/9/2024
Lower Falls Recreation Site off of Route 112 in Albany, Carroll County, New Hampshire. · Carroll, New Hampshire
Removal of up to twenty trees and demolition of current Lower Falls Recreation site toilet building and possibly old vault. Replace with new buildings and installed vaults. After installation, backfill and landscape sites.
Facility management
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 8/15/2024
Carter Notch Hut, Lakes of the Clouds Hut, Mizpah Spring Hut, Zealand Falls Hut, Greenleaf Hut, and Galehead Hut; Coos and Grafton Counties, New Hampshire. · Coos; Grafton, New Hampshire
A Starlink RV antenna would be installed along the roofline of each of the huts listed in the project location (Carter, Lakes, Mizpah, Zealand, Galehead, and Greenleaf).
Special use managementFacility management
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 7/25/2024
Selected sites across the entirety of the White Mountain National Forest within the state of Maine. · Oxford, Maine
Inject emamectin benzoate insecticide into the base of up to twenty white and/or black ash trees per site varying in size in up to 10 sites across the White Mountain National Forest in Maine.
Vegetation management (other than forest products)
Comment Period
02/08/2024
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 7/25/2024
Selected sites across the entirety of the White Mountain National Forest within the state of New Hampshire. · Carroll; Coos; Grafton, New Hampshire
Inject emamectin benzoate insecticide into the base of up to twenty white and/or black ash trees per site varying in size in up to 80 sites across the White Mountain National Forest in New Hampshire
Vegetation management (other than forest products)
Comment Period
02/08/2024
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 7/18/2024
National Forest System lands along Forest Service road 15 about seven miles south of York Pond road in Berlin, Coos County, New Hampshire. · Coos, New Hampshire
Designating about five miles of forest service road 15 as part of the corridor 11 trail network, decommissioning about five miles of existing trail, construction of about one-half mile of new tread and accompanying bridge.
Recreation management
Decision
07/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Saco Ranger District · updated 6/28/2024
Carroll County, NH · Carroll, New Hampshire
Implement a combination of silvicultural and fuels treatments to advance goals, objectives, and desired conditions of the Forest Plan for vegetation, wildlife, and other resources
Forest productsRoad managementWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
07/31/2023
Objection Period Start
02/15/2024
Decision
06/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Scenery Management; Travel Management; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 6/10/2024
Rumney Rocks Main Cliff, Meadows, and Buffalo Pit parking areas off Buffalo Road in Rumney, Grafton County, New Hampshire. · Grafton, New Hampshire
Redesign three Rumney Rocks parking areas to include paving, re-paving, painting, stabilizing, and installation of new drainage infrastructure to increase parking capacity, maximize traffic flow efficiency and safety, and improve drainage conditions.
Recreation management
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 5/13/2024
Base of the main hill at Waterville Valley Ski Resort, Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire
Project activities include enlarging an existing terrace and constructing a building to replace an existing yurt that is no longer functional.
Recreation management
Decision
05/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 2/13/2024
Camp Dodge on Camp Dodge Road, Green's Grant, and Pinkham Notch Visitors Center on Route 16 in Gorham, Coos County, New Hampshire. · Coos, New Hampshire
Install solar arrays on rooftops of existing infrastructure and electric vehicle charging stations at Pinkham Notch Visitors Center and Camp Dodge to provide clean energy to the recreation sites and reduce the sites carbon footprint.
Special use management
Decision
02/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Androscoggin Ranger District · updated 2/8/2024
The proposed project is located in the Peabody West Habitat Management Unit. · Coos, New Hampshire
Proposed recreation, transportation, vegetation, and wildlife habitat management activities in the Peabody West project area, Coos County, NH.
Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Road management
Comment Period
08/04/2022
Objection Period Start
04/27/2023
Decision
02/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 1/29/2024
Rick's Road, off of Covered Bridge Road adjacent to the Saco River in Bartlett, Carroll County, New Hampshire. · Carroll, New Hampshire
A 1050-foot section of Rick's Road will be rerouted north away from the Saco River.
Road management
Decision
01/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 12/19/2023
The Upper Bengt trail at the Jackson Ski Touring Foundation cross-country trail system in Jackson, Carroll County, New Hampshire. · Carroll, New Hampshire
Relocate one section of the Bengt Trail about 0.2 miles long to eliminate three hairpin corners and move the trail away from a wet area.
Recreation management
Decision
12/2023 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 12/7/2023
National Forest System lands just north of NH state highway 175 between East Pond Brook and Little East Pond Brook in Livermore, Grafton County, New Hampshire. · Grafton, New Hampshire
Evidence of Emerald Ash Borer has been found in the area. Project would commercially harvest up to 250 acres of Ash trees and other species needed for skidding access to remove the food source from the invasive insect in the project area.
Vegetation management (other than forest products)Forest productsWildlife, fish, rare plants
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 11/13/2023
The project area is focused on the Lake Tarleton Habitat Management Unit. · Grafton, New Hampshire
The Pemigewasset Ranger District of the White Mountain National Forest proposes recreation, transportation, vegetation, and wildlife habitat management activities within the Tarleton project area, Grafton County, New Hampshire
Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Road management
Comment Period
07/06/2021
Objection Period Start
03/16/2023
Decision
11/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Scenery Management; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 11/8/2023
Along Bear Notch Road at the intersections of Swift River and Douglas Brook in Albany, Carroll County, New Hampshire. · Carroll, New Hampshire
Manuel removal of non-native invasive species, mostly glossy buckthorn, within private inholdings along the interior of the WMNF.
Vegetation management (other than forest products)
Decision
11/2023 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Noxious Weed Treatments |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 10/10/2023
The main ski area at the Waterville Valley Ski Resort in Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire
Waterville Valley proposes to install about 57 light poles about 26 to 33 feet tall with installed lights to illuminate 44 acres of existing ski trails and construct a short connector trail about 250 feet in length.
Recreation management
Decision
10/2023 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 8/23/2023
National Forest System lands adjacent to the Town of Lincoln water treatment plant off Westwood Drive and Loon Pond Brook in Lincoln, New Hampshire. · Grafton, New Hampshire
The town of Lincoln has requested construction of a 750,000-gallon concrete water storage tank and access road on Forest System lands to provide water storage to Loon Village.
Special use management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 8/23/2023
Near the peak of the Waterville Valley Ski Resort in Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire
The Waterville Valley Ski Resort would replace an aging patrol headquarters building just uphill of the existing facility next to the top terminal of the White Peaks ski lift.
Recreation management
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 8/22/2023
Forest Service Road 27 north of highway 302 in Glen, Carroll County, New Hampshire. · Carroll, New Hampshire
Removal of the bridge and up to four culverts to restore the embankment and improve stream integrity.
Watershed management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 6/8/2023
Greenleaf Hut on the Falling Waters section of the Appalachian National Scenic Trail in Franconia, Grafton County, New Hampshire. · Grafton, New Hampshire
Construction of a tent platform and a bear box to accommodate up to ten overnight volunteers for the Greenleaf Hut on the Appalachian Trail Corridor.
Recreation management
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 5/26/2023
Jackson Ski Touring Facility, Jackson, Carroll County, New Hampshire · Carroll, New Hampshire
Relocation of two trails totaling about 0.9 miles to eliminate about five stream crossings and to establish a less steep ascent and descent along the trail corridors.
Recreation managementSpecial use management
Decision
05/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 4/7/2023
The Appalachian Trail at the Zealand Falls Hut at the junction of twinway and ethan pond trail in Bethlehem, New Hampshire. · Grafton, New Hampshire
Install nine solar panels on three ground posts within a total footprint of ten by twenty feet to provide a safer and more reliable power source for the Zealand Falls Hut while reducing noise and greenhouse gas emissions.
Special use management
Decision
04/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 3/14/2023
The project is located on the north aspect of Loon Mountain situated off Route 112 in Lincoln, New Hampshire. · Grafton, New Hampshire
Construct a recreation mountain coaster about 4500 feet in total length in the vicinity of the Kissin Cousins Double Chairlift at the Loon Mountain Ski Resort. Just over half of the coaster would sit on National Forest System Lands.
Recreation management
Decision
03/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 1/31/2023
Sawyer River Road about 1.5 miles from the gate off Route 302 in Hart's Location, New Hampshire · Carroll, New Hampshire
Build a new 40-foot bridge to replace two 48-inch culverts that carry the flow of a tributary of the Sawyer river. An earthen section of the road would be excavated and bridge installed over the new void.
Recreation managementRoad management
Decision
01/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Road Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 1/31/2023
The center of the main hill adjacent to the White Peaks Express Lift at the Waterville Valley Ski Resort in Waterville Valley, New Hampshire. · Grafton, New Hampshire
The World Cup T-Bar and Exhibition lifts would be removed and replaced with the proposed White Peaks T-Bar Lift with ten towers and a 66 chair capacity.
Recreation management
Decision
01/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 1/31/2023
One mile down Zealand road in Bethlehem, Grafton County, New Hampshire · Grafton, New Hampshire
Replacing Zealand 2 Bridge including abutments, installing the new abutments to better align with Zealand river, and realigning Zealand road to improve access to the new bridge.
Road management
Decision
01/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 1/6/2023
Eastman Brook Valley Along Tripoli Road and its spur roads in Thornton, Grafton County, New Hampshire · Grafton, New Hampshire
Harvesting four units of White ash trees for sanitation harvest in the Eastman Brook valley next to Tripoli Road to remove potential future hazard trees from heavily trafficked areas before the Ash tree population is killed by Emerald Ash Borer.
Vegetation management (other than forest products)Forest products
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 11/8/2022
Loon Mountain Resort in Lincoln, New Hampshire · Grafton, New Hampshire
Improve the Undercut ski trail by installing a total of about 4,000 linear feet of water and air pipes for snowmaking, constructing a new valve house at the top of the Undercut Trail, and installing water bars and sediment traps.
Recreation management
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 10/20/2022
About 3 acres of National Forest System lands in the Town of Stark, New Hampshire, just south of state highway 110. · Coos, New Hampshire
Eversource proposes to rebuild the O154 115-kV transmission line within the existing right of way. The entire O154 line consists of 137 structures, 8 of which occur on Forest Service lands in the town of Stark, NH.
Special use management
Decision
10/2022 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 9/15/2022
Junction of New Hampshire Route 302 and Zealand Road, Carroll, Coos County, New Hampshire · Coos, New Hampshire
Proposal includes conducting a prescribed burn to the 35 acre Zealand wildlife opening and repeating the burn every 4 years or as wildlife habitat needs dictate to promote Beaked Hazelnut and blueberry growth.
Wildlife, fish, rare plants
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 9/15/2022
Junction of New Hampshire Route 302 and Zealand Road, Carroll, Coos County, New Hampshire · Coos, New Hampshire
Apply fire to thirty acres of the Zealand Wildlife Opening to promote Beaked Hazelnut and Blueberry growth. Burns would be conducted on a four year cycle but may be done earlier depending on habitat needs.
Wildlife, fish, rare plants
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 9/13/2022
Wildlife openings across the entirety of the White Mountain National Forest · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
Continued maintenance of 750 acres of permanent wildlife openings across the White Mountain National Forest, including an expansion of existing openings totaling 128 new acres and a decommission of 202 acres of existing openings.
Wildlife, fish, rare plants
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 8/29/2022
Green Peak Waterville Valley Ski Area, Town of Waterville Valley · Grafton, New Hampshire
Construct ski trails, a glade area, a lift, and snowmaking equipment; relocate one building on Green Peak. All activities are in the Special Use Permit boundary and the ski area's accepted Master Development Plan. Site-specific Plan amendment needed.
Special use managementRecreation management
Comment Period
04/23/2013
Objection Period Start
03/15/2013
Decision
06/2013 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Timber Sales (Green) |
| Waterville Valley Ski Resort Green Peak Expansion Project Decision Notice | Decision Signed Date: 06/21/2013 Legal Notice Date: 06/26/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 8/4/2022
Up to 55 cumulative acres along Mack Brook Road within the Township of Livermore, Grafton County, New Hampshire. · Grafton, New Hampshire
Inject emamectin benzoate insecticide into the base of up to thirty White Ash trees within three young hardwood stands to preserve individual tree health through current EAB infestation. No trees will need to be cut.
Vegetation management (other than forest products)
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 6/1/2022
Bethlehem, New Hampshire on the Zealand River about two miles from New Hampshire Route 302 on the Zealand River Road. Treatments on the river would occur in the area just upstream of Hales Brook. · Grafton, New Hampshire
Two former channels of the Zealand River in the abandoned floodplain would be re-activated with river flow by construction of four check dams using gabions, trees, and boulders, along with addition of earthen fill behind each dam.
Watershed management
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 5/4/2022
The main hill of the Attitash Mountain Resort in Bartlett, New Hampshire · Carroll, New Hampshire
Replace the existing double double lifts with a new triple or quad fixed grip lift at the Attitash Ski Resort.
Recreation management
Decision
05/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 4/28/2022
19 Mile Brook Trail, Greens Grant, NH · Coos, New Hampshire
Bridge destroyed by Tropical Storm Irene. Propose to install temporary step-stone crossing 500' upstream from bridge site and rock staircase to old road prism to link to trail. Cancelled because relocation upstream deemed unnecessary.
Recreation management
Scoping Start
07/2014 (Estimated)
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · White Mountain National Forest All Units · updated 3/28/2022
Five miles along the no longer used old route 3 in Franconia and Bethlehem, Grafton County, New Hampshire. · Grafton, New Hampshire
Decommission and forego maintenance on the Franconia trail from the Franconia Notch bike path to South Gale River road, about 5 miles. Establish a new snowmobile trail at about 5 miles in length, one mile of new trail and 4 miles using old route 3.
Recreation management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 11/2/2021
Within the boundaries of the Waterville Valley Ski Area Special Use Permit in Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire
The proposed project is to upgrade two existing, unmaintained foot and horse-logging trails to a single 13-foot-wide, about one mile long multi-season trail designed and maintained for Nordic skiing.
Special use managementRecreation management
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 11/1/2021
Along Connie's Way trail in Pinkham Notch, Coos County, New Hampshire. · Coos, New Hampshire
Recent field visits revealed that the bridge on the Connie's Way Ski Trail has collapsed into the stream channel it is crossing. The bridge would be removed and the stream crossing would be established with native rock sourced on site.
Watershed managementRecreation management
Decision
11/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 11/1/2021
Town of Milan · Coos, New Hampshire
The purpose of this project is to respond to a special use permit request to use an existing 250-foot-long by 16-foot-wide skid trail and 0.5-acre log landing on National Forest System land, and to haul on forest roads 105, 105A, and 13.
Special use management
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · White Mountain National Forest All Units · updated 8/13/2021
Forest-wide - currently known locations of non-native invasive plants shown on the Forest's Invasive Species Map shown on page 3-155 of the Final Environmental Impact for the 2005 Forest Plan · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
Eradicate existing populations of non-native invasive plants and develop a process for prevention and/or eradication of new populations of non-native invasive plants as they occur.
Vegetation management (other than forest products)
Comment Period
11/02/2006
Decision
01/2007 (Estimated)
Implementation
05/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Forest-wide Invasive Plant Control Project Decision Notice and FONSI | Decision Signed Date: 01/29/2007 Legal Notice Date: 02/02/2007 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 7/14/2021
Forest Service managed Deer Hill Road, one mile off of State Highway 113 on the border of New Hampshire and Maine in Stow and Stoneham, Maine. · Oxford, Maine
The Forest proposes to replace the road surface and repair the drainage of about five miles of the Forest Service area of Deer Hill Road. The road provides access to three recreation trailheads and a scenic viewing area.
Road managementRecreation management
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 6/15/2021
Forest Service Road Corridor 19, about two miles west from State Highway 113B in Chatham, Carroll County, New Hampshire. · Carroll, New Hampshire
The Forest proposes to replace two bridges along Corridor 19, the road is used as a snowmobile trail in the winter season.
Road managementRecreation management
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 6/15/2021
The repair work would begin on Rocky Branch Road about three miles north of Highway 302 in the towns of Bartlett and Jackson, New Hampshire. · Carroll, New Hampshire
The Forest proposes to repair about 1800 feet of Rocky Branch Road damaged from recent storm events. The road provides access to the Rocky Branch South Trailhead.
Recreation managementRoad management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 6/15/2021
The Sawyer River 2 Road Bridge is located on Sawyer River Road about three and a half miles from State Highway 112. The road is used as a snowmobile trail in the winter. · Grafton, New Hampshire
The Forest proposes to restore the riprap around the Sawyer River 2 Road bridge piers that was lost during a recent storm event. The bridge is close to and provides access to the Sawyer River Road East trailhead.
Road managementRecreation management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 4/12/2021
Birch Hill, Moat, and Dandiview area, east of Moat Brook, west of Route 302 within the town of Conway, Carroll County, New Hampshire. · Carroll, New Hampshire
Apply prescribed fire to about 210 total acres within the wildland urban interface. Conduct maintenance burning on prescribed fire areas every 5-7 years.
Fuels management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 3/29/2021
Loon Mountain Ski Resort off NH State Highway 112 in Lincoln, New Hampshire · Grafton, New Hampshire
Add 14 additional beginner, intermediate, and difficult terrain trails to the Phase 1 & 2 mountain bike trails system at the Loon Mountain Ski Resort.
Recreation managementSpecial use management
Decision
02/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Saco Ranger District · updated 11/17/2020
Carroll County, New Hampshire; and Oxford County, Maine · Oxford; Carroll, Maine; New Hampshire
Vegetation, wildlife habitat, and recreation management activities in the Cold River Habitat Management Unit.
Recreation managementRoad managementForest productsVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
03/05/2020
Objection Period Start
06/30/2020
Decision
11/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Cold River Integrated Resource Project Decision Notice | Decision Signed Date: 11/17/2020 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 11/5/2020
Towns of Berlin and Randolph, Coos County, New Hampshire · Coos, New Hampshire
A collapsed snowmobile bridge on Kilkenny Snowmobile Trail would be removed. The stream would be dredged to restore flow. Kilkenny Snowmobile Trail would be temporarily relocated to Bog Dam Loop Road.
Recreation managementWatershed management
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 11/2/2020
Five miles along Route 49 and Tripoli road in Thornton and Waterville Valley, New Hampshire · Grafton, New Hampshire
Firstlight proposes to install, use and maintain under new Special Use Permit an aerial support cable and a fiber optic cable on existing pole and underground conduit lines adjacent to Route 49 and Tripoli road.
Special use management
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 11/2/2020
Jackson Ski Touring Nordic Ski Area, Jackson, Carroll County, New Hampshire · Carroll, New Hampshire
The Jackson Ski Touring Foundation proposes to build an about 750 foot Nordic ski trail 18-20 feet in width connecting the existing Keeney and Thoms Reach (Ellis) trails.
Recreation managementSpecial use management
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 9/21/2020
Waterville Valley Ski Resort in Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire
Replacement of the White Peaks Quad Chairlift with a high speed 6-person chairlift, replacement of the Sunnyside Double Chairlift with a fixed grip 4-person chairlift, all in the same general alignment, and removal of the Northside Double Chairlift.
Special use managementRecreation management
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 7/6/2020
Along U.S. Highway 2 just north of the White Mountain National Forest Presidential Range in Randolph, Coos County, New Hampshire · Coos, New Hampshire
Eversource is requesting the conversion of 12 wooden transmission poles to standard steel transmission poles in the S136 transmission line.
Special area managementSpecial use management
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Eversource S136 Line Structure and Optical Ground Wire Replacement Project | Decision Signed Date: 07/02/2020 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 6/8/2020
Forest Service developed recreation and administrative sites. · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
Amend Forest-wide Vegetation Management Forest Plan Standards S-2 and S-3 to allow whole tree removal from developed recreation and Forest Service administrative sites.
Land management planningFacility management
Comment Period
04/21/2020
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance; Plan Amendment |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 3/11/2020
Bethlehem, Grafton County, New Hampshire, just off Gale River Loop Road. · Grafton, New Hampshire
Littleton Water and Light has requested the removal of the South Branch Gale River Dam, located on National Forest land. The infrastructure will be removed and the area restored to a natural riverine habitat.
Wildlife, fish, rare plantsSpecial use managementWatershed management
Decision
03/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Special Use Authorizations; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 2/27/2020
Hudson Farm on Trescott Rd, Etna, NH · Grafton, New Hampshire
Conduct prescribed fire at Hudson Farm, Bent Field, and Trescott Field to manage wildlife habitat and a site-specific Forest Plan amendment to allow prescribed fire in the Appalachian National Scenic Trail Management Area at these locations.
Land management planningFuels managementWildlife, fish, rare plants
Comment Period
11/15/2019
Decision
02/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Plan Amendment |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Androscoggin Ranger District · updated 2/4/2020
The proposed units are located between Hastings Campground and Evans Notch along Route 113, and west of Route 113 from Bull Brook north. · Oxford, Maine
Proposed timber harvest using even-aged and uneven-aged management methods to improve forest health, improve wildlife habitat diversity, and provide for a sustainable yield of forest products. Connected road work will be proposed as well.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)
Comment Period
05/15/2019
Objection Period Start
09/26/2019
Decision
02/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Evans Brook Vegetation Management Project Decision Notice | Decision Signed Date: 02/04/2020 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 11/6/2019
Livermore (unincorporated), Grafton County, New Hampshire · Grafton, New Hampshire
Dismantle bridge, remove stringers and hardware, break up and bury or scatter concrete abutments at least 100 feet from perennial water, monitor crossing and address impacts if warranted.
Special area managementRecreation management
Comment Period
08/07/2017
Objection Period Start
05/25/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Wilderness Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 11/5/2019
Beans Purchase, Coos County , NH · Coos, New Hampshire
Analysis to consider the removal of Spruce Brook, Blue Brook, and Perkins Notch recreation shelters in Wild River, establishment of tent pads, and other site rehabilitation. Spruce Bk and Blue Bk decision made Nov. 2008. Perkins Notch on 5/23/2011
Recreation management
Decision
05/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Perkins Notch Shelter Project Decision Memo | Decision Signed Date: 05/23/2011 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 11/4/2019
Waterville Valley downhill ski area · Grafton, New Hampshire
Remove double-chair lift that is old and often down due to mechanical and wind issues. Install a new T-bar lift to access the same runs. Would require cutting <0.5 acre of Bicknell's thrush habitat, which would require a site-specific Plan amendment.
Special use managementRecreation management
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 10/30/2019
Bethlehem, NH · Grafton, New Hampshire
Proposal to grant an easement to construct a road approximately one mile long across WMNF lands for access to private inholding completely surrounded by Forest lands south of US Route 3 in Bethlehem, NH.
Special use management
Comment Period
03/25/2010
Decision
02/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Access to Private In-holding – Gale River Road Decision Notice and FONSI | Decision Signed Date: 02/22/2011 Legal Notice Date: 02/25/2011 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | South of US Route 3 in Bethlehem, NH, within the loop of the Gale River Road |
Environmental Assessment · Androscoggin Ranger District · updated 10/30/2019
Town of Stoneham, Oxford County, ME · Oxford, Maine
An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation, watershed and transportation system improvements.
Watershed managementRecreation managementRoad managementForest productsWildlife, fish, rare plants
Comment Period
05/05/2016
Objection Period Start
12/22/2017
Decision
05/2018 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Albany South Integrated Resource Project | Decision Signed Date: 05/09/2018 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 10/30/2019
Attitash Ski Area in Bartlett, NH · Carroll, New Hampshire
Allow ~1300' of a 5022' zipline cable ride to be suspended over National Forest lands. Both ends of the ride would be on private land. Would require cutting about 30 trees on National Forest land for safe use of the zipline.
Special use management
Comment Period
05/20/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Attitash Ski Area Ziplines Project Decison Memo | Decision Signed Date: 06/26/2013 Legal Notice Date: 06/30/2013 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 10/30/2019
Coos County, Towns of Carroll and Crawfords Purchase and Grafton County, Town of Bethlehem. · Coos; Grafton, New Hampshire
An integrated resource project with activities including maintenance and improvement of existing recreation facilities, wildlife habitat improvement, timber harvesting, timber stand improvement, and watershed improvement.
Watershed managementVegetation management (other than forest products)Road managementWildlife, fish, rare plantsSpecial use managementForest productsFacility management
Comment Period
10/05/2010
Decision
01/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Stewardship Contract, Consolidated Appropriations Resolution Of 2003 |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Facility Improvements/Construction; Forest Vegetation Improvements; Facility Maintenance; Trail Management; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Environmental Assessment · Androscoggin Ranger District · updated 10/30/2019
Martin's Location · Coos, New Hampshire
Repair and improvement of campground facilities including roads, campsites, water and wastewater systems, and restrooms. Installation of pedestal hookups on selected loops, shower facilities, a dump station, and volunteer sites.
Facility managementRecreation management
Comment Period
03/09/2009
Decision
04/2010 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance; Road Maintenance; Road Improvements/Construction |
| Dolly Copp Campground Rehabilitation Decision Notice and FONSI | Decision Signed Date: 04/29/2010 Legal Notice Date: 05/05/2010 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · White Mountain National Forest All Units · updated 10/30/2019
Locations across the Forest · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
Reissuance of approx. ten existing permits for driveways across National Forest system land to access private property because permits recently expired or will expire soon. Permits to be reissued for 20 years; approved activities will not change.
Special use management
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forest-wide Driveway Permit Reissuance Decision Memo | Decision Signed Date: 08/12/2015 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Androscoggin Ranger District · updated 10/30/2019
Albany Township and Mason Township, Oxford County, Maine · Oxford, Maine
Proposed timber harvest, wildlife opening expansion, prescribed fire, watershed and stream improvements, and changes to trails, roads, gravel pits, and campsites.
Forest productsWildlife, fish, rare plantsRecreation managementRoad managementVegetation management (other than forest products)Watershed managementFuels management
Comment Period
04/16/2009
Decision
03/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Stewardship Contract, Consolidated Appropriations Resolution Of 2003 |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Four Ponds Integrated Resource Management Project Decision Notice and FONSI | Decision Signed Date: 03/12/2010 Legal Notice Date: 03/17/2010 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Environmental Assessment · Saco Ranger District · updated 10/30/2019
Towns of Albany, Bartlett, Conway, and Hale's Location, Carroll County, New Hampshire, on the Saco Ranger District · Carroll, New Hampshire
Proposal: Add approximately 12 miles of non-system trails, primarily designed for mountain biking, to the National Forest System
Recreation management
Comment Period
06/22/2010
Decision
09/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Environmental Assessment · Saco Ranger District · updated 10/30/2019
UNIT - Saco Ranger District. STATE - New Hampshire. COUNTY - Carroll. North of Swift River, East of Douglas Brook · Carroll, New Hampshire
An integrated resource project that considers activities to move the NE Swift HMU toward the desired condition through timber, wildlife habitat, recreation, fisheries and aquatic management, road improvements or decommissioning, and other activities.
Forest productsVegetation management (other than forest products)Watershed managementRoad managementWildlife, fish, rare plantsRecreation management
Comment Period
06/28/2011
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 3/18/2019
Town of Benton, Grafton County, NH · Grafton, New Hampshire
Facing the existing waterside of the dam with an 8 inch structure of poured concrete with reinforcing and anchoring (rebar or other metal pins). A new drawdown pipe will be sleeved into the existing metal pipe.
Facility managementWildlife, fish, rare plantsRecreation management
Decision
03/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Facility Maintenance |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 2/26/2019
Loon Mountain Ski Area · Grafton, New Hampshire
Allow construction of two fixed-grip chairlifts, approx. 26 acres of new or realigned teaching ski terrain and expansion of snowmaking to new area with existing water. Approx. 60% of lifts and ski terrain on NFS lands. Add'l work on private lands
Recreation managementSpecial use managementLand management planning
Comment Period
04/28/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Timber Sales (Green) |
| Decision Notice and Finding of No Significant Impact | Decision Signed Date: 08/26/2014 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Lincoln, NH |
Environmental Assessment · Saco Ranger District · updated 10/19/2018
Town of Chatham, Carroll County, New Hampshire · Carroll, New Hampshire
An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as transportation system improvements
Vegetation management (other than forest products)Road managementForest products
Comment Period
04/13/2018
Objection Period Start
08/21/2018
Decision
10/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 10/18/2018
Grafton County, NH · Grafton, New Hampshire
Adopt Oliverian Orchard into the Permanent Wildlife Opening Program and conduct overstory removal operations within the footprint of the orchard.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 10/3/2018
Woodstock, NH · Grafton, New Hampshire
This project would move a section of the Corridor 14 trail off of private lands to UFSF lands to eliminate concerns about long-term sustainability.
Recreation management
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · White Mountain National Forest All Units · updated 1/5/2018
For more information, see the project website at: www.northernpasseis.us. · Grafton, New Hampshire
Proposed power transmission line that would cross the WMNF in an existing corridor in Stark and between Easton and Woodstock. US Dep't of Energy is leading the NEPA analysis. WMNF decision is whether to issue a special use permit to cross the Forest.
Special use management
NOI in Federal Register
02/11/2011
DEIS NOA in Federal Register
07/31/2015
FEIS NOA in Federal Register
08/18/2017
Objection Period Start
09/01/2017
Decision
01/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Northern Pass Transmission Line Record of Decision | Decision Signed Date: 01/05/2018 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · White Mountain National Forest All Units · updated 12/19/2017
Conway, NH · Carroll, New Hampshire
Remodel main office building to net-zero energy efficient standards and build a new addition expanding footprint to a total of 7600 sq. ft. Includes removing temporary office trailer, expanding parking areas, and making other site improvements.
Facility management
Comment Period
07/17/2017
Objection Period Start
10/23/2017
Decision
12/2017 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 11/20/2017
Sugarloaf Snowmobile Trail, Zealand Road, Carroll Coos County, NH · Coos, New Hampshire
The Twin Mountain Snowmobile Club has proposed to abandon approximately 0.5 miles of the Sugarloaf Snowmobile Trail reroute the trail by constructing approximately 800 feet of new trail.
Recreation management
Decision
11/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · White Mountain National Forest All Units · updated 11/9/2017
Camp Dodge Trails Center · Coos, New Hampshire
The WMNF is proposing to enter into a public/private partnership with Appalachian Mountain Club (AMC) to address the long-term maintenance needs and improvements at Camp Dodge. Project includes a proposal for a new long-term special use permit to AMC
Facility managementSpecial use management
Comment Period
06/02/2017
Objection Period Start
09/15/2017
Decision
11/2017 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/26/2017
Lake of the Clouds, White Mountains Presidential Range between Mt. Monroe and Mt. Washington, Sargents Purchase, NH · Coos, New Hampshire
Replacement of failing septic system at Lake of the Clouds Hut, operated under special use permit by the Appalachian Mountain Club.
Recreation managementSpecial use management
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Special Use Authorizations |
| Lake of the Clouds Hut Septic System Replacement Decision Memo | Decision Signed Date: 06/22/2017 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/6/2017
Waterville Valley Ski Area · Grafton, New Hampshire
Replace existing J Bar lift with two conveyor lifts with associated drainage improvements and grading. Construct a new facility to house the ski and snowboard rental business.
Recreation managementSpecial use management
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Androscoggin Ranger District · updated 7/18/2017
Kilkenny Unit · Coos, New Hampshire
An integrated resource project designed to move the South Pond South Habitat Mgt Unit (HMU) toward desired conditions through timber, wildlife habitat, recreation, and road improvements.
Watershed managementRoad managementRecreation managementForest productsMinerals and geologyVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
08/08/2016
Objection Period Start
01/06/2017
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Deer Ridge Integrated Resource Project Decision Notice and FONSI | Decision Signed Date: 04/21/2017 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Saco Ranger District · updated 7/18/2017
Doublehead Mountain and vicinity (NH State Highway 16B/FS Road 324), Jackson, NH · Carroll, New Hampshire
Construct a new parking lot for Doublehead cabin visitors and ski trail users. Construct approximately 0.5 miles of new trail to connect the proposed parking lot to the ski trail. Decommission New Path hiking trail, approximately 1.4 miles.
Recreation management
Comment Period
08/08/2016
Objection Period Start
10/26/2016
Decision
12/2016 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Doublehead Recreation Management Project | Decision Signed Date: 12/29/2016 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 2/22/2017
Jigger Johnson Campground · Carroll, New Hampshire
Silviculturally treat vegetation in Jigger Johnson campground to enhance recreation experience and stand resiliency.
Vegetation management (other than forest products)Forest productsRecreation management
Decision
01/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 2/22/2017
Town of Carroll, Coos County, New Hampshire · Coos, New Hampshire
The proposed action includes: repaving Zealand Road, addressing the failing water system at Sugarloaf I, upgrading both host sites (water, sewer, and power), and provide pressurized potable water at Sugarloaf II.
Facility management
Decision
02/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance; Road Maintenance |
| Letter to File Sugarloaf CG Improvement and Zealand Road Paving | Decision Signed Date: 02/21/2017 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 9/15/2016
Backcountry facilities operated by AMC · Coos; Grafton, New Hampshire
Re-issue permits for the existing backcountry facilities (shelters and tentsites) currently operated by the Appalachian Mountain Club. No additional use or increases in capacity are proposed as part of this project.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| AMC Backcountry Shelter Special Use Permit Renewal | Decision Signed Date: 09/15/2016 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 8/25/2016
Ellsworth · Grafton, New Hampshire
The Bruhawachet Sno-Trackers Snowmobile Club is proposing to re-route and upgrade a trail to 1) address safety concerns by eliminating a 90-degree turn and providing consistent trail width and 2) to improve the connectivity of the trail network.
Recreation management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| North Trail Snowmobile Trail Reroute and Upgrade | Decision Signed Date: 08/24/2016 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 8/10/2016
Tripoli Road, Mack Brook Road and Hix Mountain Spur Road between Exit 31 on I-93 and the town of Waterville Valley. · Grafton, New Hampshire
Relocation and redesign of all of the campsites along Tripoli Road to sites along adjacent spur roads to mitigate safety and resource concerns. Removal of hazard trees along Tripoli Road and spur roads to address safety concerns.
Facility managementWatershed managementRecreation management
Comment Period
02/17/2016
Objection Period Start
04/04/2016
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Species Habitat Improvements; Heritage Resource Management; Road Maintenance; Road Improvements/Construction; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 8/5/2016
Guyot Campsite. · Grafton, New Hampshire
The Guyot Campsite Reconfiguration Project would repair and rehabilitate the Guyot Shelter, address high levels of visitor use and the associated impacts, and remove structures from the Pemigewasset Wilderness.
Recreation managementFacility management
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Wilderness Management |
| Guyot Campsite Reconfiguration Project Letter to File | Decision Signed Date: 07/12/2016 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · White Mountain National Forest All Units · updated 7/15/2016
Carr Mountain, Mount Cabot, Mount Carrigain, and Wildcat Mountain. Will remove Milan repeater. · Carroll; Coos; Grafton, New Hampshire
Install 3 new radio repeaters and relocate and enhance 1 existing repeater to increase FS radio coverage on the WMNF where good coverage is lacking and allow for Forestwide communication; includes clearing trees for helicopter use and new sites.
Facility management
Comment Period
08/06/2014
Objection Period Start
03/06/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction |
| Radio Improvement Project Decision Notice and FONSI | Decision Signed Date: 05/18/2015 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 7/7/2016
Mount Washington · Coos, New Hampshire
Manually remove dandelions from the alpine zone on Mt. Washington for up to 5 years. Removal could occur at currently known and yet-to-be-discovered sites in Wilderness, Alpine Garden RNA, and the alpine zone management area.
Wildlife, fish, rare plants
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments |
| Invasive dandelion removal in the alpine zone Decision Memo | Decision Signed Date: 07/05/2016 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 6/28/2016
Jackson Ski Touring Foundation, Jackson, NH · Carroll, New Hampshire
Jackson Ski Touring Foundation proposal to decommission 0.6 miles of the Hall Trail and construct a safer, more sustainable connector (0.5 mile) to the Maple Mountain trail. 0.3 miles of new trail will be on an old skid road; 0.2 will be new trail.
Special use managementRecreation management
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Hall Mountain to Maple Mountain XC Ski Trail Connector | Decision Signed Date: 06/16/2016 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 5/20/2016
Towns of Bath, Easton and Landaff, Grafton County, NH · Grafton, New Hampshire
An integrated resource project designed to move the Wild Ammonoosuc North Habitat Mgt Unit (HMU) toward desired conditions through timber, wildlife habitat, recreation, fisheries and aquatic management, road improvements and decommissioning.
Forest productsVegetation management (other than forest products)Recreation managementWildlife, fish, rare plantsWatershed managementRoad management
Comment Period
11/06/2015
Objection Period Start
03/09/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Bowen Brook Integrated Resource Management Project | Decision Signed Date: 05/20/2016 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 5/12/2016
Libby Road in Lancaster, NH · Coos, New Hampshire
Road maintenance on approx. 300' of Libby Road, starting at Gore Road junction. Includes adding gravel to road and existing parking area, restoring drainage structures, and trimming encroaching vegetation.
Road management
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 5/10/2016
The dam is on Loon Pond west of Loon Mountain Ski Area in the town of Lincoln, NH. · Grafton, New Hampshire
The proposal is to issue a 20-year special use permit to provide the Town of Lincoln access to the Loon Pond Dam. The town owns the dam and needs access to reconstruct it in response to NHDES letter of deficiency and to maintain it into the future.
Watershed managementSpecial use management
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Harzardous Waste Compliance Actions; Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · White Mountain National Forest All Units · updated 4/19/2016
White Mountain National Forest · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
Update Monitoring Plan to be consistent with 2012 Planning Rule. Will result in Administrative Change to Forest Plan and is NOT a NEPA decision. NEPA project webpage used to increase visibility for public convenience. Comment period closes 3/31/2016.
Land management planning
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Plan Amendment |
| Administrative Change 13 | Decision Signed Date: 04/14/2016 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 3/29/2016
Town of Randolph, Coos County, New Hampshire: 238 acres of NFS land in Compartment 31, stands 4, 45, and 46. · Coos, New Hampshire
Renew the expired 5 year special use permit that authorizes maple syrup tapping on 238 acres of NFS land. The permit expired in June, 2013.
Special use management
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 2/22/2016
Mt. Stanton Trail, Town of Bartlett · Carroll, New Hampshire
Removal of an underutilized structure which is in need of significant repair
Recreation management
Scoping Start
02/2016 (Estimated)
Decision
06/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 12/17/2015
Dandiview, Suren Road and Birch Hill neighborhoods in North Conway, NH · Carroll, New Hampshire
Thin and remove small trees and shrubs to create a 40-70 foot wide shaded fuelbreak on NFS lands within the Wildland Urban Interface (WUI) located adjacent to the Birch Hill, Suren and Dandiview subdivisions in North Conway, NH.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Decision
12/2015 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 11/3/2015
Bethlehem, NH, Grafton County · Coos, New Hampshire
Relocate the existing snowmobile trail off of private land onto Forest Service lands to address private land owner concerns and eliminate safety concerns associated with the current trail location.
Recreation management
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 11/3/2015
Existing powerline corridor near Route 302 from Twin Mountain to the Mt. Washington Hotel. · Grafton, New Hampshire
Issue a permit to Time Warner Cable for fiber optic cable to provide connectivity on the north side of Crawford Notch (Twin Mountain to Mount Washington Hotel). Cable will be attached to existing utility poles under special use authorization to PSNH
Special use management
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Route 302 Fiber Optic Cable Project | Decision Signed Date: 10/03/2015 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 10/14/2015
Gray Knob, Crag Camp, Log Cabin, and the Perch shelters · Oxford, Maine
Renew for 10 years the permit authorizing the Randolph Mountain Club to utilize approximately 9 acres of NFS land for the purpose of occupying and maintaining four shelters and associated facilities: Gray Knob, Crag Camp, Log Cabin, and the Perch.
Special use managementFacility management
Decision
10/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 10/2/2015
Androscoggin Ranger Station, Gorham, NH · Coos, New Hampshire
Construct a loop hiking trail of ~1 mile from the Androscoggin Ranger Station, on the Fifth Hole Trail to beaver ponds, then parallel to the river back to the office. For employees and visitors, and for conservation education programs.
Recreation management
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Androscoggin Ranger District Education and Wellness Trail DM | Decision Signed Date: 09/23/2015 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/11/2015
Bog Pond Trail in Lincoln, NH · Grafton, New Hampshire
Reconstruct approximately 0.25 miles of the Bog Pond Snowmobile Trail so that its crossing of Harvard Brook is relocated to a more sustainable location that better protects soil and water resources.
Watershed managementRecreation management
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Watershed Improvements |
| Bog Pond Snowmobile Bridge Project | Decision Signed Date: 09/09/2015 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/11/2015
Carroll and Jefferson, NH · Coos, New Hampshire
Relocate trail to a more stable location to provide access from Mill Brook Connector north through Agnew State Forest to Red Brook Rd. New location includes no new bridges, removal of one old bridge on Appleby Bk., & decomm. of unsustainable trails.
Recreation management
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Mill Brook Connector Snowmobile Trail Maintenance and Relocation | Decision Signed Date: 09/09/2015 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Androscoggin Ranger District · updated 6/22/2015
Glen Ellis Falls Day Use Area · Coos, New Hampshire
This project proposes to repair many of the facilities--including the access road, parking, picnic sites, trails, signage and toilets--at this popular day use area.
Facility managementHeritage resource managementRecreation managementWatershed management
Comment Period
10/20/2011
Objection Period Start
02/23/2015
Decision
05/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Heritage Resource Management |
| Glen Ellis Falls Site Improvement Project Decision Notice and FONSI | Decision Signed Date: 05/15/2015 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 6/22/2015
The trails current location runs through Bartlett Experimental Forest's administrative site, and a new location is needed to connect the trail to the Town of Bartlett.. · Carroll, New Hampshire
Relocate the existing snowmobile trail to the edge of the Forest Service administrative site or off the site to a private land location to eliminate safety concerns associated with the current trail location that bisects the administrative site.
Recreation management
Scoping Start
07/2014 (Estimated)
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 6/22/2015
The proposed project includes portions of trails located in the Wild River Valley on the north side of Evans Notch. None of the proposals are in the Wild River Wilderness. · Coos, New Hampshire
Repair Highwater Trail, relocate 6 small sections (~ 0.5 miles total) adjacent to Wild River damaged during Tropical Storms Irene and Sandy. Future analysis will address the Moriah Brook Trail bridge over the Wild River damaged by these storms.
Recreation management
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Wild River Valley Trails Repair Project | Decision Signed Date: 03/16/2015 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 6/18/2015
Three snowfields located on NFS lands near the summit of Mount Washington · Coos, New Hampshire
Manually remove invasive dandelions from three snowbeds located near the summit of Mount Washington. Each infested site is estimated at less than 0.1 acres in size.
Wildlife, fish, rare plants
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments |
| Mount Washington Dandelion Removal Project | Decision Signed Date: 06/11/2015 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 6/11/2015
Waterville Valley Resort, Waterville, Valley, NH · Grafton, New Hampshire
Removal of the World Cup Triple fixed grip chair lift at the Waterville Valley resort and its relocation on Green Peak in the location approved in the original Green Peak EA for a detachable high-speed quad.
Special use managementRecreation management
Comment Period
12/01/2014
Objection Period Start
02/12/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Green Peak Expansion Supplement Decision Notice and FONSI | Decision Signed Date: 06/01/2015 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pemigewasset Ranger District · updated 2/23/2015
Town of Rumney · Grafton, New Hampshire
Proposal is to create a new trail to access crags, establish a trail system, and eliminate environmental damages caused by over use of the area.
Recreation management
Comment Period
06/01/2009
Decision
10/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Dispersed Recreation Mgmt. |
| Rumney Rocks Project | Decision Signed Date: 10/05/2009 Legal Notice Date: 10/09/2009 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 2/10/2015
Kilkenny tract, informal trails along the Bog Dam Loop Road (FR 15), City of Berlin, Coos COunty, New Hampshire. · Coos, New Hampshire
Renew the existing 5 year permit. The permit authorizes use of several informal walking trails, pre-approved brushing, and the authorization to hold competitive grouse and woodcock timed hunting events in September and October of each year.
Special use management
Decision
01/2015 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 12/31/2014
Forest Road 3314, Mason Township, Oxford County, Maine · Oxford, Maine
Issue a new special use permit to CMP for a period of 30 years. CMP proposes to install utility poles and overhead electrical lines along 1,400 feet of FR 3314 to a private inholding and residence.
Special use management
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 12/31/2014
Forest Roads 65, 65A and 65B; Town of Stark, NH · Coos, New Hampshire
The purpose of This project is to renew the existing permit for a 5 year period. The permit authorizes the road association use of Forest Roads 65, 65A and 65B to perform annual routine maintenance and snow plowing for safe public access.
Special use management
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| South Pond Rd. Assoc. Special Use Permit Renewal Decision Memo | Decision Signed Date: 10/24/2014 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 12/9/2014
Former site of Campton Group Campground on the south side of Route 49 in Campton and Thornton, NH. · Grafton, New Hampshire
Repair some facilities at the former Campton Group Campground so it will function as a day use area.
Watershed managementFacility managementRecreation management
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Campton Day Use Area Letter to the File | Decision Signed Date: 09/24/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 12/9/2014
Pemigewasset Ranger District, White Mountain National Forest. Town of Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire
Installation of a prefabricated concrete communication structure and lease space to NH Electric Coop (NHEC) at the existing Mt. Tecumseh communication site.
Facility management
Decision
10/2011 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | US Tract 50F; |
Decision Memo · Pemigewasset Ranger District · updated 12/9/2014
Mt. Tecumseh · Grafton, New Hampshire
Re-issue a 30-year permit/lease for the Mt. Tecumseh Communication Site to replace the existing permit, which expires in 12/2014, with no changes proposed to the existing communication site or operations of the site.
Special use management
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Mt Tecumseh Communication Site Lease Reissuance Project Decision Memo | Decision Signed Date: 12/05/2014 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/25/2014
Waterville Valley Ski Area · Grafton, New Hampshire
Install 8 snowmaking fan guns and 2 transformers along World Cup trail. All items would be placed on pre-cast concrete pads. A few trees would be cut at one transformer and some blasting may occur. Power and water lines would be placed in trench.
Recreation managementSpecial use management
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Waterville Valley Fan Gun and Half-pipe Decision memo | Decision Signed Date: 08/01/2014 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/25/2014
Waterville Valley Ski Area · Grafton, New Hampshire
Remove the half pipe on Exhibition trail, restoring trail to freestyle terrain. Lower the walls, bring the trail tread back toward grade level, and use extra fill from walls to form three small landings for other terrain features.
Special use managementRecreation management
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Waterville Valley Fan Gun and Half-pipe Decision Memo | Decision Signed Date: 08/01/2014 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 9/24/2014
Within the Waterville Valley Ski Resort permit boundaries, Waterville, NH · Grafton, New Hampshire
Issue a permit to Time Warner Cable Northeast LLC allowing them to extend fiber optic cable service to the existing wireless communication site on Mt. Tecumseh, including installing buried conduit under approx. 2,000%u2019 of ski trails.
Special use management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Time Warner Waterville Valley Fiber Optic Cable Decision Memo | Decision Signed Date: 07/31/2014 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 7/29/2014
Lower Meserve Brook , Jackson, NH · Carroll, New Hampshire
Restoration of aquatic and riparian habitat in and adjacent to Lower Meserve Brook
Watershed managementWildlife, fish, rare plants
Decision
07/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Meserve Brook Watershed Restoration Project | Decision Signed Date: 07/17/2014 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Jackson Township, Carroll County, New Hampshire |
Environmental Assessment · Pemigewasset Ranger District · updated 7/24/2014
Rumney Rocks Climbing Area, Buffalo Road, Rumney, NH · Grafton, New Hampshire
Update Environmental Assessment to include rock removal for trail construction by either mechanical means or controlled blasting. Other trail work was covered in 2009 decision. Also adds a permanent toilet adjacent to the Main Cliff parking area.
Recreation management
Comment Period
06/13/2013
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Supplemental Rumney Rocks Management Project Decision Notice & FONSI | Decision Signed Date: 07/23/2014 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 7/22/2014
Pond of Safety, Randolph, NH · Coos, New Hampshire
Replace user created trail from designated parking lot to canoe launch with accessible trail along an existing road prism and harden shore using riprap to limit erosion. May include a small (3' square) landing to allow easier canoe access.
Recreation management
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Pond of Safety Accessible Trail Decision memo | Decision Signed Date: 07/17/2014 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Saco Ranger District · updated 5/5/2014
Sections of Dry River Trail above the footbridge, Rocky Branch Trail between Shelters 1 and 2, and intermittent sections of Isolation (west) Trail. Rocky Shelter 2 is near the jcn. of Isolation Trail. · Carroll; Coos, New Hampshire
Sections of the Dry River Trail, Rocky Branch Trail and Isolation Trail in the Presi-Dry Wilderness were damaged by Hurricane Irene and need repair or a nearby relocation. Rocky Branch Shelter 2 is to be decommissioned and tent sites designated.
Recreation management
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Wilderness Management |
| Presidential Range-Dry River Wilderness Area Trails Project | Decision Signed Date: 04/29/2014 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Cutts Grant and Sargents Purchase in Coos County, NH, and Jackson in Carroll County, NH |
Decision Memo · Pemigewasset Ranger District · updated 5/5/2014
In the Town of Waterville Valley, NH extending from West Branch Road to the ski area and up to Schwendi Hut · Grafton, New Hampshire
Issue a 30-year permit to Time Warner Cable for existing fiber optic cable formerly under special use permit in the Town of Waterville Valley, NH
Special use management
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Androscoggin Ranger District · updated 4/8/2014
Forest Road 3314, Mason Township, Oxford County, Maine · Coos, New Hampshire
Installation of overhead electrical lines along 1,400 feet of Forest Road 3314 to a private residence and inholding.
Special use management
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 3/28/2014
For multiple locations in the Town of Thornton, NH including access off Route 49 and Upper Mad River Road · Grafton, New Hampshire
Issue permits for access to private residences in the Town of Thornton that were formerly under special use authorization but permits expired or property changed owners
Special use management
Scoping Start
02/2014 (Estimated)
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Saco Ranger District · updated 3/27/2014
Harts Location, Lots 55, 58, 60 and 65, adjacent to State Highway 302, in "Notchland". · Carroll, New Hampshire
Issue permit to allow private landowner to clear his undeveloped ROW across NFS land and construct short skid trail on NF from the ROW corridor to his landing location to reduce resource impacts from skidding and eliminate impacts to Davis Path Trail
Forest productsFuels managementWatershed managementSpecial use management
Decision
04/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 12/31/2013
Osceola Trailhead in Waterville Valley, NH · Grafton, New Hampshire
This high use site has known human waste issues. As a temporary measure, a portable toilet is currently on site. A permanent toilet is a long-term solution to address high use and existing human waste concerns.
Recreation management
Decision
12/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Decision to Implement Osceola Trailhead Toilet Installation | Decision Signed Date: 12/30/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pemigewasset Ranger District · updated 12/31/2013
Towns of Ellsworth and Warren, NH · Grafton, New Hampshire
Relocate part of the Three Ponds snowmobile trail to increase rider safety and decrease impacts on wetlands
Recreation management
Comment Period
09/03/2013
Decision
11/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Three Ponds Area Trail Relocation Project Decision Memo | Decision Signed Date: 11/20/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Saco Ranger District · updated 9/12/2013
Town of Chatham, Carroll County, New Hampshire · Carroll, New Hampshire
An integrated resource management project that proposes vegetation management to improve wildlife habitat and forest health conditions, as well as recreation and transportation system improvements.
Road managementRecreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)
Comment Period
06/11/2013
Decision
09/2013 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Androscoggin Ranger District · updated 8/21/2013
Godfrey Dam · Coos, New Hampshire
Update special use permit to allow installation of a 9-panel solar array on a single pole mount that will be placed on a 6' by 6' concrete pad. Array would be placed adjacent to an existing storage shed at the Godfrey Dam site.
Special use management
Comment Period
06/14/2013
Decision
08/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Brelin Water Works Godfrey Dam Solar Panel Installation Project DM | Decision Signed Date: 08/21/2013 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · Androscoggin Ranger District · updated 8/1/2013
Along Forest Road 752 in Batchelders Grant, Maine · Oxford, Maine
Stump two existing permanent wildlife openings on FR 752 to allow these areas to be maintained in an open, brushy condition by mowing. Stumps would be removed with an excavator and buried onsite. One opening is 4 acres; the other is 5 acres.
Wildlife, fish, rare plants
Comment Period
02/14/2013
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Bull Brook Wildlife Opening Stumping Project Decision Memo | Decision Signed Date: 07/31/2013 Legal Notice Date: 08/01/2013 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 7/9/2013
Lincoln Woods Trail along the East Branch of the Pemi River · Grafton, New Hampshire
Realign trail away from eroding river bank, raising the trail tread in this location, and install a more permanent barrier between the trail and unstable slope to improve user safety. Identify way to protect trail & historic culvert farther up trail.
Watershed managementRecreation management
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Lincoln Woods Trail Repair Project--Letter to File | Decision Signed Date: 07/07/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 6/28/2013
Near the Ammonoosuc Ravine Trail and Lakes of the Clouds Hut on the southern slope of Mt. Washington in the alpine zone · Coos, New Hampshire
This project proposes to move the propane rack associated with the Appalachian Mountain Club's Lakes of the Clouds Hut to a location that is less visible to the public. This will better conceal the rack and improve visual aesthetics of the area.
Recreation managementSpecial use management
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| AMC Hut Operating Plan approval letter | Decision Signed Date: 04/08/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Androscoggin Ranger District · updated 6/26/2013
19 Mile Brook Trail · Coos, New Hampshire
Two reroutes totaling ~1100' to put trail above flood height; may include rock steps and waterbars. Replace washed out bridge over an unnamed tributary to 19 Mile Brook. Removal of old bridge remnants and rehab old trail tread.
Recreation management
Comment Period
02/25/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| 19 Mile Brook Trail Relocation Decision memo | Decision Signed Date: 06/20/2013 Legal Notice Date: 06/21/2013 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Green's Grant, NH |
Environmental Assessment · Androscoggin Ranger District · updated 6/25/2013
Wild River Road (Forest Road 12) · Oxford, Maine
Remove hazard trees and improve forest stand conditions along 6.3 miles of the Wild River Road (Forest Road 12). Harvest timber within a designated roadside risk management zone of 100 feet on either side of Wild River Road.
Vegetation management (other than forest products)Forest productsRoad management
Scoping Start
07/2013 (Estimated)
Comment Period
08/2013 (Estimated)
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Maintenance; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
| Legal Land Description | Batchelders Grant, Oxford County, Maine |
Environmental Assessment · Pemigewasset Ranger District · updated 6/20/2013
South of Greeley Ponds in the towns of Waterville Valley and Livermore, NH · Grafton, New Hampshire
This project will address damage to the hiking trail network in the greater Greeley Ponds and Flume Brook areas from Tropical Storm Irene in August 2011.
Recreation managementWatershed management
Comment Period
01/02/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Watershed Improvements |
| Greeley Ponds and Flume Brook Trail Repair Project | Decision Signed Date: 05/31/2013 Legal Notice Date: 06/10/2013 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Environmental Assessment · Saco Ranger District · updated 6/18/2013
Slippery Brook Road, also known as Town Hall Road, in Jackson, NH. The project is on Forest Road 17 approximately 0.4 miles below the junction with Forest Road 38. · Carroll, New Hampshire
Reconstruct a 300 foot section of Slippery Brook Road and its fill slope, along with armoring the base of the slope at its interface with Slippery Brook, to prevent further damage. Project area is approximately 2.5 acres.
Road management
Comment Period
04/16/2013
Decision
05/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Improvements/Construction |
| Slippery Brook Road Repair Project | Decision Signed Date: 05/31/2013 Legal Notice Date: 06/05/2013 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · White Mountain National Forest All Units · updated 5/24/2013
Across the White Mountain National Forest · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
In accordance with changes in national policy, all Outfitter & Guide permits (currently 1 year temporary permits on the WMNF) will be issued as 10 year permits. Operating plans and proposed itineraries will still require annual Forest approval.
Recreation managementSpecial use management
Comment Period
02/14/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Outfitter & Guide Ten Year Special Use Permits Decision Memo | Decision Signed Date: 05/17/2013 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
Decision Memo · Androscoggin Ranger District · updated 3/21/2013
Pinkhams Grant & Sargents Purchase · Coos, New Hampshire
Replace 5 bridges in the Cutler River Drainage identified as undersized and damaged. All to be replaced in same locations. Bridges allow access to Tuckerman and Huntington Ravines by the general public and Mount Washington Avalanche Center staff
Recreation management
Decision
03/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Culter River Bridges Letter to the File | Decision Signed Date: 03/08/2013 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · White Mountain National Forest All Units · updated 3/11/2013
Land to become WMNF: approximately 75 acres adjacent to NFS lands on Bartlett Mt in Bartlett, NH ; Land to become SPNHF: approximately 100 acres within Jericho Mt. State Park in Berlin, NH · Carroll; Coos, New Hampshire
Land exchange: an approximately 100 acre WMNF parcel in Berlin, NH would become Society for Protection of NH Forests (Forest Society) property and an approximately 75 acre Forest Society parcel in Bartlett, NH would become part of the WMNF.
Land ownership management
Decision
03/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Bartlett Mountain Land Exchange Letter to File | Decision Signed Date: 03/11/2013 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
Environmental Assessment · Pemigewasset Ranger District · updated 2/15/2013
Towns of Benton, Easton, Woodstock and Landaff, NH · Grafton, New Hampshire
This project proposes vegetation management and improvements to wildlife habitat, recreation and watershed resources.
Fuels managementVegetation management (other than forest products)Watershed managementRoad managementForest productsRecreation management
Comment Period
10/31/2012
Decision
02/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Road Maintenance; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 1/23/2013
Waterville Valley · Grafton, New Hampshire
Special use permit to allow Town of Waterville Valley to install a municipal water supply well, fence with locked gate, electrical service with instrumentation and controls, water transmission main and electrical service from well to WMNF boundary.
Special use management
Comment Period
08/27/2012
Decision
01/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Waterville Valley Municipal Water Well Project Decision Memo | Decision Signed Date: 01/18/2013 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
Environmental Assessment · Pemigewasset Ranger District · updated 12/19/2012
Eastside Road at Lincoln Woods Visitor Center · Grafton, New Hampshire
Repair damage from Tropical Storm Irene including replacing culverts, relocating approx. 0.5 mile or road/trail away from the river and decommissioning existing segment, replacing large culvert that washed out with a bridge, and other maintenance.
Recreation managementRoad management
Comment Period
07/30/2012
Decision
12/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Road Maintenance |
| Eastside Road and Trail Repair Project Decision Notice and FONSI | Decision Signed Date: 12/19/2012 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Saco Ranger District · updated 9/24/2012
Hart's Location, along the west bank fo the Saco River, a distince of 250 feet. · Carroll, New Hampshire
The Town of Hart's Location has applied for a permit to reconstruct and maintain a damaged rock berm that protects a campground infrastructure along Rt. 302. The decision is whether to issue a permit. FEMA and NH DOT are involved in providing funding
Special use management
Comment Period
08/10/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Facility Maintenance; Watershed Improvements |
| Hart's Location Saco River Embankment Repair Project | Decision Signed Date: 09/18/2012 Legal Notice Date: 09/21/2012 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Saco Ranger District · updated 6/5/2012
NH State Route 302, Hart's Location, NH · Carroll, New Hampshire
Issuance of a Special Use Permit to New Hampshire Department of Transportation to construct a bridge crossing over the Sawyer River on State Route 302.
Road managementSpecial use management
Comment Period
05/01/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Road Maintenance; Road Improvements/Construction |
| Sawyer River Bridge Replacement Project | Decision Signed Date: 06/04/2012 Legal Notice Date: 06/05/2012 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 6/4/2012
Loon Mountain Resort, Lincoln, NH · Grafton, New Hampshire
Establish ropes course for various difficulty levels in an existing tree skiing area, including <0.5 acres of NF land. No ground disturbance or tree removal expected on NF; some limbs would be cut. Platforms attached via cables; no nails or anchors.
Special use managementRecreation management
Comment Period
04/12/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Loon Mountain Adventure Park Project Decision Memo | Decision Signed Date: 05/25/2012 Legal Notice Date: 06/04/2012 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · White Mountain National Forest All Units · updated 5/22/2012
23 campgrounds and day use sites across the White Mountain National Forest · Oxford; Carroll; Coos; Grafton, Maine; New Hampshire
Administrative action to reissue campground concessionaire permit for 23 WMNF campgrounds and day use sites beginning January 2013 because term on existing permit expires. Decision withdrawn due to national court ruling on CEs to allow 30-day comment
Special use managementRecreation management
Comment Period
04/17/2012
Decision
05/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Campground Concessionaire Special Use Permit Decision Memo | Decision Signed Date: 03/20/2012 (FS Withdrawn) |
| Campground Concessionaire Special Use Permit Decisionmemo | Decision Signed Date: 05/21/2012 |
| Forests | White Mountain National Forest |
| Districts | White Mountain National Forest All Units |
Decision Memo · Pemigewasset Ranger District · updated 3/6/2012
Waterville Valley Alpine Ski Area · Grafton, New Hampshire
Widen sections of three existing alpine ski trails to meet the specifications of FIS (International Ski Federation) and USSA (US Ski and Snowboard Association) to hold world class Super Giant Slalom race series.
Special use managementRecreation management
Decision
03/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Waterville Valley Super G Racecourse Project Decision Memo | Decision Signed Date: 03/05/2012 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Saco Ranger District · updated 11/28/2011
These trails are located in various locations throughout the Saco Ranger District. · Carroll; Grafton, New Hampshire
Decommission sections of up to seven trails that are impractical to maintain or duplicate access (Bog, Wildcat and Rob Brook, East Branch, Gleason,White Ledge and Church Pond). Would be accomplished with trail sign removal and concealing entrances.
Recreation management
Decision
11/2011 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Trail Decommission Project | Decision Signed Date: 11/07/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Saco Ranger District · updated 11/4/2011
Resolution shelter is located near the Davis Path and Mt. Parker Trail junction, between Mt. Resolution and Stairs Mountain · Coos, New Hampshire
Resolution Shelter, accessible from the Mt Parker Trail and Davis Path, is closed due to its deteriorated condition. The proposal is to dismantle the shelter, remove non-organic components, rehab the site and trail, and provide an alternate tentsite.
Recreation management
Decision
10/2011 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Resolution Shelter Removal and Site Plan Project | Decision Signed Date: 10/31/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 10/17/2011
Forest Service Tract 1028, Towns of Campton and Rumney, NH · Grafton, New Hampshire
Relocate approximately one mile of the Berry Farm Snowmobile Trail to the most appropriate route within an existing deeded right-of-way in the vicinity of Bald Mountain.
Recreation management
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Berry Farm Snowmobile Relocation Project | Decision Signed Date: 10/14/2011 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Saco Ranger District · updated 9/28/2011
NH State Route 302, Hart's Location, NH · Carroll, New Hampshire
Issuance of a Special Use Permit to New Hampshire Department of Transportation to construct and operate a temporary bridge crossing over the Sawyer River on State Route 302.
Special use management
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Sawyer River Temporary Bridge Crossing Project | Decision Signed Date: 09/02/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Saco Ranger District · updated 9/23/2011
The project site is on the existing trail template for 2.5 miles, with 1,822 feet of trail relocation. · Carroll, New Hampshire
To eliminate ~1500' of wet trail, would relocate ~1000' to Forest Road 5049 and construct ~800' of connecting trail. Remaining 2.5 miles would be maintained (improved drainage, grading, brushing, widening) and minor realignments to accomodate groomer
Recreation management
Decision
09/2011 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Bradley Brook Snowmobile Trail Relocation Decision Memo | Decision Signed Date: 09/22/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 9/23/2011
Along the Garfield Ridge Trail (part of the Appalachian Trail) near the summit of Mt. Garfield · Grafton, New Hampshire
The Garfield Shelter is in poor condition and needs replacement. We propose to replace it with a similar Adirondack-style shelter on the existing footprint.
Recreation management
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Garfield Ridge Shelter Reconstruction Project | Decision Signed Date: 09/14/2011 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 9/23/2011
From Route 302 in the town of Carroll, NH, south along Zealand Road to Sugarloaf I and II Campgrounds · Coos, New Hampshire
Bring electric power into Zealand Road to install electric hook-ups at Zealand Campground, electric hookups for host sites at Sugarloaf I and II Campgrounds, and replace solar power system used to supply water at Sugarloaf I Campground.
Recreation management
Scoping Start
10/2011 (Estimated)
Decision
03/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Saco Ranger District · updated 8/4/2011
Trail section to be relocated is approximately one mile north of the trail origin on Green Hill Road, in Jackson, NH. · Carroll, New Hampshire
A 1000 foot section of the Ellis River Trail is proposed for relocation due to a slump. Use of this section of the trail is prohibited as of April 1, 2011. A trail relocation is needed to bypass that location.
Special use management
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Ellis River Nordic Trail Relocation Project Decision Memo | Decision Signed Date: 07/28/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Saco Ranger District · updated 8/3/2011
Located on the lower third of the Blueberry Ledge Trail · Carroll, New Hampshire
Two locations on the lower third of Blueberry Ledge Trail are to be relocated because they concentrate water and are causing soil erosion. Rehabilitation of the unneeded section of trail would occur.
Recreation management
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Blueberry Ledge Trail Relocation | Decision Signed Date: 07/25/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 6/30/2011
Waterville Valley Alpine Ski Area · Grafton, New Hampshire
Extend the existing World Cup T-Bar approximately 800 lineal feet upslope to the Slalom Start area in order to enable this lift to provide access to additional trails and skiable terrain.
Recreation management
Decision
06/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| World Cup T-Bar Extension Project Decision Memo | Decision Signed Date: 06/20/2011 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Saco Ranger District · updated 6/13/2011
Bartlett Experimental Forest · Carroll, New Hampshire
One proposed site for this national network is at the Bartlett Experimental Forest. The project decision is whether or not to issue a 10 year permit to install and operate a research tower, study plots, boardwalk, and associated facilities.
Special use management
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Neon Project | Decision Signed Date: 04/25/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 5/2/2011
Along the Base Road in the town of Crawfords Purchase, NH. · Coos, New Hampshire
Harvest a total of approximately 10 acres of blown down trees along the Base Road. The trees blew down during a wind event in the winter of 2009-2010.
Vegetation management (other than forest products)Fuels management
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Environmental Assessment · Saco Ranger District · updated 3/31/2011
Towns of Jackson and Chatham, Carroll County, NH · Carroll, New Hampshire
Relocation of the Switchback Snowmobile Trail, including construction/ reconstruction of approximately 4 miles of snowmobile trail and closure of approximately 3.5 miles of snowmobile trail on WMNF land. Previously listed on SOPA as Slippery Brook.
Recreation management
Comment Period
'/ (Estimated)
Implementation
'/ (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Environmental Assessment · Saco Ranger District · updated 1/10/2011
Town of Sandwich, Carroll County, New Hampshire · Carroll, New Hampshire
Relocation of approximately 2500 feet of trail from private property onto the White Mountain National Forest. This relocation will restore public access to the McCrillis Path.
Special area managementRecreation managementLand ownership management
Comment Period
07/07/2010
Decision
12/2010 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Wilderness Management |
| McCrillis Path Relocation Project Decision Notice and FONSI | Decision Signed Date: 12/23/2010 Legal Notice Date: 01/07/2011 |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 10/21/2010
Bridges are located in the towns of Woodstock (Boles Bk), Warren (Batchelder Bk), and Sandwich (Guinea Pond Trail). · Grafton, New Hampshire
Projects proposed by local snowmobile clubs to construct bridges across Boles Brook, a small section of railroad grade near Guinea Pond, and Batchelder Brook and two of its tributaries, all to mitigate safety and resource concerns.
Watershed managementRecreation management
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Batchelder Brook/Guinea Pond Snowmobile Bridge Projects | Decision Signed Date: 10/14/2010 |
| Boles Brook Snowmobile Bridge Project | Decision Signed Date: 10/18/2010 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 9/2/2010
The proposed relocation would begin approximately 2 1/2 miles up the Gale River Trail from the trailhead on the Gale River Loop Road. · Grafton, New Hampshire
This proposed relocation of the Gale River Trail would eliminate two trail crossings of the Gale River which are difficult during moderate or high water conditions. A bridge at one crossing location washed out in 2005 and has not been replaced.
Recreation management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Gale River Trail Relocation Project | Decision Signed Date: 08/17/2010 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Androscoggin Ranger District · updated 6/18/2010
Bog Dam Loop Road (FR 15) · Coos, New Hampshire
Replace up to 14 existing culverts on tributaries to the Upper Ammonoosuc River to improve passage for aquatic species.
Wildlife, fish, rare plantsWatershed management
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements |
| Decision Memo, Stream Crossing Restoration on the Bog Dam loop Road | Decision Signed Date: 06/08/2010 |
| Forests | White Mountain National Forest |
| Districts | Androscoggin Ranger District |
Decision Memo · Saco Ranger District · updated 6/17/2010
Town of Chatham, New Hampshire · Carroll, New Hampshire
The White Mountain National Forest is proposing a value for value land exchange in Carroll County, New Hampshire. The exchange involves 4 parcels, 2 federal and 2 non-federal. Three are in the Town of Chatham and one is in the Town of Bartlett
Land ownership managementLand acquisition
Decision
03/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | White Mountain National Forest |
| Districts | Saco Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 6/14/2010
Oliverian Brook watershed, primarily in and adjacent to the opening at the base of Owl's Head Cliff in Benton, NH. · Grafton, New Hampshire
Restoration of aquatic and riparian habitat in and adjacent to Oliverian Brook, including removal of fill previously dumped in side channel, removal of old bridge abutments, and rehabilitation of a portion of old Route 25.
Watershed management
Decision
06/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Oliverian Watershed Restoration Project | Decision Signed Date: 06/10/2010 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 6/9/2010
Swan's Way Trail, Waterville Valley Nordic Ski Area, Waterville Valley, NH · Grafton, New Hampshire
Reroute less than 500 feet of nordic ski trail around a wet area affected by nearby beaver activity.
Special use managementRecreation managementWatershed management
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Swan's Way Nordic Trail Relocation | Decision Signed Date: 06/08/2010 |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Decision Memo · Pemigewasset Ranger District · updated 5/19/2010
Eliza Brook Shelter is along the Appalachian Trail north of the Reel Brook Trail junction and south of South Kinsman peak in the town of Lincoln, NH. · Grafton, New Hampshire
Eliza Brook Shelter on the Appalachian Trail is deteriorating and needs replacement. This project would replace the shelter and move it further from Eliza Brook.
Special area managementRecreation management
Decision
05/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Special Area Management |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |
Environmental Assessment · Pemigewasset Ranger District · updated 3/4/2010
near Oliverian Pond, Town of Benton, Grafton County, NH · Grafton, New Hampshire
Integrated stewardship project. Goals include improvement of quality of timber stands, enhancement of wildlife habitat, mitigation of effects of past logging practices within recent Twin Oaks land acquisition, provide access and day use to Owls Head.
Recreation managementForest productsLand management planningVegetation management (other than forest products)
Comment Period
12/03/2009
Decision
03/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Stewardship Contract, Consolidated Appropriations Resolution Of 2003 |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction; Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | White Mountain National Forest |
| Districts | Pemigewasset Ranger District |