Decision Memo · Malheur National Forest All Units · updated 5/22/2025
2024 Falls Fire footprint · Grant; Harney, Oregon

The purpose of the project is to promote reforestation of burned areas with appropriate conifer species and promote restoration of appropriate hardwood and shrub species. The need was necessitated by the 2024 Falls and Telephone Fires.

Vegetation management (other than forest products)Watershed management
Scoping Start
04/15/2025
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Melissa Ward · melissa.ward@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Watershed Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Emigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 3/12/2025
Project is located on an unnamed intermittent tributary to Dads Creek, southwest of Dixie Butte. Access is by Hwy 26 -> FSR 2600098 -> FSR 2600265 · Grant, Oregon

The purpose of the proposed action is to reduce potential public safety hazards associated with abandoned mine features, restore impaired riparian and aquatic habitat, and improve water quality.

Watershed managementMinerals and geologySpecial use management
Scoping Start
03/25/2024
Decision
02/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Raidon Poe · Raidon.Poe@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up; Watershed Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Falls Cancelled
Environmental Assessment · Emigrant Creek Ranger District · updated 12/3/2024
Footprint of the Falls, Whiskey Mountain and Sand Fires of 2024 perimeter · Harney, Oregon

Post fire safety hazard tree mitigation along infrastructure including roads, and range improvements

Forest productsFuels management
Scoping Start
11/2024 (Estimated)
Comment Period
01/2025 (Estimated)
Objection Period Start
03/2025 (Estimated)
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Melissa Ward · melissa.ward@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Boundary Project Cancelled
Environmental Assessment · Emigrant Creek Ranger District · updated 9/20/2024
The Boundary project area on the Emigrant Creek Ranger District, Malheur National Forest. · Grant; Harney, Oregon

The overarching purpose and need for this project is to restore vegetation resilience to fire, drought, and insects and disease by moving stands towards historic structure and species composition.

Forest productsFuels managementWatershed managementWildlife, fish, rare plantsRoad managementVegetation management (other than forest products)
Scoping Start
12/20/2023
Comment Period
09/2024 (Estimated)
Objection Period Start
12/2024 (Estimated)
Decision
02/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Melissa Ward · melissa.ward@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 7/8/2024
Along Forest Road 16, at roughly 44.1909109, -118.4151718 · Grant, Oregon

Creating a corral to provide the permittee a better area to hold cattle, and reduce the amount of necessary cattle trailing, allowing the more efficient rangeland practices.

Grazing management
Scoping Start
04/02/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Frederick Hoeft · Frederick.Hoeft@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionS9 T16S R35E
Decision Memo · Blue Mountain Ranger District · updated 6/17/2024
Keeny Meadows. · Grant, Oregon

This project is to decommission the current NFS road 3940136 which accesses private property and install a private driveway. Doing so will reduce resource damage to wet soils and water resources in the area.

Watershed managementRoad managementSpecial use management
Scoping Start
11/06/2023
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Sean Levin-Pompetzki · Sean.Levin-Pompetzki@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Special Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 6/17/2024
North Murderers Creek Pasture within Fields Creek Allotment. · Grant, Oregon

The proposal is to create a corral in the Southeast corner of the North Murderers Creek Pasture which is in the Fields Creek allotment.

Grazing management
Scoping Start
11/06/2023
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Sean Levin-Pompetzki · Sean.Levin-Pompetzki@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 5/24/2024
Within the Big Meadow, Black Butte and Crockets Knob fire perimeters. · Grant; Harney, Oregon

The purpose of the project is to promote reforestation and restoration of appropriate conifer, hardwood and shrub species. The need was necessitated by the 2021 Big Meadow Fire, 2021 Black Butte Fire, and the 2022 Crockets Knob Fire.

Vegetation management (other than forest products)Watershed management
Scoping Start
03/25/2024
Decision
04/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Anna Petersen · Anna.Petersen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Watershed Improvements
Big Meadow, Black Butte, and Crockets Knob Reforestation and Revegetation PDecision Signed Date: 04/30/2024
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Emigrant Creek Ranger District; Prairie City Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 8/3/2023
Complete fiber route will run from the Izee, OR area to the Unity, OR area along roads and utility corridors across the Malheur and Wallowa Whitman National Forests. · Grant, Oregon

Adding fiber to existing conduit and insulation of new buried conduit and vaults.

Special use management
Scoping Start
02/24/2023
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
OTC 2023: Unity to IzeeDecision Signed Date: 08/01/2023
ForestsMalheur National Forest; Wallowa-Whitman National Forest
DistrictsBlue Mountain Ranger District; Whitman Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Prairie City Ranger District · updated 6/29/2023
Austin Junction · Grant, Oregon

Vegetation fuels reduction on about 110 acres around the Austin House and Oregon Department of Transportation maintenance facility at the junction of US Highway 26 and US Highway 7.

Fuels management
Scoping Start
01/31/2023
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Lori Stokes · lori.stokes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Austin Junction Wildfire Resiliency ProjectDecision Signed Date: 06/28/2023
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ochoco National Forest All Units · updated 2/1/2023
National Forests in Oregon, east of the Cascade Mountain Range. · Baker; Crook; Deschutes; Grant; Harney; Klamath; Lake; Malheur; Umatilla; Union; Wallowa; Asotin; Columbia; Garfield; Walla Walla, Oregon; Washington

The USFS will evaluate alternatives to the wildlife standard of the Eastside Screens that limits harvest of trees greater than 21 inches for the Umatilla, Wallowa-Whitman, Malheur, Ochoco, Deschutes, and Fremont-Winema National Forests.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
08/11/2020
Comment Period
08/11/2020
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsDeschutes National Forest; Fremont-Winema National Forest; Malheur National Forest; Ochoco National Forest; Umatilla National Forest; Wallowa-Whitman National Forest
DistrictsBend/Fort Rock Ranger District; Crescent Ranger District; Sisters Ranger District; Bly Ranger District; Lakeview Ranger District; Paisley Ranger District; Silver Lake Ranger District; Chiloquin Ranger District; Malheur National Forest All Units; Ochoco National Forest All Units; Umatilla National Forest All Units; Wallowa-Whitman National Forest All Units
Legal Land DescriptionNot Applicable
Cliff Knox Completed
Environmental Impact Statement · Prairie City Ranger District · updated 12/6/2022
Project area is 40,000 acres in size and is located about 30 miles southeast of Prairie City, Oregon. · Grant; Harney, Oregon

Vegetation management, wildlife habitat improvement, and watershed restoration activities including timber harvest and fuels treatments and associated road activities.

Road managementForest productsVegetation management (other than forest products)Wildlife, fish, rare plantsFuels managementWatershed management
NOI in Federal Register
07/20/2018
DEIS NOA in Federal Register
08/27/2021
FEIS NOA in Federal Register
06/08/2022
Objection Period Start
06/08/2022
Decision
12/2022 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
Lori Bailey · lori.bailey@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green); Watershed Improvements
Cliff Knox Project Final Record of DecisionDecision Signed Date: 12/02/2022
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 7/20/2022
Vance Creek area · Grant, Oregon

Permit request to explore for locatable minerals on the National Forest System Lands.

Minerals and geology
Scoping Start
06/27/2022
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Janet Plocharsky · janet.plocharsky@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT. 15 S., R 31 E., Section 3
Decision Memo · Blue Mountain Ranger District · updated 5/25/2022
Aldrich is south of highway 26 between Mt. Vernon and Dayville along the forest boundary. Beech runs along highway 395 and Beech creek. Dixie is north of highway 26, Dixie Creek area. · Grant, Oregon

Noncommercial thinning of conifers up to 9 inches with chainsaws. Priority will be stands on slopes greater than 35 percent and stands along forest boundary.

Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Scoping Start
03/02/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Lori Stokes · lori.stokes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 5/18/2022
Malheur National Forest including the 240,000 acres of Ochoco National Forest area managed by the Emigrant Creek Ranger District of the Malheur NF. · Baker; Crook; Grant; Harney; Malheur, Oregon

We propose amending the Malheur and portion of Ochoco National Forest Land and Resource Management Plan to add indaziflam to the list of approved herbicides for use as part of the integrated treatment toolbox for invasive plants.

Land management planning
Scoping Start
03/09/2022
Comment Period
04/06/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Janet Plocharsky · janet.plocharsky@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsMalheur National Forest
DistrictsMalheur National Forest All Units
Legal Land DescriptionNot Applicable
Seneca Fiber Completed
Decision Memo · Malheur National Forest All Units · updated 2/16/2022
Adjacent to US Highway 395 between Seneca and Canyon City. · Grant, Oregon

Application to install an aerial fiber optic cable to existing power pole structures within the existing powerline 40%u2019 right-of-way from Canyon City to Seneca. Five miles would be across national forest system lands.

Special use management
Scoping Start
05/11/2021
Decision
02/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 14 S, R 31 E WM
Decision Memo · Emigrant Creek Ranger District · updated 10/29/2021
Around the Forest Service boundary where private land borders, along a 200 foot buffer where previous treatments have not been completed. · Grant; Harney, Oregon

Reduce hazardous fuels adjacent to private property on the Forest Service boundary.

Fuels management
Scoping Start
08/11/2021
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Neighbor Wildfire Resiliency Decision MemoDecision Signed Date: 10/29/2021
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Crow Project Completed
Environmental Assessment · Emigrant Creek Ranger District · updated 7/20/2021
Located in Harney and Grant County, in the Emigrant Creek Watershed. · Harney, Oregon

Hazardous fuels reduction and associated activities including road maintenance and prescribed burning.

Vegetation management (other than forest products)Fuels management
Scoping Start
07/08/2020
Objection Period Start
03/24/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Decision Notice for the Crow Hazardous Fuel Reduction ProjectDecision Signed Date: 07/19/2021
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S R26E, T19S R27E, T20S R27E, T20S R28E
Ragged Ruby Completed
Environmental Impact Statement · Blue Mountain Ranger District · updated 7/14/2021
The planning area is located in Grant County approximately 9 miles north of Prairie City, Oregon. · Grant, Oregon

The project includes a suite of activities to restore forest resiliency and function, including: upland restoration activities; watershed, fisheries, and wildlife restoration; prescribed burning; road activities; and recreation system changes.

Recreation managementWatershed managementFuels managementVegetation management (other than forest products)Forest productsRoad managementWildlife, fish, rare plants
NOI in Federal Register
03/24/2017
DEIS NOA in Federal Register
11/02/2018
FEIS NOA in Federal Register
09/25/2019
Objection Period Start
09/25/2019
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Renee Hollowell · renee.hollowell@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest; Umatilla National Forest
DistrictsBlue Mountain Ranger District; North Fork John Day Ranger District
Legal Land DescriptionT10S, R33E, sec 7-10, 13, and 15-36; T10S, R34E, sec 9-24 and 27-33; T11S, R33E, sec 1-5, 9-15, and 23-26; and T11S, R34E, sec 5-9, 16-21, and 28-30, W.M.
Environmental Assessment · Blue Mountain Ranger District · updated 7/9/2021
Long Creek Pass, west side of US Highway 395. · Grant, Oregon

AT&T has applied for a special use authorization to construct and operate a FirstNet site on Long Creek Pass. Site would include a 195-foot tower with associated facilities for operation.

Facility managementSpecial use management
Scoping Start
05/26/2021
Comment Period
05/26/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Janet Plocharsky · janet.plocharsky@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 6/30/2021
Laycock Creek · Grant, Oregon

Hazardous fuels reduction on National Forest System lands adjacent to the Laycock Creek Firewise community.

Fuels managementWildlife, fish, rare plants
Scoping Start
06/18/2020
Decision
12/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Bethany Parker · bethany.parker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
Laycock Creek Firewise Project Decision MemoDecision Signed Date: 12/03/2020
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionTownship 14 south, Range 30 east, sections 22, 25 through 27, and 33 through 36
Decision Memo · Blue Mountain Ranger District · updated 6/24/2021
Aldrich Communication Site. · Grant, Oregon

Construction and operation of a 199 foot communications tower, communication facility building, generator, propane tank(s) and security fencing in support of the FirstNet Emergency Services Project.

Special use managementFacility management
Scoping Start
03/04/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionSection 11, Township 14 South, Range 28 East, Willamette Meridian.
Decision Memo · Malheur National Forest All Units · updated 6/17/2021
Parish Seed Orchard, Forest Service road 1600569 · Grant, Oregon

Construction and maintenance of a 40X60 foot pole style building and 20x20 foot parking area adjacent to the building.

Special use management
Scoping Start
03/03/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Roy Walker · rlwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionSection 21, T. 16 S., R.33 E., WM.
Decision Memo · Malheur National Forest All Units · updated 5/11/2021
Aldrich Mountain communication site · Grant, Oregon

Verizon Wireless to add 65' X 9' of new solar panels (15 panel sections) to the existing communication sites solar power system.

Special use management
Scoping Start
06/29/2020
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionSection 11, T. 14 S., R. 27 E., Willamette Meridian
Decision Memo · Blue Mountain Ranger District · updated 4/22/2021
Dixie Butte · Grant, Oregon

Approval of 20 year authorization of communication site use for Grant County and Oregon Department of Transportation. Upgrading and replacing existing solar roof panels.

Special use managementFacility management
Scoping Start
03/04/2021
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Facility Maintenance
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionSection 28, T.11S., R.34 E. Willamette Meridian
Decision Memo · Malheur National Forest All Units · updated 4/20/2021
South of Seneca and west of State Highway 395. · Grant, Oregon

Powerline maintenance thru the replacement of 8 wooden poles with ductile iron structures.

Special use management
Scoping Start
03/04/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Emigrant Creek Ranger District
Legal Land Descriptionsection 11, T17S, R31E, and section 35, T19S, R31E, WM.
Decision Memo · Malheur National Forest All Units · updated 4/20/2021
Starr Ridge to Fall Mountain · Grant, Oregon

Oregon rail Electric Cooperative (OTEC) to replace overhead line with buried line within existing corridor and road prism. Oregon Telephone Corporation will co-locate fiber conduit at the same time.

Special use management
Scoping Start
03/04/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionSections 6, 7, 8, 17, and 20, T. 15 S., R. 31 E., WM
Decision Memo · Prairie City Ranger District · updated 3/10/2021
T15 S, R 35.5 E, section 3. Subbasin: Upper Malheur North Fork Malheur River Watershed: Upper North Fork Malheur River Subwatershed: Swamp Creek/North Fork of the Malheur River · Baker; Grant, Oregon

Planting 41 acres of severely burned (greater than 90 percent mortality) general forest (Management Area 1 and 2) within the 2019 Cow Fire boundary with native western larch and ponderosa pine.

Vegetation management (other than forest products)
Scoping Start
02/04/2021
Decision
03/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Teresa Corning-Sevey · tcorningsevey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT15 S, R 35.5 E, section 3
Environmental Assessment · Emigrant Creek Ranger District · updated 1/13/2021
The South Silvies planning area is located about 22 miles north of Burns, Oregon and includes approximately 38,759 acres of National Forest System lands. · Grant; Harney, Oregon

Evaluation of livestock grazing on three existing allotments: Big Sage Hen, Bridge Creek, and Silvies.

Grazing management
Scoping Start
11/14/2018
Comment Period
05/20/2020
Objection Period Start
11/11/2020
Decision
01/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Big Mosquito Completed
Environmental Assessment · Blue Mountain Ranger District · updated 12/4/2020
Big Creek and Mosquito Creek sub-watersheds approximately 25 miles north of the City of John Day, Grant Co., OR. · Grant, Oregon

The Big Mosquito Project includes a suite of activities to restore forest resiliency, including silviculture and fuels treatments, riparian restoration, range water developments, recreation site development, and associated road activities.

Fuels managementForest productsWatershed managementRecreation managementWildlife, fish, rare plantsGrazing management
Scoping Start
03/26/2014
Comment Period
08/27/2014
Objection Period Start
04/08/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Sasha Fertig · sashafertig@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Road Maintenance; Road Improvements/Construction; Grazing Structural Improvements; Timber Sales (Green); Watershed Improvements
Big Mosquito Project Decision Notice and FONSIDecision Signed Date: 09/30/2015
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Emigrant Creek Ranger District · updated 11/19/2020
Gold Hill mine claim ORMC 176624 · Harney, Oregon

Allow the excavation of material from an existing mining trench and existing pit with the use of a 6,000 lb mini excavator, Polaris ranger, trommel and highbanker sluice box.

Minerals and geology
Scoping Start
11/08/2020
Decision
11/2020 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Blue Mountain Ranger District · updated 10/16/2020
Middle Fork John Day River · Grant, Oregon

Fuels reduction through precommercial thinning and prescribed burning; commercial thinning will also be considered.

Vegetation management (other than forest products)Fuels management
Scoping Start
06/19/2007
Objection Period Start
06/04/2008
Decision
07/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Lori Stokes · lstokes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (10)
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Balance Thinning and Fuels Reduction ProjectDecision Signed Date: 07/23/2008
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT.10S., R.33E., and T.11S., R.33E.
SodaBear Project Completed
Environmental Assessment · Prairie City Ranger District · updated 10/16/2020
Lower Bear, Middle Bear, and Soda Valley Subwatersheds near Seneca, Oregon · Grant; Harney, Oregon

Approximately 20,000 acres of thinning in timber stands to reduce fire hazard, insect and disease risk, improve old growth, identify / plan biomass stands, restore riparian aspen, restore mountain mahogany, and maintain wildlife habitat.

Fuels management
Scoping Start
08/31/2010
Objection Period Start
08/27/2011
Decision
01/2012 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
Daniel Hubbard · dhubbard02@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Soda Bear ProjectDecision Signed Date: 01/06/2012
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Emigrant Creek Ranger District
Damon Completed
Environmental Assessment · Blue Mountain Ranger District · updated 10/14/2020
Located on approximately 20,000 acres in Van Aspen and Shirttail Subwatersheds, near Seneca, Oregon. · Grant, Oregon

Thinning timber stands to reduce fire hazard, insect and disease risk, and enhance old-growth; treat slash with mechanical and prescribed; restore riparian and stream function; reduce road and weeds impacts; within the WUI of Seneca, OR.

Forest productsFuels management
Scoping Start
03/05/2009
Objection Period Start
03/17/2010
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Damon Wildland Urban Interface ProjectDecision Signed Date: 06/07/2010 Legal Notice Date: 06/09/2010
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Decision Memo · Emigrant Creek Ranger District · updated 8/31/2020
Two locations off 69 kV line to Crow Flat Guard Station and private property. · Harney, Oregon

Bury two existing overhead distribution lines for the reduction of fire start risk on ECRD.

Special use management
Scoping Start
08/19/2020
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT. 20 S., R. 31 E., Sections 13 and 23
Decision Memo · Emigrant Creek Ranger District · updated 6/9/2020
Located entirely on Emigrant Creek Ranger District, near Forest Road 15. · Grant; Harney, Oregon

Hazardous fuels reduction in areas that have been heavily impacted by insect and disease infestations creating residual hazardous fuels.

Fuels management
Scoping Start
05/06/2020
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Frost Wildfire Resiliency Project Decision MemoDecision Signed Date: 06/05/2020
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT 16 S R 33 E, T 16 S R 33.5 E, T 17 S R 32 E, T 17 S R 33 E, T 17 S R 33.5 E, T 18 S R 32 E, T 18 S R 33 E, T 18 S R 33.5 E, T 19 S R 32 E, T 19 S R 33 E, T 19 S R 33.5 E
Galena Completed
Environmental Impact Statement · Blue Mountain Ranger District · updated 6/5/2020
Located in the Little Boulder/Deerhorn and Vinegar subwatersheds. · Grant, Oregon

Reducing fire hazard and improving forest health at the landscape level.

Forest productsWatershed managementFuels managementVegetation management (other than forest products)Road management
NOI in Federal Register
03/12/2009
DEIS NOA in Federal Register
03/25/2011
FEIS NOA in Federal Register
09/10/2013
Decision
09/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Dave Halemeier · dhalemeier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
Galena Record of DecisionDecision Signed Date: 09/10/2013 Legal Notice Date: 09/18/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT10S, R34-35E; T11S, R34-35E; and T12S, R34-35E
Camp Lick Completed
Environmental Assessment · Blue Mountain Ranger District · updated 5/28/2020
The project planning area is located in Grant County approximately 10 miles northeast of John Day, Oregon. · Grant, Oregon

The Camp Lick Project includes a suite of activities to restore forest resiliency, including silviculture and fuels treatments, riparian restoration, range improvements, recreation site development, and associated road activities.

Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Scoping Start
05/04/2016
Comment Period
03/08/2017
Objection Period Start
08/23/2017
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Renee Hollowell · renee.hollowell@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityBiomass; Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Plan Amendment; Special Products Sales; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT.10 S., R.32 E., sec. 19-36; T.10 S., R.33 E., sec. 18, 19, and 30-32; T.11 S., R.32 E., sec. 1-36; T.11 S. R.33 E., sec. 4-10, 15-22, and 28-32; T.12 S., R.32 E., sec. 1-5 and 8-12, Willamette Mer.
Decision Memo · Emigrant Creek Ranger District · updated 4/7/2020
Located on Emigrant Creek Ranger District, West of Hwy 395, near Forest Road 31, centered near the Grant and Harney County line. · Grant; Harney, Oregon

Hazardous fuels reduction in areas that have been heavily impacted by insect and disease infestations creating residual hazardous fuels.

Fuels management
Scoping Start
02/12/2020
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Loco Wildfire Resiliency DecisionDecision Signed Date: 04/07/2020
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT 17 S R 30 E, T 17 S R 31 E, T 18 S R 29 E, T 18 S R 30 E, T 18 S R 31 E, T 19 S R 29 E, T 19 S R 30 E, T 19 S R 31 E
Environmental Assessment · Malheur National Forest All Units · updated 3/23/2020
Forest-wide · Baker; Crook; Grant; Harney, Oregon

Develop a consistent approach for identifying and implementing aquatic restoration projects across the Forest.

Wildlife, fish, rare plantsWatershed management
Scoping Start
01/17/2014
Comment Period
06/25/2014
Objection Period Start
08/06/2014
Decision
09/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Steven Namitz · smnamitz@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityWatershed Improvements
Decision Notice for Aquatic Restoration ProjectDecision Signed Date: 09/30/2014
ForestsMalheur National Forest
DistrictsMalheur National Forest All Units
Legal Land DescriptionNot Applicable
Gold Hill Mine Completed
Decision Memo · Emigrant Creek Ranger District · updated 3/4/2020
Gold Hill, Emigrant Creek Ranger District · Harney, Oregon

Allow the excavation of material from an existing mining trench and existing pit with the use of a 6,000 lb mini excavator, Polaris ranger, trommel and highbanker sluice box.

Minerals and geology
Scoping Start
12/11/2019
Decision
03/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Gold Hill Mining Claim Project Decision MemoDecision Signed Date: 03/04/2020
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNWSE of T18S, R31E, Section 30
Decision Memo · Prairie City Ranger District · updated 12/10/2019
Approximately 30 miles south of Prairie City, OR. · Grant, Oregon

Re-establishment of the viewing area from the Antelope Lookout in order to improve both wildfire detection capabilities, and the defensible space around the 36-acre administrative site.

Vegetation management (other than forest products)Facility management
Scoping Start
12/01/2014
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Spencer Ware · saware@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT170S, R350E, Section SE 1/4 of 33; and, T180S, R350E Section NE 1/4 of 4, Willamette Meridian; USGS Quad: Knox Mountain - A444118
Environmental Assessment · Blue Mountain Ranger District · updated 12/10/2019
Northwest corner of the 343 road and Old Highway 26 · Grant, Oregon

Creation of a seasonal snowpark to provide a safe recreation location for users. Access to a warming hut and washroom to enjoy winter recreational activities. Construction of a groomer shed for OSAA Groomer operations and maintenance.

Recreation management
Scoping Start
04/25/2012
Comment Period
11/21/2012
Decision
01/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
Blue Mountain Snow Park ProjectDecision Signed Date: 01/31/2013 Legal Notice Date: 02/06/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT.11S, R35.5E S01 NEofSW W.M.
Decision Memo · Malheur National Forest All Units · updated 12/10/2019
T.12 S., R.30 E., sec 6 NE1/4SW 1/4 Williamette Meridian. · Grant, Oregon

Request for new permit term for an existing private access road that accesses private inholding. The most recent 10-year permit was authorized in 2006.

Special use management
Scoping Start
06/12/2018
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT.12 S., R.30 E., sec 6 NE1/4SW 1/4 Williamette Meridian.
Decision Memo · Malheur National Forest All Units · updated 12/10/2019
This project is located approximately 8 miles south of John Day, Oregon and 6 miles south of Prairie City, Oregon on lands administered by the Malheur National Forest. · Grant, Oregon

This project will revegetate approximately 19,924 acres of stand replacement patches within the Canyon Creek Complex Fire that burned in 2015 on the Blue Mountain and Prairie City Ranger Districts.

Vegetation management (other than forest products)
Scoping Start
01/13/2016
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Hannah Smith · hannahksmith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Prairie City Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Emigrant Creek Ranger District · updated 12/10/2019
Central Malheur Allotment · Grant; Harney, Oregon

Authorization of grazing on the Central Malheur Allotment

Grazing management
Scoping Start
01/22/2014
Comment Period
07/16/2014
Objection Period Start
10/22/2014
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Decision Notice and FONSI for the Central Malheur Allotment EADecision Signed Date: 05/11/2015
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT.17S. R.33.5E. sections 25-27 and 35-36; T.17S. R.34E. sections 19-20 and 29-33; T.18S. R33.5E. sections 1-2 and 12; T18S. R34E. sections 3-10 and 15-18.
Decision Memo · Prairie City Ranger District · updated 12/10/2019
The project areas are located approximately 20-25 miles southeast of Prairie City, Oregon, in Upper North Fork, Malheur River watershed. Grant and Baker counties. · Baker; Grant, Oregon

Build, re-build and/or maintain approximately 30 miles of fencing to improve livestock management and distribution, protect critical bull trout aquatic habitat, enhance riparian areas and hardwoods, and enhance Monument Rock Wilderness values.

Wildlife, fish, rare plantsGrazing managementWatershed management
Scoping Start
11/26/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Susan Burton · sburton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Species Habitat Improvements; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements; Wilderness Management
Crane Creek - Elk Flat Fencing ProjectDecision Signed Date: 05/30/2014
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT15S R35½E Sec 33; T16S R35E Sec 4,5,9,16,17,19,20,21,22,26,27,28,29,30,31,32,33,34; T14S R35½E Sec 23,26,35,36; T14S R36E Sec 31; T15S R35½E, Sec. 1; T15S R36E, Sec. 5,6,7,8,18.
Decision Memo · Emigrant Creek Ranger District · updated 12/10/2019
Devine Ridge, T 20S, R 31E, Section 35 · Harney, Oregon

Fell trees that are interfering with radio path from Devine Ridge to Fall Mtn communication sites.

Facility management
Scoping Start
06/11/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
Decision Memo Devine Ridge Communication site Maintenance ProjectDecision Signed Date: 07/09/2014
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Emigrant Creek Ranger District · updated 12/10/2019
Coffeepot, Cow, and Rattlesnake subwatersheds · Harney, Oregon

Remove hazardous fuels from the Rattlesnake project area.

Vegetation management (other than forest products)Fuels management
Scoping Start
11/28/2018
Objection Period Start
06/12/2019
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Rattlesnake Hazardous Fuels Reduction Project Decision Notice FONSIDecision Signed Date: 09/13/2019
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionSee attached map.
Decision Memo · Emigrant Creek Ranger District · updated 12/10/2019
Schurtz Creek, Story-Fry Allotment · Harney, Oregon

Construct up to 1/2 mile of 4-strand barbed wire fence to create a 4-acre grazing enclosure and thin juniper and conifers up to 20.9 inches dbh. Slash would be piled/burned, lopped/scattered, felled into creek, or used as a livestock barrier.

Wildlife, fish, rare plantsGrazing managementVegetation management (other than forest products)
Scoping Start
02/27/2013
Comment Period
02/27/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Species Habitat Improvements
Decision Memo Schurtz Creek Story Fry Riparian Restoration ProjectDecision Signed Date: 06/07/2013 Legal Notice Date: 06/26/2013
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT 18 S, R 33 E, Section 23 and N1/2 of section 26
Soldier Project Completed
Decision Memo · Emigrant Creek Ranger District · updated 12/10/2019
Emigrant Creek Ranger District, Armstrong Canyon, Coffeepot Creek, Rattlesnake Creek, Cow Creek · Harney, Oregon

Reduce stocking in ponderosa pine dominated stands affected by pine butterfly defoliation, drought, and high populations of bark beetles.

Vegetation management (other than forest products)Watershed management
Scoping Start
09/13/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Soldier Project Decision MemoDecision Signed Date: 12/29/2017
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Prairie City Ranger District · updated 12/10/2019
15 miles southeast and of Prairie City and approximately 30 miles from the cities of John Day/Canyon City · Grant, Oregon

Reduce fire hazard near evacuation route for at-risk communities; reduce stand density to increase resilience to insect and disease; protect bull trout habitat; develop pre-fire suppression old-growth stand composition; protect scenic and roadless

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels management
Scoping Start
08/14/2015
Comment Period
12/21/2016
Objection Period Start
05/17/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Sarah Bush · sbush01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
Summit Creek Landscape Restoration ProjectDecision Signed Date: 09/28/2017
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Prairie City Ranger District · updated 12/10/2019
Project is located approximately 22 miles southeast of Prairie City, OR, along County Highway 62, and Forest Road 16. · Grant, Oregon

Approximately 70 acres would be hand-treated with an intermediate cut to improve stand growth and development followed by hand-piling and pile burning or jackpot burning.

Forest products
Scoping Start
05/06/2015
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Alissa Tanner · altanner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT 16S, R 34E, Section 3
Environmental Assessment · Emigrant Creek Ranger District · updated 12/10/2019
Pine Creek Watershed, Upper and Middle Pine Creek subwatersheds. · Harney, Oregon

The proposal includes hazardous fuel reduction activities including biomass removal and salvage of recently dead trees, landscape scale prescribed burning activities, and access and travel management activities.

Fuels management
Scoping Start
09/19/2012
Objection Period Start
06/19/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityBiomass; Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage); Travel Management; Timber Sales (Green)
DN, FONSI and Forest Plan Amendment #74 for Upper Pine Hazardous Fuel Proj.Decision Signed Date: 09/23/2013
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S R33E sec 17-21 and 27-35, T30S R33E sec 2-28 and 34-35, T21S R33E sec 1, 2, 11, 12, T19S R32E sec 24-26 and 35-36, T20S R32E sec 1-2, 11-13, and 24, T20S R33.5E sec 30, 32 and T21S R33.5E sec 5-8
Decision Memo · Malheur National Forest All Units · updated 12/2/2019
Township 11 south, Range 35 east, sections 28, 32, and 33; Township 12 south, Range 35 east, sections 5, 7, and 8; and Township 11 south, Range 34 east, sections 10 through 16, 21, 28, 32, and 33 · Grant, Oregon

This project proposes to reinforce existing fiber optic cable from the OTC Station in Bates to Prairie City & add new conduit to Austin House & the ODOT maintenance yard to provide better telephone/internet access to local communities & businesses.

Special use management
Scoping Start
08/13/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Prairie City Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Prairie City Ranger District · updated 9/30/2019
Sheep Mountain Communication Site within Sec. 23, T. 15 S., R. 35 E., W.M., (Lat. 44.2505; Long.-118.4831). · Grant, Oregon

Special use permit for the installation of a repeater and additional solar panels and antennas at the exiting Sheep Mountain Communication Site.

Special use management
Scoping Start
08/05/2019
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionSec. 23, T. 15 S., R. 35 E., W.M.
Environmental Assessment · Blue Mountain Ranger District · updated 9/18/2019
The Roundtop Complex planning area consists of five allotments located in Grant County between 5 and 19 miles north of John Day, Oregon. · Grant, Oregon

The purpose of this project is to authorize livestock grazing in a manner that moves management of the Roundtop Complex allotments towards objectives and desired conditions identified in the Malheur Forest Plan, as amended.

Grazing management
Scoping Start
06/06/2018
Comment Period
02/2019 (Estimated)
Objection Period Start
04/2019 (Estimated)
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Sasha Fertig · sashafertig@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 7/17/2019
Devine Summit Interpretive Trail adjacent to the Idlewild Campground, on Emigrant Creek Ranger District. Campground on Hwy 395. · Harney, Oregon

Extend Devine Summit Interpretive trail and Idlewild Loop Trail to begin trailheads at the new entrance to the campground. Replace wayfinding signs in campground.

Recreation management
Scoping Start
06/03/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
Recreation Site Improvement ProjectDecision Signed Date: 07/17/2019
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Malheur National Forest All Units · updated 10/25/2018
The Emigrant Creek Ranger District, Malheur National Forest · Crook; Grant; Harney, Oregon

Remove hazard trees along 2 and 4 digit roads and campgrounds through out the Emigrant Creek Ranger District

Forest productsRoad managementFacility management
Scoping Start
10/25/2017
Comment Period
05/23/2018
Objection Period Start
08/29/2018
Decision
10/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Maintenance; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green)
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Blue Mountain Ranger District · updated 10/4/2018
Allotments are south of State Highway 402 and west of US Highway 395. · Grant, Oregon

Cattle grazing authorization on six existing allotments: Donaldson, Deer, Hamilton, King, Indian Ridge, and Highway.

Grazing management
Scoping Start
02/25/2015
Comment Period
06/03/2015
Objection Period Start
08/12/2015
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Nick Stiner · nstiner@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Magone Completed
Environmental Impact Statement · Blue Mountain Ranger District · updated 6/14/2018
Township 11S Range 31E Sections 25-29, 32-36; Township 11S Range 32E Sections 30-32; Township 12S Range 31E Sections 1-5, 8-12, 13-15, 17-24; Township 12S Range 32E Sections 5-11, 15-20, All in the Willamette Meridian. · Grant, Oregon

The Magone Project includes a suite of activities to restore forest resiliency, including silviculture and fuels treatments, Magone Lake restoration, recreation developments, and associated road activities.

Fuels managementRecreation managementWatershed managementWildlife, fish, rare plantsForest products
NOI in Federal Register
02/13/2015
DEIS NOA in Federal Register
02/05/2016
FEIS NOA in Federal Register
12/28/2016
Objection Period Start
12/28/2016
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Sasha Fertig · sashafertig@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Special Products Sales; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 5/21/2018
Township 15 South, Range 32 East, section 18 · Grant, Oregon

Issuance of a special use permit for a 10-year period to authorize the continued use and maintenance of a domestic spring development and water transmission pipeline.

Special use management
Scoping Start
03/23/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Malheur National Forest All Units · updated 5/8/2018
Malheur National Forest and that portion of the Ochoco National Forest that is administered by the Malheur NF. · Baker; Crook; Grant; Harney, Oregon

Analyze and designate the appropriate system of roads, trails, and areas open for motorized travel across the forest. Analyze the potential for game retrieval, dispersed camping, and seasonal closures to address resource issues and social concerns.

Recreation managementWatershed managementRoad management
NOI in Federal Register
06/2018 (Estimated)
DEIS NOA in Federal Register
12/2018 (Estimated)
FEIS NOA in Federal Register
09/2019 (Estimated)
Objection Period Start
09/2019 (Estimated)
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Mike Montgomery · mmontgomery02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Plan Amendment; Trail Management; Order Creation/Modification; Travel Management
ForestsMalheur National Forest
DistrictsMalheur National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Emigrant Creek Ranger District · updated 2/7/2018
Flat and Upper Camp Creek area, both sides of HWY 395 · Grant; Harney, Oregon

Vegetation management and watershed restoration activities including timber harvest and road closures and decommissioning.

Road managementFuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsWatershed managementForest products
Scoping Start
12/07/2016
Comment Period
06/21/2017
Objection Period Start
09/20/2017
Decision
02/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Malheur National Forest All Units · updated 12/5/2017
The Blue Dollar Complex project planning area includes approximately 42,000 acres of National Forest Systems public lands and consists of three allotments located south of Prairie City, Oregon. · Grant, Oregon

Evaluation of livestock grazing authorization on three existing allotments: Blue Bucket, Dollar Basin, and Star Glade.

Grazing management
Scoping Start
01/25/2017
Comment Period
07/19/2017
Objection Period Start
09/20/2017
Decision
12/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Marion Mahaffey · marionmahaffey@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 11/9/2017
T. 14S, R. 27 E, Sec. 11 · Grant, Oregon

Re-authorization of ODOT 20-year special use authorization for existing improvements at the Aldrich Mountain Electronic Communications Site.

Special use management
Scoping Start
10/01/2017
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Hannah Smith · hannahksmith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 11/9/2017
Aldrich Mountain Commsite. Malheur National Forest · Grant, Oregon

Authorization of RCC Atlantic, Inc. 20-year special use permit for existing ancillary improvements at the Aldrich Mountain Electronic Communications Site.

Special use management
Scoping Start
11/01/2017
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Hannah Smith · hannahksmith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 11/3/2017
T 10S, R 31E, sec12, Willamette Meridian · Grant, Oregon

The extension of existing power lines for approximately 1,700 feet, including the installation of 5 forty-foot power poles.

Special use management
Scoping Start
10/01/2017
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Hannah Smith · hannahksmith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blue Mountain Ranger District · updated 7/18/2017
John Day (Pine Creek), Hamilton, Galena, Izee Hwy., Starr Ridge, Canyon Creek, Seneca, Beech Creek, Long Creek Mt. · Grant, Oregon

Continued use and maintenance of buried and overhead telephone cable and necessary appurtenances located on the Blue Mountain Ranger District of the Malheur National Forest.

Special use management
Scoping Start
04/2014 (Estimated)
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionGrant County, Oregon - Malheur National Forest
Environmental Assessment · Emigrant Creek Ranger District · updated 7/18/2017
Lonesome Creek, Venator Creek-South Fork John Day River, Headwaters South Fork John Day River and Corral Creek subwatersheds within the Upper South Fork John Day River Watershed. · Grant; Harney, Oregon

Vegetation managment and watershed restoration activities including timber harvest and road closures and decommissioning.

Wildlife, fish, rare plantsFuels managementWatershed managementVegetation management (other than forest products)Forest productsRoad management
Scoping Start
09/23/2015
Comment Period
06/01/2016
Objection Period Start
02/08/2017
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Prairie City Ranger District · updated 3/23/2017
South of Highway 26 in the Clear Creek, Dry Fork, and Wiwaanaytt Creek subwatersheds of the Bridge Creek watershed. · Grant, Oregon

Prescribed burning in order to improve wildlife habitat.

Wildlife, fish, rare plants
Scoping Start
09/16/2016
Decision
06/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Shaniko Cowie · shanikocowie@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT11 S R35 E Sec. 33-35 T11 S R35 1/2 E Sec. 28, 33-35 T12 S R35 E Sec. 1-4, 9-16, 21- 28, 33-36 T12 S R35 1/2 E Sec. 1-23, 25-36 T13 S R35 E Sec. 1-4, 10-13 T13 S R35 1/2 E Sec. 1-11
Starr Aspen Completed
Environmental Assessment · Blue Mountain Ranger District · updated 8/19/2016
Within the Starr sub-watershed located in Grant County on NFS lands, approximately 14 miles south of John Day, Oregon and approximately 8 miles north of Seneca, Oregon. · Grant, Oregon

Aspen and stream restoration in the Starr sub-watershed. Removal of encroaching conifers through commercial and non-commercial treatments. Addition of large and course wood in streams.

Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)Forest productsWatershed management
Scoping Start
03/26/2014
Comment Period
07/29/2015
Objection Period Start
05/11/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Sasha Fertig · sashafertig@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Timber Sales (Green); Watershed Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Elk 16 Completed
Environmental Assessment · Prairie City Ranger District · updated 7/13/2016
Elk Creek and Crane Creek subwatersheds · Grant, Oregon

Application of thinning, slash treatments, and prescribed fire to reduce insect outbreak and fire hazard.

Fuels managementVegetation management (other than forest products)
Scoping Start
11/27/2013
Comment Period
08/13/2014
Objection Period Start
04/08/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Sarah Bush · sbush01@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Elk 16 Final Decision Notice and Finding of No Significant ImpactDecision Signed Date: 09/14/2015
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT16S R34E, T16S R35E, T17S R34E, T17S 35E
Environmental Assessment · Malheur National Forest All Units · updated 7/6/2016
The project planning area is located in Grant County approximately 8 miles south of the city of John Day, Oregon. · Grant, Oregon

The objectives of this project are to recover the economic value of dead trees and to provide for societal needs for wood products, while maintaining the ecological integrity of post-fire habitats for woodpecker species.

Forest products
Scoping Start
01/06/2016
Comment Period
04/27/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Sasha Fertig · sashafertig@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTimber Sales (Salvage)
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Emigrant Creek Ranger District · updated 6/9/2016
Snow Mountain repeater site in Sec. 32, T. 18 S., R. 27 E. · Grant, Oregon

Install a BLM repeater integration system on a Forest Service communication tower, with equipment, at the Snow Mountain repeater site.

Special use management
Scoping Start
04/05/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 6/3/2016
On Baldy Mountain in the vicinity of the Bald Sisters Fire of August 2014, at the legal coordinates listed above. · Grant, Oregon

Replanting of fire damaged locale in order to improve stand heterogeneity.

Vegetation management (other than forest products)
Scoping Start
09/14/2015
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Linda Helm · lshelm@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
2016 Spring Planting Decision MemoDecision Signed Date: 03/29/2016
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT. 13 S., R. 35 E., Sections 22, 30, and 36
Decision Memo · Malheur National Forest All Units · updated 3/17/2016
Strawberry Creek Watershed · Grant, Oregon

Renewal of Special Use Permit for the Oregon Water Resources Department Strawberry Creek Gauging Station. The gauging station has collected critical baseline stream data since 1925, and is one of the State's priority stations to maintain.

Special use management
Scoping Start
08/01/2014
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Strawberry Creek Gauging Station Special Use Permit RenewalDecision Signed Date: 11/09/2015
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionSE1/4NW1/4 sec. 20, T. 14 S., R. 34 E., WM, Grant County, Oregon
Wolf Project Completed
Environmental Assessment · Emigrant Creek Ranger District · updated 2/25/2016
Wolf Creek Watershed · Grant; Harney, Oregon

Watershed restoration activities within the Wolf Creek Watershed that improve the health, vigor, and resiliency of vegetation; improve soil and watershed conditions; reduce the fire hazard, and capture the economic value of surplus trees.

Forest productsRoad managementWatershed managementWildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Scoping Start
06/25/2014
Comment Period
02/04/2015
Objection Period Start
04/15/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
Decision Notice for Wolf Vegetation Management Project EADecision Signed Date: 07/23/2015
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT18S R33.5E sections 1-15, 17-18; T18S R33E sections 1-3, 10-15, 23; T17S R 33.5E sections 5-9, 15-22, 27-35; T17S R33E sections 1-5, 8-16, 20-29, 33-36
Decision Memo · Malheur National Forest All Units · updated 10/27/2015
The South Fork Complex was located approximately 22 miles southwest of John Day and 6 miles southeast of Dayville, Oregon. · Grant, Oregon

This project proposes to revegetate approximately 1,900 acres of stand replacement patches within the South Fork Complex Fire that burned in 2014 on the Blue Mountain Ranger District.

Vegetation management (other than forest products)
Scoping Start
03/25/2015
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Randy Kyes · rkyes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
South Fork Complex ReforestationDecision Signed Date: 10/26/2015
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Emigrant Creek Ranger District · updated 10/22/2015
The length of the 41 road in the Emigrant Creek Ranger District. · Grant; Harney, Oregon

Remove dead, dying and unsound hazard trees within the 41 road corridor from the forest boundary in the south to the junction of the 45 road in the north near Allison Guard Station.

Road managementRecreation management
Scoping Start
09/23/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Road Maintenance
41 Road Hazard Tree Removal Decision MemoDecision Signed Date: 10/21/2015
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Malheur National Forest All Units · updated 9/22/2015
Malheur National Forest · Baker; Crook; Grant; Harney; Malheur, Oregon

(Corrected) Treatment of known and newly discovered invasive plants using herbicide, manual, mechanical, biological and/or cultural treatments. Includes 1 non-significant forest plan amendment to allow use of aminopyralid (Milestone TM).

Vegetation management (other than forest products)
NOI in Federal Register
04/05/2011
DEIS NOA in Federal Register
11/08/2013
FEIS NOA in Federal Register
04/22/2015
Objection Period Start
04/22/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Joseph Rausch · jhrausch@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Amendment; Noxious Weed Treatments
ForestsMalheur National Forest
DistrictsMalheur National Forest All Units
Legal Land DescriptionForest-wide
Decision Memo · Blue Mountain Ranger District · updated 9/1/2015
In T. 15 S., R. 31 E., SE 1/4 sec. 6, Willamette Meridian along Forest Service road 4920-607. · Grant, Oregon

Authorization of a new 20 year lease term for the Fall Mountain Communication Site. No changes to the existing facilities or increases in scope or intensity of authorized activities are being requested at this time.

Special use management
Scoping Start
07/16/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Randy Kyes · rkyes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionTownship 15 South, Range 31 East, SE 1/4 sec. 6, Willamette Meridian
Environmental Assessment · Emigrant Creek Ranger District · updated 8/20/2015
Located approximately 33 miles northwest of Burns, Oregon within both Grant and Harney Counties. It consists of approximately 23,618 acres. · Grant; Harney, Oregon

The Emigrant Creek Ranger District, Malheur National Forest, proposes to continue authorization of livestock grazing within the Izee allotment using adaptive management strategies designed to meet Forest Plan standards and guidelines.

Grazing management
Scoping Start
06/02/2014
Comment Period
03/18/2015
Objection Period Start
06/17/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Benjamin Goodin · bgoodin@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionTownship 18 South, Range 27 East, sec. 15, 18, 19, 21-23, 25-29 & 32-36 T.18S, R.28E, sec. 30 & 31 T.19S, R.27E, sec. 1-4 & 11-13 T.19S, R.28E, sec. 3-11 & 15-21
Decision Memo · Emigrant Creek Ranger District · updated 7/21/2015
Donally Gravel Pit · Harney, Oregon

The objective is to dig test trenches on 4 claims: CJ3, Bosco, My Mini Mine, and Chuck. This would determine the ore bearing flow in this area.

Minerals and geology
Scoping Start
06/03/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Legendary Plan of Operations Decision MemoDecision Signed Date: 07/10/2015
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 7/21/2015
Forest wide · Baker; Crook; Grant; Harney; Malheur, Oregon

Treat five needle pine trees and stands with pouches and the semi-liquid formulations of Verbenone to reduce the rate of mortality resulting from mountain pine bark beetle attack to the pines. Application would occur in early to mid-summer.

Wildlife, fish, rare plants
Scoping Start
04/01/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Paula Brooks · pjbrooks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements
ForestsMalheur National Forest
DistrictsMalheur National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Prairie City Ranger District · updated 6/19/2015
ODOT's Austin Maintenance Station · Grant, Oregon

The Oregon Department of Transportation (ODOT) has submitted an application to amend its existing special use permit, PCD33, authorizing the operation and maintenance of ODOT's Austin Maintenance Station, to incorporate a temporary de-icer facility.

Special use management
Scoping Start
05/07/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Oregon Department of Transportation Temporary De-Icer FacilityDecision Signed Date: 06/02/2015
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT.11S., R.35E., Section 33, Williamette Meridian
Decision Memo · Emigrant Creek Ranger District · updated 6/1/2015
Idlewild, Joaquin Miller, Rock Springs, Yellowjacket, Falls, Emigrant Creek, Delintment Lake, Tip Top, Alder Springs, and Buck Springs campgrounds. · Grant; Harney, Oregon

Remove dead, dying and unsound hazard trees within the developed campgrounds on the Emigrant Creek Ranger District by cutting or pruning.

Recreation management
Scoping Start
04/17/2015
Comment Period
05/13/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
2015 Campground Hazard Tree Removal ProjectDecision Signed Date: 05/26/2015
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Malheur National Forest All Units · updated 9/25/2014
Point of diversion is from Jeff Davis Creek south of Dixie Summitt, then piped underground over half a mile to a private residence. · Grant, Oregon

This project has been canceled. This is a duplicate project with 35082, Martin Spring Special Use Permit Renewal.

Special use management
Scoping Start
10/2014 (Estimated)
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionPoint of Diversion is SW1/4SE1/4, sec. 10, T.12 S., R. 34 E., WM to place of use in SE1/4NE1/4, sec. 16, T. 12 S., R. 34 E., WM
Decision Memo · Prairie City Ranger District · updated 9/22/2014
South of Hwy 26 near Dixie Summit · Grant, Oregon

Renewal of expired special use permit - operation and use of domestic water supply for residences and the Fireside Lodge building. Improveme eighteen inch concrete collection spring box which feeds buried 1 1/4 inch plastic 2900 foot water line.

Special use management
Scoping Start
07/11/2013
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT12S R34E SESW Sec 10 and N2NW Sec 15
Decision Memo · Emigrant Creek Ranger District · updated 8/8/2014
Calamity Creek · Harney, Oregon

A multi-year project to thin approximately 150 acres of juniper trees from riparian zones along Calamity Creek. Some of the juniper will be placed into the stream channel.

Vegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
Scoping Start
04/02/2014
Decision
08/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Calamity Creek Riparian Juniper Thinning Decision MemoDecision Signed Date: 08/07/2014
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Emigrant Creek Ranger District · updated 8/8/2014
Pine Creek and Trout Creek · Harney, Oregon

Remove and replace three culverts that are degrading stream habitats and are insufficient in size.

Road managementWildlife, fish, rare plantsWatershed management
Scoping Start
04/02/2014
Decision
08/2014 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
Pine and Trout Creek Culvert Replacement Decision MemoDecision Signed Date: 08/07/2014
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
SPLAT Test Completed
Decision Memo · Emigrant Creek Ranger District · updated 8/8/2014
On Emigrant Creek Ranger District, along the 28 road. · Grant; Harney, Oregon

Test the effectiveness of Strategically Placed Land Area Treatments (SPLAT) Verbenone Plus on western pine beetles in the Malheur National Forest.

Vegetation management (other than forest products)
Scoping Start
06/11/2014
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Research And Development
SPLAT Test Decision MemoDecision Signed Date: 08/07/2014
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Emigrant Creek Ranger District · updated 7/16/2014
Dry Creek, south of 31 rd, in Emigrant Creek Ranger District. · Harney, Oregon

Treat 1500 acres of western juniper and ponderosa pine trees up to 16 inches in diameter (dbh) that are sparsely scattered across open sagebrush and Mountain Mahogany vegetation types.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
02/12/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT20S, R30E, Parts of Sections 12, 13, 24, and T20S, R31E, Parts of Sections 7, 8, 16, 17, 18, 19, 20, 21, 28, 29, 30, 31, 32, 33
Decision Memo · Blue Mountain Ranger District · updated 6/30/2014
Located in the Bark Cabin and Lower Deer Creek subwatersheds. · Grant, Oregon

Reduce post-settlement juniper trees in big game winter range, increase late season stream flow, and increase forage availability for wild horses, cattle, and wildlife.

Wildlife, fish, rare plantsGrazing management
Scoping Start
07/21/2011
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Dave Halemeier · dhalemeier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Emigrant Creek Ranger District · updated 3/31/2014
Grapple Fire area · Grant; Harney, Oregon

Reforestation by artificial means the previously burned Grapple fire area.

Vegetation management (other than forest products)
Scoping Start
01/29/2014
Comment Period
01/29/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Melissa Ward · mward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
Grapple Decision MemoDecision Signed Date: 03/17/2014 Legal Notice Date: 03/17/2014
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT180S R320E, S1 to T180S R330E S6
Environmental Impact Statement · Prairie City Ranger District · updated 11/13/2013
Analysis of the Logan Valley, McCoy Creek, Summit Prairie, and Lake Creek grazing allotments · Grant, Oregon

Authorization of grazing on four existing allotments.

Grazing management
NOI in Federal Register
02/08/2012
DEIS NOA in Federal Register
11/02/2012
FEIS NOA in Federal Register
09/23/2013
Decision
09/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT16 and 17S, R33 1/2 and 34E, Summit Prairie and Logan Valley Areas.
Decision Memo · Blue Mountain Ranger District · updated 10/29/2013
Highway 396 & Grant County Road (CR) 63 jct. to CR63 and CR 49 jct. · Grant, Oregon

New construction of overhead single phase powerline within Grant County Road 63 right-of-way.

Special use management
Scoping Start
07/15/2013
Comment Period
09/25/2013
Decision
10/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityElectric Transmission; Special Use Authorizations
OTECC Power Line Extension SUP AmendmentDecision Signed Date: 10/29/2013 Legal Notice Date: 10/29/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 15S, R 31E, Sections 30-32; T 15S, R 30E, Sections 25,26
Decision Memo · Blue Mountain Ranger District · updated 10/1/2013
The project area is located approximately 27 miles northeast of John Day on the Blue Mountain Ranger District of the Malheur National Forest and on the Whitman Ranger District of the Wallowa-Whitman · Baker; Grant, Oregon

OTC is proposing to install a new fiber optic line in conduit in their existing right-of-way between their Bates to Unity transfer stations to replace the original fiber optic cable installed in 1996.

Special use management
Scoping Start
06/26/2013
Comment Period
06/26/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
OTC Special Use Permit Amendment Fiber Optic Line Replacement Decision MemoDecision Signed Date: 09/30/2013 Legal Notice Date: 09/30/2013
ForestsMalheur National Forest; Wallowa-Whitman National Forest
DistrictsBlue Mountain Ranger District; Whitman Ranger District
Legal Land DescriptionT. 11 S. R. 35 E. Sections 25-28; T. 11 S. R. 35 E. Sections 26-28, 35, 36; T. 12 S. R. 35.5 E. Section 1; T 12 S. R 36 E. Sections 6-9, 15, 16; Willamette Meridian
Environmental Assessment · Prairie City Ranger District · updated 9/27/2013
Projects are located in the Upper Malheur Watershed in the Star Glade and Dollar Basin Allotments · Grant, Oregon

Proposed extension of the Malheur River Drift Fence, and Cross Springs water source reconstruction and extension to a second trough. Development of new water source at Dollar Basin Spring.

Grazing management
Scoping Start
12/19/2012
Comment Period
07/03/2013
Objection Period Start
08/07/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Shannon Britt · sbritt@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Structural Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT. 17S. R.33.5 E. Sections 3, 13, 23, 24 and T. 17. S. R. 34 E. Section 18
Decision Memo · Blue Mountain Ranger District · updated 9/23/2013
Lower Camp Creek, Middle Camp Creek, and Lick Creek Sub-watersheds · Grant, Oregon

Felling of trees into stream channels at rate of 80-100/mile between 12 and 20 inches diameter, and trees 4-12 inches diameter until a density of 438 trees/mile is reached to restore LWD heterogeneity.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/27/2013
Comment Period
06/12/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Camp Creek Large Woody Debris Project DecisionDecision Signed Date: 07/19/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Decision Memo · Blue Mountain Ranger District · updated 9/18/2013
T 14S. R 30E. Sections 23, 26 · Grant, Oregon

Issuance of a new special use permit, authorizing the continued use and maintenance of a liquid waste disposal site (septic drain field).

Facility managementSpecial use management
Scoping Start
07/17/2013
Comment Period
07/24/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Continued Use and Maintenance of a Liquid Waste Disposal Area SUP RenewalDecision Signed Date: 09/06/2013 Legal Notice Date: 09/18/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 14S. R 30E. Sections 23, 26
Decision Memo · Blue Mountain Ranger District · updated 7/19/2013
. · Grant, Oregon

Removal of the existing diversion pipe and installation of pre-fabricated steel headgate and pipe that will provide positive irrigation control, reduce channel disturbance, and meet current fish passage requirements for ESA listed fish.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/05/2013
Comment Period
06/05/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Daniel Armichardy · darmichardy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
Austin Ranch Diversion Project DecisionDecision Signed Date: 07/12/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT11S, R28E, Sec. 22, NWNW; Willamette Meridian
Decision Memo · Malheur National Forest All Units · updated 6/26/2013
East of the town of Austin, Oregon, on National Forest Lands. · Grant, Oregon

Requesting continued use and operation of an existing domestic spring development facility that provides domestic water supply to the residences of Austin, Or.

Special use management
Scoping Start
03/18/2013
Comment Period
04/24/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Austin Water Cooperative Special Use PermitDecision Signed Date: 06/19/2013 Legal Notice Date: 06/19/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT. 11 S., R. 35 E., SWSW Sec. 10, NW, NWSW Sec. 15, NESE Sec. 16, WM
Decision Memo · Malheur National Forest All Units · updated 6/26/2013
Within Forest Service easement of Forest Development Road 21, Fields Creek Road, Grant County, Oregon · Grant, Oregon

Renewal of existing SUP for the continued maintnenance of geological interpretive sign.

Special use management
Scoping Start
03/18/2013
Comment Period
04/24/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Stacia Kimbell · skimbell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Grant County Geological Marker Special Use PermitDecision Signed Date: 06/19/2013 Legal Notice Date: 06/26/2013
ForestsMalheur National Forest
DistrictsMalheur National Forest All Units
Legal Land DescriptionNESW Sec. 13, T. 13 S., R. 28 E., WM
Decision Memo · Blue Mountain Ranger District · updated 6/26/2013
Aspen stands near Coxie Meadow, Keeney Meadow, and Bridge Creek. · Grant, Oregon

Proposal to remove competing conifers and build buck and pole fencing around 13 aspen stands.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/27/2013
Comment Period
05/15/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Lori Stokes · rrobertson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
Keeney Aspen Project Decision MemoDecision Signed Date: 06/26/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT11S R31E Sec 12, 15, 16, 20, 28; T12S R32E Sec 4; T12S R34E Sec 12
Decision Memo · Blue Mountain Ranger District · updated 6/26/2013
Upper Middle Fork of the John Day River · Grant, Oregon

The project looks to replace 15 culverts located on the Middle Fork of the John Day River to provide stream passage through culverts for all life stages of aquatic organisms.

Wildlife, fish, rare plantsRoad managementWatershed management
Scoping Start
03/12/2013
Comment Period
05/15/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Road Maintenance; Watershed Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionS26, 34, 35 of T10S, R33E; S34, 35 of T10S, R34E; S1 of T11S, R33E; S18 of T11S, R34E; S31 of T11S, R35E; S24, 25 of T11S, R35.5E; S12 of T12S, R34E; S12 of T12S, R35E
Decision Memo · Blue Mountain Ranger District · updated 5/31/2013
The project area is located approximately 8 miles northwest of John Day and within the multimple subwatersheds south of Fox Valley. · Grant, Oregon

Pre-commercial thinning and hand piling of previously harvested plantations on approximately 4,000 acres.

Vegetation management (other than forest products)Fuels management
Scoping Start
01/01/2013
Comment Period
03/06/2013
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
Plantation Maintenance Fox/Camp CreekDecision Signed Date: 04/17/2013 Legal Notice Date: 04/17/2013
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionThe legal location for this project area includes T10S, R28E; T11S, R28E, R29E, R30E, R31E, and R32E; T12S, R28E, R29E, R30E and R31E
Decision Memo · Blue Mountain Ranger District · updated 3/22/2013
Junction of Forest Road 15 and 16, approximately 4,500 acres mostly within Upper Bear Creek Subwatershed · Grant, Oregon

The Blue Mountain Ranger District is proposing to plant about 4,500 acres of upland forests and riparian areas to accelerate the vegetative recovery of a portion of the area burned in the Parish Cabin Fire of 2012.

Vegetation management (other than forest products)
Scoping Start
01/01/2013
Comment Period
02/06/2013
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT15S, R33E, Sections 26, 34, and 35: T16S, R33E, Sections 1, 2, 3, 4, 9, 10, 11,14, 15, 16, 17, 20, 21, and 22
Environmental Assessment · Blue Mountain Ranger District · updated 12/20/2012
Camp Creek Watershed · Grant, Oregon

Decommission 83 miles of road in the Camp Creek Watershed.

Road management
Scoping Start
06/2012 (Estimated)
Comment Period
06/2012 (Estimated)
Decision
09/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Decision Memo · Blue Mountain Ranger District · updated 12/12/2012
Parish Cabin Fire, approximately 11 miles east of Seneca, Oregon. · Grant, Oregon

Salvage danger trees along selected reaches of 19 roads for a total of 236 acres within the Parish Cabin Fire. The purpose of the project is to salvage selected danger trees that would otherwise be cut down and left on site to abate safety hazards.

Forest productsRoad management
Scoping Start
10/04/2012
Comment Period
11/07/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 15S, R 33E, Sec 34, 35; T 16S, R 33E, Sec 1, 2, 3, 4, 9, 10, 11, 12, 15, 16, 17, 20, 21, 22
Decision Memo · Emigrant Creek Ranger District · updated 12/6/2012
Rocks Springs Campground and Buck Springs Campground · Grant; Harney, Oregon

Remove dead, dying and unsound danger trees within Rock Springs and Buck Springs Camprounds. Hazard trees may be removed in small sales, used as fuelwood for the campgrounds, or cut and left on site for other resource needs.

Recreation managementFacility management
Scoping Start
10/24/2012
Comment Period
10/24/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Maintenance
Buck and Rock Springs Campground Hazard Tree Removal ProjectDecision Signed Date: 12/03/2012
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT20S., R25E., Section 34 and T18S., R32E., Section 24
Decision Memo · Emigrant Creek Ranger District · updated 10/18/2012
Selected Micro, Trout and Driveway units · Harney, Oregon

Continuation of prescribe burn research project started in 1997 in selected Micro, Trout and Driveway units. The research is being conducted on 12 units for a total of 622 acres.

Research
Scoping Start
01/11/2012
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT20S., R31E., section 36; T20S., R32E., section 30 and T19S., R33E., sections 28 and 33.
Environmental Impact Statement · Blue Mountain Ranger District · updated 9/19/2012
Upper Deer Creek, Lower Fox Creek, Lower Basin Creek, Middle Fox Creek, Belshaw Creek, and North Face Creek subwatersheds. · Grant, Oregon

Analyzes cattle grazing authorizations on six existing allotments for Donaldson, Deer, Hamilton, King, Indian Ridge, Highway allotments

Grazing management
NOI in Federal Register
12/14/2011
DEIS NOA in Federal Register
02/2013 (Estimated)
FEIS NOA in Federal Register
05/2013 (Estimated)
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Kelly Ware · kware@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Starr HFRA Project Completed
Environmental Assessment · Blue Mountain Ranger District · updated 7/10/2012
Located on the north and west side of Bear Valley in the Starr Creek subwatershed. · Grant, Oregon

The project area will be treated to reduce fuel loading and improve forest health. This project area is within the Grant County Community Fire Protection Plan.

Forest productsFuels management
Scoping Start
04/15/2011
Objection Period Start
05/16/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Lori Stokes · lstokes@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
Starr Project Decision Notice and Finding of No Significant ImpactDecision Signed Date: 07/02/2012
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT15S, R29-31E, and T16S, R29-30E
Environmental Assessment · Emigrant Creek Ranger District · updated 6/22/2012
Upper and Lower Poison Creek and Trout Creek subwatersheds · Harney, Oregon

Remove hazardous fuels from the Marshall/Devine project area.

Fuels managementVegetation management (other than forest products)
Scoping Start
08/31/2011
Objection Period Start
05/09/2012
Decision
06/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
DN, FONSI, AND FPA #70 for Marshall Devine Hazardous Fuel Reduction ProjectDecision Signed Date: 06/20/2012
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19 R31, sec 23, 26, 27, 34, 35; T19 R32, sec 23-26, 35; T20 R30, sec 13-15, 24; T20 R31, 1, 2, 7, 10-15, 17-36; T20 R32, sec 2, 11-15, 19, 22-24, 27-34; T21 R31, 1-4, 9-12; T21 R32, 3-10.
Crawford Aspen Completed
Decision Memo · Blue Mountain Ranger District · updated 6/4/2012
Aspen stands are within the Mill Creek subwatershed Blue Mtn Ranger District · Grant, Oregon

Cutting of conifers that are overtopping and shading out aspen, treating the created slash, and fencing the aspen stands.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
04/11/2012
Comment Period
04/11/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Lori Stokes · lstokes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
Crawford Aspen ProjectDecision Signed Date: 05/30/2012
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 10S R 35E, T 10S R 351/2E, T10S R36E, T 11S, R35E, T11S, R351/2E, T11S, R36E
Dairy EA Completed
Environmental Assessment · Emigrant Creek Ranger District · updated 2/2/2012
Nicoll/ Dairy Creeks · Crook; Harney, Oregon

Timber harvest and road closures

Road managementForest products
Scoping Start
12/16/2010
Comment Period
10/26/2011
Decision
01/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
Dairy Project Decision Notice and Finding of No Significant ImpactDecision Signed Date: 01/23/2012 Legal Notice Date: 02/01/2012
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT10-22S R24-25E
Decision Memo · Blue Mountain Ranger District · updated 12/22/2011
Grazing Allotments on the Blue Mt. District. The majority of the projects w/in the Middle Fk. John Day, S. Fk. John Day, and Silvies sub-watersheds. · Grant, Oregon

Develop 20 springs on the following allotments: Upper Middle Fork, Murderers Creek, Sugarloaf, Keeny Meadows, Scotty Creek, Flagtail, Indian Ridge, and McClellan

Grazing managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
04/18/2011
Decision
12/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Sara Daugherty · sddaugherty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Rangeland Vegetation Improvements; Grazing Structural Improvements
Blue Mountain Springs ProjectsDecision Signed Date: 12/21/2011
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 14S R 29 E Sec. 15, 14; T 16 S R 31 E Sec. 3, 1; T 11S R 31E Sec 21, 28; T 17S R 30E Sec. 1; T 16S R 30E Sec. 33; T 17S R 29E Sec 35; T 10 S R 29E Sec. 22; T 10S R30 E Sec. 19; T 15S R 28E Sec. 29,
Decision Memo · Blue Mountain Ranger District · updated 12/16/2011
Granite Boulder Creek area along FDR 4559 on the Blue Mt. Ranger District. · Grant, Oregon

Close the Upper Lemon Cabin abandoned mine adit and remove the deteriorated Granite Boulder Cr. Bridge in order to protect public health and safety. The adit would be closed either by plugging the adit with earth or installation of a bat gate.

Minerals and geology
Scoping Start
11/19/2009
Decision
12/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Pamela Uebler · puebler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
Bat Gate Closure of the Upper Lemon Cabin Mine Adit et alDecision Signed Date: 12/16/2011
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT. 10 N., R. 34 E., SW 1/4 Sec. 14 (adit) and T. 10 S., R. 34 E., NE1/4 Sec. 22 (bridge)
Decision Memo · Emigrant Creek Ranger District · updated 12/13/2011
SF John Day and 47 road system · Grant; Harney, Oregon

Replace 3 undersized culverts on the South Fork of the John Day River that have contributed to streambed degradation and created fish passage barriers.

Watershed managementWildlife, fish, rare plants
Scoping Start
04/27/2011
Decision
11/2011 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Eric Crook · ecrook@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Decision Memo South Fork John Day Culvert Replacement ProjectDecision Signed Date: 11/27/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S, R29E, Sections 6 and 18, and T18S, R28E section 25
Decision Memo · Blue Mountain Ranger District · updated 10/12/2011
Middle Fork John Day River: approximately 215 acres of private land adjacent to the Balance Thinning and Fuels Reduction Project on National Forest System (NFS) lands. · Grant, Oregon

Proposal to burn approximately 215 acres of private land in conjunction with a FS prescribed fire under the Wyden Amendment authority. Purpose is to reduce fuels and possible future suppression costs on land adjacent to NFS lands.

Fuels management
Scoping Start
10/05/2011
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Allen Taylor · esclark@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT.10S, R.33E, Sections: 20 and 21; W.M.
Decision Memo · Blue Mountain Ranger District · updated 9/26/2011
South Fork of the John Day, Silvies, Middle Fork, John Day River watersheds. · Grant, Oregon

Erect fencing to enhance management of rangeland and riparian resources. The fencing would be located on allotments: Camp Creek, Jack Creek, Murderers Creek, Mt. Vernon, Indain Ridge, Dixie, Lower Middle Fork, and Upper Middle Fork.

Wildlife, fish, rare plantsGrazing management
Scoping Start
05/24/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Kelly Ware · kware@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Species Habitat Improvements; Rangeland Vegetation Improvements; Grazing Structural Improvements
Range Improvements Camp Creek, Lower Middle Fork, and Murderers Creek AllotDecision Signed Date: 07/01/2011
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Decision Memo · Blue Mountain Ranger District · updated 9/26/2011
Middle Fork John Day River nine miles below Bates, OR. · Grant, Oregon

Authorizing the Warm Springs Tribe to perform stream restoration activities NFS land adjacent to private land as a part of a larger project. The project area encompasses small (less than 5%) of NFS land that intersects the MFJD River.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/24/2011
Comment Period
06/25/2011
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Allen Taylor · allentaylor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Oxbow Tailings ProjectDecision Signed Date: 07/15/2011 Legal Notice Date: 07/15/2011
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT 11 S, R 34 E, Sec. 6, NW SE; SE NW & NW NW; T 11 S, R 34 E, Sec 31, NW SW;
Decision Memo · Emigrant Creek Ranger District · updated 9/13/2011
JB Spring · Harney, Oregon

Develop JB spring for livestock and wildlife use. Install a steel headbox, livestock water trough and thin approximately 5 acres of small juniper that have encroached into the spring area.

Grazing management
Scoping Start
04/27/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Cedric Selby · cmselby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
Decision Memo J B Spring DevelopmentDecision Signed Date: 08/22/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S, R33E, Section 13, SW1/4 SE 1/4
Decision Memo · Emigrant Creek Ranger District · updated 9/13/2011
West Sugarloaf/Scharff Cabin pasture boundary, Sawtooth Allotment · Harney, Oregon

Construct up to 750 feet of 4-strand barbed wire fence to realign a portion of the West Sugarloaf/Scharff Cabin pasture boundary on the Sawtooth allotment to create a livestock driveway.

Grazing management
Scoping Start
04/27/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Cedric Selby · cmselby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
Decision Memo West Sugarloaf Stock Driveway ProjectDecision Signed Date: 08/22/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S, R29E, Section 30
Decision Memo · Emigrant Creek Ranger District · updated 6/23/2011
Bear Creek, Forest Road 3750 · Harney, Oregon

Thin approximately 47 acres of juniper trees from riparian zones along Bear Creek. Some of the juniper may be placed into the stream channel to protect and rebuild vulnerable stream banks.

Wildlife, fish, rare plantsVegetation management (other than forest products)Watershed management
Scoping Start
04/27/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Decision Memo Riparian Juniper Thinning ProjectDecision Signed Date: 06/21/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S, R29E sections 4-6
Decision Memo · Emigrant Creek Ranger District · updated 6/23/2011
Emigrant Creek at Falls and Emigrant Campgrounds · Harney, Oregon

Replace 2 culverts on Forest Service roads 4340 and 4300050 that block fish passage and hinder proper hydrologic functioning on Emigrant Creek with properly sized and designed culverts.

Watershed managementWildlife, fish, rare plants
Scoping Start
04/27/2011
Decision
06/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Richard Vetter · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Decision Memo Emigrant and Falls Campgrounds Culvert Replacement ProjectsDecision Signed Date: 06/21/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT20S, R28E, Sections 6 and 7
Decision Memo · Emigrant Creek Ranger District · updated 6/23/2011
South Fork of the John Day River, and some associated unnamed tributaries · Harney, Oregon

Thin approximately 90 acres of juniper trees from riparian zones along the South Fork of the John Day River. Some of the juniper may be placed into the stream channel to protect and rebuild vulnerable stream banks.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
04/27/2011
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Decision Memo Riparian Juniper Thinning ProjectDecision Signed Date: 06/21/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S, R28 E sections 13 and 24; and T19S, R29E sections 6, 7, 18
Decision Memo · Emigrant Creek Ranger District · updated 6/23/2011
Venator Creek, Forest Road 3150 · Grant, Oregon

Thin approximately 77 acres of juniper trees from riparian zones along Venator Creek. Some of the juniper may be placed into the stream channel to protect and rebuild vulnerable stream banks.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
04/27/2011
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Decision Memo Riparian Juniper Thinning ProjectDecision Signed Date: 06/21/2011
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT18S, R29E sections 15, 16, 17, 20
Environmental Assessment · Prairie City Ranger District · updated 10/18/2010
Tamarack Creek Subwatershed · Grant, Oregon

Vegetation Management to improve forest health.

Fuels managementForest products
Scoping Start
05/17/2007
Comment Period
09/23/2008
Decision
04/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
William Brendecke · wbrendecke@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionT16S.,R35E., Sec. 32-34, T17S., R34E., Sec. 13 & 24, T17S., R35E., Sec.3-5,7-11 13-30,33-35, T.18S., R35E., Sec.1-3,10-15.
Environmental Assessment · Emigrant Creek Ranger District · updated 8/26/2010
Calamity Subwatershed in Wolf Creek Watershed · Grant; Harney, Oregon

Reduce the fire hazard, create two fuel breaks, and reduce the impact and severity of the current Western spruce budworm outbreak within the Calamity subwatershed.

Fuels managementVegetation management (other than forest products)
Scoping Start
07/08/2009
Objection Period Start
06/23/2010
Decision
08/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Decision Notice for Jane Hazardous Fuel Reduction ProjectDecision Signed Date: 08/16/2010 Legal Notice Date: 08/25/2010
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT17S R33E sections 28-34; T18S R32E sections 1, 11-14, 23-26, 35-36; T18S R33E sections 3-10, 15-36; T19S R32E sections 1-2, 11-13; T19S R33E sections 2-11, 14-18, 20-22;
Decision Memo · Emigrant Creek Ranger District · updated 8/17/2010
Multiple locations on the old Burns Ranger District · Grant; Harney, Oregon

Precommercial thinning of seedlings and saplings on up to 5000 acres of 10 to 20-year old pine plantations established in clearcuts and shelterwood harvest units.Created slash would be either pulled back, hand piled, grapple piled and burned.

Vegetation management (other than forest products)Fuels management
Scoping Start
04/22/2010
Decision
08/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Decision Memo Dragon's Hump Plantation PCTDecision Signed Date: 08/16/2010
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT18S, R29, 30, 31, 33, 33.5E; T19S R29, 30, 31, 33, 33.5E; T19S R33.5E; T20S, R33E
Environmental Assessment · Prairie City Ranger District · updated 8/6/2010
The quarry is located 4.6 miles east of Austin Junction on Highway 26 (MP 195.3). · Grant, Oregon

PCRD is proposing to allow continued use and expansion of the Savage Quarry. The proposed project would allow expansion of the quarry area by approximately 5 acres. Development within the proposed expansion area would require the cutting of trees.

Minerals and geologySpecial use management
Scoping Start
12/19/2008
Comment Period
09/16/2009
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations; Special Area Management
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Legal Land DescriptionTownship 11 South, Range 35  East, Sections 28 & 33, Grant Co. Oregon.
Environmental Assessment · Blue Mountain Ranger District · updated 2/26/2010
Canyon Creek Watershed · Grant, Oregon

This project is proposed to protect lives and property within the adjacent rural/urban community interface. It is a project that was idenfied in the Grant County Community Fire Protection Plan.

Fuels management
Scoping Start
03/30/2003
Objection Period Start
08/23/2006
Decision
12/2006 (Estimated)
Implementation
05/2007 (Estimated)
Project documents
Linda Batten · lbatten@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Canyon Creek WUI Fuels Reduction ProjectDecision Signed Date: 12/21/2006
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT15S, T16S, R31E, R32E
Merit Completed
Environmental Assessment · Prairie City Ranger District · updated 2/26/2010
Upper Malheur River Watershed - Lake Creek and Crooked Creek drainages · Grant, Oregon

Timber harvest, fuels reduction and road management

Forest productsFuels management
Scoping Start
12/01/2000
Comment Period
12/21/2005
Decision
12/2005 (Estimated)
Implementation
02/2006 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Timber Sales (Green)
Merit ProjectDecision Signed Date: 12/16/2005 Legal Notice Date: 12/21/2005
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Environmental Assessment · Emigrant Creek Ranger District · updated 12/9/2009
Emigrant Creek, Blue Creek, Whiskey Creek and Spring Valley/Foundation Canyon · Harney, Oregon

Vegetation and watershed restoration projects, including thinning, road closures, and decommisioning, prescribed burning, and riparian and fisheries enhancement.

Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels managementRoad managementWatershed managementForest products
Scoping Start
07/28/2000
Comment Period
06/10/2009
Decision
12/2009 (Estimated)
Implementation
12/2009 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green); Watershed Improvements
Green Ant Project Decision Notice and FONSIDecision Signed Date: 12/01/2009 Legal Notice Date: 12/09/2009
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT18S., R27E.; T19S, R27-28E.; T20S., R27-28E
Environmental Assessment · Blue Mountain Ranger District · updated 9/18/2009
Located on both sides of County Road 18 from Forest boundary at Bear Creek to Forest boundary at Long Creek. · Grant, Oregon

Maintain County Road 18 as a safety corridor and escape route should a wildfire close US Highways 26 and 395 between the towns of Mount Vernon and Long Creek and Prairie City and Austin. Area identified in the Grant Co Community Fire Protection Plan

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
10/02/2008
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Lori Stokes · lstokes@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Timber Sales (Green)
County Road 18 Healthy Forest Restoration Act ProjectDecision Signed Date: 09/18/2009
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT.10S. - 12S., R.31E. - 33E.
Dads Creek WUI Completed
Environmental Assessment · Blue Mountain Ranger District · updated 7/1/2009
Dads Creek sub-watershed, lands on both sides of Highway 26 on the south side of Dixie pass. May also include a small portion (approximately 100 acres) of the Dixie Meadow sub-watershed. · Grant, Oregon

This project is proposed to protect lives and property within the adjacent wildland urban community interface. It is a project that was indentified in the Grant County Community Fire Protection Plan.

Vegetation management (other than forest products)Forest productsFuels management
Scoping Start
12/05/2007
Objection Period Start
09/17/2008
Decision
12/2008 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Plan Amendment; Timber Sales (Green)
Dads Creek WUI ProjectDecision Signed Date: 12/19/2008
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District; Prairie City Ranger District
Legal Land DescriptionT.12S., R33 1/2E. and 34E.
Van Allotment EA Completed
Environmental Assessment · Emigrant Creek Ranger District · updated 9/17/2008
The Van Allotment · Harney, Oregon

For the Van Allotment, continue authorization of livestock grazing in a manner that is consistent with the Malheur Forest Plan as amended.

Grazing management
Scoping Start
08/13/2004
Comment Period
08/06/2008
Decision
09/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Authorizations
Decision Notice and FONSI Van Range AllotmentDecision Signed Date: 09/15/2008 Legal Notice Date: 09/17/2008
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT. 18 S., R. 33 E., Sections 1-3, 10-16, 21-23 and 26-28
Environmental Assessment · Emigrant Creek Ranger District · updated 9/10/2008
Egley Fire Complex · Harney, Oregon

Danger tree removal, salvage of selected danger trees, reforestation and road closures within the Egley Fire Complex.

Fuels managementForest products
Scoping Start
04/17/2008
Comment Period
07/23/2008
Decision
09/2008 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Road Maintenance; Timber Sales (Salvage)
Egley Fire Restoration Project Decision Notice and FONSIDecision Signed Date: 09/08/2008 Legal Notice Date: 09/10/2008
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT19S, R25E, T19S, R26E, T19S, R27E, T19S, R28E, T20S, R25E, T20S, R26E, T20S, R27E, T20S, R28E, T20S, R29E, T21S, R25E, T21S, R26E, T21S, R27E, T21S, R28E, T22S, R28E
Environmental Impact Statement · Blue Mountain Ranger District · updated 6/30/2008
Upper Middle Fork of the John Day River watershed · Grant, Oregon

Treat forested stands and reduce fuels using commerical harvest, precommerical thinning, & prescribed burning, designate replacement old growth areas, and implement a roads management plan (including road construction and decommissioning)

Wildlife, fish, rare plantsFuels managementRoad managementForest products
NOI in Federal Register
10/09/2003
DEIS NOA in Federal Register
11/22/2006
FEIS NOA in Federal Register
04/25/2008
Decision
06/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Timber Sales (Green)
Crawford ProjectDecision Signed Date: 06/05/2008 Legal Notice Date: 06/11/2008
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT10-12S, R34-36E
Thorn Fire Salvage Completed
Environmental Impact Statement · Blue Mountain Ranger District · updated 3/12/2008
Thorn Fire Complex approximately 20 miles southwest of John Day, OR. · Grant, Oregon

Recover the economic value of dead and dying timber consumed in the Thorn Fire Complex.

Forest products
NOI in Federal Register
12/15/2006
DEIS NOA in Federal Register
06/01/2007
FEIS NOA in Federal Register
02/22/2008
Decision
03/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Carole Holly · cholly@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Thorn Fire Salvage Recovery ProjectDecision Signed Date: 03/07/2008 Legal Notice Date: 03/12/2008
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT14S, R27E and T14S, R28E.
Starr Rock Pit Completed
Environmental Assessment · Malheur National Forest All Units · updated 12/14/2006
Starr Rock Pit · Grant, Oregon

The existing rockpit would be expanded by the Oregon Department of Transportation (ODOT). Trees removed in the rockpit expansion process are planned be sold. Pit expansion may require a Forest Plan Amendment.

Minerals and geologySpecial use management
Scoping Start
10/07/2005
Decision
11/2006 (Estimated)
Implementation
06/2007 (Estimated)
Project documents
Mark Lysne · mlysne@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
Starr Rock Pit ProjectDecision Signed Date: 11/06/2006 Legal Notice Date: 11/08/2006
ForestsMalheur National Forest
DistrictsBlue Mountain Ranger District
Legal Land DescriptionT15S, R31E, Section 20
16-Road Fuels Completed
Environmental Assessment · Prairie City Ranger District · updated 11/6/2006
East of Crane Prairie Guard Station (Halfway Creek area), Upper North Fork Malheur watershed · Grant, Oregon

This project is located adjacent to Forest Road 16, which is listed in the Grant County Community Fire Protection Plan as an "evacuation route". The project is intended to reduce the risk of loss to an evacuation route and private property.

Fuels management
Scoping Start
02/18/2005
Objection Period Start
06/07/2005
Implementation
10/2006 (Estimated)
Decision
09/2006 (Estimated)
Project documents
Ryan Falk · rfalk@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Hfra Title I: Threatened And Endangered Species Habitat
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
16 Road Forest Health ProjectDecision Signed Date: 09/28/2006 Legal Notice Date: 10/04/2006
ForestsMalheur National Forest
DistrictsPrairie City Ranger District
Environmental Assessment · Emigrant Creek Ranger District · updated 3/27/2006
House Creek Allotment District · Grant, Oregon

Development of an allotment management plan for House Creek Allotment

Grazing management
Scoping Start
08/13/2004
Comment Period
12/28/2005
Decision
12/2005 (Estimated)
Implementation
03/2006 (Estimated)
Project documents
Lori Bailey · labailey@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Decision Notice and Finding of No Significant Impact for the House Creek, West Malheur and Wolf Mountain AllotmentsDecision Signed Date: 12/21/2005 Legal Notice Date: 12/28/2005
ForestsMalheur National Forest
DistrictsEmigrant Creek Ranger District
Legal Land DescriptionT18S, R32E, Sections 1-3, 10-15, 22 & 23