Decision Memo · Lolo National Forest All Units · updated 4/29/2026
Units are located north of Highway 200 between Weeksville Creek Drainage and Thompson River. The project is in Sanders County, Montana. · Sanders, Montana
Proposed prescribed burning north of Highway 200 between Weeksville Creek and Thompson River in Sanders County Montana on the Lolo National Forest. The project would reduce fuel accumulations and improve wildlife habitat.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
09/08/2023
Decision
09/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Missoula Ranger District · updated 4/29/2026
Sapphire Divide · Missoula, Montana
Trail construction and reconstruction to connect existing trail segments, creating a 100-mile long non-motorized trail across the Lolo, Bitterroot, and Beaverhead National Forests on the Sapphire Divide.
Recreation management
Decision
08/2011 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T12N, R19W, Sections 12,13; T12N, R18W, Sections 18, 19, 20,21,27,28 and 24; T11N, R18W, Sections 3,10,15,22,27,26 and 36 and T10N, R18 W, Section 2 |
Decision Memo · Lolo National Forest All Units · updated 4/29/2026
Units are along Highway 135 in Siegel Creek, Wallace Creek, Dragonfly Creek and Sheep Creek and south of Highway 200 in Wilson Creek and Roberson Creek. The project is in Sanders County, Montana. · Sanders, Montana
Proposed prescribed burning within Siegel, Wallace, Dragonfly, Sheep, Wilson, and Robertson Creeks in Sanders County Montana on the Lolo National Forest. The project would reduce fuel accumulations and improve wildlife habitat.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
09/08/2023
Decision
09/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Ninemile Ranger District · updated 4/21/2026
The proposed Vertical Bridge Communications Tower Project is located approximately 2 miles southwest of Huson, MT, and 0.2 miles north of the Exit 82 Ninemile interchange. The proposed site is located on National Forest System (NFS) lands on the Ninemile Ranger District, Lolo National Forest. Lands covered by this proposal are located within Missoula County, State of Montana, and are within Section 34, Township 15 North, Range 22 West, P.M.M. · Missoula, Montana
Construction of a cellular communications tower near Exit 82 of I-90 in the Ninemile area to provide wireless communications coverage, consisting of a 199-foot steel monopole and lightning rod, approximately 220 foot long gated access road, and 60x60 foot gravel pad with chainlink fence enclosure.
Special use management
NEPA Start Date
6/15/2025
Finding/Decision Date
12/11/2025
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 12/11/2025 |
Decision Memo · Ninemile Ranger District · updated 6/5/2025
located on the Ninemile Ranger District in the Lolo National Forest. The project area size is less than 1 acre on the West Fork Fish Creek Trail approximately three miles south of Clearwater Crossing. · Mineral, Montana
This project proposes to repair and replace the current West Fork Fish Creek Trail Bridge that is deteriorating and will soon become unsafe to cross. This would help improve public safety, water quality, and habitat for aquatic species.
Recreation management
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Missoula Ranger District · updated 5/2/2025
Southeast end of Fort Missoula · Missoula, Montana
The T-150 administrative facility is used by the Lolo NF for a variety of purposes but has been condemned. The proposed reconstruction aims to provide a usable facility while maintaining the historic characteristics that define the current building.
Facility management
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rocky Mountain Ranger District · updated 4/15/2025
Bob Marshal Wilderness Complex · Flathead; Glacier; Lewis and Clark; Missoula; Pondera; Powell; Teton, Montana
Reissuance of outfitter and guide permits within the Bob Marshall Wilderness Complex.
Special use management
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Flathead National Forest; Lewis And Clark National Forest; Lolo National Forest |
| Districts | Spotted Bear Ranger District; Hungry Horse Ranger District; Rocky Mountain Ranger District; Lincoln Ranger District; Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 12/17/2024
The project area is located along the west-side of the Ninemile Valley, northwest of Huson, Montana in Missoula County. · Missoula, Montana
The project proposes to reduce the risk to wildfire by promoting healthy forest stands that are resilient to insects, disease, and wildfires as well as improve conditions for wildfire suppression through implementation of fuel treatments.
Vegetation management (other than forest products)Fuels management
Comment Period
09/21/2023
Decision
12/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce; 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 11/18/2024
46.773966, -114.435102 · Missoula, Montana
Proposed in-stream modifications of Lolo Creek to improve aquatic habitat, including addition of large woody debris and reconnection of historic channels.
Wildlife, fish, rare plantsWatershed management
Decision
11/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 11/13/2024
In proximity to the Main Rattlesnake trailhead in the Rattlesnake National Recreation Area. · Missoula, Montana
A proposal to reduce hazardous fuels on 305 acres within the Rattlesnake National Recreation Area. Methods would include hand thinning, hand-piling, pile burning, and underburning.
Vegetation management (other than forest products)Fuels management
Decision
11/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 10/1/2024
Upper O'Brien Creek South West of Missoula Montana · Missoula, Montana
Restoration of approximately 1.8 miles of O'Brien Creek to restore stream function and health.
Wildlife, fish, rare plantsWatershed management
Decision
09/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (19), 36 Cfr 220.6(E)(19); 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 8/16/2024
South of Clinton, Montana within the Rock Creek drainage of Granite County, Montana · Granite, Montana
Proposed prescribed burning within the Rock Creek drainage in Granite County Montana on the Lolo National Forest. The project would improve big game habitat, forage, and reduce fuels to moderate wildfire hazard and potential spread to communities.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
08/2024 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · R1 - Northern Region All Units · updated 6/12/2024
The Nez Perce National Historic Trail is approximately 2,184 miles, extending from the vicinity of Wallowa Lake in eastern Oregon to the Bear Paw Battlefield, about 16 miles south of Chinook, MT. · Clark; Clearwater; Fremont; Idaho; Lemhi; Lewis; Nez Perce; Beaverhead; Blaine; Carbon; Chouteau; Fergus; Gallatin; Golden Valley; Lewis and Clark; Missoula; Phillips; Ravalli; Stillwater; Wheatland; Yellowstone; Wallowa; Asotin; Park; Teton, Idaho; Montana; Oregon; Washington; Wyoming
This analysis identifies the visitor use capacity on National Forest System lands only, on the Nez Perce National Historic Trail to assist in the protection and management of trail resources.
Heritage resource managementRecreation management
Comment Period
06/03/2022
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Custer Gallatin National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Shoshone National Forest; Salmon-Challis National Forest; Caribou-Targhee National Forest; Wallowa-Whitman National Forest |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Custer Gallatin National Forest All Units; Lewis And Clark National Forest All Units; Plains/Thompson Falls Ranger District; Nez Perce-Clearwater National Forest All Units; Shoshone National Forest All Units; Salmon-Challis National Forest All Units; Caribou-Targhee National Forest All Units; Wallowa-Whitman National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 6/10/2024
Plains/Thompson Falls Ranger District of the Lolo National Forest, Sanders County, Montana · Sanders, Montana
The project proposes to reduce wildfire risk to communities, infrastructure, and ecosystems in the path of potential future wildfires and improve forest conditions that have departed from historic norms.
Fuels management
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior Ranger District · updated 4/26/2024
The project area of approximately 44,000 acres is between St. Regis and Superior in the Mill, Fourmile, Slowey, Keystone, and Pardee Creek drainages, and on the north slope facing into Highway 135. · Mineral; Sanders, Montana
Project includes vegetation, road, and recreation management activities to restore resilient vegetative conditions, reduce fuels, enhance recreation opportunities, and support communities. It also contains a proposal to amend the Forest Plan.
Forest productsVegetation management (other than forest products)Fuels managementRecreation managementRoad management
Comment Period
08/09/2023
Decision
04/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Missoula Ranger District · updated 4/24/2024
Rattlesnake Wilderness Area, Missoula Ranger District of the Lolo National Forest · Missoula, Montana
The City of Missoula holds an easement on McKinley Lake Dam and plans to decommission it. The Lolo NF proposal is to develop terms and conditions to minimize impacts of dam decommissioning activities on NFS lands, resources and wilderness values.
Projects that may affect wilderness (for mailing list contacts)Watershed management
Comment Period
07/12/2023
Objection Period Start
11/21/2023
Decision
04/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Watershed Improvements; Wilderness Management |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 3/19/2024
Plains / Thompson Falls Ranger District, Sanders County, Montana · Sanders, Montana
The Cherry Cr. project's purpose is to promote healthy stands of resilient tree species that can better resist insect and disease agents as well as reduce fuels near neighboring communities.
Vegetation management (other than forest products)
Decision
03/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Seeley Lake Ranger District · updated 9/5/2023
47.19043460734565, -113.51725662959274 · Missoula, Montana
Reconstruction of the boat launch and parking area at the Seeley Lake Campground to improve recreation access and reduce impacts to the aquatic ecosystem.
Recreation managementWildlife, fish, rare plants
Decision
09/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22); 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Superior Ranger District · updated 8/23/2023
Quartz Campground Tarkio West · Mineral, Montana
Missoula Electric Cooperative proposed special use permit to bury existing overhead power lines in Quartz Campground to reduce power outages, reduce fire hazard, reduce disturbance in powerline right of way, and improve aesthetics.
Special use management
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | T15N, R25W, Section 9 |
Decision Memo · Seeley Lake Ranger District · updated 7/10/2023
The Monture Creek Campground and Trailhead · Powell, Montana
Lolo National Forest proposes to remove hazard trees on about 21 acres in the Monture Creek campground and trailhead area to address dead and dying trees and safety hazards caused by Douglas-fir bark beetle infestation and decommission 2 campsites.
Vegetation management (other than forest products)Recreation management
Decision
07/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 5/17/2023
Section 33 of T22N R28W · Sanders, Montana
The Lolo National Forest proposes the closure of three hazardous mine openings (Raven two openings and North Silver King one) on the Plains Thompson Falls Ranger District. Closures would address public safety and use bat compatible locking gates.
Minerals and geology
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 5/5/2023
Missoula Ranger District of the Lolo National Forest within the Lolo, Fish, Graves, and Howard Creek drainages near Lolo Pass on US Highway 12. · Missoula, Montana
The project proposes to reduce wildfire hazard by creating a shaded fuelbreak along 37 miles of forest system road by use of chainsaws and handpiling of debris.
Fuels management
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ninemile Ranger District · updated 3/28/2023
South of I-90 and Alberton and Huson, MT in Sawmill, Reservoir, Petty, Peppard, Tank, and Corral Creek drainages. · Mineral; Missoula, Montana
Proposed treatments to accomplish the project objectives include tree thinning and slashing, prescribed fire, weed treatments, and road treatments.
Forest productsFuels managementVegetation management (other than forest products)Watershed managementRoad managementWildlife, fish, rare plants
Comment Period
09/04/2020
Objection Period Start
12/29/2020
Decision
03/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Sawmill-Petty Project Final Decision Notice | Decision Signed Date: 03/28/2023 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | SE 1/4 , NE 1/4, S 34, T14N, R 23W, MT Meridian |
Decision Memo · Lolo National Forest All Units · updated 9/14/2022
The project area is located on the Ninemile Ranger District north of the community of Frenchtown in Missoula County, Montana within the Houle Creek and Roman Creek drainages in Township 14 North, Range 21 West, Section 20 · Missoula, Montana
The purpose and need of the project is to reduce high concentrations of hazardous fuels resulting from dead and dying trees. High stand densities within the project area have caused accelerated tree mortality from insects and diseases.
Fuels managementVegetation management (other than forest products)
Decision
09/2022 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Township 14 North, Range 21 West, Section 20 |
Decision Memo · Missoula Ranger District · updated 9/9/2022
Approx. 5 mi. west of Lolo, MT in the West Fork Lolo Creek, Upper Lolo Creek, East Fork Lolo Creek, and Granite Creek watersheds on National Forest System lands · Missoula, Montana
Install lg. woody structures by hand falling trees on about 13 mi. of stream and on about 6 mi. using excavators. Would result in installing 200-250 structures across 4 targeted streams each containing 2-20 pieces of wood from local trees.
Watershed managementWildlife, fish, rare plants
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 8/31/2022
Roadside salvage along Graves Creek road #367, north of Thompson Falls. Salvage in Thompson River drainage located east of Thompson Falls. · Sanders, Montana
Salvage of dead and dying timber on approximately 610 acres of the Thorne Creek Fire. Project also includes roadside hazard tree removal and tree planting.
Forest productsVegetation management (other than forest products)
Comment Period
03/15/2022
Objection Period Start
04/21/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Graves Creek Roadside Fire Salvage Decision Memo | Decision Signed Date: 08/11/2022 |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 7/1/2022
McCabe Creek near Ovando, MT and Coopers Lake area east and west of the North Fork of the Blackfoot River · Missoula; Powell, Montana
Non-commercial thinning of small trees in previously harvested stands to increase tree health and vigor and decrease the risk of insects, disease and potential wildfire.
Vegetation management (other than forest products)
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T16N R12W Sec 33, 34; T15N R11W Sec 10, 11 |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 5/17/2022
Located about 4 miles east of Plains, Montana in the Deemer and Henry Creek drainages. · Sanders, Montana
Project includes vegetation and road management activities to reduce forest fuels, improve forest health, support communities, and address road travel management conflict. Project also includes forest plan amendment to correct mapping error.
Vegetation management (other than forest products)Fuels managementForest products
Comment Period
07/09/2021
Objection Period Start
09/09/2021
Decision
05/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Plan Amendment; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lolo National Forest All Units · updated 4/6/2022
13 miles west of Thompson Falls, MT within the Cox Gulch, Antimony Creek and Demont Creek drainages of the Prospect Creek watershed · Sanders, Montana
Integrated ecosystem management including vegetation and watershed restoration, fuels reduction, and wildlife habitat restoration.
Vegetation management (other than forest products)Fuels managementWatershed managementWildlife, fish, rare plants
Comment Period
08/08/2011
Decision
07/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Antimony Project | Decision Signed Date: 07/30/2012 Legal Notice Date: 08/02/2012 |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | T21N, R32W, Sections 16-21, 28-30, |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 1/4/2022
Project is located about 10 miles west of Thompson Falls in the Antimony, Cox, Everson, Buster Brown, Lucky Boy, and Therriault drainages, which are tributary to Prospect Creek. · Sanders, Montana
Project proposal includes vegetation, road, and watershed management activities to address multiple resource objectives.
Road managementWatershed managementVegetation management (other than forest products)Forest productsFuels managementWildlife, fish, rare plants
Comment Period
10/22/2020
Objection Period Start
02/08/2021
Decision
01/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Sections 14-16, 19-23, 26-30, and 34-35, T21N, R31W, P.M.M. |
Decision Memo · Lolo National Forest All Units · updated 10/20/2021
The project area is entirely within the Scapegoat Wilderness area, approximately 15 miles east northeast of Ovando, Montana. · Lewis and Clark; Powell, Montana
Authorize pesticide use permit and use of normally prohibited activities in designated wilderness. Would allow fish treatment and stocking project by Montana Fish, Wildlife & Parks in Scapegoat Wilderness.
Wildlife, fish, rare plants
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements; Wilderness Management |
| North Fork Blackfoot River Indigenous Fish Restoration | Decision Signed Date: 06/02/2021 (FS Withdrawn) |
| Forests | Lewis And Clark National Forest; Lolo National Forest |
| Districts | Lincoln Ranger District; Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ninemile Ranger District · updated 8/26/2021
The access request is located in Section 26, Township 14 N., Range 23 W. The authorized access would be from the existing FS gate on NFSR 5557 to the jct. with NFSR 44663, then along NFSR 44663. · Missoula, Montana
Forest Service proposes to issue a 5-year special use permit to landowner to use/maintain approx. 2800 ft. of existing NFS roads to access the northern portion of their private property located in the West Fork Petty Creek drainage
Special use management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 5/27/2021
North of Thompson Falls · Sanders, Montana
Project includes management actions on specific roads and trails to comply with Forest Plan access standards for wheeled motorized vehicle use within the portion of the Cabinet-Yaak Grizzly Bear Recovery Zone that overlaps the Lolo National Forest.
Road managementRecreation managementWildlife, fish, rare plants
Comment Period
08/12/2020
Objection Period Start
02/15/2021
Decision
05/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Trail Management; Travel Management |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 4/26/2021
Finley Flats, Prospect Creek, Thompson Falls Administrative Site, Graves Creek, and Swamp Creek · Sanders, Montana
Removal of blown down and wind damaged trees in 5 specific areas on the Plains/Thompson Falls Ranger District: Finley Flats, Prospect Creek, Thompson Falls Administrative Site, Graves Creek, and Swamp Creek.
Vegetation management (other than forest products)Forest productsFuels managementRecreation management
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Sec. 27, T23N, R30W; Sec. 21, T21N, R30W; Sec. 3, T21N, R29W; Sec. 36, T23N, R30W; Sec. 23, T20N, R27W |
Decision Memo · Seeley Lake Ranger District · updated 3/8/2021
This project area is about 2 miles northwest of Seeley Lake, MT, along the western side of Seeley Lake, accessible by County Rd 77 and NFS Rd 2190. · Missoula, Montana
This project is being developed to address forest fuels concerns on the western/northwestern side of Seeley Lake while improving species composition and forest structure.
Fuels managementVegetation management (other than forest products)Forest products
Decision
03/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5); 32.3 (9) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T17N R15W Sects. 5-8, 18-20, 28-33 |
Environmental Assessment · Superior Ranger District · updated 1/20/2021
The project area is approx. 3 miles west of Haugen and northeast of Saltese in Mineral County, MT. It is located between Interstate 90 and NFS Road 288. It is bounded by Packer Creek (W), East Fork Packer Creek (N), and McManus Creek (NE/E). · Mineral, Montana
We are proposing to implement commercial and non-commercial vegetation management, which includes fuel treatments, on approximately 1615 acres. Additionally, we are proposing to complete ecosystem maintenance burning over approximately 1136 acres.
Fuels managementVegetation management (other than forest products)Forest products
Comment Period
03/02/2020
Objection Period Start
09/28/2020
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | T19 R30 Sections 6- 8, 17-20 and T19 R31 Sections 1, 2, 11-14 |
Decision Memo · Ninemile Ranger District · updated 10/14/2020
The road would be re-constructed off of NFSR 5563 in Secs. 17 & 18, T14N, R22W between Petty Creek and Southside Rd. · Missoula, Montana
Special-use permit to re-construct, use, and maintain approximately 0.78 mi. of permanent road across NFS land to access a private parcel
Special use management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Lolo National Forest All Units · updated 9/25/2020
20 miles northwest of Missoula, Montana · Missoula, Montana
Fuels management, timber harvest, manage weeds, roads & recreation
Road managementWatershed managementVegetation management (other than forest products)Recreation managementWildlife, fish, rare plantsFuels managementForest products
NOI in Federal Register
12/06/2002
DEIS NOA in Federal Register
07/23/2004
FEIS NOA in Federal Register
03/24/2006
Decision
02/2006 (Estimated)
Implementation
06/2006 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Frenchtown Face Ecosystem Restoration | Decision Signed Date: 02/23/2006 (Reversed in Appeal (215)) Legal Notice Date: 03/24/2006 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T15N, R21W, PM-MT |
Decision Memo · Plains/Thompson Falls Ranger District · updated 8/12/2020
South of Highway 135, approximately 6 air miles southwest of Paradise, MT · Sanders, Montana
Construction of 3 miles of seasonal, non-motorized trail to connect the River Trail #223 near Ferry Landing to the Iron Mountain Wagon Road Trail #242 by Cascade Campground.
Recreation management
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Sections 14, 23, 24, 25, T18N, R25W, P.M.M. |
Decision Memo · Ninemile Ranger District · updated 8/4/2020
Two mining claims in the Little McCormick and Kennedy Creek areas on the Ninemile Ranger District, Lolo National Forest · Missoula, Montana
Includes excavating up to twenty trenches, and two sediment retention ponds with an excavator. Material from the trenches would be processed through a recirculating wash plant recovering any gold.
Minerals and geology
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Lolo National Forest All Units · updated 7/27/2020
The 61,000 acre Center Horse Project area is about 14 miles north of Ovando and includes the N. FK. Cottonwood and Spring Ck drainages on the west and the McCabe ck drainage on the east. · Missoula; Powell, Montana
Collaboratively developed integrated ecosystem management including restoration of fire adapted ecosystems, soil productivity, watersheds and aquatic habitat, and management of recreation opportunities and motor vehicle access.
Forest productsFuels managementVegetation management (other than forest products)Recreation managementWildlife, fish, rare plantsWatershed managementRoad management
NOI in Federal Register
07/23/2012
DEIS NOA in Federal Register
12/31/2015
FEIS NOA in Federal Register
07/23/2020
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Biomass; Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T16N, R11W, S 19,20,29-32; T16N, R12W, S 2,7,11-15,17-20,22-36; T16N, R13W, S 1-27; T16N, R14W S 1-5,9-15,22-24,26,27; T17 R12W S18,19,30,31; T17N, R13W S 3,4,7,9-36; T17N, R14W S 12-14,23-27, 34-36 |
Decision Memo · Missoula Ranger District · updated 6/30/2020
Approx. 25 miles west of Lolo, MT in the W Fork Lolo Creek and Upper Lolo Creek watersheds. Major streams in these watersheds include W Fork Lolo Creek, Lee Creek, Cloudburst Creek, and Mud Creek. · Missoula, Montana
Approx. 2 mi. of road would be stored (i.e., culverts are pulled at crossings to reduced sediment inputs but the roads remain on the Forest's transportation system inventory for anticipated future forest management) and 10 mi. would be decommissioned
Wildlife, fish, rare plantsWatershed management
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Township 10N, Range 24W, Sections 1, 3, & 11; Township11N, Range 24W, Sections 13, 24, 25, 35, & 36; Township 11N, Range 23W, Sections 29 & 30; and Township 12N, Range 23W Sections 25, 32, & 35 |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 6/17/2020
Priscilla Peak is 11 miles northeast of Thompson Falls and Driveway Peak is 11 miles west of Thompson Falls. · Sanders, Montana
Relocation and restoration of historic Priscilla Peak lookout. Proposal includes moving the structure from Priscilla Peak to Driveway Peak, restoring it, and opening it as a cabin rental.
Recreation managementHeritage resource management
Comment Period
11/2020 (Estimated)
Objection Period Start
02/2021 (Estimated)
Decision
03/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Heritage Resource Management |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Spotted Bear Ranger District · updated 4/2/2020
Bob Marshall Wilderness Complex · Flathead; Glacier; Lewis and Clark; Missoula; Pondera; Powell; Teton, Montana
Reissuance of existing outfitter and guide permits in the Bob Marshall Wilderness Complex.
Recreation managementSpecial use management
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Wilderness Management |
| Forests | Flathead National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest |
| Districts | Swan Lake Ranger District; Spotted Bear Ranger District; Hungry Horse Ranger District; Lincoln Ranger District; Rocky Mountain Ranger District; Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lolo National Forest All Units · updated 2/20/2020
Site 1: NW of Missoula in OKeefe Creek (Missoula County); Site 2: 6.5 miles west of Plains (Sanders County); Site 3: islands in the Clark Fork River east of Thompson Falls (Sanders County) · Missoula; Sanders, Montana
Removal of and/or abandonment-in-place of approximately 9,693 feet of out-of-service pipeline located on three separate sites within Missoula and Sanders Counties on the Missoula and Plains/Thompson Falls Ranger Districts
Special use management
Comment Period
02/13/2019
Objection Period Start
09/18/2019
Decision
11/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District; Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Superior Ranger District · updated 1/29/2020
Quartz Flats campground, Trout Creek campground, Slowey campground, Little Joe campground, Cabin City campground, and Savenac Historic Tree Nursery · Mineral, Montana
Project includes the removal of trees that are hazards and those that are affected by or highly susceptible to insects and disease within 6 developed recreation sites to maintain public safety and long-term vegetation health.
Recreation managementVegetation management (other than forest products)
Decision
01/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Forest Vegetation Improvements |
| Superior RD Campgrounds Vegetation Management Project | Decision Signed Date: 01/29/2020 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 1/8/2020
Located across the Clark Fork River from Plains in the Swamp and Combest Creek drainages · Sanders, Montana
Integrated project that includes vegetation and road management activities to restore resilient vegetative conditions, support communities, and maintain a suitable transportation system.
Recreation managementVegetation management (other than forest products)Fuels managementForest productsRoad management
Comment Period
08/14/2019
Objection Period Start
11/04/2019
Decision
01/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Road Maintenance; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | T19N, R26 and 27W, P.M.M. |
Decision Memo · Seeley Lake Ranger District · updated 11/6/2019
he project is located on the Seeley Lake Ranger District 13 miles southwest of Seeley Lake, MT. · Missoula, Montana
The proposed action includes harvesting dead, dying, insect infested, and diseased trees on 484 acres. The proposed activities would likely begin in winter of 2019-2020, with harvest and associated activities completed within one year.
Forest products
Decision
11/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior Ranger District · updated 9/30/2019
West end of the Superior Ranger District: St. Regis to Lookout Pass Ski Area · Mineral, Montana
Motorized recreation management including development and authorization of trails and roads for summer seasonal OHV use (ATV, UTV, motorcycle).
Road managementRecreation management
Comment Period
04/11/2019
Objection Period Start
07/29/2019
Decision
09/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Travel Management |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Seeley Lake Ranger District · updated 8/7/2019
Project is located about 7 miles northeast of Seeley Lake, MT in the upper reaches of the Morrell Creek watershed. · Missoula, Montana
Restore and stabilize approximately 5,000 linear feet of stream channel, streambanks,and associated floodplains to more natural conditions and reduce downstream impacts to bull trout and westslope cutthroat trout.
Wildlife, fish, rare plantsWatershed management
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Flathead National Forest All Units · updated 8/6/2019
Flathead National Forest; portions of the Lolo, Kootenai, Helena, and Lewis & Clark NF found in the Northern Continental Divide Ecosystem (grizzly bears) · Flathead; Glacier; Granite; Lake; Lewis and Clark; Lincoln; Mineral; Missoula; Pondera; Powell; Sanders; Teton, Montana
The Flathead NF is revising their forest plan and preparing an amendment providing relevant direction from the NCDE Grizzly Bear Conservation Strategy into the forest plans for the Lolo, Helena, Kootenai, and Lewis & Clark National Forests.
Land management planning
NOI in Federal Register
03/06/2015
DEIS NOA in Federal Register
06/03/2016
FEIS NOA in Federal Register
12/14/2017
Objection Period Start
12/14/2017
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Creation/Revision; Plan Amendment |
| Final ROD for the Flathead National Forest Land Management Plan | Decision Signed Date: 12/24/2018 Legal Notice Date: 12/24/2018 |
| Forests | Flathead National Forest; Helena National Forest; Kootenai National Forest; Lewis And Clark National Forest; Lolo National Forest |
| Districts | Flathead National Forest All Units; Helena National Forest All Units; Kootenai National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Ninemile Ranger District · updated 7/15/2019
Stark MT Inventoried Roadless Area along the Ninemile Divide · Missoula, Montana
The purpose of this project is to apply prescribed fire to the landscape to address wildfire risk reduction and reduce fuels accumulations within the Lolo NF Community and General Wildfire Protection Zones.
Wildlife, fish, rare plantsFuels management
Decision
05/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T16N, R24W, Sections 22, 23, 24, 25, 26, 27, 35, &36. T16N, R23W, Section 30. |
Environmental Impact Statement · Idaho Panhandle National Forest All Units · updated 7/12/2019
Lookout Pass Ski and Recreation Area on Montana-Idaho Border, approximately 12 miles east of Wallace, Idaho. · Shoshone; Mineral, Idaho; Montana
Proposal by Lookout Pass Ski and Recreation Area to expand its special use permit to upgrade and develop new lifts, ski terrain, parking, access roads, and guest service facilities.
Special use managementRecreation management
NOI in Federal Register
04/04/2014
DEIS NOA in Federal Register
03/11/2016
FEIS NOA in Federal Register
12/23/2016
Objection Period Start
12/23/2016
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Idaho Panhandle National Forest; Lolo National Forest |
| Districts | Wallace Ranger District; Lolo National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 6/3/2019
Power line corridor from Thompson Falls to the Antimony substation then up Cooper Gulch to Cooper Pass. · Sanders, Montana
Vegetation clearing and pole replacement would be conducted within the Northwestern Energy's Thompson Falls to Burke A & B 115kV power line corridor to comply with North American Electric Reliability Corporation (NERC) standards.
Special use management
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 2/21/2019
Five miles east of Paradise in the Knowles Creek area near the Flathead Indian Reservation boundary. · Sanders, Montana
The project includes prescribed burning on approximately 2500 acres to improve bighorn sheep habitat and reduce hazardous fuels.
Wildlife, fish, rare plantsFuels management
Decision
02/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 2/15/2019
Pattee Canyon Recreation Area · Missoula, Montana
Proposal in to conduct hand thinning, girdling, hand-piling, pile-burning and underburning on 1725 acres within a portion of the Pattee Canyon Recreation Area.
Fuels managementVegetation management (other than forest products)
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Sections 1, 2, 11, and 12 of Township 12 North, Range 19 West, Section 36 of Township 13 North, Range 19 West, the Southwest of Section 1 of Township 13 North, Range 18 West, and the Southwest of |
Decision Memo · Plains/Thompson Falls Ranger District · updated 2/7/2019
Graves Creek, Crow Creek, Cooper Gulch, upper Prospect Creek, and Fishtrap Creek. · Sanders, Montana
Installation of large wood and other aquatic improvements in Graves Creek, Crow Creek, Cooper Gulch, Fishtrap Creek, and upper Prospect Creek to enhance habitat for native fish.
Wildlife, fish, rare plants
Decision
02/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ninemile Ranger District · updated 12/7/2018
Project area is between Fish and Petty Creeks in Mineral County. · Mineral, Montana
Use prescribed fire (primarily aerial ignition) on about 7,300 acres to: restore wildlife habitat and reduce the risk of high severity wildfire within the project area.
Fuels managementWildlife, fish, rare plants
Decision
12/2018 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 12/3/2018
Property is located just off Columbia Street on the north end of Thompson Falls. · Sanders, Montana
Sale of property consisting of 4 buildings on approximately 5 acres, located just north of Thompson Falls in Sanders County, Montana
Land ownership management
Decision
12/2018 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Section 5, a portion of the SE1/4, SW1/4, T21N, R29W, P.M.M. |
Environmental Assessment · Lolo National Forest All Units · updated 9/5/2018
Rice Ridge Fire of 2017. Immediately north and west of Seeley Lake, MT. · Missoula; Powell, Montana
The proposed action includes harvesting dead, dying, and diseased (i.e., dwarf mistletoe) timber, cutting hazard trees along roads, and planting tree seedlings.
Forest products
Comment Period
06/11/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Seeley Lake Ranger District · updated 8/13/2018
The project is 13 miles southwest of Seeley Lake, MT. · Missoula; Sanders, Montana
Harvesting dead and dying trees is proposed on about 250 acres, requiring about 0.45 mi. of temp road construction. Plant conifer seedlings on about 6,600 acres within the fire perimeter, including all areas identified for salvage.
Forest products
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 7/31/2018
Sheep Gap Fire located approximately 8 miles west of Plains, primarily in the Swamp and Bemish Creek drainages. · Sanders, Montana
Harvest of dead and dying trees on approximately 2152 acres (11%) of the Sheep Gap Fire located about 8 miles west of Plains. Proposal also includes cutting of hazard trees along roads and planting of tree seedlings.
Forest products
Comment Period
06/05/2018
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Seeley Lake Ranger District · updated 7/16/2018
Hobnail Tom Trail #32, Scapegoat Wilderness, Seeley Lake Ranger District, Lolo National Forest. · Powell, Montana
The Seeley Lake Ranger District is proposing to replace two trail bridges along the Hobnail Tom Trail #32 that provide access across the North Fork Blackfoot River and are located in the Scapegoat Wilderness, Bob Marshall Wilderness Complex.
Watershed managementRecreation management
Comment Period
07/31/2017
Objection Period Start
10/05/2017
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Watershed Improvements; Wilderness Management |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lolo National Forest All Units · updated 6/4/2018
Sunrise Fire located on both the Superior and Ninemile Ranger Districts about 7 miles southeast of Superior, primarily within the Verde, Sunrise, Meadow, and Quartz Creek drainages · Mineral, Montana
Post-fire salvage of dead and dying trees on approximately 2718 acres (11%) of the Sunrise Fire, located approximately 7 miles southeast of Superior. Proposal also includes cutting hazard trees along roads and planting of tree seedlings.
Forest products
Comment Period
04/17/2018
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District; Superior Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Missoula Ranger District · updated 5/18/2018
Project area is within perimeter of Lolo Peak Fire (2017) about 10 miles southwest of Missoula, MT · Missoula, Montana
Plant conifer seedlings and protect them from animal browsing to reforest Lolo NF land burned during the Lolo Peak Fire of 2017.
Vegetation management (other than forest products)
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 5/18/2018
Headwaters are of the Fishtrap Creek drainage. Approximately 22 miles northeast of Thompson Falls. · Sanders, Montana
Removal of dead and dying trees on approximately 250 acres burned by the Moose Peak Fire.
Forest products
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Sections 21-22, T25N, R28W, P.M.M. |
Decision Memo · R1 - Northern Region All Units · updated 5/3/2018
Commercial use proposed on Rice Ridge, Sheep Gap, Sunrise and Goat Cr. Fires on Lolo NF. Caribou, Deep Creek, West Fork Fires on Kootenai NF. Moose Peak Fire on Lolo and Kootenai NFs. · Granite; Lewis and Clark; Lincoln; Mineral; Missoula; Powell; Sanders, Montana
Commercial Mushroom Harvest permit system for areas within several 2017 fires on the Kootenai and Lolo National Forests. Personal use mushroom harvest permit system for other 2017 fire areas.
Special use management
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Kootenai National Forest; Lolo National Forest |
| Districts | Kootenai National Forest All Units; Lolo National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 5/2/2018
Cougar Peak-Vermillion Ridge area of the Deep-Miller Fire about 10 air miles north of Thompson Falls AND Fishtrap Creek headwaters within the Moose Peak Fire about 22 air miles north of Thompson Falls · Sanders, Montana
Planting native tree seedlings on approximately 1000 acres burned by the 2017 Deep-Miller and Moose Peak Fires.
Vegetation management (other than forest products)
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Missoula Ranger District · updated 2/28/2018
Approximately 25 miles west of Lola, MT in the Granite Creek 6th Hydrologic Unit Code watershed on National Forest System Lands. · Missoula, Montana
The roads proposed for decommissioning are non-system roads that are roads are currently closed to motorized public access and this proposed project will not alter public access.
Watershed managementWildlife, fish, rare plants
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ninemile Ranger District · updated 2/16/2018
Martina Creek Road 4256 · Missoula, Montana
Private landowner is requesting a forest road permit to use and maintain the Martina Creek Road 4256 from the gate to MP 3.07 where it enters their private property. Access has been given annually through a temp road use permit since 2008.
Special use management
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior Ranger District · updated 1/18/2018
East of the Clark Fork River between the town of Superior and South Fork Nemote Creek · Mineral; Missoula; Sanders, Montana
Vegetation and road management activities to improve vegetative resilience; reduce forest fuels; improve forage conditions for elk; provide wood products to contribute to local and regional economies; and maintain a sustainable transportation system.
Forest productsVegetation management (other than forest products)Fuels managementRoad managementWildlife, fish, rare plants
Comment Period
08/12/2016
Objection Period Start
02/24/2017
Decision
05/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District; Superior Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 11/27/2017
Shorty Gulch located five miles southwest of Thompson Falls · Sanders, Montana
Integrated project that includes vegetation and road management activities to address insect and disease concerns, reduce fuels within the wildland urban interface, and maintain a suitable transportation system.
Fuels managementForest productsRoad managementVegetation management (other than forest products)
Comment Period
08/09/2017
Objection Period Start
10/13/2017
Decision
11/2017 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 7/20/2017
Bridge approach on the Martina Creek Road (NFSR#4256) crossing of Ninemile Creel and Mattie V Creek. · Missoula, Montana
he Lolo National Forest is proposing to modify a bridge approach on the Martina Creek Road (National Forest System Road #4256) crossing of Ninemile Creek near Martina and Mattie V Creeks.
Road managementWildlife, fish, rare plants
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Travel Management |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T. 17 N., R. 24 W., Sec. 22 |
Decision Memo · Seeley Lake Ranger District · updated 7/20/2017
Project occurs entirely on the Seeley Lake RD, Lolo NF. Sites are primarily associated with wetlands, riparian areas and mesic meadow lands. · Missoula; Powell, Montana
This project entails removal of conifers within aspen stands by hand feliing in order to improve aspen vigor and increase regeneration within aspen clones.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 7/19/2017
Project is located approximately 12 miles northeast of Thompson Falls, within the perimeter of the 2016 Copper King Fire. · Sanders, Montana
Salvage of dead and dying trees on approximately 1708 acres within the Copper King Fire perimeter. Project also includes cutting danger trees along roads and tree planting on approximately 6000 acres.
Vegetation management (other than forest products)Forest products
Comment Period
04/14/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 3/7/2017
In Seeley Lake, MT from MT Hwy 83 go east on Double Arrow Road to the subdivision boundary approx. 3 mi. · Missoula, Montana
Year-round use and maintenance on a Forest Service route to access Double Arrow Subdivision
Special area management
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Superior Ranger District · updated 7/6/2016
The project is located along the paved Southside Road #69 between Dry and Thompson Creeks, approximtely 4 miles northwest of Superior and 11 miles southeast of St. Regis. · Mineral, Montana
Vegetation and recreation management activities on 120 acres to reduce bark beetle susceptibility and respond to public desires for a gentle, non-motorized trail near communities.
Vegetation management (other than forest products)Recreation managementForest products
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Trail Management; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Section 25, T17N, R27W, P.M.M. |
Decision Memo · Ninemile Ranger District · updated 6/13/2016
Township 15N; Range 22 W; NW quarter of Section 6. Bordered by private property on three sides, west of Kreis Pond between Spring and Butler Creeks · Missoula, Montana
Hand thinning, hand piling, and pile burning of understory ponderosa pine and Douglas fire to reduce ladder fuels directly adjacent to private property.
Fuels management
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior Ranger District · updated 4/27/2016
Twelvemile Creek, Tamarack Creek, Mullan Gulch, and Boyd Mountain · Mineral, Montana
Integrated forest resource project that includes vegetation management, big game winter range maintenance, watershed improvements, fuels reduction, and recreation enhancements within the 69,000-acre project area located north and west of St. Regis
Wildlife, fish, rare plantsRecreation managementWatershed managementVegetation management (other than forest products)Fuels management
Comment Period
05/28/2015
Objection Period Start
01/28/2016
Decision
04/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | T19N, R27W; T19N, R28W; T19N, R29W; T18N, R27W; T18N, R28W; T18N, R29W; T20N, R28W; T20N, R29W |
Decision Memo · Ninemile Ranger District · updated 3/29/2016
Multiple sub-drainages in the Petty Creek drainage. · Mineral; Missoula, Montana
The project would reintroduce low intensity fire to primarily southern slopes to reduce natural fuel accumulations within the wildland urban interface (WUI) and to enhance the winter range of big game species by stimulating herbaceous growth.
Wildlife, fish, rare plantsWatershed managementFuels management
Decision
03/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Missoula Ranger District · updated 3/22/2016
ast Fork Lolo Creek 6th Hydrologic Unit Code watershed · Missoula, Montana
Decommissioning of approximately 14 miles of non-system forest roads to benefit Bull Trout fisheries and meet TMDL requirements by reducing stream sedimentation.
Watershed managementWildlife, fish, rare plants
Decision
03/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Seeley Lake Ranger District · updated 2/4/2016
All proposed activity would be over snow and would occur on groomed or intermittently groomed routes identified on OSVUM for the Seeley Lake Ranger District · Powell, Montana
Reissue 5 year Recreation Permit for an over snow dog sled race (4 day) on existing snowmobile routes identified on the Seeley Lake RD OSVUM. No ground disturbance. Installation of temporary checkpoints, stops, route markers, and directional signage.
Special use management
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Missoula Ranger District · updated 1/28/2016
The 13,000 acre analysis area is approx. 5 mi. NW of Missoula in Missoula Co. and includes Rattlesnake Crk., Woods Gulch, Marshall Crk., and the S portion of the Rattlesnake National Recreation Area · Missoula, Montana
Integrated resource management including vegetation and watershed restoration, fuels reduction, public education, and recreation enhancements.
Vegetation management (other than forest products)Wildlife, fish, rare plantsForest productsWatershed managementFuels managementRecreation managementRoad management
Comment Period
03/06/2015
Objection Period Start
08/10/2015
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T13N, R18W, Sec. 4-8, 18,19; T13N, R19W, Sec.1, 2, 11-14, 22-24; T14N, R18W, Sec. 18-20, 2-34; T14N, R19W, Sec. 13, 23-26, 35, 36 PM MT |
Decision Memo · Missoula Ranger District · updated 10/26/2015
Lolo Creek, along US Hwy 12 approximately 12 miles west of Lolo, MT · Missoula, Montana
This project would utilize large hazard trees cut after the 2013 Lolo Complex Fire to construct large woody debris structures on Lolo Creek to enhance aquatic habitat and improve stream and floodplain health.
Watershed managementWildlife, fish, rare plants
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Superior Ranger District · updated 9/11/2015
Cedar and Thompson Creek drainages, located southwest of Superior, MT · Mineral, Montana
Integrated forest management including: vegetation and watershed restoration, fuels reduction, and recreation enhancements within the Cedar and Thompson Creek drainages, located southwest of Superior, Montana.
Wildlife, fish, rare plantsFuels managementRecreation managementWatershed managementVegetation management (other than forest products)
NOI in Federal Register
08/07/2009
DEIS NOA in Federal Register
01/28/2011
FEIS NOA in Federal Register
11/14/2014
Decision
02/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | T15N, R28W; T15N, R27W; T16N, R28W; T16N, R27W; T16N, R26W; T17N, R27W |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 9/11/2015
Clear Creek drainage within the Prospect watershed about 3 miles west of Thompson Falls, Montana · Sanders, Montana
Integrated landscape management including forest vegetation restoration, wildlife habitat and watershed improvements, and recreation enhancements within the Clear Creek drainage.
Vegetation management (other than forest products)Wildlife, fish, rare plantsRecreation managementWatershed management
Comment Period
09/07/2012
Objection Period Start
12/06/2013
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Timber Sales (Green); Watershed Improvements |
| Clear Creek Project | Decision Signed Date: 09/02/2014 |
| Forests | Lolo National Forest |
| Districts | Lolo National Forest All Units |
| Legal Land Description | T21N, R30-32W; T22N, R30-32W |
Environmental Impact Statement · Missoula Ranger District · updated 9/11/2015
Nine miles north of Missoula, MT. The area directly west of the existing Montana Snowbowl ski area. · Missoula, Montana
Expansion of permitted ski area to provide additional winter recreational opportunities and improvement of ski area facilities.
Special use management
NOI in Federal Register
01/13/2006
DEIS NOA in Federal Register
03/11/2011
FEIS NOA in Federal Register
12/05/2013
Objection Period Start
12/06/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Montana Snowbowl Expansion | Decision Signed Date: 05/01/2014 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Sections 27, 28,32, 33,T15N, R19W; and Sections 4 and 5 T14N, R19W, PMM |
Decision Memo · Missoula Ranger District · updated 8/26/2015
25 miles east of Missoula, MT, Sapphire Range · Granite, Montana
Amendment of the Lolo National Forest Plan to include standards for the protection of wilderness character in the Welcome Creek Wilderness.
Recreation managementLand management planning
Comment Period
05/11/2012
Objection Period Start
08/05/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Dispersed Recreation Mgmt.; Plan Amendment; Wilderness Management |
| Forest Plan Amendment #38 - WCW Opportunity Classes and Standards | Decision Signed Date: 02/14/2013 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T10N, R18W; T10N, R17W; T9W, R17W, USGS Quade Name: Cleveland Mtn., Grizzly Point, Elk Mountain and Iris Point |
Decision Memo · Missoula Ranger District · updated 6/30/2015
Rock Creek Recreation Area · Granite, Montana
Re-issuance of a 10 year Special Use Permit for Outfitting and Guiding to provide big game hunting and trail ride services in the Rock Creek Recreation Area of the Missoula Ranger District.
Special use managementRecreation management
Decision
06/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Special Use Authorizations |
| JM-(BAR) Outfitters 10 Year Special Use Permit Re-issuance | Decision Signed Date: 06/25/2015 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ninemile Ranger District · updated 6/8/2015
Meadow Creek Drainage, about 11 miles SE of Superior, MT · Mineral, Montana
Placer mine exploration using heavy equipment on previously disturbed lands.
Watershed managementMinerals and geology
Comment Period
05/20/2006
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8); 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations; Watershed Improvements |
| Big Nugget Exploration Plan | Decision Signed Date: 06/10/2010 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Section 24, T15N, R26W |
Decision Memo · Ninemile Ranger District · updated 4/7/2015
Straight creek, west fork fish creek, packer gulch, and an un-named drainage north of the Clearwater Crossing Administrative site. · Mineral, Montana
Prescribed burning on approximately 2,719 acres, to reduce fuels concentrations in close proximity to the Clearwater Crossing Administrative Site and the small community located at the Clearwater Crossing location of Fish Creek.
Fuels management
Decision
04/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Proposed Great Burn Wilderness & Clearwater Crossing Prescribed Burning | Decision Signed Date: 04/06/2015 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lolo National Forest All Units · updated 3/26/2015
On the Seeley Lake District, west of Highway 83. · Missoula, Montana
Montana Department of Natual Resources and Conservation and the Lolo N.F. are entering into a Cost Share Supplement to exchange easements so both parties can have legel access to their lands.
Road managementLand ownership management
Decision
03/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Placid Lake Cost Share Supplement 29 | Decision Signed Date: 03/24/2015 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Lat 47.13, Long -113.557 |
Decision Memo · Lolo National Forest All Units · updated 3/25/2015
Township 11 North, Range 22 W, Sections 3 and 10, Missoula County, MT · Missoula, Montana
A prescribed burn on 29 acres in Butte Lookout Unit #22.
Wildlife, fish, rare plantsFuels management
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Butte Lookout Prescribed Burning Project | Decision Signed Date: 03/12/2015 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Plains/Thompson Falls Ranger District · updated 3/3/2015
Mouth of Eddy Creek about 12 air miles northwest of Plains in Section 31, T21N, R27W, P.M.M. · Sanders, Montana
Vegetation treatment to reduce future tree losses from root disease and improve resilience to insect infestation on 131 acres of National Forest System land located within the wildland urban interface, adjacent to private property and residences.
Forest productsVegetation management (other than forest products)
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Superior Ranger District · updated 1/27/2015
Located in the Cold Creek, Ann Arbor Gulch and 4th of July Gulch drainages of the Dry Creek watershed about 7 air miles south of St. Regis, MT w/in T17N R28W Sect 22 & 27 and T16N R28W Sect 33 & 34 · Mineral, Montana
The project proposes commercial timber harvest in 16 units totaling approximately 235 acres and approximately 265 acres of mixed severity prescribed burn. No permanent roads will be constructed; less than 0.5 miles of temporary road will be needed.
Forest productsVegetation management (other than forest products)
Decision
01/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Firecracker Annie Decision Memo | Decision Signed Date: 01/27/2015 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Missoula Ranger District · updated 11/14/2014
In East Fork of O'Keefe Creek, LaValle Creek and Marent Gulch · Missoula, Montana
The Lolo NF is proposing to revise the allotment management plan for the O'Keefe Grazing Allotment to ensure compliance with current environmental standards and laws.
Grazing management
Comment Period
06/28/2014
Decision
10/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| O'Keefe Grazing Allotment Management Plan Revision Final DN/FONSI | Decision Signed Date: 10/30/2014 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T14N, R20W, Sec. 1, 2, and 3 and T15N, R20W, Sec. 34 and 35 |
Decision Memo · Missoula Ranger District · updated 10/27/2014
Montana Snowbowl permit area. · Missoula, Montana
Construction of a 600' trail within the Snowbowl ski area permit boundary to allow public and maintenance access to ziplines located on Snowbowl's private lands.
Special use managementRecreation management
Decision
10/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Montana Snowbowl Zip Line Access Trail | Decision Signed Date: 10/22/2014 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T.15 N., R.19 W. |
Environmental Assessment · Superior Ranger District · updated 10/21/2014
Western end of Mineral County · Mineral, Montana
Special use permit request to conduct a commercial mountain bike shuttle service in the west end of Mineral County.
Special use management
Comment Period
05/07/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Nelson Shuttle Service Special Use Permit | Decision Signed Date: 10/20/2014 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Seeley Lake Ranger District · updated 10/21/2014
Approx. 3 mi. NW of Seeley Lake · Missoula, Montana
Construction of a shed to house the grooming equipment used to groom the snowmobile trails on the Seeley Lake area.
Special use management
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Westside Trailhead Snowmobile Groomer Shed | Decision Signed Date: 09/08/2014 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T. 17 N., R. 15 W., section 7 |
Decision Memo · Seeley Lake Ranger District · updated 10/21/2014
Approx. 9 miles SE of Seeley Lake at Morrell Mountain. · Powell, Montana
Re-issue permit authorizing sservice days for renting two yurts and guiding activities associated with the yurts.
Special use management
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| One Water Yurts Permit Re-issue | Decision Signed Date: 10/20/2014 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T. 17 N., R. 14 W., section 35 |
Decision Memo · Seeley Lake Ranger District · updated 10/2/2014
Clearwater Loop Road 4370 at mile mark 8.2. Morrell Bridge Road 4381 at mile mark 0.1. · Missoula; Powell, Montana
Replace bridge on Morrell Creek, relocate 500 feet of roadway at the bridge approaches to place the bridge at a more stable location on the stream. Replace and relocate culvert on Clearwater Loop Road 4370, 75 feet upstream of existing structure.
Road managementWatershed management
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Bridge: T17N, R15W, Section 1 Culvert: T19N, R15W, PB47 |
Environmental Assessment · Ninemile Ranger District · updated 10/2/2014
Ninemile, Superior, and Plains Ranger Districts on the Lolo National Forest · Mineral; Missoula; Sanders, Montana
The Lolo Post Burn EIS decision was not upheld in court. This project would issue a new decision to complete restoration activities originally analyzed in the EIS.Timber harvest is not proposed, only road stabilization, storage, and decommissioning
Road managementWatershed managementWildlife, fish, rare plants
Comment Period
03/26/2007
Decision
01/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District; Plains/Thompson Falls Ranger District; Superior Ranger District |
| Legal Land Description | Primary the Ninemile and Trout Creek Drainages |
Decision Memo · Lolo National Forest All Units · updated 8/26/2014
Upper O'Brien Creek / Black Mountain area west of Missoula, Montana · Missoula, Montana
Seasonal road access for the Estate of Earl M. Pruyn along approx. 9 miles of Forest Road #9961. Includes provision for seasonal access (April - November) to 1,040 acres of private land in the Black Mtn Area west of Missoula.
Road management
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T13N, R21W, Section 22, 28, 32, and 34 (USGS Quad Names and Numbers: Blue Mountain 121 and Camp Creek 122) |
Decision Memo · Ninemile Ranger District · updated 7/16/2014
John's Creek in the middle Petty Creek watershed · Missoula, Montana
220 acres of understory thinning, followed by prescribed underburning
Fuels management
Decision
06/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T13N, R23W, scetions 14, 15, 22, and 23 |
Decision Memo · Missoula Ranger District · updated 7/16/2014
Rattlesnake National Recreation Area and adjacent lands - two segments of trail # 24.5 and one segment of trail 29.1. · Missoula, Montana
Re-route of three segments of trail (4500') in the Rattlesnake NRA to reduce erosion and trail braiding in seasonally wet areas.
Recreation management
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Watershed Improvements |
| Sawmill Gulch Trail Re-Routes | Decision Signed Date: 07/01/2014 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T.14 N., R.19 W. |
Decision Memo · Seeley Lake Ranger District · updated 5/15/2014
Approximately 7 miles east of the town of Seeley Lake, MT within the upper reaches of the Cottonwood Creek watershed located entirely on National Forest System Land · Missoula, Montana
Restoration of approximately 2,500 feet of stream channel including relocation or removal of one dispersed recreation site.
Wildlife, fish, rare plantsWatershed management
Decision
05/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Sections 10,11,12, & 13, T16N, R14W USGS Quad Name and Number: Morrel Mountain 1416 |
Decision Memo · Missoula Ranger District · updated 4/13/2014
WRS - approx. 2 miles north of Milltown off Hwy. 200. LC - approx. 12 miles west of Lolo on Hwy 12. · Missoula, Montana
Tree planting and browse protection on about 1320 acres in burned areas of the 2012 West Riverside fire and the 2013 Lolo Complex fire
Vegetation management (other than forest products)
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| West Riverside & Lolo Complex Tree Planting and Animal Damage Control | Decision Signed Date: 04/07/2014 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T13N, R18W, secs. 9 and 16; T12N, R22W, secs. 26,34,34, and 36; and T11N, R22W, secs. 2 and 3 |
Decision Memo · Seeley Lake Ranger District · updated 4/10/2014
Snowmobile trail 63 · Missoula, Montana
This project would re-route the groomed snowmobile trail to avoid two stream crossings that have undersized culverts. Trail would be mostly clearing a route that a 9-foot groomer can travel through; but will not have tread for summer use.
Recreation managementWatershed management
Decision
04/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Drew Creek Snowmobile Trail Re-route | Decision Signed Date: 04/10/2014 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Township 16 North, Range 14 West, Section 18 |
Environmental Assessment · Seeley Lake Ranger District · updated 9/30/2013
10 miles north of Seeley Lake, straddling Highway 83 · Missoula, Montana
Integrated ecosystem management under the Collaborative Forest Landscape Protection Act (CFLRP) including vegetation and watershed restoration, fuels reduction, and management for wildlife habitat.
Vegetation management (other than forest products)Fuels managementWatershed managementWildlife, fish, rare plants
Comment Period
02/06/2010
Decision
09/2013 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Colt Summit Restoration and Fuel Reduction Project | Decision Signed Date: 03/25/2011 (Reversed in Appeal (215)) Legal Notice Date: 03/30/2011 |
| Colt Summit Restoration and Fuels Reduction DN Affirmation Prior Decision | Decision Signed Date: 09/27/2013 |
| Colt Summit Restoration and Fuels Reduction Project DN - Affirmation of DN | Decision Signed Date: 09/27/2013 Legal Notice Date: 09/30/2013 |
| Colt Summit Restoration and Fuels Reduction Affirmation of Prior Decision | Decision Signed Date: 09/27/2013 |
| Colt Summit Restoration and Fuels Reduction Affirmation of Decision | Decision Signed Date: 09/27/2013 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T18N, R16W, Sect. 2,3,10,11; T19N, R16W, Sect. 23.25-28,33,34, and 36 |
Environmental Assessment · Seeley Lake Ranger District · updated 8/13/2013
Approximately 3 miles southeast of Seeley Lake, Montana near the Double Arrow and Big Sky Lake subdivisions. · Missoula, Montana
Integrated landscape management including hazardous fuels reduction, vegetation restoration, soils rehabilitation, and wildlife habitat improvement.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
01/16/2013
Decision
08/2013 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements |
| Horseshoe West Fuels Reduction and Restoration Project | Decision Signed Date: 08/07/2013 Legal Notice Date: 08/12/2013 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Sections 8, 9, 17-21, and 30, T16N, R14W and Sections 13, 24, and 25, T16N, R15W. |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 6/20/2013
Ferry Landing & Cascade boat launch sites along the Clark Fork River between St. Regis & Paradise · Sanders, Montana
Issuance of additional outfitter permits for use of the Ferry Landing and Cascade boat launch sites located along the Clark Fork River between St. Regis and Paradise.
Special use management
Comment Period
05/15/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Clark Fork River Outfitter and Guide Special Use Permits | Decision Signed Date: 06/17/2013 Legal Notice Date: 06/20/2013 |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ninemile Ranger District · updated 3/25/2013
The 36,000 acre analysis area is west of the Ninemile Ranger Station. It straddles the Ninemile Divide from the Clark Fork River on the southern boundary to Fire Creek on the north · Mineral; Missoula, Montana
Integrated landscape management treatments designed to improve forest health, reduce hazardous fuels near communities, improve fish and wildlife connectivity, maintain water quality, and provide and maintain forest industry infrastructure.
Wildlife, fish, rare plantsVegetation management (other than forest products)Road managementRecreation managementForest productsFuels managementWatershed management
Comment Period
11/11/2012
Decision
03/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Roadless Area Management; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements |
| Rennic Stark Project Decision Notice | Decision Signed Date: 03/22/2013 Legal Notice Date: 03/25/2013 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T14N,R22W, Sec 5-7;T14N,R23W, Sec 1-3,6:T14N,R24W,Sec1,2; T15N,R22W,Sec7,16,17,19-21,28-32;T15N,R23W,Sec1-36;T15N,R24W,Sec 1,2,10-13,24;T16N,R23W,Sec 20,21,27-35;T16N,R24W, Sec25,26,34-36PM MT |
Environmental Assessment · Superior Ranger District · updated 3/15/2013
The Milwaukee and Northern Pacific abandoned railroad grades between Taft and Saltese, Montana · Mineral, Montana
Motorized and non-motorized recreation and travel management on approximately 30 miles of abandoned railroad grades (Milwaukee and Northern Pacific) between Taft and St. Regis, Montana.
Recreation management
Comment Period
09/23/2011
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
Environmental Assessment · Superior Ranger District · updated 3/4/2013
Located southwest of Sloway Campground and south of the Southside Road #69 · Mineral, Montana
Issuance of a special use permit for cultivation and production of hay on 35 acres of National Forest Land acquired in the October 2011 Montana DNRC land exchange.
Special use management
Comment Period
01/23/2013
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Flying H Ranch LLC Cultivation Special Use Permit | Decision Signed Date: 03/01/2013 Legal Notice Date: 03/04/2013 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | S 1/2 of the S 1/2 of Section 16, T17N, R27 W; P.M.MT - USGS Quad Name, Illinois Peak SE |
Decision Memo · Missoula Ranger District · updated 2/6/2013
The routes used are located in the vicinity of the Lolo Hot Springs Lodge. Routes are along portions of roads currently restricted to motorized use. · Missoula, Montana
Permittee proposal to conduct day trail rides on routes on the Lolo National Forest, Missoula Ranger District. Permittee's equestrian trail rides would leave from Lolo Hot Springs Lodge and follow roads currently restricted to motorized use.
Special use managementRecreation management
Comment Period
05/17/2012
Decision
01/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Rides will start from T11N, R23W, Section 7, USGS Quad Name and Number: Lolo Hot Springs, #138 |
Decision Memo · Seeley Lake Ranger District · updated 12/12/2012
Portions of Westside Bypass and Archibald Loop roads, Seeley Lake Ranger District, Lolo National Forest · Missoula, Montana
Commercial and Personal use treatment of approximately 95 acres of dead and dying timber within 150 feet of road shoulder along portions of Forest Service Roads 4349, 2190, and 2192
Vegetation management (other than forest products)Forest products
Comment Period
06/24/2012
Decision
12/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage) |
| Westside Roadside Salvage Project | Decision Signed Date: 12/05/2012 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T17N, R15W, Sections 7, 18, 29 and 30 |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 10/15/2012
Plains/Thompson Falls Ranger District, Lolo National Forest, Henry and Swamp Creek drainages · Sanders, Montana
Update Allotment Management Plans for Forest Plan compliance, incorporating changes that have been implemented through previous operating plans.
Grazing management
Comment Period
07/19/2012
Decision
09/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
| Legal Land Description | Henry Creek Drainage, T20N, R25W, Sec. 14,21-23, 25-29, 32-36, and T19N, R25W, Sec. 2-5. Swamp Creek drainage, T20N, R28W, Sec. 23-27, 34-36; T20N, R27W, Sec. 14-36 |
Decision Memo · Missoula Ranger District · updated 10/5/2012
Deer Uncle Sam Small Tree Thinning project is located in the Deer Creek drainage on the Msla RD, McGinty's Rock Small Tree Thinning project is located South of Quartz Creek on the Ninemile RD · Missoula, Montana
Non-commercial thinning of small trees in previously harvested stands to increase tree health and vigor, decrease the risk of insects and disease, and improve forest resiliency and resistance to wildfire.
Vegetation management (other than forest products)
Comment Period
03/23/2012
Decision
07/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Deer Uncle Sam Tree Thinning | Decision Signed Date: 07/23/2012 Legal Notice Date: 08/08/2012 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District; Ninemile Ranger District |
| Legal Land Description | Deer Uncle Sam - T13N, R 18W, Sec. 28, 33, 34, - McGinty's Rock Small Tree Thinning - T14N, R25W, Sec 9, 16, 17, |
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
Decision Memo · Seeley Lake Ranger District · updated 6/28/2012
Big Larch Campground and Recreation Area · Missoula, Montana
Application of bacterial insecticide to prevent spruce budworm from defoliating Douglas-fir screening material in the Big Larch Campground/Recreation area.
Watershed managementFacility management
Comment Period
04/19/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Facility Maintenance |
| Bt Insecticide application - Big Larch Campground | Decision Signed Date: 06/28/2012 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | NE1/4 SE1/4 and SE1/4 NW1/4 Section 34, T17N, R15W USGS Quad Name and Number: Seeley Lake East, 47113-B4 |
Environmental Assessment · Ninemile Ranger District · updated 6/19/2012
Various stream segments within the Ninemile Creek Drainage, Ninemile Ranger District, Lolo National Forest. · Missoula, Montana
Reclamation of abandoned placer mines including restoration of stream channels and fish habitat along Upper Ninemile, Sawpit, Martina, and Twin Creeks.
Watershed managementMinerals and geologyWildlife, fish, rare plants
Comment Period
04/10/2012
Decision
06/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Abandoned Mine Land Clean-Up; Watershed Improvements |
| Upper Ninemile Placer Mine Reclamation Project | Decision Signed Date: 06/18/2012 Legal Notice Date: 06/19/2012 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Sections 21, 22, 25-27, and 36, T17N, R24W |
Decision Memo · Lolo National Forest All Units · updated 5/22/2012
USGS Quad Name: Lolo Hot Springs Quad Number 138 · Missoula, Montana
The existing electrical line to the campground pumphouse and the host area is deteriorating and needs to be replaced. The replacement line will connect to the main electrical line located across Highway 12 at the entrance to Lee Creek Campground.
Facility managementSpecial use management
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Missoula Electric Co-op, Amendment to special Use Permit | Decision Signed Date: 05/17/2012 Legal Notice Date: 05/18/2012 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T11N, R23W, SE 1/4 Section 18 |
Decision Memo · Missoula Ranger District · updated 5/1/2012
Crazy Canyon Parking Area, Pattee Canyon Picnic Area, Rock Creek Guard Station (a/k/a Cabin), Hogback homestead, and Morgan-Case Homestead · Missoula, Montana
Application of the insecticide Carbaryl to prevent mountain pine beetle attack and mortaliity in pine trees in the Crazy/Pattee Canyon and Rock Creek recreation areas.
Vegetation management (other than forest products)Facility management
Comment Period
02/20/2012
Decision
04/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Facility Maintenance |
| Carbaryl Application: Crazy/Pattee Canyon and Rock Creek | Decision Signed Date: 04/24/2012 Legal Notice Date: 04/26/2012 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | USGS Quad Name and Number: Southeast Missoula (1670) and Quigg Peak (1932) |
Decision Memo · Missoula Ranger District · updated 5/1/2012
Missoula Ranger District · Missoula, Montana
Planting tree seedlings and protecting them from animal browsing with shade tubes.
Vegetation management (other than forest products)
Comment Period
02/04/2012
Decision
04/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| West Riverside Tree Planting and Animal Damage Control | Decision Signed Date: 04/24/2012 Legal Notice Date: 04/26/2012 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T13N, R18W, Sections 2,3,9,10,11,15,16 & 17 - T14N, R18W Sections 34 & 35 |
Decision Memo · Missoula Ranger District · updated 4/30/2012
Rattlesnake National Recreation Area. (Areas of treatment are located on the main trailhead, the horse trailhead, and approximately 150 feet on each side of the first three miles of the main trail) · Missoula, Montana
Application of the insecticide Carbaryl to prevent mountain pine beetle attack and mortality on pine trees in the Rattlesnake Trailheads and Rattlesnake Trail (Road 99).
Facility managementVegetation management (other than forest products)
Comment Period
02/29/2012
Decision
04/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Facility Maintenance |
| Carbaryl App: Rattlesnake Trailheads & Rattlesnake Trail (Road 99) Project | Decision Signed Date: 04/19/2012 Legal Notice Date: 04/21/2012 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Main Trailheads: E1/2 Section 35, T14N, R19W - First 3 Miles of main trail: Section 19, T14N, R18W, Sections 25,26, & 35, T14N, R19W. (USGS Quad Name: NE Missoula - USGS Quad Number: 1582) |
Decision Memo · Lolo National Forest All Units · updated 4/13/2012
Pattee Canyon Recreation Area, Missoula Ranger District, Lolo National Forest · Missoula, Montana
Improvement of forest stand health on approximately 130 acres in the Crazy Canyon drainage and 42 acres in the Pattee Picnic Area. Treatments would include the removal of dead and dying trees affected by the mountain pine beetle and dwarf mistletoe.
Forest productsRecreation managementVegetation management (other than forest products)
Comment Period
09/14/2011
Decision
04/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Crazy-Pattee Timber Stand Improvement Project | Decision Signed Date: 04/10/2012 Legal Notice Date: 04/13/2012 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T13N, R19W, Sec 36; T12N, R19W, Sec 1 & 2 |
Decision Memo · Ninemile Ranger District · updated 3/27/2012
Ninemile Ranger District · Missoula, Montana
Up to three test holes would be dug with a rubber-tired backhoe at an unvegetated area in a disperesed campsite. Samples would be processed using gold pans. Process water would be discharged to a test hole.
Minerals and geology
Comment Period
04/27/2011
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| T & L No.2 Placer Claim (a/k/a Tom Tracey) | Decision Signed Date: 02/06/2012 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
Decision Memo · Ninemile Ranger District · updated 12/15/2011
Upper reaches of Madison Gulch, Petty Creek Drainage, Clark Fork Watershed · Missoula, Montana
Restore stand to a historically ponderosa pine component by thinning under-story Douglas fir. Implement thinning and prescribed under-burning to reduce fuels concentrations. Project will combine fuels efforts with the Petty Rock Timber Sale
Fuels management
Comment Period
10/21/2011
Decision
11/2011 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T14N, R22W, portions of Sections 16, 17, 20, and 21, USGS Quad Name Petty Mountain |
Environmental Impact Statement · Kootenai National Forest All Units · updated 12/2/2011
Selkirk and Cabinet-Yaak Grizzly Bear Recovery Zones · Bonner; Boundary; Lincoln; Sanders; Pend Oreille, Idaho; Montana; Washington
Preparation of a Supplemental EIS to amend land and resource management plans for the Idaho Panhandle, Kootenai, and Lolo National Forests to address motorized access management within the Selkirk and Cabinet-Yaak Grizzly Bear Recovery Zones.
Land management planningWildlife, fish, rare plants
NOI in Federal Register
05/13/2008
DEIS NOA in Federal Register
05/12/2009
FEIS NOA in Federal Register
12/02/2011
Decision
11/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (1982) |
| Project Activity | Species Habitat Improvements; Plan Amendment; Travel Management |
| Motorized Access Management w/in the Selkirk & Cabinet-Yaak Recovery Zones | Decision Signed Date: 11/09/2011 (Constrained Due to Litigation) Legal Notice Date: 12/02/2011 |
| Forests | Idaho Panhandle National Forest; Kootenai National Forest; Lolo National Forest |
| Districts | Idaho Panhandle National Forest All Units; Kootenai National Forest All Units; Lolo National Forest All Units |
| Legal Land Description | Northwestern Montana, northern Idaho, and northeastern Washington. |
Environmental Assessment · Seeley Lake Ranger District · updated 9/2/2011
Seeley Lake Ranger District · Missoula; Powell, Montana
Vegetative treatments to improve forest health and reduce fuels
Forest productsVegetation management (other than forest products)Fuels management
Comment Period
07/11/2008
Decision
07/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Auggie Creek restoration/Fuels Project | Decision Signed Date: 07/27/2009 Legal Notice Date: 07/29/2009 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T17N, R15W, Sec. 24, 25, 26, 27, 34 & 35 - T17N, R14W, Sec. 32 |
Decision Memo · Seeley Lake Ranger District · updated 8/9/2011
The Swan Face Project is located at the headwaters of the Clearwater, 17 miles northwest of seeley Lake. · Missoula, Montana
The Swan Face prescribed burn project is proposed to restore the role of fire and enhance the forest ecosystem processes on 2471 acres located at the headwaters of the Clearwater on the Seeley Lake Ranger District.
Fuels managementWildlife, fish, rare plants
Comment Period
03/16/2011
Decision
07/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements |
| Swan Face Project | Decision Signed Date: 07/25/2011 Legal Notice Date: 08/05/2011 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | T19N, R15W, Sections 7,8,17,20 &21 USGS Quad Name/Number 47113-D5-TF-024 |
Environmental Assessment · Missoula Ranger District · updated 7/29/2011
15 miles west of Lolo, Montana on North side of U.S. Highway 12, between Clark Creek and a location 2 miles east of MDT maintenance facility near Martin Creek. · Missoula, Montana
Application by Missoula Electric Cooperative to bury 2.25 miles of existing overhead power lines and replace one utility pole on National Forest System Lands near U.S. Highway 12 in the Lolo Creek Drainage.
Special use management
Comment Period
03/2011 (Estimated)
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Section 29, T12N, R22W, and Sections 24, 25, 26, and 34, T12N, R23W |
Decision Memo · Seeley Lake Ranger District · updated 7/29/2011
Big Larch, Seeley Lake, and River Point Campgrounds · Missoula, Montana
Improve public safety by removing dead and dying trees, and trees at high risk of beetle infestation in the Big Larch, Seeley Lake and River Point Campgrounds and along their access roads
Facility management
Comment Period
01/13/2010
Decision
02/2010 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Section 33 and 34, T17N, R15W |
Environmental Impact Statement · Lolo National Forest All Units · updated 7/7/2011
southcentral Montana, entire 2.1 million-acre Lolo National Forest · Flathead; Granite; Mineral; Missoula; Powell; Ravalli; Sanders, Montana
Manage weeds on entire forest, using integrated weed management approach, including aerial application of herbicides. Analyze representative site types, develop priority screening criteria & standardize resource protection methods.
Vegetation management (other than forest products)
NOI in Federal Register
08/04/2004
DEIS NOA in Federal Register
05/18/2007
FEIS NOA in Federal Register
12/21/2007
Decision
12/2007 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Integrated Weed Management on the Lolo National Forest | Decision Signed Date: 12/11/2007 Legal Notice Date: 12/21/2007 |
| Forests | Lolo National Forest |
| Districts | Lolo National Forest All Units |
Decision Memo · Missoula Ranger District · updated 6/14/2011
Point 118 - south of the West Fork Butte Lookout · Missoula, Montana
The Missoula Electric Cooperative in conjunction with the Missoula County 911 Communication system proposes to install a buried powerline to the Point 118 Communication Site. Point 118 is on a peak southwest of the West Fork Butte Lookout
Special area management
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Missoula Electric Cooperative - Point 118 | Decision Signed Date: 05/20/2011 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Sec 13, T11N, R23W - West Fork Butte Quad #137 , Latitude: 46.42, Longitude: -114.25 |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 4/4/2011
Highway 135 and Clark Fork River corridor between St. Regis, MT and Highway 200 near Paradise, MT · Mineral; Sanders, Montana
Project proposes to improve highway safety; maintain/improve forest health; provide for public safety and sanitation at dispersed recreation sites; improve big game winter range; and enhance watershed health.
Vegetation management (other than forest products)Recreation managementWildlife, fish, rare plants
Comment Period
04/23/2010
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District; Superior Ranger District |
| Legal Land Description | T18 - 19N, R25 - R27W |
Environmental Assessment · Lolo National Forest All Units · updated 4/4/2011
Western Montana -- all districts on Lolo NF, but mostly Superior RD, and one small parcel on Libby RD of Kootenai NF · Granite; Lincoln; Mineral; Missoula; Powell; Sanders, Montana
Lolo NF - Montana State DNRC land exchange State wants to trade isolated, scattered school trust lands surrounded by NFS lands; FS would consolidate ownership, acquire access, riparian, roadless & recreation lands & big game winter range.
Land ownership management
Comment Period
10/25/2006
Decision
05/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| DNRC-Lolo Land Exchange | Decision Signed Date: 05/27/2010 Legal Notice Date: 06/01/2010 |
| Forests | Kootenai National Forest; Lolo National Forest |
| Districts | Libby Ranger District; Lolo National Forest All Units |
| Legal Land Description | Too large an area for legal to be meaningful; 13,336 acres of FS lands in 39 parcels, mostly in Mineral county to exhange for 12,126 acres in 37 parcels MT lands, mostly in Mineral & Missoula counties |
Decision Memo · Ninemile Ranger District · updated 3/30/2011
Located between Bird and Fire Creek drainages · Missoula, Montana
The Barrette Creek Fuels project proposes to reduce hazardous fuels from 2009 timber harvest and 2010 post commercial thin in units adjacent and/or near the wildland urban interface (wui) located between Bird and Fire Creek drainages.
Fuels management
Comment Period
12/22/2010
Decision
01/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Barrette Creek Fuels Project | Decision Signed Date: 01/27/2011 Legal Notice Date: 02/01/2011 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T16N, R23W, Sections 17, 18, 19, and 20, T16N, R24W, Sections 12 and 13 |
Decision Memo · Seeley Lake Ranger District · updated 3/3/2011
Big Nelson and Monture Campgrounds · Powell, Montana
Proposal is to implement a comprehensive vegetation management plan for the two campgrounds to improve the health of the stands, address trees killed by bark beetles, and improve public safety
Facility managementForest productsRecreation management
Comment Period
01/06/2011
Decision
02/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Facility Maintenance; Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Sections 7, 20, and 29 T15N, R10W. Principal Meridian |
Decision Memo · Ninemile Ranger District · updated 2/14/2011
Across the Ninemile and Missoula Ranger Districts · Mineral; Missoula, Montana
Noncommercial thinning of small trees in stands that were previously harvested and have densely regenerated. Thinning will increase tree health and vigor, and reduce the risk of mountain pine beetle caused mortality and large fires in the future.
Vegetation management (other than forest products)
Comment Period
11/24/2010
Decision
02/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Ninemile Missoula Small Tree Thinning Project | Decision Signed Date: 02/03/2011 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District; Ninemile Ranger District |
Decision Memo · Ninemile Ranger District · updated 7/19/2010
Section 2, T14N, R26W · Mineral, Montana
Mining of placer terrace deposits using hand tools. Process excavated material using a trommel. Process water from trommel discharged to a settling pond; solid wastes used to backfill excavations and depressions on site.
Minerals and geology
Comment Period
03/29/2010
Decision
07/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Rim Rock #1 a/k/a Gene, Roger, Dale Wingo Placer Mining Operation | Decision Signed Date: 07/13/2010 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
Decision Memo · Ninemile Ranger District · updated 6/24/2010
The pt of diversion will be in Bill Creek, a tributary of Petty Crk, in the NE1/4 NW 1/4NW1/4 Sec 30 ending where the waterline enters private property in the NW1/4SW1/4NW1/4 Sec 30 T13N,R22W;PM MT · Missoula, Montana
Karl Joost has requested a special use authorization to bury a 6" by 1,953' water transmission line in an existing irrigation ditch from Bill Creek to his property.
Special use management
Comment Period
03/13/2010
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
Decision Memo · Ninemile Ranger District · updated 6/16/2010
Mattie V and Ninemile Creeks · Mineral, Montana
Improve channel morphology, floodplain connectivity, and fish passage at the Mattie V Creek Mine through channel reconstruction and cut and fill activities.
Watershed management
Comment Period
05/05/2010
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Mattie V Mine Site Rehabilitation Project | Decision Signed Date: 06/15/2010 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T17N, R24W, Section 22 |
Decision Memo · Superior Ranger District · updated 5/28/2010
Across the Superior Ranger District · Mineral, Montana
Precommercial thinning of about 235 stands that range in size from one to 130 acres, located across the Superior Ranger District. This project covers an approximate total of 4390 acres.
Vegetation management (other than forest products)
Comment Period
01/22/2010
Decision
05/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Quartz Haugan Precommercial Thinning | Decision Signed Date: 05/25/2010 Legal Notice Date: 05/28/2010 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
Decision Memo · Ninemile Ranger District · updated 5/25/2010
Clark Fork River Drainage, east of Petty Creek along the Southside Road · Missoula, Montana
Reduce understory ladder fuels, which would reduce the threat of crown fire in the overstory and reduce ground fire intensity, by thinning 84 acres, hand-piling 25 acres, and underburning
Watershed managementVegetation management (other than forest products)Fuels management
Comment Period
04/10/2010
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Southside Road Fuels Reduction Project | Decision Signed Date: 05/20/2010 Legal Notice Date: 05/24/2010 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T14N, R21W, Section 10 |
Decision Memo · Missoula Ranger District · updated 5/7/2010
O'Brien Creek (Black Mountain Fire and Pruyn Land Acquisition) · Missoula, Montana
Hand planting about 1,900 acres with ponderosa pine and western larch
Vegetation management (other than forest products)
Comment Period
05/07/2010
Decision
04/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| O"Brien Creek Tree Planting | Decision Signed Date: 04/30/2010 Legal Notice Date: 05/07/2010 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T12N, R20W, Section 6; T12N, R21W, Sections 1 and 2; T13N, R20W, Sections 31 and 32; and T13N, R21W, Section 36 |
Environmental Assessment · Missoula Ranger District · updated 3/30/2010
Southwest Montana, 15 airmiles SE of Missoula, nestled between Sapphire Mountain range to the west & Flint Creek range to the east · Granite; Missoula, Montana
Reduce hazardous fuels, burn understory, control noxious weeds, maintain roads, develop a gravel pit & replace culverts
Recreation managementWildlife, fish, rare plantsRoad managementFuels management
Comment Period
01/31/2003
Decision
06/2003 (Estimated)
Implementation
06/2004 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | from the mouth of Rock Creek in T11N, R17W south to the boundary line of Lolo NF and Beaverhead-Deerlodge NF in T7N, R16W |
Environmental Assessment · Ninemile Ranger District · updated 3/30/2010
The South Fork of Fish Creek, Mineral County, Montana · Mineral, Montana
Vegetative treatment proposal to reduce fuels and improve forest health in the South Fork of Fish Creek, while also improving water quality and aquatic habitat and enhancing recreation opportunities and facilities in the area.
Forest productsFuels managementWatershed managementRecreation management
Comment Period
12/23/2007
Decision
03/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Facility Improvements/Construction; Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Special Area Management; Timber Sales (Green); Watershed Improvements |
| South Fork of Fish Creek Project | Decision Signed Date: 03/05/2010 Legal Notice Date: 03/12/2010 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T40N, R24W, sec. 4,5,6,7,8,9,15,16,17,21 & 22; T41N, R24W, sec 32,33 & 34; T40N, R14E, sec 10, 11 & 12 |
Decision Memo · Ninemile Ranger District · updated 3/25/2010
Adjacent to Quartz Creek, west of the Great Burn Proposed Wilderness · Mineral, Montana
Fuels reduction in the wildland urban interface (directly adjacent to private property) through noncommercial thinning to reduce ladder fuels and heavy fuel loadings on 10 acres. All activities will be accomplished by hand. No mechanized equipment.
Fuels management
Comment Period
11/25/2009
Decision
01/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Little Quartz Fuels Reduction Project | Decision Signed Date: 01/29/2010 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | Upper Quartz Creek drainage in Section 2, T14N, R26W, PMM, Mineral County, Montana |
Environmental Assessment · Superior Ranger District · updated 2/8/2010
Project is located just south of St. Regis, Montana · Mineral, Montana
Project would reduce hazardous fuels on approximately 1211 acres of National Forest System lands adjacent to the town of St. Regis, Montana. Methods would include prescribed fire only, commercial and pre-commercial thinning, and slashing and piling.
Fuels management
Comment Period
10/30/2009
Decision
02/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| St. Regis South Hazardous Fuels Reduction Project | Decision Signed Date: 02/04/2010 Legal Notice Date: 02/08/2010 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | Section 6, T17N, R27W; Section 31, T18N, R27W; Sections 1-2, T17N, R28W; and Sections 25, 35-36, T18N, R28W, P.M.M., Mineral County, MT |
Environmental Assessment · Lolo National Forest All Units · updated 1/6/2010
Tyler Creek Drainage, Missoula Ranger District · Missoula, Montana
Revise allotment management plan to incorporate changes made in past annual operating plans to meet Forest Plan standards and guidelines, and close Bateman Gillespie Allotment
Grazing management
Comment Period
12/30/2009
Decision
12/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Sec 339 |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Tyler-Genoa and Bateman-Gillespie Range Allotment Management Plan Revisions | Decision Signed Date: 12/18/2009 Legal Notice Date: 12/30/2009 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T10 and 11N, R14,15,and 16N |
Environmental Impact Statement · Clearwater National Forest All Units · updated 12/19/2009
Selway-Bitterroot Wilderness, administering Forests in Idaho and Montana; Clearwater, Nez Perce, Lolo and Bitterroot National Forests · Idaho; Ravalli, Idaho; Montana
Proposal is to treat invasive plants and noxious weeds with herbicides and biocontrols within the Selway-Bitterroot Wilderness
Vegetation management (other than forest products)
NOI in Federal Register
11/02/2006
DEIS NOA in Federal Register
04/01/2008
FEIS NOA in Federal Register
12/18/2009
Decision
11/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Selway/Bitterroot Wilderness Invasive Plants Management Project | Decision Signed Date: 11/02/2009 Legal Notice Date: 12/18/2009 |
| Forests | Bitterroot National Forest; Clearwater National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest |
| Districts | Stevensville Ranger District; Sula Ranger District; West Fork Ranger District; Lochsa Ranger District; Powell Ranger District; Missoula Ranger District; Moose Creek Ranger District |
Environmental Impact Statement · Missoula Ranger District · updated 12/16/2009
West Fork Butte Creek HUC · Missoula, Montana
Improve ecosystem function, integrity, and resilience; reduce stream sediment sources; improve fish passage, wildlife habitat and security; provide timber for harvesting, and increase wildlife habitat in mixed severity fire types.
Watershed managementVegetation management (other than forest products)Forest products
NOI in Federal Register
01/18/2007
DEIS NOA in Federal Register
03/07/2008
FEIS NOA in Federal Register
10/09/2009
Decision
09/2009 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Butte Lookout Project | Decision Signed Date: 09/25/2009 Legal Notice Date: 10/09/2009 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | T11N R22W |
Environmental Assessment · Seeley Lake Ranger District · updated 10/15/2009
Western Montana -- 1,663 acres of NF lands along the corridor of Montana Highway 83, south from NF boundary in town of Seeley Lake to about one mile north of Rainy Lake · Missoula, Montana
Reduce fire hazard from fuels on National Forest land in the highway corridor and around recreational sites and private lands
Fuels management
Comment Period
03/15/2004
Decision
03/2004 (Estimated)
Implementation
06/2005 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | National Fire Plan - Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green) |
| Seeley Lake Fuels Reduction | Decision Signed Date: 03/09/2004 Legal Notice Date: 03/15/2004 |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | selected NF lands in T17N & T18N, R15W & R16W, PMM, Missoula County, Montana |
Environmental Assessment · Missoula Ranger District · updated 10/15/2009
20 miles WSW of Missoula, Montana, close to State Highway 12 & in area of checkboard land ownership -- western boundary of project area is Idaho state line · Missoula, Montana
Recontour & decommssion existing roads to improve watershed conditions & fish habitat
Watershed managementRoad managementWildlife, fish, rare plants
Comment Period
11/23/2005
Decision
11/2005 (Estimated)
Implementation
06/2006 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Road Maintenance; Road Improvements/Construction; Travel Management; Watershed Improvements |
| Upper Lolo Watershed Restoration | Decision Signed Date: 11/16/2005 Legal Notice Date: 11/23/2005 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | selected NFS lands in T10&11N, R22, 23 & 24W, PMM, Montana |
Environmental Assessment · Plains/Thompson Falls Ranger District · updated 6/24/2009
Approx. 20 miles N. of Plains, Mt., portions of the following drainages: Little Thompson River; North Fork; Little Rock Crk, Bear Crk, Chippy Crk, and Big Rock Crk, tributary to the Thompson River · Sanders, Montana
The proposed project is salvage of a portion of the timber on National Forest System lands that burned in the Chippy Creek Fire in 2007 on the Plains/Thompson Falls Ranger District
Forest products
Comment Period
09/24/2008
Decision
06/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Chippy Creek Fire Salvage Project | Decision Signed Date: 06/17/2009 Legal Notice Date: 06/24/2009 |
| Forests | Lolo National Forest |
| Districts | Plains/Thompson Falls Ranger District |
Environmental Assessment · Ninemile Ranger District · updated 6/23/2009
WUI adj NF bdy in Moncure, Barrette, and Fire Creek, main access via FS Road #5520. · Missoula, Montana
Hazardous fuels reduction in WUI including salvage of bark beetle caused tree mortality using improvement cutting, slashing understory ladder fuels, hand piling, and underburning. Culvert removal and storage of currently closed roads.
Watershed managementRoad managementWildlife, fish, rare plantsForest productsFuels management
Comment Period
03/20/2009
Decision
06/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Barrette Creek Fuels | Decision Signed Date: 05/09/2006 (FS Withdrawn) |
| Barrette Creek Fuels Reduction Project | Decision Signed Date: 06/09/2009 Legal Notice Date: 06/21/2009 |
| Forests | Lolo National Forest |
| Districts | Ninemile Ranger District |
| Legal Land Description | T16N, R22W Sec's 12, 13; T16N, R23W Sec's 17, 18, 19, 20. |
Environmental Assessment · Lolo National Forest All Units · updated 5/26/2009
This involves an old plcacer claim that follows Cedar Creek from approx 1 mile upstream of the confluence with Oregon Gulch to approx 4 miles downstream of the confluence with Oregon Gulch · Mineral, Montana
The Superior RD of the Lolo NF is proposing to amend the Lolo NF Plan to include a newly acquired 204 acre parcel in the Cedar Creek drainage. The proposed action is to create Amendment #31 that would establish the Cedar Creek Zoological Area.
Land management planning
Comment Period
10/22/2008
Decision
05/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Plan Amendment |
| Cedar Creek Special Area | Decision Signed Date: 05/15/2009 Legal Notice Date: 05/22/2009 |
| Forests | Lolo National Forest |
| Districts | Superior Ranger District |
| Legal Land Description | begins in T16N, R27W, Section 27, NW1/4 of NW1/4 and ends downstream in T16N, R26W, Section 8, SW1/4 of NE1/4 |
Environmental Assessment · Lolo National Forest All Units · updated 12/22/2008
Placid/Finley/Boles/Archibald Crk. Drainages - west of Seeley Lake, Montana · Missoula, Montana
Salvage harvest of timber values affected by Jocko Lakes Fire
Forest products
Comment Period
02/15/2008
Decision
12/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Road Maintenance; Timber Sales (Salvage) |
| Forests | Lolo National Forest |
| Districts | Seeley Lake Ranger District |
| Legal Land Description | Sec. 31 & 32 T17N, R15W, Sec 36, T17N, R16W, Sec 2 & 10 T15N, R16W, Sec 2,4,6-8,10,13,14,18,20,22,26,28,29,32 & 34 T16N, R16W |
Decision Memo · Missoula Ranger District · updated 6/20/2008
Woods Gulch adjacent to and inside the Rattlesnake National Recreation Area in Section 31, T14N, R18W, Section 6, T13N, R18W, Section 36, T14N, R19W, Section 1, T13N, R19W · Missoula, Montana
Consider 3.1 miles of new trail construction and 6 miles of recontouring or narrowing of old nonmotorized roadbeds used as nonmotorized trails
Recreation managementWatershed management
Comment Period
03/21/2008
Decision
06/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Section 31 Road and Trail Rehabilitation Project | Decision Signed Date: 06/19/2008 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
Environmental Assessment · Missoula Ranger District · updated 6/27/2007
Butler/Grant Creek residential areas, Northside timber sale area, Snowbowl ski area, all just north of Missoula, MT · Missoula, Montana
Fuels reduction project inside WUI, including both commercial (timber sale) and non-commercial fuel treatments
Fuels managementForest products
Comment Period
02/16/2007
Decision
04/2007 (Estimated)
Implementation
09/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | National Fire Plan - Healthy Forests Initiative Demo Ea |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Timber Sales (Green) |
| Grant Creek Fuel Reduction Project | Decision Signed Date: 04/03/2007 Legal Notice Date: 04/06/2007 |
| Forests | Lolo National Forest |
| Districts | Missoula Ranger District |
| Legal Land Description | Sections 3,4,5,6,8,9,15,22, T14N, R19W, PMMT |
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/lolo/projects/30000 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/lolo/projects/30000
Wallace Ranger District
Vegetation management at Lookout Pass Ski Area administrative site. Salvage of dead and beetle-infested lodgepole pine trees. Approx. 129 acres of harvest treatment, 0.5 mile of temp road construction and obliteration.
Vegetation management (other than forest products)Special use management