Decision Memo · Hoosier National Forest All Units · updated 6/2/2025
This project is located throughout the Tell City Ranger District, including ROWs in the counties of Perry, Crawford, and Orange. · Crawford; Orange; Perry, Indiana
Proposal to issue an amended special use permit to Hoosier Energy Rural Electric Cooperative, Inc. that would incorporate herbicide to maintain rights-of-way while restoring Monarch Butterfly habitat.
Wildlife, fish, rare plantsSpecial use management
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Species Habitat Improvements; Species Population Enhancements |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hoosier National Forest All Units · updated 11/18/2024
Forest wide · Brown; Crawford; Dubois; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
An amendment to the Forest Plan to better protect caves and other karst resources while moving Forest ecosystems toward the desired conditions described in the Forest Plan.
Land management planning
Comment Period
10/16/2011
Decision
07/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Plan Amendment |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 11/15/2024
Salt Creek Township, Monroe County, Indiana. · Monroe, Indiana
Proposal to issue a special use permit to the Salt Creek Township Trustee to access and maintain the Chandler Frye Shields Cemetery.
Special use management
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 8 North, Range 1 East, Section 35 |
Decision Memo · Hoosier National Forest All Units · updated 8/27/2024
Paoli Experimental Forest, Orange County, IN · Orange, Indiana
The Hoosier National Forest proposes to implement salvage logging and removal of stream blockages within the Paoli Experimental Forest. Tree planting and deer exclosure fencing are also proposed for research purposes.
Watershed managementVegetation management (other than forest products)ResearchForest products
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Research And Development; Timber Sales (Salvage); Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1W; Sections 10 and 15 |
Environmental Assessment · Hoosier National Forest All Units · updated 8/22/2024
Forest-wide treatment of nonnative invasive species wherever found, except in Wilderness · Brown; Crawford; Daviess; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
Reduce populations of nonnative invasive plants species using integrated pest management tools
Vegetation management (other than forest products)
Comment Period
05/07/2009
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 5/14/2024
Mt Pleasant Road, Cannelton, Indiana · Perry, Indiana
The Hoosier is proposing to amend the existing permit to install additional fiber optic line. This fiber optic line would be buried and installed in the same corridor as an existing and permitted buried electric line.
Special use management
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 4 South, Range 1 West, Section 35 |
Decision Memo · Hoosier National Forest All Units · updated 4/15/2024
Forest-wide · Brown; Crawford; Dubois; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
The Hoosier is proposing to amend the Land and Resource Management Plan to remove two standards pertaining to camping. Removing the standards are needed for consistency and would allow for necessary updates to the associated Forest Orders.
Land management planning
Comment Period
09/21/2023
Objection Period Start
12/14/2023
Decision
04/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 3/6/2024
Approximately 5 miles south of Paoli. · Orange, Indiana
The Hoosier National Forest is proposing to re-route a short trail segment within the Youngs Creek Trail System.
Recreation management
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1W, Section 35 |
Decision Memo · Hoosier National Forest All Units · updated 12/4/2023
Approximately 8 miles south of Shoals, IN. · Martin, Indiana
The Hoosier National Forest proposes to implement salvage logging and removal of stream blockages on tornado damaged lands in Martin County, Indiana.
Watershed managementFuels managementForest productsVegetation management (other than forest products)
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 1 N., R. 4 W., Section 6 |
Decision Memo · Hoosier National Forest All Units · updated 11/13/2023
Blackwell Campground, Shirley Creek Campground, Youngs Creek Campground, Indian-Celina Lakes Recreation Area and Tipsaw Recreation Area. · Monroe; Orange; Perry, Indiana
The Forest Service proposes to make improvements to three existing campgrounds, one boat ramp, and one group campground.
Recreation management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | T. 6 N., R. 1 E., Sections 22 and 27; T. 2 N., R. 2 W., Section 35; T. 1 N., R. 1 W., Section 24; T. 4 S., R.2 W., Section 10; T. 4 S., R. 2 W., Section 28 |
Environmental Assessment · Brownstown Ranger District · updated 11/9/2023
Proposed: 27 treatment areas on the Lost River portion of the Forest - about 590 acres, somewhat less than previously authorized. · Lawrence; Martin; Orange, Indiana
Maintain permanent openings as early successional habitat using a variety of tools, including fire, mowing, chainsaws, root raking, and strip disking.
Vegetation management (other than forest products)
Comment Period
07/19/2009
Decision
02/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Legal land descriptions for the treatment areas are available from the Project Contact |
Decision Memo · Hoosier National Forest All Units · updated 11/3/2023
Approximately 5 miles southeast of Shoals, IN. · Martin, Indiana
Proposal to issue U.S. Gypsum a special use permit to conduct exploratory drilling at four sites.
Special use management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Hoosier National Forest US Gypsum Exploratory Core Drilling Project | Decision Signed Date: 11/02/2023 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 3 West, Sections 1 and 2 |
Decision Memo · Hoosier National Forest All Units · updated 11/3/2023
Approximately 7 miles southeast of Bloomington, IN. · Monroe, Indiana
The Hoosier National Forest proposes to issue a special use permit to the Polk Township Trustee in Monroe County to authorize the continued operation and maintenance of Old Allen's Creek Cemetery.
Special use management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 1 East, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 11/3/2023
Approximately 6 miles southwest of Paoli, IN. · Orange, Indiana
The Hoosier National Forest proposes to issue a special use permit to authorize an existing driveway on NFS land and to authorize construction to widen the private driveway.
Special use management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 1 N, Range 1 W, Section 33 |
Decision Memo · Hoosier National Forest All Units · updated 9/22/2023
Approximately 2.5 miles north, northwest of Freetown, IN. · Jackson, Indiana
The Hoosier is proposing to amend the existing permit to extend high speed fiber optic services. This fiber optic line would be buried and installed in the same corridor as an existing and permitted buried electric line.
Special use management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 N, Range 3 E, Section 25 |
Decision Memo · Hoosier National Forest All Units · updated 6/26/2023
Approximately 0.5 miles and 2.5 miles west of Derby, IN. · Perry, Indiana
The Hoosier is proposing to issue a special use permit amendment to Southern Indiana Power to construct a 3-phase overhead power line along the south side of Highway 70 and to relocate an existing power line in the same vicinity.
Special use management
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S R1W, Section 32 and T5S R2W, Section 36 |
Decision Memo · Hoosier National Forest All Units · updated 6/21/2023
The proposed project is alongside county roads at various locations on National Forest System lands throughout Perry County, Indiana. · Perry, Indiana
Proposal to issue Perry-Spencer R.T.C., Inc. a special use authorization to install approximately 8 miles of buried fiber optic cable along several county roads in Perry County and to place approximately 0.15 miles of aerial fiber optic cable.
Special use management
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 5/2/2023
Approximately 5 miles northwest of French Lick, IN. · Orange, Indiana
The Hoosier is proposing to issue a special use permit to a private landowner for a 20-foot construction right-of-way for the purpose of running buried water and electrical utilities to private property.
Special use management
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T2N, R2W, Section 7 |
Decision Memo · Brownstown Ranger District · updated 4/10/2023
Hardin Ridge Recreation Area · Monroe, Indiana
The Hoosier National Forest is proposing to drain Bluegill Pond and re-establish a healthy fish population.
Wildlife, fish, rare plants
Decision
04/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 7 N., R. 1 E., Section 20 |
Environmental Assessment · Hoosier National Forest All Units · updated 4/4/2023
Approximately one mile south of Young' Creek Horse Camp; approximately one mile northwest of Pine Valley. · Orange, Indiana
The Hoosier National Forest proposes to issue a Special Use Permit to authorize the construction, use, and maintenance of a gravel-surface road across National Forest System land.
Special use management
Scoping Start
04/2020 (Estimated)
Comment Period
08/2020 (Estimated)
Objection Period Start
01/2021 (Estimated)
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1W, Sections 24, 25, and 36 |
Decision Memo · Hoosier National Forest All Units · updated 1/31/2023
Approximately 3.5 miles northwest of French Lick, IN. · Orange, Indiana
The Hoosier proposes to issue a five-year special use permit to French Lick Resorts to authorize tree planting and subsequent restoration work within the Roland Riparian Restoration Area.
Special use management
Decision
01/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 2 West, Sections 19 and 20 |
Decision Memo · Hoosier National Forest All Units · updated 1/31/2023
Approximately 3.5 miles northwest of French Lick, IN. · Orange, Indiana
The Hoosier proposes to permit French Lick Resorts to complete a rehabilitation project that includes planting approximately 366 native trees and 900 native shrubs within the Roland Riparian Restoration Area.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
01/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 2 West, Sections 19 and 20 |
Decision Memo · Hoosier National Forest All Units · updated 1/27/2023
Approximately 3.4 miles NNE of Norman, IN · Jackson, Indiana
The Hoosier is proposing to issue a temporary special use permit to ANR Pipeline Company, Inc. to authorize the excavation and repair of a section of existing gas pipeline within ANR's existing right-of-way.
Special use management
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 2 west, Section 36 |
Decision Memo · Hoosier National Forest All Units · updated 1/6/2023
Approximately 1 mile south of Mount Pleasant, IN. · Perry, Indiana
The Hoosier proposes to issue a special use permit for continued access to private property via an existing driveway.
Special use management
Decision
01/2023 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 5 South, Range 1 West, Section 3 |
Decision Memo · Hoosier National Forest All Units · updated 12/16/2022
Approximately 0.5 miles south of Sulphur, IN. · Crawford, Indiana
The Hoosier proposes to issue a special use permit for a waterline within an existing road easement.
Special use management
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 3 South, Range 1 West, Section 36 |
Environmental Assessment · Hoosier National Forest All Units · updated 11/30/2022
Pleasant Run area of the Hoosier National Forest. Approximately 214 scattered openings. · Brown; Jackson; Lawrence; Monroe, Indiana
The Hoosier National Forest proposes to maintain 214 forest openings as early successional grass, forb, and shrubland habitats in the Pleasant Run area of the Brownstown Ranger District.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
03/24/2022
Objection Period Start
05/03/2022
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 10/13/2022
Hardin Ridge Recreation Area, Monroe County, IN · Monroe, Indiana
The Hoosier National Forest is proposing to demolish and reconstruct three toilet/shower buildings on the Eads, Holland, and Southern Point campground loops at Hardin Ridge Recreation Area.
Facility management
Decision
10/2022 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R1E, Sec. 29 |
Environmental Assessment · Hoosier National Forest All Units · updated 10/12/2022
The majority of the project lies in the northwest corner of Jackson County. A small portion overlaps into the northeast corner of Lawrence County. · Jackson; Lawrence, Indiana
This project proposes to treat vegetation and conduct related management activities improving forest health and sustainability of the oak-hickory ecosystems while also improving wildlife habitat.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Comment Period
07/28/2019
Objection Period Start
11/08/2019
Decision
02/2020 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 9/20/2022
Approximately 2 miles northwest of Houston, Indiana. · Jackson, Indiana
The Hoosier proposes to issue a short-term special use permit to ANR Pipeline Company, Inc. authorizing the excavation and repair/replacement of a section of the existing gas pipeline.
Special use management
Decision
09/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/20/2022 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 3 West, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 8/19/2022
Hickory Ridge is approximately 2 miles northwest or Norman, IN; Buzzard Roost is approximately 2.5 miles west of Alton, IN. · Lawrence; Perry, Indiana
The Hoosier proposes to make improvements to the Hickory Ridge Campground and install a fee tube and kiosk within the Buzzard Roost Campground.
Recreation management
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | T. 6 N., R. 2 E., Section 3; T. 4 S., R. 1 W., Section 36 |
Decision Memo · Hoosier National Forest All Units · updated 8/9/2022
Hickory Ridge Road, Jackson County, Indiana. · Jackson, Indiana
The Forest Service is proposing a change in how dispersed roadside camping is managed on the Hoosier National Forest.
Recreation management
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 7/27/2022
Approximately 3.5 miles east of Gatchel, Indiana · Perry, Indiana
The Hoosier proposes to issue a permit to authorize Southern Indiana Power to remove existing aerial powerline and place the immediately adjacent to State Highway 70.
Special use management
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 6 South, Range 2 West, Sections 25, 26 & 36 |
Decision Memo · Hoosier National Forest All Units · updated 7/5/2022
Tipsaw Lake Recreation Area, approximately 6.5 miles SSW of Saint Croix, IN. · Perry, Indiana
The Tell City Ranger District is proposing to install a new precast vault toilet adjacent to the entrance of Primrose Group campsite in Tipsaw Lake Recreation Area.
Recreation management
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T4S, R2W, Section 28 |
Decision Memo · Hoosier National Forest All Units · updated 6/28/2022
Approximately 1.5 miles west of Eckerty, IN. · Crawford, Indiana
The Hoosier is proposing to issue a special use permit to access private property.
Special use management
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 2 South, Range 2 West, Section 21 |
Decision Memo · Hoosier National Forest All Units · updated 6/2/2022
Approximately 2.5 miles southeast of Shoals, IN. · Martin, Indiana
The Hoosier is proposing to issue a special use permit that authorizes seasonal access across National Forest System land to private land.
Special use management
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 3 West, Section 4 |
Decision Memo · Hoosier National Forest All Units · updated 3/29/2022
Approximately 4 miles south southeast of Shoals, IN · Martin, Indiana
The Hoosier is proposing to issue a road special use permit that authorizes the construction and maintenance of an access road through the HNF to private property.
Special use management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 3 West, Section 17 |
Decision Memo · Hoosier National Forest All Units · updated 2/7/2022
Approximately 2 miles west southwest of Spurgeons Corner. · Brown, Indiana
The Hoosier proposes to issue a new special use permit to authorize the construction and maintenance of a waterline to supply water from Brown County Water to the private residence.
Special use management
Decision
12/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 3 East, Section 2 |
Decision Memo · Hoosier National Forest All Units · updated 2/7/2022
Approximately 3.5 miles north northwest of Freetown, IN. · Jackson, Indiana
The Hoosier is proposing to issue a special use permit amendment that authorizes a right-of-way for an electrical transmission line and a single pole replacement.
Special use management
Decision
12/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 3 East, Section 24 |
Decision Memo · Hoosier National Forest All Units · updated 2/7/2022
Approximately 2 miles west northwest of Sulphur, IN. · Crawford, Indiana
The Hoosier is proposing a permit amendment to move an existing waterline along State Road 62 in Crawford County, Indiana to accommodate a road repair project by the Indiana Department of Transportation.
Special use management
Decision
12/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 3 South, Range 1 west, Section 27 |
Decision Memo · Hoosier National Forest All Units · updated 1/31/2022
Approximately 1/2 mile southeast of Oriole, IN. · Perry, Indiana
The project proposes to promote regeneration of oak and hickory by conducting prescribed fire in a research study being conducted by the US Forest Service Northern Research Station and Purdue University.
Vegetation management (other than forest products)
Decision
01/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T. 4 S., R. 1 W., Section 14 |
Decision Memo · Hoosier National Forest All Units · updated 9/24/2021
Forest-wide · Brown; Crawford; Dubois; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
The Hoosier is proposing to install artificial fish habitat structures into lakes and ponds throughout the Forest. The structures will mimic brush piles or fallen trees.
Wildlife, fish, rare plants
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 9/3/2021
Tipsaw Lake Recreation Area · Perry, Indiana
The Hoosier is proposing to issue a special use permit amendment to Southern Indiana Power to install and maintain approximately 581 feet of buried electrical line in the Tipsaw Lake Recreation Area.
Special use management
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 4 South, Range 2 West, Section 29 |
Decision Memo · Hoosier National Forest All Units · updated 8/17/2021
Approximately 3 miles south of Huron, IN. · Orange, Indiana
The Hoosier proposes to issue a short-term special use permit to Indiana Gas Company, Inc. authorizing a temporary area in which to perform pipeline repair work.
Special use management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 3 North, Range 2 West, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 8/16/2021
Approximately 8 miles west of Orleans, IN. · Orange, Indiana
The Hoosier National Forest is proposing to re-route two trail segments within the Shirley Creek Trail System.
Recreation management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T.3.N., R.2.W, Section 27 |
Decision Memo · Hoosier National Forest All Units · updated 8/2/2021
One sign would be placed along Tower Ridge Road, at the intersection of Hickory Ridge Road. The other would be placed on Hickory Grove Road, east of Horse Camp Road. · Lawrence; Monroe, Indiana
The Hoosier is proposing to issue a special use permit to Friends of Lake Monroe, Inc. to place two informational signs within the road right-of-way in Monroe County and Lawrence County to advise motorists they are entering the Monroe Lake watershed.
Special use management
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R2E, Section 17 and T6N, R2E, Section 3 |
Decision Memo · Hoosier National Forest All Units · updated 7/14/2021
Approximately 5.5 miles northwest of Freetown, IN. · Jackson, Indiana
The Hoosier is proposing to buttress a head cut at Charlie's pond to alleviate erosion and avoid risking a dam breach.
Watershed management
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R3E, Section 15 |
Decision Memo · Hoosier National Forest All Units · updated 6/23/2021
Approximately 5 miles SE of Paoli, IN. · Orange, Indiana
The Hoosier is proposing a new parking area for access to the Lick Creek Trail area at the end of Grease Gravy Road/South County Road 250 East.
Recreation management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 1 North, Range 1 East, Section 28 |
Decision Memo · Hoosier National Forest All Units · updated 5/20/2021
Approximately 6 miles east of Tell City, IN. · Perry, Indiana
The Hoosier is proposing to issue a 10-year Priority Use Outfitter and Guide Permit to Froehlich Outfitter and Guides Horse Trail Rides, LLC.
Special use management
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 05/20/2021 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 6 South, Range 2 West, Sections 28 and 29 |
Decision Memo · Hoosier National Forest All Units · updated 5/18/2021
Approximately 3 miles southeast of Shoals, IN · Martin, Indiana
The Hoosier is proposing to issue a permit amendment that properly authorizes rights-of-way for an existing waterline and approximately 125 feet of new waterline.
Special use management
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 3 West, Sections 5 and 6 |
Decision Memo · Hoosier National Forest All Units · updated 5/17/2021
This project encompasses multiple areas and covers Townships/Ranges spanning from T3N, R1W to T5S, R1E in portions of Crawford, Orange and Perry counties. · Crawford; Orange; Perry, Indiana
The Hoosier proposes to consolidate Patoka Lake Regional Water & Sewer District (PLRW&SD) waterline permits into a single master permit to be issued for a 30-year time period along with incorporating an Operations & Maintenance (O&M) Plan.
Special use management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 5/17/2021
The project area covers portions of several Townships/Ranges throughout southern Perry county. · Perry, Indiana
The Hoosier is proposing to issue Perry-Spencer R.T.C.,Inc. a special use authorization to install approximately 5.8 miles of buried fiber optic cable along county roads in an effort to expand highspeed internet access to residents of rural Perry Co.
Special use management
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 5/17/2021
Approximately 8 miles southeast of Bloomington, IN. · Monroe, Indiana
The Hoosier is proposing to issue two special use road easements to private land owners that properly authorizes access to private land.
Special use management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R1E, Sections 3 and 10 |
Decision Memo · Hoosier National Forest All Units · updated 1/29/2021
The project area covers portions of several Townships/Ranges throughout southern Perry county. · Perry, Indiana
Cancelled due to change in proposal.
Special use management
Decision
02/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 1/26/2021
The first location is at the Redhorse Timber Sale, approximately 2 miles east of Birdseye, IN. The second location is at Hemlock Cliffs Special Area, approximately 2 miles south of Mifflin, IN. · Crawford, Indiana
The Hoosier National Forest is proposing to repair two areas of severe erosion in Crawford County.
Wildlife, fish, rare plantsWatershed management
Decision
01/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T2S, R2W Section 29 and T3S, R1W Sec. 8 |
Decision Memo · Hoosier National Forest All Units · updated 9/29/2020
Approximately 2 miles WNW of Sulphur, IN along SR 62. · Crawford, Indiana
The Hoosier is proposing to authorize the subsurface and geotechnical investigation to gather data regarding the rate of surface movement in two locations along State Route 62.
Special use management
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3S, R1W, Section 27 |
Decision Memo · Hoosier National Forest All Units · updated 7/8/2020
Approximately 1.5 miles northeast of Rusk, Indiana. · Martin, Indiana
The Hoosier NF is proposing to remove a low-water crossing on Buck Creek and replace it with a portable bridge to provide aquatic organism passage and improved hydrologic function.
Wildlife, fish, rare plantsWatershed management
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T2N, R3W, Section 28 |
Decision Memo · Hoosier National Forest All Units · updated 6/22/2020
Approximately 4 miles northeast of Houston, Indiana. · Jackson, Indiana
The Hoosier, in response to a request from Jackson County REMC, is proposing to amend the existing Special Use Permit to eliminate a section of previously authorized buried fiber optic cable and would authorize a new section in a different location.
Special use management
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R4E, Section 18 |
Decision Memo · Hoosier National Forest All Units · updated 6/9/2020
Initial Point monument, approximately 1/2 mile southwest of Pine Valley, IN. · Orange, Indiana
The Hoosier National Forest is proposing to armor the streambank of an intermittent stream with native rock to reduce erosion risk near the Initial Point monument.
Heritage resource managementWatershed management
Decision
06/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T 1 S, R 1 E, Section 6 |
Decision Memo · Hoosier National Forest All Units · updated 5/27/2020
South Indian Lake Road, near the Indian Lake dam. · Perry, Indiana
The Hoosier is proposing to replace an undersized, perched culvert with an AOP structure for the purpose of aquatic organism passage and improved hydrologic function.
Wildlife, fish, rare plantsRoad managementWatershed management
Decision
05/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T4S R2W, Section 6 |
Environmental Assessment · Hoosier National Forest All Units · updated 4/22/2020
The project is located near Birdseye, Indiana. The project is south of State Road 64, west of State Road 37 and north of Oak Hill Road. · Crawford, Indiana
Proposal to implement the 2006 Land and Resource Management Plan by increasing the amount of early successional habitat available.
Vegetation management (other than forest products)Forest productsWildlife, fish, rare plants
Comment Period
11/02/2015
Objection Period Start
02/29/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 4/20/2020
Approximately 2.5 miles northeast of Alton, Indiana · Crawford, Indiana
The Hoosier is proposing to issue a special use permit to access private property.
Special use management
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T. 4 S., R. 1 E.; Section 22 |
Environmental Assessment · Hoosier National Forest All Units · updated 4/3/2020
The project would occur throughout the Tell City Ranger District. · Crawford; Dubois; Orange; Perry, Indiana
The Hoosier is proposing to maintain openings as early successional habitat using a variety of tools.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
08/26/2019
Objection Period Start
02/03/2020
Decision
04/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 1/31/2020
This project encompasses areas in portions of Jackson, Brown, and Lawrence counties. · Brown; Jackson; Lawrence, Indiana
The Hoosier is proposing to issue a special use permit to authorize the existing use and occupancy of NFS land by Jackson County REMC and authorize the rural broadband service expansion within Jackson Connect, LLC's service area.
Special use management
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 1/31/2020
Approximately 1 mile southwest of Gerald, Indiana. · Perry, Indiana
The Hoosier is proposing to issue a Special Use Permit authorizing access to private property across NFS land via an existing gravel road and to issue a Special Use Permit authorizing a private gate on NFS land.
Special use management
Decision
01/2020 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | SWNE of Section 14, T6S, R2W |
Decision Memo · Hoosier National Forest All Units · updated 8/20/2019
Immediately adjacent to and west of State Road 37 between Burma Road and Pine Valley Road. · Orange, Indiana
The Hoosier is proposing to issue a special use permit for a driveway and turn-around.
Special use management
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1E, Section 30 |
Environmental Impact Statement · Hoosier National Forest All Units · updated 8/2/2019
East -northeast of Tell City · Perry, Indiana
Supplement EIS. Same project: Replace non-native pine plantations with native hardwood communities; improve conditions for species associated with barrens communities.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)Forest products
NOI in Federal Register
08/30/2002
DEIS NOA in Federal Register
10/01/2006
FEIS NOA in Federal Register
05/04/2007
Decision
04/2007 (Estimated)
Implementation
08/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Timber Sales (Green) |
| German Ridge Restoration | Decision Signed Date: 04/16/2007 Legal Notice Date: 04/22/2007 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 11-15, 21-23, 25-29, and 31-36 T 6S, R2W and Sections 4-6 of T7S, R2W |
Environmental Assessment · Tell City Ranger District · updated 8/2/2019
Between Seton Knob and English Reservoir · Crawford, Indiana
Mow and use chainsaws, prescribed burning, strip disking, seed drilling, shrub planting, and NNIS treatments to maintain and restore approx. 186 acres of early succcessional habitat.
Wildlife, fish, rare plants
Comment Period
06/12/2008
Decision
01/2009 (Estimated)
Implementation
03/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments |
| Miflin Restoration | Decision Signed Date: 01/05/2009 Legal Notice Date: 01/08/2009 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 32 and 33, T2S,R1E and Section 4 ,T3S,R1E |
Environmental Assessment · Hoosier National Forest All Units · updated 8/2/2019
Area near Ohio River between Oriole and Deuchars, between Orange Grove Road and Buzzard Roost Road. · Crawford; Perry, Indiana
Restore ecosystem processes--approx. 110 acres of stand improvement, approx. 2,200 acres of commercial timber harvest and approx. 3,500 acres of burning. Herbicide treatment for known populations of NNIS to reduce the potential spread.
Fuels managementForest productsVegetation management (other than forest products)Watershed management
Comment Period
03/25/2007
Decision
11/2007 (Estimated)
Implementation
01/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 1, 10-15, and 22-26 of T4S, R1W; sections 7, 8, 16-21, and 28-33 of T4S, R1E. |
Environmental Impact Statement · Tell City Ranger District · updated 8/2/2019
a zone 8 miles wide and 25 miles long running from Birdseye southeast to the Ohio River · Crawford; Dubois; Perry, Indiana
About 3,100 acres of salvage logging and 5,590 acres of prescribed fire, the need arising from the July 2004 storms that affected the southern Indiana area. Approximately 27 miles of road work is anticipated.
Fuels managementForest products
NOI in Federal Register
12/17/2004
DEIS NOA in Federal Register
12/23/2005
FEIS NOA in Federal Register
05/19/2006
Decision
04/2006 (Estimated)
Implementation
06/2006 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage) |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 8/1/2019
Springs Valley Lake, approximately 5 miles SE of French Lick, Indiana. · Orange, Indiana
The Hoosier is proposing to issue a new replacement permit authorizing a dam and reservoir at Springs Valley Lake.
Special use management
Scoping Start
07/2019 (Estimated)
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1W, Sections 29, 30, and 31 |
Decision Memo · Hoosier National Forest All Units · updated 7/10/2019
One is located just north of Shirley Creek Horse Camp; the other is on S. Co. Rd. 590 W., at the west end of Tucker Lake. · Orange, Indiana
The Hoosier is proposing to issuing a new permit for two transfer stations for another 10 years and incorporating an O&M Plan, which will contain provisions specifically addressing leachate control and spill prevention measures.
Special use management
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3N, R2W, Section 26 and T1N, R1W, Section 31 |
Decision Memo · Hoosier National Forest All Units · updated 4/16/2019
Hanner Cemetery is located approximately 1.5 miles northwest of Kurtz, IN. · Jackson, Indiana
The Hoosier proposes to issue a special use permit to authorize the continued operation and maintenance of Hanner Cemetery.
Special use management
Decision
04/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 6 N., R. 3 E., Section 8 |
Decision Memo · Hoosier National Forest All Units · updated 4/16/2019
Way Cemetery is approximately 4 miles southeast of Shoals, IN. · Martin, Indiana
The Hoosier proposes to issue a special use permit to authorize the continued operation and maintenance of Way Cemetery.
Special use management
Decision
04/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 2 N., R. 3 W., Section 9 |
Decision Memo · Hoosier National Forest All Units · updated 3/22/2019
Just west off of SR 37 between Burma Road and Pine Valley · Orange, Indiana
The Hoosier proposes to issue a special use permit to authorize an access road to private property.
Special use management
Decision
03/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1E, Section 30 |
Decision Memo · Hoosier National Forest All Units · updated 3/21/2019
Approximately 2 miles west of St. Croix, IN. · Perry, Indiana
The Hoosier proposes to issue a special use permit to authorize the installation of a waterline on an existing permitted private driveway.
Special use management
Decision
03/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 2 South, Range 3 West; Section 28 |
Decision Memo · Hoosier National Forest All Units · updated 12/17/2018
Approximately 6.5 miles WNW of French Lick, Indiana · Martin, Indiana
The Hoosier is proposing to authorize the subsurface and geotechnical investigation to be performed on the existing access road to facilitate the design work needed for the upcoming proposed Buck Creek AOP project.
Special use management
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Section 28, T2N, R3W |
Decision Memo · Hoosier National Forest All Units · updated 11/9/2018
The replacement bridge crosses Theis Creek on Locust Road near the Saddle Lake Recreation Area, approximately 8 miles northeast of Tell City. · Perry, Indiana
Issuance of a Public Road Easement to the Perry County Board of Commissioners for the necessary right-of-way to accommodate a replacement bridge across Theis Creek on Locust Road.
Special use management
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 19 |
Environmental Assessment · Hoosier National Forest All Units · updated 10/22/2018
Proposal is in three project areas: Boone Creek, approximately 3 miles northwest of Alton, IN; Mogan Ridge, located between SR 37 and SR 66 near Derby, IN; and Harding Flats, near Gerald, IN · Crawford; Perry, Indiana
Proposal to restore fire-dependent barrens communities using prescribed fire while considering additional treatments to reduce woody species encroachment and plant succession.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
07/16/2018
Objection Period Start
08/20/2018
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hoosier National Forest All Units · updated 9/27/2018
The roads and road segments are located throughout the Pleasant Run Unit of the Brownstown Ranger District. · Brown; Jackson; Lawrence; Monroe, Indiana
The Hoosier is proposing to decommission 13 roads in their entirety and segments of 52 roads for a total of approximately 22 miles. The roads and segments proposed for decommissioning are closed to motorized vehicles and no longer needed.
Road management
Comment Period
04/09/2018
Objection Period Start
08/05/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 8/23/2018
Alongside various roads in Martin County located on NFS land. · Martin, Indiana
The Hoosier is proposing to issue a new, replacement permit authorizing existing buried waterline.
Special use management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Brownstown Ranger District · updated 6/25/2018
The East Bass Pond segment of the Cope Hollow trail, located within the Charles C. Deam Wilderness. · Monroe, Indiana
The Hoosier is proposing to reroute the East Bass Pond trail segment of the Cope Hollow Trail in the Charles C. Deam Wilderness. Approximately 1 mile of new trail would be constructed and approximately 1 mile of old trail would be decommissioned.
Recreation management
Decision
05/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Section 25 of Township 7 North, Range 1 East. |
Environmental Assessment · Hoosier National Forest All Units · updated 5/4/2018
The Grubb Ridge Trailhead overflow parking lot is located on the south side of Tower Ridge Road across from the Grubb Ridge Trailhead and parking. · Monroe, Indiana
The Hoosier National Forest is proposing to add a pull through for the overflow parking lot at the Grubb Ridge Trailhead.
Recreation management
Comment Period
01/21/2018
Objection Period Start
03/11/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R2E; Section 19 |
Decision Memo · Hoosier National Forest All Units · updated 4/16/2018
Various locations on National Forest System lands in south central and northwest Orange County, Indiana. · Orange, Indiana
The Hoosier proposes to consolidate and renew all of Orange County REMC's permits into a single master permit.
Special use management
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1E, Section 30, 31; T1N, R1W, Sections 27, 32, 33, 34, 35, 36; T1S, R1E, Section 2, 5, 28; T1S, R1W, Sections 1, 10, 11; T3N, R1W, Sections 30, 31; T3N, R2W, Sections 21, 22, 26, 27 |
Decision Memo · Hoosier National Forest All Units · updated 3/27/2018
Existing electric lines at various locations on National Forest System lands in southern Orange County, western Crawford County, and northern Perry County, Indiana. · Crawford; Orange; Perry, Indiana
The Hoosier proposes to consolidate Hoosier Energy REC's two permits into a single master permit and renew this permit for another 30 years.
Special use management
Decision
02/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 3/20/2018
Approximately 2 miles southeast of Saint Croix, Indiana · Perry, Indiana
The Hoosier is proposing to issue a special use permit for a gate and driveway access to private land.
Special use management
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 4 South, Range 1 West, Section 6 |
Decision Memo · Hoosier National Forest All Units · updated 3/20/2018
Approximately 2 miles west of Leopold, Indiana · Perry, Indiana
The Hoosier proposes to issue a special use permit authorizing Southern Indiana Power to install approximately 1,000 feet of buried power cable on NFS land.
Special use management
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 5 South, Range 2 West, Section 3 |
Environmental Assessment · Tell City Ranger District · updated 3/1/2018
The project would occur throughout the Tell City Ranger District. · Crawford; Dubois; Orange; Perry, Indiana
Maintain openings as early successional habitat using a variety of tools. Project cancelled to focus on other priority projects.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
02/2018 (Estimated)
Objection Period Start
05/2018 (Estimated)
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 2/20/2018
South Forest Drive near Deckard Ridge; approximately 7 miles southeast of Bloomington, IN · Monroe, Indiana
Proposal to issue a new special use permit to Salt Creek Services, Inc. to properly authorize the use and maintenance of the road located on NFS land to access the Salt Creek Estates private development.
Special use management
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T8N, R1E, Section 35 |
Decision Memo · Hoosier National Forest All Units · updated 12/12/2017
The proposed treatment areas are in the Lost River area; in the Mifflin project area, approximately 4 miles south of English; and the Oriole project area, approximately 3 miles north of Alton, IN. · Crawford; Lawrence; Martin; Orange; Perry, Indiana
The Hoosier is proposing to use prescribed fire on approximately 370 acres as a restoration tool at three project areas which have ongoing activities.
Vegetation management (other than forest products)
Decision
12/2017 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 12/4/2017
The location is on Old State Road 37, approximately one mile southeast of Saddle Lake. · Perry, Indiana
The Hoosier is proposing to issue a special use permit to authorize the use of a portion of NFS land for driveway access.
Special use management
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W; Section 29 |
Environmental Assessment · Hoosier National Forest All Units · updated 10/24/2017
The proposed facilities would be located on Forest Service managed land on Highway 37 South, approximately 3 miles north of Mitchell, IN. · Lawrence, Indiana
The Hoosier is proposing to design and construct an administrative office complex.
Facility management
Comment Period
07/10/2017
Objection Period Start
08/27/2017
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | T4N, R1W; Section 15 |
Decision Memo · Hoosier National Forest All Units · updated 10/23/2017
Burgoon Church is located approximately 7.5 miles southeast of Bloomington, IN, off State Road 446. · Monroe, Indiana
The Hoosier proposes to issue a special use permit authorizing Burgoon Church's use of an approximately 100' x 30' area of land and an approximately 25' asphalt drive.
Special use management
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Burgoon Baptist Church Special Use Road Permit | Decision Signed Date: 10/18/2017 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R1E; Section 10 |
Decision Memo · Hoosier National Forest All Units · updated 8/30/2017
Approximately 3 miles north of Norman, Indiana · Jackson, Indiana
Proposal to replace two low-water concrete crossings with bridges for aquatic organism passage and improved hydrologic function. Also proposing to issue a Public Road Easement to Jackson County for the sections of road that will be realigned.
Road managementWatershed managementWildlife, fish, rare plantsSpecial use management
Decision
08/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Special Use Authorizations; Road Improvements/Construction; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R2E Section 35 |
Decision Memo · Hoosier National Forest All Units · updated 7/20/2017
Various locations on National Forest System lands in western Crawford County, Indiana and one location in Dubois County, approximately one mile southeast of Birdseye, Indiana. · Crawford; Dubois, Indiana
The Hoosier proposes to consolidate and renew all of Dubois REC's permits into a single master permit.
Special use management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T2S, R1W, Sec. 5; T2S, R2W, Sec. 29; T2S, R3W, Sec. 36; T3S, R1W, Sec. 2, 27, 32 |
Decision Memo · Hoosier National Forest All Units · updated 7/20/2017
Paynetown is approximately 1 mi. north of the Paynetown State Recreation Area; Georgia is approximately 4.5 mi. west of Mitchell, IN; Marchand is approximately 1 mi. NE of the Hwy 37/70 intersection. · Lawrence; Monroe; Perry, Indiana
The Hoosier National Forest proposes to issue replacement Communication Site Leases to the Indiana Integrated Public Safety Commission (Marchand and Georgia) and the Indiana Department of Natural Resources (Paynetown) for a new 30-year term.
Special use management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Marchand: Section 22, T5S, R2W; Georgia: Section 36, T4N, R2W; Paynetown: Section 29, T8N, R1E |
Decision Memo · Hoosier National Forest All Units · updated 7/20/2017
The cemetery is located just south of the intersection of Roberts Road and Allens Creek Road, near Hardin Ridge Recreation Area. · Monroe, Indiana
The Hoosier National Forest proposes to issue a special use permit to the Polk Township Trustee in Monroe County to authorize the continued operation and maintenance of Roberts Road Cemetery.
Special use management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 1 East, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 7/19/2017
The Shirley Creek Trail System is approximately 8 miles west of Orleans, Indiana. · Orange, Indiana
The Hoosier National Forest is proposing to re-route a section of the Shirley Creek Trail System.
Recreation management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T.3.N, R.2.W; Section 27 |
Decision Memo · Hoosier National Forest All Units · updated 3/27/2017
Approximately 6 miles east of Tell City, Indiana · Perry, Indiana
The Hoosier National Forest is proposing to re-issue a special use permit to Froehlich Outfitter and Guides Horse Trail Rides, LLC. to use a trail located on the Hoosier National Forest.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T.6.S., R.2.W; Section 28 |
Decision Memo · Hoosier National Forest All Units · updated 3/10/2017
The project is located within the Indian-Celina Recreation Area. · Perry, Indiana
Proposal to amend the existing permit to authorize Perry Spencer RTC, Inc. to bury new fiber optic line along segments of Forest Service roads in the Indian-Celina Lake Recreation Area.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 4 South, Range 2 West, Portions of Sections 2 and 10 |
Decision Memo · Hoosier National Forest All Units · updated 12/23/2016
Approximately 1 mile north of U.S. Highway 50 near the Lawrence/Martin County line. · Lawrence, Indiana
Proposal to issue a special use permit authorizing a driveway and waterline.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T4N, R2W, Section 32 |
Decision Memo · Hoosier National Forest All Units · updated 12/23/2016
Located off of County Road 460 near the Wildwood Subdivision, approximately 1 mile southeast of Springs Valley Lake. · Orange, Indiana
Proposal to issue a special use permit to authorize a driveway.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1N, R1W, Section 32 |
Decision Memo · Hoosier National Forest All Units · updated 12/23/2016
Approximately 0.25 miles south of Lacy, Indiana · Martin, Indiana
Proposal to issue a special use permit to authorize a driveway.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T2N, R3W, Section 7 |
Decision Memo · Hoosier National Forest All Units · updated 11/14/2016
Approximately 2 miles west of Norman, Indiana. · Lawrence, Indiana
The Hoosier National Forest is proposing to remove the Hickey-Martin Dam from Henderson Creek to allow for movement of aquatic species and to restore hydraulic processes within the stream.
Wildlife, fish, rare plantsWatershed management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T6N, R2E, Section 16 |
Decision Memo · Hoosier National Forest All Units · updated 10/21/2016
Approximately 0.7 miles northeast of Gatchel, Indiana, off of Old State Road 37. · Perry, Indiana
The Hoosier is proposing to issue a special use permit to authorize use of a road through National Forest System land.
Special use management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 9/23/2016
The Saddle Lake Trail is in the Saddle Lake Recreation Area. · Perry, Indiana
Proposal to relocate the Saddle Lake trail out of the floodplain of Saddle Lake.
Recreation management
Decision
08/2016 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 9/23/2016
Off of County Road 950 East, just west of Sulphur Creek. Approximately 8 miles north of French Lick, Indiana · Orange, Indiana
Authorize use and occupancy of NFS land for an existing facility owned by a local utility provider.
Special use management
Decision
07/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3N, R2W, Section 33 |
Decision Memo · Hoosier National Forest All Units · updated 7/19/2016
Approximately 6 miles east of Tell City, Indiana · Perry, Indiana
Proposal to reroute approximately 1,400 feet of the existing Froehlich special use trail.
Recreation management
Decision
07/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R2W; Section 29 |
Decision Memo · Hoosier National Forest All Units · updated 6/2/2016
The trailhead is located approximately 3 miles southwest of Story, Indiana. · Brown, Indiana
The Hoosier is proposing to reroute approximately one mile of the D Trail and re-designate the trail to include mountain bike use.
Recreation management
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T8N, R2E; Sections 26, 27, and 35 |
Decision Memo · Hoosier National Forest All Units · updated 5/20/2016
Forest-wide · Brown; Crawford; Dubois; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
The Hoosier is proposing to amend the Hoosier National Forest Land and Resource Management Plan to establish a Management Area and associated direction to existing and future communication sites. No new sites would be added or created at this time.
Land management planning
Comment Period
02/01/2016
Objection Period Start
03/28/2016
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 4/22/2016
The project is near Saddle Lake, approximately 9 miles northeast of Tell City. · Perry, Indiana
The Hoosier is proposing to remove a road/stream crossing structure at Albany Road and stabilize the stream bank at a structure on Saddle Creek Road to allow for movement of aquatic species and to restore hydraulic processes within the stream.
Watershed managementRoad managementWildlife, fish, rare plants
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 4/12/2016
The proposed project is alongside county and state roads and on existing power poles at various locations on National Forest System lands throughout Perry County, Indiana. · Perry, Indiana
The Hoosier is proposing to issue a special use permit to authorize Perry Spencer RTC, Inc. to bury new fiber optic line along county and state roads and to install aerial fiber optic line on existing power poles.
Special use management
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 4/5/2016
Forest-wide · Brown; Crawford; Dubois; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
The Hoosier is proposing a ponds maintenance project for habitat and recreational improvement, as well as preserving the integrity of the structures constructed to maintain the waterbodies.
Recreation management
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Species Habitat Improvements |
| Decision Decided Date | 04/05/2016 |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 1/27/2016
Approximately 4 mile northwest of Rome, Indiana. · Perry, Indiana
Proposal to reissue a special use permit for a private road.
Special use management
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R2W, NE1/4 Section 25 |
Decision Memo · Hoosier National Forest All Units · updated 1/27/2016
Approximately 4 miles northeast of Huron, Indiana · Lawrence, Indiana
Renewal of a special use permit to RTC Communications for a buried telephone line.
Special use management
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Davis-Martin County Rural Telephone Corporation | Decision Signed Date: 01/13/2016 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T4N, R2W, S1/4SE1/4 Section 21, N1/4NE1/4 Section 28 and SWNE Section 23 |
Decision Memo · Hoosier National Forest All Units · updated 1/27/2016
Approximately 1 mile southeast of Gerald, Indiana. · Perry, Indiana
Proposal to reissue a special use permit for a private road.
Special use management
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R1W, NW1/4NW1/4 Section 17 |
Decision Memo · Hoosier National Forest All Units · updated 12/9/2015
Approximately 0.5 mile southeast of Spurgeons Corner, Indiana · Brown, Indiana
The Hoosier is proposing to resolve an encroachment with a Small Tracts Act sale.
Land ownership management
Decision
12/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Boundary Adjustments |
| Decision Decided Date | 12/09/2015 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Part of the Southwest Quarter of the Southwest Quarter of Section 6, Township 7 North, Range 4 East |
Decision Memo · Hoosier National Forest All Units · updated 12/9/2015
Approximately 7 miles southeast of Bloomington, Indiana · Monroe, Indiana
The Hoosier is proposing a land-for land exchange to resolve an unauthorized encroachment of private improvements located on National Forest System land.
Land ownership management
Decision
12/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Decision Decided Date | 12/09/2015 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 1 East, Section 4 |
Decision Memo · Hoosier National Forest All Units · updated 11/20/2015
The north section of the North Loop of the German Ridge Multiple Use Trail. · Perry, Indiana
The Hoosier is proposing to reroute approximately 550 feet of the German Ridge North Loop trail.
Recreation management
Decision
11/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R2W, Sections 14 and 15 |
Decision Memo · Hoosier National Forest All Units · updated 11/20/2015
The Crawford County location is 2.5 miles north of Taswell, IN and the Orange County location is 5 miles southeast of French Lick, IN. · Crawford; Orange, Indiana
The Hoosier is proposing to authorize pole replacement work with a temporary special use permit.
Special use management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T2S, R1W, Section 8 and T1N, R1W, Section 31 |
Decision Memo · Hoosier National Forest All Units · updated 11/2/2015
Approximately 7 miles east of the SR37/SR62 intersection on SR62. · Crawford, Indiana
The Hoosier is proposing to issue a special use permit to allow the State of Indiana to replace a deteriorating bridge and culvert and to convey a right-of-way easement for ongoing maintenance purposes.
Special use management
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3S, R1W, Section 30 |
Decision Memo · Hoosier National Forest All Units · updated 9/25/2015
Approximately 4.5 miles southeast of Birdseye, Indiana. · Crawford, Indiana
The Hoosier is proposing to issue a special use permit to access Mingus Cemetery (private cemetery).
Special use management
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3S, T2W, Section 9 |
Decision Memo · Hoosier National Forest All Units · updated 9/22/2015
Celina Lake and Indian Lake are located in the Indian-Celina Recreation Area and Tipsaw Lake is in the Tipsaw Lake Recreation Area. Both Recreation Areas are off of Highway 37, south of Interstate 64. · Perry, Indiana
The Hoosier is proposing to manipulate lake water levels to control non-native Eurasian water milfoil in Celina Lake, Indian Lake and Tipsaw Lake.
Recreation management
Decision
09/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Decision Decided Date | 09/22/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 9/16/2015
The proposed project is located along State Road 70, approximately 3.5 miles west of Derby, Indiana · Perry, Indiana
The Hoosier is proposing to issue a special use permit to allow AND-TRO Water, Inc. to reconstruction approximately 100 feet of buried waterline within the right-of-way along the south side of State Road 70.
Special use management
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| AND-TRO Water Authority Pipe Replacement | Decision Signed Date: 09/16/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 26 |
Decision Memo · Hoosier National Forest All Units · updated 8/24/2015
Approximately 5.5 miles southwest of English, Indiana · Crawford, Indiana
The Hoosier is proposing to resolve an encroachment with a Small Tracts Act sale.
Land ownership management
Decision
08/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Boundary Adjustments |
| Decision Decided Date | 08/24/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 7/5/2015
Approximately 5 miles west of Tell City, Indiana. · Perry, Indiana
The Hoosier is proposing to issue a 10-year Priority Use Outfitter and Guide Permit to Froehlich Outfitter and Guides Horse Trail Rides, LLC.
Special use management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Froehlich Priority Use Outfitting and Guiding Special Use Authorization | Decision Signed Date: 06/25/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 28 and 29, T.6.S., R.2.W |
Environmental Assessment · Hoosier National Forest All Units · updated 6/17/2015
Approximately 3 miles south of Mifflin, east of South Hatfield Road in Crawford County, Indiana. · Crawford, Indiana
The Hoosier is proposing to issue a special use permit to access private property and a temporary log landing area approximately 100' x 50' in size.
Special use management
Comment Period
05/08/2015
Objection Period Start
05/07/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Gretchen Sell Temporary Road and Log Landing Special Use Permit | Decision Signed Date: 06/15/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | NENW Quarter of Section 17, T3S, R1W |
Decision Memo · Hoosier National Forest All Units · updated 6/11/2015
This project is located at the North Face Camp Loop in the Indian-Celina Recreation Area. The entrance is located 3 miles south of Interstate 64 off State Highway 37. · Perry, Indiana
The Hoosier is proposing to extend electricity from camp sites 28 and 30 in the North Face Camp Loop to seven more camp sites.
Recreation management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Decision Decided Date | 06/11/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3S, R2W, NW 1/4 of Section 2 |
Environmental Assessment · Hoosier National Forest All Units · updated 5/11/2015
Hunters Creek Road, between State Road 446 and Tower Ridge Road. · Lawrence; Monroe, Indiana
The Hoosier is proposing to convey right-of-way easements to Lawrence and Monroe Counties for the realignment of Hunters Creek Road.
Special use management
Comment Period
01/11/2015
Objection Period Start
03/15/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R2E, Sections 20, 29, 32, 31; T7N, R1E, Section 36 (Monroe Co.); T6N, R1E, Section 1 (Lawrence Co.) |
Decision Memo · Hoosier National Forest All Units · updated 4/14/2015
Approximately 7 miles northeast of Tell City, Indiana · Perry, Indiana
The Hoosier is proposing to issue a short-term special use permit (5-year term) to Perry County Soil and Water Conservation District for the operation and maintenance of the Deer Creek Dam.
Special use management
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Deer Creek Dam and Lake | Decision Signed Date: 04/10/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6N, R2W, Sections 4, 9, 10, 15, and 16 |
Decision Memo · Hoosier National Forest All Units · updated 3/18/2015
A section of US Highway 150, 6 miles southeast of Shoals, Indiana. · Martin, Indiana
The Hoosier is proposing to provide a Public Road Easement to Indiana Department of Transportation to widen a section of US Highway 150 by two feet.
Special use management
Decision
03/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| INDOT - US HWY 150 Easement | Decision Signed Date: 03/18/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T2N, R3W, Section 14 |
Decision Memo · Hoosier National Forest All Units · updated 2/19/2015
Various locations in central and northeast Perry County along with one location that is approximately 1.5 miles northeast of Sulphur, IN in Crawford County. · Crawford; Perry, Indiana
Re-issuance of a fiber optic telephone line permit for another 20 years.
Special use management
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ameritech | Decision Signed Date: 02/18/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S,R2W, Sections 2, 11, 22, and 29; T4S, R1W, Sections 11 and 30; T3S, R1E, Sections 19 and 20 |
Decision Memo · Hoosier National Forest All Units · updated 2/19/2015
Approximately 2 miles west of Houston, Indiana · Jackson, Indiana
The Hoosier is proposing to issue a special use permit to access private land across NFS land.
Special use management
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Brian A. & Patricia A. Martin | Decision Signed Date: 02/18/2015 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R3E, Section 20 |
Decision Memo · Hoosier National Forest All Units · updated 2/19/2015
Approximately 3 miles north of Houston, Indiana in Brown County. · Brown, Indiana
The Hoosier is proposing to issue a special use permit for a private road with a gate to access private property.
Special use management
Decision
01/2015 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R3E, Section 3 |
Decision Memo · Hoosier National Forest All Units · updated 2/19/2015
Approximately 7 miles southeast of Bloomington, IN on the Ransburg Boy Scout Reservation. · Monroe, Indiana
The Hoosier is proposing to issue a special use permit to the Ransburg Scout Reservation for a road and a recreation trail.
Special use management
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Crossroads of America Council, BSA Ransburg Scout Reservation | Decision Signed Date: 02/18/2015 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T7N, R1E; Sections 9, 16, and 17 |
Decision Memo · Hoosier National Forest All Units · updated 2/19/2015
Approximately 1 mile east of Mount Pleasant, in Perry County, Indiana. · Perry, Indiana
Proposal to issue a special use permit for Southern Indiana Power and Perry Spencer Rural Telephone to place an electric and telephone line along an existing permitted access road.
Special use management
Decision
02/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power & Perry Spencer RTC - Larry Wilson Permit | Decision Signed Date: 02/18/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T4S, R1W, Section 35 |
Decision Memo · Hoosier National Forest All Units · updated 2/9/2015
Approximately one mile south of Houston, Indiana. · Jackson, Indiana
Propose to reduce the density of trees and improve stand structure through 38 acres of single tree selection harvest and regenerate a 15 acre stand using group selection harvest.
Vegetation management (other than forest products)Forest products
Decision
02/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 3 East, Sections 33 and 34 |
Decision Memo · Hoosier National Forest All Units · updated 2/2/2015
Various locations within Perry County, Indiana · Perry, Indiana
Proposal to consolidate 17 individual Southern Indiana Power special use permits into one master permit.
Special use management
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power | Decision Signed Date: 02/02/2015 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 12/29/2014
One location (T1S, R1W, Section 10) is approximately 9 miles southeast of French Lick, IN and the other location (T1S, R1W, Section 27) is approximately 5 miles northwest of English, IN. · Orange, Indiana
Proposal to provide Hoosier Energy access to their transmission line for structure/pole replacement.
Special use management
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Hoosier Energy | Decision Signed Date: 12/17/2014 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1S, R1W, Sections 10 and 27 |
Decision Memo · Brownstown Ranger District · updated 12/29/2014
The main portion of the line is within the Hardin Ridge Recreation Area. · Monroe, Indiana
The Hoosier is proposing to reissue a special use permit for another twenty (20) years for a buried power line across NFS lands.
Special use management
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Utilities District of Western Indiana (UDWI) | Decision Signed Date: 12/17/2014 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 1 East, Sections 9, 16, 19, 21,28, 29, and 30; Township 6 North, Range 1 East, Section 5 |
Decision Memo · Hoosier National Forest All Units · updated 12/16/2014
Hickory Ridge trails, utilizing the parking area located off of Hickory Ridge Road; a campsite on Lake Monroe; the Pate Hollow trailhead; and the Two Lakes trail. · Jackson; Monroe; Perry, Indiana
The Hoosier is proposing to issue a 5-year Priority Use Outfitter and Guide Permit to IU Outdoor Adventures to provide outfitting and guiding services on the Hoosier NF.
Special use management
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| IU Outdoor Adventures 5-year Priority Use Outfitting and Guiding | Decision Signed Date: 12/05/2014 |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hoosier National Forest All Units · updated 8/4/2014
Approximately 3.5 miles southwest of Houston, Indiana · Jackson, Indiana
The Hoosier is proposing to issue a special use permit to Autumn and Karen Kinser, operators of Maumee Valley Horsecamp, for a trail access connector permit.
Special use management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Kinser Special Use Access Trail Permit | Decision Signed Date: 07/24/2014 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | NE 1/4 NW 1/4 Section 36, T.7 N., R. 2 E. |
Decision Memo · Brownstown Ranger District · updated 7/29/2014
Approximately 1/2 mile southwest of Maumee, Indiana · Jackson, Indiana
The Hoosier National Forest is proposing to reroute approximately 3/8 mile of trail 18 on the Hickory Ridge trail system to improve soil and water conditions and improve the experience for the trail user.
Recreation management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Trail 18 Re-route | Decision Signed Date: 07/18/2014 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | NE 1/4 of Section 26; T.7.N., R. 2 E |
Decision Memo · Hoosier National Forest All Units · updated 6/18/2014
Two locations in the Uniontown area in northern Perry County. The first location is along SR 62, east of CR 211 . The second location is on the east side of Indian Lake Road · Perry, Indiana
Proposal to issue a special use permit to PSCI to bury fiber optic in two locations in the Uniontown area in northern Perry County.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Perry Spencer R.T.C.,Inc. | Decision Signed Date: 06/13/2014 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 3 South, Range 2 West, Sections 29 and 31 |
Decision Memo · Hoosier National Forest All Units · updated 6/16/2014
The private road easement is located on the north side of Chapel Hill Road, approximately one mile from the entrance of Hardin Ridge Recreation Area in Monroe County, Indiana. · Monroe, Indiana
Proposal to issue a special use permit to install a Forest Service approved special use gate near the entrance of a private road easement.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Todd and Heather Davis | Decision Signed Date: 06/13/2014 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | South half of the northeast quarter of Section 32, T7N, R1E. |
Decision Memo · Hoosier National Forest All Units · updated 5/19/2014
Approximately 2.5 miles northwest of Kurtz, Indiana · Jackson, Indiana
The Hoosier is proposing to reissue a special use permit for another five years for a trail access connector permit across National Forest System land.
Special use management
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Joseph P. Bond | Decision Signed Date: 03/31/2014 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T6N, R2E, Section 12 and T6N, R3E, Sections 6 and 7 |
Decision Memo · Hoosier National Forest All Units · updated 3/26/2014
Approximately 2.5 miles west of Saint Croix, Indiana · Perry, Indiana
The Hoosier is proposing to reissue a special use permit to access private property.
Special use management
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Allen Schepers | Decision Signed Date: 03/20/2014 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | South half of the northeast quarter of Section 28, T. 3 S., R. 2 W. |
Decision Memo · Hoosier National Forest All Units · updated 2/19/2014
Approximately 2 miles west of Houston, Indiana. · Jackson, Indiana
Proposal to issue a special use permit to the Indiana Department of Natural Resources for the maintenance and use of two access lanes/roads across approximately 1,200 and 150 feet, respectively, of National Forest System land.
Special use management
Comment Period
12/16/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Indiana Department of Natural Resources (IDNR) | Decision Signed Date: 02/18/2014 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 7 N. R. 3 E. Section 29 |
Decision Memo · Hoosier National Forest All Units · updated 1/9/2014
Osgood Road, approximately 2.5 miles southeast of Saint Croix, Indiana. · Perry, Indiana
Proposal to issue a special use permit for a buried powerline across 200 feet of National Forest System land.
Special use management
Comment Period
09/30/2013
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power-Osgood Road | Decision Signed Date: 01/08/2014 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 4 South, Range 1 West, section 5 |
Decision Memo · Hoosier National Forest All Units · updated 10/23/2013
Approximately 2 miles west, northwest of Leopold, Indiana · Perry, Indiana
Proposal to issue a special use permit for a new waterline across National Forest System land.
Special use management
Comment Period
05/05/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Gary and Donna Mullis | Decision Signed Date: 09/30/2013 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 5 South, Range 2 West, Section 3 |
Decision Memo · Hoosier National Forest All Units · updated 10/23/2013
East side of State Highway 37, approximately 2 miles Northwest of Gatchel, Indiana. · Perry, Indiana
Proposal to issue a special use permit for a new gas line across approximately 0.5 mile of National Forest System land.
Special use management
Comment Period
08/16/2013
Decision
10/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Ohio Valley Gas Line | Decision Signed Date: 10/22/2013 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 22 |
Decision Memo · Brownstown Ranger District · updated 9/24/2013
The Saddle Creek Bottom Trail is located within the Charles C. Deam Wilderness. · Monroe, Indiana
Proposed closure of the approximate 0.5 mile trail segment identified as Saddle Creek Bottom Trail to protect soil and water resources and to ensure trail user safety.
Watershed managementRecreation management
Comment Period
03/03/2013
Decision
09/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 1 East, Section 14 |
Decision Memo · Hoosier National Forest All Units · updated 8/30/2013
Approximately 2 miles northwest of Spraytown, Indiana. · Jackson, Indiana
Proposal to issue a special use permit to instal a waterline along County Road 1775.
Special use management
Comment Period
05/05/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Jackson County Water | Decision Signed Date: 08/29/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 4 East, Section 16 |
Decision Memo · Hoosier National Forest All Units · updated 7/22/2013
Southwestern portion of the Birdseye Trail adjacent to U-38 Lake. Approximately 2 miles southwest of Birdseye, Indiana. · Crawford, Indiana
Proposal to reroute the southwest portion of the Birdseye Trail adjacent to U-38 Lake.
Recreation management
Comment Period
05/09/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 2 South, Range 2 West, NE 1/4 Section 6, SW 1/4 Section 36 |
Decision Memo · Tell City Ranger District · updated 7/22/2013
The project is located along county roads in an area that is east of Hwy 37, west of Hwy 66, south of Hwy 70, and north of Hwy 66. · Perry, Indiana
Proposal to issue a special use permit amendment to Perry Spencer R.T.C., Inc. authorizing the placement of fiber optic cable on National Forest System land.
Special use management
Comment Period
02/17/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Perry Spencer R.T.C.,Inc. | Decision Signed Date: 07/22/2013 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 5 South, Range 1 West, Section 32; Township 6 South, Range 1 West, Sections 6, 8, and 17; Township 6 South, Range 2 West, Sections 1, 10, 11, 12, 13, 14, 18, 19, 22 and 23 |
Decision Memo · Tell City Ranger District · updated 6/24/2013
The project area is adjacent to the Lost River, approximately 4 miles northwest of French Lick, Indiana. · Orange, Indiana
Restoration of shallow-water wetlands adjacent to Lost River.
Wildlife, fish, rare plantsWatershed management
Comment Period
03/31/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Moffatt Restoration | Decision Signed Date: 06/19/2013 Legal Notice Date: 06/23/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T2N, R2W, Section 18 |
Decision Memo · Brownstown Ranger District · updated 6/19/2013
The access road is approximately 3 miles east of Houston, IN. · Jackson, Indiana
Proposal to issue a special use permit for twenty (20) years for an existing private access road (driveway) across National Forest System land.
Special use management
Comment Period
02/17/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| John & Imogene Francis | Decision Signed Date: 06/19/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 3 East, Section 25 |
Decision Memo · Tell City Ranger District · updated 6/19/2013
Old State Road 37, approximately 1 mile west of Leopold, Indiana · Perry, Indiana
This project is marked "cancelled" because it falls into a categorical exclusion that does not require a Decision Memo. The project involved issuing a minor, short-term special use permit.
Special use management
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, Section 11 |
Decision Memo · Brownstown Ranger District · updated 6/13/2013
The property is off of County Road 925 in Jackson County at the Maumee Boy Scout Camp. · Jackson, Indiana
Proposal to issue a new special use permit for twenty (20) years to provide access to the Maumee Boy Scout property for periodic and occasional use associated with forest management activities.
Special use management
Comment Period
02/17/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Hoosier Trails Council, BSA Road Access | Decision Signed Date: 06/13/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 2 East, Section 27 |
Decision Memo · Tell City Ranger District · updated 2/14/2013
The property is located 5.5 miles south of Paoli, Indiana. · Orange, Indiana
The Hoosier is proposing to reissue a special use permit for another five years for a trail access connector permit across Hoosier National Forest.
Special use management
Comment Period
11/05/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| The Mane Trails | Decision Signed Date: 12/13/2012 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 1 North, Range 1 West, NW 1/4 Section 33 |
Decision Memo · Brownstown Ranger District · updated 1/25/2013
The property is located in Jackson County, approximately 2.5 miles north of Freetown, Indiana. · Jackson, Indiana
The Hoosier is proposing to reissue a special use permit for another 20 years for a buried telephone line across NFS land in Jackson County, Indiana.
Special use management
Comment Period
11/04/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Frontier Telephone | Decision Signed Date: 01/08/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 3 East, Section 25 |
Decision Memo · Brownstown Ranger District · updated 1/25/2013
The property is off of County Road 925 in Jackson County at the Maumee Boy Scout Camp. · Jackson, Indiana
The Hoosier is proposing to reissue a special use permit for another 20 years to access the Maumee Boy Scout Camp.
Special use management
Comment Period
11/04/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Hoosier Trails Council, BSA Road Access | Decision Signed Date: 01/08/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 7 North, Range 2 East, SW 1/4 Section 26 |
Decision Memo · Brownstown Ranger District · updated 1/25/2013
The property is located approximately 1.5 miles south, southwest of Scarlet, Indiana. · Orange, Indiana
The Hoosier is proposing to reissue a special use permit for another five years to access private property.
Special use management
Comment Period
11/04/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Ronnie Wright Road Access | Decision Signed Date: 01/08/2013 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Township 2 North, Range 2 West, Section 6 and Township 3 North, Range 2 West, Section 31 |
Decision Memo · Tell City Ranger District · updated 1/10/2013
Approximately 7 miles south of Paoli, Indiana; approximately 0.75 mile west of State Highway 37. · Orange, Indiana
The Hoosier National Forest is proposing to maintain existing wetlands and riparian structures bordering the Patoka River.
Wildlife, fish, rare plantsWatershed management
Comment Period
05/10/2012
Decision
01/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T1S, R1W; Sections 11 and 12 |
Decision Memo · Hoosier National Forest All Units · updated 1/8/2013
The project would occur in lakes and ponds within the Hoosier National Forest boundary. · Brown; Crawford; Jackson; Lawrence; Martin; Monroe; Perry, Indiana
The Hoosier National Forest is proposing to provide improved fisheries habitat within National Forest System lands by cutting and dropping trees into lakes and ponds.
Wildlife, fish, rare plants
Comment Period
12/03/2012
Decision
01/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
Decision Memo · Tell City Ranger District · updated 12/31/2012
The property is off of St. Croix Road, approximately 1 mile southeast of St. Croix, Indiana · Perry, Indiana
The Hoosier is proposing to reissue a special use permit for another five years to access private property.
Special use management
Comment Period
11/05/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| 4H Tree Farm, LLC | Decision Signed Date: 12/20/2012 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 3 South, Range 2 West, SE1/4 SE 1/4, Section 36 |
Decision Memo · Brownstown Ranger District · updated 12/31/2012
The project is located on the Saddle Creek Bottom trail in the Charles C. Deam Wilderness. · Monroe, Indiana
This project proposes to reroute the Saddle Creek Bottom trail within the Charles C. Deam Wilderness to mitigate resource damage from poor location of the existing trail.
Recreation management
Comment Period
06/17/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Saddle Creek Bottom Reroute | Decision Signed Date: 12/10/2012 Legal Notice Date: 12/23/2012 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 7 N., R. 1 E. Section 14 |
Decision Memo · Tell City Ranger District · updated 11/5/2012
Within the right-of-way on Oriental Road and Old Glory Road in Perry County, Indiana · Perry, Indiana
Proposal to amend the existing permit to Southern Indiana Power to remove approximately seven power poles and line and place approximately eight new overhead power poles and line within the road right-of-way.
Special use management
Comment Period
07/19/2012
Decision
10/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power - Oriental Road | Decision Signed Date: 10/10/2012 Legal Notice Date: 10/15/2012 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Township 3 South, Range 2 West, Section 22 |
Environmental Assessment · Hoosier National Forest All Units · updated 9/24/2012
Sterling, Ohio, Boone, and Union Townships in Crawford County; Southeast Township in Orange County. · Crawford; Orange, Indiana
Exchange approximately 426 acres of NFS land (2 tracts) for approximately 443 acres of private land (3 tracts).
Land acquisition
Comment Period
04/30/2012
Decision
08/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | T2S, R1E Sections 5 and 8; T4S, R1E Section 34; T1S, R1E Sections 1 and 2; T4S, R1E Sections 20 and 29; T3S, R1W Section 23 |
Decision Memo · Tell City Ranger District · updated 7/17/2012
The proposed project is located along the south side of State Highway 70, approximately 2 miles west of Derby, Indiana · Perry, Indiana
Proposal to amend the existing permit to replace a water line.
Special use management
Comment Period
05/21/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T. 5 S., R. 2 W. Sections 25, 26, and 27 |
Decision Memo · Tell City Ranger District · updated 6/26/2012
Approximately 2 miles northwest of German Ridge Recreation Area. · Perry, Indiana
The Hoosier National Forest is proposing to reissue the Southern Indiana Horseman Club special use trail permit for an additional year.
Special use management
Comment Period
04/09/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Southern Indiana Horsemen | Decision Signed Date: 06/18/2012 Legal Notice Date: 06/25/2012 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
Environmental Assessment · Brownstown Ranger District · updated 6/4/2012
The project is located in southeast Monroe County, northeast Lawrence County, and southwest Brown County, includes the Hardin Ridge Rec. Area and a large portion of the Charles C. Deam Wilderness. · Brown; Lawrence; Monroe, Indiana
Proposal to expand the current emerald ash borer treatment area.
Vegetation management (other than forest products)
Comment Period
02/19/2012
Decision
05/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
Environmental Assessment · Tell City Ranger District · updated 3/1/2012
The project area is bounded by State Road 62 to the north, and abuts private land to the west and east. The project area contains the Indian and Celina Lake Recreation Area. · Perry, Indiana
Proposal to implement the 2006 Land and Resource Management Plan by increasing the amount of early successional habitat available.
Forest productsVegetation management (other than forest products)
Comment Period
04/21/2011
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 1, 10-15, and 22-26 of T4S, R1W; sections 7,8,16-21, and 28-33 of T4S, R1E. |
Decision Memo · Tell City Ranger District · updated 1/24/2012
Along County Road 750 South in Orange County, Indiana · Orange, Indiana
Issue a right-of-way permit to Orange County REMC to trench and place approximately 3,500 feet of new buried powerline along County Road 750 South.
Special use management
Decision
01/2012 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Orange County REMC - Apple’s Chapel | Decision Signed Date: 01/10/2012 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T 1 S, R 1 W. Sections 2 and 3 |
Decision Memo · Brownstown Ranger District · updated 1/12/2012
This project is located on the Brownstown Ranger District approximately four miles north of Heltonville, Indiana. · Lawrence; Monroe, Indiana
Propose to reduce density of trees and improve stand structure through a 46 acre single tree selection harvest and regenerate a 20 acre stand using group selection harvest. Each group would range from 0.25 to 3 acres in size.
Forest productsVegetation management (other than forest products)
Decision
01/2012 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Dutch Ridge Project | Decision Signed Date: 01/12/2012 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | NW 1/4 Section 2, T6N, R1E; SW1/4 Section 35, T7N, R1E. |
Decision Memo · Tell City Ranger District · updated 11/1/2011
Along German Ridge Road near the German Ridge Campground, approximately 4 miles northwest of Rome, Indiana. · Perry, Indiana
Authorizing Southern Indiana Power to bore under German Ridge Road and place buried powerline.
Special use management
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power Ronald Hoffman Jr. Residence | Decision Signed Date: 10/25/2011 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R1W, Section 25 |
Decision Memo · Tell City Ranger District · updated 9/29/2011
Approximately one mile south of Gerald in Perry County, Indiana. · Perry, Indiana
Issue a right-of-way (ROW) permit to Southern Indiana Power, Inc (SIP) to allow SIP to set two poles, side trim along county road, and remove approximately 250 feet of aerial line and poles.
Special use management
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T. 6 S. R 1 W, Section 19 and T 6 S, R 2 W. Section 13 |
Decision Memo · Tell City Ranger District · updated 9/29/2011
Within the right-of way of German Ridge Road and Bear Creek Road · Perry, Indiana
Placing an underground powerline along German Ridge Road and Bear Creek Road within the right-of-way. Removal of a decommissioned aerial powerline.
Special use management
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Area Management |
| Southern Indiana Power Phase II | Decision Signed Date: 09/14/2011 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R1W, Section 30; T6S, R2W, Sections 23, 25, and 26 |
Decision Memo · Hoosier National Forest All Units · updated 5/20/2011
The proposed reroute is approximately 0.4 miles south of Hindostan along County Road 775. · Orange, Indiana
The Hoosier is proposing to reroute a short section of the Shirley Creek trail along County Road 775.
Recreation management
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 3. N., R. 2 W., Section 26 |
Decision Memo · Hoosier National Forest All Units · updated 5/19/2011
The proposed reroute is located southeast of the Hickory Grove Church and south of Hickory Grove Road. · Lawrence, Indiana
The Hoosier is proposing to relocate a section of Hickory Ridge Trail 10.
Recreation management
Decision
05/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T. 6 N., R. 2 E., Section 4 |
Decision Memo · Hoosier National Forest All Units · updated 4/4/2011
Approximately 3 miles west, northwest of Leopold, Indiana · Perry, Indiana
The Forest is proposing to grant a permit amendment to Andtro Water, Inc. to bury a 4" waterline across segments of NFS land in the road edge or ditch.
Special use management
Decision
03/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| AndTro Water District and three private water lines | Decision Signed Date: 03/31/2011 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T4S, R2W S1/2 section 35 and T5S, R2W parts of sections 3, 4, and 5 |
Environmental Assessment · Tell City Ranger District · updated 2/25/2011
The project is located at two sites, both on the Tell City Ranger District. One is near Mckensie Ridge in Crawford County; the other is near Buck Creek, just off High Water Road in Perry County. · Crawford; Perry, Indiana
The Hoosier is proposing to plant blight resistant American chestnut trees.
Research
Comment Period
09/20/2010
Decision
02/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Research And Development |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | NW ¼ of Section 15, T3S, R1W and NE 1/4 of Section 10, T7S, R2W |
Decision Memo · Hoosier National Forest All Units · updated 2/14/2011
The proposed project is located along Aster Road, approximately 5 miles northeast of Tell City in Perry County, Indiana · Perry, Indiana
The Hoosier is proposing to grant a permit amendment to Southern Indiana Power to construct a new aerial power line across NFS land. The line would connect two existing dead-ends on each side of NFS land.
Special use management
Decision
01/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power Inc. Aster Road Project | Decision Signed Date: 01/14/2011 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R2W, NWSW Section 7 |
Environmental Assessment · Tell City Ranger District · updated 2/11/2011
The Buzzard Roost Recreation Area is located off Buzzard Roost Road approximately 2 miles north of Magnet, Indiana in Perry County. · Perry, Indiana
Proposal to increase the field of view at the existing overlook.
Recreation management
Comment Period
08/06/2010
Decision
02/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Scenery Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | SE 1/4 of the SE 1/4, section 36, T4S, R1W |
Decision Memo · Hoosier National Forest All Units · updated 10/18/2010
Along Tiger Road, approximately 4.5 miles west of Derby, Indiana in Perry County. · Perry, Indiana
Proposal to issue a right-of-way permit to Southern Indiana Power to relocate an existing cross-country aerial electric line to the roadside.
Special use management
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T6S, R2W, NE Section 3 |
Decision Memo · Tell City Ranger District · updated 9/23/2010
The project is located south of County Road 550 and east of County Road 175, about 1.5 miles west of State Road 37. · Orange, Indiana
Reroute the southwestern segment of the Youngs Creek Multiple Use Trail through the recently aquired Shine property.
Recreation management
Decision
09/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 35 and 36 of R1E, T1N |
Decision Memo · Tell City Ranger District · updated 8/27/2010
Approximately one mile southeast of Saint Croix in Perry County, Indiana · Perry, Indiana
Issue a permit to construct a single lane driveway across a 200-foot length of National Forest System (NFS) land.
Special use management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T3S, R2W, SESE Section 36 |
Decision Memo · Tell City Ranger District · updated 8/26/2010
Approximately 2.5 miles southwest of Leopold, Indiana; 0.5 mile east of Highway 37 in Perry County · Perry, Indiana
A permit to construct a single lane driveway across a 34-foot length of National Forest System (NFS) land. Also includes a permit to install buried service across 440 feet by 10-foot right-of-way over NFS land.
Special use management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T5S, R2W, NWNENE Section 22 |
Decision Memo · Brownstown Ranger District · updated 6/25/2010
Little Salt Creek vicinity of the Hoosier National Forest, near Sundance Lake; Brown County, Indiana · Brown, Indiana
Proposal to designate a group site in the Little Salt Creek vicinity of the Hoosier National Forest near Sundance Lake. This proposal is to designate a dispersed group use area for intermittent use such as large non-commercial group use events.
Recreation management
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | NE 1/4, NE 1/4 Section 7, T.7 N., R. 4 E. |
Decision Memo · Hoosier National Forest All Units · updated 5/12/2010
Forest-wide closure of all caves on National Forest System lands within the Forest boundary. · Brown; Crawford; Dubois; Jackson; Lawrence; Martin; Monroe; Orange; Perry, Indiana
The Hoosier National Forest is proposing to continue for the next three years the emergency cave closure issued by the Eastern Region of the U.S. Forest Service. The current emergency closure order expires in April 2010.
Regulations, directives, orders
Decision
05/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Order Creation/Modification |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
Decision Memo · Brownstown Ranger District · updated 5/12/2010
Martin Hollow Trail in Charles C. Deam Wilderness · Monroe, Indiana
Close approximately .75 mile of poorly located, non-standard trail and replace with .25 mile of trail properly located and meeting FS standards. Restore closed section of trail. Cut brush and small trees for reroute.
Recreation management
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Wilderness Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | SE 1/4 Section 19, R2E, T7N |
Decision Memo · Tell City Ranger District · updated 3/31/2010
The proposed project is located within the Indian-Celina Lake Recreation Area. · Perry, Indiana
Decommission picnic area parking lot and FS road 1141.070. Remove all existing asphalt from road and surrounding picnic area, including the parking lot.
Recreation management
Decision
03/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Developed Site Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | NW ¼, SE ¼ Section 5, T4S, R2W |
Decision Memo · Tell City Ranger District · updated 3/26/2010
Along Locust Road, about 1/2 mile to 3/4 mile west of Highway 37 in Perry County, Indiana. · Perry, Indiana
Southern Indiana Power is proposing to move an existing cross-country aerial line out of the county road (Locust Road) in a short segment and remove leaning trees from another segment. This will facilitate repair in the event of storm damage.
Special use management
Decision
03/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Southern Indiana Power Inc. Locust Road Project | Decision Signed Date: 03/16/2010 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 9 and 10 of T5S, R2W |
Decision Memo · Hoosier National Forest All Units · updated 2/22/2010
35 areas across much of the Forest · Crawford; Lawrence; Martin; Orange; Perry, Indiana
crop tree release, grapevine control, or both in 35 areas totaling 808 acres to increase the oak and hickory component and to improve growth and survival by reducing damage by grapevines
Vegetation management (other than forest products)
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | T6N, R2E, Sections 10, 16; T2N, R3W, Section 6; T3S, R1W, Sections 15, 21, 26; T4S, R2W, Section 27,32,35,36; T4S, R21W, Sections 19, 28, 30, 32; T4S, R1E, Section 30; amd other locations |
Decision Memo · Tell City Ranger District · updated 9/11/2009
along old SR 37 between the St. Marks substation and St. Croix across four segments of National Forest System (NFS) land · Perry, Indiana
bury an innerduct tube and fiber optic line across four segments of NFS land
Special use management
Decision
07/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Perry-Spencer Rural Telephone Cooperative Old State Road 37 Cooperative | Decision Signed Date: 07/14/2009 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 2, 11, and 23 of T4S, R2W and Sections 2, 11, and 22 of T5S, R2W |
Decision Memo · Tell City Ranger District · updated 6/19/2009
SW of SR 150, south of Trotter Crossing · Orange, Indiana
Issue temporary road use permit to cross 150 feet of NFS land to allow Bye Real Estate to harvest on land it owns.
Land ownership management
Decision
03/2009 (Estimated)
Implementation
04/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Section 36 of T1N,R1E |
Decision Memo · Brownstown Ranger District · updated 6/19/2009
on Deckard Ridge Road · Monroe, Indiana
Exchange 1 acre of NFS land for 1 acre of pvt land--based on value for value; would resolve an encroachment and provide additional access to existing NFS land
Land ownership management
Decision
06/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | exchange NFS land in SE 1/4 of NW 1/4 of section 26 of T8N, R1E for pvt land NE 1/4 of NW 1/4 of same section. |
Decision Memo · Tell City Ranger District · updated 3/11/2009
at the end of Okolono Road · Perry, Indiana
Apply fire to recently acquired acreage to restore ecological processes and control some invasive species.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
07/18/2008
Decision
02/2009 (Estimated)
Implementation
03/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 15 & 16, T3S, R2W |
Decision Memo · Tell City Ranger District · updated 3/11/2009
A - near Brunner Cemetery (near Bonds); B- north of Tucker Lake and Springs Valley Rec Area · Lawrence; Orange, Indiana
In spring 2009 plant native hardwood tree species on 49 acres, in two locations.
Vegetation management (other than forest products)
Decision
01/2009 (Estimated)
Implementation
04/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| 2009 Tree Planting | Decision Signed Date: 01/20/2009 |
| Forests | Hoosier National Forest |
| Districts | Hoosier National Forest All Units |
| Legal Land Description | A - Section 16 of T3N, R2W; B - Section 30 of T1N, R1W |
Decision Memo · Brownstown Ranger District · updated 3/5/2009
Northwest of Kurtz · Jackson, Indiana
Construct approximately 2 miles of trail in the Hickory Ridge Trail system. Most of the proposed trail would use an existing route. Construct approximately 2,000 feet of new trail. Cut no trees over 3" dbh during construction.
Recreation management
Decision
01/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Hickory Ridge Trail 22 Construction | Decision Signed Date: 01/09/2009 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | NW 1/4 & NE 1/4 of section 1 of T6N,R2E; NW 1/4 of the NW 1/4 of section 6 of T6N,R3E; SW 1/4 & SE 1/4 section of 36 of T7N,R2E; SW 1/4 of the SW 1/4 of section 31of T7N,R3E |
Decision Memo · Tell City Ranger District · updated 8/27/2008
along Buck Creek off of Highwater Road · Perry, Indiana
55 acres of single-tree and 10 acres of group selection harvests--to improve stand structure and vigor and generate small groups of declining black and chestnut oak.
Forest products
Decision
07/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Green) |
| Buck Project | Decision Signed Date: 07/23/2008 Legal Notice Date: 07/29/2008 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | Sections 10 and 11of T7S,R2W |
Decision Memo · Brownstown Ranger District · updated 8/18/2008
near Spurgeons Corner and Beck Cemetery · Brown, Indiana
Close and obliterate section of trail, recontour the land, and construct a barrier gate
Recreation management
Decision
07/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Sections 5-9 and 18 of T7N,R4E |
Decision Memo · Brownstown Ranger District · updated 7/30/2008
southwest of Hickory Ridge lookout tower · Monroe, Indiana
Use earth-moving equipment to construct shallow water and wetland habitat. Leave trees that are felled on site. Slope some banks. Revegetate disturbed areas.
Wildlife, fish, rare plantsWatershed management
Decision
07/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Noxious Weed Treatments; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Sections 31 and 32 of T7N, R2E |
Decision Memo · Brownstown Ranger District · updated 6/26/2008
near Hickory Ridge horse camp · Lawrence, Indiana
Close approx. 200' of poorly located, non-standard trail eroding into creek and replace with 400' of trail properly located & meeting FS standards. Restore the closed section. Cut brush & trees for reroute, but cut no trees > 3" dia.
Recreation management
Decision
04/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | SE 1/4 of NW 1/4 of Section 3, T6N, R2E |
Decision Memo · Brownstown Ranger District · updated 6/26/2008
Nebo Trail; southeast of Elkinsville · Brown, Indiana
Close approx. 400' of poorly located, non-standard trail and replace it with 900' of trail in a different location (properly located). Restore the closed section. Cut brush and small trees on the reroute but probably no tree > 3" dbh.
Recreation management
Decision
02/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | SW 1/4 SE 1/4 of Section 6, R3E,T7N |
Decision Memo · Tell City Ranger District · updated 6/26/2008
Between Paoli and Patoka Lake · Orange, Indiana
Decommision unused road at rec. area and prepare for installation of an SST. Remove approx. 2,000 feet of asphalt road and restore bed to contour. On 500 feet, remove only half of road bed and asphalt to allow access for trail maintenance.
Road management
Decision
02/2008 (Estimated)
Implementation
02/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | SE 1/4 NW 1/4 of Section 30, R1W,T1N |
Environmental Assessment · Brownstown Ranger District · updated 6/20/2008
In Spice Valley Township, about 10 miles southwest of Bedford · Lawrence, Indiana
Exchange 130 acres (one parcel) of Federal land for 180 acres (one parcel) of non-Federal land, acreages approximate.
Land acquisition
Comment Period
08/19/2007
Decision
05/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Federal: W 1/2 of Sec. 7 inT3N,R2W; Non-Federal: E 1/2 of Sec 34 in T4N,R2W |
Environmental Assessment · Tell City Ranger District · updated 3/24/2008
7 of 24 special areas, in the southernmost part of the Forest, south of I-64: Boone Creek, Buzzard Roost, Clover Lick, Deer Creek, Harding Flats, Horse Mill Branch, & Rockhouse Hollow. · Crawford; Perry, Indiana
Use integrated pest management to eliminate control invasive plants. Treatments: hand, mechnical, backpack propane torch, and herbicide--in 7 of 24 special areas, focusing on barrens communities. Then use native material for planting and seeding
Vegetation management (other than forest products)
Comment Period
11/22/2007
Decision
03/2008 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
Decision Memo · Brownstown Ranger District · updated 3/4/2008
southeast of Lake Monroe, east of Maumee Boy Scout Reservation · Jackson, Indiana
Prescribed burning on 820 acres for reduction of fire hazard (fuel reduction) and restoration of dry oak community in Compartments 244 & 246. 4 miles of new line construction, fell 35 trees less than 9 inches dbh to create safety zone/staging area.
Fuels managementVegetation management (other than forest products)
Comment Period
12/23/2007
Decision
02/2008 (Estimated)
Implementation
03/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Sections 30 and 31 of T7N, R3E |
Environmental Assessment · Brownstown Ranger District · updated 3/4/2008
Pleasant Run area. East and northeast of Lake Monroe. Approx. 260 scattered openings · Brown; Jackson, Indiana
Mow, use chainsaws, prescribed burning, and NNIS treatments to maintain 5 forest openings and 4 ROW segments in early successional habitat.Treatments in selected openings include construction of a small wetland, planting shrubs, and removing redcedar
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
09/16/2007
Decision
01/2008 (Estimated)
Implementation
01/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Special Products Sales; Noxious Weed Treatments; Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | T 6,7,8 N, R1,2,3,4 E |
Decision Memo · Tell City Ranger District · updated 3/4/2008
Approximately 36 miles north of Tell City; approx. 3-4 miles south of Paoli. · Orange, Indiana
Construct about 2900 feet of trail. Currently, users must use two county roads to connect from the southern segment of the trail to the northern segment. The new trail will provide a safer option and also proivde a shorter loop option for users.
Recreation management
Decision
01/2008 (Estimated)
Implementation
03/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | NW 1/4 of sect. 1 T1S, R1 W and the SW, SE and NW 1/4s of sect. 36, T1N, R1W. |
Decision Memo · Brownstown Ranger District · updated 9/25/2007
4 to 5 miles west of Propsect, which is just north of West Baden, then north along the river · Orange, Indiana
Restoration of 1.5 to 5 acres of shallow-water wetlands adjacent to Lost River.
Watershed management
Decision
08/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | Sections 18 and 19 of T2N, R2W |
Decision Memo · Tell City Ranger District · updated 6/21/2007
0.5 miles east of the intersection of Crawford County Road 59 and the West Fork Lookout Tower Road between the road and the powerline ot the north · Crawford, Indiana
Increase stand health by implementing a single-tree and group selection harvest on approximately 70 acres.
Forest products
Comment Period
02/19/2007
Decision
06/2007 (Estimated)
Implementation
09/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Green) |
| McKensie Ridge Project | Decision Signed Date: 06/11/2007 Legal Notice Date: 06/17/2007 |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | In Section 15 of T3S, R1W |
Decision Memo · Tell City Ranger District · updated 6/26/2006
long the Branchville Road between Oriole, Indiana and the Branchville Department of Corrections facility on Old State Road 37 · Perry, Indiana
Construct a buried water line along Branchville Road on NFS land. The new buried line will share the road corridor with existing and future utilities.
Special use management
Implementation
06/2006 (Estimated)
Decision
06/2006 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Hoosier National Forest |
| Districts | Tell City Ranger District |
| Legal Land Description | T4S, R2W |
Decision Memo · Brownstown Ranger District · updated 9/27/2005
from Paynetown across the causeway on State Road 446 and ending at the STC substation about 1/2 mile north of Allens Creek Road · Monroe, Indiana
permit for a 10-foot right-of-way for a buried fiber optic line to close a loop on a Smithville Telephone Company (STC) line, to be buried about two feet deep
Special use management
Decision
08/2005 (Estimated)
Implementation
08/2005 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Smithville Telephone Company Special Use Permit Along State Road 446 | Decision Signed Date: 08/17/2005 |
| Forests | Hoosier National Forest |
| Districts | Brownstown Ranger District |
| Legal Land Description | lands in Sections 4, 9, and 16 in T7N, R1E. |