Inyo National Forest — Project Detail

182 projects with crawled detail · milestones · contacts · documents

Inyo National Forest

R05 Pacific Southwest · 182 projects · crawled 2026-08-01
In Progress 1 Completed 143 Cancelled 38
Decision Memo 124 Environmental Assessment 49 Environmental Impact Statement 8 1
181 with documents 59 with comments page 1 fetch errors
Decision Memo · Inyo National Forest All Units · updated 4/1/2025
Pine Creek Canyon, White Mountain Ranger District, Inyo National Forest. · Inyo, California

Planning for the construction of up to two toilet facilities in Pine Creek Canyon. One toilet facility will be tentatively constructed at the wilderness trailhead, another at the Scheelite Canyon Parking area. Implementation is pending funding.

Recreation management
Scoping Start
01/24/2025
Decision
03/2025 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
Blaine Hartman · blaine.hartman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.
Pine Creek Toilet ProjectDecision Signed Date: 03/26/2025
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mount Whitney Ranger District · updated 2/5/2025
Golden Trout Wilderness and South Sierra Wilderness · Inyo; Tulare, California

Approximately 200 soil pits will be dug roughly 18" in diameter and up to 60" deep to classify soils throughout the Golden Trout and South Sierra Wilderness. Soil will be placed back where they originated from and the area will be naturalized.

Special use management
Scoping Start
06/21/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Michael Wiese · michael.wiese@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 11/6/2024
Monache Meadows · Tulare, California

The proposed Monache Airstrip Restoration Project would bring the airstrip back into safe operation. Volunteers with RAF would remove vegetation using hand tools within existing airstrip footprint. Usage expected up to two planes per day in summer.

Special use management
Scoping Start
05/10/2023
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Blaine Hartman · blaine.hartman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 11/6/2024
On Cottonwood Creek in the Golden Trout Wilderness at a location just south of the John Muir Wilderness. The camp is roughly 2.5 miles north of the Horseshoe Meadow Trailhead. · Inyo, California

Reissuance of a ten year term permit to The Thacher School for operation and maintenance of Golden Trout Wilderness School in the Golden Trout Wilderness.

Special use management
Scoping Start
02/02/2019
Decision
10/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Blaine Hartman · Blaine.Hartman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT16.5S R35E Section 33 and T17S R35E Section 3 as shown on the Cirque Peak, California 7.5 minute USGS Topographic Map. UTM Zone 11, 394616mE, 4038284mN.
Decision Memo · Inyo National Forest All Units · updated 7/30/2024
The non-wilderness portions of the Inyo National Forest outside the White or Inyo Mountains. · Inyo; Mono, California

Restore and maintain fire regimes to vegetation types characterized by frequent to moderate fire return intervals using prescribed fire and wildfires managed for resource benefit.

Fuels managementVegetation management (other than forest products)
Scoping Start
11/22/2019
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Chance Traub · chance.traub@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 7/24/2024
Reroute extends south from Upper Soda Springs campground to Devil's Postpile Boundary Trail · Mono, California

The Forest Service proposes approximately 6 miles of temporary reroute of the Pacific Crest Trail (PCT) at Upper Soda Springs Campground to address the bridge over the Middle Fork, San Joaquin River that was destroyed in 2022 winter storms.

Recreation management
Scoping Start
03/01/2024
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Evan Topal · evan.topal@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionR26E T3S S26 & S35; R26E T4S S2
Decision Memo · Mono Ranger District · updated 5/13/2024
June Lake Loop, between Highway 158 and private property located in Peterson Tract · Mono, California

Issuance of a special use authorization for driveway for private residence

Special use management
Scoping Start
01/2018 (Estimated)
Decision
03/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Sheila Irons · sheila.irons@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 2/28/2024
Forest-wide assessment · Inyo; Mono, California

Assessment of Inyo NF Personal Use Fuelwood Program Open areas

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
03/2020 (Estimated)
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Scott Kusumoto · scott.kusumoto@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (13), 36 Cfr 220.6(E)(13); 32.3 (2)
Special AuthorityHfra Title Iv: Insect Infestations And Related Diseases; Hfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 9/29/2023
East and South of the Hot Creek Fish Hatchery, just outside of the private land boundary. · Mono, California

Installation of two monitoring wells at the Hot Creek Fish Hatchery, to monitor groundwater quality effects from sewage percolation ponds.

Special use management
Scoping Start
06/02/2023
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Nathan Sill · nathan.sill@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionSection 3S, Range 28E, Section 35; and Section 4S, Range 28E, Section 2
Decision Memo · Inyo National Forest All Units · updated 9/29/2023
East side of the White Mountains in Mineral County, Nevada. · Mineral, Nevada

Add approximately 0.9 mi of established, non-system road as a motorized trail. Install OHV barriers to block non-system roads, install rolling dips on 10 roads to reduce erosion, re-shape and harden two system roads (O1N131, 02N115.

Road management
Scoping Start
05/17/2022
Decision
08/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Casey Shannon · casey.shannon@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Road Maintenance; Road Improvements/Construction
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · R5 - Pacific Southwest Region All Units · updated 6/16/2023
Certain national forest roads, trails and facilities within recent fire areas. · Butte; Colusa; Del Norte; Fresno; Glenn; Humboldt; Inyo; Kern; Lake; Lassen; Madera; Mendocino; Mono; Plumas; Shasta; Siskiyou; Tehama; Trinity; Tulare, California

Hazard tree felling and removal is proposed to reduce public safety hazards along portions of certain roads, trails and facilities within nine national forests. We expect to complete three zone-level analyses and nine decisions.

Recreation managementFuels managementRoad management
Scoping Start
10/25/2021
Comment Period
04/11/2022
Objection Period Start
10/26/2022
Decision
06/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
Laura Hierholzer · laura.hierholzer@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Trail Management; Road Maintenance
R5HT Final DN Six RiversDecision Signed Date: 06/15/2023
R5HT Final DN KlamathDecision Signed Date: 06/07/2023
R5HT Final DN MendocinoDecision Signed Date: 06/12/2023
R5HT Final DN Shasta-TrinityDecision Signed Date: 06/13/2023
R5HT Final DN PlumasDecision Signed Date: 12/19/2022
R5HT Final DN LassenDecision Signed Date: 12/19/2022
R5HT Final DN SequoiaDecision Signed Date: 01/17/2023
R5HT Final DN InyoDecision Signed Date: 01/17/2023
ForestsInyo National Forest; Klamath National Forest; Lassen National Forest; Mendocino National Forest; Six Rivers National Forest; Plumas National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest
DistrictsInyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Mendocino National Forest All Units; Six Rivers National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Mount Whitney Ranger District · updated 4/19/2023
13 meadows in the Kern Pleateau area of the Inyo National Forest, from Monache Meadows in the South to Horseshoe Meadow in the North. Mostly within the Golden Trout Wilderness. · Inyo; Kern, California

Restore degraded habitat across 13 meadow complexes in and around Golden Trout Wilderness Area. Includes maintenance of exiting and placement of new instream restoration treatment structures to reconnect incised stream channels to the floodplain.

Watershed management
Scoping Start
08/10/2022
Decision
04/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Todd Ellsworth · todd.ellsworth@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements; Wilderness Management
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 4/6/2023
The Owens River Headwaters, including Deadman and Glass Creeks, in Mono County, from the headwaters to the private land boundary downstream of Hwy 395, and Cottonwood Creek in the White Mountains. · Inyo; Mono, California

Developing a Wild and Scenic River Management Plan for two designated rivers: Cottonwood Creek in the White Mountains and the Owens River Headwaters.

Special area management
Scoping Start
08/18/2020
Comment Period
03/15/2022
Objection Period Start
10/20/2022
Decision
04/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Adam Barnett · adam.barnett@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Area Management
ForestsInyo National Forest
DistrictsMono Ranger District; White Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 11/3/2022
Directly south of the community of Starlite, which is east of Bishop, California. · Inyo, California

Reissue a 20 year permit for an existing 50,000 gallon water storage reservoir and pipeline, used by the community of Starlite.

Special use management
Scoping Start
10/02/2018
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Rosalie Herrera · rosalie.herrera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT7S, R31E, Sections 23 and 27
Decision Memo · Mammoth Ranger District · updated 10/24/2022
The project is located within the upper Middle Fork San Joaquin River watershed, at Reds Meadow valley, on the Mammoth Ranger District, Inyo National Forest, Madera County, CA. · Madera, California

Understory burning is proposed on 133 acres of national forest and 25 acres of national monument lands. Small trees would be cut with chainsaws on 31 acres of national forest to create fire containment lines along Reds Meadow and DEPO access roads.

Fuels management
Scoping Start
02/09/2015
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Susan Farley · sfarley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionSections 2 and 11, Township 4 south, Range 26 east, Mt. Diablo meridian
Decision Memo · Inyo National Forest All Units · updated 9/28/2022
Near the community of Sunny Slopes, in the vicinity of Tom's Place, California, northeast of highway 395. · Mono, California

reissue a permit to the Birchim Community Services District for operation and maintenance of two water tanks, and approximately 500 feet of water line, for water tapped from a system located on private property. Serves the community of Sunny Slopes.

Special use management
Scoping Start
10/2019 (Estimated)
Decision
11/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT4S, R30E, Sections 28 and 29
Decision Memo · White Mountain Ranger District · updated 9/28/2022
The road is located in the White Mountains at the north end of the Ancient Bristlecone Pine Forest; this is a cherry-stem road into the White Mountains Wilderness off of Crooked Creek Rd. · Inyo, California

Improve the condition of the Cottonwood Creek Road to address resource concerns and safety issues. Work will include improving stream crossings to prevent the road from washing out in the future.

Recreation management
Scoping Start
09/2015 (Estimated)
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Jeff Novak · jnovak@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTravel Management
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain Ranger District · updated 9/28/2022
Aspendell 168W, west of Bishop CA · Inyo, California

Reissuance of permit and to conduct critical repairs to the sewer line before it fails: Add 10ft of LROW on the INF. This is for access by a tractor. County has a 5ft easement on private property, adjacent to the requested area.

Special use management
Scoping Start
01/2022 (Estimated)
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Billy Preston · bpreston@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT8S R31E Sec20
Decision Memo · Mount Whitney Ranger District · updated 9/28/2022
Casa Vieja, Dutch, Brown, Monache, Strawberry, Mulkey on the Kern Plateau. · Inyo; Tulare, California

Implement stream stabilization projects in Casa Vieja, Monache, Dutch, Strawberry, Brown and Mulkey Meadows, on the Kern Plateau. Work will include constructing new headcut stabilization structures, and repairing and maintaining existing structures.

Watershed management
Scoping Start
10/2015 (Estimated)
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Casey Shannon · cshannon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 9/28/2022
In the Long Valley area, north of Hot Creek, East of Highway 395, and South of the Owens River · Inyo, California

The Inyo National Forest has received a request from the Bureau of Land Management to determine whether to consent to lease parcels for geothermal exploration and development, and if so, under what stipulations.

Minerals and geology
Scoping Start
03/2022 (Estimated)
Comment Period
06/2022 (Estimated)
Objection Period Start
12/2022 (Estimated)
Decision
07/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Colleen Garcia · colleen.garcia@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGeothermal
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionTownship 3S, Range 28E, Sections 21, 22, 23, 26, 27, 28, 33, 34, 35
Decision Memo · Mammoth Ranger District · updated 9/28/2022
Glass Mountain Peak, Glass Mountains · Mono, California

Issuance of Communication Site Lease to replace expired permit

Special use management
Scoping Start
01/2013 (Estimated)
Decision
03/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionMDM, T.2S., R.30E. Sec. 18
Environmental Assessment · Mount Whitney Ranger District · updated 9/28/2022
Lode Mine tunnel and adjacent cabin at CAMC 31348 Township 12S A Range 36 East Section 31 SW · Inyo, California

MCS Old 49er Mine Exploration and Production Plan of Operation located in Mazourka Canyon within the Inyo National Forest

Minerals and geology
Scoping Start
02/2017 (Estimated)
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Colleen Garcia · colleenggarcia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionCAMC 31348 Township 12S A Range 36 East Section 31 SW
Decision Memo · Inyo National Forest All Units · updated 9/28/2022
USFS Lands Whitney Portal Road for Badwater and Summit Adventure, Whitney R.D.. Loop around White Mountain Range for NDZone, White Mountain R.D. · Inyo, California

Reissuance of three recreation event permits for a term of 5 years: 1)AdventureCorp. Badwater Ultramarathon, 2)Summit Adventure bike ride from Badwater to Whitney Portal, 3) NDZone, White Mountain Double Century.

Special use management
Scoping Start
07/18/2017
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District; Mount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 9/28/2022
Mammoth Distribution Area, Mammoth Lakes Area · Mono, California

Reissuance of expired permit for Southern California Edision's electrical distribution lines in the Mammoth Distribution Area.

Special use management
Scoping Start
06/2018 (Estimated)
Decision
07/2018 (Estimated)
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT.3S., R.28E., MDBM
Decision Memo · Inyo National Forest All Units · updated 9/28/2022
UTM Coordinates: Zone 11, 408046 mE, 4038135 mN SE  SW  S33, T16S, R35E and S3 T17S, R35E USGS 7.5 min topo Cirque Peak. · Inyo, California

Reissuance of a 10 year permit to Thacher School for their operations and facilities @ Golden Trout Camp (GTC). Thacher operates under a special use permit since 1976, the GTC for wilderness education. Name change to Golden Trout Wilderness School.

Special use management
Scoping Start
02/2019 (Estimated)
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionUTM Coordinates: Zone 11, 408046 mE, 4038135 mN SE  SW  S33, T16S, R35E and S3 T17S, R35E USGS 7.5 min topo Cirque Peak
Decision Memo · Inyo National Forest All Units · updated 9/28/2022
Adjacent to the Mammoth Yosemite Airport · Mono, California

Construction of wildlife safety fence adjacent to the Mammoth Yosemite Airport.

Special use management
Scoping Start
03/10/2016
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 9/28/2022
Off Highway 203, before the entrance to the Town of Mammoth Lakes · Mono, California

Reissuance of expired permit to the Town of Mammoth for a snow disposal area

Special use management
Scoping Start
04/2019 (Estimated)
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 9/28/2022
A site to be determined adjacent to the Town of Mammoth Lakes · Mono, California

Town of Mammoth Lakes 10-20 acre transfer site in anticipation of County landfill closing.

Special use management
Scoping Start
03/2019 (Estimated)
Comment Period
07/2019 (Estimated)
Objection Period Start
03/2020 (Estimated)
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 9/28/2022
Along Highway 6 in Nevada, on the East side of Montgomery Pass, near the Esmeralda, Mineral County line. · Esmeralda; Mineral, Nevada

Valley Electric Authority (VEA), a Nevada utility company, is proposing to add broadband cables to existing utility lines, and renew their Special Use Permit. There would be about 10.5 miles of cable added to overhead lines, and 200 feet underground.

Special use management
Scoping Start
04/2017 (Estimated)
Comment Period
07/2017 (Estimated)
Objection Period Start
01/2018 (Estimated)
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District; White Mountain Ranger District
Legal Land DescriptionTownship 1N, Range 32 East and Range 33 East, and Township 2N, Range 33E.
Decision Memo · Inyo National Forest All Units · updated 9/21/2022
Grandview Campground host site · Inyo, California

Install a pump-out septic tank at the Grandview Campground host campsite.

Facility management
Scoping Start
03/16/2022
Decision
06/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Steven Van-Si · steven.c.vansi@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT7S, R34E, Section 13
Environmental Impact Statement · Mount Whitney Ranger District · updated 7/18/2022
Templeton/Whitney Grazing Allotments in the Golden Trout Wilderness · Inyo; Tulare, California

Review and analysis of the Monache, Mulkey, Templeton and Whitney grazing allotments in the Golden Trout Wilderness on the Mt Whitney Ranger District

Grazing management
NOI in Federal Register
01/2016 (Estimated)
DEIS NOA in Federal Register
06/2016 (Estimated)
FEIS NOA in Federal Register
03/2017 (Estimated)
Objection Period Start
10/2016 (Estimated)
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Margaret Wood · mwood@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 6/24/2022
At June Lake Beach, in June Lake, and on adjacent roads and parking lots. · Mono, California

One-year permit issuance to Alpha Win for the June Lake Triathlon, which is planned for July 9, 2022, for up to 500 participants. The permit would include parking restrictions to limit parking to one lot, and resource protection measures

Special use management
Scoping Start
01/01/2022
Decision
03/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Melissa Baechle · Melissa.Baechle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 6/23/2022
Sherwins and Lakes Basin areas near the Town of Mammoth Lakes, CA · Mono, California

Construction of 3 miles of natural surfaced multi-use, non-motorized trails in the Lakes Basin area, near Mammoth Lakes, CA. Most are existing user trails. The trails will be constructed and maintained in partnership with the Town of Mammoth Lakes

Recreation management
Scoping Start
06/10/2020
Decision
03/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 3/8/2022
Inyo Craters Interpretive site. Affected roads include, but are not limited to 3S22, 3S23 (Mammoth Scenic Loop), 3S29, 3S30 and 3S89, Mammoth Scenic Loop (FS road 3S23). · Mono, California

Treat dead and dying trees which are currently a danger to the public, infrastructure and improvements, including those currently infested trees which are potential threats. Implementation by Forest Service crews and/or service contractors

Road managementFacility managementRecreation management
Scoping Start
06/11/2021
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Scott Kusumoto · skusumoto@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management; Road Maintenance
Inyo Craters Area Bark Beetle Mortality Hazard Abatement ProjectDecision Signed Date: 03/07/2022
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT3S; R27E; Secs. 9, 16-17, 20-21, 29 MDB&M
Decision Memo · Inyo National Forest All Units · updated 2/7/2022
Buttermilk Bouldering area · Inyo, California

This project would install two manufactured double seat vault toilets with a 1000 gallon storage capacity at the Buttermilk Boulders area.

Recreation management
Scoping Start
12/16/2021
Decision
02/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Dannon Dirgo · dannon.dirgo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT07S, R31E, Section 21
Decision Memo · Inyo National Forest All Units · updated 9/27/2021
Township 3S, Range 28E, Section 26, Mt. Diablo Meridian · Mono, California

The Long Valley Exploration Drilling Project proposes to drill up to 3 core borings on up to 14 drill pads, to evaluate the mineral potential within the Long Valley area, near Lake Crowley. Access may include driving on existing roads and temp roads.

Minerals and geology
Scoping Start
04/08/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Colleen Garcia · colleenggarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionTownship 3 S, Range 28 E, Section 26
Environmental Assessment · Inyo National Forest All Units · updated 7/20/2021
Located inside of Mammoth Mountain Ski Area INF permit area · Mono, California

MMSA proposes to expand year-round activities at the existing 55-acre Woolly's Adventure Summit tube park, located inside of Mammoth Mountain Ski Area INF permit area along State Route 203, and improve the snowmaking system throughout the MMSA.

Special use managementRecreation management
Scoping Start
02/13/2020
Comment Period
02/15/2020
Objection Period Start
03/18/2021
Decision
07/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mono Ranger District · updated 3/31/2021
Mt. Downs, above south June Lake Junction, and Lee Vining Hill, north of Lee Vining. · Mono, California

Special Use Permit reissuance to the California Department of Transportation for avalanche control systems located in the June Lake and Lee Vining areas.

Special use management
Scoping Start
01/2021 (Estimated)
Decision
02/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/30/2021
On the North side of Laurel Ponds near the town of Mammoth lakes, CA · Mono, California

The Mammoth Community Water District is proposed to replace four existing monitoring wells around Laurel Ponds, on the Mammoth Ranger District and abandon the existing wells. The wells are needed to comply with State Water Board regulations

Special use management
Scoping Start
12/2020 (Estimated)
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionMDM, T.4S, R 2 E., Sec 9.
Decision Memo · Inyo National Forest All Units · updated 3/30/2021
Bishop Creek and White Mountains · Inyo, California

This study addresses a significant knowledge gap in variation in seedling traits and success in high-elevation conifer forests, which play a critical role in providing water through snowpack stabilization.

Special use management
Scoping Start
07/24/2019
Decision
10/2019 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 12/18/2020
Buttermilk Road near junction of Hwy 168; Parcher's Resort, South Fork Bishop Creek; Cardinal Gold Mine, Bishop Creek; Hwy 395 20 North of Bishop Sherwin Grade; Intake 2, Bishop Creek. · Inyo, California

Issue a new permit to the Slim Princess Chapter of E. Clampus Vitus authorizing five historical markers located at various locations on the south zone Inyo National Forest. New permit term will be for 10 years.

Special use management
Scoping Start
12/07/2016
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Carmen John · cjohn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District; Mount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 12/17/2020
Throughout Inyo County, including County, Onion Valley, Foothill, and Death Valley roads. · Inyo, California

Proposal is to provide easements to Inyo County on four roads to allow for continued road maintenance by Inyo County under a legal instrument.

Road managementSpecial use management
Scoping Start
01/13/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District; Mount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 12/15/2020
Lee Vining Canyon · Mono, California

Permit reissuance for water transmission pipeline and a spring diversion works to Lee Vining PUD, in Lee Vining Canyon. The water supply is about 5,357 feet long, and is underground. Eight foot right-of-way.

Special use management
Scoping Start
10/11/2019
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT1N, R26E, Sec. 17 & 19, and T1N, R25E, Sec 24
Decision Memo · Mount Whitney Ranger District · updated 9/13/2020
The area of the Inyo National Forest near the community of Kennedy Meadows. · Tulare, California

Fuels reduction of shrubs and trees around the Kennedy Meadow Campground and access road, and the Wildrose Trailhead. Includes removing dead and dying trees. Treatment area will be 200-400 acres.

Fuels management
Scoping Start
08/2017 (Estimated)
Decision
12/2017 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain Ranger District · updated 7/1/2020
Near the Red Rock Mine in Esmeralda County of Nevada. · Esmeralda, Nevada

Maintain six Forest Service system roads, install barricades on unauthorized routes, close existing road near Red Rock mine with safety concerns, add another 0.5 mile of road to improve access, and change other roads to single-track for motorcycles.

Road management
Scoping Start
12/23/2019
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Todd Ellsworth · tellsworth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Road Maintenance; Road Improvements/Construction; Travel Management
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionTownship 1S, Range 33E, multiple sections
Decision Memo · Inyo National Forest All Units · updated 7/1/2020
Pine Glade Association water system between Pine Glade recreation resident tract and Rock Creek · Mono, California

Reissued Pine Glade's permit to provide water to recreation residence tract and upgrade underground control room/vault; amend permit for upgrade to water system utility box, pole, conduit.

Special use management
Scoping Start
07/03/2019
Decision
09/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pine Glade Association Permit reissuance amendment #1 WMD1805501Decision Signed Date: 09/22/2019
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 6/8/2020
This project lies .5 miles to the West of the town of Mammoth Lakes along highway 203, and the Reds Meadow Rd. It is also adjacent to the Devils Post Pile National Monument in Reds Meadow. · Madera; Mono, California

This project will reduce fuels within the high use Reds Meadow area to protect life and property in the event of a wildfire, and promote fire suppression activities. Secondary effects will be forest health enhancement and watershed improvement.

Watershed managementForest productsFuels managementVegetation management (other than forest products)
Scoping Start
08/08/2018
Objection Period Start
04/18/2020
Decision
05/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Eric Vane · ericdvane@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT3S R26E, Sections: 14, 15, 22, 23, 25, 26, 34, 35, 36. T4S R 26E, Sections:2, 3, 11, 14. T30S R27E, Sections: 29 - 32
Decision Memo · Inyo National Forest All Units · updated 1/13/2020
3 miles west of Alabama Hills, CA · Inyo, California

The primary purpose of this project is to provide defensible space to help protect structures and developments in the Granite View subdivision and Carroll Creek in the event of a wildfire. Treatments include prescribed fire, mowing, and hand cutting.

Fuels management
Scoping Start
04/25/2018
Decision
11/2019 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
Lance Rosen · lrosen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 11/22/2019
Forestwide · Esmeralda; Mineral; Fresno; Inyo; Madera; Mono; Tulare, California; Nevada

Implement integrated plant management to control and eradicate non-native invasive plant infestations on the Inyo National Forest. To comment, click on "comment" on the right side of this page or email to comments-pacificsouthwest-inyo@fs.fed.us

Vegetation management (other than forest products)
Scoping Start
08/19/2016
Comment Period
05/07/2019
Objection Period Start
09/29/2018
Decision
11/2019 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Blake Engelhardt · bmengelhardt@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Inyo National Forest All Units · updated 10/25/2019
Forestwide · Esmeralda; Mineral; Fresno; Inyo; Madera; Mono; Tulare, California; Nevada

Revision of the 1988 Inyo National Forest Land and Resource Management Plan under the provisions of the 2012 National Forest System Planning Rule.

Land management planning
NOI in Federal Register
08/29/2014
DEIS NOA in Federal Register
05/27/2016
FEIS NOA in Federal Register
09/20/2019
Objection Period Start
08/04/2018
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Creation/Revision
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 9/27/2019
Highway 395, outside of Caltrans Easement · Mono, California

June Lake Chamber of Commerce Gateway Sign to be located on Highway 395 outside the Caltrans Easement

Special use management
Scoping Start
01/2015 (Estimated)
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 9/23/2019
Adjacent to the Alpers Ranch, located off of the Owens River Road · Mono, California

Replacement of approximately 2,700 feet of pipeline that is currently under special use authorization

Special use management
Scoping Start
06/27/2018
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 9/23/2019
South and adjacent of the Town of Mammoth Lakes near Old Mammoth and Sherwin Creek Roads. · Mono, California

Trail improvements in the Sherwins including reconstruction of select user-created trails and construction of new trails to be designated as non-motorized National Forest System Trails. Closure and rehabilitation of other user-trails.

Recreation management
Scoping Start
04/06/2018
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionTownship 4N, Range 27E Sections 2, 9-11
Decision Memo · Inyo National Forest All Units · updated 9/17/2019
Canyon Lodge Chair 16 · Mono, California

Realign and replace existing Chair 16 with a high speed 6 passenger detachable chairlift.

Special use managementRecreation management
Scoping Start
05/07/2018
Decision
09/2019 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 6/28/2019
Between the Mammoth YMCA camp and the Sherwin Creek Campground, southeast of the town of Mammoth Lakes. · Mono, California

Reissue permit for a water tank, water pipeline, and 4 inch electrical conduit extending from the vicinity of the Sherwin Creek Campground water main to the Mammoth YMCA camp. Eight foot right-of-way. Buried, in place since 2001.

Special use management
Scoping Start
11/01/2018
Decision
11/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Andrea Kachulis · akachulis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT4S, R28E, Sections 6 and 7
Decision Memo · White Mountain Ranger District · updated 6/25/2019
Near North Fork of Crooked Creek north of Sage Hen Flat, White Mountains · Mono, California

Installing a water trough to improve cattle distribution. The trough would be removable, and placed only when cattle are present in the area, for a few weeks a year. The trough would be connected to a spring box that is already in place.

Grazing management
Scoping Start
10/16/2018
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Lisa Sims · lsims@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionTownship 5S, Range 35E, Section 26
Decision Memo · Mammoth Ranger District · updated 6/25/2019
Adjacent to Shady Rest Park in Mammoth Lakes, Mono County, CA. · Mono, California

The Town of Mammoth Lakes proposes to install an 18 hole disc golf course adjacent to the Shady Rest Park. The course would consist of 18 wood and aggregate tee pads (6x20 ft), 18 removable baskets, 18 removable tee signs and one kiosk. Summer 2019.

Recreation management
Scoping Start
05/2019 (Estimated)
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Alecia Rutledge · amrutledge@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/28/2019
At Sherwin Summit Communication site, east of Highway 395 at the top of the Sherwin Grade. · Mono, California

The Vista Tower's Sherwin Summit tower is currently 60 feet tall, and the permittee is requesting to extend it by 10 feet, to 70 feet tall, in order to improve coverage and increase the number of carriers about to use the tower.

Special use management
Scoping Start
11/01/2018
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land Description37.544794, -118.631875
Decision Memo · Inyo National Forest All Units · updated 3/28/2019
Panorama Dome at Tamarack Lodge · Mono, California

Mammoth Mountain proposes to improve the biathlon site on Panorama Dome at Tamarack Lodge. The goal is to create a safer and more functional Firing Range and Penalty Loop location by enlarging the range and creating a Penalty Loop opposite the firing

Recreation managementSpecial use management
Scoping Start
11/28/2018
Decision
03/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/27/2019
Near Sherwin Creek, Southeast of the Town of Mammoth Lakes. · Mono, California

Renewal of the Mammoth motocross track permit, for a 5-year term. This permit covers infrastructure and improvements on-site. The annual two week long recreation event at the site is covered under a separate recreation event permit.

Special use management
Scoping Start
11/01/2018
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionSections 11 and 12 of T4S, R28E
Decision Memo · Inyo National Forest All Units · updated 3/27/2019
Across the Inyo National Forest, outside of Wilderness. · Inyo; Mono, California

Approve continued operation, maintenance and use of existing distribution and transmission powerlines and infrastructure for Southern California Edison located within designated corridors on the Inyo National Forest

Special use management
Scoping Start
03/15/2018
Decision
02/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Spencer Bleadorn · sbleadorn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Mammoth Ranger District · updated 3/18/2019
The area near Main Lodge, Mammoth Mountain Ski Area would be exchanged for up to 11 non Federal parcels in Inyo, Mono, Plumas and Tuolumne Counties. · Inyo; Mono; Plumas; Tuolumne, California

Exchange of approximately 35.6 acres of National Forest System land, currently under special use authorization to Mammoth Mountain Ski Area, located near the Main Lodge north of Highway 203 for approximately 1296.7 acres of private land in California

Land ownership management
NOI in Federal Register
08/23/2016
DEIS NOA in Federal Register
07/07/2017
FEIS NOA in Federal Register
08/30/2018
Objection Period Start
08/30/2018
Decision
01/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsInyo National Forest; Plumas National Forest; Stanislaus National Forest
DistrictsMammoth Ranger District; White Mountain Ranger District; Mt. Hough Ranger District; Mi-Wok Ranger District
Legal Land DescriptionLand to be exchanged is located in T.3S, R. 27E., Sec 30, MDM. Proposal includes the addition of non-federal parcels to the Inyo, Plumas, and Stanislaus National Forests in California
Decision Memo · Inyo National Forest All Units · updated 2/13/2019
Near Bishop, California in Inyo County and near Lee Vining, California in Mono County. · Inyo; Mono, California

Improve safety by blocking access to abandoned mines. Activities will include install bat gates, culverts, and fences in and around mine openings, and filling in shafts with polyurethane foam and/or backfill to permanently close the shafts.

Minerals and geology
Scoping Start
09/14/2018
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
Colleen Garcia · colleenggarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsInyo National Forest
DistrictsMono Ranger District; White Mountain Ranger District
Legal Land DescriptionT2S, R26E, Sec 10&15; T7S,R34E, Sec.9; T7S, R31E, Sec.7
Decision Memo · Mono Ranger District · updated 12/12/2018
Periphery of Big Sand Flat near Sagehen Summit, Mono County, California. · Mono, California

Removal of small diameter Jeffrey pines which are encroaching into sage-grouse habitat. Trees will be felled using hand tools, limbed and left to decompose naturally. No mechanical equipment would be used.

Wildlife, fish, rare plants
Scoping Start
08/23/2018
Decision
11/2018 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Richard Perloff · rperloff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Sagehen II sage-grouse habitat enhancement projectDecision Signed Date: 11/14/2018
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT1S, R28E, Sec. 3-6,8,9,16,17
Decision Memo · Inyo National Forest All Units · updated 11/15/2018
Pine Glade Recreation Residences in the Rock Creek area. · Inyo, California

Pine Glade Water Assoc. water storage tank access vault is in need of reconstruction. They propose to replace this vault at the same location but made of reinforced cement to utility grade standards.They also request to renew their existing permit.

Special use management
Scoping Start
10/2018 (Estimated)
Decision
11/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Trudy Garza · tgarza@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain Ranger District · updated 11/15/2018
On the north side of the community of Starlite · Inyo, California

A private homeowner would like to move a stormwater drainage ditch, which drains onto National Forest land, about 200 feet to the South. The length of the ditch on National Forest land would be about 40 feet.

Special use management
Scoping Start
03/12/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionTownship 7S, Ranger 32E, Section 23
Decision Memo · White Mountain Ranger District · updated 11/1/2018
In the Pine Glade Recreation Residence tract. · Mono, California

Renewal of permit for Pine Glad water storage tank, well, and water transmission line. Water services 48 recreation residences in the Lower Rock Creek area. Also permits replacing existing water tank and vault.

Special use management
Scoping Start
09/11/2018
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT4s, R36E, sec. 28
Decision Memo · Inyo National Forest All Units · updated 9/25/2018
Starting at the ticket office at the June Mountain Parking lot, following a dirt road to the lodge at the top of the J1 chairlift. · Mono, California

The California Broadband Cooperative (CBC has proposed to install underground fiber optic cable from the parking area to the lodge at June Mountain Ski Area. This cable will be placed in an existing road fro the June Mtn. Parking lot to the lodge.

Special use management
Scoping Start
07/19/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 7/3/2018
The project includes the 11 SNBS herd units located on the Inyo NF. · Inyo; Mono, California

This project will address potential disease transmission from pack goat use on the endangered Sierra Nevada bighorn sheep. This project is a continuation of a previous closure which has expired.

Wildlife, fish, rare plants
Scoping Start
09/12/2012
Comment Period
04/01/2014
Objection Period Start
05/2016 (Estimated)
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Kary Schlick · kschlick@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityOrder Creation/Modification
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 6/28/2018
Snow fences located at the intersection of Highways 395 &203, and on Highway 395 north of the June Lake Junction and Crestview flats · Mono, California

reauthorization of existing three snow fences, as well as rebuilding of the one located north of the south June Lake Junction

Special use management
Scoping Start
12/12/2017
Decision
01/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mount Whitney Ranger District · updated 6/26/2018
Along trails in the Mulkey Creek and Golden Trout Creek watersheds within the South Fork Kern River Watershed, within the Golden Trout Wilderness, approximately 13 miles southwest of Lone Pine, CA. · Tulare, California

Reconstruct 2 miles of storm damaged trail; deferred maintenance & storm proofing on 27 miles of trail; stabilize 11 perennial stream crossings; 0.9 miles of trail stabilization/reroute through meadows, and treat headcuts in/near Big Whitney Meadow.

Recreation managementWatershed management
Scoping Start
03/09/2018
Decision
06/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Casey Shannon · cshannon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/28/2018
Upper Caldera Overlook Cliffs located east-north east of McCoy Station at 9,600ft. · Mono, California

Construction of up to six Via Ferrata fixed cable climbing routes on the Upper Caldera Overlook Cliffs.

Recreation managementSpecial use management
Scoping Start
02/13/2018
Decision
03/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/19/2018
At the end of Forest Road 9S21 · Inyo, California

Reissue a 20 year resort special use permit for Glacier Lodge, in Big Pine Canyon

Special use management
Scoping Start
03/14/2017
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Shane Hoskins · shaneahoskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionSec. 35 & 36, T9S, R32E Mt. Diablo Principle
Decision Memo · Inyo National Forest All Units · updated 3/19/2018
Lake Sabrina - end of the road · Inyo, California

Reissuing a special use permit for a store/restaurant and boat dock at Lake Sabrina.

Special use management
Scoping Start
04/03/2017
Decision
01/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Shane Hoskins · shaneahoskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionLot #23 of Lake Sabrina Tract, NE 1/4 Section 31, T8S, R31E
Decision Memo · Inyo National Forest All Units · updated 3/19/2018
Mammoth Mountain Ski Area Permit · Mono, California

Construct a two span zip line, challenge ropes course and summer tubing within the Mammoth Mountain Ski Area permit boundary.

Special use management
Scoping Start
11/22/2017
Decision
03/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mono Ranger District · updated 3/19/2018
Negit islets in Mono Lake, Mono County, California · Mono, California

Remove the invasive weed Bassia hyssopifolia from several islands in Mono Lake, Mono County, California. Where feasible, broadcast burning will be utilized. In other areas, weeds will be pulled by had or cut with a string trimmer, piled and burned.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
02/05/2018
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Blake Engelhardt · bmengelhardt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityNoxious Weed Treatments
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/19/2018
Across Rock Creek Road from the Rock Creek Lake outlet. · Inyo, California

Reissuing a 20 year special use permit for the Rock Creek Lake Resort, with no changes to current operations.

Special use management
Scoping Start
03/14/2017
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Shane Hoskins · shaneahoskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionSec. 36, T5S, R29E, Mt. Diablo Principle
Environmental Assessment · Mammoth Ranger District · updated 3/7/2018
1/4 mile Southwest of Mammoth Lakes, CA in the Lakes Basin, adjacent to Lake Mary, George, Mamie, and Twin Lakes, 4 Miles West of Highway 395. · Mono, California

This is a fuels reduction project in the Mammoth Lakes Basin. The goal of treatments will be to create defensible space around private and Forest Service developments to facilitate fire suppression activities and reduce potential wildfire severity.

Fuels management
Scoping Start
09/27/2016
Objection Period Start
12/12/2017
Decision
03/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Eric Vane · ericdvane@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionTownship 4.S, Range 27.E, Sections 7-9, 15-17, 22
Environmental Assessment · Mammoth Ranger District · updated 2/15/2018
All proposed treatment units lie within the Mono Lake and Mammoth Ranger Districts of the Inyo National Forest, Mono County, California. · Mono, California

The Three Creeks Jeffrey Pine Forest Health & Restoration project objective is to provide for healthy forest conditions, promote establishment of old growth and reintroduce fire to the ecosystem.

Forest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
10/29/2012
Comment Period
03/22/2016
Objection Period Start
07/27/2017
Decision
01/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Scott Kusumoto · skusumoto@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTimber Sales (Green); Watershed Improvements
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain Ranger District · updated 1/27/2018
Near communities, developments, and recreation sites in the Bishop and Pine Creek drainages. · Inyo, California

Fuels reduction and vegetation improvement to protect communities, facilities, and recreation sites in the Bishop Creek and Pine Creek drainages.

Watershed managementVegetation management (other than forest products)Fuels management
Scoping Start
08/01/2016
Decision
01/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Heather Stone · hestone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionTownships 6-8S, Ranges 30-31E
Decision Memo · Mammoth Ranger District · updated 12/18/2017
In the Town of Mammoth Lakes within the Mammoth RV Park, just south of Highway 203. · Mono, California

Inyo NF Mammoth District CD-IV Geothermal Monitoring Wells -Installation Off Lease on Forest Service Lands

Minerals and geology
Scoping Start
09/01/2017
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Margie DeRose · mbderose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGeothermal
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Amerigas Project Cancelled
Decision Memo · Mammoth Ranger District · updated 9/28/2017
West of John Muir Rd. and ending at 924 Canyon Blvd. · Mono, California

Install 100 feet of propane pipeline to connect existing pipeline on both ends of existing pipeline. This is the same project as the Rock Creek Energy Project. Rock Creek Energy was purchased by Amerigas.

Special use management
Scoping Start
01/2012 (Estimated)
Decision
02/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT3S, R27E, Sec 33
Decision Memo · Inyo National Forest All Units · updated 9/28/2017
Deadman Creek, within the Big Springs campground, off of Owens River Road · Mono, California

Installation of stream flow gauge on Deadman Creek, within the Big Springs Campground

Special use management
Scoping Start
06/15/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 9/25/2017
At existing horse corrals north of Convict Lake Resort · Mono, California

Facilities include 12 RV campsites with hook-ups; 6 temporary day use stalls, expansion of existing tack shed from 225' to 600' sq. ft.; 1,500 sq. ft. recreation building with toliets & showers, game room, laundry; new landscaping

Recreation management
Scoping Start
11/2013 (Estimated)
Comment Period
01/2014 (Estimated)
Objection Period Start
03/2014 (Estimated)
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Jon Kazmierski · jkazmierski@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT.4S., R.28E., Section 14
Decision Memo · Mount Whitney Ranger District · updated 9/11/2017
On the North and South Fork of Oak Creek, near Independence, California · Inyo, California

Restore hydrologic connectivity between the channel incised in the Oak Creek Flood, and the floodplain and side channels to restore the native Black Oak riparian area. Also, remove noxious weeds.

Vegetation management (other than forest products)Watershed management
Scoping Start
11/14/2016
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Todd Ellsworth · tellsworth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityNoxious Weed Treatments; Watershed Improvements
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT13S, R34E, Section 3
Decision Memo · Inyo National Forest All Units · updated 9/7/2017
Approximately 1/3 of a mile up stream of the Cardinal Village Resort property boundary, Bishop Creek. · Inyo, California

Authorize the construction of approx. 275 ft of stock passable trail, from the existing authorized route, crossing Bishop Creek above Cardinal Village Resort. The crossing is necessary because the existing bridge crossing has been determined unsafe.

Special use management
Scoping Start
03/15/2017
Decision
07/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Carmen John · cjohn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT.8S. R.31E. Section 29
Decision Memo · White Mountain Ranger District · updated 9/6/2017
Jean Blanc Mines: Quad Name: Laws Meridian MDBM, Township 6South, Range 33East, Section 12 Black Canyon Mines Quad Name: Westgard Pass Meridian MDBM, Township 7South, Range 34East, Section 34 · Inyo, California

This project will protect the health and safety of forest visitors by conducting specialist surveys to appropriately mitigate mine safety hazards present at two (2)AML sites located in both the White and the Inyo Mountains of the Inyo National Forest

Minerals and geology
Scoping Start
03/02/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Colleen Garcia · colleenggarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionJean Blanc Mines: Quad Name: Laws Meridian MDBM, Township 6South, Range 33East, Section 12 Black Canyon Mines Quad Name: Westgard Pass Meridian MDBM, Township 7South, Range 34East, Section 34
Environmental Assessment · Mount Whitney Ranger District · updated 8/30/2017
Grazing allotments in the southern portion of the Inyo National Forest along the escarpment of the Sierra Nevada · Inyo, California

Analysis of grazing allotments on the South Zone of the Inyo National Forest, including the Alabama Hills, Ash Creek, George Creek, Olancha, and Tunawee Allotments

Grazing managementWatershed managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
05/17/2013
Comment Period
10/23/2014
Objection Period Start
05/31/2016
Decision
08/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
April Barron · abarron@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Noxious Weed Treatments; Rangeland Vegetation Improvements; Grazing Structural Improvements
Desert Grazing AllotmentsDecision Signed Date: 08/28/2017
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White Mountain Ranger District · updated 7/18/2017
FS Road 7S127 and mining claim at 37.352 118.255 Township 7 South Range 34 East Section 9 SE 1/4 · Inyo, California

Robbie Hoyt Memorial Mine Exploration Plan of Operation located in Redding Canyon

Minerals and geology
Scoping Start
02/03/2017
Comment Period
06/2017 (Estimated)
Objection Period Start
09/2017 (Estimated)
Decision
11/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Colleen Garcia · colleenggarcia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations; Road Maintenance
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionFS Road 7S127 and mining claim at 37.352 118.255 Township 7 South Range 34 East Section 9 SE 1/4
Decision Memo · White Mountain Ranger District · updated 7/18/2017
Units are located along the eastern private/public lands boundaries adjacent to the community of Swall Meadows. Swall Meadows is located Northwest of Bishop, California along Lower Rock Creek Road. · Mono, California

Hazardous fuels reduction treatments are proposed on 108 acres adjacent to the community of Swall Meadows. Treatments are designed to lower flame length & severity while providing defensible space & safe ingress/egress for public & firefighters.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/05/2016
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Swall Meadows Community Fuelbreak ProjectDecision Signed Date: 05/23/2017
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionSec(s)13,14,18 T5S. R30E. Mt.Diablo Baseline and Meridian
Decision Memo · Inyo National Forest All Units · updated 5/31/2017
Within the Sierra Nevada Mountains on the Inyo and Sierra National Forests. · Fresno; Inyo; Madera; Mono; Tulare, California

Dr. Ronald Knapp from UC Santa Barbara%u2019s Sierra Nevada Aquatic Research Laboratory (SNARL) proposes to continue monitoring, research, and recovery activities for the mountain yellow-legged frog on the Inyo and Sierra National Forests.

ResearchSpecial use management
Scoping Start
05/2017 (Estimated)
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Kary Schlick · kschlick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsInyo National Forest; Sierra National Forest
DistrictsInyo National Forest All Units; Sierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 3/17/2017
North of the Mammoth Rock Trail and South of the Snowcreek development. · Mono, California

Construction, reconstruction, and maintenance of non-motorized trails in the Sherwin Area.

Recreation management
Scoping Start
07/07/2016
Decision
02/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Molly Burns · mollyburns@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Sherwin Area TrailDecision Signed Date: 02/17/2017
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT4S,R27E, Sec.'s 2,10,11
Decision Memo · Inyo National Forest All Units · updated 3/13/2017
Silver Peak, Casa Diablo, Sherwin Summit, Mazourka Canyon, South Benton, Milner Peak, Wilfred Canyon, Mustang, Poleta, McGee, Little Antelope and Glass Mountain. · Inyo; Mono, California

Reissuing special use permits for up to 12 communication sites throughout the Inyo National Forest, for a period of up to 30 years. Facilities include radio and cell phone towers, radio repeaters, and other communications equipment.

Special use management
Scoping Start
12/12/2016
Decision
01/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 3/13/2017
Roads and trails in 12 locations, including Bohler Canyon, Hwy 395 corridor north of Mammoth, Mono Lake, Smokey Bear and Airstrip Sandflats, Deadman Creek, Upper Dry Creek, Doe Ridge and others. · Mono, California

This project will analyze system and unauthorized routes for use by motorized vehicles in 12 project areas in the Mammoth and Mono Lake area with known recreation, access, safety or resource issues.

Recreation managementRoad management
Scoping Start
10/15/2014
Comment Period
05/28/2016
Objection Period Start
08/16/2016
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Marty Hornick · mhornick@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Trail Management; Travel Management
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 1/20/2017
Marina and resort are located off of Hwy 158, the "June Lake Loop," on the western shore of Grant Lake. · Mono, California

Renewal and continuation of Grant Lake Marina's 20 year marina/resort permit.

Recreation management
Scoping Start
10/01/2014
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Molly Burns · mollyburns@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Grant Lake Marina Permit ReissuanceDecision Signed Date: 09/01/2016
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionW1/2 Sec 28, T1S, R26E
Decision Memo · Inyo National Forest All Units · updated 12/22/2016
Located on the backside of Mammoth Mountain in Hemlock Bowl. · Mono, California

The project proposal consists of creating an over the snow access corridor and construction of nine snow features in Hemlock Bowl.

Special use managementRecreation management
Scoping Start
10/20/2016
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionMammoth Mountain Quad, T4S, R26E, Section 1
Decision Memo · Mono Ranger District · updated 12/19/2016
The Rush Creek return ditch, from Mono Gate One to Rush Creek · Mono, California

LADWP is proposing to raise the embankment of the return ditch by approximately two feet for the full length of the ditch. The height would be raised by adding compacted fill on the road that parallels the ditch

Special use management
Scoping Start
04/04/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mono Ranger District · updated 12/19/2016
Parker Bench, southwest of Mono Lake · Mono, California

Jeffrey pines are encroaching into otherwise suitable sage-grouse habitat, creating perches for raptors which dissuades use by grouse. Jeffrey pines would be felled and limbed using chain-saws and allowed to decay naturally on site.

Wildlife, fish, rare plants
Scoping Start
03/18/2016
Decision
11/2016 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Richard Perloff · rperloff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT1S, R26E, Sec. 5-8, 17
Decision Memo · Inyo National Forest All Units · updated 12/15/2016
Canyon Lodge at Mammoth Mountain Ski Area · Mono, California

The MCWD proposes to construct 750 feet of new waterline on the western edge of the Canyon Lodge parking lot, just off the edge of the pavement. MCWD will also propose to abandon in place the existing water line, with capped ends.

Special use management
Scoping Start
08/01/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT03S, 27E, 33
Decision Memo · White Mountain Ranger District · updated 12/8/2016
Rock Creek Lodge is located along Rock creek Road, about 7 miles south/southwest of Tom's Place, California. · Mono, California

Reissuance of a 20-year special use permit for Rock Creek Lodge, with no changes in uses relative to the existing permit.

Special use management
Scoping Start
09/12/2016
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Shane Hoskins · shaneahoskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rock Creek Lodge Special Use Permit ReissuanceDecision Signed Date: 12/05/2016
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT5S, R30E, Section 31
Decision Memo · Mount Whitney Ranger District · updated 12/8/2016
At the Mt. Whitney Trailhead, about 10 miles west of the town of Lone Pine, California. · Inyo, California

Reissuance of the special use permit for the Whitney Portal Store, with no changes relative to the current permit.

Special use management
Scoping Start
10/10/2016
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Shane Hoskins · shaneahoskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Whitney Portal Store Special Use Permit ReissuanceDecision Signed Date: 12/05/2016
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT15S, R34E, Section 35
Decision Memo · Mount Whitney Ranger District · updated 9/30/2016
Improvements are located approximately 5 miles SSW of Olancha, CA, adjacent to private property known as Sierra Glen Ranch located at the terminus of the of the pavement of Sage Flat Road,#20S01. · Inyo, California

Issuance of a special use permit for continued use of existing spring box, 2000 feet of 2 inch waterline, and access road to provide domestic water to the Sierra Glen Ranch.

Special use management
Scoping Start
03/03/2016
Comment Period
03/03/2016
Decision
09/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionSections 2-3; T20S, R36E; MDBM
Decision Memo · Mono Ranger District · updated 9/28/2016
June Lake, California · Mono, California

Reissue a 20 year permit to a new owner of the Big Rock Resort at June Lake, California.

Special use management
Scoping Start
07/15/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Molly Burns · mollyburns@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionSW1/4 SE1/4 Sec. 11, T.2 S., R26 E.
Decision Memo · Inyo National Forest All Units · updated 9/27/2016
The Mammoth RV Park is located off of Hwy 203, directly across from the Mammoth Ranger Station. · Mono, California

Renewal and continuation of Mammoth RV Park's 20 year term special use permit to operate and maintain a RV campground and associated facilities on the national forest.

Recreation management
Scoping Start
10/01/2014
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Molly Burns · mollyburns@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Mammoth RV Park Permit ReissuanceDecision Signed Date: 09/01/2016
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionS1/2, NE1/4, Sec 35, T3S, R27E
Decision Memo · White Mountain Ranger District · updated 6/27/2016
The project is located on the Lamarck trail system out of the North Lake (Bishop Creek) trailhead up to Lamarck Col on various sections of the trail. · Inyo, California

This project will repair and stabilize degraded sections of trail and re-route sections of trail out of sensitive meadows on the Lamarck trail system on the White Mountain Ranger District.

Watershed management
Scoping Start
01/19/2016
Decision
05/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Jeff Novak · jnovak@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Inyo National Forest All Units · updated 6/10/2016
The entire area of the Inyo National Forest that receives sufficient snowfall for potential snowmobile use. · Inyo; Madera; Mono; Tulare, California; Nevada

Designate motorized over-snow vehicle (OSV or snowmobile) use on National Forest System roads and trails and areas on National Forest System lands as allowed, restricted, or prohibited. Identify trails for grooming for snowmobile use.

Recreation management
Scoping Start
04/2016 (Estimated)
Comment Period
01/2017 (Estimated)
Objection Period Start
07/2017 (Estimated)
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Trail Management; Travel Management
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 6/7/2016
Forested Medians along highway 395, starting approximately 1 mile north of highway 203/395 intersection heading north approximately 10 miles to Wilson butte which located 2 miles south of HWY 158S. · Mono, California

Timber Stand Improvement activities, i.e., thinning & slash treatment, proposed on 118 acres of forested medians on highway 395 from Mammoth north to Wilson Butte to enhance highway safety, forest health, & resiliency to catastrophic wildfire event.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/05/2016
Decision
05/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Andrew Weinhart · aweinhart@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionLLD (North to South): T2S. R27E. Sec(s)8,21,22,27,35; T3S. R27E. Sec(s)1,2,12,13,24; T3S. R28E. Sec(s)19,30 Mt. Diablo Baseline and Meridian
Decision Memo · White Mountain Ranger District · updated 3/29/2016
Mazourka Peak Communication site T11S, R35E, sec 23; Silver Peak communication site T2S, R34E, sec24 · Inyo; Mono, California

Continue the shared occupation and use of Forest Service owned facilities at Mazourka and Silver Peak communication site

Special use management
Scoping Start
11/19/2015
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT11S, R34E, Section 23 and T2S, R34E, Section 24
Decision Memo · Mammoth Ranger District · updated 3/22/2016
Mammoth Mountain Ski Area Permit Area · Mono, California

Construct seven new mountain bike trail segments, and an above-ground manufactured pump track within the Mammoth Mountain Ski Area permit boundary.

Special use managementRecreation management
Scoping Start
10/28/2015
Decision
02/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations; Trail Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mono Ranger District · updated 1/8/2016
Caltrans Crestview Maintenance Yard, adjacent to Highway 395 · Mono, California

Caltrans proposed to install a fire suppression system at the Crestview Maintenance Yard including a water tank, pump house, piping, and two fire hydrants. Part of this system will be on National Forest System lands currently under permit to Caltrans

Special use management
Scoping Start
12/10/2015
Decision
12/2015 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Sheila Irons · sirons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 1/8/2016
Shady Rest Park and Horseshoe Lakes Area of Mammoth lakes, CA. · Mono, California

Reissue of MLFD Annual picnic 5 year permit

Special use management
Scoping Start
10/01/2015
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Lawson Reif · lreif@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Mammoth Ranger District · updated 12/15/2015
Site 1: Junction of 395 and the Mammoth Scenic Loop - East side of Highway 395 at the intersection with route 3S06. Site 2: Junction of Mammoth Scenic Loop and route 3S22 · Mono, California

The purpose of this project is to improve two off highway vehicle (OHV) and over snow vehicle (OSV) staging areas in areas that have existing, user-created staging areas (just east of Highway 395, lookout loop; and at 3S22, just off the Scenic Loop).

Recreation management
Scoping Start
11/2013 (Estimated)
Comment Period
11/2013 (Estimated)
Objection Period Start
04/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Jon Kazmierski · jkazmierski@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionSite 1: SW1/4 SW1/4 SEC1 T3S R27E Site 2: NE1/4 SW1/4 SEC15 T3S R27E
Decision Memo · Inyo National Forest All Units · updated 12/15/2015
In the areas of: Obsidian Dome, Inyo Craters, Buttermilk country, Tungsten Hills, Mammoth Creek, Starlight, Intake II Pipeline, Mammoth to Bishop, Mono Lake to Bishop. · Inyo; Mono, California

Amend existing special use authorization to include guided mountain biking on identified designated forest roads and trails.

Special use management
Scoping Start
07/01/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Carmen John · cjohn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 12/11/2015
Permit area north of Mammoth lakes but south of june lake on trails east and west of highway 395 · Mono, California

Renewal and continuation of DJs Snowmobiles 5 year outfitting/guiding Special use Permit

Special use managementRecreation management
Scoping Start
10/01/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Lawson Reif · lreif@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 12/10/2015
Smokey Bear Flat Area North Of Mammoth Lakes, CA · Mono, California

Mammoth Dog Teams 5 Year Permit Reissue

Special use managementRecreation management
Scoping Start
12/10/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Lawson Reif · lreif@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mammoth Ranger District · updated 12/8/2015
West of Highway 395 and north of Mammoth Scenic Loop Road. · Mono, California

Reissuance of expired permit for Mammoth Snowmobile Adventure. No increase in the scope or intensity of authorized activities is proposed.

Recreation managementSpecial use management
Scoping Start
10/20/2015
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 12/7/2015
The project is located along Hwy. 203 near the Earthquake Fault adjacent to Mammoth Mountain, Mono County, CA. · Mono, California

Renewal and continuation of Woollys Adventure Summit 10 year term special use permit. No increase in the scope or intensity of authorized activities is proposed.

Recreation managementSpecial use management
Scoping Start
10/07/2015
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Janelle Walker · janellelwalker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionPortions of Sections 28, 29, 32 and 33 of T3S R27E.
Decision Memo · Mammoth Ranger District · updated 10/2/2015
Project is proposed in the "Mammoth Lakes Basin" and would depart from the "Pokenobe Lodge" intersection, parallel the road, and then climb the north facing hill along a utilty coridor to Lake George. · Mono, California

The US Forest Services proposes to issue the Town of Mammoth Lakes a special use permit to contruct and maintain approximately one mile of a paved multiple use path that will connect Lake George to the existing paved multiple use path.

Recreation management
Scoping Start
02/09/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management; Scenery Management
Lake George Multiple Use PathDecision Signed Date: 09/14/2015
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionW1/2 Section 9 and E1/2 Section 17, T4S, R27E
Decision Memo · Mount Whitney Ranger District · updated 8/6/2015
Unnamed peak, approximately 8 miles southwest of Deep Springs Lake · Inyo, California

Placement of a 4' radio antenna on a 15' triangular tower in the Westgard Pass area to aid in emergency response communications.

Special use management
Scoping Start
01/12/2015
Decision
02/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Carmen John · cjohn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Big Pine Fire Department Westgard Pass Communication TowerDecision Signed Date: 02/03/2015
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionSW 1/4, Section 35, T8S, R35E
Decision Memo · Mount Whitney Ranger District · updated 8/6/2015
To the extent possible, the .5stations will be placed at the apex of the alluvial fans on Walker, Ash and Cottonwood Creeks · Inyo, California

Authorizing under special use permit the placement of hydrologic measuring stations on Walker, Ash and Cottonwood Creeks. Structures include a rectangular compound weir and associated measuring devices.

Special use management
Scoping Start
11/12/2014
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Carmen John · cjohn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Owens Lake Base of Mountain Monitoring Station InstallationDecision Signed Date: 01/08/2015
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionSection 27, T17S, R36E; Section 11, T18S, R36; Section 35, T19S, R35E , MDB&M.
Decision Memo · Inyo National Forest All Units · updated 8/6/2015
Nine locations on the Mono Lake, Mammoth, and White Mountain Ranger Districts · Mono, California

Research on Belding's ground squirrels and gold-mantled ground squirrels on the Mammoth and White Mountain Ranger Districts. Research activities include observing and trapping squirrels.

Special use management
Scoping Start
05/11/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo-Behavioral research Belding & Golden Mantled Ground SquirrelsDecision Signed Date: 06/18/2015
ForestsInyo National Forest
DistrictsMammoth Ranger District; White Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain Ranger District · updated 8/6/2015
Rock Creek, North and South Fork Bishop Creek, and Big Pine Creek drainages both within and outside of the John Muir Wilderness. · Inyo, California

Willow Beetle research within the Rock Creek, North and South Fork Bishop Creek, and Big Pine Creek areas, both inside and outside the John Muir Wilderness. Activities include observing and capturing beetles, and installing temporary climate stations

Special use management
Scoping Start
05/18/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo - Willow Beetle Research Permit - Dr. Elizabeth DahlhoffDecision Signed Date: 06/17/2015
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mono Ranger District · updated 8/5/2015
Southwest escarpment of the Glass Mountains, Mono County, CA. · Mono, California

Jeffrey pines are encroaching into otherwise suitable sage-grouse habitat, creating perches for raptors which dissuades use by grouse. Jeffrey pines would be felled and limbed using chain-saws and allowed to decay naturally on site.

Wildlife, fish, rare plants
Scoping Start
04/01/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Richard Perloff · rperloff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Long Valley Sage-Grouse Habitat Enhancement ProjectDecision Signed Date: 08/05/2015
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT2S, R29E, Sections 22, 25, 26, 27, 36, TS, R30E, Section 31 and T3S, R30E, Section 8 (MDB&M)
Decision Memo · Mount Whitney Ranger District · updated 6/11/2015
Shepherd Pass Trail's beginning terminus is at Sims Creek, approximately 7 miles southwest of Independence, CA. The trail's ending terminus is at the Inyo NF boundary with Sequoia National Park. · Inyo, California

Reconstruct and/or repair Shepherd Pass Trail's (#3402) stream and gully crossings damaged by flash flood event. Reconstruct and/or repair trail tread,tread retaining strucutes(check dams, retaining walls) and water diversion structures (water bars).

Recreation management
Scoping Start
10/24/2014
Decision
03/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jeff Novak · jnovak@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
Shepard Pass Trail Repair and Reconstruction ProjectDecision Signed Date: 03/02/2015
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Mount Whitney Ranger District · updated 4/22/2015
Mazourka Canyon area · Inyo, California

Process a Plan of Operations for mineral exploration

Minerals and geology
Scoping Start
06/18/2014
Comment Period
06/24/2014
Objection Period Start
04/2015 (Estimated)
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Colleen Garcia · colleenggarcia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT 12 S, R 35 E, Sect. 26 and T 12 S, R35 E, Sect. 1, and T 12 S, R 36 E, Sect. 6
Decision Memo · Mount Whitney Ranger District · updated 4/2/2015
Sidehill Spring is located within the Inyo Mountains Wilderness on the Mazourka Cattle & Horse Grazing Allotment about 15 air miles northeast of Independence, CA. · Inyo, California

The existing Sidehill Spring riparian exclosure(about 0.04 acres), will be removed, and a larger exclosure (about 0.35 acres) of barbed wire fence will be built that better protects the riparian vegetation from cattle impacts.

Vegetation management (other than forest products)Watershed managementGrazing management
Scoping Start
03/2015 (Estimated)
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Brianna Goehring · bjgoehring@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT11S, R36E, N/W1/4 Sec.22, MDM.
Decision Memo · White Mountain Ranger District · updated 3/13/2015
The cable would be placed both area on DWP and SCE poles and directly buried with 2-1.25 inner ducts for approximately two miles from Toms Place to Sherwin Summit. · Inyo, California

Verizon of CA is proposing to place a new 48 fiber optic line. The purpose of this project is to provide enhanced services and speeds for residents and travelers along 395 from the cell providers. The cable would be placed on existing DWP/SCE poles.

Special use management
Scoping Start
11/28/2014
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Jennifer Austin · jenniferlaustin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Verizon Wireless Fiber Optic Cable Project and Permit AmendmentDecision Signed Date: 03/12/2015
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionTOMS PLACE, TOWNSHIP 5S, RANGE 30E, SECTIONS 1, 35, AND 34.
Decision Memo · Mammoth Ranger District · updated 1/13/2015
At the crossing of road 03S09 and Mammoth Creek, near the junction of Highway 203 and 395. · Mono, California

Reroute of the road and stabilizatation of the streambank at crossing of Mammoth Creek and Road 03S09, off of Highway 203 near Town of Mammoth Lakes. The road is currently diverting the stream, leading to streambank erosion and water quality concerns

Watershed managementRecreation management
Scoping Start
09/24/2014
Decision
01/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Watershed Improvements
Mammoth Creek Road Reroute and Stream Stabilization ProjectDecision Signed Date: 01/06/2015
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionTownship 4S, Range 28E, Section 6
Decision Memo · White Mountain Ranger District · updated 12/17/2014
One camera will be located at each site: Laws (4143826, 384315), Santa Rita (4090406, 398984), and Sage (4009337, 406512). · Inyo, California

Great Basin Air Pollution Control District proposes to install three cameras to locate and monitor fugitive dust sources in the Owens Valley. The cameras would be operated for ten or more years, year round.

Special use management
Scoping Start
10/07/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Jennifer Austin · jenniferlaustin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision for the installation of three dust monitoring camerasDecision Signed Date: 11/07/2014
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionLAWS T6S, R33E S13, MAZOURKA PEAK T 11S, R 35E, S34, HAIWEE PASS T 19S, R36E, S2
Decision Memo · Mount Whitney Ranger District · updated 12/17/2014
On the Oak Creek mudflow · Inyo, California

This project proposes to plant oak seedlings in plots in the Oak Creek watershed on the mudflow to determine feasibility of oak restoration on the mud flow.

ResearchVegetation management (other than forest products)
Scoping Start
11/10/2014
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Todd Ellsworth · tellsworth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Research And Development
Oak Creek Mudflow - Oak Restoration StudyDecision Signed Date: 12/05/2014
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT. 13S. R. 34 E. SEC. 3
Decision Memo · Mammoth Ranger District · updated 12/11/2014
Mammoth Rock, Old Mammoth, Monte Cristo and Mammoth Consolidated abandoned mines near the town of Mammoth Lakes. · Mono, California

Installation of safety features and wildlife protection features at four abandoned mines near the Mammoth Lakes area. Methods will include bat gates, foam plugs, and removal of trash from sites.

Minerals and geology
Scoping Start
09/25/2014
Decision
11/2014 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
Mammoth Abandoned Mine Lands Reclamation ProjectDecision Signed Date: 11/20/2014
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT4S R27E Section 10 (Mammoth Rock and Old Mammoth) T4S R27E Section 15 (Monte Cristo) T4S R27E Section 16 (Mammoth Consolidated)
Decision Memo · Mammoth Ranger District · updated 12/11/2014
Existing OSV trails on the Mammoth and Mono Lakes Ranger Districts · Mono, California

Grooming of existing Over-snow vehicle trails from winter 2014/2015 through 2016/2017

Recreation management
Scoping Start
09/23/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Jon Kazmierski · jkazmierski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Inyo National Forest Over-Snow Vehicle Trail GroomingDecision Signed Date: 11/20/2014
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White Mountain Ranger District · updated 12/1/2014
Along the Sierra Escarpment from Bishop to Olancha · Inyo, California

Restore unauthorized routes along the Sierra Escarpment(Bishop to Olancha)that are continuing to cause watershed and vegetation issues.

Watershed managementVegetation management (other than forest products)
Scoping Start
01/06/2014
Comment Period
04/21/2014
Decision
11/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Watershed Improvements
Sierra Front Unauthorized Route Restoration ProjectDecision Signed Date: 11/24/2014
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mono Ranger District · updated 9/25/2014
June Mountain Ski Area · Mono, California

The proposal is for four test wells within the permit area to find more groundwater for snowmaking.The test wells would occur near the base of the mid-mountain chairlifts 4 and 7 and the snowmaking pond. This proposal is for test wells only.

Special use management
Scoping Start
05/20/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Rodney Wilson · rmwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
June Mountain Ski Area Test WellsDecision Signed Date: 09/15/2014
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionJune Lake Quad, T2S., R26E., section 23 and 26 primarily, possibly within section 24 and 25.
Decision Memo · White Mountain Ranger District · updated 6/25/2014
In the White Mountains above 3,353 meters. Four of the five sites are within the MacAfee Meadow Research Natural Area and the others are to the west and south of the RNA. · Mono, California

Megan Oldfather requests to establish twenty 30 cm x 30 cm plots containing Ivesia lycopodioides in the White Mountains above 3,353 meters, some in the MacAfee Research Natural Area. Sites will be marked by nails, wooden toothpicks, and PVC pipe.

Research
Scoping Start
05/05/2014
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Rosalie Herrera · raherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
Decision Memo: Ivesia Research in the White MountainsDecision Signed Date: 06/20/2014
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT 4S, R 34E, Sections 9, 17, 21 and 33, Mt. Diablo Meridian
Decision Memo · Inyo National Forest All Units · updated 6/19/2014
Authorized National Forest System roads and trails within the areas of Coyote Flat, Upper and Lower Rock Creek Canyon, Black Canyon/Poleta and Papoose Flat (Death Valley Rd. to Mazourka Canyon Rd.). · Inyo; Mono, California

To authorize guided mountain biking activities on authorized National Forest System roads and trails. Authorized activity will be added to current priority use special use permit.

Special use management
Scoping Start
03/25/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Carmen John · cjohn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Mountain Center LLC; Amendment to include guided mountain bikingDecision Signed Date: 04/10/2014
ForestsInyo National Forest
DistrictsMammoth Ranger District; White Mountain Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Inyo National Forest All Units · updated 6/16/2014
White Mountain Research Station, Crooked Creek Field Station · Inyo, California

Celia Symons will place 40 stock tanks in a 30'x35' area located at the Inyo National Forest White Mountain Research Station. The tanks will contain well water, plankton, and half the tanks will contain trout.

Special use management
Scoping Start
06/04/2014
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Katheryn Rich · kdrich@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT.4S, R.34E, SEC 20
Decision Memo · Mount Whitney Ranger District · updated 5/6/2014
Pops Gulch near Santa Rita Flat, Inyo Mountains, Inyo National Forest, Section 1, Township 12s, Range 35e MDM, and Section 6,Township 12s, Range 36e MDM. Approximately 10 miles NE of Independence,CA · Inyo, California

The project is a dry placer mining operation using a metal detector. The project will involve moving existing tailing piles left behind early mining activites by means of a Kubota garden tractor and disturbed areas will be reclaimed.

Minerals and geology
Scoping Start
06/03/2013
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Casey Shannon · cshannon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Mammoth Ranger District · updated 3/27/2014
Shady Rest area on the Mammoth Lakes Ranger District · Mono, California

Planning for construction of an OHV/OSV staging area in the Shady Rest area of Mammoth Lakes. This may also include the construction of a snowmobile trail to town and snowmobile parking area.

Recreation management
Scoping Start
01/30/2013
Comment Period
09/26/2013
Objection Period Start
12/24/2013
Decision
03/2014 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Katheryn Rich · kdrich@fs.fed.us
NEPA / regulatory detail
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNW ¼ of the SW ¼ of Section 25, T3S, R27E. Old Mammoth.
Environmental Assessment · Mammoth Ranger District · updated 3/27/2014
In Mono County, near the community of Mammoth Lakes and North to the Obsidian Dome area. · Mono, California

Evaluation and restoration of routes defined as unauthorized in the 2009 Travel Management EIS, on the North Zone. It would determine type of restoration action needed on each route,if any.It could also revisit unauthorized designation in some cases.

Watershed managementRoad management
Scoping Start
04/02/2013
Comment Period
08/29/2013
Decision
01/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Todd Ellsworth · tellsworth@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Travel Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land Description2S, 27E; 3S, 27E; 4S, 27E
Decision Memo · Inyo National Forest All Units · updated 3/26/2014
Upper Owens Watershed and Bishop Creek watershed, including some areas of the White Mountains east of Bishop. In both the Mammoth and White Mountain Ranger Districts. · Inyo; Mono, California

Evaluation and restoration actions for routes defined as unauthorized in the Travel Management EIS. This project would determine what kind of restoration is needed on each route.

Watershed managementRoad management
Scoping Start
01/13/2014
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Jeff Novak · jnovak@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Upper Owens Bishop Creek Unauthorized Route Restoration - Phase 2Decision Signed Date: 03/12/2014
ForestsInyo National Forest
DistrictsMammoth Ranger District; White Mountain Ranger District
Legal Land DescriptionT02S, R27-30E; T03S, R27-30E; T04S, R27-30E; T05S, R28,29,31E; T06S, R31-34E; T07S, R30-34E; T08S, R30-34E; T09S, R31-34E
Environmental Assessment · White Mountain Ranger District · updated 11/26/2013
The proposed project area is about 400 m north of the existing campground entrance. New campground entrance road will connect Rock Creek Road (4S12) to the closest portion of the interior campground · Inyo; Mono, California

Construction of no more than a 0.75 mile of road, to replace the current Holiday Campground entrance road, which is at risk of destabilization due to run-off from the Birch Fire burn area. The current road will be decommissioned and rehabilitated.

Watershed managementRoad managementRecreation management
Scoping Start
01/22/2013
Comment Period
07/23/2013
Decision
09/2013 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Brianna Goehring · bjgoehring@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Developed Site Management; Road Improvements/Construction
Holiday Campground Entrance Road ProjectDecision Signed Date: 09/20/2013 Legal Notice Date: 09/26/2013
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionThe project is located in the Tom's Place Quad, in the south half of T4S, R30E, Section 33.
Environmental Impact Statement · Inyo National Forest All Units · updated 11/6/2013
Inyo National Forest · Esmeralda; Mineral; Inyo; Madera; Mono; Tulare, California; Nevada

This decision designated a system of roads, trails and areas for people using motorized wheeled vehicles on the Inyo National Forest

Road management
NOI in Federal Register
10/01/2007
DEIS NOA in Federal Register
01/30/2009
FEIS NOA in Federal Register
09/04/2009
Decision
08/2009 (Estimated)
Implementation
12/2009 (Estimated)
Project documents
Marty Hornick · mhornick@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Travel Management
Motorized Travel Management Record of DecisionDecision Signed Date: 08/17/2009 Legal Notice Date: 09/03/2009
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · White Mountain Ranger District · updated 9/30/2013
Project area includes unathorized routes in the White Mountains Wilderness and the 2009 John Muir Wilderness Additions. · Inyo, California

A project to protect natural qualities in designated wilderness by restoring unauthorized off-highway vehicle routes to natural conditions with visual disguise, revegetation, and erosion control treatments.

Recreation management
Scoping Start
01/30/2013
Comment Period
06/04/2013
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Jeff Novak · jnovak@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Roadless Area Management; Travel Management; Wilderness Management
Wilderness Unauthorized Route Restoration ProjectDecision Signed Date: 07/29/2013 Legal Notice Date: 08/01/2013
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District; Mount Whitney Ranger District
Environmental Impact Statement · Inyo National Forest All Units · updated 9/25/2013
Near the intersection of CA State Route 203 and U.S. Highway 395 approximately 3 miles east of Mammoth Lakes, CA · Mono, California

Construction of a 33-megawatt geothermal power plant and associated well field, internal access roads, pipelines, and a transmission line. The Forest Service would authorize changes to the forest transportation system.

Minerals and geology
NOI in Federal Register
03/25/2011
DEIS NOA in Federal Register
11/16/2012
FEIS NOA in Federal Register
07/05/2013
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Sarah Tomsky · sarahtomsky@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Casa Diablo IV Geothermal Development Project Record of DecisionDecision Signed Date: 08/12/2013 Legal Notice Date: 08/17/2013
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Mono Ranger District · updated 9/17/2013
Mono Craters, Mono County, California · Mono, California

Evaluate and restore approximately 60 miles of routes in the Mono Craters area that were not designated as part of the Inyo National Forest Travel Management Record Of Decision (2009) and are not authorized for OHV use.

Watershed managementRecreation managementWildlife, fish, rare plants
Scoping Start
02/01/2013
Comment Period
07/30/2013
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
April Barron · abarron@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Scenery Management
ForestsInyo National Forest
DistrictsMono Ranger District
Environmental Assessment · White Mountain Ranger District · updated 9/5/2013
Bishop Creek Watershed. More specific location is Bishop Creek, Horton Creek, Coyote Flat and Redding Canyon areas. · Inyo, California

This project proposes to evaluate unauthorized routes to determine future uses and additional restoration needs within the Bishop Creek Watershed. See http://www.fs.usda.gov/detail/inyo/landmanagement/project/?cid=stelprdb5407462

Recreation management
Scoping Start
02/04/2013
Comment Period
07/18/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Todd Ellsworth · tellsworth@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Travel Management
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Mono Ranger District · updated 7/25/2013
Mono Basin National Forest Scenic Area, Inyo National Forest · Mono, California

The proposal described in the Plan of Operations will expand mining operations at an existing cinder mine over a period of fifteen years.

Minerals and geology
Scoping Start
03/10/2009
Comment Period
04/01/2010
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Sarah Tomsky · sarahtomsky@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Black Point Cinder Mine Decision Notice and FONSIDecision Signed Date: 07/24/2013
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionSection 21, Township 2 North, Range 26 East
Environmental Assessment · White Mountain Ranger District · updated 6/28/2013
Upper Black Canyon, southwestern White Mountains approximately 20 miles S.E. of Bishop, CA · Inyo, California

Decommission one mile of existing system motorized trail and conduct watershed restoration activities in riparian/wetland section of upper Black Canyon, and maintain motorized trail in middle section of Black Canyon to prevent diversion of water.

Watershed managementRecreation management
Scoping Start
05/08/2012
Comment Period
11/06/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Casey Shannon · cshannon@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityOrder Creation/Modification
Black Canyon Riparian Restoration Project EADecision Signed Date: 04/01/2013 Legal Notice Date: 04/06/2013
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionTownship 7S, Range 34E, Sections 2, 11, 27
Environmental Assessment · White Mountain Ranger District · updated 6/11/2013
Buttermilk area of the Bishop Creek drainage · Inyo, California

Construction of up to two small vault toilets adjacent to the Buttermilk area of the Bishop Creek drainage in order to protect resource values and address health and safety issues, in the face of increasing dispersed recreation in that area.

Recreation management
Scoping Start
06/16/2011
Comment Period
01/24/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Lesley Yen · lyen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.
Buttermilk ToiletDecision Signed Date: 06/07/2013 Legal Notice Date: 06/11/2013
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionLocated in the north half of Township 7 South, Range 31 East, Section 21 immediately north of National Forest System Road 7S01.
Decision Memo · Mono Ranger District · updated 3/27/2013
Sagehen Summit, south of SR 120 East · Mono, California

Jeffrey pines are encroaching into otherwise suitable sage-grouse habitat, creating perches for raptors which dissuades use by grouse. Jeffrey pines would be felled and limbed using chain-saws and allowed to decay naturally on site.

Wildlife, fish, rare plants
Scoping Start
04/12/2011
Comment Period
09/18/2012
Decision
03/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Richard Perloff · rperloff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Sagehen Summit Sage-Grouse Habitat Enhancement ProjectDecision Signed Date: 03/26/2013
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT1S, R28E, Sections 2, 3, and 10
Environmental Assessment · Mammoth Ranger District · updated 3/20/2013
Sherwin Creek Road, Mammoth Creek Road, Hwy. 203 and Scenic Loop Road areas surrounding the Mammoth Lakes community. · Mono, California

The proposed action is to use three types of treatment methods, singly or in combination, to reduce hazardous fuels such as brush and trees in the Sherwin Creek, Mammoth Creek and Mammoth Scenic Loop areas surrounding the Mammoth Lakes community.

Fuels management
Scoping Start
11/23/2009
Decision
03/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Sue Farley · sfarley@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionTownship 3 south and 4 south, Range 28 East
Decision Memo · White Mountain Ranger District · updated 12/27/2012
Mono County, Inyo NF, California. Sand Canyon within Birch Creek, just upstream from Witcher Flat. About 2 miles NW of Swall Meadow. · Mono, California

This project will improve mountain yellow-legged frog habitat by increasing current breeding pond area. This will be accomplished by removing sediment from the margins of the pond that was deposited as a result of the Birch Fire.

Wildlife, fish, rare plants
Scoping Start
06/28/2012
Comment Period
06/28/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Lisa Sims · lsims@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Birch Creek Mountain Yellow-legged Frog Habitat RestorationDecision Signed Date: 08/14/2012
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT5S, R30E, SW1/4 of NW1/4 section 10
Decision Memo · Mammoth Ranger District · updated 12/14/2012
Trails are generally located between the towns of Mammoth Lakes and June Lake, and east to Bald Mountain. · Mono, California

The proposal is to groom approximately 100 miles of snowmbile trails on the Inyo National Forest using funding from the California Department of Parks and Recreation.

Recreation management
Scoping Start
11/10/2012
Comment Period
11/10/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Erin Noesser · elnoesser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Over-Snow Grooming Vehicle Trail Grooming Decision MemoDecision Signed Date: 12/12/2012
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District
Decision Memo · Mount Whitney Ranger District · updated 11/7/2012
Big Pine Volcanic Field, east of Hwy 395 · Inyo, California

Process a proposal to extract 120 tons of cinders for sampling from the Tinemaha Cinder Site

Recreation management
Scoping Start
08/23/2012
Comment Period
08/23/2012
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Margie DeRose · mbderose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Tinemaha Cinder siteDecision Signed Date: 10/09/2012 Legal Notice Date: 10/11/2012
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT11S, R35E, Section 5
Environmental Assessment · White Mountain Ranger District · updated 9/30/2012
Project area is 20 miles northwest of Bishop, CA, in the Hilton Creek analysis unit of the John Muir Wilderness. · Inyo, California

A trails management project to protect watershed conditions: install stream protection treatments at stream crossings; construct trail reroutes; reconstruct trail causeways; add trail stabilizing structures; reduce trail widths to Forest standard.

Watershed managementRecreation management
Scoping Start
08/23/2011
Comment Period
02/07/2012
Decision
07/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Jeff Novak · jnovak@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Watershed Improvements; Wilderness Management
Hilton Lakes and Hilton Creek Trail Project Decision Notice/FONSIDecision Signed Date: 07/18/2012 Legal Notice Date: 09/29/2012
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionSections 2, 11, 12, 13, 24, 25, 26, T.5S, R.29E. Sections 25, 36, T.5S, R291/2E. Sections 30, 31, T.5S, R.30E. Section 1, T.6S, R.291/2 E.
Environmental Assessment · Mammoth Ranger District · updated 9/21/2012
Mammoth Mountain Ski Area · Mono, California

Winter recreation projects are proposed to enhance winter recreation skiing and tubing activities.

Special use managementRecreation management
Scoping Start
05/17/2012
Comment Period
05/17/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Allison Jackson · ajackson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
DN and Finding of No Significant Impact Mammoth Mountain Winter Rec ProjectDecision Signed Date: 09/17/2012
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land Descriptionincludes portions of T3S, R26E, Section 26; T3S, R27E, Section 27, 28 and 30-34; T4S, R27E, Section 3-6 and 8; T4S, R26E, Section 1.
Truman Project Completed
Decision Memo · Mono Ranger District · updated 9/14/2012
Truman Meadows area · Mineral, Nevada

Process a Plan of Operations to drill 18 mineral exploration holes

Minerals and geology
Scoping Start
07/19/2012
Comment Period
07/19/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Margie DeRose · mbderose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT1N, R32E, Sections 1, 11, 12
Environmental Assessment · Mammoth Ranger District · updated 8/2/2012
The project is located in the Middle Fork San Joaquin River watershed, Madera County, California. Treatment areas are situated no farther than 0.3 mile from the paved road in Reds Meadow Valley. · Madera, California

Hazardous fuel treatment would remove wind-fallen trees on 150 acres outside of IRA, and 70 acres within IRA. A half mile of temporary roads would be constructed outside of IRA.

Fuels management
Scoping Start
04/16/2012
Objection Period Start
06/19/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Sue Farley · sfarley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
Reds Meadow Valley Wind-Fallen Tree Removal Hazardous Fuels ReductionDecision Signed Date: 08/02/2012
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionProposed treatment areas are located in portions of Sections 14, 23, 26 and 35 in Township 3 south, Range 26 east, and portions of Sections 2 and 11 in Township 4 south, Range 26 east.
Decision Memo · Mammoth Ranger District · updated 7/18/2012
Mammoth Mountain Ski Area, LLC Mammoth Lakes, CA 93546 · Mono, California

Mammoth Mountain Ski Area has proposed to construct three mountain bike trails to provide new terrain, recreation opportunities, better connectivity, and better separation between differently skilled riders within Mammoth Mountain Bike Park.

Special use managementRecreation management
Scoping Start
05/17/2012
Comment Period
05/17/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Allison Jackson · ajackson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Trail Management
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionMMSA permit area T3S, R26E, Section 26; T3S, R27E, Section 27, 28 and 30-34; T4S, R27E, Section 3-6 and 8; T4S, R26E, Section 1.
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Environmental Assessment · Mount Whitney Ranger District · updated 6/28/2012
Township 15 South, Range 34 East, Sections 35 and 36. Tent pads would be placed approximately 250 ft. east of the overflow parking lot and 200 ft. south of the Whitney Portal Road. · Inyo, California

Addition of up to 13 tent pads east of the overflow parking lot at Whitney Portal.

Recreation management
Scoping Start
02/02/2012
Comment Period
02/02/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Nicholas Ettema · nettema@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionTownship 15 South, Range 34 East, Sections 35 and 36
Environmental Assessment · Inyo National Forest All Units · updated 6/18/2012
Sierra Nevada bighorn sheep recovery area, within the Golden Trout, Hoover, John Muir, Owens River Headwaters, and South Sierra Wildernesses · Inyo; Mono, California

This project would authorize the CA Dept. of Fish and Game to land a helicopter when capturing Sierra Nevada bighorn sheep (endangered species) within wilderness areas for the purposes of monitoring and translocations.

Special area managementWildlife, fish, rare plants
Scoping Start
04/01/2011
Comment Period
10/11/2011
Decision
06/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Leeann Murphy · lbmurphy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Population Enhancements; Wilderness Management
Helicopter Landings by CDFG for capturing SNBS in wilderness areasDecision Signed Date: 06/11/2012 Legal Notice Date: 06/16/2012
ForestsInyo National Forest
DistrictsInyo National Forest All Units
Environmental Assessment · Mono Ranger District · updated 6/8/2012
June Mountain Ski Area · Mono, California

Veg mgt plan to determine desired future vegetation condition for the resort permit area. Conditions not meeting the yet to be determined desired conditions will create project opportunities to move the ski area towards the desired condition.

Special use managementWatershed managementVegetation management (other than forest products)Wildlife, fish, rare plantsRecreation managementForest productsFuels management
Scoping Start
12/16/2010
Objection Period Start
04/19/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Scott Kusumoto · skusumoto@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
June Mountain Ski Area Vegetation Management Planning ProjectDecision Signed Date: 06/08/2012
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionT2S, R26E, Sections 14,15, 22, 23, 25, 26, MDB&M
Environmental Assessment · Mammoth Ranger District · updated 5/23/2012
Southern Mono County along Casa Diablo Road to US 395 and Mill Creek Powerhouse Road · Mono, California

Installation of a new 593 mile underground fiber optic cable network between Barstow California and Carson City Nevada. Approximately 49 miles of the cable network cross the Inyo National Forest.

Special use management
Scoping Start
08/27/2011
Comment Period
08/27/2011
Decision
05/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Susan Joyce · sejoyce@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Notice and FONSI: Digital 395 Middle-Mile ProjectDecision Signed Date: 05/23/2012
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District; White Mountain Ranger District
Decision Memo · Mount Whitney Ranger District · updated 1/23/2012
The Mount Whitney Trail (#3404), from Whitney Portal to Trail Crest, and the Whitney Portal National Recreation Trail (#3501) from Whitney Portal to Lone Pine Campground. · Inyo, California

Repair and/or reconstruct trail tread, rock retaining walls, tread-retaining structures (check dams, rip-rap), and and water diversion structures (waterbars) on the Mt. Whitney Trail (#3404) and Whitney Portal National Recreation Trail (#3501).

Recreation management
Scoping Start
01/18/2012
Decision
01/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Marty Hornick · mhornick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Repair and Deferred Maintenance of the Mt. Whitney and Whitney Portal TrailDecision Signed Date: 01/20/2012
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionRange 34E, Township 15S, Sec 35, 36; Range 34 E, Township 16S, Sec 2, 3, 9, 10; Range 35 E, TownshipP 15S, Sec 29, 30, 31
Environmental Assessment · Inyo National Forest All Units · updated 9/28/2011
No captures in the Inyo NF are proposed as part of this project. The Inyo National Forest portion of the project has been cancelled. · Inyo, California

The study involves the capture and collaring of Sierra Nevada bighorn sheep in designated wilderness in Sequoia-Kings Canyon National Parks. The project no longer includes proposed captures on the Inyo National Forest and has been marked "cancelled"

Wildlife, fish, rare plants
Scoping Start
06/16/2010
Comment Period
06/21/2011
Decision
07/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Susan Joyce · sejoyce@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation215
Project ActivitySpecies Population Enhancements
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District; Mount Whitney Ranger District
Decision Memo · White Mountain Ranger District · updated 9/21/2011
Project area is located east of Lake Crowley, in the vicinity of Casa Diablo Mountain, northeast of Toms Place and Sunny Slopes. · Mono, California

From 1999 to 2009, approximately 50% of the 10,000 acre Casa Diablo Project area has been treated with prescribed fire in the Jeffrey pine understory. This project proposes maintenance prescribed burning on a 7-15 year rotation in the same area.

Fuels management
Scoping Start
01/18/2011
Decision
09/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Sue Farley · sfarley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Casa Diablo Maintenance Prescribed Burning ProjectDecision Signed Date: 09/09/2011
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionPortions of Sections 18-19, T. 4 south, R. 31 east; and portions of Sections 1-4, 9-16, 20-24, 26-29 & 34-35, T. 4 south, R. 30 east.
Environmental Assessment · Mono Ranger District · updated 8/15/2011
Areas surrounding the community of June Lake, California, and other developed areas within the June Lake Loop. · Mono, California

Inyo NF proposes hazardous fuels reduction work on 4578 acres within WUI defense and threat zones in June Lake Loop. Treatments include tree thinning, shrub cutting or mowing, prescribed fire, conifer removal from aspen, and slash pile burn or chip.

Fuels management
Scoping Start
12/17/2010
Objection Period Start
07/07/2011
Decision
08/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Sue Farley · sfarley@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
June Loop Hazardous Fuels Reduction ProjectDecision Signed Date: 08/15/2011
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionPortions of Sections 15-16, 20-23, 25-29 & 32-36, T. 1 south, R. 26 east; Portions of Sections 1-5, 8-17 & 20-22, T. 2 south, R. 26 east; Portions of Sections 6-7, T. 2 south, R. 27 east
Environmental Assessment · Mono Ranger District · updated 7/22/2011
Within the Mono Basin and along the northeastern slope of the Glass Mountains · Mono, California

Analysis of grazing allotments in the vicinity of Mono Lake including Mono Sand Flat, June Lake, Mono Mills and Dexter Allotments.

Wildlife, fish, rare plantsGrazing managementWatershed managementVegetation management (other than forest products)
Scoping Start
10/23/2010
Comment Period
10/23/2010
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
April Barron · abarron@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Grazing Authorizations; Species Habitat Improvements; Noxious Weed Treatments; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements
Mono Basin Grazing Allotments AnalysisDecision Signed Date: 07/20/2011
ForestsInyo National Forest
DistrictsMono Ranger District
Environmental Assessment · Mount Whitney Ranger District · updated 9/28/2010
Along Blackrock-Kern Trail near Jordan Hot Springs, Golden Trout Wilderness. · Tulare, California

Eradicate perennial pepperweed from the Jordan Hot Springs area and any other populations found during surveys of Blackrock-Kern and Wildrose Trails.

Vegetation management (other than forest products)
Scoping Start
04/16/2009
Comment Period
04/16/2009
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Sue Weis · sweis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
Perennial Pepperweed Eradication on Blackrock-Kern and Wildrose TrailsDecision Signed Date: 06/28/2010
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT19S R35E Sec. 33
Environmental Assessment · White Mountain Ranger District · updated 9/24/2010
White Mountains, White Mountain Ranger District · Esmeralda; Mono, California; Nevada

Analysis of grazing on allotments in the White Mountains including Davis Creek C&H, Indian Creek, Perry Aiken, and Trail Canyon Allotments.

Wildlife, fish, rare plantsVegetation management (other than forest products)Grazing managementWatershed management
Scoping Start
02/07/2009
Comment Period
06/24/2010
Decision
09/2010 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
Jennifer Ebert · jebert@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Rangeland Vegetation Improvements; Watershed Improvements
White Mountain Group Grazing Allotment AnalysisDecision Signed Date: 09/21/2010
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Environmental Assessment · White Mountain Ranger District · updated 9/8/2010
Public land near or adjacent to the residences and businesses of Aspen Springs, Crowley, and McGee Creek · Mono, California

Fire hazard reduction by removal of hazardous fuels around the communities of Aspen Springs, Crowley, McGee Creek, Sunny Slopes, & Tom's Place, CA.

Fuels management
Scoping Start
04/08/2009
Decision
08/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Heather Swartz · heswartz@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
DN and FONSI for the Crowley Communities Fuels Reduction ProjectDecision Signed Date: 08/16/2010
ForestsInyo National Forest
DistrictsMammoth Ranger District; White Mountain Ranger District
Legal Land DescriptionT4S, R30E, Sec. 33, 32, 29, & 28; T5S, R30E, Sec. 5 & 6; T4S, R29E, Sec. 35, 34, & 28
Environmental Assessment · Mammoth Ranger District · updated 9/1/2010
Near Mill City Tract, Old Mammoth area · Mono, California

Hazardous fuels reduction in the Old Mammoth and Mill City area. Combination of understory thinning, mastication of trees and brush, piling of project-generated slash, and pile burning on approximately 125 acres within WUI defense zone.

Fuels management
Scoping Start
12/27/2007
Objection Period Start
01/22/2008
Decision
02/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Scott Kusumoto · skusumoto@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (10)
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Mill City Fuels Reduction ProjectDecision Signed Date: 02/28/2008
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionT.4S, R.27E, S.4, 9, 10
Environmental Assessment · Mount Whitney Ranger District · updated 2/18/2010
Whitney Portal west of Lone Pine. · Inyo, California

Reduce hazardous fuels in and around homes and businesses in the Whitney Portal area.

Fuels management
Scoping Start
09/18/2008
Objection Period Start
01/07/2010
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Heather Swartz · heswartz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (10)
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
Portal Fuels Reduction ProjectDecision Signed Date: 02/18/2010
ForestsInyo National Forest
DistrictsMount Whitney Ranger District
Legal Land DescriptionT.15S, R.34E, S.25, 35, 36
Environmental Impact Statement · Inyo National Forest All Units · updated 11/20/2009
John Muir and Ansel Adams Wildernesses · Fresno; Inyo; Madera; Mono, California

The project will analyze the proposed commercial use by pack stations in the two wilderness areas. A wilderness Trail Management Plan will also be a part of the analysis

Special use managementRecreation management
NOI in Federal Register
06/15/2004
DEIS NOA in Federal Register
04/15/2005
FEIS NOA in Federal Register
12/30/2005
Decision
11/2005 (Estimated)
Implementation
06/2006 (Estimated)
Project documents
MaryBeth Hennessy · mhennessy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Wilderness Management
Trail and Commercial Pack Stock Management in the Ansel Adams and John Muir WildernessesDecision Signed Date: 11/10/2005 Legal Notice Date: 12/27/2005
ForestsInyo National Forest; Sierra National Forest
DistrictsMono Ranger District; Mammoth Ranger District; White Mountain Ranger District; Mount Whitney Ranger District; Bass Lake Ranger District; High Sierra Ranger District
Environmental Assessment · Mammoth Ranger District · updated 8/11/2009
Grazing Allotments around Long Valley including Alpers Cyn, Antelope, Casa Diablo, Clark Cyn, Clover Patch, Hot Crk, Long Vly, McGee, Rock Crk, Tobacco Flt, Turner, Watterson Cyn, and Wilfred Crk · Mono, California

Analysis of grazing on allotments in the Crowley Lake Area including the Alpers Canyon, Antelope, Casa Diablo, Clark Canyon, Clover Patch, Hot Crk, Long Valley, McGee, Rock Crk, Tobacco Flat, Turner, and Watterson Allotments.

Wildlife, fish, rare plantsVegetation management (other than forest products)Grazing managementWatershed management
Scoping Start
06/28/2007
Comment Period
04/02/2009
Decision
07/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
Jennifer Ebert · jebert@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Grazing Authorizations; Species Habitat Improvements; Noxious Weed Treatments; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements
Crowley Lake Watershed Grazing Allotment Analysis EADecision Signed Date: 07/20/2009 Legal Notice Date: 07/23/2009
ForestsInyo National Forest
DistrictsMono Ranger District; Mammoth Ranger District; White Mountain Ranger District
Environmental Assessment · White Mountain Ranger District · updated 6/29/2009
Furnace Creek road is located 3 miles south of Dyer, Nevada on the disputed California/Nevada Stateline. · Mono, California

Joint Forest Service and BLM Assessment of the Furnace Creek Road to determine if riparian values are being affected and what measures are necessary to protect the riparian area.

Recreation managementRoad management
Scoping Start
08/01/2003
Comment Period
01/18/2005
Project documents
Margaret Wood · mwood@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsInyo National Forest
DistrictsWhite Mountain Ranger District
Legal Land DescriptionT 4 S, R 36 E, Sections 37, 17, 21, 28, 33, & 32 this is an area of disputed stateline with several section corrections. T 5 S, R 36 E Sections 4, 5, & 6, T 5 S, R 35 E, Section 1
Ski Back Trail Completed
Environmental Assessment · Mammoth Ranger District · updated 3/17/2009
June Lakes, California · Mono, California

Construction of a ski trail from the Mammoth Mountain Ski Area, paralleling SR 203, to the North Village Development

Special use management
Scoping Start
09/09/2007
Comment Period
10/29/2007
Decision
01/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
Jonathan Fisher · jcfisher@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Maintenance; Scenery Management
Mammoth Mountain Ski Area Ski Back TrailDecision Signed Date: 01/21/2009 Legal Notice Date: 01/22/2009
ForestsInyo National Forest
DistrictsMammoth Ranger District
Legal Land DescriptionR 26 E, T 3 S, Sec. 33, 28, and 27
Mono Lake Trail Completed
Environmental Assessment · Mono Ranger District · updated 6/27/2008
North of Mono Basin National Forest Scenic Area Visitor Center to Old Marina site along S/W shore of Mono Lake · Mono, California

The construction of a recreation trail that connects the Mono Basin National Forest Scenic Area Visitor Center to the Old Marina site adjacent to Mono Lake. Implementation pending grant approval

Road managementRecreation managementHeritage resource management
Scoping Start
02/17/2006
Comment Period
08/28/2007
Decision
03/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Jon Kazmierski · jkazmierski@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Developed Site Management; Facility Improvements/Construction; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Heritage Resource Management; Trail Management; Special Area Management; Scenery Management; Travel Management
Mono Basin National Forest Scenic Area Vistor Center TrailDecision Signed Date: 03/27/2008 Legal Notice Date: 03/27/2008
ForestsInyo National Forest
DistrictsMono Ranger District
Legal Land DescriptionSections 4,5, &9, T1N, R26E
Environmental Impact Statement · R5 - Pacific Southwest Region All Units · updated 12/28/2007
Along Sierra Nevada chain from Oregon/California border to south of Lake Isabella as well as lands in western Nevada · Douglas; Esmeralda; Mineral; Alpine; Amador; Butte; Calaveras; El Dorado; Fresno; Inyo; Kern; Lassen; Madera; Mariposa; Modoc; Mono; Nevada; Placer; Plumas; Shasta; Sierra; Siskiyou; Tulare; Tuolumne; Yuba, California; Nevada

Amend Land and Resource Management Plans for ten (10) Forests within the Sierra Nevada region by modifying Management Indicator Species (MIS) lists and associated monitoring strategies.

Wildlife, fish, rare plantsLand management planning
NOI in Federal Register
04/30/2007
DEIS NOA in Federal Register
07/13/2007
FEIS NOA in Federal Register
12/28/2007
Decision
12/2007 (Estimated)
Implementation
01/2008 (Estimated)
Project documents
Diana Craig · dcraig01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityPlan Amendment
Sierra Nevada Forests Management Indicator Species AmendmentDecision Signed Date: 12/14/2007 Legal Notice Date: 12/21/2007
ForestsEldorado National Forest; Inyo National Forest; Lassen National Forest; Modoc National Forest; Plumas National Forest; Sequoia National Forest; Sierra National Forest; Stanislaus National Forest; Tahoe National Forest; Lake Tahoe Basin Mgt Unit
DistrictsEldorado National Forest All Units; Inyo National Forest All Units; Lassen National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Sierra National Forest All Units; Stanislaus National Forest All Units; Tahoe National Forest All Units; Lake Tahoe Basin Mgt Unit
Detail fetch failed: 404 Client Error for https://www.fs.usda.gov/r05/inyo/projects/56520
Inyo National Forest All Units

Multi year study from the Young Lab in wilderness locations, @ Golden Lake, No Name Lake, Fifth & Six Lake on WMRD, and heart Lake, Bench Lake, Matlock Lake and Flower Lake on MWRD;includes various temporary installations and collections.

Special use management