Sierra National Forest — Project Detail

233 projects with crawled detail · milestones · contacts · documents

Sierra National Forest

R05 Pacific Southwest · 233 projects · crawled 2026-08-01
Completed 183 Cancelled 50
Decision Memo 159 Environmental Assessment 58 Environmental Impact Statement 13 Categorical Exclusion 3
228 with documents 100 with comments page
Categorical Exclusion · HIGH SIERRA RANGER DISTRICT · updated 5/1/2026 · decision 5/2023 (Estimated)
In and around McKinley Grove · Madera, California

The project is designed to reduce the threat of wildfire to the McKinley Grove of giant sequoias.

Fuels managementVegetation management (other than forest products)
NEPA Start Date
11/8/2022
Finding/Decision Date
John Polisar · john.polisar@usda.gov
NEPA / regulatory detail
Categorical ExclusionSection 605 of HFRA (16 U.S.C.6591d)
Categorical Exclusion · BASS LAKE RANGER DISTRICT · updated 5/1/2026 · decision 5/2024 (Estimated)
NE of Bass Lake, in N Fork Willow Creek watershed, sub-watershed of Upper San Joaquin River Basin, surrounds Central Camp, includes Gaggs and Whisker's campgrounds · Fresno, California

Fuel reduction, forest restoration, increase forest resilience and resistance to drought and inserts, and reduce likelihood of uncharacteristic severe wildfire

Fuels managementVegetation management (other than forest products)
NEPA Start Date
11/29/2023
Finding/Decision Date
John Polisar · john.polisar@usda.gov
NEPA / regulatory detail
Categorical ExclusionSection 605 of HFRA (16 U.S.C.6591d)
Categorical Exclusion · Sierra National Forest · updated 5/1/2026 · decision 5/2024 (Estimated)
East of Huntington Lake between the Kaiser and Dinkey Lake Wildernesses · Fresno, California

The propsed action would help the project area to be more resilient to future drought, restore and preserve wildlife habitat to persist and to reduce the likelihood of uncharacteristic wildfire with all the associated damage that causes to resources.

Forest productsFuels managementVegetation management (other than forest products)
NEPA Start Date
12/1/2023
Finding/Decision Date
John Polisar · john.polisar@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-47d-USFS
Decision Memo · Sierra National Forest All Units · updated 12/3/2025
east of Nelder Grove and west of Sierra Vista South Restoration Project including Fresno Dome and Kelty Meadow campgrounds · Madera, California

help these project areas to be more resilient to drought, restore and preserve wildlife habitat to persist and to reduce the likelihood of uncharacteristic wildfire

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
12/01/2023
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
James Simmons · james.m.simmons@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 6/6/2025
From Prather CA 22 miles east on CA-168, left on Huntington Lake Rd - 7.1 miles, right on Big Creek Rd - 1.5 miles, left onto Stump Springs Rd - 12.83 miles to arrive at site · Fresno, California

Repair 21 short sections of washed out road. The largest section needing repair is l40 ft wide, 150 ft long, and in some sections 40 ft high. Address and repair the 20 other shorter sections also requiring attention.

Road management
Scoping Start
03/11/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
John Polisar · john.polisar@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ERFO-7S05 Road Repairs MP 12.83 - Stump Springs RoadDecision Signed Date: 06/05/2025
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 5/28/2025
Along the Wishon Reservoir along the eastern border partially in wilderness. · Fresno, California

Forest Plan amendment to commit to Conservation Covenant for the Wishon land donation from PG&E.

Land management planning
Scoping Start
01/05/2024
Comment Period
05/31/2024
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionAPN 133-190-01U
Decision Memo · Bass Lake Ranger District · updated 4/17/2025
It is located along the front country bordering WUI area of Ponderosa Basin that has a very high density of private property and infrastructure. Along west and south sides of Ponderosa Basin community · Mariposa, California

The proposed action is to establish, re-establish and maintain 368 acres of a historically used Roundtree Fuelbreak that originated as firelines from past wildfires in the area. This project is in Cooperation with local Cal Fire MMU Unit.

Fuels management
Scoping Start
07/01/2024
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Burt Stalter · burt.stalter@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Roundtree Fuelbreak ProjectDecision Signed Date: 04/17/2025
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship(s): T5 &6 S, Range(s): R20&21E, Section(s): T5S (11,24,23,26 (T6S) 1,6
Decision Memo · Sierra National Forest All Units · updated 10/31/2024
Teakettle Experimental Forest · Fresno, California

prescribe burn approximately 3,800 acres, construct approximately 5 miles of fire control lines, and remove overhead hazards along approximately 16 miles of road

Fuels management
Scoping Start
07/11/2023
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Laura Hierholzer · laura.hierholzer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 7/16/2024
Sierra National Forest lands outside of wilderness · Fresno; Madera; Mariposa, California

We had proposed to use prescribed fire (underburning and pile burning), up to 10,000 acres per year, to address fuel conditions throughout the Sierra National Forest.

Fuels management
Scoping Start
05/14/2018
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 6/24/2024
See #15 · Madera, California

This project has been cancelled. This project is not going forward.

Fuels managementVegetation management (other than forest products)
Scoping Start
05/13/2014
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Burt Stalter · burt.stalter@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT6S, R21E, Sec 2-4,9-16
Decision Memo · Sierra National Forest All Units · updated 6/24/2024
Upper Big Creek and South Form Willow Creeks watersheds · Fresno; Madera, California

Project has been cancelled. Project is not going forward.

Watershed managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
03/04/2016
Decision
08/2018 (Estimated)
Implementation
05/2019 (Estimated)
Kellen Takenaka · kellen.takenaka@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 6/20/2024
up to 300 feet along maintenance level 2, 3 and 4 roads throughout the forest · Fresno; Madera; Mariposa, California

Abatement of hazardous trees along roadsides.

Road management
Scoping Start
05/18/2020
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 6/20/2024
SR 140 from 5.1 kilometers (3.2 miles) east of Briceburg to approximately 9.7 kilometers (6.0 miles) west of El Portal · Mariposa, California

This project has been cancelled.

Road managementSpecial use management
Scoping Start
01/01/2015
Comment Period
06/04/2015
Decision
02/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · High Sierra Ranger District · updated 12/18/2023
Near Swanson Meadow, south of Dinkey Creek Road to the Bretz development on private lands. · Fresno, California

Proposed action is extending Bretz Road by widening and paving 1.3-mile section of currently native surface USFS 10S01 from easterly boundary Tract 5276 (Quartz Mountain) to Dinkey Creek Road

Road managementSpecial use management
Scoping Start
03/01/2017
Comment Period
10/23/2023
Objection Period Start
10/23/2023
Decision
12/2023 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
John Polisar · John.Polisar@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
Decision Notice Bretz Road Extension 10S01 December 12,2023Decision Signed Date: 12/12/2023
Bretz Road Extension 10S01 DecisionDecision Signed Date: 12/12/2023
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 11/30/2023
Project area is within confines of the Sierra National Forest, bound by the Kings River to south, Merced River and Yosemite National Park to north, west of Ansel Adams and John Muir Wilderness areas. · Fresno; Madera; Mariposa, California

Adding four additional routes and one concentrated use area in the Sierra National Forest Transportation System.

Road managementRecreation management
Scoping Start
05/17/2019
Comment Period
06/26/2022
Objection Period Start
08/16/2022
Decision
10/2023 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Trail Management; Road Maintenance
Motorized Recreation Project - Additional Five Routes - Decision NoticeDecision Signed Date: 10/30/2023
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Bass Lake Ranger District · updated 11/3/2023
a subsection of the popular and highly traveled Sierra Scenic Byway including the spur roads to nearby recreation facilities and trailheads. · Madera, California

This project reduces hazard trees along the Granite Creek units analyzed in the Sierra Scenic Byway EA to address health and safety of the public, employees and firefighters as well as reducing fuel loading along entry and exit routes.

Forest productsRoad management
Scoping Start
10/28/2021
Comment Period
01/16/2022
Objection Period Start
03/11/2022
Decision
10/2023 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
John Polisar · John.Polisar@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance; Timber Sales (Green)
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Bass Lake Ranger District · updated 10/20/2023
The nearest Project area, Port Nor, is 21 miles from Bass Lake; 30 miles from Oakhurst and 28 miles from the south entrance of Yosemite. · Madera, California

Removal of hazard trees (and associated slash clean up) along the Sierra Vista Scenic Byway and associated roads allowing recreation site access.

Fuels managementRoad management
Scoping Start
10/28/2021
Comment Period
01/16/2022
Objection Period Start
03/11/2022
Decision
08/2022 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Road Maintenance
Sierra Scenic Byway Roadside Hazard Abatement ProjectDecision Signed Date: 08/05/2022
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Dinkey South Completed
Environmental Assessment · High Sierra Ranger District · updated 10/19/2023
The project is located on the Sierra National Forest near the city of Fresno, CA. The project is in mountanous terrain. · Fresno, California

Implement vegetative treatments- thinning timber stands, underburning, and reforestation - consistent with "An Ecosystem Management Strategy for Southern Sierran Mixed-Conifer Forests", authored by North, Stine,O'Hara, Zielinski, and Stephens.

Wildlife, fish, rare plantsForest productsFuels management
Scoping Start
10/22/2009
Objection Period Start
08/07/2010
Decision
10/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Ray Porter · rporter@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Timber Sales (Green)
Dineky South Restoration ProjectDecision Signed Date: 10/12/2010
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT.10S. R.26E. section 16,17,19,20,21,22,28,29.
Environmental Assessment · Sierra National Forest All Units · updated 7/10/2023
This project area is within the Creek Fire footprint. It excludes the portions of the fire footprint within inventoried roadless areas and designated wilderness. · Fresno; Madera, California

Various activities within Creek Fire area to restore wildlife habitat, reestablish forested conditions, reduce hazardous fuels and minimize the risk of fire, address risks to public safety, and eradicate non-native invasive species.

Forest productsClimate change adaptationWatershed managementCarbon stewardshipFuels managementHeritage resource managementGrazing managementVegetation management (other than forest products)
Scoping Start
01/06/2022
Comment Period
08/22/2022
Objection Period Start
12/29/2022
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Heritage Resource Management; Noxious Weed Treatments; Grazing Structural Improvements; Timber Sales (Salvage); Watershed Improvements
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · R5 - Pacific Southwest Region All Units · updated 6/16/2023
Certain national forest roads, trails and facilities within recent fire areas. · Butte; Colusa; Del Norte; Fresno; Glenn; Humboldt; Inyo; Kern; Lake; Lassen; Madera; Mendocino; Mono; Plumas; Shasta; Siskiyou; Tehama; Trinity; Tulare, California

Hazard tree felling and removal is proposed to reduce public safety hazards along portions of certain roads, trails and facilities within nine national forests. We expect to complete three zone-level analyses and nine decisions.

Recreation managementFuels managementRoad management
Scoping Start
10/25/2021
Comment Period
04/11/2022
Objection Period Start
10/26/2022
Decision
06/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
Laura Hierholzer · laura.hierholzer@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Trail Management; Road Maintenance
R5HT Final DN Six RiversDecision Signed Date: 06/15/2023
R5HT Final DN KlamathDecision Signed Date: 06/07/2023
R5HT Final DN MendocinoDecision Signed Date: 06/12/2023
R5HT Final DN Shasta-TrinityDecision Signed Date: 06/13/2023
R5HT Final DN PlumasDecision Signed Date: 12/19/2022
R5HT Final DN LassenDecision Signed Date: 12/19/2022
R5HT Final DN SequoiaDecision Signed Date: 01/17/2023
R5HT Final DN InyoDecision Signed Date: 01/17/2023
ForestsInyo National Forest; Klamath National Forest; Lassen National Forest; Mendocino National Forest; Six Rivers National Forest; Plumas National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest
DistrictsInyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Mendocino National Forest All Units; Six Rivers National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 6/8/2023
Nelder Grove near Oakhurst on Bass Lake Ranger District and McKinley Grove near Dinkey Creek Campground on the High Sierra Ranger District · Fresno; Madera, California

Removal of hazardous fuels to project giant sequoia groves from the threat of uncharacteristic wildfire

Fuels management
Scoping Start
09/30/2022
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Sierra National Forest All Units · updated 5/30/2023
Entire Sequoia National Forest outside of the Giant Sequoia National Monument and entire Sierra National Forest. · Fresno; Kern; Kings; Tulare, California

The Sequoia and Sierra National Forests propose to revise their land management plans as guided by the 2012 Planning Rule

Land management planning
NOI in Federal Register
08/29/2014
DEIS NOA in Federal Register
06/27/2019
FEIS NOA in Federal Register
05/26/2023
Objection Period Start
06/14/2022
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Bobbie Miller · bobbie.miller@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Creation/Revision
Sequoia National Forest Land Management PlanDecision Signed Date: 05/15/2023 (In Appeal Period) Legal Notice Date: 05/26/2023
Sierra National Forest Land Management PlanDecision Signed Date: 05/16/2023 (In Appeal Period) Legal Notice Date: 05/26/2023
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 3/31/2023
Gold Arrow Camp, west end near Mirimichi portion. Huntington Lake, Fresno County, CA. · Fresno, California

Gold Arrow Camp proposing to drill a water well and install water tank and waterlines within the permitted area.

Special use management
Scoping Start
12/14/2018
Decision
07/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Elaine Locke · elaine.locke@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 3/31/2023
Sample Meadow Campground on High Sierra Ranger District on FS Road 7S05. · Fresno, California

Two CXT restroom buildings (each 72sqft) to be relocated from Eastwood VIS to Sample Meadow Campground in same footprint of old pit toilet locations. Cement vaults (appr. 700-1000gal)will be installed in ground.

Recreation management
Scoping Start
09/20/2019
Decision
09/2022 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Elaine Locke · elaine.locke@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 3/30/2023
11 air miles east southeast of the town of Shaver Lake · Fresno, California

The proposed action is designed to promote a dynamically functioning ecological condition throughout the meadow

Watershed management
Scoping Start
06/16/2022
Decision
12/2022 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Stephanie Barnes · stephanie.barnes1@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Decision Memo Exchequer Meadow Restoration ProjectDecision Signed Date: 12/07/2022
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land Description37.07211 latitude, and -119.11723 longitude
Environmental Assessment · Sierra National Forest All Units · updated 1/27/2023
Sierra National Forest, specific routes across the forest (outside of Wilderness). · Fresno; Madera; Mariposa, California

The SNF has committed to the motorized recreation community to examine routes, not previously analyzed and decided, for potential addition to the FS System of roads, OHV areas, and motorized trails.

Recreation managementWildlife, fish, rare plantsWatershed management
Scoping Start
05/17/2019
Comment Period
06/26/2022
Objection Period Start
08/16/2022
Decision
12/2022 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Jody Nickerson-Powell · jody.nickerson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 9/26/2022
Musick Mountain and Mammoth Pool · Fresno; Madera, California

PG&E has submitted a proposal to install new weather stations on Musick Mountain and at the Mammoth Pool Communications Site.

Special use management
Scoping Start
10/19/2021
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Kimberley Sorini wilson · kim.sorini@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 8/30/2022
Musick Mountain and Mammoth Pool areas · Fresno; Madera, California

Installation of two 25 - 30 feet tall poles to support solar powered weather stations on Musick Mountain and Mammoth Pool to allow PGE to monitor weather conditions to manage their facilities to prevent fire.

Special use managementClimate change adaptationFuels management
Scoping Start
08/30/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Hydropower; Special Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 6/30/2022
Huntington Lake, CA · Fresno, California

The Huntington Recovery Project will be reducing fuel levels post Creek fire while recovering value in the trees that are dead in the Huntington Basin from the fire, providing for public safety and restoring a fire damaged area

Fuels managementForest products
Scoping Start
09/20/2021
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Olivia Roe · olivia.roe@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R25E, Section 10-16.
Decision Memo · High Sierra Ranger District · updated 6/30/2022
adjacent to the communities of Shaver Lake, Jose Basin and Pine Ridge, California, and to the east of the San Joaquin River · Fresno, California

This project will reduce fuel loading through site prep; maintain fuel breaks and reforest up to 2,975 acres.

Carbon stewardshipFuels managementVegetation management (other than forest products)
Scoping Start
03/25/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11); 32.3 (9); 32.3(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · High Sierra Ranger District · updated 6/28/2022
The Aspen Project area is approximately 22,350 acres and is bounded by the San Joaquin River, West; Kaiser Wilderness, East; Road 6S02, North; and Ordinance Creek, South. · Fresno, California

The purpose of the project is to capture the economic value and benefit of the forest products, and reforest the landscape deforested by the Aspen Fire.

Vegetation management (other than forest products)Forest productsFuels management
Scoping Start
09/04/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Ramiro Rojas · rrojas@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Salvage)
Alternative 2 of the Aspen Recovery and Reforestation Project EADecision Signed Date: 06/27/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land Descriptionall or portions of: Township 6 South, Range 24 East; T7S, R24E; T8S, R24E; T6S, R25E; and T7S, R25E ; Mount Diablo Base Meridian.
Environmental Assessment · High Sierra Ranger District · updated 6/28/2022
Project is located in Fresno County, south and east of Shaver lake, CA. The project area is approximately 15,000 acres. · Fresno, California

Implement restoration treatments collaboratively to reduce hazardous fuels, retain and promote large tree and denning/nesting structures, promote stand/landscape heterogeneity, and provide for natural regeneration of shade intolerant tree species.

Road managementFuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsForest products
Scoping Start
09/14/2012
Comment Period
09/20/2013
Objection Period Start
06/27/2014
Decision
10/2014 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Keith Ballard · keballard@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218 (2013) HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements
Bald Mountain Project Alternative 2Decision Signed Date: 10/08/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionLegal description is T9S, R25E; T9S, R26E; T10S, R24E; T10S, R25E; and T10S, R26E; Mt. Diablo Base Meridian
Blue Rush Completed
Decision Memo · High Sierra Ranger District · updated 6/28/2022
Project is in the Blue Canyon area with main roads 10S02,10S18,10S17 and Peterson Mill Rd. Nearby communities include Shaver Lake, Ockenden, Pineridge, Cressmans, and Dinkey Creek · Fresno, California

This project will implement fuels reduction, improve forest health and increase public safety in response to high levels of mortality due to bark beetles. This project will include fuel breaks, density reduction and reforestation.

Fuels managementForest products
Scoping Start
01/08/2018
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Olivia Roe · ollyons@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2); 32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments
Blue Rush ProjectDecision Signed Date: 02/15/2018
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownship 10 south, Range 24 east, Sec.11-13,24;Township 10 south, range 25 east, sec.1-35;Township 11 south, Range 25 east, Sec.2-10 and 16; and Township 10 south, Range 26 east, Sec.7,18,19,29,30
Dinkey North Completed
Environmental Assessment · High Sierra Ranger District · updated 6/28/2022
The project is located on the Sierra National Forest near the city of Fresno, CA. The project is in mountanous terrain. · Fresno, California

Implement vegetative treatments- thinning timber stands, underburning, and reforestation - consistent with "An Ecosystem Management Strategy for Southern Sierran Mixed-Conifer Forests", authored by North, Stine,O'Hara, Zielinski, and Stephens.

Forest productsWildlife, fish, rare plantsFuels management
Scoping Start
10/22/2009
Objection Period Start
09/22/2010
Decision
11/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Ray Porter · rporter@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Timber Sales (Green)
Dinkey North Restoration ProjectDecision Signed Date: 11/23/2010
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT.10S. R.26E. section 7,8,17,18.
Environmental Assessment · High Sierra Ranger District · updated 6/28/2022
The Eastfork Restoration Project area is located in two separate management units. The Eastfork Unit is near Ahart Meadow and the Bear Ridge Unit is south of Nelson Mountain. · Fresno, California

Implement restoration treatments that are collaborately developed to achieve multiple goals; reduce hazardous fuels, retain and promote sensitive species habitat, and promote stand and landscape heterogeneity.

Vegetation management (other than forest products)Watershed managementForest productsFuels management
Scoping Start
07/01/2011
Objection Period Start
02/14/2012
Decision
04/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Keith Ballard · keballard@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
Decision Notice and FONSI Eastfork Restoration ProjectDecision Signed Date: 04/12/2012
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R27E, Sections 5, 7, 8, 17, 18, and 31-33; and T11S, R27E, Sections 4-6; Mt Diablo Baseline and Meridian.
Environmental Assessment · Bass Lake Ranger District · updated 6/28/2022
Includes the lands immediately north of Clearwater Creek, south of West Fork Chiquito Creek, east of Whisky Ridge, and west of the San Joaquin River · Madera, California

The project would remove roadside hazard trees, recover the economic value of fire-killed/ fire-damaged trees, re-establish forested conditions, manage fuel loads, and work towards eradication of invasive non-native weeds.

Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
10/30/2014
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Jody Nickerson · jnickerson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Salvage)
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 6 Range 24 Section 33; Township 7 Range 24 Sections 3-11, 14-22, 26-30, 32-35; Township 8 South Range 24 Sections 2-5, 8-11, 16, & 15, Mount Diablo Base Meridian.
Environmental Impact Statement · Bass Lake Ranger District · updated 6/28/2022
This proposed project is located in the upper Willow Creek watershed , north of Bass Lake, south of Fresno Dome, east of Nelder Grove,and west of Graham Mountain. · Madera, California

The purpose of the project will be to: Reduce fuel ladders and ground fuels in a wildland urban interface area, increase vigor and health of mixed conifer stands, restore key ecological watershed components, and restore wildlife structures/habitat.

Forest productsWildlife, fish, rare plantsFuels managementHeritage resource managementWatershed managementVegetation management (other than forest products)Recreation management
NOI in Federal Register
05/31/2011
DEIS NOA in Federal Register
12/16/2011
FEIS NOA in Federal Register
03/30/2012
Decision
03/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Burt Stalter · bstalter@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
Greys Mountain Ecological Restoration ProjectDecision Signed Date: 03/16/2012 Legal Notice Date: 03/31/2012
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionThe project is located in Madera County, Ca in T6S R22E Sec 13,14,15,16,21,22,23,24,25,26,27,28,29,32,33,34 and 35; T6S R23E Sec 18 & 19 and T7S R22E Sec 2&3. MDB &M
Environmental Impact Statement · Bass Lake Ranger District · updated 6/28/2022
Project centered around the community of Sugar Pine. Bounded west by Hwy. 41, east to Nelder Grove, north to approx FS road 6S07 and south to Calvin Crest Camp. · Mariposa, California

The purpose of the project will be to: Reduce fuel ladders and ground fuels in a wildland urban interface area, increase vigor and health of mixed conifer stands and reduce noxious weed populations.

Forest productsFuels managementVegetation management (other than forest products)
NOI in Federal Register
10/12/2007
DEIS NOA in Federal Register
07/17/2009
FEIS NOA in Federal Register
03/10/2010
Decision
02/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Denise Tolmie · dtolmie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Timber Sales (Green)
Record of Decision for the Sugar Pine Adaptive Management ProjectDecision Signed Date: 02/22/2010 Legal Notice Date: 03/10/2010
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT5S, R21E, Sec. 25,26,35,36; T6S, Sec. 1,2,11,12; T5S, R22E, Sec. 31; T6S, R22E, Sec. 5,6,7,8
Environmental Impact Statement · Bass Lake Ranger District · updated 6/28/2022
The project is within the Willow Creek watershed and is located east of the town of North Fork, California and is adjacent to the community of Cascadel Woods. · Madera, California

The project would implement a strategy for ecological restoration that emphasizes the ecological role of fire, changing climate conditions, sensitive wildlife habitat and the importance of forest structure heterogeneity and hydrologic function.

Watershed managementHeritage resource managementForest productsRoad managementWildlife, fish, rare plantsFuels managementVegetation management (other than forest products)Recreation management
NOI in Federal Register
04/13/2012
DEIS NOA in Federal Register
03/22/2013
FEIS NOA in Federal Register
05/28/2013
Decision
05/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Aimee Smith · asmith03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityBiomass; Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Scenery Management; Grazing Structural Improvements; Timber Sales (Green); Watershed Improvements
Whiskey Ridge Ecological Restoration Project Record of DecisionDecision Signed Date: 05/22/2013 Legal Notice Date: 05/31/2013
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 7 South and Township 8 South; Range 23 East and Range 24 East
Decision Memo · Bass Lake Ranger District · updated 1/16/2022
Roads listed within the Bass Lake Ranger District of the Sierra National Forest. · Madera, California

This is a project consists of hazard tree removal along sections of forest roads: 4S81, 4S81M, 6S66X, 6S539, and 7S35. This road system is the Scenic Byway and roads lead to recreation areas such as trail heads and campgrounds.

Road management
Scoping Start
10/2021 (Estimated)
Decision
04/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT6S R24E sec 20, 29, 30, and 31, T7S R24E sec 5, 6, 8, and 17
Decision Memo · Sierra National Forest All Units · updated 1/16/2022
The general location of the project is T4S R24E sec 25, 36, T4S R25E sec 31, 32, 33, T5S R24E sec 1 & 12, T5S R25E sec 5, 6, 7, 8, 17, 18, 19, 20, 30 · Madera, California

This is a project entailing hazard tree along the listed roads including sections of forest roads: 4S43, 4S60, 4S60A, 4S61, 4S81, 4S81B, 5S30, 5S33, 5S47, 5S47A, 5S53Y, 5S065, 5S84, and 5S84A.

Road management
Scoping Start
10/2021 (Estimated)
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Judith Tapia · judith.tapia@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Road Maintenance
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 12/31/2020
approximately 4 miles north of Big Creek, California, and south of Mammoth Pool Resevoir within the HSRD of the SNF · Madera; Mariposa, California

Removal of roadside hazard trees, recover the economic value of fire-killed/ fire-damaged trees (collectively hereafter, fire-affected), and re-establish forested conditions.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
12/15/2017
Decision
03/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
David Austin · daaustin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionThe legal description includes all or portions of: Township 6 South, Range 24 East; T7S, R24E; T8S, R24E; T6S, R25E; and T7S, R25E ; Mount Diablo Base Meridian.
Decision Memo · Bass Lake Ranger District · updated 12/1/2020
Miami Mountain Motorcycle recreation area. · Madera; Mariposa, California

Fuels reduction in the Miami Creek motorcycle recreation area.

Fuels management
Scoping Start
01/2015 (Estimated)
Decision
09/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Mark Smith · mssmith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Species Population Enhancements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT5S, R21E, Sections 26,34 and 35. T6S, R21E, Sections 2,3,4,5,8,9,10,11,12,13,14,15,16,17,22 and 23.
Decision Memo · Bass Lake Ranger District · updated 12/1/2020
Bass Lake Ranger District, near Cedar Valley private land · Madera, California

Reissue a Special Use Permit for a residential water supply line (12" or less pipeline), forless than 1 mile across Natioanl Forest System lands on the Bass Lake Ranger District of the Sierra National Forest

Special use management
Scoping Start
03/22/2011
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT 6 S, R 21 E Section 24 MDM
Decision Memo · High Sierra Ranger District · updated 10/17/2020
Adjacent to HWY 168 between Tamarack Subdivision and China Peak Resort. · Fresno, California

Underground 3 mile section of the Siphon 4kv circuit; remove tree attachments, old cable which is not accessible, and relocate adjacent to Hwy 168. Will upgrade to 12kv cable and equipment. Will eliminate costly repairs during the winter months.

Special use management
Scoping Start
12/04/2018
Decision
10/2020 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · High Sierra Ranger District · updated 9/24/2020
Sierra National Forest, High Sierra RD, adjacent to the communities of Shaver Lake, Big Creek, Jose Basin and Camp Sierra and east of the San Joaquin River. · Fresno, California

In response to the tree mortality, this project proposes activities within the communities to create areas of reduced fuels along roads and ridges. Proposes to increase the resilience of surviving conifer forests through thinning and Rx fire.

Fuels management
Scoping Start
07/01/2018
Comment Period
08/03/2018
Objection Period Start
05/11/2020
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Kimberley Sorini wilson · ksorini@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10,R23;T10,R24;T9,R23;T9,R24;T9,R23;T8,R24;T8,R25
Decision Memo · Sierra National Forest All Units · updated 6/30/2020
northwestern lobe of the Sierra National Forest in the Merced River Canyon and along Highway 140 · Mariposa, California

removal of hazardous dead, dying, and damaged trees in the Project area

Fuels managementRoad managementForest products
Scoping Start
04/15/2019
Decision
03/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionAll or portions of: Township 4 South, Range 21 E, section 36; T4S R21E, section 32; T5S, R20E, section 1; T5S, R21 E, sections 1, 4, 5, 6, 7, 8, 9. Mount Diablo Meridian
Environmental Assessment · Bass Lake Ranger District · updated 6/24/2020
Iron Telephone Gate, intersection of forest road 8S09 and forest road 7S07 · Madera, California

Installation of a double vault concrete toilet building at the Iron Telephone Gate located within the Whisky Ridge OHV riding area.

Recreation management
Scoping Start
11/08/2018
Comment Period
07/22/2019
Decision
02/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Theodore Webb · theodorehwebb@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT.7S./R 22E. Sec. 3 Quad Map number#4173 Shuteye Peak
Decision Memo · Bass Lake Ranger District · updated 3/23/2020
Goat Mountain Communications Site · Madera, California

Issue a Communications Use Lease to Ponderosa Telephone, AT&T, and Verizon Wireless to authorize existing communication facilities.

Special use management
Scoping Start
05/26/2016
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Bass Lake Ranger District · updated 3/10/2020
Project is within the County of Madera, California and is approximately 8 miles north of the town of Oakhurst, California · Madera, California

Reconstruction of a 2.1 acre site to develop parking/off loading, replace deterioating toilet, reduce maintenance costs and impacts to natural and cultural resources including soils and water quality.

Recreation management
Scoping Start
12/28/2009
Comment Period
07/22/2019
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Theodore Webb · theodorehwebb@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship: 5S, Range: 21E, Section: 14, 1/4 Sec: NE1/4
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Beasore Road (5S07) TS5S and TS6S, R22E, Sec15,10,3,2,35,26,25,23,24,13,14, Cold Springs Summit TS5S, R22E Sec 16 · Madera, California

Enhance and sustain winter recreation activities and OSV access by providing winter maintenance on Beasore Road (5S07)and Cold Springs parking area.

Recreation managementFacility managementRoad management
Scoping Start
12/05/2013
Decision
12/2014 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Linda McPhail · lmcphail01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Road Maintenance
Beasore Road and Cold Prings Summit OSV Winter MaintenanceDecision Signed Date: 12/22/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 12/10/2019
West side of Bass Lake Annex private property. Approximately 1.5 miles south of Bass Lake · Madera, California

Project will utilize a mastication machine to grind brush and small trees to create a fuel break around the Bass Lake Annex private property. Brush and trees will generally be 1-9 inches in diameter. Cut material will be mulched and left to decompose

Vegetation management (other than forest products)Fuels management
Scoping Start
05/18/2012
Comment Period
05/18/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Mike Nolen · mnolen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Bass Lake Annex MasticationDecision Signed Date: 09/27/2012 Legal Notice Date: 09/29/2012
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionT7S R22E S35, T6S R22E S2
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Bass Lake Ranger District on the Sierra National Forest · Madera; Mariposa, California

Decommission (remove) existing toilets, install new accessible toilet. Summerdale Campground will remove two 'double' toilets and replace with two double toilets. Fresno Dome Campground will remove one 'double' toilet and replace with a double toi

Recreation management
Scoping Start
04/01/2012
Comment Period
12/28/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Susan Burkindine · sburkindine@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction
DECISION MEMO BASS LAKE TOILET REPLACEMENT PROJECT A U.S. FOREST SERVICE (SUMMERDALE AND FRESNO DOME)Decision Signed Date: 04/15/2013 Legal Notice Date: 04/25/2013
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionSummerdale: Lat: 37.48967083, Long: -119.63230950; Fresno Dome: Lat: 37.45551374, Long: -119.54832340
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Big Creek Town, California · Madera, California

Big Creek School is proposing to install a new 400 foot section of buried 6-inch sewer line and 2 new manholes and tying in with an existing SCE system, located on Forest Service land within the FERC licensed boundary.

Special use management
Scoping Start
12/11/2015
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Big Creek School District New Buried Sewer LineDecision Signed Date: 12/17/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Camp Fresno Well Completed
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Near Camp Fresno. · Fresno, California

Camp Fresno needs another source for water and is proposing to drill a new well.

Special use management
Scoping Start
01/17/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Camp Fresno Well, Pipe Line, and Storage TankDecision Signed Date: 09/16/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R26E, Section 17
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
The Carmen Pasture is located approximately 5 miles south of Madera County Road 200 and the town of North Fork, California along Madera County Road 222 (Auberry Road). · Madera, California

This project proposes to issue new special use authorization, to reconstruct boundary fenceline damaged during the Corrine Fire and to burn brush and piles created during fire suppression activities.

Special use management
Scoping Start
03/09/2016
Decision
06/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Aimee Cox · aimeecox@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11); 32.2 (15)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 9S, Range 23E, SE 1/4 of Section 6
Environmental Assessment · High Sierra Ranger District · updated 12/10/2019
The project area (approximately 4800 acres) is located south of Huntington Lake and west of the China Peak Ski Area. · Fresno; Madera, California

This proposal would manage WUI to provide a higher level of safety from wildfire to residences and businesses and manage trees, vegetation, and fuel beds to improve resilience.

Vegetation management (other than forest products)Fuels management
Scoping Start
04/04/2012
Comment Period
01/19/2013
Decision
05/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Dineky Creek Recreation Residence Tract · Fresno, California

The cabin owner has applied to Ponderosa Telephone Company to add phone service to his cabin. A special use permit is required.

Special use management
Scoping Start
07/16/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
New Phone Service at Dinkey Creek #28Decision Signed Date: 08/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R26E, Section 8
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Dinkey Creek Tract · Fresno, California

Dinkey Creek Recreation Rsidence Tract currently has a spring fed domestic water system and would like to develop a more reliable water source.

Special use management
Scoping Start
02/26/2014
Decision
08/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Dinkey Creek Tract Well, New Tanks, and Permit RenewalDecision Signed Date: 08/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 12/10/2019
The Dorabelle Campground and Day-Use Picnic Area are located on the western shore of Shaver Lake · Fresno, California

specific construction activities associated with the removal, replacement, and/or rehabilitation of existing Dorabelle Campground and Day-Use Picnic Area facilities, including campsites, day-use picnic sites, parking areas, and restroom facilities

Recreation management
Scoping Start
01/01/2013
Comment Period
01/31/2013
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
Dorabelle Campground Rehabilitation ProjectDecision Signed Date: 04/04/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionSection 25, Township T9S, Range R24E
Environmental Assessment · High Sierra Ranger District · updated 12/10/2019
Shaver Lake area on the High Sierra Ranger District of the Sierra National Forest. · Fresno, California

Removal, replacement, and/or rehabilitation of existing picnic site facilities on 5 acres in the Shaver Lake area

Facility management
Scoping Start
09/11/2012
Comment Period
05/29/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Elaine Locke · elainenlocke@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionSection 25, Township 9 South, Range 24 East
Decision Memo · Sierra National Forest All Units · updated 12/10/2019
Duff Creek crossing on Road 10S17 approx. 1 mile east of Bretz Mill Campground for area 1 and Duff Creek crossing on Road 10S02 approximately 1.5 miles SE of Bretz Mill CG at Duff Creek CG for area 2. · Fresno, California

Replacement of two culverts one on Road 10S02 and the other culvert on Road 10S17 to allow safe passage for the western pond turtle, and provide additional habitat for trout.

Wildlife, fish, rare plants
Scoping Start
06/15/2014
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Elwood Raley · elwoodcraley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Watershed Improvements
Culvert Replacement at Duff Creek Crossings ProjectDecision Signed Date: 06/04/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionSW ¼ of the NW ¼ of Section 26, T10S/R25E, MDB&M for area 1 and SE ¼ of the NE ¼ of Section 34, T10S/R25E, MDB&M for area 2
Environmental Impact Statement · High Sierra Ranger District · updated 12/10/2019
Project is east of Camp Fresno and Dinkey Ranger Station, includes McKinley Grove, west of Buck Meadow Campground and Nelson Mt. The Project is entirely within the Dinkey Creek watershed. · Fresno, California

Implement restoration treatments collaboratively to reduce hazardous fuels, retain/promote large tree and denning/nest structures, promote stand/landscape heterogeneity, meadow restoration and aid natural regeneration of shade intolerant tree species

Heritage resource managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
NOI in Federal Register
03/20/2015
DEIS NOA in Federal Register
08/04/2017
FEIS NOA in Federal Register
03/04/2019
Objection Period Start
07/20/2018
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Elaine Locke · elainenlocke@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements
Exchequer Restoration Project Record of DecisionDecision Signed Date: 03/04/2019
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionPortions of: Township9S Range25E,T9S R26E, T10S R25E, T10S R26E, T10S R27E, T11S R26E, T11S R27E Mount Diablo Base Meridian
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Wishon Reservoir area. · Fresno, California

PG&E is proposing to remove dead and live hazard trees along their Haas Woodchuck 70 kilovolt transmission line. They experience outages every winter due to trees/limbs falling onto the line.

Special use management
Scoping Start
09/10/2012
Comment Period
07/19/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
PG&E Haas Woodchuck Power Line Hazard Tree Removal ProjectDecision Signed Date: 09/04/2013 Legal Notice Date: 11/01/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT11S, R27E, Sections 1, 2, 11, 12, 14, 16, 22, 23, 27
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Miami Mountain Communications Site. · Mariposa, California

To issue a special use permit (lease) to Horizon Tower for the existing Miami Mountain communications site previously owned and operated by California Sierra Tower Company. Work is administrative only. No ground disturbance will occur.

Special use management
Scoping Start
04/08/2013
Decision
04/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 6 South, Range 20 East, Section 11.
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Huntington Heliport near Huntington Lake, California · Fresno, California

Cut and remove hazard trees adjacent to Huntington Heliport for safety of Heliport use.

Forest products
Scoping Start
12/09/2014
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Keith Ballard · keballard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Timber Sales (Salvage); Timber Sales (Green)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8s, R26E, Section 7, Mt. Diablo Base Meridian
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Behind the Lakeview Cottages. · Fresno, California

Lakeview has applied to drill a new well, install pipe line, and install a storage tank.

Special use management
Scoping Start
08/29/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Lakeview Tract Well and Storage TankDecision Signed Date: 09/03/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 12/10/2019
Designated corridors · Fresno; Madera; Mariposa, California

Approve continued operation, maintenance and use of existing distribution and transmission power lines and infrastructure for PGE and Southern California Edison located within designated corridors on the Sierra National Forest.

Special use managementFacility management
Scoping Start
01/09/2018
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
Spencer Bleadorn · sbleadorn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Located off of Road 222. Lot is surrounded by large mature trees. Area heavily used for recreational purpose during peak season. · Madera, California

Demolition and removal of existing cabin located on FS land.

Land management planningRecreation management
Scoping Start
09/10/2013
Decision
01/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Mollie Clayton Removal Project Decision MemoDecision Signed Date: 01/12/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Fence Meadow Ridge/ Nutmeg Saddle. · Fresno, California

Fell, pile &burn drought/bug killed trees in plantation that pose risk of extreme fire behavior & escape of adjacent underburn. Adds additional underburn acres in 50 yr old plantation and adjacent to plantation. Proposes minimal additional fireline.

Vegetation management (other than forest products)Fuels management
Scoping Start
06/04/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Carolyn Ballard · cballard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNational Fire Plan - Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT11S, R25E, S.11-27; T11S R26E S. 7-8 & 17-18.
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Lower Deer Creek Tract at Huntington Lake. · Fresno, California

The Ponderosa Telephone Co. is proposing to reinforce their existing facilities in Lower Deer Creek Tract and provide for a new fiber optic cable to the cell site operated by Verizon on private land.

Special use management
Scoping Start
09/16/2014
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ponderosa Telephone - New Fiber to Verizon Site at Huntington CondosDecision Signed Date: 09/10/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Beasore Meadows area · Madera, California

Telephone system will consist of a fenced communications site including a pre-fab building, monopole, and solar panel system; 7,827 feet of buried fiber optic cable.

Special use management
Scoping Start
07/16/2015
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ponderosa Telephone Company New Telephone System for Beasore MeadowsDecision Signed Date: 10/25/2017
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Dowville Tract, Huntington Lake · Fresno, California

Originally part of project #35163. Ponderosa subscribers will benefit from DSL and high speed internet with the installation of this cabinet to support existing buried fiber optic and copper telephone service cables.

Special use management
Scoping Start
03/07/2011
Comment Period
08/01/2012
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
The Ponderosa Telephone Co., Dowville Electric Cabinet SiteDecision Signed Date: 07/10/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R25E, Section 16
Decision Memo · Sierra National Forest All Units · updated 12/10/2019
Project is within an existing telecommunication line right-of way that begins at Forest Road 7S23A and terminates at the Ponderosa Telephone facility at the Goat Mountain Communications Site. · Madera, California

To authorize The Ponderosa Telephone Co. to allow Sierra Telephone Company Inc. to install approximately 6,086 feet of new fiber optic cable into an existing Ponderosa conduit and a new in-ground pull box over the conduit.

Special use management
Scoping Start
06/24/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Sharon Dooley · sdooley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Conduit Space Lease and New Fiber Optic Cable to Goat Mt Comm SiteDecision Signed Date: 07/14/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT. 7S. R. 22 E., Sec. 28
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Bass Lake area · Madera, California

Ponderosa Telephone is proposing to replace some copper cable and place new fiber optic cable between Marina View and Bass Lake Annex to provide more reliable service and greater bandwidth.

Special use management
Scoping Start
04/22/2015
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ponderosa Telephone Fiber Optic Cable for Marina View to Bass Lake AnnexDecision Signed Date: 10/26/2017
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Throughout the Bass Lake Ranger District. Primarily along the western boundary. · Madera, California

To renew and consolidate Ponderosa Telephone Company's special use permits for existing telecommunications facilities into one master permit. No physial changes to the environment will occur. This action is administrative only.

Special use management
Scoping Start
03/19/2013
Comment Period
03/30/2013
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Henry Herrera · hherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Ponderosa Telephone Company Master Permit-BLRDDecision Signed Date: 08/26/2013 Legal Notice Date: 09/13/2013
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Camp Sierra recreation residence tract. · Fresno, California

Ponderosa subscribers will benefit from DSL and high speed internet with the installation of this cabinet to support existing buried fiber optic and copper telephone service cables.

Special use management
Scoping Start
02/03/2015
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The Ponderosa Telephone Co. Camp Sierra Electronic Cabinet SiteDecision Signed Date: 03/19/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Dinkey Creek Road, Summit Meadow Area · Fresno, California

Installation of 3,510 feet of buried copper cable to provide phone and internet services to private lands.

Special use management
Scoping Start
05/26/2016
Decision
01/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The Ponderosa Telephone Co. New Copper Cable Along 10S87Decision Signed Date: 01/13/2017
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Camp Sierra Recreation Residence Tract · Fresno, California

The cabin owner at Camp Sierra Recreation Residence Tract Lot 16 has applied to The Ponderosa Telephone Co. for new telecommunications services.

Special use management
Scoping Start
02/09/2015
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The Ponderosa Telephone Co. New Phone Service at Camp Sierra Lot #16Decision Signed Date: 03/19/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Huntington Lake Recreation Area · Fresno, California

Three cabin owners at Huntington Lake have requested new phone service, at Bear Creek #8 and Lower Line Creek #'s 2 and 3.

Special use management
Scoping Start
05/26/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ponderosa Telephone New Service Cable to Three Cabins at Huntington LakeDecision Signed Date: 09/12/2016
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 12/10/2019
within the footprint of the Railroad Fire · Madera; Mariposa, California

Hazard tree removal along road and within recreation facilities/along trails within the footprint of the Railroad fire.

Vegetation management (other than forest products)Road management
Scoping Start
12/15/2017
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Railroad Roadside Hazard ProjectDecision Signed Date: 09/10/2019
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Rancheria Enterprises Resort, Huntington Lake · Fresno, California

Rancheria Enterprises has been renting 2 cabins, 5 dry camp spots, and 6 RV spots on a trial basis, and are proposing to have these as permanent services and added to their special use permit.

Special use management
Scoping Start
03/14/2016
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sno-Rancheria, Inc. Addition of Rental Services Provided to the PublicDecision Signed Date: 05/05/2016
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
SCE powerhouse 3 compound at Redinger Lake. · Fresno, California

SCE needs to install a Mechanical Electrical Equipment Room (MEER) building to support its newly relocated 12 kV substation located near powerhouse #3.

Special use management
Scoping Start
02/26/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Big Creek 3 Mechanical Electrical Equipment RoomDecision Signed Date: 06/19/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 12/10/2019
Vegetation treatments along County Road M2440 (Dinkey Creek Road), McKinley Grove Road (Forest Service Road 11S40), and Dorabelle, Dinkey Creek, Gigantea, and Buck Meadow Campgrounds. · Fresno, California

Actions include felling and removing insect and disease infested trees along well traveled forest roads and selected campgrounds to reduce the risk of further insect and disease infestation within the project area and provide for public safety.

Forest productsVegetation management (other than forest products)Road management
Scoping Start
03/11/2016
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Keith Ballard · keballard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R24E, Sec. 25; T10S, R25E, Secs. 1-3, 11, 12; T10S, R26E, Secs. 5, 7, 8, 16-18, 20-22, 26, 27, 35, 36; T10S, R27E, Secs. 31, 32, 34-36; T11S, R26E, Secs. 1, 2; T11S, R27E, Secs. 1-6; MDBM
Decision Memo · Sierra National Forest All Units · updated 12/10/2019
at the Miami Mountain Communications Site. · Mariposa, California

Sierra Tel Business Systems has requested issuance of a communications use lease for the facility at Miami Mountain Communications Site previously owned by sister company, Sierra Telephone Company, Inc.

Special use management
Scoping Start
01/15/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Sharon Dooley · sdooley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Tel Business Systems Miami Mountain Communications Site LeaseDecision Signed Date: 08/10/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionSection 11, Township 6 South, Range 20 East Mount Diablo Meridian
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
South side of Bass Lake, between The Forks and Rocky Point. · Madera, California

This project involves the proposed installation of approximately 10,100 feet of buried conduit with fiber optic cable and empty conduit for future use from existing facilities on USFS Road 7S24.

Special use management
Scoping Start
08/13/2015
Decision
11/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone Company, Inc. Bass Lake New Fiber Optic CableDecision Signed Date: 11/21/2016
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT7S, R22E, Sections 22,23
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
East of Bass Lake within an existing Sierra Telephone line route along Road 434 and overland from the Cedar Ridge Subdivision boundary to Emerald Cove Camp. · Madera, California

Amend Sierra Telephone Company Inc.s master special use permit to authorize installation of new fiber optic cable to Emerald Cove Private Camp.

Special use management
Scoping Start
06/28/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone Company New Fiber Optic for Emerald Cove CampDecision Signed Date: 07/20/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionSec 15, T. 7 S., R. 22E
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
at the Jerseydale Workcenter · Mariposa, California

To issue an amendment to Sierra Telephone's telecommunication lines master special use permit authorizing replacement of failed copper telephone cable to the men's and women's barracks buildings.

Special use management
Scoping Start
08/03/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone - Cable Replacement at Jerseydale Work CenterDecision Signed Date: 09/10/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT. 4 S. R. 19 E. Sec. 35
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Throughout the Bass Lake Ranger District · Madera; Mariposa, California

To renew and consolidate Sierra Telephone Company's special use permits for existing telecommunications facilities into one master permit. No physial changes to the environment will occur. This action is administrative only.

Special use management
Scoping Start
03/15/2013
Comment Period
03/30/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Henry Herrera · hherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Sierra Telephone Company Master Permit-BLRDDecision Signed Date: 08/26/2013 Legal Notice Date: 08/26/2013
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Skylake Camp and Lupine Campground, Bass Lake Recreation Area · Madera, California

The objective is to replace overhead cable attached to trees between Skylake Camp and Lupin CG. This project involves the installation of underground facilities consisting of copper cable and 2 inch conduit using a combination of boring and trenching

Special use management
Scoping Start
05/26/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone Company Skylake Yosemite Camp Cable ReplacementDecision Signed Date: 09/09/2016
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Teaford Meadow Ranch area south of Bass Lake. · Madera, California

Sierra Telephone proposes to install 10,100 feet of buried conduits with a fiber cable to be placed in one of the conduits. The proposed route goes through USFS land, beginning at USFS Road 7S23 and continuing south to Teaford Meadows subdivision.

Special use management
Scoping Start
08/13/2015
Decision
11/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone Company, Inc. Teaford Meadow New Fiber Optic CableDecision Signed Date: 11/21/2016
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT7S, R22E, Sections 28, 32, 33; T8S, R22E, Section 5
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Forest Service Westfall Station · Mariposa, California

The placement of telephone equipment site including two above ground cabinets placed on top of underground vaults, a power meter and appurtenant facilities; 850' of buried conduit for copper and fiber optic cable.

Special use management
Scoping Start
07/16/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
New Fiber Optic Cable and Carrier Site at Westfall StationDecision Signed Date: 08/11/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · High Sierra Ranger District · updated 12/10/2019
The Soaproot Restoration Project area is located in two separate management units. The Soaproot Unit is located west of Barnes Mountain and the Providence 1 Unit is located below Grand Bluffs. · Fresno, California

Implement restoration treatments that are collaborately developed to achieve multiple goals: reduce hazardous fuels, retain and promote sensitive species habitat, and promote stand and landscape heterogeneity.

Forest productsFuels managementWatershed management
Scoping Start
06/11/2011
Objection Period Start
07/09/2012
Decision
09/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Keith Ballard · keballard@fs.fed.us
NEPA / regulatory detail
Special AuthorityNational Fire Plan - Healthy Forests Initiative Alternative Consultation Arrangements; Hfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R25E, Sections 9–11, 14–16, 21-23, and 29-33; and T11S, R25E, Sections 4-9; Mt Diablo Baseline and Meridian.
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Mammoth Pool Area · Madera, California

Renew Southern California Edison's permit and install a 1,000 gallon propane tank at the existing Mammoth Pool communication site.

Special use management
Scoping Start
03/14/2013
Comment Period
03/30/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Henry Herrera · hherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Southern California Edison-Mammoth Pool Communications Site-Propane TankDecision Signed Date: 08/30/2013 Legal Notice Date: 09/13/2013
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 7 South, Range 24 East, Section 15
Decision Memo · High Sierra Ranger District · updated 12/10/2019
In the Providence Creek area, south of Dinkey Creek Road, north of Forest Road 10S17. · Fresno, California

UC Merced has submitted a proposal to install a cellular wireless network repeater that would support an existing wireless sensor network off of 10S17, off Dinkey Creek Road.

Special use management
Scoping Start
09/16/2014
Decision
03/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The University of California at Merced New Repeater ProposalDecision Signed Date: 03/19/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
beginning at the west boundary of township 5 south range 21 east section 24 continuing in an easterly direction to serve Camp Green Meadows, then going northwesterly along USFS Road 5S49-A to White Chief Mountain Road. · Mariposa, California

The Sierra National Forest would approve a special use permit for the installation of one fiber optic cable in a conduit of less than 2 inches for a distance of less than ½ mile (1800 feet) with a right of way of 20 feet across to Camp GM.

Special use management
Scoping Start
02/01/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone Company New Fiber Optic Cable for Camp Green MeadowsDecision Signed Date: 08/03/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/10/2019
Wisseman Mine is located off of Forest Road 4S81, north of Fish Creek Campground and accessed off of Forest Road 4S081N and 4S081P on the Sierra National Forest. · Mariposa, California

The proposed action is to reclaim the Wisseman Mine sites by removing all remaining mining equipment, structures and debris.Install bat gates on two adits or close the remaining adits by using foam plugs.

Wildlife, fish, rare plants
Scoping Start
08/07/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up; Species Population Enhancements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT. 8 S; R 24 E; Sections 3 & 4 Mt. Diablo Meridian
Environmental Assessment · High Sierra Ranger District · updated 6/3/2019
Ershim meadow located one mile North of Ershim Lake. · Fresno, California

To protect meadow resources by building a bridge over a perennial water crossing on a congressionally designated OHV Route (Dusy Ershim).

Recreation management
Scoping Start
07/30/2013
Comment Period
06/2015 (Estimated)
Objection Period Start
07/2015 (Estimated)
Decision
09/2015 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Raul Moreno · rmorenojr@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Trail Management; Travel Management; Watershed Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 3/6/2019
The "007' route is located approximately 4.5 miles north of North Fork, CA. · Madera, California

The project will develop needed social, economic and natural resource impacts and information to determine the purpose and need for the popular user defined "007" route to establish it's designation as a trail.

Recreation management
Scoping Start
10/03/2011
Comment Period
01/2015 (Estimated)
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Travel Management
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTS7S, R22E, Sec 25 SE1/4, NE1/4, Sec 24 SE1/4, NE1/4, Sec19 NW1/4, Sec 13 SW1/4, Sec18 SW1/4, NW1/4, NE1/4, Sec7 SW1/4, SE 1/4, NE1/4
Environmental Assessment · High Sierra Ranger District · updated 2/8/2019
Shaver Springs area. · Fresno, California

SCE has chosen a 1 mile corridor as a test area to explore a long-term approach to vegetation management within their authorized transmission corridor. Methods include both mechanical and chemical. Their goal is to avoid interruptions and wildfire.

Special use management
Scoping Start
06/08/2017
Comment Period
06/2019 (Estimated)
Objection Period Start
07/2019 (Estimated)
Decision
09/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R24E, Sections 20 and 29
Environmental Impact Statement · Bass Lake Ranger District · updated 12/18/2018
Small channel off of West Fork Chiquito Creek, north of Soda Springs. · Madera, California

The proposal includes mining gold bearing gravels along 1500 feet of channel, setting up a camp and storage area, diversion of water around the mining operation, constructing a sediment pond and small earthen dam to pond water and reclamation.

Regulations, directives, orders
NOI in Federal Register
03/15/2016
DEIS NOA in Federal Register
10/2017 (Estimated)
FEIS NOA in Federal Register
07/2018 (Estimated)
Objection Period Start
07/2018 (Estimated)
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Kellen Takenaka · ktakenaka@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT. 6 S.; R. 24E, 23E; Sections 13, 18, & 19
Decision Memo · Bass Lake Ranger District · updated 9/28/2018
Between Marina View at Bass Lake and Central Camp along an existing PG&E utility corridor. · Madera, California

To authorize The Ponderosa Telephone Company to attach approximately 20,704' of fiber optic cable to existing PG&E poles from Marina View at Bass Lake to Central Camp.

Special use management
Scoping Start
11/06/2014
Decision
09/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ponderosa Telephone company Central Camp New Fiber Optic CableDecision Signed Date: 09/27/2018
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 7 South, Range 22 East, Sections 24 & 25 and Township 7 South, Range 23 East, Sections 6, 7, 18, & 19.
Decision Memo · Bass Lake Ranger District · updated 9/18/2018
Chiquito Creek Watershed · Madera, California

Restore the remaining 13.6 miles of the 17.4 miles of non-system OHV routes proposed for restoration in the Chiquito Creek Watershed that require F&W consultation.

Watershed managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
01/03/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Bass Lake Ranger District · updated 8/9/2018
Bass Lake Ranger District, Sierra National Forest, Madera and Mariposa Counties, California, Between the Merced and San Joaquin Rivers · Madera; Mariposa, California

Hazard trees will be removed along entire district road system, focusing on major arterial and collector roads, including roads indicated on the Forest Recreation Visitor Map.

Road management
Scoping Start
07/15/2005
Comment Period
05/28/2006
Decision
07/2006 (Estimated)
Implementation
08/2006 (Estimated)
Project documents
Mark Smith · msmith04@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Harzardous Waste Compliance Actions; Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Facility Maintenance; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green)
Hazard Tree Removal Environmental AnalysisDecision Signed Date: 07/17/2006 Legal Notice Date: 07/21/2006
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionR. 19-25 E., T. 3-9 S., MDB&M
Environmental Assessment · Bass Lake Ranger District · updated 8/9/2018
Designated recreation site, Nelder Grove interpretive area and campground. · Madera, California

Installation of a new CXT Vault toilet building in the Nelder Grove campground area. Existing toilets near campground will be decommissioned and removed off site.

Recreation managementFacility management
Scoping Start
03/08/2016
Comment Period
09/18/2016
Decision
10/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 4/24/2018
Huntington Lake Basin on the High Sierra RD, Sierra National Forest. · Fresno, California

The project includes hand and mechanical treatments, temporary and perm road construction. Treatment activities include commercial harvest, pre-commercial thinning, hazardous fuels reduction, hazard tree removal and reforestation.

Fuels managementVegetation management (other than forest products)
Scoping Start
11/16/2017
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Kim Sorini · ksorini@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 3/29/2018
Italian Bar Bridge crossing the San Joaquin River / Redinger Lake near SCE Powerhouse #3. · Fresno; Madera, California

Fresno/Madera Counties are proposing to replace Italian Bar Bridge crossing the San Joaquin River. The existing bridge is 241 feet long and 12 feet wide between the railings and is classified as both structurally deficient and functionally obsolete.

Special use managementRoad management
Scoping Start
08/21/2017
Comment Period
10/03/2017
Decision
12/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
SUP Issuance for the Italian Bar Road Bridge Replacement Prjt ConstructionDecision Signed Date: 12/19/2017
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 3/29/2018
Surveys, planning and NEPA analysis will occur for meadows and streams throughout the 80,000 acre 5th-Field (HUC10) Willow Creek watershed. · Madera; Mariposa, California

This project will complete the planning and NEPA analysis necessary to successfully repair several high priority meadows and streams within the Willow Creek watershed.

Watershed management
Scoping Start
04/13/2016
Decision
03/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Kellen Takenaka · ktakenaka@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · High Sierra Ranger District · updated 11/30/2017
Fresno County, areas outside of the Kaiser Wilderness to the west, north, east, and southeast of Huntington Lake, including the China Peak Resort. · Fresno, California

The purpose of this project is to minimize the risk of uncontrolled fire on the landscape and improve tree vigor and health in the Huntington Basin while maintaining a visually appealing and undeveloped appearing landscape.

Fuels managementVegetation management (other than forest products)
Scoping Start
10/18/2012
Comment Period
06/2017 (Estimated)
Objection Period Start
09/2017 (Estimated)
Decision
12/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S R25E Sections 1, 2, 11, 12, 13, 15, 16, and 21, and T8S R26E Sections 4, 5, 6, 7, 8, 9, 17, 18, 19, 20, and 21 (Mt Diablo Base Meridian)
Environmental Assessment · High Sierra Ranger District · updated 9/28/2017
Brewer Lake OHV Trail System · Fresno, California

OHV related restoration implementation activities along the Brewer Lake OHV Trail system on the SNF to include closing off reroutes and detours, protection of meadows, rehab of closed areas, and install of signage.

Regulations, directives, ordersSpecial area managementVegetation management (other than forest products)Recreation managementWatershed management
Scoping Start
01/01/2015
Comment Period
07/02/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Meredith Hollowell · meredithahollowell@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Special Area Management; Scenery Management; Travel Management; Watershed Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Bass Lake Ranger District · updated 9/28/2017
Granite Creek Campground currently operates as a campground available for non-fee camping. A camp host helps in maintaining the camp May through October annually which is the peak season of use. · Madera, California

Install new CXT vault toilet building in Granite Creek Campground. Existing toilet would additionally be decommissioned and removed.

Facility managementRecreation management
Scoping Start
09/13/2016
Comment Period
07/11/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Facility Maintenance; Scenery Management
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship(s): 4S , Range(s): 25E , Section(s): 31; Quad#: Timberknob 4364
Environmental Assessment · High Sierra Ranger District · updated 9/28/2017
Red Mountain OHV Trail System · Fresno, California

OHV related restoration implementation activities along approx. 7.5 miles of the Red Mountain OHV Trail system on the SNF to include closing off reroutes and detours, protection of meadows, rehab of closed areas, and install of signage.

Vegetation management (other than forest products)Special area managementWatershed managementRecreation managementRegulations, directives, orders
Scoping Start
01/01/2015
Comment Period
07/02/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Meredith Hollowell · meredithahollowell@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Special Area Management; Scenery Management; Travel Management; Watershed Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 8/11/2017
Indian Flat adjacent to the Merced River. · Mariposa, California

PG&E is proposing to replace a 70kV switch with a new circuit breaker to improve electric reliability throughout the region. To accommodate this project they need to construct a new access for trucks and expand the footprint of the switchyard.

Special use management
Scoping Start
02/10/2016
Decision
07/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT3S, R19E, Section 23
Decision Memo · High Sierra Ranger District · updated 7/18/2017
Bald Mountain OHV Trail System · Fresno, California

OHV related restoration implementation activities along the Bald Mountain OHV Trail system on the SNF to include closing off reroutes and detours, protection of meadows, rehab of closed areas, and install of signage.

Watershed managementRecreation managementVegetation management (other than forest products)Regulations, directives, ordersSpecial area management
Scoping Start
01/01/2015
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Mike Nolen · mknolen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Special Area Management; Scenery Management; Travel Management; Watershed Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 7/18/2017
Located in the upper San Joaquin River (SJR) watershed in Madera and Fresno counties, California. · Fresno; Madera, California

Evaluate the effect of the implementation of the Southern California Edison Company's (SCE's) Ely, Balsam, and Bolsillo Creek Diversions Infrastructure Improvement Project on federally listed threatened, endangered, candidate, and proposed species.

Facility management
Scoping Start
07/02/2012
Comment Period
08/21/2012
Decision
06/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 7/18/2017
Sierra National Forest - Huntington, Shaver, Mammoth Pool, Auberry, North Fork · Fresno; Madera, California

Renew a special use permit forest-wide for existing distribution lines 33 kilovolts and under on the Sierra National Forest

Special use management
Scoping Start
09/10/2010
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionVarious locations on Bass Lake (BLRD) and High Sierra Ranger Districts (HSRD), maps available at HSRD.
Decision Memo · Inyo National Forest All Units · updated 5/31/2017
Within the Sierra Nevada Mountains on the Inyo and Sierra National Forests. · Fresno; Inyo; Madera; Mono; Tulare, California

Dr. Ronald Knapp from UC Santa Barbara%u2019s Sierra Nevada Aquatic Research Laboratory (SNARL) proposes to continue monitoring, research, and recovery activities for the mountain yellow-legged frog on the Inyo and Sierra National Forests.

ResearchSpecial use management
Scoping Start
05/2017 (Estimated)
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Kary Schlick · kschlick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsInyo National Forest; Sierra National Forest
DistrictsInyo National Forest All Units; Sierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 3/13/2017
Vegetation treatments and hazardous fuels removal along Fresno County Roads including Big Creek, Tollhouse, Auberry and Petersen Mill roads and Highway 168 on Forest Service lands · Fresno, California

To fell dead trees, and remove the hazardous fuels along 53 miles of County and State Highways on NFS lands to create a 400 foot wide hazard reduction zone for public and firefighters safety in the WUI on areas not covered by right of ways

Vegetation management (other than forest products)Fuels management
Scoping Start
06/01/2016
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Carolyn Ballard · cballard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.3 (5)
Special AuthorityNot Applicable / Other; Hfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S R25 E. S. 11,15-16,20-26, 28-29,31-33. R26E S. 5,7,8,12-13,17-18. T9S R25E S. 1-2,6,9-12,16-18. T10S R23E S. 3,9-10, 23-24. R24E 17-21,23-24, 28-30.
Environmental Assessment · Sierra National Forest All Units · updated 2/28/2017
Merced River Canyon · Mariposa, California

Issue an Easement for approximately 10.4 miles of the Exchecker-Yosemite 70Kv Transmission Line located on the Sierra and Stanislaus National Forests, and the Indian Flat Substation located in the Merced River Canyon in Mariposa County, California.

Special use management
Scoping Start
06/14/2011
Comment Period
01/2015 (Estimated)
Objection Period Start
03/2015 (Estimated)
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest; Stanislaus National Forest
DistrictsBass Lake Ranger District; Groveland Ranger District
Legal Land DescriptionT 3SR 19E
Environmental Assessment · Bass Lake Ranger District · updated 2/28/2017
U.S. Forest Service Pacific Southwest Station San Joaquin Experimental Range · Madera, California

Install approximately 7424'of buried telephone cable inside a conduit to serve the San Joaquin Experimental Range. Related facilities would include pedestals and above ground warning markers.

Special use management
Scoping Start
01/2015 (Estimated)
Comment Period
04/2015 (Estimated)
Objection Period Start
06/2015 (Estimated)
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 10 South, Range 21 East, Sections 1, 6, MDBM.
Decision Memo · Bass Lake Ranger District · updated 8/31/2016
Cedar Valley Road, north of Oakhurst · Madera, California

Install 2,640 feet of new conduit for fiber optic cable and develop a new carrier site in the Cedar Valley area.

Special use management
Scoping Start
04/11/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 8/31/2016
Forest Service Jerseydale Fire Station · Madera, California

Sierra Telephone is proposing to replace approximately 500 feet of buried telephone cable within the Forest Service Jerseydale Fire Station Compound.

Special use management
Scoping Start
03/15/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sierra Telephone Additional Cable Replacements at Jerseydale Work CenterDecision Signed Date: 08/15/2016
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 7/26/2016
86 Campground and Picnic Sites Forest-wide · Fresno; Madera; Mariposa, California

Amend existing permit to extend two years for concessionaire permit.

Facility managementRecreation management
Scoping Start
11/08/2013
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 6/27/2016
Road 10S03 to the South and the 10S60 road to the West, North and East. · Fresno, California

This prescribed fire project is bordered by the 10S03 to the South and the 10S60 to the West, North and East.

Vegetation management (other than forest products)Fuels management
Scoping Start
10/22/2014
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
John Cielnicky · johnwcielnicky@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT11S R 25E S23, 24, 13, 14
Environmental Impact Statement · Bass Lake Ranger District · updated 6/27/2016
On hold due to Frenchfire. Project is in Madera County, CA. The outer project boundary encompasses 19,810 acres, primarily within the Lower Chiquito Creek Watershed in the Bass Lake Ranger District. · Madera, California

This project is ON HOLD due to a recent fire.

Road managementFuels managementVegetation management (other than forest products)Forest productsRecreation management
NOI in Federal Register
09/2014 (Estimated)
DEIS NOA in Federal Register
06/2015 (Estimated)
FEIS NOA in Federal Register
09/2015 (Estimated)
Objection Period Start
02/2016 (Estimated)
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Denise Tolmie · dtolmie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 6/1/2016
Bass Lake Recreation Area Bass Lake Ranger District · Madera, California

The Bass Lake Recreation area has experienced heavy mortality in and around public use areas. This project is designed to remove overhead hazards, reduce fuel loadings, precommercially thin conifer pockets, plant and maintain native seedlings.

Vegetation management (other than forest products)
Scoping Start
10/13/2015
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Mike Nolen · mnolen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT7S, R22E, S8,9,14,15,16,17,21,22,23,26
Decision Memo · High Sierra Ranger District · updated 5/11/2016
Swamp, Bald Mountain, and Blue Canyon OHV areas · Fresno, California

There are three commercial/special use permit events being analyzed for use of the High Sierra Ranger District of the Sierra National Forest. Local 4X4 clubs have conducted these activities for the past few decades.

Watershed managementRegulations, directives, ordersVegetation management (other than forest products)Special area management
Scoping Start
05/03/2016
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Raul Moreno · rmorenojr@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Bass Lake Ranger District · updated 4/6/2016
Bass Lake, California. · Madera, California

Issue a new special use permit to the Bass Lake Water Company, construct a new water treatment plant and decommission (remove) the existing water treatment plant that is no longer functioning.

Special use management
Scoping Start
06/03/2013
Comment Period
02/24/2015
Objection Period Start
04/13/2015
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 7 South, Range 22 East, Section 9, MDBM
Decision Memo · Bass Lake Ranger District · updated 2/26/2016
Douglas Ranger Station in North Fork, CA. · Madera, California

A replacement cable is necessary in order to upgrade existing services for providing a more reliable communication network to the station.

Special use management
Scoping Start
11/17/2015
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The Ponderosa Telephone Co. Cable Replacement at Douglas Ranger StationDecision Signed Date: 02/25/2016
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 2/13/2016
Various locations on the Bass Lake and High Sierra Ranger Districts · Fresno; Madera; Mariposa, California

Reissue expired or soon to be expired permits to various (33) PGE electric line and associated access roads.

Special use management
Scoping Start
03/01/2007
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land Descriptionmaps available at the District Offices
Environmental Assessment · High Sierra Ranger District · updated 2/1/2016
White Bark Vista above Huntington Lake and road junction at 8S10 and 8S42 serving Red Mountain. · Fresno, California

Develop Off Highway Vehicle (OHV) staging and parking areas at White Bark Vista and Red Mountain.

Recreation management
Scoping Start
05/08/2013
Comment Period
12/17/2015
Decision
01/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Raul Moreno · rmorenojr@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 2/1/2016
Various locations on the High Sierra Ranger District. · Fresno, California

SCE has identified 45 deteriorated poles on the High Sierra Ranger District that need to be replaced before they fall over or break, which could result in fires and/or resource damages.

Special use management
Scoping Start
09/16/2014
Decision
01/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 2/1/2016
Within the Dinkey Creek Fisherman's Picnic area. · Fresno, California

SCE as 4 deteriorated poles within the Dinkey Fisherman's Picnic area that need to be replaced.

Special use management
Scoping Start
09/16/2014
Decision
04/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 12/3/2015
The Courtney fire area is between Bass Lake and road 426 on the Bass Lake Ranger District. · Madera, California

The Courtney fire of 2014 killed the majority of trees in the fire perimeter. Numerous snags of various sizes are present throughout the fire area. Pine stands that vegetated the fire area have been converted to pine snags. The fire created hazardous

Vegetation management (other than forest products)
Scoping Start
07/01/2015
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Mike Nolen · mnolen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionT7S, R22E, S16,21
Environmental Assessment · Sierra National Forest All Units · updated 11/2/2015
The Upper Billy Creek Campground is located on the northwestern shore of Huntington Lake · Fresno, California

The project would rehabilitate and replace existing campsites, ancillary amenities, and associated roads and parking spurs at the Upper Billy Creek Campground.

Recreation management
Scoping Start
10/15/2012
Comment Period
09/04/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownship 9 South, Range 25 East, Section 15
Decision Memo · High Sierra Ranger District · updated 9/30/2015
Spring Creek Tract (Deer Creek) · Fresno, California

Drill a well to provide water to the tract. If the well is viable hook it to the existing water system piping.

Special use management
Scoping Start
02/09/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Philip MacAskill · philipmacaskill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 9/22/2015
Granite Creek and Nelder Grove areas · Madera, California

Decommission (remove) existing toilets, install new accessible toilet. Granite Creek Campground will remove one 'single' toilet and replace with one 'single' toilet. Nelder Grove Campground will remove two 'double' toilets and replace with one 'do

Facility management
Scoping Start
04/01/2012
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionGranite Creek: Lat: 37.53820799, Long: -119.26455680; Nelder Grove: Lat: 37.43118561, Long: -119.58214220
Decision Memo · High Sierra Ranger District · updated 7/11/2015
High Sierra Ranger Station. · Fresno, California

The Ponderosa Telephone Co. received an application from the Forest Service to provide phone service at the High Sierra Ranger Station.

Special use managementFacility management
Scoping Start
09/16/2014
Decision
07/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
New Communications Service at High Sierra Ranger StationDecision Signed Date: 07/07/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 7/1/2015
Area consists of 31.9 acres of National Forest System land located in the Huntington Lake Recreation Area at Huntington Lake, Fresno County, California. · Fresno, California

Issue of a new special use permit (20-year term) to the Lakeshore Resort for the purpose of operating and maintaining an existing resort at Huntington Lake in Fresno County, Ca. Work is administrative only; no changes on ground will occur.

Special use management
Scoping Start
05/01/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Elaine Locke · elainenlocke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Lakeshore Reissue DMDecision Signed Date: 06/22/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R26E, Sections 6 & 7, MDB&M.
Decision Memo · Sierra National Forest All Units · updated 7/1/2015
Forest Service lands not within the Ansel Adams Wilderness, on Bass Lake Ranger District. · Mariposa, California

Authorization for guided fly-fishing tours conducted by Yosemite Outfitters along the Merced River and various creeks identified south of Yosemite National Park.

Special use managementRecreation management
Scoping Start
05/13/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Documentation of DecisionDecision Signed Date: 06/10/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 7/1/2015
Near Fish Camp, CA · Madera, California

Reissue 20 yr term permit to Yosemite Sugar Pine Railroad Resort

Recreation managementSpecial use management
Scoping Start
10/15/2009
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Leak Pen · lpen02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sugar Pine_1Decision Signed Date: 06/17/2015
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionSection 35 T5S R21E
Decision Memo · High Sierra Ranger District · updated 6/24/2015
Locations are at Blue Canyon and the Bald Mtn. OHV area. · Fresno, California

There are four commercial/special use permitted events scheduled on the High Sierra Ranger District of the Sierra National Forest. Local 4X4 clubs have conducted these activities for the past few decades.

Special use managementRecreation management
Scoping Start
03/30/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Dan Gunn · degunn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
High Sierra Ranger District OHV Events 2015 decisionsDecision Signed Date: 05/15/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 6/10/2015
Carstens Fire area. Concentrating activities along Roads 4S10, 4S13, in areas previously masticasted or prepared by the Carstens fire east of Snow creek. · Mariposa, California

Spot pile, burn, plant and follow up hand release within the Carstens Fire area. Approx. 30 acres within and 20 acres outside the hazard trees removal area (roads 4S13 and 4S10 mainly). Additionally approx. 110 acres planting and release w/out prep.

Watershed managementVegetation management (other than forest products)
Scoping Start
09/19/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Mike Nolen · mnolen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Watershed Improvements
Carstens Fire Site Preparation, Planting Project CEDecision Signed Date: 05/14/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT4S, R19E, Sections 9,10,20,21,28,29,32,33
Decision Memo · High Sierra Ranger District · updated 5/27/2015
Lower Teakettle, Wishon area · Fresno, California

The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to address critical questions about land use and climate change on ecological systems and to evaluate the impacts to the environment.

Special use managementResearch
Scoping Start
01/20/2012
Decision
03/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
NEON, Inc. Lower Teakettle Relocatable Site, Long Term Research ProjectDecision Signed Date: 03/30/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT11S, R27E, Sections 2, 3
Decision Memo · High Sierra Ranger District · updated 3/27/2015
Huntington Lake · Fresno, California

Upgrade water system piping, install tank, and installation of a water flow meter to meet state regulation.

Special use management
Scoping Start
02/09/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Philip MacAskill · philipmacaskill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 3/3/2015
Soaproot Saddle · Fresno, California

The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to address critical questions about land use and climate change on ecological systems and to evaluate the impacts to the environment.

Special use managementResearch
Scoping Start
01/20/2012
Decision
02/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
NEON Inc., Soaproot Saddle Relocatable Site, Long Term Research ProjectDecision Signed Date: 02/22/2015
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R25E, Section 29
Decision Memo · High Sierra Ranger District · updated 1/20/2015
T 8 S, R25 E, Sec. 28 located below the community of Big Creek California · Fresno, California

Hand cutting (23 acres)of live trees less than 12 inches DBH and hand pile (15 acres) and tractro pile (5 acres) within 1000 ft of the community of Big Creek.

Fuels management
Scoping Start
08/01/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Ramiro Rojas · rrojas@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Big Creek Community Fuel Break Decision MemoDecision Signed Date: 12/11/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 12/30/2014
250 acres along the Scenic Byway within and adjacent to the French Fire burn area. · Madera, California

The project is the salvage of dead and dying trees. The project reduces the hazard potential of dead, and dying, trees by removing hazardous trees within striking distance of the road and recreation sites.

Recreation managementForest productsFuels managementRegulations, directives, ordersRoad management
Scoping Start
09/16/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Katharine Napier · knapier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
Mile High Roadside SalvageDecision Signed Date: 11/03/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 12/17/2014
Conifer removal would occur on the eastern arm of Jackass Meadow · Madera, California

Removal (by hand) of approximately 15 acres of small (<10" dbh) encroaching lodgepole conifers in the arm of Jackass Meadow.

Watershed managementFuels managementGrazing managementVegetation management (other than forest products)
Scoping Start
05/13/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Keith Stone · kstone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Watershed Improvements
Jackass Meadow Conifer Removal ProjectDecision Signed Date: 09/25/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
High Sierra Ranger District · Fresno, California

New owners have submitted application for a permit to continue current resort acitivities authorized for the Dinkey Creek Inn.

Special use management
Scoping Start
06/12/2014
Decision
10/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Issuance of New Resort Term Special Use Permit Dinkey Creek InnDecision Signed Date: 10/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
Gold Arrow Camp is located at the south east end of Huntington Lake. · Fresno, California

Camp Gold Arrow has requested to expand their leach field capacity due to increased usage.

Special use management
Scoping Start
09/26/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
Huntington Lake Resort, Huntington Lake Recreation Area, High Sierra Ranger District. · Fresno, California

Huntington Lake Resort has been sold and there are new owners. A new permit needs to be issued to the new owners as permits are not transferable.

Special use management
Scoping Start
09/18/2014
Decision
10/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Issuance of New Resort/Marina Special Use Permit Huntington Lake ResortDecision Signed Date: 10/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
Camp Sierra Tract, High Sierra Ranger District · Fresno, California

The cabin owners at lot 41 in the Camp Sierra Recreation Residence Tract have applied to The Ponderosa Telephone Co. for new phone service.

Special use management
Scoping Start
09/19/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
New Phone Service at Camp Sierra Lot #41 The Ponderosa Telephone Co.Decision Signed Date: 10/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
Work to take place within the China Peak Mountain Resort's permitted area. · Fresno, California

SCE proposes to upgrade and alter the configuration of several overhead and underground facilities along the China Peak 12kV circuit at the China Peak Mountain Resort. Crews will access poles scoped for removal on foot.

Special use management
Scoping Start
09/16/2014
Decision
10/2014 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
SCE Grid Reliability and Maintenance Project China Peak 12kVDecision Signed Date: 10/14/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
High Sierra Ranger District · Fresno, California

Authorizes 2 year extensions for 6 special use authorizations for those permits which would otherwise expire on 12/31/14, and will continue the authorizations through 12/31/16 or until an assessment is conducted to continue the use or not.

Special use management
Scoping Start
09/16/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Term Extensions to 2016 - Special Use Permits High Sierra Ranger DistrictDecision Signed Date: 10/14/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 10/30/2014
High Sierra Ranger District · Fresno, California

Authorizes 2 year extensions for 21 special use authorizations for those permits which would otherwise expire on 12/31/14, and will continue the authorizations through 12/31/16 or until an assessment is conducted to continue the use or not.

Special use management
Scoping Start
09/16/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Term Extensions to 2016 - Special use PermitsDecision Signed Date: 10/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sierra National Forest All Units · updated 9/18/2014
Located on the Merced River along Highway 140 at Post Mile 42.0 to 42.7, eight miles east of the community of Briceburg and 7.6 miles west of the community of El Portal in Mariposa County, California. · Mariposa, California

This Project will consist of stabilization of the rock talus and debris slide via installation of a cable net drapery system, and removal of rock talus and debris from below the origination point of the slide.

Road management
Scoping Start
06/30/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Doug McKay · dcmckay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
CDOT District 10: SUP for Phase 1 - Ferguson Slide Highway 140 Rest Prjt.Decision Signed Date: 09/11/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 3 South, Range 19 East, Section 19
Decision Memo · High Sierra Ranger District · updated 9/12/2014
Fence Meadow Lookout and Communications Site · Fresno, California

PGE and Ponderosa Telephone are proposing changes to the established communications site. The tower will be replaced, with the additions of a new building and solar panels. The purpose is for enhanced internal communications for PGE.

Special use management
Scoping Start
03/07/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Fence Meadow Communications Site UpgradeDecision Signed Date: 08/29/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT11S, R26E, Section 19
Decision Memo · High Sierra Ranger District · updated 9/12/2014
Huckleberry Tract at Huntington Lake area. · Fresno, California

The Huckleberry Recreation Residence Tract wants to drill a new well to supplement their current domestic water supply.

Special use management
Scoping Start
07/01/2014
Decision
08/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Huckleberry Tract Well and Water System Permit RenewalDecision Signed Date: 08/28/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bass Lake Ranger District · updated 8/21/2014
The Sweetwater Mine is located approximately 3 miles northwest of the Jerseydale Fire Station off Forest Road 5S24. · Mariposa, California

The project includes improving public safety & watershed condition by removing structures and abandoned mining property, eradicating noxious weeds by using mechanical methods & stabilizing sections of an open trench, and road decommissioning.

Heritage resource managementWatershed managementMinerals and geologyRoad managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
03/11/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Species Habitat Improvements; Heritage Resource Management; Abandoned Mine Land Clean-Up; Noxious Weed Treatments; Watershed Improvements
Final DM for the Sweetwater Mine AML Project Revised 08192014Decision Signed Date: 08/19/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionRange 19 East, Township 4 South,Sections 17 and 20; MDB&M (protracted)
Decision Memo · High Sierra Ranger District · updated 8/20/2014
Providence Creek · Fresno, California

The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to address critical questions about land use and climate change on ecological systems and to evaluate the impacts to the environment.

ResearchSpecial use management
Scoping Start
01/20/2012
Decision
10/2014 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R25E, Sections 13, 14
Decision Memo · High Sierra Ranger District · updated 6/25/2014
The project is located in the Boundaries of the Aspen Fire. The project planting is located in riparian areas or areas with limited effects from logging. · Fresno, California

Project Proposes to plant and hand release 28,000 seedlings and mechanically site prepare 220 acres within the Aspen fire boundary

Vegetation management (other than forest products)
Scoping Start
03/06/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Ramiro Rojas · rrojas@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Decision Memo 2014 Kaiser-Aspen Reforestation ProjectDecision Signed Date: 05/07/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionThe Project area is located in all or portions of Township 6 South, Range 24 East; Township 7 South, Range 24 East; Township 8 South, Range 24 East; Township 6 South, Range 25 East; and Township 7 South, Range 25 East of the Mt Diablo Base Meridian
Decision Memo · High Sierra Ranger District · updated 6/25/2014
Locations are at Blue Canyon and the Bald Mtn. OHV area. · Fresno, California

There are four commercial/special use permitted events scheduled on the High Sierra Ranger District of the Sierra National Forest. Local 4X4 clubs have conducted these activities for the past few decades.

Special use managementRecreation management
Scoping Start
03/27/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Anthony Benedetti · abenedetti@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rec event decision for (4) events.Decision Signed Date: 05/07/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 6/13/2014
Camp Olajto is on the southern shore of Huntington Lake in Lakeshore, CA · Fresno, California

Camp Oljato proposes the construction of a new wood and concrete slip dock landing on the shore of Huntington Lake within the permit boundary of the Camp Oljato Boy Scout Camp. The current earthen landing constitutes a safety hazard.

Special use management
Scoping Start
10/06/2011
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R26E, Sec18
Environmental Assessment · Sierra National Forest All Units · updated 5/29/2014
The bridge is located on the Bass Lake Ranger District, in Madera County, California (Section 16, Township T6S, Range R22E) 8.6 miles from SR41 on Sky Ranch road (06S10). · Madera, California

This project consists of a total replacement of the existing 42 foot span 14 foot wide travel lane bridge with a 50 foot span 24 wide travel lane bridge.

Road management
Scoping Start
12/24/2013
Comment Period
04/09/2014
Decision
05/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Antonio Cabrera · acabrera02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Improvements/Construction
Soquel Ditch Bridge Replacement Alternative 2Decision Signed Date: 05/12/2014
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sierra National Forest All Units · updated 5/27/2014
The Lower Billy Creek Campground and Billy Creek Picnic Site are located on the northwestern shore of Huntington Lake · Fresno, California

The project would rehabilitate and replace existing campsites,picnic units, ancillary amenities and associated roads and parking spurs at the Lower Billy Creek Campground and Billy Creek Picnic Site.

Recreation management
Scoping Start
10/15/2012
Comment Period
10/19/2012
Objection Period Start
04/03/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
DN and FONSI Lower Billy Creek Campground and Billy Creek Picnic Rehab ProjDecision Signed Date: 05/23/2014 Legal Notice Date: 05/23/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownship T9S, Range R25E, Section 15
Decision Memo · High Sierra Ranger District · updated 4/10/2014
Camp Sierra Recreation Residence Tract · Fresno, California

The owner of the cabin at Lot 46 in the Camp Sierra Recreation Residence Tract has applied to The Ponderosa Telephone Co. for new service.

Special use management
Scoping Start
01/22/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
New Phone Service at Camp Sierra #46Decision Signed Date: 04/03/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 4/10/2014
Dinkey Creek area · Fresno, California

Dinkey Creek Recreational Residence Tract uses existing roads to access cabins. A Special Use Permit will be issued to the Tract Association to authorize the use and maintenance of the roads.

Special use management
Scoping Start
12/09/2013
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Dinkey Creek Tract Access Roads Special Use Permit IssuanceDecision Signed Date: 04/03/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R26E, Section 8
Decision Memo · High Sierra Ranger District · updated 4/10/2014
Peterson Mill area. · Fresno, California

Ponderosa Telephone Company will be burying new fiber optic cable and replacing copper cable in the Peterson Mill area as they continue to upgrade their system for increased band width and a more reliable service for customers.

Special use management
Scoping Start
03/07/2011
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Peterson Mill Phone Cable Replacement and New Fiber PlacementDecision Signed Date: 04/08/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R24E, Section 24
Decision Memo · High Sierra Ranger District · updated 4/10/2014
Mt. Rest and Shaver Springs areas. · Fresno, California

Ponderosa Telephone continues to replace old copper service cable throughout their service area.

Special use management
Scoping Start
03/07/2011
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Tollhouse Phone Cable Replacement and New Fiber PlacementDecision Signed Date: 04/08/2014
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R24E, Sections 17, 20
Decision Memo · Bass Lake Ranger District · updated 3/28/2014
Between Marina View and Central Camp along existing PG&E utility corridor. · Madera, California

To authorize Ponderosa Telephone Company to attach approximately 20,704' of fiber optic cable to existing PG&E poles from Marina View to Central Camp.

Special use management
Scoping Start
04/01/2013
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Carter Deems · carterddeems@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 7 South, Range 22 East Sections 24 & 25 and Township 7 South, Range 23 East, Sections 6, 7, 18, & 19.
Decision Memo · Bass Lake Ranger District · updated 3/28/2014
Along Forest Service Road 8S48 near Corrine Lake. · Madera, California

To authorize Ponderosa Telephone Company to install approximately 1,920' of buried telephone cable and spare conduit to serve the PG&E powerhouse at Corrine Lake.

Special use management
Scoping Start
04/01/2013
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Carter Deems · carterddeems@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 9 South, Range 23 East, Section 8.
Decision Memo · Bass Lake Ranger District · updated 3/28/2014
Along portions of Forest Service road 7S23A up to Goat Mountain communications site. · Madera, California

To authorize Ponderosa Telephone Company to allow Sierra Telephone Company to install approximately 4, 956' of fiber optic cable into an existing Ponderosa conduit and install a pull box over existing conduit.

Special use management
Scoping Start
04/01/2013
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Carter Deems · carterddeems@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 7 South, Range 22 East, Section 28.
Decision Memo · High Sierra Ranger District · updated 3/24/2014
Gold Arrow Camp is located on the southern shore of Huntington Lake near Lakeshore, CA. · Fresno, California

Gold Arrow Camp proposes to remove 5 existing restroom facilities and replace them with 4 updated versions.

Special use management
Scoping Start
04/08/2011
Comment Period
04/20/2011
Decision
07/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Dan Gunn · degunn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R 26E, Sec.17
Environmental Assessment · Sierra National Forest All Units · updated 3/21/2014
Forest-wide outside of wilderness · Fresno; Madera; Mariposa, California

The Sierra National Forest proposes to change about 40 miles of road classification and add approximately 68 miles of trails and 318 areas to the National Forest Transportation System.

Road managementRecreation management
Scoping Start
08/09/2012
Comment Period
01/2014 (Estimated)
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Susan Burkindine · sburkindine@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · High Sierra Ranger District · updated 8/9/2013
Hall Mountain Communications Site · Fresno, California

PG&E is proposing to remove 2 existing repeater boards and a building and replacing them with a new building, a 60' tower, and a solar panel array.

Special use management
Scoping Start
03/02/2012
Comment Period
04/20/2012
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
PG&E Hall Mountain Communications Site UpgradesDecision Signed Date: 07/31/2013 Legal Notice Date: 08/08/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R27E, Section 27
Decision Memo · High Sierra Ranger District · updated 7/26/2013
Huckleberry Tract, Huntington Lake · Fresno, California

Originally part of project #35163. Ponderosa subscribers will benefit from DSL and high speed internet with the installation of this cabinet to support existing buried fiber optic and copper telephone service cables.

Special use management
Scoping Start
03/07/2011
Comment Period
08/01/2012
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
The Ponderosa Telephone Co. Huckleberry Electronic Cabinet SiteDecision Signed Date: 07/10/2013 Legal Notice Date: 07/12/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R25E, Section 11
Decision Memo · High Sierra Ranger District · updated 7/22/2013
Mostly roadside (9S65, 8S14, M2710, M3120) and some on existing SCE pole line. · Fresno, California

Ponderosa Telephone Company will be placing new fiber optic cable from the top of Musick Mtn. to the Town of Big Creek as they continue to upgrade their system for increased band width and a more reliable service for customers.

Special use management
Scoping Start
03/07/2011
Comment Period
08/01/2012
Decision
04/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Musick Mtn. to Big Creek Town Buried Fiber Optic Cable ProjectDecision Signed Date: 04/11/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R24E, Section1; T9S, R25E, Section 6; T8S, R25E, Sections 28, 29, 31, 32, 33.
Environmental Assessment · Sierra National Forest All Units · updated 6/17/2013
The Ely and Balsam creek diversions are located approximately 60 miles northeast of the City of Fresno. Access to these diversions is via Highway 168 toward Huntington Lake, and then along Highway 168 · Fresno, California

The Sierra National Forest (SNF) proposes to improve the infrastructure of three different creek diversions which would lead to enhancement of aquatic habitats and life, improved water quality, and higher availability of water.

Recreation management
Scoping Start
08/01/2010
Comment Period
06/2013 (Estimated)
Decision
10/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Environmental Assessment · Sierra National Forest All Units · updated 6/10/2013
Dorabelle Campground and Day Use Picnic Site is located on the southwestern shore of Shaver Lake near Highway 168, in Fresno County within the High Sierra Ranger District (HSRD), SNF · Fresno, California

The SNF proposes to rehabilitate existing Dorabelle Campground and Day Use facilities, including campsites, picnic sites, roads and parking areas, a storm water drainage ditch, restroom facilities, and other facilities

Recreation management
Scoping Start
08/15/2010
Comment Period
06/2013 (Estimated)
Decision
11/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Decision Memo · High Sierra Ranger District · updated 3/27/2013
Camp Sierra, Dowville Tract, Huckleberry Tract · Fresno, California

The proposed cabinet sites will serve as switching stations linking fiber optic cable to Ponderosa's Big Creek central office. The subscriber lines will originate from the cabinets, creating a shorter length of cable to each subscriber.

Special use management
Scoping Start
03/07/2011
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R25E, Sections 11, 15, 32
Decision Memo · High Sierra Ranger District · updated 2/27/2013
Blue Canyon Work Center · Fresno, California

Ponderosa Telephone proposes to place 2,960 feet of buried and 380 feet of aerial conduit for fiber and copper cable to serve the Forest Service Blue Canyon Work Center.

Special use managementFacility management
Scoping Start
11/15/2012
Comment Period
01/16/2013
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Special Use Authorizations
Blue Canyon Work Center Buried Fiber Optic Cable ProjectDecision Signed Date: 02/26/2013
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R25E, Sections 21, 22, 27
Environmental Assessment · High Sierra Ranger District · updated 12/31/2012
The project area encompasses 1357 acres, and is found in the Blue Canyon, Dinkey Mountain and the Patterson Mountain area of the district. · Fresno, California

Thin pre-commerical trees and release competing vegetations using hand and mechanical methods, chemical spraying, while reducing fuel loads to help regain old forest conditions, increase vigor, increase stand heterogenity, and decrease fire potential

Watershed managementFuels managementVegetation management (other than forest products)
Scoping Start
10/01/2010
Comment Period
07/16/2012
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Nevia Brown · neviabrown@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionThe legal description of the project area is as follows: Townships (T) 10S & 11S, Range (R) 24,25,26,27 E.
Decision Memo · Sierra National Forest All Units · updated 12/13/2012
Fresno County, Madera County · Fresno; Madera; Mariposa, California

Issuance of a special use permit(s) for concessionaire management (including operation and maintenance) of developed recreation facilities. Locations of facilities include but not limited to Dinkey Creek, Bass Lake, Huntington Lake and Edison Lake.

Recreation management
Scoping Start
09/06/2007
Decision
12/2012 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Cesar Sanchez · cesarsanchez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionForest Wide
Environmental Assessment · Sierra National Forest All Units · updated 9/30/2012
Base of Mammoth Pool Dam and surrounding roads 6S25, 6S25G, 7S20, and 6S76. · Madera, California

Issuance of a Special Use Authorization for components of the SCE Mammoth Pool HB Balve and FWG Replacement Project and authorization to utilizing FS roads. SNF authorization is required until FERC licensing is in place.

Special use management
Scoping Start
02/05/2007
Comment Period
09/02/2011
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Teri Drivas · tdrivas@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Mammoth Pool Howell-Bunger Valve and Fishwater Generator REplacement SUADecision Signed Date: 09/28/2012 Legal Notice Date: 09/30/2012
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionT7S, R24E, Sections 3 & 10 MDBM
Decision Memo · Sierra National Forest All Units · updated 9/30/2012
The project is located on current snowmobiling routes near Huntington Lake · Fresno, California

The High Sierra Ranger District proposes to permit grooming on up to 215 miles of the designated snowmobile routes and two trailheads for the period of November 2012 through April 2020. The project is located forest-wide outside of wilderness.

Recreation management
Scoping Start
07/30/2012
Comment Period
08/04/2012
Decision
09/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Travel Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Decision Memo · Bass Lake Ranger District · updated 9/30/2012
Project is located in the Kinsman Flat, and Hogue Ranch/Clearwater area. Lions Point to the San Joaquin River is the southern boundary · Madera, California

The Source/Kinsman Project is a vegetation managment project which will utilize prescribed fire, mastication and brush crushing to modify and or remove vegetation to ehance wildlife habitat, cultural resources and manage fuel loading in WUI

Wildlife, fish, rare plantsRegulations, directives, ordersHeritage resource managementWatershed managementFuels managementVegetation management (other than forest products)
Scoping Start
02/12/2011
Comment Period
07/20/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Burt Stalter · bstalter@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Species Population Enhancements
Source Kinsman ProjectDecision Signed Date: 09/07/2012 Legal Notice Date: 09/30/2012
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT. 8 S. R. 23 & 24 E. (R23E Sec 13, 24&25) ( R 24 E Sec 17,18,19,20 &21.
Environmental Assessment · Sierra National Forest All Units · updated 9/30/2012
Routes TH-41y, TH-67y, TH-3y, TH-7y, KD-219 and KD-220 in South Fork, West Fall and Dinkey-Kings Analysis Units (see MTM FEIS) · Madera, California

3.43 miles of routes would be added to the NFTS and placed on the MVUM to allow loop opportunities once testing for NOA has been completed

Road management
Scoping Start
10/01/2010
Comment Period
08/12/2012
Decision
09/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionUSGS Quad Numbers: 37119E6_SW (West Fall AU), 37119E7_NW (South Fork AU) , 36119H1_NW (Dinkey Kings AU)
Environmental Assessment · Bass Lake Ranger District · updated 9/30/2012
The project is located 30 miles northeast of the city of Fresno. The site is at the confluence of the San Joaquin River and Willow Creek. · Madera, California

Proposed construction of the Willow Creek access trail and an associated access road and parking area.

Recreation management
Scoping Start
09/01/2010
Comment Period
08/17/2012
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Darcy Brown · dlbrown02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 9 south, range 23 east, section 16 on Mt.Diablo Baseline and Meridian.
Decision Memo · Sierra National Forest All Units · updated 9/24/2012
Located in the headwaters of Sweetwater Creek Merced River Watershed · Mariposa, California

Open up Air Condition Adit and determine mineral (gold) potential in old Sweetwater Mine workings.

Minerals and geology
Scoping Start
07/01/2012
Comment Period
08/04/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Alan Gallegos · ajgallegos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Sweetwater Mine 2012 Plan of Operations ProjectDecision Signed Date: 09/12/2012 Legal Notice Date: 09/19/2012
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionSec 17 & 20 T.4 S. R. 19 E. Mount Diable Meridian
Decision Memo · Bass Lake Ranger District · updated 9/11/2012
Placer Guard Station is located adjacent to the Placer Campground off Forest Road 81 off the Mammoth Pool Road that leads to Mammoth Pool Reservoir. · Madera, California

The project proposal would remove hazardous fuels, protect and maintain historic structures and remove encroaching conifers from adjacent pasture meadow at the Placer Guard Station Administrative Site.

Vegetation management (other than forest products)Heritage resource managementFacility managementFuels managementWatershed management
Scoping Start
06/10/2011
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Aimee Smith · asmith03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (1); 32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Fuel Treatments (Non-Activity Fuels); Heritage Resource Management; Facility Maintenance; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 6S Range 24E SEction 29 SE 1/4
Environmental Assessment · High Sierra Ranger District · updated 9/10/2012
Kaiser Grazing Allotment within a portion of the Kaiser Wilderness and north and east of Huntington Lake. · Fresno, California

Interdisciplinary team to address proposed action to continue commercial cattle grazing on the Kaiser Grazing Allotment following specific grazing and rangeland management direction outlined in the Forest Plan (as amended)

Grazing management
Scoping Start
12/02/2011
Comment Period
06/21/2012
Decision
08/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Amy Gustafson · amygustafson@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Decision Notice and Finding of No Significant Impact Kaiser AllotmentDecision Signed Date: 08/13/2012 Legal Notice Date: 08/16/2012
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownships 7 and 8 South, Ranges 24-26 East
Environmental Assessment · High Sierra Ranger District · updated 9/7/2012
NFSR 9S402 · Fresno, California

Road obliteration.

Wildlife, fish, rare plants
Scoping Start
11/2012 (Estimated)
Comment Period
12/2012 (Estimated)
Decision
03/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Andy Hosford · ahosford@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownship Range
Decision Memo · High Sierra Ranger District · updated 8/16/2012
From Trapper Springs Campground to Courtright Lake · Fresno, California

To provide safe access from the PG&E Trapper Springs Campground to Courtright Lake.

Special use management
Scoping Start
03/07/2011
Comment Period
06/22/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Pacific Gas and Electric Company Reconstruction of Campground TrailDecision Signed Date: 08/13/2012 Legal Notice Date: 08/16/2012
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R27E, Section 36
Environmental Assessment · Sierra National Forest All Units · updated 7/31/2012
Take Hwy 168 east from Clovis to Shaver Lake. Continue thru Shaver Lake to Huntington Lake. Continue around Huntington Lake for 1/2 of a mile to College Campground. · Fresno; Madera, California

Rehabilitation of the College Campground recreation facilities includes reconditioning or replacement of existing fixed assets (e.g., repaving existing roads, replacing existing picnic tables, campfire rings, and vault toilets).

Recreation management
Scoping Start
01/01/2012
Scoping Start
01/01/2012
Comment Period
04/08/2012
Comment Period
04/08/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Teri Drivas · tdrivas@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Environmental Assessment · Sierra National Forest All Units · updated 7/31/2012
Located on Huntington Lake at the west end near the Dam. Continue around Huntington Lake for 5 miles to Dowville Picnic Site. · Fresno; Madera, California

Rehabilitation of the Dowville Dowville Day-Use Picnic Area recreation facilities includes reconditioning or replacement of existing fixed assets (e.g., repaving existing roads, replacing existing picnic tables, campfire rings, and vault toilets).

Recreation management
Scoping Start
01/01/2012
Comment Period
05/08/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Teri Drivas · tdrivas@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
Dowville Day-Use Picnic Area Rehabiliation ProjectDecision Signed Date: 07/24/2012 Legal Notice Date: 07/25/2012
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Environmental Assessment · High Sierra Ranger District · updated 7/23/2012
Dinkey Ranger Station · Fresno, California

Demolish 3 storage sheds, one oil/gas service shed, and one warehouse. Relocate Radio Vault and demolish antenna.

Facility management
Scoping Start
03/29/2012
Comment Period
04/23/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Suzanne Hendrickson · slhendrickson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Maintenance
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionSE1/4 of the SW1/4 of Section 8 T10S R25E
Environmental Assessment · Bass Lake Ranger District · updated 7/23/2012
Located on the North Fork administrative site in North Fork, California · Madera, California

Remove and dispose of the Pole Barn at the North Fork administrative site

Facility management
Scoping Start
01/01/2012
Comment Period
04/23/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Suzanne Hendrickson · slhendrickson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Maintenance
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionSW1/4 SW1/4 T8S R23E Sec 18
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Decision Memo · Bass Lake Ranger District · updated 6/29/2012
Eastern Madera County, north of Mammoth Pool Reservior and west of the Ansel Adams wilderness · Madera, California

Establishment of Reach 8 of the San Joaquin River Trail by using 7.5 miles of existing system roads and trails in the area from Piyau Dome to the Mammoth TH. There is a need to construct 5 minor realignmens (~0.4 miles total) of the trail.

Recreation management
Scoping Start
01/13/2011
Decision
02/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Susan Burkindine · sburkindine@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Mariposa County Routine Trail MaintenanceDecision Signed Date: 02/16/2012
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT4 and 5S, R24E MDM
Decision Memo · Sierra National Forest All Units · updated 6/12/2012
Sierra National Forest outside of Wilderness or special designated areas. · Fresno; Madera; Mariposa, California

This is to approve the Gathering of Forest Products for Personal Use Under Permits Less than One Year in Duration.

Vegetation management (other than forest products)
Scoping Start
04/2012 (Estimated)
Decision
05/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Cindy Whelan · cwhelan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Environmental Assessment · Sierra National Forest All Units · updated 6/7/2012
Forestwide · Fresno; Madera; Mariposa, California

The project will provide line officers of the SNF to use discretion to modify the seasonal designation for a road, trail or area to address unpredictable conditions such as no rainfall, heavy rain or snowfall, fire danger or flooding.

Recreation management
Scoping Start
01/02/2012
Comment Period
03/24/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
Sierra National Forest Revision of Motor Vehicle Use Designations ProjectDecision Signed Date: 06/07/2012
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionForestwide
Decision Memo · Bass Lake Ranger District · updated 3/29/2012
Willow Creek Watershed · Madera; Mariposa, California

Off site compensatory mitigation for the loss of wetlands at the base of the Crane Valley Dam

Watershed management
Scoping Start
10/03/2011
Decision
01/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Keith Stone · kstone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Crane Valley Dam Offsite Wetland Mitigation ProjectDecision Signed Date: 01/30/2012
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Decision Memo · Bass Lake Ranger District · updated 3/28/2012
On several populare high elevation OHV routes and an OHV use area, prone to bears. · Madera, California

Installation of 4 bear boxes on 3 high elevation OHV trails and 1 OHV use area: 2 @ Iron Lakes 4x4 trail, 1 @ Star Lakes 4x4 trail, 1 @ Red Top OHV dispersed site; existing sites, very popular to the forest visitor and are located in bear prone areas

Recreation management
Scoping Start
07/30/2011
Decision
08/2011 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
Linda McPhail · lmcphail01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
David MartinDecision Signed Date: 08/22/2011
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionIron Lakes; site #1 UTM: 278913.456/4151894.135, site #2 UTM : 279121.021/4152326.563, Star Lakes UTM: 274931799/4154257.8, Red Top UTM: 287175.682/4156425.721
Environmental Assessment · Bass Lake Ranger District · updated 3/14/2012
The project is located 30 miles northeast of the city of Fresno. The site is southeast of Kerckhoff Lake, west of edinger Lake and just south of Redinger Lake Road. · Madera, California

Realignment of a section of the Hoseshoe Bend Trail, including construction of a 3-foot-wide trail beginning at the exiting unimproved parking and staging area at County Road 235 and FS 9S75 and extending along the hillside.

Recreation management
Scoping Start
09/01/2010
Comment Period
11/03/2011
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Horseshoe Bend Trail RealignmentDecision Signed Date: 02/21/2012 Legal Notice Date: 03/14/2012
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionTownship 9 south, range 23 east, section 17 and 20 - Mt. Diablo Baseline and Meridian.
Decision Memo · Sierra National Forest All Units · updated 2/3/2012
Across the Sierra National Forest · Fresno; Madera; Mariposa, California

Application for a grant that would enable forest restoration on illegal marijuana cultivation sites on the Sierra National Forest

Vegetation management (other than forest products)
Scoping Start
12/12/2011
Decision
01/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Cindy Whelan · cwhelan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Environmental Assessment · High Sierra Ranger District · updated 2/2/2012
High Sierra RD, Sierra NF · Fresno, California

Create and maintain 3 new fuelbreaks and maintain 6 existing fuelbreaks in the front country of the High Sierra Ranger Distict using various mechanical, hand and herbicide methods. Maintain Access roads to fuelbreaks.

Fuels management
Scoping Start
10/30/2008
Comment Period
01/10/2011
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Carolyn Ballard · cballard@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Road Maintenance
High Sierra Fuelbreak Maintenance ProjectDecision Signed Date: 09/09/2011 Legal Notice Date: 09/09/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R23E, Sec 19,24-26, 30-32; T10S R23 E, S13-15,24;T10S R24E, S19-21,23-30,32-35; T11S R24E S3,4,10;
Environmental Impact Statement · Sierra National Forest All Units · updated 2/2/2012
Providence and Bull Units of the Kings River Watershed · Fresno, California

The EIS will evaluate the effects of the KREW Project which is designed to treat portions of the Kings River watershed to improve forest health and to examine the short and long term effects of these treatments as well.

Research
NOI in Federal Register
10/14/2009
DEIS NOA in Federal Register
12/17/2010
FEIS NOA in Federal Register
04/16/2011
Decision
04/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityResearch And Development
Kings River Experimental Watershed Forest Health and Research ProjectDecision Signed Date: 04/07/2011 Legal Notice Date: 04/16/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionProvidence Unit is off of Dinkey Creek Road, adjacent to the Providence Creek Road (10S17)and Bull Unit is on Patterson Mountain adjacent tot he RossCrossing Road (10S24)
Environmental Impact Statement · Sierra National Forest All Units · updated 2/2/2012
Sierra National Forest excluding designated Wilderness areas · Fresno; Madera; Mariposa, California

Designate a wheeled motorized road and trail system on the Sierra NF and to prohibit wheeled motorized vehicle travel off the designated system. Project name changed from SNF Route Designation and Access Travel Mgmt to SNF Motorized Travel Mgmt.

Road managementRecreation management
NOI in Federal Register
09/14/2007
DEIS NOA in Federal Register
05/01/2009
FEIS NOA in Federal Register
05/10/2010
Decision
03/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Gayne Sears · gsears@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Travel Management
Record of Decision Sierra National Forest Motorized Travel ManagementDecision Signed Date: 03/01/2010 Legal Notice Date: 05/10/2010
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionSierra National Forest outside of Wilderness and other special designated areas.
Environmental Assessment · High Sierra Ranger District · updated 12/8/2011
The Keola project is found adjacent to Camp Keola, 20 recreation residences under forest service permit and ten cabins on private lands (Lakeside Cottages). The Keola project is found entirely within · Fresno, California

This project proposes to reduce the potential for severe fire, restore forest structure and composition consistent with frequent fire, and improve forest health conditions on 500 ac. The project is located within the Huntington Basin Recreation area

Vegetation management (other than forest products)Forest productsFuels management
Scoping Start
12/20/2010
Objection Period Start
09/09/2011
Decision
12/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Zachary Tane · ztane@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
KEOLA FUELS AND FOREST HEALTH PROJECTDecision Signed Date: 12/08/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S R25E Sections 21, 22, and 23
Decision Memo · Sierra National Forest All Units · updated 12/6/2011
Upper Billy Creek Campground and Dowville Picnic Area · Fresno, California

Issuance of an ARPA permit to complete archeological investigations via subsurface excavations at Upper Billy Creek Campground (2 sites) and Dowville Picnic Area (1 site)

Heritage resource management
Scoping Start
06/29/2011
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Doug McKay · dcmckay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Heritage Resource Management
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownship Range Section
Decision Memo · Sierra National Forest All Units · updated 12/6/2011
Mono Hot Springs Resort area · Fresno, California

Issuance of a SUP authorizing the operation and maintenance of a resort and associated facilities for up to 175 people at one time.

Special area management
Scoping Start
04/01/2011
Decision
11/2011 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
Doug McKay · dcmckay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Special Area Management
Decision Memo Mono Hot Springs Resort 20-year Term Permit IssuanceDecision Signed Date: 11/01/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionNE 1/4, NE 1/4, Section 16 Township 7 south, Range 27 east MDB&M
Decision Memo · High Sierra Ranger District · updated 11/16/2011
Water Tank Road west of Dowville Tract · Fresno, California

The Tract Association has requested to install a gate on a permitted road that access their water tanks.

Special use management
Scoping Start
10/19/2011
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Dowville Tract Association Addition of Gate on Existing Access RoadDecision Signed Date: 11/15/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R25E, Section 16
Decision Memo · High Sierra Ranger District · updated 11/4/2011
Along Railroad Grade approximately 2 miles west of Stevenson Creek. · Fresno, California

SCE has 2 crib walls to support transmission line towers. The walls are deteriorating wood and will be replaced with new steel crib walls.

Special use management
Scoping Start
03/17/2011
Decision
11/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Big Creek Life Extension Project, Transmission Line Crib Wall ReplacementDecision Signed Date: 11/03/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R24E, Section 9
Environmental Assessment · Sierra National Forest All Units · updated 10/25/2011
Near the community of Bass Lake in Madera County · Madera, California

Supplement the Crane Valley Dam Seismic Retrofit NEPA to provide more rock. Sell additional minerals and timber to PG&E, modify permits authorizing road use, expand stockpile by 15 acres, and divert an additional 13 acre-feet of water.

Minerals and geology
Scoping Start
03/08/2010
Comment Period
09/02/2011
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Karen Nooney · knooney@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Wishon Quarry Stockpile Area ExpansionDecision Signed Date: 10/21/2011 Legal Notice Date: 10/24/2011
ForestsSierra National Forest
DistrictsSierra National Forest All Units
Legal Land DescriptionSec. 26, T7S, R22E, MDB&M
Decision Memo · High Sierra Ranger District · updated 10/14/2011
Sunset Point Communications Site · Fresno, California

Add a new cable from an existing Ponderosa manhole to the existing AT&T owned building for fiber optic service expansion.

Special use management
Scoping Start
09/19/2011
Decision
10/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Fiber Optic Cable Installation at Sunset PointDecision Signed Date: 10/12/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R25E, SE 1/4 Section 21
Decision Memo · High Sierra Ranger District · updated 10/14/2011
Adjacent to Forest Roads 9S22, 9S22A, 9S65 · Fresno, California

Ponderosa Telephone Company will be burying new fiber optic cable from the dam at Shaver Lake to the top of Musick Mtn. as they continue ti upgrade their system for increased band width and a more reliable service for customers.

Special use management
Scoping Start
03/07/2011
Decision
10/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Fiber Optic Cable Installation Shaver Dam to Musick Mtn.Decision Signed Date: 10/13/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R24E, Sections 1, 12
Decision Memo · Bass Lake Ranger District · updated 9/27/2011
Bass Lake Ranger District · Madera; Mariposa, California

Series of four foot races on the Bass Lake District of the Sierra National Forest

Special use management
Scoping Start
06/15/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Sharon Dooley · sdooley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Baz Hawley, Feet First Promotions, Summer Sierra Trail Run, Temporary SpeciDecision Signed Date: 07/08/2011
ForestsSierra National Forest
DistrictsBass Lake Ranger District
Legal Land DescriptionT5 and 6 S, R 21 and 22 E MDM
Decision Memo · High Sierra Ranger District · updated 9/26/2011
Dowville Tract Lot #27 at Huntington Lake · Fresno, California

Mr. Horstmann is a cabin owner at Huntington Lake and is experiencing severe erosion and water damage at his cabin.

Special area management
Scoping Start
07/01/2011
Comment Period
07/30/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Dowville #27 Erosion Control & Mitigation of Soil & Water DamageDecision Signed Date: 08/03/2011 Legal Notice Date: 08/03/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionTownship 8 South, Range 24 East, Section 16
Decision Memo · High Sierra Ranger District · updated 9/19/2011
Near Mono Diversion · Fresno, California

SCE has filed an application to develop a helicopter landing site near their Mono Diversion.

Special use management
Scoping Start
09/30/2010
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Helicopter Landing Site Mono Creek at Diversion Southern California EdisonDecision Signed Date: 09/13/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT6 1/2 S, R27E, Section 35
Decision Memo · High Sierra Ranger District · updated 9/1/2011
Fence Meadow Lookout · Fresno, California

Ponderosa Telephone will be providing new service to the Forest Service's Fence Meadow Lookout Tower. A new service cable will be installed underground.

Special use management
Scoping Start
08/31/2011
Decision
08/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
New Telephone Service to the Forest ServiceDecision Signed Date: 08/31/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT11S, R26E, Section 19
Decision Memo · High Sierra Ranger District · updated 8/31/2011
Balch Camp and switchyard, Kings River switchyard, Haas switchyard · Fresno, California

PG&E has an ongoing problem with burrowing rodents at their Balch, Haas, and Kings River FERC authorized facilities. They are requesting the use of Diphacinone, a rodenticide previously approved for use at their Helms and Crane Valley facilities.

Special use management
Scoping Start
03/18/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Use of Rodenticides at Balch, Haas, and Kings River FacilitiesDecision Signed Date: 08/19/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT12S, R26E, Section 10, 12, 17, T11S, R27E, Section 34
Decision Memo · High Sierra Ranger District · updated 8/31/2011
High Sierra Ranger District · Fresno, California

Amend various special use permits to add one year to the terms. New permits will not be issued this year for various reasons.

Special use management
Scoping Start
07/08/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Term Extension - Special Use PermitsDecision Signed Date: 08/26/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Decision Memo · High Sierra Ranger District · updated 7/5/2011
Existing distribution powerlines from Sahver Dam to Powerhouse 2 · Fresno, California

SCE is proposing to add fiber optic cable to an existing distributio power line from Shaver Dam to Powerhouse 2.

Special use management
Scoping Start
09/30/2010
Decision
06/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Fiber Optic Cable Installation Powerhouse 2 to Shaver DamDecision Signed Date: 06/30/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R24E, Sections 25, 36; T9S, R24E, Sections 1, 12
Environmental Assessment · Sierra National Forest All Units · updated 6/30/2011
Rancheria Campground is located on the SE shore of Huntington Lake near Highway 168. Rancheria Campground, with a 50-acre footprint, has 149 campsites. · Fresno, California

The SNF proposes to improve campground facilities and to protect and/or restore culturally and biologically sensitive resources at the Rancheria Campground.

Recreation management
Scoping Start
01/21/2010
Comment Period
03/15/2011
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Judith Tapia · jetapia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
Rancheria Campground Rehabiliation ProjectDecision Signed Date: 05/25/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Decision Memo · High Sierra Ranger District · updated 4/11/2011
Near Mt. Rest Fire Station · Fresno, California

Special Use Permit holder Mrs. Zupko has asked to install a gate on her authorized private access road for safety and security reasons.

Special use management
Scoping Start
02/25/2011
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Irene Zupko Addition of Gate on Existing Access RoadDecision Signed Date: 04/11/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R24E, SE 1/4 SE 1/4 Section 17
Decision Memo · High Sierra Ranger District · updated 3/7/2011
Adjacent to Auberry Road and Beal Fire Road · Fresno, California

Ponderosa Telephone is proposing to replace two sections of existing copper cable and place new fiber optic cable adjacent to Auberry Road.

Special use management
Scoping Start
02/23/2011
Decision
03/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ponderosa Telephone Company Auberry Road Fiber Optic Cable PlacementDecision Signed Date: 03/03/2011
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT10S, R23E, Sections 3 and 14
Decision Memo · High Sierra Ranger District · updated 12/8/2010
Huntington Lake and Big Creek Town areas · Fresno, California

Renew special use permits for 6 existing water systems in the Huntington Lake and Big Creek areas.

Special use management
Scoping Start
09/20/2010
Decision
12/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Six Community Water Systems Special Use Permit RenewalsDecision Signed Date: 12/07/2010
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Decision Memo · High Sierra Ranger District · updated 11/30/2010
Near Huntington Lake · Fresno, California

Renew a special use permit for an existing construction camp near huntington Lake used by F&G wardens.

Special use management
Scoping Start
09/21/2010
Decision
11/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Permit Renewal California State Department of Fish and GameDecision Signed Date: 11/30/2010
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT8S, R26E, Section 5
Decision Memo · High Sierra Ranger District · updated 11/1/2010
Near Shaver Lake and Huntington Lake · Fresno, California

Renew a special use permit for Southern California Edison existing buried water lines near Shaver Lake and Huntington lake.

Special use management
Scoping Start
09/21/2010
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Annette Lambert · alambert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Permit Renewal, Southern California Edison Buried Water LinesDecision Signed Date: 10/18/2010
ForestsSierra National Forest
DistrictsHigh Sierra Ranger District
Legal Land DescriptionT9S, R24E, Section 13; T8S, R25E, Section 22
Environmental Impact Statement · Inyo National Forest All Units · updated 11/20/2009
John Muir and Ansel Adams Wildernesses · Fresno; Inyo; Madera; Mono, California

The project will analyze the proposed commercial use by pack stations in the two wilderness areas. A wilderness Trail Management Plan will also be a part of the analysis

Special use managementRecreation management
NOI in Federal Register
06/15/2004
DEIS NOA in Federal Register
04/15/2005
FEIS NOA in Federal Register
12/30/2005
Decision
11/2005 (Estimated)
Implementation
06/2006 (Estimated)
Project documents
MaryBeth Hennessy · mhennessy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Wilderness Management
Trail and Commercial Pack Stock Management in the Ansel Adams and John Muir WildernessesDecision Signed Date: 11/10/2005 Legal Notice Date: 12/27/2005
ForestsInyo National Forest; Sierra National Forest
DistrictsMono Ranger District; Mammoth Ranger District; White Mountain Ranger District; Mount Whitney Ranger District; Bass Lake Ranger District; High Sierra Ranger District
Environmental Impact Statement · R5 - Pacific Southwest Region All Units · updated 12/28/2007
Along Sierra Nevada chain from Oregon/California border to south of Lake Isabella as well as lands in western Nevada · Douglas; Esmeralda; Mineral; Alpine; Amador; Butte; Calaveras; El Dorado; Fresno; Inyo; Kern; Lassen; Madera; Mariposa; Modoc; Mono; Nevada; Placer; Plumas; Shasta; Sierra; Siskiyou; Tulare; Tuolumne; Yuba, California; Nevada

Amend Land and Resource Management Plans for ten (10) Forests within the Sierra Nevada region by modifying Management Indicator Species (MIS) lists and associated monitoring strategies.

Wildlife, fish, rare plantsLand management planning
NOI in Federal Register
04/30/2007
DEIS NOA in Federal Register
07/13/2007
FEIS NOA in Federal Register
12/28/2007
Decision
12/2007 (Estimated)
Implementation
01/2008 (Estimated)
Project documents
Diana Craig · dcraig01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityPlan Amendment
Sierra Nevada Forests Management Indicator Species AmendmentDecision Signed Date: 12/14/2007 Legal Notice Date: 12/21/2007
ForestsEldorado National Forest; Inyo National Forest; Lassen National Forest; Modoc National Forest; Plumas National Forest; Sequoia National Forest; Sierra National Forest; Stanislaus National Forest; Tahoe National Forest; Lake Tahoe Basin Mgt Unit
DistrictsEldorado National Forest All Units; Inyo National Forest All Units; Lassen National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Sierra National Forest All Units; Stanislaus National Forest All Units; Tahoe National Forest All Units; Lake Tahoe Basin Mgt Unit
Environmental Impact Statement · High Sierra Ranger District · updated 3/28/2007
The project is located on the Sierra National Forest · Fresno; Madera; Mariposa, California

The Sierra National Forest proposes to issue 7 Resort Special Use Permits, 1 outfitter guide . The area affected by the proposal includes the John Muir, Ansel Adams and Dinkey Lakes Wildernesses in addition to other non-wilderness areas on the Forest

Special use managementRecreation management
NOI in Federal Register
08/10/2005
DEIS NOA in Federal Register
03/16/2006
FEIS NOA in Federal Register
12/15/2006
Decision
01/2007 (Estimated)
Implementation
04/2007 (Estimated)
Project documents
Kim Sorini · ksorini@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Trail Management; Wilderness Management
Commercial Pack Stock Permit Reissuance for the SNFDecision Signed Date: 01/30/2007 Legal Notice Date: 02/14/2007
ForestsSierra National Forest
DistrictsBass Lake Ranger District; High Sierra Ranger District
Legal Land DescriptionForest-wide project