The project is designed to reduce the threat of wildfire to the McKinley Grove of giant sequoias.
NEPA / regulatory detail
| Categorical Exclusion | Section 605 of HFRA (16 U.S.C.6591d) |
233 projects with crawled detail · milestones · contacts · documents
The project is designed to reduce the threat of wildfire to the McKinley Grove of giant sequoias.
| Categorical Exclusion | Section 605 of HFRA (16 U.S.C.6591d) |
Fuel reduction, forest restoration, increase forest resilience and resistance to drought and inserts, and reduce likelihood of uncharacteristic severe wildfire
| Categorical Exclusion | Section 605 of HFRA (16 U.S.C.6591d) |
The propsed action would help the project area to be more resilient to future drought, restore and preserve wildlife habitat to persist and to reduce the likelihood of uncharacteristic wildfire with all the associated damage that causes to resources.
| Categorical Exclusion | USDA-47d-USFS |
help these project areas to be more resilient to drought, restore and preserve wildlife habitat to persist and to reduce the likelihood of uncharacteristic wildfire
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Biomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Repair 21 short sections of washed out road. The largest section needing repair is l40 ft wide, 150 ft long, and in some sections 40 ft high. Address and repair the 20 other shorter sections also requiring attention.
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| ERFO-7S05 Road Repairs MP 12.83 - Stump Springs Road | Decision Signed Date: 06/05/2025 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Forest Plan amendment to commit to Conservation Covenant for the Wishon land donation from PG&E.
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | APN 133-190-01U |
The proposed action is to establish, re-establish and maintain 368 acres of a historically used Roundtree Fuelbreak that originated as firelines from past wildfires in the area. This project is in Cooperation with local Cal Fire MMU Unit.
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Roundtree Fuelbreak Project | Decision Signed Date: 04/17/2025 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township(s): T5 &6 S, Range(s): R20&21E, Section(s): T5S (11,24,23,26 (T6S) 1,6 |
prescribe burn approximately 3,800 acres, construct approximately 5 miles of fire control lines, and remove overhead hazards along approximately 16 miles of road
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
We had proposed to use prescribed fire (underburning and pile burning), up to 10,000 acres per year, to address fuel conditions throughout the Sierra National Forest.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
This project has been cancelled. This project is not going forward.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T6S, R21E, Sec 2-4,9-16 |
Project has been cancelled. Project is not going forward.
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Abatement of hazardous trees along roadsides.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
This project has been cancelled.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Proposed action is extending Bretz Road by widening and paving 1.3-mile section of currently native surface USFS 10S01 from easterly boundary Tract 5276 (Quartz Mountain) to Dinkey Creek Road
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Decision Notice Bretz Road Extension 10S01 December 12,2023 | Decision Signed Date: 12/12/2023 |
| Bretz Road Extension 10S01 Decision | Decision Signed Date: 12/12/2023 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Adding four additional routes and one concentrated use area in the Sierra National Forest Transportation System.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Road Maintenance |
| Motorized Recreation Project - Additional Five Routes - Decision Notice | Decision Signed Date: 10/30/2023 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
This project reduces hazard trees along the Granite Creek units analyzed in the Sierra Scenic Byway EA to address health and safety of the public, employees and firefighters as well as reducing fuel loading along entry and exit routes.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Maintenance; Timber Sales (Green) |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Removal of hazard trees (and associated slash clean up) along the Sierra Vista Scenic Byway and associated roads allowing recreation site access.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Road Maintenance |
| Sierra Scenic Byway Roadside Hazard Abatement Project | Decision Signed Date: 08/05/2022 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Implement vegetative treatments- thinning timber stands, underburning, and reforestation - consistent with "An Ecosystem Management Strategy for Southern Sierran Mixed-Conifer Forests", authored by North, Stine,O'Hara, Zielinski, and Stephens.
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Timber Sales (Green) |
| Dineky South Restoration Project | Decision Signed Date: 10/12/2010 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T.10S. R.26E. section 16,17,19,20,21,22,28,29. |
Various activities within Creek Fire area to restore wildlife habitat, reestablish forested conditions, reduce hazardous fuels and minimize the risk of fire, address risks to public safety, and eradicate non-native invasive species.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Heritage Resource Management; Noxious Weed Treatments; Grazing Structural Improvements; Timber Sales (Salvage); Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Hazard tree felling and removal is proposed to reduce public safety hazards along portions of certain roads, trails and facilities within nine national forests. We expect to complete three zone-level analyses and nine decisions.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Trail Management; Road Maintenance |
| R5HT Final DN Six Rivers | Decision Signed Date: 06/15/2023 |
| R5HT Final DN Klamath | Decision Signed Date: 06/07/2023 |
| R5HT Final DN Mendocino | Decision Signed Date: 06/12/2023 |
| R5HT Final DN Shasta-Trinity | Decision Signed Date: 06/13/2023 |
| R5HT Final DN Plumas | Decision Signed Date: 12/19/2022 |
| R5HT Final DN Lassen | Decision Signed Date: 12/19/2022 |
| R5HT Final DN Sequoia | Decision Signed Date: 01/17/2023 |
| R5HT Final DN Inyo | Decision Signed Date: 01/17/2023 |
| Forests | Inyo National Forest; Klamath National Forest; Lassen National Forest; Mendocino National Forest; Six Rivers National Forest; Plumas National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest |
| Districts | Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Mendocino National Forest All Units; Six Rivers National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Removal of hazardous fuels to project giant sequoia groves from the threat of uncharacteristic wildfire
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
The Sequoia and Sierra National Forests propose to revise their land management plans as guided by the 2012 Planning Rule
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Creation/Revision |
| Sequoia National Forest Land Management Plan | Decision Signed Date: 05/15/2023 (In Appeal Period) Legal Notice Date: 05/26/2023 |
| Sierra National Forest Land Management Plan | Decision Signed Date: 05/16/2023 (In Appeal Period) Legal Notice Date: 05/26/2023 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Gold Arrow Camp proposing to drill a water well and install water tank and waterlines within the permitted area.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Two CXT restroom buildings (each 72sqft) to be relocated from Eastwood VIS to Sample Meadow Campground in same footprint of old pit toilet locations. Cement vaults (appr. 700-1000gal)will be installed in ground.
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The proposed action is designed to promote a dynamically functioning ecological condition throughout the meadow
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Decision Memo Exchequer Meadow Restoration Project | Decision Signed Date: 12/07/2022 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | 37.07211 latitude, and -119.11723 longitude |
The SNF has committed to the motorized recreation community to examine routes, not previously analyzed and decided, for potential addition to the FS System of roads, OHV areas, and motorized trails.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Travel Management |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
PG&E has submitted a proposal to install new weather stations on Musick Mountain and at the Mammoth Pool Communications Site.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Installation of two 25 - 30 feet tall poles to support solar powered weather stations on Musick Mountain and Mammoth Pool to allow PGE to monitor weather conditions to manage their facilities to prevent fire.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Hydropower; Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
The Huntington Recovery Project will be reducing fuel levels post Creek fire while recovering value in the trees that are dead in the Huntington Basin from the fire, providing for public safety and restoring a fire damaged area
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Biomass; Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R25E, Section 10-16. |
This project will reduce fuel loading through site prep; maintain fuel breaks and reforest up to 2,975 acres.
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11); 32.3 (9); 32.3(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Biomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The purpose of the project is to capture the economic value and benefit of the forest products, and reforest the landscape deforested by the Aspen Fire.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Salvage) |
| Alternative 2 of the Aspen Recovery and Reforestation Project EA | Decision Signed Date: 06/27/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | all or portions of: Township 6 South, Range 24 East; T7S, R24E; T8S, R24E; T6S, R25E; and T7S, R25E ; Mount Diablo Base Meridian. |
Implement restoration treatments collaboratively to reduce hazardous fuels, retain and promote large tree and denning/nesting structures, promote stand/landscape heterogeneity, and provide for natural regeneration of shade intolerant tree species.
| Special Authority | Hfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Bald Mountain Project Alternative 2 | Decision Signed Date: 10/08/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Legal description is T9S, R25E; T9S, R26E; T10S, R24E; T10S, R25E; and T10S, R26E; Mt. Diablo Base Meridian |
This project will implement fuels reduction, improve forest health and increase public safety in response to high levels of mortality due to bark beetles. This project will include fuel breaks, density reduction and reforestation.
| Categorical Exclusion | 32.3 (2); 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Biomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments |
| Blue Rush Project | Decision Signed Date: 02/15/2018 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Township 10 south, Range 24 east, Sec.11-13,24;Township 10 south, range 25 east, sec.1-35;Township 11 south, Range 25 east, Sec.2-10 and 16; and Township 10 south, Range 26 east, Sec.7,18,19,29,30 |
Implement vegetative treatments- thinning timber stands, underburning, and reforestation - consistent with "An Ecosystem Management Strategy for Southern Sierran Mixed-Conifer Forests", authored by North, Stine,O'Hara, Zielinski, and Stephens.
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Timber Sales (Green) |
| Dinkey North Restoration Project | Decision Signed Date: 11/23/2010 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T.10S. R.26E. section 7,8,17,18. |
Implement restoration treatments that are collaborately developed to achieve multiple goals; reduce hazardous fuels, retain and promote sensitive species habitat, and promote stand and landscape heterogeneity.
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Decision Notice and FONSI Eastfork Restoration Project | Decision Signed Date: 04/12/2012 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R27E, Sections 5, 7, 8, 17, 18, and 31-33; and T11S, R27E, Sections 4-6; Mt Diablo Baseline and Meridian. |
The project would remove roadside hazard trees, recover the economic value of fire-killed/ fire-damaged trees, re-establish forested conditions, manage fuel loads, and work towards eradication of invasive non-native weeds.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Salvage) |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 6 Range 24 Section 33; Township 7 Range 24 Sections 3-11, 14-22, 26-30, 32-35; Township 8 South Range 24 Sections 2-5, 8-11, 16, & 15, Mount Diablo Base Meridian. |
The purpose of the project will be to: Reduce fuel ladders and ground fuels in a wildland urban interface area, increase vigor and health of mixed conifer stands, restore key ecological watershed components, and restore wildlife structures/habitat.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements |
| Greys Mountain Ecological Restoration Project | Decision Signed Date: 03/16/2012 Legal Notice Date: 03/31/2012 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | The project is located in Madera County, Ca in T6S R22E Sec 13,14,15,16,21,22,23,24,25,26,27,28,29,32,33,34 and 35; T6S R23E Sec 18 & 19 and T7S R22E Sec 2&3. MDB &M |
The purpose of the project will be to: Reduce fuel ladders and ground fuels in a wildland urban interface area, increase vigor and health of mixed conifer stands and reduce noxious weed populations.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Timber Sales (Green) |
| Record of Decision for the Sugar Pine Adaptive Management Project | Decision Signed Date: 02/22/2010 Legal Notice Date: 03/10/2010 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T5S, R21E, Sec. 25,26,35,36; T6S, Sec. 1,2,11,12; T5S, R22E, Sec. 31; T6S, R22E, Sec. 5,6,7,8 |
The project would implement a strategy for ecological restoration that emphasizes the ecological role of fire, changing climate conditions, sensitive wildlife habitat and the importance of forest structure heterogeneity and hydrologic function.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Biomass; Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Scenery Management; Grazing Structural Improvements; Timber Sales (Green); Watershed Improvements |
| Whiskey Ridge Ecological Restoration Project Record of Decision | Decision Signed Date: 05/22/2013 Legal Notice Date: 05/31/2013 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 7 South and Township 8 South; Range 23 East and Range 24 East |
This is a project consists of hazard tree removal along sections of forest roads: 4S81, 4S81M, 6S66X, 6S539, and 7S35. This road system is the Scenic Byway and roads lead to recreation areas such as trail heads and campgrounds.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T6S R24E sec 20, 29, 30, and 31, T7S R24E sec 5, 6, 8, and 17 |
This is a project entailing hazard tree along the listed roads including sections of forest roads: 4S43, 4S60, 4S60A, 4S61, 4S81, 4S81B, 5S30, 5S33, 5S47, 5S47A, 5S53Y, 5S065, 5S84, and 5S84A.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Road Maintenance |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Removal of roadside hazard trees, recover the economic value of fire-killed/ fire-damaged trees (collectively hereafter, fire-affected), and re-establish forested conditions.
| Categorical Exclusion | 32.3 (2) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | The legal description includes all or portions of: Township 6 South, Range 24 East; T7S, R24E; T8S, R24E; T6S, R25E; and T7S, R25E ; Mount Diablo Base Meridian. |
Fuels reduction in the Miami Creek motorcycle recreation area.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Species Population Enhancements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T5S, R21E, Sections 26,34 and 35. T6S, R21E, Sections 2,3,4,5,8,9,10,11,12,13,14,15,16,17,22 and 23. |
Reissue a Special Use Permit for a residential water supply line (12" or less pipeline), forless than 1 mile across Natioanl Forest System lands on the Bass Lake Ranger District of the Sierra National Forest
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T 6 S, R 21 E Section 24 MDM |
Underground 3 mile section of the Siphon 4kv circuit; remove tree attachments, old cable which is not accessible, and relocate adjacent to Hwy 168. Will upgrade to 12kv cable and equipment. Will eliminate costly repairs during the winter months.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
In response to the tree mortality, this project proposes activities within the communities to create areas of reduced fuels along roads and ridges. Proposes to increase the resilience of surviving conifer forests through thinning and Rx fire.
| Special Authority | Hfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10,R23;T10,R24;T9,R23;T9,R24;T9,R23;T8,R24;T8,R25 |
removal of hazardous dead, dying, and damaged trees in the Project area
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | All or portions of: Township 4 South, Range 21 E, section 36; T4S R21E, section 32; T5S, R20E, section 1; T5S, R21 E, sections 1, 4, 5, 6, 7, 8, 9. Mount Diablo Meridian |
Installation of a double vault concrete toilet building at the Iron Telephone Gate located within the Whisky Ridge OHV riding area.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T.7S./R 22E. Sec. 3 Quad Map number#4173 Shuteye Peak |
Issue a Communications Use Lease to Ponderosa Telephone, AT&T, and Verizon Wireless to authorize existing communication facilities.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Reconstruction of a 2.1 acre site to develop parking/off loading, replace deterioating toilet, reduce maintenance costs and impacts to natural and cultural resources including soils and water quality.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township: 5S, Range: 21E, Section: 14, 1/4 Sec: NE1/4 |
Enhance and sustain winter recreation activities and OSV access by providing winter maintenance on Beasore Road (5S07)and Cold Springs parking area.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Road Maintenance |
| Beasore Road and Cold Prings Summit OSV Winter Maintenance | Decision Signed Date: 12/22/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Project will utilize a mastication machine to grind brush and small trees to create a fuel break around the Bass Lake Annex private property. Brush and trees will generally be 1-9 inches in diameter. Cut material will be mulched and left to decompose
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Bass Lake Annex Mastication | Decision Signed Date: 09/27/2012 Legal Notice Date: 09/29/2012 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | T7S R22E S35, T6S R22E S2 |
Decommission (remove) existing toilets, install new accessible toilet. Summerdale Campground will remove two 'double' toilets and replace with two double toilets. Fresno Dome Campground will remove one 'double' toilet and replace with a double toi
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Facility Improvements/Construction |
| DECISION MEMO BASS LAKE TOILET REPLACEMENT PROJECT A U.S. FOREST SERVICE (SUMMERDALE AND FRESNO DOME) | Decision Signed Date: 04/15/2013 Legal Notice Date: 04/25/2013 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Summerdale: Lat: 37.48967083, Long: -119.63230950; Fresno Dome: Lat: 37.45551374, Long: -119.54832340 |
Big Creek School is proposing to install a new 400 foot section of buried 6-inch sewer line and 2 new manholes and tying in with an existing SCE system, located on Forest Service land within the FERC licensed boundary.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Big Creek School District New Buried Sewer Line | Decision Signed Date: 12/17/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Camp Fresno needs another source for water and is proposing to drill a new well.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Camp Fresno Well, Pipe Line, and Storage Tank | Decision Signed Date: 09/16/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R26E, Section 17 |
This project proposes to issue new special use authorization, to reconstruct boundary fenceline damaged during the Corrine Fire and to burn brush and piles created during fire suppression activities.
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11); 32.2 (15) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 9S, Range 23E, SE 1/4 of Section 6 |
This proposal would manage WUI to provide a higher level of safety from wildfire to residences and businesses and manage trees, vegetation, and fuel beds to improve resilience.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
The cabin owner has applied to Ponderosa Telephone Company to add phone service to his cabin. A special use permit is required.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New Phone Service at Dinkey Creek #28 | Decision Signed Date: 08/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R26E, Section 8 |
Dinkey Creek Recreation Rsidence Tract currently has a spring fed domestic water system and would like to develop a more reliable water source.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Dinkey Creek Tract Well, New Tanks, and Permit Renewal | Decision Signed Date: 08/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
specific construction activities associated with the removal, replacement, and/or rehabilitation of existing Dorabelle Campground and Day-Use Picnic Area facilities, including campsites, day-use picnic sites, parking areas, and restroom facilities
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Dorabelle Campground Rehabilitation Project | Decision Signed Date: 04/04/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Section 25, Township T9S, Range R24E |
Removal, replacement, and/or rehabilitation of existing picnic site facilities on 5 acres in the Shaver Lake area
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Section 25, Township 9 South, Range 24 East |
Replacement of two culverts one on Road 10S02 and the other culvert on Road 10S17 to allow safe passage for the western pond turtle, and provide additional habitat for trout.
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements |
| Culvert Replacement at Duff Creek Crossings Project | Decision Signed Date: 06/04/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | SW ¼ of the NW ¼ of Section 26, T10S/R25E, MDB&M for area 1 and SE ¼ of the NE ¼ of Section 34, T10S/R25E, MDB&M for area 2 |
Implement restoration treatments collaboratively to reduce hazardous fuels, retain/promote large tree and denning/nest structures, promote stand/landscape heterogeneity, meadow restoration and aid natural regeneration of shade intolerant tree species
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Exchequer Restoration Project Record of Decision | Decision Signed Date: 03/04/2019 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Portions of: Township9S Range25E,T9S R26E, T10S R25E, T10S R26E, T10S R27E, T11S R26E, T11S R27E Mount Diablo Base Meridian |
PG&E is proposing to remove dead and live hazard trees along their Haas Woodchuck 70 kilovolt transmission line. They experience outages every winter due to trees/limbs falling onto the line.
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| PG&E Haas Woodchuck Power Line Hazard Tree Removal Project | Decision Signed Date: 09/04/2013 Legal Notice Date: 11/01/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T11S, R27E, Sections 1, 2, 11, 12, 14, 16, 22, 23, 27 |
To issue a special use permit (lease) to Horizon Tower for the existing Miami Mountain communications site previously owned and operated by California Sierra Tower Company. Work is administrative only. No ground disturbance will occur.
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 6 South, Range 20 East, Section 11. |
Cut and remove hazard trees adjacent to Huntington Heliport for safety of Heliport use.
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8s, R26E, Section 7, Mt. Diablo Base Meridian |
Lakeview has applied to drill a new well, install pipe line, and install a storage tank.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lakeview Tract Well and Storage Tank | Decision Signed Date: 09/03/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Approve continued operation, maintenance and use of existing distribution and transmission power lines and infrastructure for PGE and Southern California Edison located within designated corridors on the Sierra National Forest.
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
Demolition and removal of existing cabin located on FS land.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Mollie Clayton Removal Project Decision Memo | Decision Signed Date: 01/12/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Fell, pile &burn drought/bug killed trees in plantation that pose risk of extreme fire behavior & escape of adjacent underburn. Adds additional underburn acres in 50 yr old plantation and adjacent to plantation. Proposes minimal additional fireline.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | National Fire Plan - Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T11S, R25E, S.11-27; T11S R26E S. 7-8 & 17-18. |
The Ponderosa Telephone Co. is proposing to reinforce their existing facilities in Lower Deer Creek Tract and provide for a new fiber optic cable to the cell site operated by Verizon on private land.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone - New Fiber to Verizon Site at Huntington Condos | Decision Signed Date: 09/10/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Telephone system will consist of a fenced communications site including a pre-fab building, monopole, and solar panel system; 7,827 feet of buried fiber optic cable.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone Company New Telephone System for Beasore Meadows | Decision Signed Date: 10/25/2017 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Originally part of project #35163. Ponderosa subscribers will benefit from DSL and high speed internet with the installation of this cabinet to support existing buried fiber optic and copper telephone service cables.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| The Ponderosa Telephone Co., Dowville Electric Cabinet Site | Decision Signed Date: 07/10/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R25E, Section 16 |
To authorize The Ponderosa Telephone Co. to allow Sierra Telephone Company Inc. to install approximately 6,086 feet of new fiber optic cable into an existing Ponderosa conduit and a new in-ground pull box over the conduit.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Conduit Space Lease and New Fiber Optic Cable to Goat Mt Comm Site | Decision Signed Date: 07/14/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T. 7S. R. 22 E., Sec. 28 |
Ponderosa Telephone is proposing to replace some copper cable and place new fiber optic cable between Marina View and Bass Lake Annex to provide more reliable service and greater bandwidth.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone Fiber Optic Cable for Marina View to Bass Lake Annex | Decision Signed Date: 10/26/2017 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
To renew and consolidate Ponderosa Telephone Company's special use permits for existing telecommunications facilities into one master permit. No physial changes to the environment will occur. This action is administrative only.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone Company Master Permit-BLRD | Decision Signed Date: 08/26/2013 Legal Notice Date: 09/13/2013 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
Ponderosa subscribers will benefit from DSL and high speed internet with the installation of this cabinet to support existing buried fiber optic and copper telephone service cables.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| The Ponderosa Telephone Co. Camp Sierra Electronic Cabinet Site | Decision Signed Date: 03/19/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Installation of 3,510 feet of buried copper cable to provide phone and internet services to private lands.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| The Ponderosa Telephone Co. New Copper Cable Along 10S87 | Decision Signed Date: 01/13/2017 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The cabin owner at Camp Sierra Recreation Residence Tract Lot 16 has applied to The Ponderosa Telephone Co. for new telecommunications services.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| The Ponderosa Telephone Co. New Phone Service at Camp Sierra Lot #16 | Decision Signed Date: 03/19/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Three cabin owners at Huntington Lake have requested new phone service, at Bear Creek #8 and Lower Line Creek #'s 2 and 3.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone New Service Cable to Three Cabins at Huntington Lake | Decision Signed Date: 09/12/2016 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Hazard tree removal along road and within recreation facilities/along trails within the footprint of the Railroad fire.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Railroad Roadside Hazard Project | Decision Signed Date: 09/10/2019 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Rancheria Enterprises has been renting 2 cabins, 5 dry camp spots, and 6 RV spots on a trial basis, and are proposing to have these as permanent services and added to their special use permit.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sno-Rancheria, Inc. Addition of Rental Services Provided to the Public | Decision Signed Date: 05/05/2016 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
SCE needs to install a Mechanical Electrical Equipment Room (MEER) building to support its newly relocated 12 kV substation located near powerhouse #3.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Big Creek 3 Mechanical Electrical Equipment Room | Decision Signed Date: 06/19/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Actions include felling and removing insect and disease infested trees along well traveled forest roads and selected campgrounds to reduce the risk of further insect and disease infestation within the project area and provide for public safety.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R24E, Sec. 25; T10S, R25E, Secs. 1-3, 11, 12; T10S, R26E, Secs. 5, 7, 8, 16-18, 20-22, 26, 27, 35, 36; T10S, R27E, Secs. 31, 32, 34-36; T11S, R26E, Secs. 1, 2; T11S, R27E, Secs. 1-6; MDBM |
Sierra Tel Business Systems has requested issuance of a communications use lease for the facility at Miami Mountain Communications Site previously owned by sister company, Sierra Telephone Company, Inc.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Tel Business Systems Miami Mountain Communications Site Lease | Decision Signed Date: 08/10/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Section 11, Township 6 South, Range 20 East Mount Diablo Meridian |
This project involves the proposed installation of approximately 10,100 feet of buried conduit with fiber optic cable and empty conduit for future use from existing facilities on USFS Road 7S24.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Company, Inc. Bass Lake New Fiber Optic Cable | Decision Signed Date: 11/21/2016 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T7S, R22E, Sections 22,23 |
Amend Sierra Telephone Company Inc.s master special use permit to authorize installation of new fiber optic cable to Emerald Cove Private Camp.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Company New Fiber Optic for Emerald Cove Camp | Decision Signed Date: 07/20/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Sec 15, T. 7 S., R. 22E |
To issue an amendment to Sierra Telephone's telecommunication lines master special use permit authorizing replacement of failed copper telephone cable to the men's and women's barracks buildings.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone - Cable Replacement at Jerseydale Work Center | Decision Signed Date: 09/10/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T. 4 S. R. 19 E. Sec. 35 |
To renew and consolidate Sierra Telephone Company's special use permits for existing telecommunications facilities into one master permit. No physial changes to the environment will occur. This action is administrative only.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Company Master Permit-BLRD | Decision Signed Date: 08/26/2013 Legal Notice Date: 08/26/2013 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
The objective is to replace overhead cable attached to trees between Skylake Camp and Lupin CG. This project involves the installation of underground facilities consisting of copper cable and 2 inch conduit using a combination of boring and trenching
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Company Skylake Yosemite Camp Cable Replacement | Decision Signed Date: 09/09/2016 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Sierra Telephone proposes to install 10,100 feet of buried conduits with a fiber cable to be placed in one of the conduits. The proposed route goes through USFS land, beginning at USFS Road 7S23 and continuing south to Teaford Meadows subdivision.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Company, Inc. Teaford Meadow New Fiber Optic Cable | Decision Signed Date: 11/21/2016 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T7S, R22E, Sections 28, 32, 33; T8S, R22E, Section 5 |
The placement of telephone equipment site including two above ground cabinets placed on top of underground vaults, a power meter and appurtenant facilities; 850' of buried conduit for copper and fiber optic cable.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New Fiber Optic Cable and Carrier Site at Westfall Station | Decision Signed Date: 08/11/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Implement restoration treatments that are collaborately developed to achieve multiple goals: reduce hazardous fuels, retain and promote sensitive species habitat, and promote stand and landscape heterogeneity.
| Special Authority | National Fire Plan - Healthy Forests Initiative Alternative Consultation Arrangements; Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R25E, Sections 9–11, 14–16, 21-23, and 29-33; and T11S, R25E, Sections 4-9; Mt Diablo Baseline and Meridian. |
Renew Southern California Edison's permit and install a 1,000 gallon propane tank at the existing Mammoth Pool communication site.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Southern California Edison-Mammoth Pool Communications Site-Propane Tank | Decision Signed Date: 08/30/2013 Legal Notice Date: 09/13/2013 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 7 South, Range 24 East, Section 15 |
UC Merced has submitted a proposal to install a cellular wireless network repeater that would support an existing wireless sensor network off of 10S17, off Dinkey Creek Road.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| The University of California at Merced New Repeater Proposal | Decision Signed Date: 03/19/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The Sierra National Forest would approve a special use permit for the installation of one fiber optic cable in a conduit of less than 2 inches for a distance of less than ½ mile (1800 feet) with a right of way of 20 feet across to Camp GM.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Company New Fiber Optic Cable for Camp Green Meadows | Decision Signed Date: 08/03/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
The proposed action is to reclaim the Wisseman Mine sites by removing all remaining mining equipment, structures and debris.Install bat gates on two adits or close the remaining adits by using foam plugs.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Abandoned Mine Land Clean-Up; Species Population Enhancements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T. 8 S; R 24 E; Sections 3 & 4 Mt. Diablo Meridian |
To protect meadow resources by building a bridge over a perennial water crossing on a congressionally designated OHV Route (Dusy Ershim).
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Travel Management; Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The project will develop needed social, economic and natural resource impacts and information to determine the purpose and need for the popular user defined "007" route to establish it's designation as a trail.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Travel Management |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | TS7S, R22E, Sec 25 SE1/4, NE1/4, Sec 24 SE1/4, NE1/4, Sec19 NW1/4, Sec 13 SW1/4, Sec18 SW1/4, NW1/4, NE1/4, Sec7 SW1/4, SE 1/4, NE1/4 |
SCE has chosen a 1 mile corridor as a test area to explore a long-term approach to vegetation management within their authorized transmission corridor. Methods include both mechanical and chemical. Their goal is to avoid interruptions and wildfire.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R24E, Sections 20 and 29 |
The proposal includes mining gold bearing gravels along 1500 feet of channel, setting up a camp and storage area, diversion of water around the mining operation, constructing a sediment pond and small earthen dam to pond water and reclamation.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T. 6 S.; R. 24E, 23E; Sections 13, 18, & 19 |
To authorize The Ponderosa Telephone Company to attach approximately 20,704' of fiber optic cable to existing PG&E poles from Marina View at Bass Lake to Central Camp.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone company Central Camp New Fiber Optic Cable | Decision Signed Date: 09/27/2018 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 7 South, Range 22 East, Sections 24 & 25 and Township 7 South, Range 23 East, Sections 6, 7, 18, & 19. |
Restore the remaining 13.6 miles of the 17.4 miles of non-system OHV routes proposed for restoration in the Chiquito Creek Watershed that require F&W consultation.
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Hazard trees will be removed along entire district road system, focusing on major arterial and collector roads, including roads indicated on the Forest Recreation Visitor Map.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Harzardous Waste Compliance Actions; Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Facility Maintenance; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green) |
| Hazard Tree Removal Environmental Analysis | Decision Signed Date: 07/17/2006 Legal Notice Date: 07/21/2006 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | R. 19-25 E., T. 3-9 S., MDB&M |
Installation of a new CXT Vault toilet building in the Nelder Grove campground area. Existing toilets near campground will be decommissioned and removed off site.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
The project includes hand and mechanical treatments, temporary and perm road construction. Treatment activities include commercial harvest, pre-commercial thinning, hazardous fuels reduction, hazard tree removal and reforestation.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Fresno/Madera Counties are proposing to replace Italian Bar Bridge crossing the San Joaquin River. The existing bridge is 241 feet long and 12 feet wide between the railings and is classified as both structurally deficient and functionally obsolete.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| SUP Issuance for the Italian Bar Road Bridge Replacement Prjt Construction | Decision Signed Date: 12/19/2017 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
This project will complete the planning and NEPA analysis necessary to successfully repair several high priority meadows and streams within the Willow Creek watershed.
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
The purpose of this project is to minimize the risk of uncontrolled fire on the landscape and improve tree vigor and health in the Huntington Basin while maintaining a visually appealing and undeveloped appearing landscape.
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S R25E Sections 1, 2, 11, 12, 13, 15, 16, and 21, and T8S R26E Sections 4, 5, 6, 7, 8, 9, 17, 18, 19, 20, and 21 (Mt Diablo Base Meridian) |
OHV related restoration implementation activities along the Brewer Lake OHV Trail system on the SNF to include closing off reroutes and detours, protection of meadows, rehab of closed areas, and install of signage.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Special Area Management; Scenery Management; Travel Management; Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Install new CXT vault toilet building in Granite Creek Campground. Existing toilet would additionally be decommissioned and removed.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance; Scenery Management |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township(s): 4S , Range(s): 25E , Section(s): 31; Quad#: Timberknob 4364 |
OHV related restoration implementation activities along approx. 7.5 miles of the Red Mountain OHV Trail system on the SNF to include closing off reroutes and detours, protection of meadows, rehab of closed areas, and install of signage.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Special Area Management; Scenery Management; Travel Management; Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
PG&E is proposing to replace a 70kV switch with a new circuit breaker to improve electric reliability throughout the region. To accommodate this project they need to construct a new access for trucks and expand the footprint of the switchyard.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T3S, R19E, Section 23 |
OHV related restoration implementation activities along the Bald Mountain OHV Trail system on the SNF to include closing off reroutes and detours, protection of meadows, rehab of closed areas, and install of signage.
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Special Area Management; Scenery Management; Travel Management; Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Evaluate the effect of the implementation of the Southern California Edison Company's (SCE's) Ely, Balsam, and Bolsillo Creek Diversions Infrastructure Improvement Project on federally listed threatened, endangered, candidate, and proposed species.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Renew a special use permit forest-wide for existing distribution lines 33 kilovolts and under on the Sierra National Forest
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Various locations on Bass Lake (BLRD) and High Sierra Ranger Districts (HSRD), maps available at HSRD. |
Dr. Ronald Knapp from UC Santa Barbara%u2019s Sierra Nevada Aquatic Research Laboratory (SNARL) proposes to continue monitoring, research, and recovery activities for the mountain yellow-legged frog on the Inyo and Sierra National Forests.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Research And Development |
| Forests | Inyo National Forest; Sierra National Forest |
| Districts | Inyo National Forest All Units; Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
To fell dead trees, and remove the hazardous fuels along 53 miles of County and State Highways on NFS lands to create a 400 foot wide hazard reduction zone for public and firefighters safety in the WUI on areas not covered by right of ways
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.3 (5) |
| Special Authority | Not Applicable / Other; Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S R25 E. S. 11,15-16,20-26, 28-29,31-33. R26E S. 5,7,8,12-13,17-18. T9S R25E S. 1-2,6,9-12,16-18. T10S R23E S. 3,9-10, 23-24. R24E 17-21,23-24, 28-30. |
Issue an Easement for approximately 10.4 miles of the Exchecker-Yosemite 70Kv Transmission Line located on the Sierra and Stanislaus National Forests, and the Indian Flat Substation located in the Merced River Canyon in Mariposa County, California.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest; Stanislaus National Forest |
| Districts | Bass Lake Ranger District; Groveland Ranger District |
| Legal Land Description | T 3SR 19E |
Install approximately 7424'of buried telephone cable inside a conduit to serve the San Joaquin Experimental Range. Related facilities would include pedestals and above ground warning markers.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 10 South, Range 21 East, Sections 1, 6, MDBM. |
Install 2,640 feet of new conduit for fiber optic cable and develop a new carrier site in the Cedar Valley area.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Sierra Telephone is proposing to replace approximately 500 feet of buried telephone cable within the Forest Service Jerseydale Fire Station Compound.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sierra Telephone Additional Cable Replacements at Jerseydale Work Center | Decision Signed Date: 08/15/2016 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Amend existing permit to extend two years for concessionaire permit.
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
This prescribed fire project is bordered by the 10S03 to the South and the 10S60 to the West, North and East.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T11S R 25E S23, 24, 13, 14 |
This project is ON HOLD due to a recent fire.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
The Bass Lake Recreation area has experienced heavy mortality in and around public use areas. This project is designed to remove overhead hazards, reduce fuel loadings, precommercially thin conifer pockets, plant and maintain native seedlings.
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T7S, R22E, S8,9,14,15,16,17,21,22,23,26 |
There are three commercial/special use permit events being analyzed for use of the High Sierra Ranger District of the Sierra National Forest. Local 4X4 clubs have conducted these activities for the past few decades.
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Issue a new special use permit to the Bass Lake Water Company, construct a new water treatment plant and decommission (remove) the existing water treatment plant that is no longer functioning.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 7 South, Range 22 East, Section 9, MDBM |
A replacement cable is necessary in order to upgrade existing services for providing a more reliable communication network to the station.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| The Ponderosa Telephone Co. Cable Replacement at Douglas Ranger Station | Decision Signed Date: 02/25/2016 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Reissue expired or soon to be expired permits to various (33) PGE electric line and associated access roads.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | maps available at the District Offices |
Develop Off Highway Vehicle (OHV) staging and parking areas at White Bark Vista and Red Mountain.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Travel Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
SCE has identified 45 deteriorated poles on the High Sierra Ranger District that need to be replaced before they fall over or break, which could result in fires and/or resource damages.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
SCE as 4 deteriorated poles within the Dinkey Fisherman's Picnic area that need to be replaced.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The Courtney fire of 2014 killed the majority of trees in the fire perimeter. Numerous snags of various sizes are present throughout the fire area. Pine stands that vegetated the fire area have been converted to pine snags. The fire created hazardous
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | T7S, R22E, S16,21 |
The project would rehabilitate and replace existing campsites, ancillary amenities, and associated roads and parking spurs at the Upper Billy Creek Campground.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Township 9 South, Range 25 East, Section 15 |
Drill a well to provide water to the tract. If the well is viable hook it to the existing water system piping.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Decommission (remove) existing toilets, install new accessible toilet. Granite Creek Campground will remove one 'single' toilet and replace with one 'single' toilet. Nelder Grove Campground will remove two 'double' toilets and replace with one 'do
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Granite Creek: Lat: 37.53820799, Long: -119.26455680; Nelder Grove: Lat: 37.43118561, Long: -119.58214220 |
The Ponderosa Telephone Co. received an application from the Forest Service to provide phone service at the High Sierra Ranger Station.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| New Communications Service at High Sierra Ranger Station | Decision Signed Date: 07/07/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Issue of a new special use permit (20-year term) to the Lakeshore Resort for the purpose of operating and maintaining an existing resort at Huntington Lake in Fresno County, Ca. Work is administrative only; no changes on ground will occur.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lakeshore Reissue DM | Decision Signed Date: 06/22/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R26E, Sections 6 & 7, MDB&M. |
Authorization for guided fly-fishing tours conducted by Yosemite Outfitters along the Merced River and various creeks identified south of Yosemite National Park.
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Documentation of Decision | Decision Signed Date: 06/10/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Reissue 20 yr term permit to Yosemite Sugar Pine Railroad Resort
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sugar Pine_1 | Decision Signed Date: 06/17/2015 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Section 35 T5S R21E |
There are four commercial/special use permitted events scheduled on the High Sierra Ranger District of the Sierra National Forest. Local 4X4 clubs have conducted these activities for the past few decades.
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| High Sierra Ranger District OHV Events 2015 decisions | Decision Signed Date: 05/15/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Spot pile, burn, plant and follow up hand release within the Carstens Fire area. Approx. 30 acres within and 20 acres outside the hazard trees removal area (roads 4S13 and 4S10 mainly). Additionally approx. 110 acres planting and release w/out prep.
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Watershed Improvements |
| Carstens Fire Site Preparation, Planting Project CE | Decision Signed Date: 05/14/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T4S, R19E, Sections 9,10,20,21,28,29,32,33 |
The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to address critical questions about land use and climate change on ecological systems and to evaluate the impacts to the environment.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Research And Development |
| NEON, Inc. Lower Teakettle Relocatable Site, Long Term Research Project | Decision Signed Date: 03/30/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T11S, R27E, Sections 2, 3 |
Upgrade water system piping, install tank, and installation of a water flow meter to meet state regulation.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to address critical questions about land use and climate change on ecological systems and to evaluate the impacts to the environment.
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Research And Development |
| NEON Inc., Soaproot Saddle Relocatable Site, Long Term Research Project | Decision Signed Date: 02/22/2015 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R25E, Section 29 |
Hand cutting (23 acres)of live trees less than 12 inches DBH and hand pile (15 acres) and tractro pile (5 acres) within 1000 ft of the community of Big Creek.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Big Creek Community Fuel Break Decision Memo | Decision Signed Date: 12/11/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The project is the salvage of dead and dying trees. The project reduces the hazard potential of dead, and dying, trees by removing hazardous trees within striking distance of the road and recreation sites.
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Mile High Roadside Salvage | Decision Signed Date: 11/03/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
Removal (by hand) of approximately 15 acres of small (<10" dbh) encroaching lodgepole conifers in the arm of Jackass Meadow.
| Categorical Exclusion | 32.3 (2); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Grazing Allotment Management; Watershed Improvements |
| Jackass Meadow Conifer Removal Project | Decision Signed Date: 09/25/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
New owners have submitted application for a permit to continue current resort acitivities authorized for the Dinkey Creek Inn.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Issuance of New Resort Term Special Use Permit Dinkey Creek Inn | Decision Signed Date: 10/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Camp Gold Arrow has requested to expand their leach field capacity due to increased usage.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Huntington Lake Resort has been sold and there are new owners. A new permit needs to be issued to the new owners as permits are not transferable.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Issuance of New Resort/Marina Special Use Permit Huntington Lake Resort | Decision Signed Date: 10/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The cabin owners at lot 41 in the Camp Sierra Recreation Residence Tract have applied to The Ponderosa Telephone Co. for new phone service.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New Phone Service at Camp Sierra Lot #41 The Ponderosa Telephone Co. | Decision Signed Date: 10/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
SCE proposes to upgrade and alter the configuration of several overhead and underground facilities along the China Peak 12kV circuit at the China Peak Mountain Resort. Crews will access poles scoped for removal on foot.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| SCE Grid Reliability and Maintenance Project China Peak 12kV | Decision Signed Date: 10/14/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Authorizes 2 year extensions for 6 special use authorizations for those permits which would otherwise expire on 12/31/14, and will continue the authorizations through 12/31/16 or until an assessment is conducted to continue the use or not.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Term Extensions to 2016 - Special Use Permits High Sierra Ranger District | Decision Signed Date: 10/14/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Authorizes 2 year extensions for 21 special use authorizations for those permits which would otherwise expire on 12/31/14, and will continue the authorizations through 12/31/16 or until an assessment is conducted to continue the use or not.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Term Extensions to 2016 - Special use Permits | Decision Signed Date: 10/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
This Project will consist of stabilization of the rock talus and debris slide via installation of a cable net drapery system, and removal of rock talus and debris from below the origination point of the slide.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| CDOT District 10: SUP for Phase 1 - Ferguson Slide Highway 140 Rest Prjt. | Decision Signed Date: 09/11/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 3 South, Range 19 East, Section 19 |
PGE and Ponderosa Telephone are proposing changes to the established communications site. The tower will be replaced, with the additions of a new building and solar panels. The purpose is for enhanced internal communications for PGE.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Fence Meadow Communications Site Upgrade | Decision Signed Date: 08/29/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T11S, R26E, Section 19 |
The Huckleberry Recreation Residence Tract wants to drill a new well to supplement their current domestic water supply.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Huckleberry Tract Well and Water System Permit Renewal | Decision Signed Date: 08/28/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
The project includes improving public safety & watershed condition by removing structures and abandoned mining property, eradicating noxious weeds by using mechanical methods & stabilizing sections of an open trench, and road decommissioning.
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Species Habitat Improvements; Heritage Resource Management; Abandoned Mine Land Clean-Up; Noxious Weed Treatments; Watershed Improvements |
| Final DM for the Sweetwater Mine AML Project Revised 08192014 | Decision Signed Date: 08/19/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Range 19 East, Township 4 South,Sections 17 and 20; MDB&M (protracted) |
The National Ecological Observatory Network proposes to establish scientific infrastructure needed for research to address critical questions about land use and climate change on ecological systems and to evaluate the impacts to the environment.
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Research And Development |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R25E, Sections 13, 14 |
Project Proposes to plant and hand release 28,000 seedlings and mechanically site prepare 220 acres within the Aspen fire boundary
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Decision Memo 2014 Kaiser-Aspen Reforestation Project | Decision Signed Date: 05/07/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | The Project area is located in all or portions of Township 6 South, Range 24 East; Township 7 South, Range 24 East; Township 8 South, Range 24 East; Township 6 South, Range 25 East; and Township 7 South, Range 25 East of the Mt Diablo Base Meridian |
There are four commercial/special use permitted events scheduled on the High Sierra Ranger District of the Sierra National Forest. Local 4X4 clubs have conducted these activities for the past few decades.
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Rec event decision for (4) events. | Decision Signed Date: 05/07/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Camp Oljato proposes the construction of a new wood and concrete slip dock landing on the shore of Huntington Lake within the permit boundary of the Camp Oljato Boy Scout Camp. The current earthen landing constitutes a safety hazard.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R26E, Sec18 |
This project consists of a total replacement of the existing 42 foot span 14 foot wide travel lane bridge with a 50 foot span 24 wide travel lane bridge.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Improvements/Construction |
| Soquel Ditch Bridge Replacement Alternative 2 | Decision Signed Date: 05/12/2014 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Not Applicable |
The project would rehabilitate and replace existing campsites,picnic units, ancillary amenities and associated roads and parking spurs at the Lower Billy Creek Campground and Billy Creek Picnic Site.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| DN and FONSI Lower Billy Creek Campground and Billy Creek Picnic Rehab Proj | Decision Signed Date: 05/23/2014 Legal Notice Date: 05/23/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Township T9S, Range R25E, Section 15 |
The owner of the cabin at Lot 46 in the Camp Sierra Recreation Residence Tract has applied to The Ponderosa Telephone Co. for new service.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New Phone Service at Camp Sierra #46 | Decision Signed Date: 04/03/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Not Applicable |
Dinkey Creek Recreational Residence Tract uses existing roads to access cabins. A Special Use Permit will be issued to the Tract Association to authorize the use and maintenance of the roads.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Dinkey Creek Tract Access Roads Special Use Permit Issuance | Decision Signed Date: 04/03/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R26E, Section 8 |
Ponderosa Telephone Company will be burying new fiber optic cable and replacing copper cable in the Peterson Mill area as they continue to upgrade their system for increased band width and a more reliable service for customers.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Peterson Mill Phone Cable Replacement and New Fiber Placement | Decision Signed Date: 04/08/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R24E, Section 24 |
Ponderosa Telephone continues to replace old copper service cable throughout their service area.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Tollhouse Phone Cable Replacement and New Fiber Placement | Decision Signed Date: 04/08/2014 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R24E, Sections 17, 20 |
To authorize Ponderosa Telephone Company to attach approximately 20,704' of fiber optic cable to existing PG&E poles from Marina View to Central Camp.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 7 South, Range 22 East Sections 24 & 25 and Township 7 South, Range 23 East, Sections 6, 7, 18, & 19. |
To authorize Ponderosa Telephone Company to install approximately 1,920' of buried telephone cable and spare conduit to serve the PG&E powerhouse at Corrine Lake.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 9 South, Range 23 East, Section 8. |
To authorize Ponderosa Telephone Company to allow Sierra Telephone Company to install approximately 4, 956' of fiber optic cable into an existing Ponderosa conduit and install a pull box over existing conduit.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 7 South, Range 22 East, Section 28. |
Gold Arrow Camp proposes to remove 5 existing restroom facilities and replace them with 4 updated versions.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R 26E, Sec.17 |
The Sierra National Forest proposes to change about 40 miles of road classification and add approximately 68 miles of trails and 318 areas to the National Forest Transportation System.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Travel Management |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Not Applicable |
PG&E is proposing to remove 2 existing repeater boards and a building and replacing them with a new building, a 60' tower, and a solar panel array.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| PG&E Hall Mountain Communications Site Upgrades | Decision Signed Date: 07/31/2013 Legal Notice Date: 08/08/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R27E, Section 27 |
Originally part of project #35163. Ponderosa subscribers will benefit from DSL and high speed internet with the installation of this cabinet to support existing buried fiber optic and copper telephone service cables.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| The Ponderosa Telephone Co. Huckleberry Electronic Cabinet Site | Decision Signed Date: 07/10/2013 Legal Notice Date: 07/12/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R25E, Section 11 |
Ponderosa Telephone Company will be placing new fiber optic cable from the top of Musick Mtn. to the Town of Big Creek as they continue to upgrade their system for increased band width and a more reliable service for customers.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Musick Mtn. to Big Creek Town Buried Fiber Optic Cable Project | Decision Signed Date: 04/11/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R24E, Section1; T9S, R25E, Section 6; T8S, R25E, Sections 28, 29, 31, 32, 33. |
The Sierra National Forest (SNF) proposes to improve the infrastructure of three different creek diversions which would lead to enhancement of aquatic habitats and life, improved water quality, and higher availability of water.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
The SNF proposes to rehabilitate existing Dorabelle Campground and Day Use facilities, including campsites, picnic sites, roads and parking areas, a storm water drainage ditch, restroom facilities, and other facilities
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
The proposed cabinet sites will serve as switching stations linking fiber optic cable to Ponderosa's Big Creek central office. The subscriber lines will originate from the cabinets, creating a shorter length of cable to each subscriber.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R25E, Sections 11, 15, 32 |
Ponderosa Telephone proposes to place 2,960 feet of buried and 380 feet of aerial conduit for fiber and copper cable to serve the Forest Service Blue Canyon Work Center.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Blue Canyon Work Center Buried Fiber Optic Cable Project | Decision Signed Date: 02/26/2013 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R25E, Sections 21, 22, 27 |
Thin pre-commerical trees and release competing vegetations using hand and mechanical methods, chemical spraying, while reducing fuel loads to help regain old forest conditions, increase vigor, increase stand heterogenity, and decrease fire potential
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | The legal description of the project area is as follows: Townships (T) 10S & 11S, Range (R) 24,25,26,27 E. |
Issuance of a special use permit(s) for concessionaire management (including operation and maintenance) of developed recreation facilities. Locations of facilities include but not limited to Dinkey Creek, Bass Lake, Huntington Lake and Edison Lake.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Forest Wide |
Issuance of a Special Use Authorization for components of the SCE Mammoth Pool HB Balve and FWG Replacement Project and authorization to utilizing FS roads. SNF authorization is required until FERC licensing is in place.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Mammoth Pool Howell-Bunger Valve and Fishwater Generator REplacement SUA | Decision Signed Date: 09/28/2012 Legal Notice Date: 09/30/2012 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | T7S, R24E, Sections 3 & 10 MDBM |
The High Sierra Ranger District proposes to permit grooming on up to 215 miles of the designated snowmobile routes and two trailheads for the period of November 2012 through April 2020. The project is located forest-wide outside of wilderness.
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Travel Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
The Source/Kinsman Project is a vegetation managment project which will utilize prescribed fire, mastication and brush crushing to modify and or remove vegetation to ehance wildlife habitat, cultural resources and manage fuel loading in WUI
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Species Population Enhancements |
| Source Kinsman Project | Decision Signed Date: 09/07/2012 Legal Notice Date: 09/30/2012 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T. 8 S. R. 23 & 24 E. (R23E Sec 13, 24&25) ( R 24 E Sec 17,18,19,20 &21. |
3.43 miles of routes would be added to the NFTS and placed on the MVUM to allow loop opportunities once testing for NOA has been completed
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | USGS Quad Numbers: 37119E6_SW (West Fall AU), 37119E7_NW (South Fork AU) , 36119H1_NW (Dinkey Kings AU) |
Proposed construction of the Willow Creek access trail and an associated access road and parking area.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 9 south, range 23 east, section 16 on Mt.Diablo Baseline and Meridian. |
Open up Air Condition Adit and determine mineral (gold) potential in old Sweetwater Mine workings.
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Sweetwater Mine 2012 Plan of Operations Project | Decision Signed Date: 09/12/2012 Legal Notice Date: 09/19/2012 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Sec 17 & 20 T.4 S. R. 19 E. Mount Diable Meridian |
The project proposal would remove hazardous fuels, protect and maintain historic structures and remove encroaching conifers from adjacent pasture meadow at the Placer Guard Station Administrative Site.
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (1); 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Fuel Treatments (Non-Activity Fuels); Heritage Resource Management; Facility Maintenance; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 6S Range 24E SEction 29 SE 1/4 |
Interdisciplinary team to address proposed action to continue commercial cattle grazing on the Kaiser Grazing Allotment following specific grazing and rangeland management direction outlined in the Forest Plan (as amended)
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements |
| Decision Notice and Finding of No Significant Impact Kaiser Allotment | Decision Signed Date: 08/13/2012 Legal Notice Date: 08/16/2012 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Townships 7 and 8 South, Ranges 24-26 East |
Road obliteration.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Township Range |
To provide safe access from the PG&E Trapper Springs Campground to Courtright Lake.
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Pacific Gas and Electric Company Reconstruction of Campground Trail | Decision Signed Date: 08/13/2012 Legal Notice Date: 08/16/2012 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R27E, Section 36 |
Rehabilitation of the College Campground recreation facilities includes reconditioning or replacement of existing fixed assets (e.g., repaving existing roads, replacing existing picnic tables, campfire rings, and vault toilets).
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
Rehabilitation of the Dowville Dowville Day-Use Picnic Area recreation facilities includes reconditioning or replacement of existing fixed assets (e.g., repaving existing roads, replacing existing picnic tables, campfire rings, and vault toilets).
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Dowville Day-Use Picnic Area Rehabiliation Project | Decision Signed Date: 07/24/2012 Legal Notice Date: 07/25/2012 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
Demolish 3 storage sheds, one oil/gas service shed, and one warehouse. Relocate Radio Vault and demolish antenna.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Maintenance |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | SE1/4 of the SW1/4 of Section 8 T10S R25E |
Remove and dispose of the Pole Barn at the North Fork administrative site
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Maintenance |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | SW1/4 SW1/4 T8S R23E Sec 18 |
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
Establishment of Reach 8 of the San Joaquin River Trail by using 7.5 miles of existing system roads and trails in the area from Piyau Dome to the Mammoth TH. There is a need to construct 5 minor realignmens (~0.4 miles total) of the trail.
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Mariposa County Routine Trail Maintenance | Decision Signed Date: 02/16/2012 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T4 and 5S, R24E MDM |
This is to approve the Gathering of Forest Products for Personal Use Under Permits Less than One Year in Duration.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Products Sales |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
The project will provide line officers of the SNF to use discretion to modify the seasonal designation for a road, trail or area to address unpredictable conditions such as no rainfall, heavy rain or snowfall, fire danger or flooding.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Sierra National Forest Revision of Motor Vehicle Use Designations Project | Decision Signed Date: 06/07/2012 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Forestwide |
Off site compensatory mitigation for the loss of wetlands at the base of the Crane Valley Dam
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Crane Valley Dam Offsite Wetland Mitigation Project | Decision Signed Date: 01/30/2012 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
Installation of 4 bear boxes on 3 high elevation OHV trails and 1 OHV use area: 2 @ Iron Lakes 4x4 trail, 1 @ Star Lakes 4x4 trail, 1 @ Red Top OHV dispersed site; existing sites, very popular to the forest visitor and are located in bear prone areas
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| David Martin | Decision Signed Date: 08/22/2011 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Iron Lakes; site #1 UTM: 278913.456/4151894.135, site #2 UTM : 279121.021/4152326.563, Star Lakes UTM: 274931799/4154257.8, Red Top UTM: 287175.682/4156425.721 |
Realignment of a section of the Hoseshoe Bend Trail, including construction of a 3-foot-wide trail beginning at the exiting unimproved parking and staging area at County Road 235 and FS 9S75 and extending along the hillside.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Horseshoe Bend Trail Realignment | Decision Signed Date: 02/21/2012 Legal Notice Date: 03/14/2012 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | Township 9 south, range 23 east, section 17 and 20 - Mt. Diablo Baseline and Meridian. |
Application for a grant that would enable forest restoration on illegal marijuana cultivation sites on the Sierra National Forest
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
Create and maintain 3 new fuelbreaks and maintain 6 existing fuelbreaks in the front country of the High Sierra Ranger Distict using various mechanical, hand and herbicide methods. Maintain Access roads to fuelbreaks.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Road Maintenance |
| High Sierra Fuelbreak Maintenance Project | Decision Signed Date: 09/09/2011 Legal Notice Date: 09/09/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R23E, Sec 19,24-26, 30-32; T10S R23 E, S13-15,24;T10S R24E, S19-21,23-30,32-35; T11S R24E S3,4,10; |
The EIS will evaluate the effects of the KREW Project which is designed to treat portions of the Kings River watershed to improve forest health and to examine the short and long term effects of these treatments as well.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Research And Development |
| Kings River Experimental Watershed Forest Health and Research Project | Decision Signed Date: 04/07/2011 Legal Notice Date: 04/16/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Providence Unit is off of Dinkey Creek Road, adjacent to the Providence Creek Road (10S17)and Bull Unit is on Patterson Mountain adjacent tot he RossCrossing Road (10S24) |
Designate a wheeled motorized road and trail system on the Sierra NF and to prohibit wheeled motorized vehicle travel off the designated system. Project name changed from SNF Route Designation and Access Travel Mgmt to SNF Motorized Travel Mgmt.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Travel Management |
| Record of Decision Sierra National Forest Motorized Travel Management | Decision Signed Date: 03/01/2010 Legal Notice Date: 05/10/2010 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Sierra National Forest outside of Wilderness and other special designated areas. |
This project proposes to reduce the potential for severe fire, restore forest structure and composition consistent with frequent fire, and improve forest health conditions on 500 ac. The project is located within the Huntington Basin Recreation area
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage) |
| KEOLA FUELS AND FOREST HEALTH PROJECT | Decision Signed Date: 12/08/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S R25E Sections 21, 22, and 23 |
Issuance of an ARPA permit to complete archeological investigations via subsurface excavations at Upper Billy Creek Campground (2 sites) and Dowville Picnic Area (1 site)
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Heritage Resource Management |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Township Range Section |
Issuance of a SUP authorizing the operation and maintenance of a resort and associated facilities for up to 175 people at one time.
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management; Special Area Management |
| Decision Memo Mono Hot Springs Resort 20-year Term Permit Issuance | Decision Signed Date: 11/01/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | NE 1/4, NE 1/4, Section 16 Township 7 south, Range 27 east MDB&M |
The Tract Association has requested to install a gate on a permitted road that access their water tanks.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Dowville Tract Association Addition of Gate on Existing Access Road | Decision Signed Date: 11/15/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R25E, Section 16 |
SCE has 2 crib walls to support transmission line towers. The walls are deteriorating wood and will be replaced with new steel crib walls.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Big Creek Life Extension Project, Transmission Line Crib Wall Replacement | Decision Signed Date: 11/03/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R24E, Section 9 |
Supplement the Crane Valley Dam Seismic Retrofit NEPA to provide more rock. Sell additional minerals and timber to PG&E, modify permits authorizing road use, expand stockpile by 15 acres, and divert an additional 13 acre-feet of water.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Wishon Quarry Stockpile Area Expansion | Decision Signed Date: 10/21/2011 Legal Notice Date: 10/24/2011 |
| Forests | Sierra National Forest |
| Districts | Sierra National Forest All Units |
| Legal Land Description | Sec. 26, T7S, R22E, MDB&M |
Add a new cable from an existing Ponderosa manhole to the existing AT&T owned building for fiber optic service expansion.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Fiber Optic Cable Installation at Sunset Point | Decision Signed Date: 10/12/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R25E, SE 1/4 Section 21 |
Ponderosa Telephone Company will be burying new fiber optic cable from the dam at Shaver Lake to the top of Musick Mtn. as they continue ti upgrade their system for increased band width and a more reliable service for customers.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Fiber Optic Cable Installation Shaver Dam to Musick Mtn. | Decision Signed Date: 10/13/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R24E, Sections 1, 12 |
Series of four foot races on the Bass Lake District of the Sierra National Forest
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Baz Hawley, Feet First Promotions, Summer Sierra Trail Run, Temporary Speci | Decision Signed Date: 07/08/2011 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District |
| Legal Land Description | T5 and 6 S, R 21 and 22 E MDM |
Mr. Horstmann is a cabin owner at Huntington Lake and is experiencing severe erosion and water damage at his cabin.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Dowville #27 Erosion Control & Mitigation of Soil & Water Damage | Decision Signed Date: 08/03/2011 Legal Notice Date: 08/03/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | Township 8 South, Range 24 East, Section 16 |
SCE has filed an application to develop a helicopter landing site near their Mono Diversion.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Helicopter Landing Site Mono Creek at Diversion Southern California Edison | Decision Signed Date: 09/13/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T6 1/2 S, R27E, Section 35 |
Ponderosa Telephone will be providing new service to the Forest Service's Fence Meadow Lookout Tower. A new service cable will be installed underground.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New Telephone Service to the Forest Service | Decision Signed Date: 08/31/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T11S, R26E, Section 19 |
PG&E has an ongoing problem with burrowing rodents at their Balch, Haas, and Kings River FERC authorized facilities. They are requesting the use of Diphacinone, a rodenticide previously approved for use at their Helms and Crane Valley facilities.
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Use of Rodenticides at Balch, Haas, and Kings River Facilities | Decision Signed Date: 08/19/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T12S, R26E, Section 10, 12, 17, T11S, R27E, Section 34 |
Amend various special use permits to add one year to the terms. New permits will not be issued this year for various reasons.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Term Extension - Special Use Permits | Decision Signed Date: 08/26/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
SCE is proposing to add fiber optic cable to an existing distributio power line from Shaver Dam to Powerhouse 2.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Fiber Optic Cable Installation Powerhouse 2 to Shaver Dam | Decision Signed Date: 06/30/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R24E, Sections 25, 36; T9S, R24E, Sections 1, 12 |
The SNF proposes to improve campground facilities and to protect and/or restore culturally and biologically sensitive resources at the Rancheria Campground.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Rancheria Campground Rehabiliation Project | Decision Signed Date: 05/25/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
Special Use Permit holder Mrs. Zupko has asked to install a gate on her authorized private access road for safety and security reasons.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Irene Zupko Addition of Gate on Existing Access Road | Decision Signed Date: 04/11/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R24E, SE 1/4 SE 1/4 Section 17 |
Ponderosa Telephone is proposing to replace two sections of existing copper cable and place new fiber optic cable adjacent to Auberry Road.
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ponderosa Telephone Company Auberry Road Fiber Optic Cable Placement | Decision Signed Date: 03/03/2011 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T10S, R23E, Sections 3 and 14 |
Renew special use permits for 6 existing water systems in the Huntington Lake and Big Creek areas.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Six Community Water Systems Special Use Permit Renewals | Decision Signed Date: 12/07/2010 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
Renew a special use permit for an existing construction camp near huntington Lake used by F&G wardens.
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Special Use Permit Renewal California State Department of Fish and Game | Decision Signed Date: 11/30/2010 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T8S, R26E, Section 5 |
Renew a special use permit for Southern California Edison existing buried water lines near Shaver Lake and Huntington lake.
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Special Use Permit Renewal, Southern California Edison Buried Water Lines | Decision Signed Date: 10/18/2010 |
| Forests | Sierra National Forest |
| Districts | High Sierra Ranger District |
| Legal Land Description | T9S, R24E, Section 13; T8S, R25E, Section 22 |
The project will analyze the proposed commercial use by pack stations in the two wilderness areas. A wilderness Trail Management Plan will also be a part of the analysis
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Wilderness Management |
| Trail and Commercial Pack Stock Management in the Ansel Adams and John Muir Wildernesses | Decision Signed Date: 11/10/2005 Legal Notice Date: 12/27/2005 |
| Forests | Inyo National Forest; Sierra National Forest |
| Districts | Mono Ranger District; Mammoth Ranger District; White Mountain Ranger District; Mount Whitney Ranger District; Bass Lake Ranger District; High Sierra Ranger District |
Amend Land and Resource Management Plans for ten (10) Forests within the Sierra Nevada region by modifying Management Indicator Species (MIS) lists and associated monitoring strategies.
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (1982) |
| Project Activity | Plan Amendment |
| Sierra Nevada Forests Management Indicator Species Amendment | Decision Signed Date: 12/14/2007 Legal Notice Date: 12/21/2007 |
| Forests | Eldorado National Forest; Inyo National Forest; Lassen National Forest; Modoc National Forest; Plumas National Forest; Sequoia National Forest; Sierra National Forest; Stanislaus National Forest; Tahoe National Forest; Lake Tahoe Basin Mgt Unit |
| Districts | Eldorado National Forest All Units; Inyo National Forest All Units; Lassen National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; Sequoia National Forest All Units; Sierra National Forest All Units; Stanislaus National Forest All Units; Tahoe National Forest All Units; Lake Tahoe Basin Mgt Unit |
The Sierra National Forest proposes to issue 7 Resort Special Use Permits, 1 outfitter guide . The area affected by the proposal includes the John Muir, Ansel Adams and Dinkey Lakes Wildernesses in addition to other non-wilderness areas on the Forest
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Trail Management; Wilderness Management |
| Commercial Pack Stock Permit Reissuance for the SNF | Decision Signed Date: 01/30/2007 Legal Notice Date: 02/14/2007 |
| Forests | Sierra National Forest |
| Districts | Bass Lake Ranger District; High Sierra Ranger District |
| Legal Land Description | Forest-wide project |