Decision Memo · Tofte Ranger District · updated 3/17/2026
On the Stony River Road, near Spur End Creek and Wilbur Creek - Spur End South- Section 18, T58N, R9W Spur End North- Section 18, T58N, R9W -Wilbur Creek- Section 27, T59N, R9W · Cook, Minnesota
The MN DNR is planning to remove and replace three culverts on the Stony River Road, one near Wilbur Creek crossing and two crossing the Stony River Spur.
Facility managementRoad management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Laurentian Ranger District · updated 6/16/2025
Brimson Area · St. Louis, Minnesota
Salvage of red pine from plantations effected by the Camp House and Jenkins Creek wildfires
Forest products
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Gunflint Ranger District · updated 5/20/2025
T64N, R2E, Section 28 · Cook, Minnesota
Access to private land crossing Nationals Forest System roads, road association working to obtain a Special Use to do so.
Special use management
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T64N, R2E, Section 28 |
Decision Memo · Gunflint Ranger District · updated 3/11/2025
Gunflint Ranger District, Township 62N, Range 2E, Section 28 · Cook, Minnesota
Road access to Private Property that crosses federal property, working to get under special use permit.
Special use management
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Gunflint Ranger District · updated 3/11/2025
Gunflint Ranger District - Binigami Gravel Pit, T62N, R1E, Sec. 17 · Cook, Minnesota
Crawford Excavating is seeking a 5- year special use permit to stockpile 2 piles of gravel (1 pile 6000 yards of class 5 and 1 pile 2000 yards of 1 1/2-inch rock) in the Binagami Gravel Pit.
Special use management
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Township 62N, Range 1E, Section 17 |
Decision Memo · Superior National Forest All Units · updated 1/29/2025
Gravel pits near August Lake, trail near FR387A · Lake, Minnesota
Expansion of two gravel pits of less than 5 acres total. Gravel is needed for trail resurfacing and culvert installation.
Minerals and geology
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations; Trail Management |
| GAOA Gravel Pit Expansion | Decision Signed Date: 02/01/2024 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | August Lake Pit T61N, R10W, section 21 Kuusi Lake Pit T61N, R10W, section 23 |
Decision Memo · Kawishiwi Ranger District · updated 1/24/2025
SESW Sec. 19 T60N R9W; NENW Sec. 30 T60N R9W; SENW Sec. 30 T60N R9W; Gov. Lot 2 Sec. 30 T60N R9W; Gov. Lot 3 Sec.30 T60N R9W; NESE Sec. 25 T60N R10W; SESE Sec. 25 T60N R10W; SWSE Sec. 25 T60N R10W; SESW Sec. 25 T60N R10W; and NENW Sec. 36 T60N R10W. · Lake, Minnesota
Install underground powerline next to existing underground powerline originally put in the 1970s. Has current authorization for construction, operation, and maintenance of Electric Transmission Lines.
Special use management
Decision
10/2024 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Gunflint Ranger District · updated 10/30/2024
3.2 miles east of the Gunflint Trail down FR304. · St. Louis, Minnesota
Replace existing washed out metal pipe culvert with a 25ft x 8-1/2ft Aluminum Box Culvert at Kimball Creek on FR304. It would restore access for the road and trail system and allow for better aquatic passage in Kimball Creek which is a trout stream.
Road management
Decision
04/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior National Forest All Units · updated 8/16/2024
This project area is the Tofte Ranger District, excluding the Boundary Waters Canoe Area Wilderness, Roadless Area Conservation Rule areas, Research Natural Areas, and Unique Biological Areas. · Cook; Lake, Minnesota
The second implementation cycle for the Tofte Landscape Project is complete and documents describing the treatments are available. Please open the Second Implemenatation Cycle folder and then the Finalization folder on this project webpage.
Road managementWildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)Forest productsFuels management
Comment Period
06/16/2021
Objection Period Start
04/16/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Roadless Area Management; Scenery Management; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Superior National Forest All Units · updated 7/25/2024
multiple lands within Cook, Lake and Saint Louis Counties, Minnesota · Cook; Lake; St. Louis, Minnesota
This project would exchange federal Superior National Forest lands located outside the Boundary Waters Canoe Area Wilderness (BWCAW) for Minnesota School Trust land located inside the BWCAW.
Land ownership management
NOI in Federal Register
08/28/2015
DEIS NOA in Federal Register
08/11/2017
FEIS NOA in Federal Register
09/2024 (Estimated)
Objection Period Start
09/2024 (Estimated)
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Land Exchanges |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | multiple lands within Cook, Lake and Saint Louis Counties, Minnesota |
Decision Memo · Superior National Forest All Units · updated 6/5/2024
The project is generally located in the southern portion of Gunflint District in Cook County between the Caribou Trail (CC4) and Highway 14 (CC14) · Cook, Minnesota
The goal of this restoration project is to convert stands, particularly dense spruce plantations, to more ecologically appropriate forest types through natural regeneration and/or planting.
Fuels managementVegetation management (other than forest products)Forest products
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tofte Ranger District · updated 3/13/2024
T59N R10W T60N R10W T60N R09W · Lake, Minnesota
The Tofte and Kawishiwi Silviculture programs area planning to hand plant and aerially seed portions of stands affected by the Greenwood fire in 2021.
Vegetation management (other than forest products)
Decision
01/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Gunflint Ranger District · updated 1/30/2023
See the web map at the following link: https://usfs.maps.arcgis.com/apps/webappviewer/index.html?id=997b8118fa0f44f08f18bee9511821bd · Cook, Minnesota
The legal notice for the objection period for the TwinGreen Project was published October 15th, 2022 in the Cook County News-Herald.
Fuels managementForest productsVegetation management (other than forest products)Wildlife, fish, rare plantsWatershed managementRoad management
Comment Period
08/13/2022
Objection Period Start
10/15/2022
Decision
01/2023 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T61N R2W; T62N R2W; T62N R1W; T62N, R1E; T63N R1W; T63N R1E; T63N R2E; T64N R1W, T64N R1E - all various sections. |
Environmental Assessment · Superior National Forest All Units · updated 1/26/2023
The Federal lands are located within a portion of the Rainy River watershed, outside the Boundary Waters Canoe Area Wilderness (BWCAW) and the BWCA Mining Protection Area. See application Map. · Cook; Lake; St. Louis, Minnesota
The Secretary of the Interior has made a decision on the requested Rainy River Withdrawal.
Land management planningMinerals and geology
Comment Period
06/28/2022
Decision
01/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Public Land Order No. 7917 for Withdrawal of Federal Lands | Decision Signed Date: 01/26/2023 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | See application, appendix A |
Environmental Assessment · Laurentian Ranger District · updated 11/4/2022
The Superior National Forest is proposing vegetation management on National Forest System lands (NFS), located two miles north of Biwabik, MN and west of Giants Ridge Recreation Area. · St. Louis, Minnesota
The Laurentian Ranger District proposes activities to move vegetation conditions toward desired conditions as described in the Forest Plan, while maintaining scenic integrity near Giants Ridge Recreation Area.
Vegetation management (other than forest products)Wildlife, fish, rare plantsRecreation managementForest products
Comment Period
04/30/2022
Objection Period Start
08/09/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Improvements/Construction; Scenery Management; Timber Sales (Green) |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Superior National Forest All Units · updated 10/28/2022
T62NR12W along Hwy 1 outside of Ely to T59NR8W in Isabella · Lake; St. Louis, Minnesota
The MN Dept. of Transportation (MNDOT) is planning to clear the right-of-way 35 feet from center line along MN Hwy 1 from Ely to Isabella. Maintenance would include tree and brush removal to allow more light to reach roadbed for safer winter driving.
Special use managementRoad management
Decision
10/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Highway 1 Roadside Clearing from Isabella to Ely | Decision Signed Date: 10/24/2022 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District; Tofte Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior National Forest All Units · updated 5/31/2022
Two treatment blocks located in the southeastern part of the Forest approximately 20 miles north of Two Harbors, MN. · Lake, Minnesota
The Minnesota Department of Agriculture (MDA), in collaboration with federal, state, and local partners, is proposing to treat isolated gypsy moth populations using a mating disruptant on Superior National Forest lands.
Vegetation management (other than forest products)Fuels management
Comment Period
03/24/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Forest Vegetation Improvements |
| 2022 Gypsy Moth Slow the Spread EA | Decision Signed Date: 05/03/2022 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Superior National Forest All Units · updated 5/16/2022
Mile 286.5 to 301.5 (Ely to FR 553-Harris Lk and Mile 311.5 to 325.5 (County Hwy 2 to Isabella) · Lake; St. Louis, Minnesota
The Minnesota Department of Transportation (MNDOT) is planning to clear the right-of-way (ROW), 35 feet from center line, along MN Highway 1 from Ely to Isabella, from Ely to Forest Rd 553 (Harris Lake), & Cty Hwy 2 to Isabella
Special use managementRoad management
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District; Tofte Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Superior National Forest All Units · updated 3/16/2022
The proposed activities would occur approximately 10 miles southeast of Ely, MN, South of State Highway 1, in an area southeast of the South Kawishiwi River. · Lake; St. Louis, Minnesota
The BLM will lead preparation of an EIS to analyze potential impacts of issuing a preference right lease application and mine plan for an underground copper-nickel mine. Forest Plan amendment and special use permit may be needed.
Minerals and geology
NOI in Federal Register
06/30/2020
DEIS NOA in Federal Register
01/2022 (Estimated)
FEIS NOA in Federal Register
06/2022 (Estimated)
Objection Period Start
06/2022 (Estimated)
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Electric Transmission; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Plan Amendment; Road Improvements/Construction |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kawishiwi Ranger District · updated 1/4/2022
The salvage units are located around 15 miles south of Ely, MN. They are along Lake County 2, around two miles west and southwest of the intersection of MN State Highway 1 and Forest Road 933 spur. · Lake; St. Louis, Minnesota
The Kawishiwi Ranger District proposes to salvage harvest up to 250 acres of moderately to severely damaged trees within the Greenwood Fire perimeter, which burned around 26,797 acres on the Superior National Forest during the summer of 2021.
Forest productsVegetation management (other than forest products)
Decision
12/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Gunflint Ranger District · updated 11/8/2021
Trails and roads in the Tofte and Gunflint Ranger Districts. · Cook; Lake, Minnesota
This project would authorize a series of trails, and decommission other trails no longer in use on the East Zone. In addition, culvert removal, reclassification, and decommissioning of roads would restore streams and wetlands.
Recreation managementRoad managementWatershed management
Comment Period
04/24/2021
Objection Period Start
07/03/2021
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Trail Management; Road Maintenance; Travel Management; Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kawishiwi Ranger District · updated 2/25/2021
This trail is located north of the North Arm Road, approximately 6 miles northwest of Ely, MN. · St. Louis, Minnesota
Construct a cross country skiing and hiking trail connecting two existing trail systems - North Arm Junction and North Arm. To accommodate more use the parking lot at Slim Lake would be expanded to allow approximately four to six more vehicles.
Recreation management
Decision
02/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Gunflint Ranger District · updated 8/4/2020
The project area encompasses Devils Track, Northern Lights, Elbow, and Trout Lakes, as well as portions of the Gunflint Trail · Lake, Minnesota
The Kimball Project aims to promote diverse, resilient forest ecosystems. This will be accomplished through hazard fuels reduction, vegetation management, and wildlife habitat improvement.
Watershed managementRoad managementFuels managementRecreation managementVegetation management (other than forest products)Wildlife, fish, rare plantsForest products
Comment Period
04/26/2019
Objection Period Start
12/20/2019
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Special Products Sales; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Kimball Decision Notice | Decision Signed Date: 06/03/2020 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Superior National Forest All Units · updated 6/26/2020
Highway 21 South; Township 61 North, Range 12 West, E ? Section 5 · St. Louis, Minnesota
St. Louis Co. Public Works is planning to replace County Bridge#285 on Bear Island River(Hwy 21), between Ely and Babbitt. Tentative spring 2020 construction. Same location as existing structure, with a temp road-bridge bypass west of construction.
Road management
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior National Forest All Units · updated 6/1/2020
The 234,328 acres of Federal land in this proposed request for withdrawal are located within the Rainy River watershed on the Superior National Forest and are adjacent to the BWCAW and MPA. · Cook; Lake; St. Louis, Minnesota
The Forest Service requested a withdrawal of National Forest System lands, for a 20-year term, within the Rainy River Watershed. An EA will be prepared to inform the Secretary of Interior's decision. No Forest service decision will be made.
Minerals and geology
Comment Period
01/26/2018
Decision
01/2019 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Use Adjustments |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | See Federal Register Notice and Forest Service Withdrawal Application. |
Environmental Assessment · Superior National Forest All Units · updated 5/8/2020
Approximately seven miles Southeast of Ely, Minnesota near Birch Lake and the Kawishiwi River. · Lake; St. Louis, Minnesota
Twin Metals Minnesota has requested special use permit for access to collect baseline hydrogeologic environmental data to data to assist the company's prefeasablity study for a mining project to ensure that the environment is appropriately protected.
Minerals and geologySpecial use management
Comment Period
10/10/2015
Objection Period Start
02/2017 (Estimated)
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T 60N R12W S4, T 61N R12W S11, T 61N R12W S13, T 61N R11W S18, T 61N R11W S6, T 62N R11W S23, T 62N R11W S24, T 62N R11W S26, T 62N R11W S28, T 62N R11W S31, T 62N R11W S32, T 62N R11W S33 |
Environmental Assessment · Tofte Ranger District · updated 4/21/2020
Three miles northeast of Isabella, MN. · Cook; Lake, Minnesota
The project purpose is to promote diverse and healthy vegetation communities by creating young forest through even-aged harvest, improving stand conditions through intermediate harvests and restoring stand conditions through non-harvest activities.
Fuels managementVegetation management (other than forest products)Watershed managementRoad managementWildlife, fish, rare plantsForest products
Comment Period
06/13/2014
Decision
03/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Windy Project Decision Notice and Finding of No Significant Impact | Decision Signed Date: 03/20/2015 |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | T61N R8W,7W,6W; T60N R8W, 7W, 6W |
Environmental Assessment · Tofte Ranger District · updated 3/26/2020
Township 59 North, Range 4 West, Sections 3, 4, & 5; Township 60 North, Range 4 West, Section 34 · Cook, Minnesota
A private landowner has requested to construct and maintain a road for access to private property to conduct maple tapping operations on federal land.
Special use management
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Township 59 North, Range 4 West, Sections 3, 4, & 5; Township 60 North, Range 4 West, Section 34 |
Decision Memo · Kawishiwi Ranger District · updated 3/16/2020
Superior National Forest, Lake County, MN. Legal T63N, R11W, section 30 · Lake, Minnesota
The Prospector ATV Club has requested the Forest Service to consider a needed 196 foot trail reroute to connect the City of Ely with the rest of the Prospector ATV trail. The reroute is around private land.
Recreation management
Decision
02/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T63N, R11W, section 30 |
Decision Memo · Superior National Forest All Units · updated 12/10/2019
Within the City of Ely · St. Louis, Minnesota
This proposal allows for the sale of a former Administrative Site which includes three warehouses, two garages, one dwelling, a carpenter's shop, associated sheds and outbuildings and a 200' self supporting communication tower.
Land management planning
Decision
05/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Ely Service Center Forest Service Facilities Realignment & Enhancement Act | Decision Signed Date: 05/15/2014 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T63N,R12W, Section 33, Parts of SWNE, NWSE, SESE and lots in Fortiers Addition, containing 2.74 acres, more or less. |
Environmental Assessment · Laurentian Ranger District · updated 12/2/2019
Existing Seppi operation at the Jammer Lake Gravel Pit off of Hwy 53 north of Virginia, MN · St. Louis, Minnesota
Authorize gravel pit prospecting and expansion of the existing Jammer Lake gravel pit to provide mineral materials to meet future demand.
Minerals and geology
Comment Period
08/28/2019
Objection Period Start
10/05/2019
Decision
12/2019 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · LaCroix Ranger District · updated 11/25/2019
LaCroix Ranger District of the Superior National Forest · St. Louis, Minnesota
The LaCroix Ranger District proposes to create young forest, manage forest roads, reduce hazardous fuels, increase wildlife habitat, and conduct vegetation management through harvest, nonharvest, and planting.
Recreation managementForest productsWildlife, fish, rare plantsRoad managementFuels managementVegetation management (other than forest products)
Comment Period
05/11/2019
Objection Period Start
09/24/2019
Decision
11/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Scenery Management |
| Jeanette Project Finding of No Significant Impact & Final Decision Notice | Decision Signed Date: 11/25/2019 |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kawishiwi Ranger District · updated 10/11/2019
South of Fernberg Trail on Kawishiwi Ranger District. South and southwest of Sawbill Lake on Tofte Ranger District. · Lake, Minnesota
Improvement of moose habitat and reduction of hazards fuels of the Kawishiwi and Tofte Ranger Districts
Wildlife, fish, rare plants
Decision
06/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · LaCroix Ranger District · updated 9/26/2019
8 miles NE of Orr, MN · St. Louis, Minnesota
Access to private land
Special use management
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T66N R18W sec18 |
Environmental Assessment · Kawishiwi Ranger District · updated 7/30/2019
The Birch Project Area is located near Ely, MN and south and west of Ely. · Lake; St. Louis, Minnesota
The Kawishiwi Ranger District proposes to manage the vegetation and road system in the Birch Project Area.
Recreation managementWildlife, fish, rare plantsFuels managementVegetation management (other than forest products)Watershed managementRoad managementForest productsSpecial use management
Comment Period
07/01/2011
Decision
11/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Use Authorizations; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements |
| Birch Project Decision Notice and Finding of No Significant Impact | Decision Signed Date: 11/04/2011 Legal Notice Date: 11/05/2011 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Activities could be located on National Forest System (NFS) land in portions of Townships 61 to 63 North, and Ranges 11 to 13 West. |
Environmental Impact Statement · LaCroix Ranger District · updated 7/30/2019
The Project Area encompasses NFS land south of Voyageurs NP, west of the BWCAW, north of Echo Lake, and east of the Forest proclamation boundary · St. Louis, Minnesota
Analysis of proposed actions to move existing forest vegetation condition and transportation system towards Forest Plan desired conditions.
Road managementSpecial use managementVegetation management (other than forest products)Fuels managementForest products
NOI in Federal Register
01/28/2008
DEIS NOA in Federal Register
05/22/2009
FEIS NOA in Federal Register
10/23/2009
Decision
10/2009 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | All or portions of sections in Townships 65 to 68 North and Ranges 16 to 19 West |
Environmental Assessment · Superior National Forest All Units · updated 7/30/2019
Gunflint and Tofte Ranger Districts · Cook, Minnesota
With this exchange, the United States would acquire 1910.76 acres of non-federal land within the Boundary Waters Canoe Area Wilderness (BWCAW) in exchange for up to apapproximately 1620 acres of federal land.
Land ownership management
Comment Period
01/24/2014
Objection Period Start
03/04/2015
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Land Exchanges |
| Cook County Land Exchange Decision Notice | Decision Signed Date: 04/28/2015 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District; Tofte Ranger District |
| Legal Land Description | Cook County |
Environmental Assessment · Superior National Forest All Units · updated 7/30/2019
Both the federal and nonfederal property are located in the general vicinity of the Town of Crane Lake, Minnesota · St. Louis, Minnesota
This is a land exchange proposal involving federal land located within and adjacent to the Town of Crane Lake for private land in the general vicinity of Crane Lake and the Boundary Waters Canoe Area Wilderness.
Land ownership management
Comment Period
10/30/2012
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| Crane Lake Land Exchange Decision Notice | Decision Signed Date: 08/20/2013 Legal Notice Date: 08/23/2013 |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | Federal land: T67N, R17W, Sec. 23 & 26, Non Federal land: T67N-R16W, Section 7 and T65N-R17W, Sections 4 and 15 |
Environmental Impact Statement · LaCroix Ranger District · updated 7/30/2019
North and South of Echo Trail County RD 116 from Vermillion River to Burntside Lake and Lake Vermillion to BWCAW · St. Louis, Minnesota
FEIS analyzed actions to move vegetation and transportation existing conditions towards Forest Plan desired conditions.
Road managementForest products
NOI in Federal Register
03/25/2005
DEIS NOA in Federal Register
04/14/2006
FEIS NOA in Federal Register
02/02/2007
Decision
01/2007 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green) |
| Echo Trail Forest Management Project | Decision Signed Date: 01/03/2007 Legal Notice Date: 02/02/2007 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District; LaCroix Ranger District |
| Legal Land Description | T62-66N R11-17W |
Environmental Impact Statement · Superior National Forest All Units · updated 7/30/2019
Forest-wide, broad scale analysis and in 29 submitted prospecting permit application areas. · Cook; Koochiching; Lake; St. Louis, Minnesota
Broadscale analysis to address FS consent and BLM issuance of federal hardrock mineral prospecting permits and operating plans (present and future).
Minerals and geology
NOI in Federal Register
12/19/2008
DEIS NOA in Federal Register
04/01/2011
FEIS NOA in Federal Register
06/01/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Regulation Creation/Modification |
| Federal Hardrock Mineral Prospecting Permits Record of Decision | Decision Signed Date: 06/01/2012 Legal Notice Date: 06/01/2012 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Project covers the entire forest except for Boundary Waters Canoe Area Wilderness and the Mining Protection Area (approximately 1,7 million acres). |
Environmental Assessment · Superior National Forest All Units · updated 7/30/2019
Superior National Forest all units (excluding BWCAW and semi-primitive non-motorized areas) · Cook; Lake; St. Louis, Minnesota
This implements the travel management rule & addresses Off-Highway Vehicle management on existing roads & trails & the disposition of unclassified roads. This analysis combines the East & West Zone travel management projects into one analysis.
Road managementRecreation managementSpecial use management
Comment Period
06/06/2008
Decision
12/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Trail Management; Travel Management |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
Environmental Impact Statement · Kawishiwi Ranger District · updated 7/30/2019
The Project Area encompasses NFS land from approximately 5 to 20 miles east of Ely in the vicinity of the Fernberg Road and Highway 1. · Lake; St. Louis, Minnesota
Analysis of proposed actions to move existing vegetation condition and transportation system towards Forest Plan desired conditions.
Vegetation management (other than forest products)Fuels managementSpecial use managementRoad managementWildlife, fish, rare plantsForest products
NOI in Federal Register
11/02/2007
DEIS NOA in Federal Register
07/25/2008
FEIS NOA in Federal Register
02/20/2009
Decision
02/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Use Authorizations; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | All or portions of sections in T.61N, R.9W., T.62N., R.10W., T.63N., R.11W. |
Decision Memo · Gunflint Ranger District · updated 7/30/2019
Trail would start at the end of Forest Road 329 · Cook, Minnesota
Atv Access to Private Land.
Special use management
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Kevin Woodward Access | Decision Signed Date: 10/17/2014 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T62N, R2W Sections 26 & 27 |
Environmental Assessment · Superior National Forest All Units · updated 7/30/2019
Federal land is on the South Kawishiw River. Non-federal land is on the Vermilion River, South Kawishiwi River, and remote forest tracts. · Lake; St. Louis, Minnesota
This is a land exchange involving the federal summer home tract located on S Kawishiwi River for private land referred to as the Vermillion Gorge near Crane Lake, Kawishiwi River (near BWCAW), and misc tracts on the Laurentian RD.
Land acquisition
Comment Period
06/20/2008
Decision
10/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Land Exchanges |
| South Kawishiwi Cabin Group Land Exchange Project | Decision Signed Date: 10/14/2009 (FS Withdrawn) Legal Notice Date: 10/17/2009 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Federal - T61N, R11W, S5 and 6 and T62N, R11W, S28, 32, and 33. Non-federal - T67N, R17W;T66N, R17W; T62N, R11W, T59NR11-13W; and T58N, R9W. |
Environmental Assessment · Superior National Forest All Units · updated 7/30/2019
Superior National Forest · Cook; Koochiching; Lake; St. Louis, Minnesota
Supplemental Analysis for the Environmental Assessment to the Forest-wide Travel Management Project
Road managementRecreation management
Comment Period
07/17/2009
Decision
11/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management |
| Forest-wide Travel Management Project | Decision Signed Date: 11/17/2009 Legal Notice Date: 11/30/2009 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Koochiching, St. Louis, Lake and Cook Counties |
Environmental Assessment · Kawishiwi Ranger District · updated 7/23/2019
Approximately 10 miles east of Babbitt, Minnesota near Harris Lake. · Lake, Minnesota
Cold Spring Granite Co. has submitted a request to expand their wast-rock (grout) stockpile approximately 14 acres. This expansion is beyond what is currently approved in their operating plan for the quarry.
Minerals and geology
Comment Period
04/20/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Mesabi Black Quarry Expansion DN and FONSI | Decision Signed Date: 06/14/2013 Legal Notice Date: 06/15/2013 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | SWSW and SESW of Sec. 24, and NWNW and NENW of Sec. 25, T61N R11W |
Decision Memo · LaCroix Ranger District · updated 6/26/2019
Leslie Road west of Hwy 53 · St. Louis, Minnesota
92 acres of prescribed burning to improve oak and blueberry habitat.
Fuels managementWildlife, fish, rare plants
Decision
03/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Laurentian Ranger District · updated 5/20/2019
Beaver River is located in the southeast corner of the Superior National Forest, approximately 9 miles northwest of Silver Bay, MN. · Lake, Minnesota
The Laurentian Ranger District proposes activities to move vegetation and wildlife habitat toward desired conditions as described in the Forest Plan by managing vegetation with prescribed fire, harvesting, and other mechanical means.
Watershed managementRoad managementVegetation management (other than forest products)Special use managementFuels managementWildlife, fish, rare plantsRecreation managementForest products
Comment Period
11/19/2018
Objection Period Start
02/15/2019
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Use Authorizations; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Kawishiwi Ranger District · updated 3/11/2019
Approximately 4 miles northwest of Ely. · Lake; St. Louis, Minnesota
The Kawishiwi Ranger District proposes activities to move vegetation toward desired conditions as described in the Forest Plan by reducing hazardous fuels, conducting forest vegetation, and managing wildlife and other resources.
Minerals and geologyWildlife, fish, rare plantsFuels managementRoad managementForest productsRecreation managementSpecial use managementWatershed managementVegetation management (other than forest products)
NOI in Federal Register
06/09/2017
DEIS NOA in Federal Register
04/09/2018
FEIS NOA in Federal Register
10/12/2018
Objection Period Start
10/12/2018
Decision
03/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Chief's Approval |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Use Authorizations; Plan Amendment; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T63N R12W, T63N R13W, T64N R11W, T64N R12W, T64N R13W, T65N R13W |
Decision Memo · Superior National Forest All Units · updated 12/20/2018
Fernberg tower communication site located on Lookout Road east of Ely, MN. · Lake, Minnesota
Approving an additional telecommunication use at a site already used for such purposes.
Special use management
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| T Mobile Co-locating at Fernberg Communication Tower Decision Memo | Decision Signed Date: 12/03/2018 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Sec 8, T63N, R9W, |
Environmental Assessment · Tofte Ranger District · updated 10/31/2018
The left side of the project area borders the Kawishiwi Ranger District. The north edge of this project borders the BWCAW and encompasses the city of Isabella. · Lake, Minnesota
The TomaInga Project proposes to manage vegetation and roads to promote diverse, productive, and healthy ecosystems and wildlife habitat, improve moose habitat, reduce hazardous fuels and provide sustainable forest products.
Fuels managementRecreation managementWildlife, fish, rare plantsRoad managementForest productsWatershed managementVegetation management (other than forest products)
Comment Period
04/13/2018
Objection Period Start
08/24/2018
Decision
10/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Special Products Sales; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | T59N R7W,8W,9W,10W; T60N R7W,8W,9W,10W; T61N R8W,9W |
Decision Memo · Gunflint Ranger District · updated 10/23/2018
Township 65 North, Range 4 West, Section 5 · Cook, Minnesota
MnDOT has requested a communication site facility for the ARMER project located at the existing Gunflint Trail Volunteer Fire Department Seagull Fire Hall #3 station. The site will house an 80' communication tower, 10 x 18' equipment building.
Special use management
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Township 65 North, Range 4 West, Section 5 |
Decision Memo · Gunflint Ranger District · updated 9/18/2018
T66N, R4W, Section 30 · Cook, Minnesota
The Gunflint Trail Historical Society has requested to construct an additional parking area at the Chik-Wauk site.
Special use management
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T66N, R4W, Section 30 |
Decision Memo · Gunflint Ranger District · updated 9/4/2018
The ski trail is approximately 1 mile up the Gunflint Trail off of County Road 12 in Grand Marais, MN. · Cook, Minnesota
Project proposes rerouting the Superior Hiking Trail near Pincushion Mountain. Rerouting the trail on its own corridor to preserve the ski trail and reduce user conflicts.
Recreation management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T61N, R1E, Section 15 |
Environmental Assessment · Gunflint Ranger District · updated 8/9/2018
The project area is approximately three miles north of Tofte and Lutsen Minnesota; The western boundary is near Ninemile Lake and the eastern boundary is near Pike Lake. · Cook; Lake, Minnesota
The Barker Project proposes to manage vegetation and roads to promote diverse, productive and healthy ecosystems and wildlife habitat, reduce hazardous fuels and provide sustainable forest products.
Wildlife, fish, rare plantsRoad managementFuels managementVegetation management (other than forest products)Watershed managementForest productsRecreation management
Comment Period
09/26/2015
Objection Period Start
03/19/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Special Products Sales; Noxious Weed Treatments; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District; Tofte Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Gunflint Ranger District · updated 8/9/2018
This project is approximately 20 miles north of Grand Marais. It encompasses the Mid Gunflint Trail on the east side, and borders the Grand Portage Reservation from the west side · Cook, Minnesota
The Shokoshoe Project proposes to manage vegetation and roads to promote diverse, productive, and healthy ecosystems and wildlife habitat, reduce hazardous fuels and provide sustainable forest products.
Watershed managementForest productsVegetation management (other than forest products)Fuels managementRecreation managementWildlife, fish, rare plantsRoad management
Comment Period
04/01/2017
Objection Period Start
08/12/2017
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Special Products Sales; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Township 65N Range 2W, 1W, 1E. Township 64N Range 1W,1E,2E,3E,4E,4W. Township 63N Range 3E,2E,4E. Township 62N Range 3E. |
Environmental Assessment · Superior National Forest All Units · updated 5/30/2018
Split Rock/Beaver Bay treatment block in Lake County · Lake, Minnesota
Treatment to slow the spread of the invasive insect, gypsy moth, on a block of about 11,784 acres of national forest land on the Laurentian district. All treatment on national forest lands would be with disparlure, a mating disrupter.
Vegetation management (other than forest products)Fuels management
Comment Period
02/15/2018
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tofte Ranger District · updated 5/29/2018
The project area is roughly located, east to west, between the Sawbill and the Kawishiwi Lake Road, and bounded north to south by the BWCAW and CR 3/7 · Lake, Minnesota
This project proposes wildlife habitat enhancement activities through prescribed burning and non-harvest site preparation. No roads would be constructed.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other; Ira - Inventoried Roadless Area Activities Requiring Chief's Approval |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | T 61N R 4W Sec. 6; T 61N R 5W Sec. 1, 2, 3; T 61N R 6W Sec. 1; T 62N R 4W Sec. 30, 31; T 62N R 5W Sec. 25, 26, 28, 29, 31, 34, 35, 36; T 62N R 6W Sec. 36. |
Decision Memo · Kawishiwi Ranger District · updated 7/18/2017
There are two separate locations included in this project. Both areas are along the Cloquet Line Road, which is between five and seven miles north of Ely, MN. · Lake; St. Louis, Minnesota
This project proposes to salvage 250 acres of blown down timber and vegetation that occurred on July 21, 2016.
Vegetation management (other than forest products)Forest products
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Laurentian Ranger District · updated 7/18/2017
Townships 58-61N, Ranges 16-21W · St. Louis, Minnesota
The Laurentian Ranger District proposes activities to move vegetation toward desired conditions as described in the Forest Plan by reducing hazardous fuel, conducting forest vegetation, and managing wildlife and other resources.
Forest productsWatershed managementRecreation managementFuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsSpecial use managementRoad management
Comment Period
10/25/2016
Objection Period Start
01/13/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Use Authorizations; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Superior National Forest All Units · updated 3/31/2017
Federal lands located in St. Louis county near Hoyt Lakes. Non-federal lands located in St. Louis, Lake, and Cook counties. · Cook; Lake; St. Louis, Minnesota
A land exchange of federal lands in: T59N, R12W, T59N, R13W, and T60N, R13W. Non-federal lands being proposed are located throughout the Superior National Forest in St. Louis, Lake, and Cook counties.
Minerals and geologyLand ownership management
NOI in Federal Register
10/13/2010
DEIS NOA in Federal Register
12/13/2013
FEIS NOA in Federal Register
11/17/2015
Objection Period Start
11/17/2015
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Land Exchanges |
| Northmet Land Exchange Record of Decision | Decision Signed Date: 01/09/2017 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District; Gunflint Ranger District; Kawishiwi Ranger District; LaCroix Ranger District |
| Legal Land Description | Federal: T59N, R12W, Sections 6 &7; T59N, R13W, Sections 1 thru 12, 17, & 18; and T60N, R13W, Sections 33 thru 35. |
Decision Memo · Gunflint Ranger District · updated 3/23/2017
The project location is at the junction of the Superior Hiking Trail and Crow Creek. · Cook, Minnesota
The Crow Creek bridge on the Superior Hiking Trail (SHT) needs to be replaced. The current bridge has a span of approximately 50 feet. By rerouting the SHT by 250 ft a smaller bridge spanning only 30 feet could be utilized to cross Crow Creek.
Recreation management
Decision
02/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| SHT Crow Creek Re-route Decision Memo | Decision Signed Date: 02/17/2017 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | NW 1/4 of T 61 N, R 2 E, Sec 2 |
Decision Memo · Superior National Forest All Units · updated 3/20/2017
Verso Corporation: Township 60,Range 11, Section 34. MN DNR: Township 61, Range 11, Section 10. · Lake; St. Louis, Minnesota
Purpose is to provide most reasonable access to nonfederal land in accordance with Federal Land Policy and Management Act of October 21, 1976 (FLPMA) and Alaska National Interest Lands Conservation Act of 1980 (ANILCA).Responses to applicants needs.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kawishiwi Ranger District · updated 12/5/2016
5 different locations on the west zone of the Forest. · Lake; St. Louis, Minnesota
Improve browse and habitat for moose and marsh birds.
Wildlife, fish, rare plants
Decision
11/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Gunflint Ranger District · updated 9/15/2016
Located in T62N, R1E, Section 30 on the South Shore of Devil Track Lake. · Cook, Minnesota
Proposed new vehicle access of approx. 105 feet to a parcel that the Boy Scouts of America own on the south shore of Devil Track Lake.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior National Forest All Units · updated 8/25/2016
Trail would be located in northern St. Louis and Lake Counties. · Lake; St. Louis, Minnesota
The Prospector OHV Loop Project would to add linkages using existing roads and trails to create a 75 mile OHV riding loop, providing long distance recreational riding opportunities that would connect the cities of Ely and Babbitt.
Recreation management
Comment Period
04/09/2016
Objection Period Start
07/02/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Superior National Forest All Units · updated 7/20/2016
The project area is located near Isabella, Minnesota. The western boudary is near McDougal Lake and the eastern boundary is near Ninemile Lake. · Cook; Lake, Minnesota
The Stony Project proposes to manage vegetation and roads to promote diverse, productive and healthy ecosystems and wildlife habitat, reduce hazardous fuels and provide sustainable forest products.
Wildlife, fish, rare plantsRecreation managementWatershed managementRoad managementVegetation management (other than forest products)Forest productsFuels management
Comment Period
01/27/2016
Objection Period Start
04/29/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Special Products Sales; Noxious Weed Treatments; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · LaCroix Ranger District · updated 6/15/2016
. · St. Louis, Minnesota
The LaCroix Ranger District proposes to create young forest, manage forest roads, and conduct vegetation management through harvest, nonharvest, and planting.
Forest productsRoad managementVegetation management (other than forest products)
Comment Period
12/11/2015
Objection Period Start
03/30/2016
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T66-67N, R20-21W |
Decision Memo · Tofte Ranger District · updated 3/15/2016
T62N R8W Section 18, T62N R8W Sec 24. Project located between Powwwow trail entry point and Pose Lake. · Lake, Minnesota
Reroute 500' of the hiking trail that goes through a section that is often underwater due to its poor location in a natural drainage. We propose to reroute that section of trail onto durable terrain on the east side of the trail.
Recreation management
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Laurentian Ranger District · updated 2/23/2016
Lake Fourteen north of Virginia, MN · St. Louis, Minnesota
Realignment of Folsom Rd. Project was put on hold. St. Louis County is reactivating project.
Special use management
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T60N R19W sec 23 |
Environmental Assessment · Kawishiwi Ranger District · updated 11/4/2015
Eight miles north of Ely, MN off the Echo Trail. · St. Louis, Minnesota
The Kawishiwi Ranger District of the Superior National Forest is proposing to allow mixed use of passenger vehicles and ATVs on 5.25 miles of Forest Roads 459 and 457 to enhance long distance recreational vehicle riding opportunities on existing road
Recreation management
Comment Period
02/21/2014
Objection Period Start
06/13/2015
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Travel Management |
| Mixed Use Decision Notice and Finding of No Significant Impact | Decision Signed Date: 11/02/2015 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T64N, R12W sections 14,20-23,30 |
Environmental Assessment · Kawishiwi Ranger District · updated 11/4/2015
Activities would be located on NFS lands in portions of the Pearl Project Areas which is approximately 3 miles south of Ely · St. Louis, Minnesota
The Kawishiwi Ranger District proposes activities to move vegetation toward desired conditions as described in the Forest Plan by managing forest vegetation, reducing hazardous fuel, and managing for wildlife and other resources.
Vegetation management (other than forest products)Road managementForest productsFuels management
Comment Period
10/04/2014
Objection Period Start
02/07/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Pearl Project Decision Notice | Decision Signed Date: 05/28/2015 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T59-61N, R 9-12W |
Environmental Assessment · Gunflint Ranger District · updated 9/11/2015
The project area is approximately three to five miles wide, along the North Shore of Lake Superior · Cook; Lake, Minnesota
This project is to restore native vegetation communities along the North Shore of Lake Superior. This project is in conjunction with the North Shore Forest Collaborative.
Forest productsWildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)Fuels management
Comment Period
12/13/2013
Objection Period Start
05/09/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Noxious Weed Treatments; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| North Shore Restoration Project Decision Notice | Decision Signed Date: 08/22/2014 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District; Tofte Ranger District |
| Legal Land Description | T62N R4E, 3E, 2E, 1E, 1W, 2W and T61N R1W, 2W, 3W, 4W, 5W |
Decision Memo · Gunflint Ranger District · updated 6/22/2015
Bower Trout Lake is accessed via forest road 152H off of forest road 152 (Lima Grade). From the entry point parking lot visitors travel a 60 road portage to access Bower Trout Lake. · Cook, Minnesota
Past erosion control methods have been unsuccessful. There is a section of rocky shoreline to the east of the current portage that would provide a more stable canoe landing. This re-route will require approximately 300 feet of boardwalk in Wilderness
Recreation management
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Decision Memo Signed | Decision Signed Date: 05/12/2015 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tofte Ranger District · updated 6/22/2015
T 63N R 5W Sec 24. Portage is located between Lujenida Lake and Zenith Lake in the Boundary Waters Canoe Area Wilderness. · Cook, Minnesota
In 2013 a beaver dam flooded 250-300' of portage including 40' of boardwalk. Erosion has occurred on multiple unsustainable paths used to avoid the flooded section. We propose to reroute about 600' of portage to higher ground.
Recreation management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Wilderness Management |
| Decision Memo Signed | Decision Signed Date: 06/05/2015 |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kawishiwi Ranger District · updated 3/31/2015
Special Use road from the Cloquet Line going into Brown's Lake · Lake, Minnesota
This proposal is to issue a special use (SU) permit to utilize an existing SU road that already has an existing SU permit with another landowner.
Special use management
Decision
08/2014 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | SE1/4Sw1/4 of Section 5, T63N. R11W |
Decision Memo · Gunflint Ranger District · updated 1/22/2015
The site is located approximately 55 miles northwest of Grand Marais, Minnesota, and can be reached via the Gunflint Trail (Cook County Road 12) and Moose Pond Drive (Cook County Road 81). · Cook, Minnesota
The Gunflint Trail Historical Society is proposing to construct five buildings within their 50-acre permitted area. Buildings are proposed to be constructed where buildings existed in the past.
Special use management
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T66N, R4W, Section 30 |
Decision Memo · Kawishiwi Ranger District · updated 12/23/2014
20 miles NE of Ely MN, North end of Lake One · Lake, Minnesota
The Kawishiwi Ranger District of the Superior National Forest is proposing to add two campsites to Lake One which is located in the Boundary Waters Canoe Area Wilderness.
Recreation management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Wilderness Management |
| Environmental Documentation Letter to File | Decision Signed Date: 07/08/2014 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T63N R9W Sec 22 |
Decision Memo · Gunflint Ranger District · updated 9/26/2014
Location is in the Portage Lake area. · Cook, Minnesota
Access will mostly be on private land, in order to avoid a wet land the access will curve on FS lands for approximately 275 feet with a width of 25 feet.
Special use management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Special Use Access Requests | Decision Signed Date: 07/25/2014 Legal Notice Date: 07/25/2014 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T64N, R2W, Section 3 by Portage Lake. |
Environmental Assessment · Superior National Forest All Units · updated 6/24/2014
The area proposed includes Kawishiwi, Laurentian, and Tofte Districts. The main routes are T.H. 1, C.S.A.H. 2, 7, 16, and 18 and throughout the Ely area (see Maps). · Lake; St. Louis, Minnesota
Lake County (through Compass Consultants Inc.) has submitted a proposal requesting a special-use permit to construct, install, operate, and maintain fiber optic cable (RUS financed) on/over National Forest System (NFS) lands.
Special use management
Comment Period
01/17/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Lake County Fiber Optic Project Decision Notice | Decision Signed Date: 05/13/2014 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District; Kawishiwi Ranger District; Tofte Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tofte Ranger District · updated 6/19/2014
The road being proposed for access is located approximately 18 miles north of Highway 61 off of the Caribou Trail (County Road 4) on Forest Service Road 162I. · Cook, Minnesota
The Brown Access Request is for access across federal land utilizing approximately 0.35 miles of existing road to access private property.
Special use management
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Memo - Special Use Access Requests | Decision Signed Date: 05/27/2014 |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Township 62 North, Range 3 West, Sections 25, 26 and 35 |
Decision Memo · Laurentian Ranger District · updated 6/19/2014
The south-east corner of the Laurentian Ranger District, Superior National Forest; approximately seven miles west of Silver Bay, Minnesota · Lake, Minnesota
Lake County and the Minnesota DNR propose to upgrade segments of the Northshore Snowmobile Trail on the Superior National Forest to accomodate ATV use.
Recreation management
Decision
04/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T 56N R 9W, Sections 24, 25, 35, and 36, |
Environmental Assessment · Superior National Forest All Units · updated 6/11/2014
Treatment block on National Forest lands is located north of Ely, MN. Treatment is outside the Boundary Waters Canoe Area Wilderness. · St. Louis, Minnesota
Treatment with pheremone, disparlure, to slow the spread of the non-native insect Gypsy Moth.
Vegetation management (other than forest products)Fuels management
Comment Period
04/07/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Forest Vegetation Improvements |
| 2014 Gyspy Moth Slow the Spread Project Decision Notice | Decision Signed Date: 06/11/2014 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Tofte Ranger District · updated 2/20/2014
This proposed re-route is located east of the existing Beaver Trail corridor on the north side of Isak Ridge Road · Cook, Minnesota
This proposed re-route is designed to connect the existing trail corridor on federal land with the recently completed trail re-route on private land.
Recreation management
Comment Period
12/20/2013
Decision
02/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Township 60 North, Range 3 West, Section 13 |
Environmental Assessment · Laurentian Ranger District · updated 9/30/2013
Activities would be located on NFS lands in portions of the Skibo Project Area East of Hoyt Lakes, MN · St. Louis, Minnesota
The proposed activities in the project area are intended to move vegetation from its existing condition toward the desired conditions as described in the Forest Plan by managing forest vegetation age, composition, structure, and spatial patterns.
Special use managementVegetation management (other than forest products)Forest productsFuels management
Comment Period
06/20/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Use Authorizations; Timber Sales (Green) |
| Skibo Project Decision Notice and Finding of No Significant Impact | Decision Signed Date: 08/27/2013 Legal Notice Date: 08/27/2013 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T56-58N, R12-14W |
Decision Memo · Kawishiwi Ranger District · updated 9/30/2013
Slim Lake is located near the North Arm of Burntside Lake, North of Ely, MN. Access is via the Echo Trail and the North Arm Trail. · St. Louis, Minnesota
The Kawishiwi Ranger District of the Superior National Forest is proposing to add a campsite on Slim Lake which is located in the Boundary Waters Canoe Area Wilderness.
Recreation management
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Wilderness Management |
| Slim Lake Letter to the File | Decision Signed Date: 07/24/2013 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Section 27, T 64 N, R 13W |
Decision Memo · Kawishiwi Ranger District · updated 9/24/2013
Activities located west of Burntside Lake from Hunch Lake south to Buckshot Lake. · St. Louis, Minnesota
Reduce hazardous fuel concentrations west of Burntside Lake from North Arm south to Buckshot Lake.
Fuels management
Comment Period
07/06/2013
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District; LaCroix Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Superior National Forest All Units · updated 9/23/2013
Over 1000 small treatment sites are located throughout the 1.1 million acre BWCAW, primarily at campsites, portages, and old cabin/resort sites · Cook; Lake; St. Louis, Minnesota
Proposal for an integrated pest management approach to treat non-native invasive plants beginning with approximately 14 acres of infestations scattered across the 1.1 million acre BWCAW and possibly expanding up to 60 acres over the next 10 years.
Wildlife, fish, rare plantsSpecial area managementVegetation management (other than forest products)
NOI in Federal Register
04/21/2011
DEIS NOA in Federal Register
02/01/2013
FEIS NOA in Federal Register
08/23/2013
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments; Wilderness Management |
| BWCAW Non-native Invasive Plant Project Record of Decision | Decision Signed Date: 08/21/2013 Legal Notice Date: 08/30/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District; Kawishiwi Ranger District; LaCroix Ranger District; Tofte Ranger District |
Decision Memo · Gunflint Ranger District · updated 9/17/2013
North of Eggers Lake, Off of Forest Road 152C · Cook, Minnesota
Proposed Walking Trail to Private Land
Special use management
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T63N, R1W, Section 24 |
Decision Memo · Gunflint Ranger District · updated 7/16/2013
North East of Devil Track Lake · Cook, Minnesota
Access to State Lands for timber management on old existing route then about 800 feet of new construction. Access will be obliterated when sale is complete.
Special use management
Comment Period
09/28/2012
Decision
02/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Natural Resources 107271 | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T62N, R 1E, Section 28 |
Decision Memo · Gunflint Ranger District · updated 7/15/2013
North of Swamp Lake · Cook, Minnesota
Temporary access to State Timber Sale in T62N, R2W, Section 9
Special use management
Comment Period
06/15/2012
Decision
02/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Secretary/Undersecretary Approval |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Natural Resources Timber Sale Access, 107266 | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T62N, R2W, Section 9 |
Decision Memo · Gunflint Ranger District · updated 7/15/2013
Up by the Grand Portage Reservation sign and border · Cook, Minnesota
Access to State lands for timber management on old existing route. No new construction. Road will be obliterated after sale is complete.
Special use management
Comment Period
09/15/2012
Decision
02/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Natural Resources | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T62N, R 4E, Section 1 |
Decision Memo · Gunflint Ranger District · updated 7/15/2013
North of Mark Lake · Cook, Minnesota
Access to State lands for timber management
Special use management
Comment Period
07/01/2013
Decision
02/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Natural Resources | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T61N, R2W, Section 5 and T62N, R2W Section 34 |
Decision Memo · Gunflint Ranger District · updated 7/15/2013
Just west of Pine Mountain Lake · Cook, Minnesota
Access to State lands for timber management.
Special use management
Comment Period
10/15/2012
Decision
02/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Natural Resources Timber Sale Access, 107274 | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T63N, R1E, Section 27 and T63N, R1E, Section 34 |
Decision Memo · Gunflint Ranger District · updated 7/15/2013
North of Pine Mountain Lake off the Pine Mountain road. · Cook, Minnesota
Access to State lands for timber management
Special use management
Comment Period
12/15/2012
Decision
02/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Naturla Resources Access to Timber Sale 107275 | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T63N, R1E, Section 27 |
Decision Memo · Gunflint Ranger District · updated 7/15/2013
Access off of County Raod 16 · Cook, Minnesota
Access to State lands for timber management.
Special use management
Comment Period
10/15/2012
Decision
02/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Minnesota Department of Natural Resources Timber Sale Access 107276 | Decision Signed Date: 02/04/2013 Legal Notice Date: 02/04/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T62N, R4W, Section 8 |
Environmental Assessment · Superior National Forest All Units · updated 6/30/2013
Saint Louis County, Minnesota · St. Louis, Minnesota
Treatment of forest lands to slow the spread of the non-native invasive species, gypsy moth. The treatment is a species specific pheremone called disparlure.
Fuels managementVegetation management (other than forest products)
Objection Period Start
04/01/2013
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Saint Louis County, Minnesota |
Decision Memo · Kawishiwi Ranger District · updated 6/30/2013
Coxey Pond Road off SLC644 (North Arm Road). · St. Louis, Minnesota
The request is for access across federal land for management of county land.
Special use management
Comment Period
06/23/2012
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Coxey Pond Road Access | Decision Signed Date: 01/07/2013 Legal Notice Date: 01/07/2013 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Township 64N, Range 13 West, Section 35. |
Environmental Impact Statement · Gunflint Ranger District · updated 3/18/2013
McFarland Lake/South Fowl Lake area · Cook, Minnesota
Provide safe access for snowmobilers/anglers to South Fowl Lake. This project would route current access off County roads to improve safety for drivers and snowmobilers. An EIS is being prepared to comply with a Minnesota District Court ruling.
Recreation management
NOI in Federal Register
08/26/2009
DEIS NOA in Federal Register
08/13/2010
FEIS NOA in Federal Register
09/23/2011
Decision
08/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Travel Management |
| South Fowl Lake Snowmobile Access Project Record of Decision | Decision Signed Date: 08/25/2011 Legal Notice Date: 09/24/2011 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T64N R3E Section 10, 11, 12 |
Environmental Assessment · Superior National Forest All Units · updated 2/22/2013
Pine Mountain / Forest Center / Fernberg Comm Site / Meander Comm Site · Cook; Lake; St. Louis, Minnesota
Minnesota Department of Transportation (MnDOT) proposes to construct two new radio towers and replace two existing towers, showing age and limited capabilities, for the operation of the Allied Radio Matrix for Emergency Response (ARMER) system.
Special use management
Comment Period
09/20/2012
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| MnDOT ARMER Project | Decision Signed Date: 02/21/2013 Legal Notice Date: 02/22/2013 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District; Kawishiwi Ranger District; LaCroix Ranger District; Tofte Ranger District |
| Legal Land Description | T63N, R1E, Section 33 NWSE / T61N, R8W, Section 20 NENW / T63N, R9W, Section 8 SESE / T65N, R14W, Section 17 NWNE |
Decision Memo · Gunflint Ranger District · updated 12/21/2012
North of Ward Lake · Cook, Minnesota
50 feet of access to private land
Special use management
Comment Period
08/18/2012
Decision
10/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Edward Chaplin Access | Decision Signed Date: 10/31/2012 Legal Notice Date: 12/05/2012 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
| Legal Land Description | T61N, R2W, Section 31 |
Environmental Assessment · LaCroix Ranger District · updated 12/20/2012
Activities would be located on NFS lands in portions of the Pelican Project Area which is bounded by state Hwy 53 on the west, county Hwy 23 on the south, and the Vermilion River on part of the east · St. Louis, Minnesota
The LaCroix Ranger District proposes to create young forest, promote existing white pine regeneration, enhance scenic quality, reduce hazardous fuels, manage forest roads, and conduct vegetation management through harvest, non-harvest, and planting.
Vegetation management (other than forest products)Watershed managementSpecial use managementFuels managementWildlife, fish, rare plantsRoad managementRecreation managementForest products
Comment Period
07/18/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements |
| Pelican Project Decision Notice | Decision Signed Date: 11/20/2012 Legal Notice Date: 11/20/2012 |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T65-68N, R17-20W |
Decision Memo · Gunflint Ranger District · updated 12/20/2012
Township 63 North, Range 1 East · Cook, Minnesota
The proposal is decommissioning 1500ft of snowmobile trail and opening up 900ft of re-route snowmobile trail.
Recreation managementRoad management
Comment Period
08/18/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Travel Management |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
Decision Memo · Kawishiwi Ranger District · updated 12/18/2012
Various locations across the Kawishiwi Ranger District. · Lake; St. Louis, Minnesota
The special use authorizations expiring the end of 2012 include six year-round private road special use permits and one communications use lease.
Special use management
Comment Period
06/23/2012
Decision
09/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Re-issuance of special use authorizations that are scheduled to expire | Decision Signed Date: 09/10/2012 Legal Notice Date: 09/15/2012 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T64N, R12W, Section 24; T63N, R9W, Section 8; T62N, R12W, Section 1; T62N, R11W, Sections 27, 28 & 33; T61N, R13W, Section 1; T60N, R11W, Section 23; T59N, R12W, Sections 9, 10 & 15. |
Decision Memo · Laurentian Ranger District · updated 12/13/2012
4 miles east of Angora · St. Louis, Minnesota
Access to state land for management activities
Special use management
Comment Period
05/25/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T61N R18W sec13 |
Decision Memo · Laurentian Ranger District · updated 12/13/2012
6 miles NW of Finland MN · Lake, Minnesota
MNDNR - Access to State land for management activities
Special use management
Comment Period
05/25/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T58N R18W sec21 |
Decision Memo · Laurentian Ranger District · updated 12/13/2012
7 miles north of Britt · St. Louis, Minnesota
Access to county land for management activities
Special use management
Comment Period
05/25/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T61N R17W sec 29-33 |
Decision Memo · Kawishiwi Ranger District · updated 12/12/2012
North of Tofte and Jasper Lakes and east of Ely, MN. · Lake, Minnesota
The request is for new construction of a short-term seasonal access road for management of state land.
Special use management
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Northeast Quarter of the Southeast Quarter of Section 35, T64N, R10W. |
Decision Memo · Laurentian Ranger District · updated 12/7/2012
Laurentian Ranger District, various locations · St. Louis, Minnesota
Reissue of existing permits
Special use management
Comment Period
05/25/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
Decision Memo · LaCroix Ranger District · updated 11/1/2012
9 miles west of Crane Lake, MN · St. Louis, Minnesota
Access to private land across federal.
Special use management
Comment Period
07/28/2012
Decision
10/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T66N R18W sec3 |
Decision Memo · LaCroix Ranger District · updated 11/1/2012
LaCroix Ranger District, various locations · St. Louis, Minnesota
Reissues of existing projects
Special use management
Comment Period
07/28/2012
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
Decision Memo · LaCroix Ranger District · updated 11/1/2012
12 miles north of Orr MN · St. Louis, Minnesota
Access to private land across federal.
Special use management
Comment Period
07/28/2012
Decision
10/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T67N R20W sec28 |
Decision Memo · LaCroix Ranger District · updated 11/1/2012
7 miles east of Buyck MN · St. Louis, Minnesota
Access to county land for management activities.
Special use management
Comment Period
07/28/2012
Decision
10/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | LaCroix Ranger District |
| Legal Land Description | T66N R16W sec22, 27, 28 |
Environmental Assessment · Superior National Forest All Units · updated 9/20/2012
Laurentian Ranger District, Superior National Forest & Cloquet, Minnesota area · Cook; Koochiching; Lake; St. Louis, Minnesota
Proposal to slow the spread of the invasive insect gypsy moth with a mating disruption treatment. The project is lead by the Minnesota Department of Agriculture and U.S. Forest Service-State and Private Forestry.
Vegetation management (other than forest products)Fuels management
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 |
| Project Activity | Forest Vegetation Improvements |
| 2012 Gypsy Moth Slow the Spread Project Decision Notice | Decision Signed Date: 06/22/2012 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | St. Louis County, Minnesota |
Decision Memo · Superior National Forest All Units · updated 9/7/2012
US Highway 53, Trunk Highway 73, Trunk Highway 169, and County Road 106 (this Phase 2 project includes lands in St. Louis County on the Kawishiwi, Laurentian, and LaCroix Ranger Districts) · St. Louis, Minnesota
Install, operate, maintain fiber optic cable for high-speed internet service. This proposal is the second and final phase of the project. Cable is proposed to follow existing road rights-of-way.
Special use management
Comment Period
05/10/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Northeast Service Cooperative (Middle Mile) Phase 2 | Decision Signed Date: 08/20/2012 Legal Notice Date: 08/23/2012 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District; Kawishiwi Ranger District; LaCroix Ranger District |
| Legal Land Description | See Draft land List and Maps |
Decision Memo · Laurentian Ranger District · updated 7/30/2012
4 miles NE of Side Lake · St. Louis, Minnesota
Access to state land for management activities.
Special use management
Comment Period
05/25/2012
Decision
07/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T61N R20W Sec32 |
Decision Memo · Laurentian Ranger District · updated 7/30/2012
1.5 miles north of Toimi · Lake, Minnesota
Private - Access to private land across federal for management activities.
Special use management
Comment Period
05/25/2012
Decision
07/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T57N R11W sec18 |
Decision Memo · Laurentian Ranger District · updated 7/30/2012
11 miles northeast of Hoyt Lakes · St. Louis, Minnesota
Access to county land for management activities
Special use management
Comment Period
05/25/2012
Decision
07/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T59N R12W sec18 |
Decision Memo · Laurentian Ranger District · updated 7/30/2012
2 miles east of Sherman Corners · St. Louis, Minnesota
Access to county land for management activities.
Special use management
Comment Period
05/25/2012
Decision
07/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T61N R18W sec11 |
Decision Memo · Laurentian Ranger District · updated 7/30/2012
10 miles East of Hoyt Lakes · St. Louis, Minnesota
SLC - Access to county land for management activities.
Special use management
Comment Period
05/25/2012
Decision
07/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T58N R13W sec12 |
Decision Memo · Laurentian Ranger District · updated 7/30/2012
12 miles SW of Isabella · Lake, Minnesota
Private - Access to private land across federal.
Special use management
Comment Period
05/25/2012
Decision
07/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T58N R10W sec7 |
Environmental Assessment · Gunflint Ranger District · updated 7/23/2012
T63N R1W, 1E & 2E and T64N R1W, 1E & 2E. · Cook; Lake, Minnesota
This project proposes to enhance moose habitat, restore red & white pine, enhance the scenic quality along the Gunflint Trail & improve forest conditions through vegetation management, harvests and planting. Temporary roads would be used for access.
Forest productsWatershed managementFuels managementRoad managementVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
03/31/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Lima Green Project | Decision Signed Date: 07/12/2012 Legal Notice Date: 07/14/2012 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
Decision Memo · Tofte Ranger District · updated 6/21/2012
Tofte Ranger District, Tofte, MN · Lake, Minnesota
Improve stream habitat and access in the two rivers, Little Isabella and Manitou Rivers through rehabing existing and adding new stream structures. Access to the Manitou River would be a less than 50' user developed trail.
Wildlife, fish, rare plants
Comment Period
05/04/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Little Isabella River and Manitou River Stream Structure Placement Project | Decision Signed Date: 06/15/2012 Legal Notice Date: 06/20/2012 |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Twp 60 N, R 9W, Sec. 25; Twp 59 N, R 7W, Sec. 27 |
Decision Memo · Kawishiwi Ranger District · updated 6/11/2012
Approximately 11 miles east-southeast of Ely, Minnesota · St. Louis, Minnesota
DMC (USA) LLC has submitted a proposed operating plan to conduct mineral exploration at four sites on private reserved minerals on the Kawishiwi Ranger District, Superior National Forest.
Minerals and geology
Comment Period
03/08/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Township 62 North, Range 10 West, Section 29 and 30 |
Decision Memo · Kawishiwi Ranger District · updated 3/21/2012
The Shamrock Lake gravel pit is located approximately 16 miles southeast of Ely, Minnesota. · St. Louis, Minnesota
The Minnesota Department of Transportation is proposing to expand the Shamrock Lake gravel pit less than five acres to extract of approximatley 130,000 cubic yards of sand and gravel. The material would be used for the Hwy 1 reconstruction.
Special use management
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Shamrock Lake Gravel Pit | Decision Signed Date: 10/26/2011 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Township 61 North, Range 10 West, Section 23 |
Decision Memo · Laurentian Ranger District · updated 2/28/2012
The project is located approximately 14 miles southeast of Hoyt Lakes, MN on the Laurentian Ranger District. · St. Louis, Minnesota
Encampment Minerals, Inc. proposes to conduct ground geophysical surveys and drill four exploratory core holes with associated temporary access on National Forest system lands on leased private reserved mineral subsurface.
Minerals and geology
Decision
02/2012 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Mud Lake Mineral Exploration Project Encampment Minerals, Inc. | Decision Signed Date: 02/16/2012 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Township 57 North, Range 12 West, Sections 10, 14, 15, 21, 22, 23, 27, and 28 |
Decision Memo · Tofte Ranger District · updated 12/15/2011
Township 60 North, Ranges 7 & 8 West; and Township 61 North, Ranges 7 & 8 West. · Lake, Minnesota
This project proposes to treat about 1000 acres in the Windy Project Area to improve the health and productivity of red pine stands and to restore areas impacted by the Pagami Fire.
Forest productsFuels managementVegetation management (other than forest products)
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (11), 36 Cfr 220.6(E)(11); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage); Timber Sales (Green) |
| Windy Red Pine Thinning and Pagami Fire Salvage/Restoration | Decision Signed Date: 12/15/2011 |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
Decision Memo · Kawishiwi Ranger District · updated 12/2/2011
The Land 'O' Dixie Mineral Exploration project is located approximately 16 miles south-southeast of Ely, MN. · St. Louis, Minnesota
Duluth Metals Corporation (DMC) has proposed four mineral exploration core holes on leased private mineral subsurface on National Forest System lands and access across National Forest to one drill site on private surface ownership.
Minerals and geology
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Township 60 North, Range 11 West, Sections 11, 12, 14, 15, 23, 25, 32, 33, 34, and 36 |
Decision Memo · Laurentian Ranger District · updated 10/20/2011
The proposed NorthMet mine site is located approximately 8 miles northeast of Hoyt Lakes, Minnesota. · St. Louis, Minnesota
PolyMet Mining, Inc. proposes to construction and install 22 water monitoring wells and associated access roads at the proposed NorthMet mine site. 15 sites are located on National Forest lands with 7 sites on land in private or county ownership.
Special use management
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| PolyMet NorthMet Monitoring Well Installation | Decision Signed Date: 10/20/2011 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Township 59 North, Range 13 West, Sections 1-4 and 9-12. |
Decision Memo · Laurentian Ranger District · updated 8/8/2011
This project is located approximatley three miles north of Brimson, MN · St. Louis, Minnesota
Encampment Minerals, Inc. proposes to conduct ground geophysical surveys and drill one exploratory core hole with associated temporary access on National Forest system lands and leased private reserved mineral subsurface.
Minerals and geology
Decision
03/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Greenwood Lake South Mineral Exploration Decision Memo | Decision Signed Date: 03/04/2011 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T56N, R12W, Sections 7, 8, 17, 18, 19, and 20 |
Decision Memo · Kawishiwi Ranger District · updated 8/8/2011
Project area is approximately four miles southeast of Babbitt, MN · St. Louis, Minnesota
Encampment Minerals, Inc. has proposed four mineral exploration core holes with related temporary access and leased private reserved mineral subsurface on National Forest System lands .
Minerals and geology
Decision
03/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Serpentine Mineral Exploration Project, Encampment Minerals, Inc. | Decision Signed Date: 03/07/2011 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T60N, R12W, Section 21 |
Environmental Assessment · Gunflint Ranger District · updated 7/8/2011
T63N R1W & R1E and T62N R1W & R1E · Cook, Minnesota
This project proposes creating a young forest through final harvest, improving stand diversity through intermediate harvest and restoring forest conditions through site preparation and prescribed burning. Temporary roads would be utilized for access.
Forest productsWatershed managementVegetation management (other than forest products)Wildlife, fish, rare plantsRoad managementFuels management
Comment Period
06/12/2010
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
Environmental Assessment · Superior National Forest All Units · updated 6/9/2011
National Forest and adjacent lands on the North Shore of Lake Superior · Cook; Lake; St. Louis, Minnesota
The 2011 Gypsy Moth Slow-the-Spread Project would slow the spread of the non-native invasive gypsy moth at several locations along the North Shore on the Superior National Forest.
Fuels managementVegetation management (other than forest products)
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | 218 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
| Legal Land Description | Cook, Lake and St. Louis Counties |
Environmental Assessment · Tofte Ranger District · updated 4/19/2011
The project area stretches about 25 miles northeast from the eastern side of Dumbbell Lake to Sawbill Lake. · Cook; Lake, Minnesota
The Tofte District proposes to create young forest and improve stand diversity through harvest, and restore forest conditions and reduce hazardous fuels through site preparation and perscribed burning. Temporary roads would be used for access.
Road managementVegetation management (other than forest products)Fuels managementWildlife, fish, rare plantsForest products
Comment Period
02/07/2011
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Species Habitat Improvements; Species Population Enhancements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
| Legal Land Description | Township 59 North, Ranges6 & 7 West; Township 60 North, Ranges 5, 6 &7 West; Township 61 North, Ranges 4,5 & 6 West; and Township 62 North, Ranges 4 & 5 West. |
Environmental Assessment · Superior National Forest All Units · updated 4/7/2011
Several treatment areas on the north shore of Lake Superior · Cook; Lake, Minnesota
Treatments to slow the spread of the non-native invasive insect, the gypsy moth, on the North Shore of Lake Superior.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Objection Period Start
04/08/2010
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 |
| Project Activity | Forest Vegetation Improvements; Scenery Management |
| Gypsy Moth Slow-the-Spread Project | Decision Signed Date: 05/19/2010 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District; Tofte Ranger District |
| Legal Land Description | Lake and Cook Counties |
Decision Memo · Laurentian Ranger District · updated 4/7/2011
Located near Hoyt Lakes Minnesota · St. Louis, Minnesota
Encampment Minerals Inc. proposes to drill four mineral exploration holes on National Forest surface ownership and private reserved mineral ownership.
Minerals and geology
Decision
01/2009 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Decision Memo Siphon Mineral Exploration Project Encampment Minerals, Inc. | Decision Signed Date: 01/21/2009 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T59N R14W Section 25 and 26 |
Decision Memo · Laurentian Ranger District · updated 4/7/2011
Located off the Mosse Line road and south of Forest Road 790 · St. Louis, Minnesota
Encampment Minerals, Inc. has submitted a mineral exploration plan to drill 6 exploration holes on a private reserved mineral estate and National Forest surface ownership.
Minerals and geology
Decision
01/2009 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Decision Memo Skibo Minerals Exploration Project Encampment Minerals, Inc | Decision Signed Date: 01/21/2009 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T57N R14W Section 3 and T58N R14W Section 34 |
Decision Memo · Laurentian Ranger District · updated 4/7/2011
Located approximately five miles south of Hoyt Lakes, MN · St. Louis, Minnesota
Encampment Minerals, Inc. has proposed to drill two mineral exploratory core holes with associated temporary access on National Forest system lands and leased private reserved mineral subsurface.
Minerals and geology
Decision
02/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Skibo South Mineral Exploration Project Encampment Minerals Inc. | Decision Signed Date: 02/07/2011 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T57N, R14W, Section 10 |
Environmental Impact Statement · Laurentian Ranger District · updated 4/7/2011
The Tracks Project Area is located approximately 10 miles east and southeast of Aurora, MN and approximately 40 miles north of Duluth in St. Louis and Lake Counties. · Lake; St. Louis, Minnesota
The final draft version of the Record of Decision was on the website from February 23-March 2. The correct and final version is now available on the website and hard copy. The legal notice was published on February 25, 2011 in the Mesabi Daily News.
Watershed managementVegetation management (other than forest products)Recreation managementRoad managementFuels managementWildlife, fish, rare plantsForest products
NOI in Federal Register
07/31/2009
DEIS NOA in Federal Register
05/21/2010
FEIS NOA in Federal Register
03/04/2011
Decision
02/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements |
| Tracks Project Record of Decision | Decision Signed Date: 02/22/2011 Legal Notice Date: 02/25/2011 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | Activities could be located on National Forest System (NFS) land in portions of Townships 56 to 59 North, and Ranges 11 to 14 West. |
Decision Memo · Kawishiwi Ranger District · updated 1/12/2011
The project is located in Lake County in a corridor of land beginning near Farm Lake, extending to the Tomahawk Road (FR 377) and bordered to the south by State Hwy 1 and the BWCAW to the north. · Lake, Minnesota
Re-route portions of the Tomahawk Snowmobile Trail onto unplowed system roads. Decommission some snowmobile bridges. Designate non-motorized winter routes for skiers and dogsledders.
Recreation management
Decision
01/2011 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Trail Corridor Project Decision Memo | Decision Signed Date: 01/07/2011 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | Farm Lake; T62, R11W, section 3 to the Tomahawk Road (FR 377); T61N, R10W, section 32 |
Environmental Assessment · Superior National Forest All Units · updated 10/7/2010
Approximately 12,000 acres in Lake County on the Superior National Forest · Lake, Minnesota
A land exchange of federal lands in T56N R9W, T57N R9W, T58N R8W and T63N, R11W, for Lake County-owned lands in the BWCAW.
Land management planning
Comment Period
05/01/2009
Decision
09/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Exchanges |
| Lake County-Rifle Lake Land Exchange | Decision Signed Date: 09/27/2010 Legal Notice Date: 09/30/2010 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |
Environmental Assessment · Laurentian Ranger District · updated 3/11/2010
Superior National Forest, Whiteface, Pfieffer, Cadotte, and Birch Lake Campgrounds · Lake; St. Louis, Minnesota
New facilities will be developed at Whiteface, Pfieffer, Cadotte, and Birch Lake Campgrounds.
Recreation management
Comment Period
10/31/2009
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| West Zone Campground Development Decision Notice | Decision Signed Date: 03/03/2010 Legal Notice Date: 03/03/2010 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District; Kawishiwi Ranger District |
| Legal Land Description | T56N R15W S17&20, T61N R17W S23, T57N R12W S31, T61N R11W S19 |
Environmental Assessment · Tofte Ranger District · updated 4/3/2009
T60N R3W, T61N R3 & 4W, T62N R3 & 4W, T63N R2 &3W · Cook, Minnesota
This project proposes creating young forest through final harvest, improving stand diversity through intermediate harvest and restoring forest conditions through site preparation and prescribed burning. Temporary roads would be used for access.
Watershed managementVegetation management (other than forest products)Fuels managementWildlife, fish, rare plantsForest productsRoad management
Comment Period
01/28/2009
Decision
03/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Scenery Management; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
Decision Memo · Laurentian Ranger District · updated 3/26/2009
NorthMet proposed mine site near Hoyt Lakes MN · St. Louis, Minnesota
PolyMet Mining Corporation proposed 2008-2009 exploratory drilling at the NorthMet proposed mine site. 123 proposed drill holes and up to 10 soil borings.
Minerals and geology
Comment Period
12/09/2008
Decision
02/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| NorthMet Mineral Exploration Project, PolyMet Mining, Inc. | Decision Signed Date: 02/24/2009 |
| Forests | Superior National Forest |
| Districts | Laurentian Ranger District |
| Legal Land Description | T59N R13W Sections 1-4, 9-10 |
Environmental Assessment · Gunflint Ranger District · updated 3/10/2009
T62N R1W · Cook, Minnesota
Fuel reduction through harvest
Fuels managementForest products
Comment Period
12/06/2008
Decision
02/2009 (Estimated)
Implementation
03/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Green) |
| Maple Hill Project | Decision Signed Date: 02/05/2009 Legal Notice Date: 02/07/2009 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
Environmental Impact Statement · LaCroix Ranger District · updated 2/23/2009
North and South of Echo Trail County Rd 116 from Vermilion River to Burntside Lake and Lake Vermilion to BWCAW · St. Louis, Minnesota
FEIS analyzed actions to move vegetation and transportation existing conditions towards Forest Plan desired conditions. The supplement to the FEIS will address water quality and watershed health concerns to comply with a US District Court order.
Forest productsRoad management
NOI in Federal Register
10/28/2008
DEIS NOA in Federal Register
11/22/2008
FEIS NOA in Federal Register
02/20/2009
Decision
02/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green) |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District; LaCroix Ranger District |
| Legal Land Description | T62-66N R11-17W |
Environmental Assessment · Gunflint Ranger District · updated 3/24/2008
The project is located about ten miles northwest of Grand Marais inTownships 61 and 62 North, Ranges 1 and 2 West · Cook, Minnesota
This project proposes creating young forest through final harvest, improving diversity through intermediate harvest, restoring stand conditions through site preparation and prescribed burning and constructing temporary roads.
Road managementForest productsWildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
12/21/2007
Decision
03/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green) |
| Cascade Project Decision Notice | Decision Signed Date: 03/21/2008 Legal Notice Date: 03/21/2008 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
Environmental Assessment · Kawishiwi Ranger District · updated 12/17/2007
The proposed activities would occur about 10 miles southeast of Ely, MN on State highway 1 in an area southeast of the South Kawishiwi River. · Lake, Minnesota
Minerals exploration on the Kawishiwi RD of the Superior National Forest. Primary activity would be exploratory drilling.
Minerals and geology
Comment Period
09/21/2007
Decision
11/2007 (Estimated)
Implementation
12/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Kawishiwi Minerals Expl Franconia Minerals Corp. Fed. Mineral Lease ES-1352 | Decision Signed Date: 11/27/2007 Legal Notice Date: 11/30/2007 |
| Kawishiwi Minerals Expl Encampment Resources LLC Permit MNES-050817 | Decision Signed Date: 11/27/2007 Legal Notice Date: 11/30/2007 |
| Kawishiwi Minerals Expl Duluth Metals Corp Permits MNES-050652, MNES-050846 | Decision Signed Date: 11/27/2007 Legal Notice Date: 11/30/2007 |
| Forests | Superior National Forest |
| Districts | Kawishiwi Ranger District |
| Legal Land Description | T61N R11W sec. 2-5 & 8; T62N R11W sec 25-27 & 32-36 |
Environmental Assessment · Tofte Ranger District · updated 9/12/2007
T61N R4W, T61N R5W · Cook, Minnesota
The project is to move vegetation towards desired condition in the Forest Plan. It will include use of tools such as harvesting, reforestation and prescribed burning.
Road managementWildlife, fish, rare plantsFuels managementForest products
Comment Period
05/21/2007
Decision
07/2007 (Estimated)
Implementation
09/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Use Authorizations; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Superior National Forest |
| Districts | Tofte Ranger District |
Environmental Assessment · Gunflint Ranger District · updated 6/13/2007
T61N R1W, 1E; T62N R1W, 2W, 1E, 2E · Cook, Minnesota
The project would restore white pine, create young age class and reduce fuel hazards as well as meeting other objectives through harvesting, mechanical fuel reduction and prescribed burning.
Forest productsWildlife, fish, rare plantsFuels managementRoad managementVegetation management (other than forest products)
Comment Period
02/16/2007
Decision
05/2007 (Estimated)
Implementation
06/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Devil Trout Project | Decision Signed Date: 05/08/2007 Legal Notice Date: 05/11/2007 |
| Forests | Superior National Forest |
| Districts | Gunflint Ranger District |
Environmental Assessment · Superior National Forest All Units · updated 3/14/2007
The project will occur at weed infestation sites scattered accross the Superior National Forest · Cook; Lake; St. Louis, Minnesota
The project proposes to control non-native invasive plants on the Superior National Forest using an integrated pest management approach.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
02/01/2006
Decision
04/2006 (Estimated)
Implementation
06/2006 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| NNIP Management Project | Decision Signed Date: 04/27/2006 Legal Notice Date: 05/09/2006 |
| Forests | Superior National Forest |
| Districts | Superior National Forest All Units |