Idaho Panhandle National Forests — Project Detail

167 projects with crawled detail · milestones · contacts · documents

Idaho Panhandle National Forests

R01 Northern · 167 projects · crawled 2026-08-01
Completed 153 Cancelled 14
Decision Memo 100 Environmental Assessment 44 14 Environmental Impact Statement 9
153 with documents 83 with comments page 14 fetch errors
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 4/20/2026
The activities are in and adjacent to Red Ives Creek, in Shoshone County Idaho, approximately 21 miles southwest of St. Regis, Montana. · Shoshone, Idaho

The project would replace a bridge, remove a road and bridge to improve habitat for Bull Trout

Watershed managementRoad management
Scoping Start
07/2023 (Estimated)
Comment Period
08/2023 (Estimated)
Objection Period Start
09/2023 (Estimated)
Decision
10/2023 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
Amy Thompson · amy.thompson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Road Maintenance
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionTownship 43 North, Range 9 East, Section 20, of the Boise Meridian
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 2/19/2026
Various locations across the forest · Benewah; Bonner; Boundary; Clearwater; Kootenai; Latah; Shoshone; Lincoln; Sanders; Pend Oreille, Idaho; Montana; Washington

Management of non-native invasive plant species utilizing herbicides, biological control agents, cultural and mechanical methods for weed control.

Vegetation management (other than forest products)
Scoping Start
10/28/2011
Project documents
Bennett Thomas · bennett.thomas@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityNoxious Weed Treatments
ForestsIdaho Panhandle National Forest
DistrictsIdaho Panhandle National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Sandpoint Ranger District · updated 7/15/2025
Located along Forest Service Trail 2240 in the Auxor Basin. · Bonner, Idaho

Two temporary drill pads would be constructed to delineate a known mineral deposit. Drill pads would be 50' X 50' and would each include a 10'x10'x5' sump. The Auxer Mine portal would also be reestablished to facilitate future underground work.

Minerals and geology
Scoping Start
02/01/2020
Comment Period
02/28/2020
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Bennett Thomas · Bennett.Thomas@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Auxer Exploratory Drill ProjectDecision Signed Date: 06/30/2025
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT57N, R2E, Section 20, BM
Decision Memo · Idaho Panhandle National Forest All Units · updated 4/17/2025
Within the 2023 Ridge Creek wildfire perimeter on National Forest System Roads located near Hayden Creek watershed outside the community of Hayden Lake, Idaho. · Kootenai, Idaho

The project proposes to harvest roadside dead and dying trees resulting from the 2023 Ridge Creek wildfire to reduce hazards and provide a safe transportation system and recover the economic value of forest products supporting the local economy.

Forest products
Scoping Start
03/10/2025
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Jasmine Drapeau · jasmine.drapeau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT52N, R2W
Decision Memo · Idaho Panhandle National Forest All Units · updated 2/4/2025
The claim is located on the southeast corner of the junction of Beaver Creek Road and Kings Pass Road, in the SW4 of Section 10, T49N, R4E, B.M. · Shoshone, Idaho

The proposed project would include the excavation of 10 exploratory trenches, 20' x 20', on the claim, the removal of the excavated material to an off-site location for testing and then backfilling and reclaiming each trench once testing is complete.

Minerals and geology
Scoping Start
11/10/2021
Decision
01/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Niranjan Walters · Niranjan.Walters@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT49N, R4E, Section 10
Decision Memo · Idaho Panhandle National Forest All Units · updated 2/4/2025
North east of Shoshone Park near the town of Mullan, reached via FS 6531 and 6532 and various trails. · Shoshone, Idaho

Daycon Minerals proposes to drill/core 4 holes on their mining claims on the Coeur d'Alene River Ranger District, using low-impact, environmentally friendly drilling techniques. Expected timeframe for operations is 3 months.

Minerals and geology
Scoping Start
06/09/2023
Decision
07/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Niranjan Walters · Niranjan.Walters@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District
Legal Land DescriptionSections 28 & 29, T48N, R6E, BM
Decision Memo · Idaho Panhandle National Forest All Units · updated 12/11/2024
From I-90, take Exit #43, drive 24 mi north on Forest HWY 9 to the Prichard Junction. Continue on FR 208 for 28 mi to continue onto FR 6310. Travel 7 mi on FR 6310 to the Magee Ranger Cabin. · Shoshone, Idaho

The project proposes constructing a new vault toilet structure adjacent to the Magee Recreation Rental Cabin and decommission the existing septic system.

Recreation management
Scoping Start
12/18/2023
Decision
12/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Jedediah Friedman · Jedediah.Friedman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionS19 T52N R2E (Lat/Long: 47.84359, -116.25269)
Decision Memo · Idaho Panhandle National Forest All Units · updated 11/18/2024
From I-90, take Exit #43 and drive 24 miles north on Forest Hwy 9 to Prichard junction. Continue on Forest Rd 208 for about 5 mi to Forest Rd 602. Drive about 9 mi to the lookout. · Shoshone, Idaho

This project proposal is to address and complete recommended restorations and repairs to the Little Guard Lookout and Recreation Rental Cabin.

Recreation management
Scoping Start
01/07/2024
Decision
11/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Jedediah Friedman · Jedediah.Friedman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionS06 T51N R4E
Decision Memo · Idaho Panhandle National Forest All Units · updated 10/18/2024
To travel to Shoshone Park from Mullan, drive east on Friday Avenue which turns into Larson Road. The total trip is three miles from I90 and there is signage for Shoshone Park. · Shoshone, Idaho

This project proposes to install two double stall vault toilets at Shoshone Park to replace deteriorating vault toilets, improve accessibility and decommission existing cesspools.

Recreation management
Scoping Start
04/24/2024
Decision
10/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Jedediah Friedman · Jedediah.Friedman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionS32 T48N R6E
Decision Memo · Idaho Panhandle National Forest All Units · updated 9/16/2024
In Young Stands (5-25 years old) across the Bonners Ferry, Priest Lake, and Sandpoint Ranger Districts. · Bonner; Boundary, Idaho

Address the critical need for young stand management and associated fuels treatments across public lands by conducting regular treatments in areas where young stand regeneration has been established.

Vegetation management (other than forest products)Fuels management
Scoping Start
04/26/2024
Decision
09/2024 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Douglas Nishek · douglas.nishek@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Bonners Ferry Ranger District; Priest Lake Ranger District
Legal Land DescriptionNot Applicable
Lindstrom Completed
Decision Memo · Idaho Panhandle National Forest All Units · updated 8/6/2024
Project area is located 3 miles west/southwest of Flat Creek, Idaho on Highway 3 in Benewah County on the St. Joe Ranger District. · Benewah, Idaho

Improve forest health by increasing desirable species, provide structure diversity, reduce tree density. Minimize impacts from roads to water and wildlife. Provide timber products for local economy.

Forest productsVegetation management (other than forest products)Watershed managementRoad management
Scoping Start
08/28/2023
Comment Period
08/28/2023
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Jennifer Cinq-Mars · Jennifer.Cinq-Mars@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT45N R2W
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 12/29/2023
All of the Sandpoint, Bonners Ferry, and Priest Lake Ranger Districts and a small portion of the Coeur D'Alene River Ranger District on the Idaho Panhandle National Forest · Bonner; Boundary; Kootenai; Lincoln; Sanders; Pend Oreille, Idaho; Montana; Washington

Designate trails and areas for over-snow vehicle use on the three northern ranger districts (Kaniksu Unit) of the IPNF.

Recreation management
Scoping Start
08/16/2022
Comment Period
03/29/2023
Objection Period Start
07/14/2023
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Kaleigh Maze · Kaleigh.Maze@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
Kaniksu Over-snow Vehicle Use Designation ProjectDecision Signed Date: 12/28/2023
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Bonners Ferry Ranger District; Priest Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 9/19/2023
The project area is accessed from Fernan Saddle along the Lost Mines Road (FS-612) to Five Fingers Saddle, then 1.8 miles along FS-411 to the project area on closed road 544D. · Kootenai, Idaho

Silver Hammer Mining Corp. proposes to drill from 4 pads on their mining claims on the Coeur d'Alene River Ranger District using low-impact drilling techniques. The project will use existing roads with a total surface disturbance of 0.22 acres.

Minerals and geology
Scoping Start
07/07/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Niranjan Walters · Niranjan.Walters@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Emerald Completed
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 6/12/2023
The project area is located within Latah County, but extends slightly into Shoshone County west of Clarkia, ID. · Latah; Shoshone, Idaho

Vegetation and hazardous fuels management project to include: timber harvest, fuels reduction, watershed improvements, and roads management.

Fuels managementRoad managementForest productsWatershed managementVegetation management (other than forest products)
Scoping Start
09/28/2018
Comment Period
10/03/2020
Objection Period Start
01/18/2021
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Chandra Neils · chandra.neils@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements
Decision Notice and Finding of No Significant Impact for the Emerald ProjecDecision Signed Date: 05/25/2021
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionAll or part of Sections 1, 2, 10-15, 22-24 in Township ID T42N R1W and Sections 4-10, 16-21, 29, and 30 in Township ID T42N R1E, Boise Meridian.
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 6/12/2023
Lone Mountain Seed Orchard · Kootenai, Idaho

The Idaho Panhandle National Forests proposes to sell approximately 136 acres of undeveloped lands within the Lone Mountain Seed Orchard administrative site, approximately 20 mi. north of Coeur d'Alene, no longer needed for seed orchard development.

Land ownership management
Scoping Start
07/20/2015
Comment Period
11/06/2015
Objection Period Start
12/13/2019
Decision
02/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Kim Pierson · kpierson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Use Adjustments
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionE1/2NE1/4 and E1/2W1/2NE1/4 Section 27, T. 53 N., R. 4 W., Boise Meridian
Potter's Wheel Completed
Environmental Assessment · Fernan Ranger District · updated 6/12/2023
Project area is located approx. 35 mi. NE of Coeur d'Alene, Idaho, running north-south from Magee Historic Site to Skull Saddle and east-west from Grassy Mountain to Cascade Spur. · Kootenai; Shoshone, Idaho

Activities are proposed to establish/maintain resilient forests, improve water quality/aquatic habitats, improve big-game wildlife conditions, reduce high-intensity wildfire potential, and contribute economic benefits to the public.

Vegetation management (other than forest products)Watershed managementForest products
Scoping Start
10/02/2017
Comment Period
09/14/2018
Objection Period Start
02/28/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Kerry Arneson · kerry.arneson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT52N R1W Sec.31,36; T51N R1W Sec.6,7,18,19,30,31; T51N R1E Sec. 5,8,17,18,20,24-28,29,32-34; T52N R1E Sec. 21-24,28,32,33; T51N R2E Sec. 19,4; T52N R2E Sec. 20-22,27,33; Boise Meridian.
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 6/12/2023
The project area is south of Pend Oreille River, and west of Pend Oreille Lake, immediately adjacent to the State of Washington state line in townships 54 and 55 north, range 46 east, Boise Meridian. · Bonner, Idaho

The primary objective of this environmental assessment is to decrease the quantity and modify the arrangement of hazardous forest fuels to reduce the current and future wildfire risk to people, private lands, and resource values.

Fuels management
Scoping Start
01/08/2021
Comment Period
01/08/2021
Objection Period Start
06/21/2021
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Jennie O'Connor Card · jennie.oconnorcard@usda.gov
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Scattered Lands Project Decision NoticeDecision Signed Date: 09/15/2021
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionThe project area is south of Pend Oreille River, and west of Pend Oreille Lake, immediately adjacent to the State of Washington state line in townships 54 and 55 north, range 46 east, Boise Meridian.
Environmental Assessment · Bonners Ferry Ranger District · updated 6/12/2023
Includes the Cascade, Myrtle, Snow, and Caribou Creek drainages from Burton Peak to Roman Nose, as well as lands in the vicinity of Dodge Peak and White Mountain. · Boundary, Idaho

Vegetation management activities including timber harvest, road construction, prescribed burning, tree planting and recreation improvements.

Forest productsVegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Scoping Start
12/20/2019
Comment Period
12/04/2020
Objection Period Start
06/11/2021
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Jennifer Anderson · jlanderson02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionNumerous Sections in T62N, R1W and T62N, R2W; also T61N, R1W Sections 2-11, 14 and 15; T61N, R2W Sections 1, 2, 4, 9, 10, 12, 14-16 and 22; and T60N, R2W Sections 2, 11, 12, 13 and 24 B.M.
Environmental Assessment · Fernan Ranger District · updated 3/20/2023
The project area is generally located north of Interstate 90 and south of the North Fork Coeur d'Alene River, east of Character Ridge and west of Prichard Creek/Kings Pass, in Shoshone County, ID · Kootenai, Idaho

The effect of the Character Fire resulted in a need to recover economic value of forest products in a timely manner, reduce hazards threatening human health and safety, and re-establish forested conditions outlined in the Forest Plan.

Vegetation management (other than forest products)Forest products
Scoping Start
11/19/2021
Comment Period
11/19/2021
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Kerry Arneson · kerry.arneson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/15/2023
3600 W. Nursery Road, Coeur d%u2019Alene, Idaho · Kootenai, Idaho

Replacement of nine aging greenhouses and adjoining structures at the Coeur d'Alene Nursery to improve safety and efficiency, helping to meet increasing demands for seedlings for reforestation.

Facility management
Scoping Start
04/25/2022
Decision
06/2022 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Kerry Arneson · kerry.arneson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsIdaho Panhandle National Forest
DistrictsIdaho Panhandle National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 8/5/2022
Two miles north of the City of Sprit Lake, north of State Highway 41 and west of the Spirit Lake Cutoff Road. · Bonner, Idaho

Convey an isolated parcel of NFS lands to the City of Spirit Lake, comprising 158.74 acres, through the authority of the Townsite Act. The land conveyance would enable the City to acquire land adjacent to its current wastewater treatment site.

Land acquisition
Scoping Start
11/24/2021
Comment Period
11/24/2021
Objection Period Start
05/09/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Nolan Baldwin · nolan.baldwin@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Purchases
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionSE of section 30, T. 54 N., R. 4 W, Boise Meridian
Rosie Cedar Completed
Environmental Assessment · Fernan Ranger District · updated 7/20/2022
The project is located along the south side of the Interstate 90 corridor between Highway 97 and Highway 3 in Kootenai County, Idaho on the Coeur d'Alene River Ranger District. · Kootenai, Idaho

The project seeks to improve forest health conditions and provide timber products to support the local economy. Review tabs below for more details about the project and https://usfs-public.app.box.com/s/v8mfub27gpvh5oimb2wurmd5y5endb0c

Forest productsVegetation management (other than forest products)
Scoping Start
10/01/2021
Comment Period
10/29/2021
Objection Period Start
04/08/2022
Decision
07/2022 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Chandra Neils · chandra.neils@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTimber Sales (Green)
Rosie Cedar DN/FONSIDecision Signed Date: 07/18/2022
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Fernan Ranger District · updated 1/14/2022
The project area is situated in the frontage country east of the Highway 95 corridor through Kootenai County, from northeast of Coeur d'Alene, Idaho to just southeast of Bayview, Idaho. · Kootenai, Idaho

Project will be designed to improve ecological/social conditions, including but not limited to improved forest health, reduced potential for high-intensity wildfires, improved watershed conditions, and sustainable recreation opportunities.

Fuels managementVegetation management (other than forest products)Forest productsWatershed managementRecreation management
Scoping Start
03/31/2020
Comment Period
05/17/2021
Objection Period Start
07/20/2021
Decision
01/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Kerry Arneson · kerry.arneson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Fernan Ranger District · updated 7/22/2021
Kootenai County, ID. T50N R2W sections 7, 8, 17-20 and 30; T50N R2W sections 10-16 and 21-26; T51N R1W sections 6 and 31; T51N R2W sections 1, 2, 35 and 36, Boise Meridian. (Project #4) · Kootenai, Idaho

The Bottom Canyon project area is located approximately 10 miles northeast of the city of Coeur d'Alene, ID. The project area is approximately 11,000 acres in size and has high potential for both vegetation and watershed restoration activities.

Forest productsWatershed managementVegetation management (other than forest products)
Scoping Start
10/10/2014
Comment Period
10/10/2014
Objection Period Start
06/10/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Kerry Arneson · karneson@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation218 (2013) HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Homestead Completed
Environmental Assessment · St. Maries Ranger District · updated 5/5/2021
The project area lies south of the St. Joe River in the Marble Creek drainage around Marble Mountain. The project area includes Little Daveggio Creek, Shearer Creek, Davies Creek, and Homestead Creek. · Shoshone, Idaho

Vegetation management activities, including timber harvest, road construction, prescribed burning and tree planting.

Road managementForest productsWatershed managementFuels management
Scoping Start
08/19/2019
Comment Period
02/12/2020
Objection Period Start
10/01/2020
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Mary Reinhart · mreinhart@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT44N, R3E, Sec 9, 13-16, 20-24, 25-29 BM. T44N, R4E, Sec 17-20, 28-33 BM.
Environmental Assessment · Sandpoint Ranger District · updated 4/26/2021
The following tributaries to the Clark Fork River: Dry Cr., Twin Cr., Derr Cr. and Johnson Creek. The Green Monarch Mountain area and the Granite Creek drainage. · Bonner, Idaho

Vegetation management activities including timber harvest, fuel reduction, road construction, improvement, storage & decommissioning, prescribed burning, trail mtce and improvement, tree planting, and potential travel management for elk security

Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Scoping Start
08/05/2019
Comment Period
01/08/2020
Objection Period Start
07/13/2020
Decision
04/2021 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Douglas Nishek · dnishek@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Noxious Weed Treatments; Road Improvements/Construction
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT54N R3E Sec: 3-6, 7-10 and 16-18. T55N R3E Sec: 31-32. T54N R2E Sec: 1-4 and 9-14. T55N R2E Sec: 6-8, 15-23 and 25-36. T55N R1E Sec: 1 and 7-36. T54N R1E Sec: 1-11 and 15-16. T55N R1W Sec: 13, 23-26 and 34-36. T54N R1W Sec: 1-3.
Decision Memo · Fernan Ranger District · updated 3/24/2020
English Point Recreation Area, 8 miles northeast of Coeur d'Alene, Idaho. · Kootenai, Idaho

Commercial and non-commercial timber harvest, fuels reduction, tree planting, and trail maintenance/repair activities would occur to restore sustainable forest conditions and improve trail conditions in the English Point Recreation Area.

Recreation managementVegetation management (other than forest products)
Scoping Start
06/04/2019
Comment Period
06/04/2019
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Kyla Berendzen · kberendzen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.3 (5)
Special AuthorityNot Applicable / Other; Hfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Trail Management; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT51N, R3W, Section 9, Boise Meridian
Environmental Impact Statement · Idaho Panhandle National Forest All Units · updated 2/3/2020
Selkirk Mountains of northern Idaho within 2 miles of the Canadian border. · Boundary, Idaho

Providing safe east-west access across the Selkirk Mtns for U.S. Border Patrol agents by repairing and maintaining portions of the Bog Creek Road (Forest Roads 1013 and 2450).

Road management
NOI in Federal Register
02/06/2013
DEIS NOA in Federal Register
06/01/2018
FEIS NOA in Federal Register
02/15/2019
Objection Period Start
02/15/2019
Decision
01/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Kim Pierson · kpierson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionT65N, R4W, Sections 8, 9, 10, 15, 17, 19 and T65N, R5W, Section 24, B.M.
Decision Memo · Idaho Panhandle National Forest All Units · updated 12/11/2019
Within the Tower, Grizzly, Marble and Scotchman's Peak fire perimeters. · Bonner; Kootenai; Shoshone; Pend Oreille, Idaho; Washington

Implement site preparation where needed and plant rust-resistant white pine, western larch, ponderosa pine, or white bark pine on appropriate sites severely burned in the wildfires of 2015.

Vegetation management (other than forest products)
Scoping Start
08/14/2018
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Elisa Stamm · elisastamm@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District; Avery Ranger District; Fernan Ranger District; St. Maries Ranger District; Sandpoint Ranger District; Priest Lake Ranger District
Legal Land DescriptionNot Applicable
Crown Point Access Completed
Environmental Assessment · Fernan Ranger District · updated 11/6/2019
Near Kings Pass in Shoshone County, Idaho; within the Osburn 7.5-minute topographic quadrangle. · Shoshone, Idaho

New Jersey Mining Company is proposing to utilize Forest Service roads and trails administered by the Idaho Panhandle National Forests in order to access privately held mining claims over a five year period.

Minerals and geology
Scoping Start
03/05/2019
Comment Period
04/05/2019
Objection Period Start
07/20/2019
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Courtney Priddy · courtney.priddy@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
Crown Point Access ProjectDecision Signed Date: 10/30/2019
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionSection 1 and 2, T49N, R4E, BM
Decision Memo · St. Maries Ranger District · updated 11/5/2019
St. Joe watershed upstream from the confluence of Simmons Creek and the St. Joe River, including Simmons Creek. The project area drains over 205 square miles and is completely within Shoshone County. · Shoshone, Idaho

Improve stream habitat quality for bull trout, a threatened species and to restore aquatic ecosystem function.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/23/2017
Decision
09/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Lisa Hawdon · lhawdon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionNot Applicable
Brebner Flat Completed
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 10/9/2019
The project area lies directly south of Avery, Idaho and includes the Theriault Creek, Kelly Creek, Williams, Creek, and Siwash Creek drainages. · Shoshone, Idaho

Vegetation management activities including timber harvest, road construction, prescribed burning and tree planting.

Forest productsFuels managementRoad management
Scoping Start
02/01/2018
Comment Period
03/15/2019
Objection Period Start
07/01/2019
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Mary Reinhart · mreinhart@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionT45N, R5E, Sec 13, 14, 16, 22, 24, 26, 28, 34, 35, 36 BM. T44N, R5E Sec 1, 2, 11, 12, BM. T17N, R32W, Sec 30 and 31, PM.
Decision Memo · Sandpoint Ranger District · updated 9/30/2019
Approximately 3 miles northeast of Athol, Idaho along the Old House Road. · Bonner, Idaho

Reduce hazardous fuels adjacent to private property/residences in the Wildland Urban Interface by removing storm damaged and insect prone trees and thin remaining trees to improve stand health.

Fuels management
Scoping Start
07/24/2019
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Sara Sink · sarassink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT54N, R9W, Sec. 26 E1/2 of SE1/4, B.M.
Environmental Assessment · Sandpoint Ranger District · updated 8/28/2019
The Grouse Bear Management Unit is located northeast of Sandpoint, Idaho. It is surrounded by the Kootenai River Valley to the north, US Highway 95 to the west, and the Cabinet Mountains to the east. · Bonner; Boundary, Idaho

This project will manage the road system to bring the Grouse Bear Management Unit into compliance with the Forest Plan and the 2011 Motorized Access Amendment.

Wildlife, fish, rare plants
Scoping Start
09/16/2016
Comment Period
05/24/2018
Objection Period Start
06/21/2019
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Brett Lyndaker · blyndaker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Bonners Ferry Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Fernan Ranger District · updated 7/12/2019
Fernan Hill/Smith Gulch · Kootenai, Idaho

To authorize the continued operation and maintenance of a target range. The target range has operated under the special use permit since 1990. Permit may be issued for up to a 20-year term.

Special use management
Scoping Start
03/25/2015
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT50 N, R3W, NE1/4, NW1/4 Section 2, B.M.
Environmental Impact Statement · Idaho Panhandle National Forest All Units · updated 7/12/2019
Lookout Pass Ski and Recreation Area on Montana-Idaho Border, approximately 12 miles east of Wallace, Idaho. · Shoshone; Mineral, Idaho; Montana

Proposal by Lookout Pass Ski and Recreation Area to expand its special use permit to upgrade and develop new lifts, ski terrain, parking, access roads, and guest service facilities.

Special use managementRecreation management
NOI in Federal Register
04/04/2014
DEIS NOA in Federal Register
03/11/2016
FEIS NOA in Federal Register
12/23/2016
Objection Period Start
12/23/2016
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Shoshana Cooper · smcooper@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsIdaho Panhandle National Forest; Lolo National Forest
DistrictsWallace Ranger District; Lolo National Forest All Units
Legal Land DescriptionNot Applicable
MR 5 II Completed
Decision Memo · Idaho Panhandle National Forest All Units · updated 6/28/2019
Located in the Beaver Creek-Lower North Fork Coeur d'Alene River watershed. · Shoshone, Idaho

Excavate a 250 ft x 70 ft panel for locatable mineral exploration. Operations would includ constructing approximately 400 feet of access road off of FR 1505 to access the panel location.

Minerals and geology
Scoping Start
03/06/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Courtney Priddy · cpriddy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
MR5II Decision MemoDecision Signed Date: 06/26/2019
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District
Legal Land DescriptionT49N, R4E, Section 1, B.M.
Snow Fuels Cancelled
Decision Memo · Bonners Ferry Ranger District · updated 3/19/2019
IN the Snow Creek drainage, approximately 1.5 miles up Forest Service Road 402 in the vicinity of the Snow Falls trailhead. · Boundary, Idaho

Fuel reduction project that includes hand felling small trees, hand piling slash and forest debris, and burning piles.

Fuels management
Scoping Start
01/2019 (Estimated)
Decision
03/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Jennifer Anderson · jlanderson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionT61N, R1E, N1/2 of Section 2
Camp Robin Completed
Environmental Assessment · Bonners Ferry Ranger District · updated 3/12/2019
The project is located north of Bonners Ferry in Boundary County, Idaho. It is north of Highway 2 and east of Highway 95. Another parcel extends to the Canadian border, Northwest of Robinson Lake. · Boundary, Idaho

Vegetation treatment to reduce the risk or extent of, or increase resilience to insect or disease infestation; reduce wildfire risk to the local communities and surrounding federal lands; and protect critical infrastructure and primary egress routes.

Wildlife, fish, rare plantsForest productsFuels managementRoad management
Scoping Start
12/19/2017
Comment Period
07/17/2018
Objection Period Start
11/30/2018
Decision
03/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Steven Selser · sselser@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Road Maintenance; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · St. Maries Ranger District · updated 3/6/2019
Little North Fork, Clearwater River drainage. Incl. E. side of Spotted Louis Creek watershed & entire Canyon Creek watershed (including tributaries). Snow Peak (6,760 ft.) located 18 mi SSE Avery, ID. · Shoshone, Idaho

Improve browse conditions for big game, improve vegetation conditions to increase resilience to insect and disease, and reduce fuel loading.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/20/2017
Comment Period
06/01/2017
Decision
04/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Gregory Juvan · gjuvan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT43N, R7E, Section 34. Boise Meridian.
Decision Memo · Avery Ranger District · updated 12/17/2018
East portal to Pearson trailhead, including shuttle services on Roads 326, 456, and 506 · Shoshone, Idaho

Route of the Hiawatha 20 year permit.

Recreation managementSpecial use management
Scoping Start
02/02/2016
Decision
10/2018 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Christine Plourde · cplourde@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Bonners Ferry Ranger District · updated 12/14/2018
The Boulder Creek project is located on federally managed lands in the Boulder Creek Watershed and includes the drainages east of Katka peak. · Boundary, Idaho

Ecosystem restoration in various forest types. Project purposes include reducing sediment to Boulder Creek and protecting emergency communication equipment on Black Mountain from wildfire.

Fuels managementForest products
Scoping Start
12/09/2016
Comment Period
10/06/2017
Objection Period Start
07/24/2018
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Douglas Nishek · dnishek@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
Boulder Creek Restoration Project, Decision NoticeDecision Signed Date: 10/29/2018
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionFederal lands in all or portions of: T61N, R2E, Sections 1-2, 11-13, 20-36. T61N, R3E, Sections 5-9, 16-22, 27-34. T60N, R2E, Sect. 1-36. T60N, R3E, Sect. 3-9, 16-20, 29-30. T59N, R2E, Sect. 4,BM
Hanna Flats GNA Completed
Decision Memo · Priest Lake Ranger District · updated 12/14/2018
Priest Lake Ranger District, Bonner County, Idaho. On the west side of Priest Lake, in the Hanna Flats area to the north of the Lamb Creek community and to the south of the Nordman community. · Bonner, Idaho

Activities include forest vegetation management and hazardous fuel reduction, including timber harvest, temporary road construction, road maintenance, prescribed burning, tree planting, pre-commercial thinning, ski trail mtce, aquatic restoration.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
04/13/2017
Decision
10/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
David Cobb · dcobb@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityNot Applicable / Other; Hfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT61N, R5W, sections 32-35 and T60N, R5W, sections 2-5, 8-11, 14-17, 21-23 and 26-27, Boise Meridian.
Decision Memo · Fernan Ranger District · updated 9/28/2018
Adjoining National Forest System (NFS) lands on permitted trails in the vicinity of Red Horse Mountain Ranch private property (48N03W141200). · Kootenai, Idaho

Red Horse Properties, LLC (dba Red Horse Mountain Ranch) has purchased a dude ranch, outfitting & guiding business previously owned by Terteling Co., also dba Red Horse Mountain Ranch, through a corporation by the same name. See Other Project Info

Special use management
Scoping Start
01/10/2018
Decision
07/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Barbara Hansen · bjhansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Red Horse Mountain Ranch Outfitting and Guiding Term PerDecision Signed Date: 07/20/2018
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Fernan Ranger District · updated 9/4/2018
On National Forest System (NFS) lands within the wildland-urban interface of Kootenai County. · Kootenai, Idaho

Treatment of hazardous fuels reduction and prescribed fire. Proposed activities include non-commercial mechanical and hand treatments to thin continuous fuels, limb ladder fuel vegetation, reduce canopy bulk density and increase canopy base height.

Fuels management
Scoping Start
12/18/2017
Comment Period
02/06/2018
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Sarah Jerome · sjerome@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNFS lands in T53N R2W, T52N R3W, T51N R3W, T50N R2 & 3W, T49N R 1, 2 &3 W, T48N R 3 & 4W, BM.
Environmental Impact Statement · Idaho Panhandle National Forest All Units · updated 6/13/2018
Coeur d'Alene Lake Basin - including the Coeur d'Alene River (North Fork, South Fork, and main stem), the St. Joe River, Lake Coeur d'Alene, and the Upper Spokane River. · Benewah; Kootenai; Shoshone, Idaho

Restore, rehabilitate, replace, and/or acquire the equivalent of the injured natural resources in the Coeur d'Alene Basin as a result of the release of hazardous mining wastes.

Watershed managementWildlife, fish, rare plants
NOI in Federal Register
06/13/2013
DEIS NOA in Federal Register
11/10/2016
FEIS NOA in Federal Register
02/23/2018
Decision
04/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Jeffrey Johnson · jkjohnson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Abandoned Mine Land Clean-Up; Species Population Enhancements; Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District; Avery Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 6/13/2018
Green Mountain at the intersection of FR1050 and FR1050UC · Bonner, Idaho

Exploratory drilling from a single drill pad

Minerals and geology
Scoping Start
01/26/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Courtney Priddy · cpriddy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT54N R1E Section 30, T54N R1W Section 25
St. Joe Divide Completed
Decision Memo · St. Maries Ranger District · updated 5/22/2018
On the St. Joe and Coeur d'Alene River Ranger Districts in Shoshone County, Idaho · Shoshone, Idaho

Improvement of vegetation conditions to increase resilience to insect and disease, provide better browse for ungulate species, and reduce fuel loading

Vegetation management (other than forest products)
Scoping Start
02/23/2016
Decision
11/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Dawn Griffith · dmgriffith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District; Avery Ranger District; Fernan Ranger District; St. Maries Ranger District
Legal Land DescriptionNot Applicable
Halfway Malin Completed
Environmental Assessment · Avery Ranger District · updated 1/18/2018
Bottle Creek, Tin Can Creek, and Malin Creek Drainages north of the St. Joe River on the St. Joe Ranger District · Shoshone, Idaho

Vegetation management and watershed improvement including timber harvest, road construction, road storage & decommissioning, prescribed burning, culvert removal, tree planting, and travel management changes to address elk security.

Fuels managementRoad managementVegetation management (other than forest products)Watershed managementForest products
Scoping Start
01/07/2015
Comment Period
05/10/2017
Objection Period Start
09/21/2017
Decision
01/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
Halfway Malin ProjectDecision Signed Date: 01/11/2018
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSections 9-11, 15-17, 19-22 T45N, R7E, BM
Environmental Impact Statement · Sandpoint Ranger District · updated 12/19/2017
Priest Lake, Sandpoint, and Bonners Ferry Ranger Districts · Bonner; Boundary; Pend Oreille, Idaho; Washington

Travel management plan for motorized winter recreation use within the Selkirk Mountain Range on the Bonners Ferry, Priest Lake Ranger District and Sandpoint Ranger District.

Recreation management
NOI in Federal Register
03/2018 (Estimated)
DEIS NOA in Federal Register
06/2019 (Estimated)
FEIS NOA in Federal Register
06/2020 (Estimated)
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Erick Walker · ewalker02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Bonners Ferry Ranger District; Priest Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Fernan Ranger District · updated 9/1/2017
Between Mason Saddle and Curran Saddle, north of Fourth of July Pass Summit; Fern and Hardy Creek drainages · Shoshone, Idaho

Fuels reduction and stand improvement in and around the Wildland Urban Interface, possible watershed restoration or wildlife habitat improvement activities. Supplemental analysis of management activities proposed outside of the 1.5 mi interface zone.

Vegetation management (other than forest products)Fuels management
Scoping Start
03/30/2010
Comment Period
12/23/2016
09/01/2017
Objection Period Start
07/20/2017
Decision
08/2011 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Kerry Arneson · karneson@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Fern HardyDecision Signed Date: 08/05/2011 (Constrained Due to Litigation)
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT50N, R1W, Sections 28, 29, 32, 33, and 34; T49N, R1W, Sections 1-17 and 21; T49N, R1E, Sections 7, 8, 9, and 15-18; B.M.
Environmental Impact Statement · Nez Perce-Clearwater National Forest All Units · updated 7/24/2017
The lands to acquire are in the upper Lochsa River drainage on the border of ID and MT. The federal lands to exchange out of are scattered on the Idaho Panhandle, Clearwater, and Nez Perce NF's. · Benewah; Bonner; Clearwater; Idaho; Kootenai; Latah, Idaho

The Forest Service (FS) is considering a land exchange with Western Pacific Timber. The FS would receive approx. 40,000 acres of WPT land in the upper Lochsa River drainage and WPT would recieve an equal value of Forest Service land in north Idaho.

Land ownership management
NOI in Federal Register
09/12/2011
DEIS NOA in Federal Register
11/18/2011
FEIS NOA in Federal Register
05/2014 (Estimated)
Decision
05/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Lois Hill · lrhill@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
ForestsIdaho Panhandle National Forest; Nez Perce-Clearwater National Forest
DistrictsSandpoint Ranger District; Palouse Ranger District; North Fork Ranger District; Powell Ranger District; Clearwater Ranger District; Red River Ranger District
Legal Land DescriptionNot Applicable
Deer Creek Completed
Environmental Assessment · Bonners Ferry Ranger District · updated 7/19/2017
The Deer Creek project is located north of Moyie Springs in multiple drainages that flow into the Moyie and Kootenai Rivers including Deer Creek, Curley Creek, Skin Creek, Meadow Creek and Fry Creek. · Boundary, Idaho

The activities associated with this project include timber harvest, timber stand maintenance, fuels treatments, and road maintenance.

Road managementFuels managementForest products
Scoping Start
01/21/2015
Comment Period
01/22/2016
Objection Period Start
03/01/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
David Cobb · dcobb@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionPortions of T63N, R2E, Sections 12, 13, 14, 15,16 , 20, 22, 24, 25, 26, 28, 32, 34 and 36; T62N, R2E, Sections 2, 4 and 6; T63N, R3E, Sections 7, 8, 16, 17, 18, 19, 20, 21, 28, 29, 30, 31, 32 and 33
Seedy Jane Completed
Decision Memo · Sandpoint Ranger District · updated 7/19/2017
Near Falls Creek · Bonner, Idaho

Exploratory Drilling Project

Minerals and geology
Scoping Start
02/08/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Timothy Sadler · tjsadler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT55N R1W Section 35, B.M.
Decision Memo · Idaho Panhandle National Forest All Units · updated 7/19/2017
Lightning Creek drainage north of Clark Fork, ID. · Bonner; Lincoln, Idaho; Montana

Prescribed burning and thinning of small trees.

Fuels managementVegetation management (other than forest products)
Scoping Start
12/17/2014
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Sara Savage · sesavage@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionBM - T56N, R2E, Sections 2 & 3; T56N, R3E, Sections 19,20,21,& 28; T57N, R2E, Sections 4,8,9,17-20,22,23,26,27,34 & 35; T57N, R3E, Sections 3,4,9,10,16,17,18,20, PM - T29N, R35W, Sect. 26 & 3
Decision Memo · Sandpoint Ranger District · updated 7/19/2017
Located off of the Forest Road 278 northeast of the town of Lakeview, ID. · Bonner, Idaho

Exploratory Drilling program that is going to be used to define a mineral resource.

Minerals and geology
Scoping Start
02/08/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Timothy Sadler · tjsadler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT54N R1W Section 35 and T53N R1W Section 2, B.M.
Decision Memo · Idaho Panhandle National Forest All Units · updated 5/17/2017
Across the St. Joe Ranger District · Benewah; Latah; Shoshone, Idaho

Approximately 6,500 acres of precommercial thinning with white pine pruning in some areas to be completed in the next five to ten years.

Vegetation management (other than forest products)
Scoping Start
02/11/2011
Comment Period
02/17/2011
Decision
05/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
St. Joe 2012 Timber Stand Improvement Decision MemoDecision Signed Date: 05/03/2012 Legal Notice Date: 05/08/2012
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District; St. Maries Ranger District
Legal Land DescriptionMany sections, townships, and ranges across the St. Joe Ranger District
Decision Memo · Idaho Panhandle National Forest All Units · updated 5/17/2017
1,600 acres across the St. Joe Ranger District · Benewah; Latah; Shoshone, Idaho

Approximately 1,600 acres of timber stand improvement work inlcuding precommercial thinning and white pine pruning in previously harvested areas.

Vegetation management (other than forest products)
Scoping Start
08/02/2013
Comment Period
08/02/2013
Decision
02/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
St. Joe 2014 Timber Stand ImprovementDecision Signed Date: 02/18/2014 Legal Notice Date: 02/18/2014
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District; St. Maries Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Avery Ranger District · updated 5/4/2017
St. Joe Ranger District including Avery RD & St. Maries RD · Benewah; Clearwater; Latah; Shoshone, Idaho

Designating roads and trails for public motorized vehicle use on the St. Joe Ranger District.

Recreation managementRoad management
Scoping Start
10/30/2008
Comment Period
08/06/2015
Objection Period Start
01/08/2016
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District; St. Maries Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 1/4/2017
The Hughes Fork is a tributary to the larger Upper Priest drainage and is northwest of Upper Priest Lake. · Bonner, Idaho

Restoring the meadow hydrology, enhancing wetland species and improving fish habitat are the primary goals for this project.

Watershed management
Scoping Start
05/05/2016
Decision
12/2016 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Jill Cobb · jcobb@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 1/4/2017
Priest Lake airstrip. · Bonner, Idaho

Vintage snowmobile races on an oval track.

Recreation management
Scoping Start
10/04/2016
Decision
12/2016 (Estimated)
Implementation
02/2017 (Estimated)
Project documents
Debbie Butler · dabutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Decision Memo Kaniksu Lions Club Vintage Snowmobile RacesDecision Signed Date: 12/08/2016
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT.60N., R5W., sections 2 and 11, Boise Meridian
Twenty Mile Creek Completed
Environmental Assessment · Bonners Ferry Ranger District · updated 9/16/2016
Twenty Mile Creek and Brown Creek drainages. · Boundary, Idaho

Reduce the risk of sediment entering the drinking water through road improvements, road decommissioning, vegetation and fuels management, and to improve grizzly bear habitat.

Vegetation management (other than forest products)
Scoping Start
03/02/2012
Comment Period
04/05/2013
Objection Period Start
04/18/2014
Decision
09/2016 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Douglas Nishek · dnishek@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green); Watershed Improvements
Twentymile CreekDecision Signed Date: 06/13/2014
Black Mountain Lookout Tower RelocationDecision Signed Date: 09/13/2016
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionT61N, R1E, Sections 25, 26, 35, 36. T61N, R2E, Sections 30, 31. T60N, R1E, Sections 1, 2, 12. T60N, R2E, Sections 6, 7, 18. BM
Environmental Assessment · Idaho Panhandle National Forest All Units · updated 8/31/2016
Located within the fenceline on the southeast corner of the Forest Service Coeur d'Alene Nursery · Kootenai, Idaho

Construction of a new interagency office for the IPNF Supervisor's Office, Bureau of Land Management Coeur d'Alene Field Office and US Fish and Wildlife Supervisor's Office on lands located within the Forest Service Coeur d'Alene Nursery

Facility management
Scoping Start
10/18/2014
Comment Period
10/18/2014
Objection Period Start
06/24/2016
Decision
08/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
James Gebhardt · jgebhardt@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction
ForestsIdaho Panhandle National Forest
DistrictsIdaho Panhandle National Forest All Units
Legal Land DescriptionT51N, R4W, south 1/2 of the SE 1/4 of section 34, B.M.
Decision Memo · St. Maries Ranger District · updated 7/26/2016
Project located on Forest Road 3472K near the ID/MT border. Project area is accessed via Taft Exit on I90 up the Rainy Creek Rd and across the FR1187 connector to the Stateline and FR3472 intersection · Shoshone, Idaho

Exploratory drilling program that is being driven by results obtained from 2015 drilling program. Data is being used to further define and characterize mineral potential of the claim block.

Minerals and geology
Scoping Start
04/08/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Timothy Sadler · tjsadler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT46N R6E Section 1, B.M.
Decision Memo · St. Maries Ranger District · updated 7/14/2016
Approximately 1.75 miles south of the Marble Creek Historic Site. · Shoshone, Idaho

Construction, use and maintenance of a 136' section of road on NFS lands to facilitate timber management activities on adjacent private lands.

Special use management
Scoping Start
03/14/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Marble Creek Access for PotlatchDecision Signed Date: 07/13/2016
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSW1/4SW1/4 Section 24, T45N, R3E, Boise Meridian
Environmental Assessment · Priest Lake Ranger District · updated 6/23/2016
Upper West Branch Priest River Drainage including Paqua Creek, Klhowya Creek, Galena Creek, Solo Creek, and North Fork Goose Creek. · Pend Oreille, Washington

Protect the health and safety of the public by removing hazardous trees, capture the economic value of the dead and dying timber, and reforest areas burned by the Tower Fire.

Vegetation management (other than forest products)Forest products
Scoping Start
01/29/2016
Comment Period
01/29/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Jennie O'Connor Card · jennieoconnorcard@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT35N-R45E, T35N-R44E, T34N-R45E, and T34N-R44E, WM
Decision Memo · Priest Lake Ranger District · updated 6/21/2016
The project area occur on Idaho Department of Lands ownership and the Canyon Creek Research Natural Area (RNA) on the Priest River Experimental Forest. · Bonner, Idaho

Whitebark pine restoration project in the vicinity of Gisborne Mountain. The project area is approximately 60 acres; 11 acres occur on Idaho Department of Lands ownership and the remaining 49 acres occur within the Canyon Creek Research Natural Area.

Vegetation management (other than forest products)
Scoping Start
02/05/2016
Decision
06/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Jennifer Anderson · jlanderson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT58N, R3W, Sections 28 and 29, B.M.
Environmental Assessment · St. Maries Ranger District · updated 6/9/2016
Emerald Creek Garnet Area in 281 Gulch and Garnet Gulch, St. Joe Ranger District. · Latah, Idaho

This project will keep the public sluicing operations at the current location and build a road from 281 Gulch to Garnet Gulch, construct a parking area, improve Road 3781 and implement other improvements for operations.

Recreation managementMinerals and geology
Scoping Start
09/22/2014
Comment Period
09/22/2014
Objection Period Start
03/16/2016
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · St. Maries Ranger District · updated 5/9/2016
Ten miles southwest of Avery, Idaho near Daveggio Knob in the Boulder Creek and Daveggio Creek Drainages · Shoshone, Idaho

Salvage/sanitation harvest on approximately 175 acres of forest that experienced low-, moderate-, and high-fire severity in the 2015 Marble Creek Fire. Approximately 0.5 miles of temporary road would be constructed to facilitate harvest operations.

Vegetation management (other than forest products)Forest products
Scoping Start
01/12/2016
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Ben Timchak · btimchak@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSections 6 & 7, T44N, R4E, BM
Decision Memo · St. Maries Ranger District · updated 4/22/2016
Hamilton Creek north of the Avery Ranger Station · Shoshone, Idaho

Construct 0.3 mile of road across NFS to give access to Molpus lands.

Road managementLand ownership management
Scoping Start
05/12/2015
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 2, T45N, R4E, BM
Decision Memo · Avery Ranger District · updated 4/15/2016
East Portal to Pearson Trailhead, including shuttle services on Roads 326, 456, and 506. · Shoshone, Idaho

Issue a temporary, one-year permit the current permit holder for 2016 and a 20-year permit based on competitive proposals for the operation and maintenance of the Route of the Hiawatha Trail.

Recreation managementSpecial use management
Scoping Start
02/02/2016
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Tracy Gravelle · tgravelle@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/31/2016
North Fork Coeur d'Alene River from Devil's Elbow Campground to the headwaters of the North Fork including Tepee/Independence Creeks, and from Devil's Elbow CG downstream to the South Fork confluence. · Shoshone, Idaho

Addresses issuance of a 10-year outfitter/guide permit to NW Outfitters, authorizing 150 priority use days to conduct "walk and wade" fishing activities on the North Fork Coeur d'Alene River.

Recreation management
Scoping Start
10/01/2015
Decision
01/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Barbara Hansen · bjhansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/31/2016
Specific roads and trails on the Coeur d'Alene River Ranger District. · Kootenai; Shoshone, Idaho

Issuance of 5-year permits for recurring recreation events: North Idaho Trailblazers Cabin Fever Run, Back Country ATV Fun Run/Shootout, Jeep Jamboree USA Silver Valley Jeep Jamboree, Trail Maniacs 4th of July Ultra, and High Mountain ATV Jamboree.

Recreation management
Scoping Start
10/01/2015
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Barbara Hansen · bjhansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District; Fernan Ranger District
Legal Land DescriptionNot Applicable
Last Rainbow Cancelled
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/14/2016
Lost Creek Drainage in Shoshone County off of Kings Pass Highway (aka FR605) · Shoshone, Idaho

Exploratory Placer Pit, 25 feet by 35 feet located on National Forest Lands up the Lost Creek Drainage. Excavation will be down to bedrock with the top 7 feet being overburden and 12 inches being pay gravel to be processed and returned.

Minerals and geology
Scoping Start
09/2014 (Estimated)
Decision
01/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Justin Rice · jwrice@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 9/9/2015
St. Joe River in Avery, Idaho · Shoshone, Idaho

Conveyance of a Forest Service facility.

Land ownership management
Scoping Start
06/16/2015
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Leann Maupin · lmaupin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
Avery White "Troll" House ConveyanceDecision Signed Date: 08/10/2015
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionT45N., R5E., Section 15, BM. Lot 6
Decision Memo · Idaho Panhandle National Forest All Units · updated 9/9/2015
Near Clarkia, Idaho · Shoshone, Idaho

Conveyance of National Forest System land and facilities at the Clarkia Work Center.

Land ownership management
Scoping Start
06/16/2015
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Leann Maupin · lmaupin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT42N., R2E., East half of Section 6, BM.
Hellroaring Completed
Environmental Assessment · Bonners Ferry Ranger District · updated 8/5/2015
The project encompasses the Hellroaring Creek drainage and is bordered by Round Prairie to the north, Tungsten Mountain to the southwest, and Bussard Mountain to the south. · Boundary, Idaho

Vegetation management and fuels reduction.

Fuels managementWatershed managementVegetation management (other than forest products)Forest products
Scoping Start
06/07/2013
Comment Period
07/25/2014
Objection Period Start
05/08/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Douglas Nishek · dnishek@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Decision Notice and FONSI for the Hellroaring ProjectDecision Signed Date: 08/04/2015
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionT64N, R1E, Sections 1, 2, 3, 11, 12, 13; T65N, R1E, Sections 35 and 36; T65N, R2E, Sections 28, 29, 30, 31, 32, 33, 34;T64N, R2E, Sections 3, 4, 5, 6, 7, 8, 9, 16, 17, 18, Boise Meridian.
Decision Memo · Idaho Panhandle National Forest All Units · updated 8/3/2015
Grouse Creek, about twenty miles north and east of Sandpoint, Idaho. · Bonner, Idaho

Replenish large wood for fish habitat enhancement in Grouse Creek. Hand crews will place approximately 350 pieces of large wood in four to five reaches over about six miles in Grouse Creek.

Watershed management
Scoping Start
01/01/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jill Cobb · jcobb@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT 59N, R 1E, Sections 16, 20, 21, 22, 23 and 30, BM.
Environmental Assessment · Sandpoint Ranger District · updated 7/28/2015
Projects are located throughout the Lightning Creek drainage north of Clark Fork, ID. · Bonner, Idaho

Several projects encompassing trail reroute and reconstruction, ATV trail bridge construction, snowmobile warming hut construction, and mountain lake boardwalks.

Recreation management
Scoping Start
01/17/2014
Comment Period
03/10/2015
Objection Period Start
06/04/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Erick Walker · ewalker02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Trail Management
Decision Notice and FONSI for the Treasured Landscapes Recreation ProjectDecision Signed Date: 07/27/2015
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Priest Lake Ranger District · updated 7/22/2015
Throughout North Idaho: Bonners Ferry, Priest Lake and Sandpoint Ranger Districts · Bonner; Boundary, Idaho

Special use authorization

Special use management
Scoping Start
03/09/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Frontier Communications NW, Inc. Telephone Line Permit ReissuanceDecision Signed Date: 07/22/2015
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionNot Applicable
TSI 2015 Completed
Decision Memo · St. Maries Ranger District · updated 7/2/2015
St Joe Ranger District · Benewah; Kootenai; Latah; Shoshone, Idaho

Approximately 6500 acres would be treated in previously harvested areas that were then planted and naturally regenerated with trees.

Vegetation management (other than forest products)
Scoping Start
03/03/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
St Joe Timber Stand Improvement Project: 2015Decision Signed Date: 07/01/2015
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bonners Ferry Ranger District · updated 6/25/2015
The culverts identified for replacement are located at various places in the Bonners Ferry, Sandpoint, and Priest Lake Ranger Districts. · Bonner; Boundary, Idaho

Replace up to 17 road culverts that are impeding or completely blocking upstream fish passage to beneficial spawning and rearing habitat.

Watershed managementRoad management
Scoping Start
03/22/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Sean Stash · sstash@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Watershed Improvements
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Fernan Ranger District · updated 6/10/2015
Map #1 - Alder, Marie, Searchlight, Wolf Lodge, and Blue Creek drainages east of Coeur d'Alene and west of Fourth of July Summit · Kootenai, Idaho

Prescribed burning, timber harvest, site rehabilitation and regeneration (tree planting), on 2,829 acres; also trail construction, road decommissioning, and barrier installation to prevent illegal motorized access.

Vegetation management (other than forest products)Fuels management
Scoping Start
12/03/2007
Objection Period Start
06/03/2008
Decision
02/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Matthew Bienkowski · mbienkowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (10)
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Trail Management; Timber Sales (Green)
Blue Alder HFRADecision Signed Date: 02/23/2009
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT50N, R2 & 3W, B.M.
Jasper Mountain Completed
Decision Memo · Priest Lake Ranger District · updated 5/18/2015
The potential project area boundary runs north to south, from Pee Wee trailhead to the headwaters area of Quartz Creek, and east to west from Jasper Mtn to Quartz Mtn. T57N, R5W, and multiple sections · Bonner, Idaho

The Idaho Panhandle NF is proposing a project in the Jasper Mountain area to reduce the risk or extent of, or increase the resilience to, insect or disease infestation. This project would occur in an area designated under section 602 of HFRA.

Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
09/29/2014
Decision
05/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Tera Little · teralittle@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
Jasper Mountain Decision MemoDecision Signed Date: 05/18/2015
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionNot Applicable
Fun For a Day Completed
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/31/2015
Between Daisy and Fancy Gulches off of Eagle Creek Road. · Shoshone, Idaho

Placer Gold Exploration Trench

Minerals and geology
Scoping Start
11/17/2014
Decision
02/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Timothy Sadler · tjsadler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Fun for a day projectDecision Signed Date: 02/11/2015
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District
Legal Land DescriptionT50N R4E Sec 26 SE 1/4, B.M.
Monitor Project Completed
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/31/2015
Between the Manhattan and Mineral Creesk and southwest of Silver Lake. · Shoshone, Idaho

Mineral exploration at seven drill sites

Minerals and geology
Scoping Start
02/27/2014
Decision
02/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Timothy Sadler · tjsadler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionT46N, R7E, Sections 4 - 9, B.M.
Decision Memo · St. Maries Ranger District · updated 3/25/2015
Big Creek Drainage on the St. Joe Ranger District · Shoshone, Idaho

Reroute approximately 1 1/2 miles of Big Creek Trail 44. The current single-track motorized trail has long, steep grades. It would be relocated, and the existing section of trail would be decommissioned and recontoured.

Recreation management
Scoping Start
08/06/2014
Decision
03/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Big Creek Trail 44 & Marble Creek Trail 261 ReroutingDecision Signed Date: 03/19/2015
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSections 28, 29, & 32, T46N, R3E, BM
Decision Memo · St. Maries Ranger District · updated 3/25/2015
Marble Creek Drainage on the St. Joe Ranger District. · Shoshone, Idaho

Relocation of single-track motorized trail and decommission existing section that needs to be replaced because of a sustained, steep grade and erosion.

Recreation management
Scoping Start
08/06/2014
Decision
03/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Big Creek Trail 44 and Marble Creek Trail 261 ReroutingDecision Signed Date: 03/19/2015
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSections 34 & 35, T44N, R3E, BM
Decision Memo · Idaho Panhandle National Forest All Units · updated 3/20/2015
Priest Lake Airstrip · Bonner, Idaho

Annual dog sled race on the Hanna Flats/Priest Lake Airstrip

Special use management
Scoping Start
07/01/2014
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Debbie Butler · dabutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Inland Empire Sled Dog AsssociationDecision Signed Date: 02/05/2015
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT60N, R5W., sections 2, 3, 4, 9, 10; T61N, R5W, sections 34, B.M.
Decision Memo · Bonners Ferry Ranger District · updated 2/13/2015
Hall, Copper and Saddle Communication Sites · Boundary, Idaho

The US Border Patrol is proposing to expand the communication system in and around the north Idaho border to increase surveillance and operate more safely. The additional radio equipment would be installed on Hall, Copper and Saddle Mtn. comm. sites.

Special use management
Scoping Start
09/24/2014
Decision
02/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Border Patrol Communications Special Use PermitsDecision Signed Date: 02/12/2015
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionHall Mountain - T65N, R1E, S1/2 S1/2 Section 20; Copper Mountain - T65N, R3E, Section 20; Saddle Mountain - T65N, R3W, SE1/4 Section 30, B.M.
Environmental Impact Statement · Idaho Panhandle National Forest All Units · updated 2/4/2015
Northern Idaho · Benewah; Bonner; Boundary; Clearwater; Kootenai; Latah; Shoshone, Idaho

Forest Plan Revision

Land management planning
NOI in Federal Register
03/10/2010
DEIS NOA in Federal Register
01/13/2012
FEIS NOA in Federal Register
09/27/2013
Objection Period Start
09/27/2013
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Nancy Kertis · nkertis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Creation/Revision
ROD for the FEIS and Idaho Panhandle National Forests Land Management PlanDecision Signed Date: 01/05/2015
ForestsIdaho Panhandle National Forest
DistrictsIdaho Panhandle National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Sandpoint Ranger District · updated 1/28/2015
Approximately 3 miles south of Newport, just east of Hwy 41. · Bonner, Idaho

Landowner is requesting continued use of an existing unimproved road to access private property. The access road is approximately 1,000 feet in length and 15 feet in width before entering private property.

Special use management
Scoping Start
09/24/2014
Decision
01/2015 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Thomas J. Adamson Private Road Special Use PermitDecision Signed Date: 01/27/2015
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT55N, R5W, SW1/4 Section 6, B.M.
Decision Memo · Idaho Panhandle National Forest All Units · updated 12/22/2014
Lee's Point on the Clark Fork River, Granite Creek at Lake Pend Oreille and Kalispell Bay at Priest Lake. · Bonner, Idaho

Continued authorization of three docks owned by Bonner County at Lee's Point on the Clark Fork River, Granite Creek on Lake Pend Oreille, and Kaispell Bay on Priest Lake.

Special use management
Scoping Start
07/01/2014
Decision
10/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Debbie Butler · dabutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Priest Lake Ranger District
Legal Land DescriptionT55N, R2E, SE1/4, NW1/4 of Section 6; T55N, R1W, Section 26; T60N, R5W, SE 1/4 of Section 12, B.M.
Decision Memo · Priest Lake Ranger District · updated 10/27/2014
Lakeview Mountain Communication Site · Bonner, Idaho

Installation of a backup generator, load transfer switch, and four 25-gallon liquid propane fuel storage tanks for use in the event of a power outage.

Special use management
Scoping Start
05/22/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Priest Lake Translator District Backup Generator ProjectDecision Signed Date: 10/22/2014
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT61N, R4W, SE1/4 SW1/4 Section 31, B.M.
Decision Memo · Avery Ranger District · updated 10/14/2014
Slate Creek, Shefoot, Upper St. Joe, Snow Peak, Sherlock Outfitter & Guide Areas on the St. Joe Ranger District. · Shoshone, Idaho

Renewal of outfitter & guide permits for 5 areas on the St. Joe RD: Slate Ck, Shefoot, Upper St. Joe, Snow Peak, & Sherlock. Authorized uses would be the same as in the original permits. Previously approved campsites would remain the same.

Special use managementRecreation management
Scoping Start
07/09/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Tracy Gravelle · tgravelle@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
St. Joe Outfitter-guide Permit RenewalsDecision Signed Date: 10/10/2014
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Idaho Panhandle National Forest All Units · updated 9/25/2014
The Hope Paninsula near Sam Owen Campground. · Bonner, Idaho

Remove approximately 65 trees that blew down in a wind event on the Sam Owen Peninsula in November 2013.

Forest products
Scoping Start
03/28/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Sean Stash · sstash@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT28N, R1E, Sections 1, 2, 11, 12. B.M.
Decision Memo · Fernan Ranger District · updated 9/15/2014
Along FS Trails 1562 and 2342 · Kootenai, Idaho

Operation and maintenance of an access road to the Canfield Butte Communication Site for use by Communication Use Lease holders for the continued operation and maintenance of a communication facility.

Special use management
Scoping Start
06/13/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Canfield Butte Communication Site Private Road Special Use PermitDecision Signed Date: 09/15/2014
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · St. Maries Ranger District · updated 8/1/2014
T43N, R2E, Sec. 6 & 31; T43N, R1E, Sec. 25 & 36; T43N, R2W, Sec. 7; and T43N, R3W, Sec. 12, 13 & 24, B.M. · Benewah; Shoshone, Idaho

Reissuance of an expired Special Use Permit for the continued operation and maintenance of 14.4 kV or under distribution overhead and buried lines within the Idaho Panhandle National Forests.

Special use management
Scoping Start
04/23/2014
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Clearwater Power Company Power Line Special Use Permit ReissuanceDecision Signed Date: 07/31/2014
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Priest Lake Ranger District · updated 7/28/2014
Hwy 57, immediately southwest of Falls Inn · Bonner, Idaho

Reissuance of a special use permit for the continued use and maintenance of an access road and waterline to serve private property.

Special use management
Scoping Start
05/22/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Peterson Road & Waterline Special Use Permit ReissuanceDecision Signed Date: 07/10/2014
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT57N, R5W, Sections 21 & 22, B.M.
Kreist Creek Completed
Environmental Assessment · Bonners Ferry Ranger District · updated 7/15/2014
Bordered by Deer Ridge to the east, the Moyie River to the West, and the Meadow Creek Campground to the South. Encompasses the Feist, Kreist, Snyder and Placer Creek drainages. · Boundary, Idaho

Vegetation and fuels management to reduce the risk of high-severity wildfires. Maintain and improve aquatic habitat and watershed health.

Watershed managementFuels managementVegetation management (other than forest products)Forest products
Scoping Start
04/19/2013
Comment Period
04/19/2013
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Shanna Kleinsmith · skleinsmith@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionT64N, R2E, Sections 1, 2, 3, 11, 12, 13, 14, 23, 24, 25, 26, 35, 36. T64N, R3E, Sections 6, 7, 8, 18, 19, 30, 31, 32. T63N, R2E, Sections 1, 2, 11, 12, T64N, R3E, Sections 5, 6, 7. B.M.
Decision Memo · Sandpoint Ranger District · updated 7/14/2014
Forest Service Road 280 at Wylie Creek, mile post 4.3. · Bonner, Idaho

Replace the existing treated timber bridge with a new, longer spill-through design, pre-fabricated bridge.

Road management
Scoping Start
02/25/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Sean Stash · sstash@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
Wylie Creek/FS Road 280 Bridge ReplacementDecision Signed Date: 07/11/2014
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT59N, R1E, Section 15, B.M.
Simmons Completed
Decision Memo · Avery Ranger District · updated 7/10/2014
Project #4 - Upper St. Joe River Drainage in Simmons, Washout, Goat, Wampus, Indian, Bonehead, Red Ives, Bedrock, Color, and Game Creeks · Shoshone, Idaho

Rx burning w/ some planting on 8500 acres to facilitate fire mgmt; reduce natural fuels; provide protection to values at risk; enhance conditions for regeneration of whitebark pine, WP & WL; enhance fire resiliency; increase forage for big game.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Scoping Start
07/13/2012
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Population Enhancements
Simmons ProjectDecision Signed Date: 07/09/2014
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionMultiple sections in T42N, R9E; T43N, R9E; T44N, R9E; T44N, R10E; T44N, R11E,B.M.
Decision Memo · Priest Lake Ranger District · updated 7/9/2014
West Twin Island and Bartoo Island · Bonner, Idaho

Reissuance of the special use permit authorizing two navigational light aids on Priest Lake.

Special use management
Scoping Start
05/22/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Joseph Holzinger · jholzinger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Bonner County Navigation Lights Special Use Permit ReissuanceDecision Signed Date: 07/08/2014
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionSW1/4 Section 4, T61N, R4W; NW1/4 Section 16, T60N, R4W, B.M.
Environmental Assessment · St. Maries Ranger District · updated 6/3/2014
Cat Spur Drainage in the West Fork St. Maries River Drainage on the St. Joe Ranger District · Clearwater; Shoshone, Idaho

Vegetation management and water quality improvement in the Cat Spur Drainage on the St. Joe Ranger District

Fuels managementForest productsVegetation management (other than forest products)Watershed management
Scoping Start
07/13/2012
Comment Period
07/03/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Timothy Price · tprice@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green); Watershed Improvements
Wooden SpurDecision Signed Date: 06/03/2014
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT41N, R2E, Sections 5 & 6; T42N, R2E, Sections 19-22, 27-30, 31-33, B.M.
North Zone TSI Completed
Decision Memo · Bonners Ferry Ranger District · updated 5/23/2014
Various locations throughout the Bonners Ferry, Sandpoint, and Priest Lake ranger districts. · Bonner; Boundary, Idaho

Pre-commercial thinning and white pine pruning.

Vegetation management (other than forest products)
Scoping Start
02/11/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Patrick Behrens · pbehrens@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
North Zone Timber Stand Improvement Project Decision MemoDecision Signed Date: 05/22/2014
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · St. Maries Ranger District · updated 2/28/2014
Several miles upstream of the creek's confluence with the St. Joe River within the U.S. Forest Service's Grandmother Mountain Roadless Area. · Shoshone, Idaho

The St. Joe Ranger District is partnering with the USFWS, Idaho DEQ, Idaho Dept. of Fish & Game, and Avista Corp to breach two historic splash dams on Marble Creek to increase amount of habitat available for bull trout.

Wildlife, fish, rare plants
Scoping Start
04/26/2012
Comment Period
05/10/2013
Decision
02/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Lisa Hawdon · lhawdon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Marble Creek Splash Dams ProjectDecision Signed Date: 02/24/2014 Legal Notice Date: 02/27/2014
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 1, T43N, R3E, BM
Decision Memo · Priest Lake Ranger District · updated 2/26/2014
Priest River Experimental Forest. · Bonner, Idaho

A series of commercial thinnings to demonstrate logging practices. Thinning would focus on removing trees with low crown ratios, weak boles, and poor form.

Forest products
Scoping Start
10/16/2012
Comment Period
10/16/2012
Decision
02/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Luke Hixson · lhixson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
PREF Continuing Education ProjectDecision Signed Date: 02/13/2014 Legal Notice Date: 02/26/2014
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT58N, R4W, Sections 27 and 28, B.M.
Idaho Buckhorn Completed
Decision Memo · Bonners Ferry Ranger District · updated 2/7/2014
West of Buckhorn Ridge in the Miller, Faro and Keno Creek drainages. The project area is bounded by Deer Creek to the west, Canuck Basin to the north and Buckhorn Ridge to the east. · Bonner; Lincoln, Idaho; Montana

Wildlife habitat and big game browse improvement. Also, use prescribed fire to reduce fuels.

Fuels management
Scoping Start
03/20/2013
Comment Period
03/20/2013
Decision
02/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Jennifer Anderson · jlanderson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Idaho Buckhorn Burning ProjectDecision Signed Date: 02/03/2014 Legal Notice Date: 02/06/2014
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionBoise Meridian - T64N, R3E, Sections 15, 16, 20-22, 27-29, 32-34, and T63N, R3E, Sections 3, 4, 9, 10, 15. Principal Meridian - T36N, R34W, Sections 20, 29, 32 and T35N, R34W, Sect. 5, 8, 9, 17
Decision Memo · Bonners Ferry Ranger District · updated 12/6/2013
Mission Creek drainage. · Boundary, Idaho

Eight sites on existing road prisms used for drill core mineral exploration.

Minerals and geology
Scoping Start
04/24/2013
Comment Period
04/24/2013
Decision
12/2013 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Timothy Sadler · tjsadler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Hall Mission to Drill ProjectDecision Signed Date: 12/03/2013 Legal Notice Date: 12/06/2013
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionSections 9, 11, 14 and 18-21, T65N, R1E, B.M.
Decision Memo · Fernan Ranger District · updated 6/28/2013
Specific open system trails, access sites, and dispersed campsites across the Idaho Panhandle National Forests. · Benewah; Bonner; Boundary; Kootenai; Shoshone, Idaho

North Idaho College (NIC) has requested a temporary Outfitter Guide Special Use Permit to conduct guided activities such as cross-country skiing, avalanche education, kayaking, fly-fishing, hiking, biking and camping on the CDA River RD.

Special use management
Scoping Start
04/24/2012
Comment Period
04/24/2012
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Claire Pitner · cpitner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsIdaho Panhandle National Forest
DistrictsIdaho Panhandle National Forest All Units
Legal Land DescriptionMultiple across the IPNFs.
Larch Gold Completed
Decision Memo · Avery Ranger District · updated 6/5/2013
Project #4 - Approximately 24 miles east of Avery, Idaho in the Simmons Creek Drainage · Shoshone, Idaho

The Larch Gold Project Area is located in the Simmons Creek Drainage of the St. Joe River approximately 24 miles east of Avery, Idaho. The project will consist of commercial thinning on approzimately 62 acres.

Vegetation management (other than forest products)
Scoping Start
10/26/2012
Comment Period
10/26/2012
Decision
05/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Kaysee Miller · kayseejmiller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 10, T44N, R9E, B.M.
Decision Memo · Priest Lake Ranger District · updated 5/10/2013
Nordman, Reeder Creek, and Bismarck Guard Station. · Bonner, Idaho

Guided horseback rides parallel to existing roads near the Priest Lake Ranger District.

Special use management
Scoping Start
05/08/2012
Comment Period
05/08/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Debbie Butler · dabutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Selkirk Guiding and Outfitting Permit Decision MemoDecision Signed Date: 05/03/2013 Legal Notice Date: 05/10/2013
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT61N, R5W, Sections 14, 22, 23, and 15, B.M. Project #5
Quartz Beetle Completed
Decision Memo · Avery Ranger District · updated 5/3/2013
Project #5 - 19 miles east of Avery in the Quarz Creek area · Shoshone, Idaho

The Quartz Beetle project is 19 miles East of Avery in the Quartz Creek drainage of the St Joe River. The Project will consist of commercial thinning on approzimately 65 acres.

Vegetation management (other than forest products)
Scoping Start
10/26/2012
Comment Period
10/26/2012
Decision
04/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Kaysee Miller · kayseejmiller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Quartz Beetle Decision MemoDecision Signed Date: 04/23/2013 Legal Notice Date: 04/29/2013
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionT45N, R8E, Sec: 14, 15, B.M.
Windy Larch Completed
Decision Memo · St. Maries Ranger District · updated 4/11/2013
Project #7 - 10 miles NW of Clarkia, ID in the Windy Creek and Gold Center Drainages of the St. Maries River · Shoshone, Idaho

Commercial thinning on approx. 70 acres using skyline and tractor logging systems to improve the health and vigor of the remaining trees, maintain long-lived early-seral tree species, and provide timber products.

Vegetation management (other than forest products)Forest products
Scoping Start
12/05/2011
Comment Period
12/05/2011
Decision
04/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 5, T42N, R3E, BM
Decision Memo · Sandpoint Ranger District · updated 4/5/2013
Sand Creek and Schweitzer Creek, Project # 30 · Bonner, Idaho

Fuels treatment.

Fuels management
Scoping Start
03/02/2012
Comment Period
03/02/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Sara Savage · sesavage@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Schweitzer Fuels Reduction ProjectDecision Signed Date: 04/02/2013 Legal Notice Date: 04/05/2013
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionSections 26, 27, and 34, T 58 N, R 2 W, B.M.
Lower Priest Completed
Environmental Assessment · Priest Lake Ranger District · updated 3/19/2013
Cottonwood Creek, Dubius Creek and Murray Creek drainages accessed by the Gleason-McAbee Falls County Road. Project #3 · Bonner, Idaho

Vegetation and fuels management.

Forest products
Scoping Start
02/22/2012
Comment Period
11/20/2012
Decision
03/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Albert Helgenberg · ajhelgenberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Lower Priest ProjectDecision Signed Date: 03/14/2013 Legal Notice Date: 03/16/2013
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionPortions of T58N, R5W, Sections 11, 12 and 14; T58N, R4W, Sections 6, 7 and 18-21, B.M.
Garfield Bay Thin Completed
Decision Memo · Sandpoint Ranger District · updated 2/20/2013
Adjacent to Garfield Bay, Lake Pend Oreille · Bonner, Idaho

Commercial thinning of six acres of dry forest type of ponderosa pine and Douglas-fir.

Vegetation management (other than forest products)
Scoping Start
09/12/2012
Comment Period
09/12/2012
Decision
02/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Luke Hixson · lhixson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionT56N, R1W, Section 22, B.M.
Environmental Assessment · Fernan Ranger District · updated 9/28/2012
Map #13 - Coeur d'Alene River Ranger District · Kootenai, Idaho

Forest stand management, fuel reduction, road construction, road reconstruction and road decommissioning.

Fuels managementVegetation management (other than forest products)
Scoping Start
10/14/2010
Objection Period Start
06/04/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Michael Jow · mjow@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
Red Beauty Decision NoticeDecision Signed Date: 08/30/2012
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT48 and 49N, R2 and 3W, B.M.
Decision Memo · Avery Ranger District · updated 9/20/2012
Map #8 - Lines Creek in the Bussel Creek drainage · Shoshone, Idaho

BPA has requested to upgrade and expand the electronic site used to monitor the Dworshak to Taft transmission line.

Special use management
Scoping Start
05/29/2012
Comment Period
05/29/2012
Decision
09/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
BPA Lines Creek Electronic Site ExpansionDecision Signed Date: 09/11/2012 Legal Notice Date: 09/19/2012
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSW 1/4, SW 1/4, Section 33, T44N, R2E
Decision Memo · Fernan Ranger District · updated 6/28/2012
Various locations on the Coeur d'Alene River Ranger District · Kootenai; Shoshone, Idaho

Pre-commercially thin and/or prune approximately 2,400 acres of young trees that have been planted or re-established naturally on previously harvested sites.

Vegetation management (other than forest products)
Scoping Start
03/01/2012
Comment Period
03/01/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Barbara Hansen · bjhansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District; Fernan Ranger District
Decision Memo · Avery Ranger District · updated 6/25/2012
Map #2 - St. Joe Ranger District - Road 1268 LNF Clearwater · Shoshone, Idaho

Bridge replacement on Road 1268 across the Little North Fork of the Clearwater River. This bridge was part of the original St. Joe Remedial Bridge Repair and Replacement Project.

Road management
Scoping Start
02/08/2010
Decision
03/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Bridge Replacement - Road 1268 LNF Clearwater River letter to fileDecision Signed Date: 03/08/2011
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 15, T43N, R5E, BM
Environmental Assessment · Bonners Ferry Ranger District · updated 5/22/2012
Various road systems on Bonners Ferry, Sandpoint, and Priest Lake Ranger Districts. · Bonner; Boundary, Idaho

Provide community and economic stability and wood products by salvaging dead standing and down timber from alongside roads. Road maintenance consisting of spot gravel placement, removing vegetation from cut/fill slopes, and improve public safety.

Forest productsFuels managementRoad management
Scoping Start
09/17/2009
Comment Period
03/21/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Anita Hanson · achanson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Timber Sales (Salvage)
North Zone Roadside Salvage Decision NoticeDecision Signed Date: 05/15/2012 Legal Notice Date: 05/22/2012
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Bonners Ferry Ranger District; Priest Lake Ranger District
Moose Drool Completed
Environmental Assessment · Fernan Ranger District · updated 5/18/2012
Upper Little North Fork Coeur d'Alene River watershed, Map #17 · Kootenai, Idaho

Watershed Restoration project aimed to improve water quality and stream habitat across 21,600 acres in the upper Little North Fork of the Coeur d’Alene River. Watershed improvement activities include road, riparian area, and in-stream activities.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/04/2011
Comment Period
03/01/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Katherine Prussian · katherineprussian@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Species Habitat Improvements; Road Maintenance; Watershed Improvements
Moose Drool Watershed Restoration ProjectDecision Signed Date: 05/11/2012 Legal Notice Date: 05/12/2012
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT52N, R1W, BM
Environmental Impact Statement · Priest Lake Ranger District · updated 5/17/2012
Map #1 - Kalispell Creek and Granite Creek drainages · Bonner; Pend Oreille, Idaho; Washington

Hazardous fuels reduction on about 2,319 acres

Fuels management
NOI in Federal Register
04/21/2011
DEIS NOA in Federal Register
12/02/2011
FEIS NOA in Federal Register
03/16/2012
Objection Period Start
03/16/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Albert Helgenberg · ajhelgenberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityRegulation Creation/Modification
Lakeview Reeder Roads Record of DecisionDecision Signed Date: 12/04/2009 Legal Notice Date: 12/09/2009
Lakeview-Reeder Fuels Reduction Record of DecisionDecision Signed Date: 05/10/2010 (FS Withdrawn, Constrained Due to Litigation)
Lakeview-Reeder Fuels Reduction ProjectDecision Signed Date: 05/09/2012
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionT60N, T61N, R4W, R5W, B.M.; T36N, T37N, R45E, R46E, W.M.
Environmental Assessment · Priest Lake Ranger District · updated 4/23/2012
Boswell, Four Corners, Lamb Creek, Lower Squaw Valley, Moores Creek, and Upper Squaw Valley allotments. · Bonner, Idaho

Livestock grazing

Grazing management
Scoping Start
08/17/2006
Comment Period
02/14/2011
Decision
04/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Nancy Kertis · nkertis@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Priest Lake Grazing Allotments Project DN and FONSIDecision Signed Date: 04/16/2012 Legal Notice Date: 04/20/2012
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionBM, T57N, 58N, 59N, 60N, R5W; T57N , R6W; WM, T33N, 34N, R45E; T33N, 34N, 35N, 36N, R46E
Leonia Completed
Environmental Assessment · Bonners Ferry Ranger District · updated 4/5/2012
Leonia Knob at approximately 11 miles up Katka Road, west of the Kootenai River and east of Gable Creek in the Lower Boulder Creek and Kootenai River above Bonners Ferry watersheds. Map #2 · Boundary, Idaho

Vegetation and fire regime restoration

Forest products
Scoping Start
03/29/2010
Comment Period
10/17/2011
Decision
04/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Jennifer Anderson · jlanderson02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Leonia Restoration Project Decision Notice and FONSIDecision Signed Date: 04/02/2012 Legal Notice Date: 04/04/2012
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionNational Forest System lands in Sections 6, 15, 21, 22, 28 and 29, T61N, R3E of the Boise Meridian
Green Slate Completed
Decision Memo · Avery Ranger District · updated 3/21/2012
Map #1 - St. Joe Ranger District - Slate Creek Drainage between Mack Gulch and Horn Gulch · Shoshone, Idaho

70 acres of commercial thin with 1/4 mile of temporary road construction

Forest products
Scoping Start
02/09/2011
Comment Period
02/14/2011
Decision
03/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
James McFarland · jdmcfarland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Green Slate II Decision MemoDecision Signed Date: 03/16/2012 Legal Notice Date: 03/17/2012
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 24, T46N, R4E, Boise Meridian
Charlie Preston Completed
Environmental Assessment · St. Maries Ranger District · updated 2/14/2012
Map #12 - St. Joe Ranger District - Charlie Creek drainage in the area from the Fagan Creek drainage to the Hume Creek drainage · Benewah, Idaho

1,625 ac timber harvest, 82 ac Rx burn, 5.4 mi. system rd constr., 1.1 mi temp rd constr., 2.8 mi rd reconstr., 0.6 mi rd decommissioning, 5.0 mi rd storage, riparian planting and LWD placement, 5 culvert replacements, fuel treatment, planting

Road managementVegetation management (other than forest products)Fuels managementWatershed managementWildlife, fish, rare plantsForest products
Scoping Start
09/03/2010
Comment Period
06/06/2011
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
Charlie Preston ProjectDecision Signed Date: 02/06/2012 Legal Notice Date: 02/14/2012
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT43N, R2W, sections 3, 4, 9, 10, 14-16, 20- 23-28, 34, 35, BM
Environmental Impact Statement · St. Maries Ranger District · updated 2/4/2012
Map #6 - Bussel Creek Draiange between Avery and Clarkia · Shoshone, Idaho

Maintain or improve vegetation resiliency, provide wood products, work toward full support of designated beneficial uses, and manage access

Road managementForest productsRecreation managementWatershed management
NOI in Federal Register
04/20/2011
DEIS NOA in Federal Register
06/03/2011
FEIS NOA in Federal Register
02/03/2012
Decision
01/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements
Bussel 484Decision Signed Date: 01/06/2012 Legal Notice Date: 01/27/2012
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionT43N, R2E, Sec.1-4; T44N, R2E, Sec. 15-16, 20-29, 32-36; T44N, R3E, Sec. 18-20, 29-31, BM
Decision Memo · Sandpoint Ranger District · updated 12/19/2011
Various locations on the Bonners Ferry, Priest Lake and Sandpoint Ranger Districts. · Bonner; Boundary, Idaho

Thin and/or prune approximately 5,200 acres of juvenile sapling sized stands that were established through planting and natural reforestation means on the Bonners Ferry, Priest Lake and Sandpoint Ranger Districts.

Vegetation management (other than forest products)
Scoping Start
03/07/2011
Comment Period
03/07/2011
Decision
12/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Jeffrey Pennick · jpennick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
North Zone Timber Stand Improvement ProjectDecision Signed Date: 12/05/2011 Legal Notice Date: 12/19/2011
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District; Bonners Ferry Ranger District; Priest Lake Ranger District
Environmental Assessment · Bonners Ferry Ranger District · updated 12/13/2011
Map #9 - Bonners Ferry Ranger District · Boundary, Idaho

Reduce the hazardous fuels and the risk of high severity fires; create a comprehensive road system that provides access to the area for vegetation management and fire suppression needs; maintain and improve aquatic habitat and watershed health.

Vegetation management (other than forest products)Road managementForest productsFuels management
Scoping Start
05/29/2009
Comment Period
09/19/2011
Decision
12/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Douglas Nishek · dnishek@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Timber Sales (Green)
East Fork of Meadow CreekDecision Signed Date: 05/23/2011 (FS Withdrawn) Legal Notice Date: 05/27/2011
East Fork Meadow Creek ProjectDecision Signed Date: 12/02/2011 Legal Notice Date: 12/07/2011
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionSections (or portions of) 13, 24 and 36 in T64N, R1E; Sections 19-21, 28-32, T63N, R2E; Sections 6-8, and 28, T63N, R2E of the Boise Meridian
Hells Canyon Trail Completed
Decision Memo · Fernan Ranger District · updated 12/12/2011
Hells Canyon Creek and East Fork of Hayden Creek · Kootenai, Idaho

Trail relocation and bridge construction.

Recreation management
Scoping Start
04/04/2011
Decision
12/2011 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Andrew Boggs · aboggs@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Hells Canyon Trail Relocation ProjectDecision Signed Date: 12/08/2011
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT52N, R2W, Sections 27, 28, 34 and 35, B.M., Map #15
Decision Memo · Avery Ranger District · updated 12/9/2011
Map #4 - Snow Peak Lookoust · Shoshone, Idaho

A pre-fabricated 8-ft X 8-ft building to house communication equipment would be placed east of the existing Snow Peak Lookout. The structure would be delivered and set by helicopter.

Facility management
Scoping Start
01/20/2011
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Lynette Myhre · lmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
Snow Peak Communication Equipment BuildingDecision Signed Date: 10/18/2011
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 30, T 43 N, R 31 W, BM
Environmental Impact Statement · Kootenai National Forest All Units · updated 12/2/2011
Selkirk and Cabinet-Yaak Grizzly Bear Recovery Zones · Bonner; Boundary; Lincoln; Sanders; Pend Oreille, Idaho; Montana; Washington

Preparation of a Supplemental EIS to amend land and resource management plans for the Idaho Panhandle, Kootenai, and Lolo National Forests to address motorized access management within the Selkirk and Cabinet-Yaak Grizzly Bear Recovery Zones.

Land management planningWildlife, fish, rare plants
NOI in Federal Register
05/13/2008
DEIS NOA in Federal Register
05/12/2009
FEIS NOA in Federal Register
12/02/2011
Decision
11/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Karl Dekome · kdekome@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivitySpecies Habitat Improvements; Plan Amendment; Travel Management
Motorized Access Management w/in the Selkirk & Cabinet-Yaak Recovery ZonesDecision Signed Date: 11/09/2011 (Constrained Due to Litigation) Legal Notice Date: 12/02/2011
ForestsIdaho Panhandle National Forest; Kootenai National Forest; Lolo National Forest
DistrictsIdaho Panhandle National Forest All Units; Kootenai National Forest All Units; Lolo National Forest All Units
Legal Land DescriptionNorthwestern Montana, northern Idaho, and northeastern Washington.
Lone Mountain Thin Completed
Decision Memo · Fernan Ranger District · updated 7/15/2011
Lone Mountain Seed Orchard administrative site, within an isolated parcel of NFS land, Map #5 · Kootenai, Idaho

Commercial thinning of ponderosa pine on approximately 70 acres using ground-based yarding systems.

Vegetation management (other than forest products)
Scoping Start
04/28/2011
Comment Period
04/28/2011
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Robert Rehnborg · rrehnborg@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Lone Mountain Thin ProjectDecision Signed Date: 07/13/2011 Legal Notice Date: 07/15/2011
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT53N, R4W, Section 27
Decision Memo · Bonners Ferry Ranger District · updated 7/13/2011
Northwest of Bonners Ferry in the Clark Creek Drainage. · Boundary, Idaho

Salvage dead trees that were blown down in a 2005 wind event. The salvaged trees will be used by the Kootenai River Restoration Project to provide woody debris structure to improve fisheries habitat and stabilize the river banks that are eroding.

Vegetation management (other than forest products)
Scoping Start
08/30/2010
Comment Period
08/30/2010
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Douglas Nishek · dnishek@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Clark Creek Blowdown ProjectDecision Signed Date: 07/07/2011 Legal Notice Date: 07/11/2011
ForestsIdaho Panhandle National Forest
DistrictsBonners Ferry Ranger District
Legal Land DescriptionSection 34, T63N, R1W, B.M. Map #3
Decision Memo · St. Maries Ranger District · updated 6/16/2011
Map #3 - Shadowy St. Joe Campground · Benewah, Idaho

Replacement of Shadowy St. Joe Campground docks on the St. Joe River that were damaged winter 2009-2010.

Recreation management
Scoping Start
11/19/2009
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Mary Price · mprice@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Shadowy St. Joe Docks Decision Letter to FilesDecision Signed Date: 06/14/2011
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 19, T46N, R1E, BM
Decision Memo · Priest Lake Ranger District · updated 6/2/2011
Immediately adjacent to PREF headquarters administrative site, near Benton Creek. Map #25 · Bonner, Idaho

Continue two on-going research timber management projects and initiate one new 5-acre commercial thinning research study in a young white pine stand. Activities include limited timber harvest, timber stand improvement, and biomass thinning.

Forest products
Scoping Start
06/17/2010
Comment Period
06/17/2010
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Barry Wynsma · bwynsma@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Priest River Experimental Forest (PREF) TSI Continuing Research ProjectDecision Signed Date: 05/23/2011 Legal Notice Date: 05/26/2011
ForestsIdaho Panhandle National Forest
DistrictsPriest Lake Ranger District
Legal Land DescriptionSections 26 and 27, T58N, R4W, B.M.
Environmental Assessment · Sandpoint Ranger District · updated 3/14/2011
Sandpoint Ranger District · Bonner, Idaho

Land exchange

Land ownership management
Scoping Start
09/20/2008
Comment Period
08/17/2010
Decision
03/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Nancy Kertis · nkertis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
ForestsIdaho Panhandle National Forest
DistrictsSandpoint Ranger District
Legal Land DescriptionVarious parcels on Sandpoint Ranger District
Decision Memo · Fernan Ranger District · updated 3/3/2011
Fernan Cr., Yellowbanks Cr., Deception Cr., John Cr., Little NF Coeur d'Alene River, Can Cr., WF Downey Cr., Haystack Cr., and Lost Cr. · Kootenai; Shoshone, Idaho

Precommercial thinning and white pine pruning in 31 stands on a total of approximately 792 acres at multiple locations on the Coeur d'Alene River R.D.

Vegetation management (other than forest products)
Scoping Start
11/10/2010
Comment Period
11/10/2010
Decision
02/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
Barbara Hansen · bjhansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
Central Zone Pre-commercial Thinning and Pruning 2011/12 ProjectDecision Signed Date: 02/25/2011 Legal Notice Date: 02/25/2011
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionMultiple locations across the Coeur d'Alene River R.D.
Decision Memo · Avery Ranger District · updated 9/30/2010
Rd 320 at Heller & Red Ives Cks; Rd 715 at St. Joe River; Rds 301 and 1268 at LNF Clearwater River · Shoshone, Idaho

Repair and replacement of bridges in various locations on the St. Joe Ranger District. These bridges cross streams that are occupied by bull trout.

Road management
Scoping Start
02/08/2010
Decision
09/2010 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Cornie Hudson · chudson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
St. Joe Remedial Bridge Repair and Replacement #2Decision Signed Date: 09/30/2010
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionS15,17, T43N, R5E; S17,26, T43N, R10E; S21, T43N, R9E, BM
Decision Memo · St. Maries Ranger District · updated 8/23/2010
Map #9 - Rochat Creek on the St. Joe Ranger District · Benewah, Idaho

Shrubfield burning on 103 acres in collaboration with Benewah County's work on private land to extend a fuelbreak adjacent to the St. Maries municipal watershed

Fuels managementWildlife, fish, rare plants
Scoping Start
11/19/2009
Comment Period
05/21/2010
Decision
08/2010 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
Breck Hudson · bhudson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNational Fire Plan - Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 4, T46N, R1W, BM
K and N Salvage Completed
Decision Memo · Avery Ranger District · updated 6/21/2010
Map #11 - Nugget Creek Drainage on the St. Joe Ranger District on Road 1478UA · Shoshone, Idaho

8-acre timber salvage and tree planting in a 1,500-acre area that burned in 2009

Vegetation management (other than forest products)Forest products
Scoping Start
02/12/2010
Comment Period
02/17/2010
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
James McFarland · jdmcfarland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 4, T44N, R7E, BM
One Boot Merry Completed
Decision Memo · St. Maries Ranger District · updated 6/21/2010
Map #1 - Merry Creek Drainage, St. Joe Ranger District · Shoshone, Idaho

Sanitation/salvage one 22-acre area to reduce competition for WL, WRC, & WWP; reduce existing root & stem decay in the GF, WH, & DF to enhance the growth & vigor; and capture timber value of GF, WH, and DF before value is lost to root & stem decays.

Forest products
Scoping Start
02/12/2010
Comment Period
02/17/2010
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Steven Nelson · swnelson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 20, T43N, R2E, BM
Shoepack Firewood Completed
Decision Memo · Avery Ranger District · updated 6/21/2010
Map #6 - Shoepack Creek Drainage within the larger Sister Creek Drainage on the St. Joe Ranger District · Shoshone, Idaho

Removal of dead standing and down larch trees above and below a road for commercial firewood on 17 acres.

Forest products
Scoping Start
02/12/2010
Comment Period
02/17/2010
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Steven Nelson · swnelson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales; Timber Sales (Salvage)
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSE 1/4 Section 8, T44N, R6E, BM
Shoepack Thinning Completed
Decision Memo · Avery Ranger District · updated 6/21/2010
Map #7 - Shoepack Creek Drainage within the larger Sisters Creek Drainage on the St. Joe Ranger District · Shoshone, Idaho

Commercial thinning 70 acres western larch stands to promote health and vigor by removing competing trees.

Forest productsVegetation management (other than forest products)
Scoping Start
02/12/2010
Comment Period
02/17/2010
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Steven Nelson · swnelson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 8, T44N, R6E, BM
Decision Memo · St. Maries Ranger District · updated 3/29/2010
Map #10 - Road 326 at Cliff Creek on the St. Joe Ranger District in the Loop Creek Drainage · Shoshone, Idaho

Replace and widen the Cliff Creek Bridge on Road 326 and realign the approach.

Road management
Scoping Start
11/19/2009
Decision
03/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Cornie Hudson · chudson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Cliff Creek Bridge Replacement and Remedial Bridge RepairsDecision Signed Date: 03/26/2010
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionSection 10, T46N, R6E, Boise Meridian
Decision Memo · Avery Ranger District · updated 3/29/2010
Rd 326 at Frazier, Manhattan, Ward Cks; Rd 1268 at Adair Ck; Rd 1222 at Gold Ck; Rd 320 at Medicine Ck; · Shoshone, Idaho

Repair and replacement of bridges in various locations on the St. Joe Ranger District

Road management
Scoping Start
02/08/2010
Decision
03/2010 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Cornie Hudson · chudson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Cliff Creek Bridge Replacement and Remedial Bridge RepairDecision Signed Date: 03/26/2010
ForestsIdaho Panhandle National Forest
DistrictsAvery Ranger District
Legal Land DescriptionS4, T46N, R6E; S7 & 20, T46N, R7E; S10,T43N, R5E; S7,T44N, R9E; S20, T43N, R10E; S20, T43N, R9E, BM
Decision Memo · St. Maries Ranger District · updated 3/16/2010
Map #8 - Clarkia Work Center on the St. Joe Ranger District near Clarkia, Idaho · Shoshone, Idaho

Construct a subsurface wastewater treatment and disposal system for the St. Joe Ranger District's Clarkia Work Center.

Facility management
Scoping Start
11/19/2009
Decision
03/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Cornie Hudson · chudson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Clarkia Work Center Wastewater Treatment Facility - Letter to FileDecision Signed Date: 03/12/2010
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionSection 6, T42N, R2E, BM
Decision Memo · Fernan Ranger District · updated 1/29/2010
Along existing Trail 14 from Road 406 to Chilco Saddle, and Road 1506 that connects Chilco Saddle to Road 385. · Kootenai, Idaho

Perform Level III maintenance to Trail 14 between Road 406 and Chilco Saddle, including reshaping 11 dips and 13 waterbars. Reconstruct or recondition 6 switchbacks. Relocate trail (1.4 mile of new trail replacing 0.8 mile of former trail).

Recreation management
Scoping Start
10/16/2009
Decision
01/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Andrew Boggs · aboggs@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Chilco Trail 14Decision Signed Date: 01/14/2010
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT52N, R2W (Sec. 1, 11, 14) and T53N, R2W (Sec. 1, 6, 36), B.M., Map #2
Decision Memo · St. Maries Ranger District · updated 1/19/2010
Map #5 - Marble Creek drainage near Cranberry Creek · Shoshone, Idaho

Mineral sale of approximately 825 tons of decorative rock

Minerals and geology
Scoping Start
06/04/2009
Decision
01/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Tracy Gravelle · tgravelle@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Cranberry Decorative Rock IIDecision Signed Date: 01/19/2010
ForestsIdaho Panhandle National Forest
DistrictsSt. Maries Ranger District
Legal Land DescriptionNW 1/4 of Section 33, T44N, R3E, BM
Environmental Assessment · Fernan Ranger District · updated 9/25/2009
Map #8 - Deception Creek drainage. · Kootenai, Idaho

Rocky Mountain Research Station two-part forest research study involving approx. 390 ac. commercial harvest, 220 ac. fuels treatment, 16 mi. road reconditioning, 3 mi. reconstruction, 10 mi. road decommissioning, with culvert upgrades or removal.

Vegetation management (other than forest products)Research
Scoping Start
12/05/2008
Comment Period
06/17/2009
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Daniel Frigard · dfrigard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Road Maintenance; Research And Development; Road Improvements/Construction; Timber Sales (Green)
Hoodoo-Ames Research Project AreaDecision Signed Date: 09/21/2009 Legal Notice Date: 09/25/2009
ForestsIdaho Panhandle National Forest
DistrictsFernan Ranger District
Legal Land DescriptionT51N, R1W, Sections 19, 20, 29, 30, 31, and 32, B.M.
Travel Plan Completed
Environmental Assessment · Fernan Ranger District · updated 6/23/2009
District-wide · Kootenai; Shoshone, Idaho

Designate those roads, trails and areas open to motorized vehicle use on the Coeur d'Alene River Ranger District, and identify them on a motor vehicle use map that will be published annually and free to the public.

Road managementRecreation management
Scoping Start
03/22/2007
Comment Period
04/30/2008
Decision
04/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Sherri Lionberger · slionberger@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
Coeur d'Alene River Ranger District Travel Plan Project DNDecision Signed Date: 04/30/2009 Legal Notice Date: 05/07/2009
ForestsIdaho Panhandle National Forest
DistrictsWallace Ranger District; Fernan Ranger District
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/32462 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/32462
Wallace Ranger District

Special Use Permit and Challenge Cost Share Agreement allowing grooming of Nordic Ski trails, closure of Road 614 only when the route is being groomed for Nordic ski and snowshoe use, with a continued area closure prohibiting motorized use.

Recreation managementSpecial use management
Beaver Creek Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/40488 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/40488
Wallace Ranger District

Proposed watershed improvement, commercial timber harvest, hazardous fuels treatment, fuelbreak construction, reforestation, and associated road management.

Watershed managementRoad managementFuels managementForest productsVegetation management (other than forest products)
Double Placer Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/39676 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/39676
Wallace Ranger District

Excavate panel 600' x 30' x 10' and haul pay gravel offsite (private) to process for gold. Gravel returned for reclamation.

Minerals and geology
Double Placer II Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/50722 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/50722
Wallace Ranger District

Placer Trenching Project

Minerals and geology
Equity in Potosi Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/33803 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/33803
Wallace Ranger District

Excavate 140 sq. ft. panel to bedrock and haul pay gravel offsite (private) to process for gold

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/48585 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/48585
Wallace Ranger District

Provide a safe transportation system free of unstable fire-affected trees; re-establish forested conditions to increase the representation of early seral conifer species; and recover the economic value of forest products.

Forest productsVegetation management (other than forest products)
Last Rainbow Cancelled
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/33804 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/33804
Wallace Ranger District

Excavate ~35 sq. ft. panel to bedrock and dredge inside hole

Minerals and geology
Lookout Ski Beetle Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/30000 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/30000
Wallace Ranger District

Vegetation management at Lookout Pass Ski Area administrative site. Salvage of dead and beetle-infested lodgepole pine trees. Approx. 129 acres of harvest treatment, 0.5 mile of temp road construction and obliteration.

Vegetation management (other than forest products)Special use management
MR5 Completed
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/50229 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/50229
Wallace Ranger District

Mineral test pit exploration

Minerals and geology
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/37674 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/37674
Wallace Ranger District

North Idaho College (NIC) is requesting a Special Use Permit to construct a yurt on West Willow Peak to be used for academic and extracurricular programs, such as avalanche education, natural resource management, etc.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/26829 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/26829
Wallace Ranger District

200 ac western larch/white pine commercial thin, 20 ac lodgepole pine overstory removal and western larch thinning, yielding 2.5 mmbf. Forwarder/skyline yarding. 50 ac ecoburning. 4.2 mi. new road construction, 4.8 mi. road decommissioning.

Vegetation management (other than forest products)Fuels management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/29135 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/29135
Wallace Ranger District

An administrative action to continue protection from locatable mineral entry in the Settler's Grove of Ancient Cedar, to protect the area's unique botanical, historical, aesthetic, recreation and research values.

Special area management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/51279 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/51279
Wallace Ranger District

Promotion of timber stand health and vigor through commercial thinning activities intended to complement recent vegetation treatments on adjacent lands. Approximately 300 feet (0.056 miles) of a temporary road construction to access harvest unit.

Forest productsVegetation management (other than forest products)Fuels management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r01/idahopanhandle/projects/33913 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r01/idahopanhandle/projects/33913
Wallace Ranger District

The project would reduce fuels at a landscape scale, while maintaining and improving the quality and quantity of big game forage.

Wildlife, fish, rare plantsFuels management