Decision Memo · Unaka Ranger District · updated 4/29/2026
North Zone Cherokee National Forest · Carter; Johnson; Unicoi; Washington, Tennessee
The proposed forest plan amendment would address the need to assign management prescriptions to four tracts of land that were previously acquired.
Land management planning
Comment Period
06/03/2022
Objection Period Start
08/2022 (Estimated)
Decision
07/2022 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 4/28/2026
Margarette Falls Trail #189 · Greene; Unicoi, Tennessee
This project is proposing to relocate approximately a 50 ft long section of trail #189. Waterbars would also be installed to limit stormwater runoff and continued damage to the trail.
Recreation management
Decision
04/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 4/28/2026
The Walnut Mountain shelter is located on the Unaka Ranger District of the Cherokee National Forest in Cocke County, Tennessee. · Cocke, Tennessee
The Carolina Mountain Club have proposed to decommission and remove the Walnut Mountain shelter and associated infrastructure from national forest system lands.
Recreation management
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt. |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 4/22/2026
The project is located in Carter County, TN. The area is bounded by the Walnut Mountain Road on the eastern side, Laurel Fork Road on the Northern edge and the Appalachian Trail on the west and south · Sullivan, Tennessee
The project would provide early successional forest for wildlife, restore forest and wetland comm., release mast-producing trees, improve forest health, provide wildlife habitat components, and manage NFS system and non-system roads
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementRoad management
Comment Period
05/2023 (Estimated)
Objection Period Start
07/2023 (Estimated)
Decision
09/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cherokee National Forest All Units · updated 4/15/2026
High elevation red spruce-fir systems on the Cherokee National Forest. · Carter; Monroe; Unicoi, Tennessee
The Cherokee National Forest, George Washington and Jefferson National Forests, Monongahela National Forest, and the National Forests in North Carolina seek to implement large landscape red spruce - fir ecosystem restoration.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Watershed managementRoad managementProjects that may affect wilderness (for mailing list contacts)Climate change adaptationCarbon stewardship
Comment Period
01/2025 (Estimated)
Objection Period Start
04/2025 (Estimated)
Decision
07/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Nolichucky Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Ocoee Ranger District · updated 12/22/2025
The project is located on existing transmission lines in Monroe and Polk Counties, TN. · Monroe; Polk, Tennessee
The Tennessee Valley Authority (TVA) proposes to replace the existing ground wire on approximately 60 miles of transmission lines on the Cherokee National Forest with optical ground wire or fiber to improve internet access to rural communities in the southeast United States.
Special use management
NEPA Start Date
4/15/2025
Finding/Decision Date
11/4/2025
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 11/4/2025 |
Decision Memo · Tellico Ranger District · updated 7/3/2025
The project is located on existing utility corridors in Monroe County, TN. · Monroe, Tennessee
TDS proposes to overlay new fiber optic cable to existing utility lines on national forest land. The project would install approximately 135,421 feet of aerial cable and 32,131 ft of buried cable.
Special use management
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 6/13/2025
Project units are located throughout the Watauga Ranger District within Johnson, Carter, Sullivan and Unicoi Counties. · Carter; Johnson; Sullivan; Unicoi, Tennessee
The Watauga Ranger District of the Cherokee National Forest is proposing a series of fuel reduction treatments within the wildland-urban interface to improve forest resiliency to wildfire post-Hurricane Helene.
Vegetation management (other than forest products)Fuels management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Biomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/16/2025
The project is located east of Tellico Plains, TN near the Tellico Ranger Station and the Caney Branch Overlook. · Monroe, Tennessee
The project would construct a 36-48 inch wide, 1.1-mile-long, native surface trail in the Buck Branch burn unit. The trail would include viewing areas, fire interpretive kiosks,native plantings, selective tree removal, and trail signs.
Recreation management
Decision
05/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/16/2025
The project is located approximately 16 miles east of Tellico Plains, TN. · Monroe, Tennessee
The project would remove the current administration sites at the existing administration area, construct a new administration area, and construct defined camping sites in the overflow camping area.
Recreation management
Decision
05/2025 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/16/2025
The project is located approximately 20 miles north of Tellico Plains, TN in Monroe County. · Monroe, Tennessee
The project would acquire a parcel of land in Monroe County, TN that is approximately 341 acres. The parcel would be managed under the Prescription 9.H Management, Maintenance, and Restoration of Plant Associations to their Ecological Potential.
Land acquisition
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/2/2025
Project is located east of Tellico Plains, TN on the Tellico River. · Monroe, Tennessee
The bridge would be replaced with a structure similar to the existing bridge, constructed within the Area of Potential Effect in the attached map. The existing bridge would be removed from the site and disposed of at a suitable location off forest.
Facility management
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 4/14/2025
Project is located in multiple areas on the Ocoee Ranger District. See project maps for more detailed location information. · McMinn; Polk, Tennessee
The FY 2025 South Zone Prescribed Fire- Ocoee Ranger District Project would conduct prescribed fire on approximately 13,332 acres on 8 burn units on the Ocoee/Hiwassee Ranger District.
Vegetation management (other than forest products)Fuels management
Decision
04/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| FY25 Prescribed Fire Project-Ocoee Ranger District | Decision Signed Date: 04/04/2025 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 4/8/2025
The project is located on Tellico River Road approximately 20 miles east of Tellico Plains, TN. · Monroe, Tennessee
The bridge would be replaced with a structure similar to the existing bridge. The existing bridge would be removed from the site and disposed of at a suitable location off of the forest. The new bridge would be constructed in the disturbed area.
Facility management
Decision
04/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 3/4/2025
This project would take place near Iron Mountain Gap on the Unaka Ranger District of the Cherokee National Forest in Unicoi County, Tennessee. · Unicoi, Tennessee
The Cherokee National Forest is proposing a temporary reroute of the Appalachian National Scenic Trail near Iron Mountain Gap due to impacts from Hurricane Helene. The reroute would last until projects that restore connectivity are complete.
Recreation management
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 2/28/2025
White Rocks mountain on the Watauga Ranger District in Carter County, Tennessee. · Carter, Tennessee
The purpose of this project is to authorize the decommissioning of an existing communications tower and the construction of a new tower and associated improvements on White Rocks mountain in Carter County, TN.
Special use management
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/17/2024
Project is located on Dennis Cove Road in Hampton, TN. · Carter, Tennessee
The Dennis Cove U-1640 Land Acquisition Project would acquire approximately 129.5 acres of adjoining the Pond Mountain Wilderness. The parcel would be managed under the 4.A Appalachian Trail Corridor management prescription.
Land acquisition
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 12/6/2024
This project is on the Unaka Ranger District of the Cherokee National Forest. · Unicoi, Tennessee
The Temple Hill U-1638 Land Acquisition Project would acquire approximately 65.5 acres of land near the Temple Hill Elementary School on Tipton Olsen Drive. The parcel would be managed under the 7.E Dispersed Recreation areas- Suitable.
Land acquisition
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 11/1/2024
Project is located in Polk County, TN on a tributary to Loss Creek. · Polk, Tennessee
The Tennessee Valley Authority (TVA) proposes to construct a ford on an existing utility access road that crosses a tributary of Loss Creek. Currently, vehicles cannot cross the stream to conduct vegetation maintenance on power line L5144.
Special use management
Decision
11/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 10/17/2024
Project is located approximately 13 miles Northeast of Tellico Plains, TN, at river mile 8.3 on Citico Creek, near Young Branch Campground. · Monroe, Tennessee
The project would remove an instream concrete dam at river mile 8.3 near Young Branch in Citico Creek. The dam would be removed with heavy machinery in a live or wet stream. All dam materials would be removed from the site.
Watershed management
Decision
10/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Lower Citico Dam Removal Project Decision Memo | Decision Signed Date: 10/17/2024 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 9/17/2024
Iron Mountain in Johnson County, TN. · Johnson, Tennessee
Johnson County is proposing to erect a 120-foot free-standing metal power pole and a 10x12 concrete building to house radio components and a generator. The pole and building would be constructed on a gravel pad and surrounded by a chain-link fence.
Special use management
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/12/2024
The project is located in multiple locations in Polk and Monroe Counties in Tennessee · Monroe; Polk, Tennessee
The Fiscal Year 2024 Prescribed Fire Project would conduct prescribed fire on 41,919 acres on 28 burn units: 15 burn units on the Ocoee/Hiwassee Ranger District and 13 burn units on the Tellico Ranger District.
Vegetation management (other than forest products)Fuels management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| FY Prescribed Fire Project- Tellico | Decision Signed Date: 11/17/2023 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 8/12/2024
Near Watauga Point along U.S. Route 321 in Carter County, TN. · Carter, Tennessee
SkyBest is proposing to bury fiber optic cable along U.S. Route 321 to increase grid reliability in new service areas in Carter County, TN.
Special use management
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 7/29/2024
The project is located in Polk County Tennessee approximately 2 miles north west of Turtletown, TN. · Polk, Tennessee
The project would conduct forest restoration and improvement actions under the programmatic environmental assessment, Restoration of Dry Forest Communities. Additional actions in the project area would include road improvements and prescribed fire.
Vegetation management (other than forest products)Fuels managementForest products
Comment Period
07/27/2023
Objection Period Start
05/23/2024
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/9/2024
USA Tract U-1637 on the waters of Dry Creek in Unicoi County, TN. · Unicoi, Tennessee
The Forest Service is proposing to acquire 1 parcel in Unicoi County, TN (U-1637), approximately 67 acres.
Land acquisition
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/20/2024
Project is located east of Etowah, TN · McMinn, Tennessee
The project would repair and reconstruct a woven wire fence within the Bullet Creek Rare Community to prevent feral swine / wild boar from entering and damaging this unique and rare ecosystem. The existing fence would be removed from the site.
Wildlife, fish, rare plants
Decision
05/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/15/2024
The project is located primarily in Polk County. Small portions are located in McMinn and Monroe Counties. · McMinn; Monroe; Polk, Tennessee
Special Use Permit to host rally car race on the Ocoee Ranger District for June 12-17.The race would utilize National Forest System Roads (NFSR) 23, 44, 55, 67, 99, 103, 220, 221, 302, and 1333. Four areas are identified for spectators.
Special use management
Decision
05/2024 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 3/1/2024
Cedar Mountain (Cedar Peak) · Carter, Tennessee
This project is proposing to install an approx. 300%u2019 trail connector from the Forest Service boundary to the top of Cedar Mountain (Cedar Peak)
Recreation management
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 2/29/2024
Project is located approximately 14 miles east of Cleveland, TN. · Polk, Tennessee
Project would acquire approximately 280 acres of land near the intersection of Us Highway 64 and TN State Highway 314. The project would incorporate approximately 2.2 miles of existing roads on the parcel into the National Forest System Roads.
Land acquisition
Decision
02/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| DM-Ocoee Gateway K-1616 Land Acquisition Project | Decision Signed Date: 02/28/2024 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 2/12/2024
All sites are shaded to open woodland. The shelter and tent pad site has a slope of 10-15% and the privy site has a slope of 15-20%. · Cocke, Tennessee
This project proposes to install two AT supporting facilities and provide access to a suitable water source.
Special area management
Decision
10/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/11/2023
Project is located approximately 17 miles east of Cleveland, TN. · Polk, Tennessee
Expand the employee parking lot at the Ocoee Ranger station by approximately 135 to the west and add a fence to the existing parking lot on the north side of the ranger station.
Facility management
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 10/10/2023
Horse Creek Recreation Area · Greene, Tennessee
This project proposes to implement stream and aquatic habitat restoration, dam removal, low water ford removal, and new bridge installation.
Recreation managementWatershed management
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 8/4/2023
Project is located on Oswald Road in Polk County, TN. · Polk, Tennessee
Crown Castle proposes to increase the height of their cellular tower from 180' to 210' and add 3 new guyed anchor rods to the existing guyed anchor blocks. Crown Castle has a communication site lease. There would be no new ground disturbance.
Special area management
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 5/24/2023
Farthing Tract · Johnson, Tennessee
This project proposes an easement request for access to the Farthing Tract, which is private property surrounded by Cherokee National Forest (CNF). The landowner is requesting to put in an access road to their property which will cross CNF property.
Special use managementRoad management
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction; Travel Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 5/5/2023
Lower Paint Creek · Greene, Tennessee
This project focuses on moving stands toward a more open woodland condition, with pockets of mature timber with grassy herbaceous layers, and a mosaic feature of pine/oak regeneration using non commercial slashdown treatments and RX fire.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 4/24/2023
Hwy 64 from Lake Ocoee Inn and Marina to the Ocoee Ranger Station in Benton, TN. Future Fiber Optic would be located adjacent to Hwy 64 and Hwy 30. · Polk, Tennessee
At the request of the Cherokee National Forest, AT&T would install fiber optic line from Lake Ocoee Inn and Marina to the Ocoee Ranger Station. Analysis includes a foreseeable future action to install fiber optic to the Ocoee Work Center on Hwy 30.
Special area management
Decision
04/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| AT&T Fiber Optic line to Ocoee Ranger Station and Work Center Project | Decision Signed Date: 04/17/2023 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · R8 - Southern Region All Units · updated 4/10/2023
Chattahoochee, Cherokee, Daniel Boone, Sumter, Jefferson, Nantahala, Pisgah, Uwharrie, and Croatan National Forests and private, state, and other federal lands within their adjacent counties. · Habersham; Rabun; Stephens; Towns; Bath; Bell; Breathitt; Carter; Clay; Elliott; Estill; Fleming; Harlan; Jackson; Knox; Laurel; Lee; Leslie; Letcher; Lewis; McCreary; Madison; Menifee; Morgan; Owsley; Perry; Pike; Powell; Pulaski; Rockcastle; Rowan; Wayne; Whitley; Wolfe; Ashe; Avery; Buncombe; Burke; Caldwell; Carteret; Cherokee; Clay; Craven; Davidson; Graham; Haywood; Henderson; Jackson; Jones; McDowell; Macon; Madison; Mitchell; Montgomery; Onslow; Randolph; Stanly; Swain; Transylvania; Watauga; Yancey; Abbeville; Chester; Fairfield; Greenwood; Laurens; Newberry; Oconee; Pickens; Saluda; Union; Blount; Campbell; Carter; Cocke; Greene; Johnson; Monroe; Pickett; Scott; Sullivan; Unicoi; Washington; Bland; Buchanan; Carroll; Dickenson; Grayson; Lee; Russell; Scott; Smyth; Tazewell; Washington; Wise; Wythe, Georgia; Kentucky; North Carolina; South Carolina; Tennessee; Virginia
Aerial treatments of an exotic moth known as Lymantria dispar using mating disruption, Bacillus thuringiensis var. kurstaki, Nucleopolyhedrosis virus, or their combination.
Vegetation management (other than forest products)
Comment Period
09/01/2021
Objection Period Start
01/20/2023
Decision
04/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Daniel Boone National Forest; Chattahoochee-Oconee National Forests; Cherokee National Forest; George Washington and Jefferson National Forest; National Forests In North Carolina; Francis Marion and Sumter National Forests |
| Districts | Daniel Boone National Forest All Units; Chattahoochee-Oconee National Forest All Units; Cherokee National Forest All Units; George Washington and Jefferson National Forest All Units; National Forests In North Carolina All Units; Francis Marion and Sumter National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/24/2023
The project is located approximately 20 miles east southeast from Cleveland, TN. · Polk, Tennessee
Replace two failed water crossings with Aquatic Organism Passage structures sized for the stream, reconstruct .35 miles of Forest Service Road 221, and restore aquatic habitat and stream stability that mimics a properly functioning system.
Road managementWatershed management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction; Watershed Improvements |
| ERFO Little Sylco Creek FSR 221 Project- Decision Memo | Decision Signed Date: 03/22/2023 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/24/2023
Project is located in three areas. See Attached Map. · Polk, Tennessee
Reconstruct and relocate trails damaged in the 2020 spring storms with Emergency Relief for Federally Owned Roads (ERFO) Funding. Trails include John Muir, Turtletown Falls, Parksville Recreation Area, and Scenic Spur trails.
Recreation management
Decision
03/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Ocoee 2020 ERFO Trails Project- Decision Memo | Decision Signed Date: 03/22/2023 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 3/2/2023
Little Jacob Creek · Sullivan, Tennessee
This project would replace the existing culvert with a bottomless arch culvert or bridge and simulate the natural stream channel throughout. The project would improve passage for aquatic organisms, restore the stream channel and protect road crossin
Wildlife, fish, rare plantsWatershed management
Decision
02/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 2/7/2023
Project is located in multiple locations on the Tellico Ranger District near Tellico Plains, TN. · Monroe, Tennessee
Conduct prescribed fire on five existing burn units on the Tellico Ranger District. Project would include multiple burn entries to maintain a fire return interval less than 12 years.
Fuels managementVegetation management (other than forest products)
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 2/6/2023
Project is located on multiple locations on the Ocoee Ranger District near Benton, TN. · Monroe; Polk, Tennessee
Conduct prescribed fire on 13 burn units: eight burn units on the Ocoee Ranger District and 5 on Tellico Ranger District.
Fuels managementVegetation management (other than forest products)
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| FY23 South Zone Prescribed Fire Project | Decision Signed Date: 02/06/2023 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 1/23/2023
Houston Valley Recreation Area, Cocke County, TN · Cocke, Tennessee
The proposed action is to provide a safe creek crossing location to access Houston Valley Recreation Area and protect the streambank. The proposed action is needed for visitor safety and to mitigate negative effects to aquatic species.
Recreation managementWatershed management
Decision
01/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 1/12/2023
The project is located in the Citico Creek Watershed on the Tellico Ranger District and in many locations on the Ocoee Ranger District. See maps located in Supporting Documents. · Monroe; Polk, Tennessee
Replace 14 culverts on the Tellico and Ocoee Ranger Districts which are serving as migration barriers to fishes, are at risk of failure, or have already failed. Project would follow design elements to limit the impact to aquatic species.
Road managementWildlife, fish, rare plants
Decision
01/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance |
| South Zone Culvert Replacement Project- Ocoee Decision Memo | Decision Signed Date: 01/11/2023 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 10/5/2022
Salt Spring Burn Unit is 13 miles Northeast of Tellico Plains, TN, McNabb Burn Unit is 10 miles east of Tellico Plains, TN, McCamey Ridge Burn Unit is 3 miles east of Benton, TN. · Monroe; Polk, Tennessee
The 2022 South Zone Prescribed Fire Renewal project renews and amends three existing burn units: McNabb T25, Salt Spring T03, and McCamey O31. This project would involve multiple prescribed burn entries in the burn units.
Fuels managementWildlife, fish, rare plants
Decision
08/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| 2022 TELLICO AND OCOEE PRESCRIBED FIRE RENEWAL PROJECT | Decision Signed Date: 08/11/2022 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 9/28/2022
Trail 148 · Unicoi, Tennessee
This project is proposing to mitigate sedimentation and disturbance to streambank as well as installing a ~30 feet (horizontal feet) single-log or multi-log, stringer bridge to elevate users traversing the stream crossing.
Recreation management
Decision
09/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cherokee National Forest All Units · updated 9/1/2022
YMCA Camp Ocoee is located on the west side of Baker Creek Inlet of Parksville Lake. · Polk, Tennessee
The project expands the recreational opportunities of the camp while improving the facilities to current laws and regulations.
Special use management
Comment Period
03/12/2020
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 8/10/2022
The project is located approximately five miles south of Coker Creek, TN, in County. · Monroe; Polk, Tennessee
The Proposed Action would involve multiple silvicultural treatments within the scope of the Programmatic EA, Restoration of Dry Forest Communities on the South Zone of the Cherokee National Forest.
Forest products
Comment Period
05/22/2021
Objection Period Start
03/10/2022
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Restoration of Dry Forest Communities, Unicoi Mountain Project | Decision Signed Date: 07/27/2022 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/15/2022
The tract is located approximately 3 miles North of Farner, TN in Polk County. · Polk, Tennessee
The USDA Forest Service proposes to acquire 39.1 acres more or less on Brushy Creek within the Hiwassee River watershed. The parcel would be managed under the "7.B- Scenic Corridor and Scenic Viewshed" management prescription.
Land acquisition
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 7/5/2022
The project is located approximately 1.5 miles east of Tellico Plains, TN. · Monroe, Tennessee
Project would acquire approximately 3.77 acres adjacent to the Tellico River near Tellico Plains, TN.
Land acquisition
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cherokee National Forest All Units · updated 5/2/2022
The project area covers all four Ranger Districts of the Cherokee National Forest. · Carter; Cocke; Greene; Johnson; McMinn; Monroe; Polk; Sullivan; Unicoi; Washington, Tennessee
This project proposes routine road maintenance activities across all four Ranger Districts of the Cherokee National Forest.
Road management
Decision
05/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (20), 36 Cfr 220.6(E)(20); 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Cherokee National Forest |
| Districts | Cherokee National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cherokee National Forest All Units · updated 4/11/2022
Cherokee National Forest · Carter; Cocke; Greene; Johnson; McMinn; Monroe; Polk; Sullivan; Unicoi; Washington, Tennessee
The intent of this project is to produce a landscape scale project that would support the use of mechanical, herbicide and prescribed fire treatments in appropriate forest communities, across the entire Cherokee National Forest landscape.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
09/25/2018
Objection Period Start
10/2022 (Estimated)
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Cherokee National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 4/1/2022
The project is located at the Baby Falls Day Use Area in Monroe County, TN. · Monroe, Tennessee
The project would construct a permanent observation platform, walkway, and river access at Baby Falls Day Use Area. Design and construction materials of the viewing platform would be consistent with proposed Bald River Falls Bridge construction.
Facility managementRecreation management
Decision
03/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Great American Outdoors Act Baby Falls Viewing Overlook Project Decision | Decision Signed Date: 03/31/2022 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Tract K-312 |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/22/2022
The project is located approximately 4 miles west of Ducktown, TN in Polk County. · Polk, Tennessee
A special use applicant has requested to place an apiary on Lower Sheep Top Road, NFS 332103 from May to October. The apiary is a collection of Italian and European honey bee hives for honey production.
Special use management
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| DM_Lower Sheeptop Apiary Project Signed | Decision Signed Date: 03/22/2022 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 3/21/2022
Unaka and Watauga Ranger Districts of the Cherokee National Forest · Carter; Cocke; Greene; Johnson; Sullivan; Unicoi; Washington, Tennessee
This project focuses on enhancing aquatic habitat and riparian conditions in streams, lakes, and rivers on USFS lands on the Unaka and Watauga Ranger Districts of the Cherokee National Forest (CNF).
Wildlife, fish, rare plants
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District; Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 3/17/2022
The project is located on the Tellico River approximately 12.5 miles East of Tellico Plains, TN in Monroe County. · Monroe, Tennessee
The project would transfer the management and maintenance responsibilities of the Tellico Intake Bridge from the USDA Forest Service to the Tennessee Wildlife Resources Agency. The bridge would be maintained to USDA Forest Service Standards.
Special use management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Tellico Intake Bridge Project Decision Memo | Decision Signed Date: 03/16/2022 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 2/24/2022
The project is located approximately 4 miles south of Etowah, TN. · McMinn, Tennessee
The project would acquire approximately 153 acres on Starr Mountain in McMinn County, TN. The parcel is adjacent to Gee Creek Wilderness and would be managed under the 7.B Scenic Corridor/Sensitive Viewsheds prescription.
Land acquisition
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 2/23/2022
Project is located across the Tellico Ranger District. · Monroe, Tennessee
This project would allow for the continuation of permitting to conduct fishing outfitting and guiding on the Tellico River, North River, Sycamore Creek, and Citico Creek. This project is located on the Tellico Ranger District.
Special use management
Decision
02/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 2/16/2022
The project is located on Sugarloaf Drive in Ocoee, TN. · Polk, Tennessee
The project establishes a utility corridor 20 feet on either side of the 1.3 mile Sugar Loaf Drive. The corridor would be 6.3 acres in area. Water and fiber optic would be installed subsurface and electric aerially.
Special use management
Decision
02/2022 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 2/7/2022
A.T. in the Pond Mountain Wilderness Area · Carter, Tennessee
This project is proposing to relocate approximately a 250 ft long section of the A.T. in the Pond Mountain Wilderness Area.
Recreation management
Decision
12/2021 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 2/3/2022
Buffalo Mountain · Unicoi; Washington, Tennessee
This project proposes the establishment of approximately 5.05 miles of trail that are currently existing on the ground.
Recreation management
Decision
02/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 2/3/2022
Comp 367, 368, 369, 370, and 371 · Washington, Tennessee
Prescribe burn approximately 1,550 acres for hazardous fuels reduction and wildlife habitat creation.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Decision
01/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 11/10/2021
Beginning approximately 7.5 miles east of Tellico Plains, TN. · Monroe, Tennessee
The project would maintain, repair, or replace existing site features and furnishings, redesign campground layouts, remove hazard trees, harden user-created river access at recreation sites, and complete site drainage improvements in the Tellico area
Recreation management
Decision
11/2021 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| GAOA Tellico Corridor Recreation Site Maintenance and Repairs Project | Decision Signed Date: 11/09/2021 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 11/9/2021
Coon Den Falls Trail 37 · Carter, Tennessee
This project is proposing to relocate approximately 150 ft of the Coon Den Falls (Trail 37)
Recreation management
Decision
11/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 10/19/2021
Sullivan County, northwest of Jacob's Crk Civilian Conservation Center; Compartments 92, 94, and 95 · Sullivan, Tennessee
62 acres of thinning (Comp 92, Std 16; Comp 94, Stds 3 & 21; Comp 95, Stds 4 & 5), with TSI and mid-story burning.
Vegetation management (other than forest products)
Comment Period
09/27/2010
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 10/18/2021
Compartment 77-79 · Carter; Johnson, Tennessee
Prescribe burn approximately 2,020 for hazardous fuels reduction and wildlife habitat creation.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 9/28/2021
Sink Mountain Recreation Site - National Forest System Road (NFSR) 298 · Johnson, Tennessee
This project includes constructing a new facility that includes internal vehicular and pedestrian circulation, parking for single vehicles and vehicles with trailers, a boat launch with courtesy boat dock, fishing pier, and vault toilet.
Recreation managementRoad management
Comment Period
04/29/2021
Objection Period Start
08/06/2021
Decision
09/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Trail Management; Road Maintenance; Road Improvements/Construction |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 9/27/2021
The project is located approximately 4 miles east of Tellico Plains, TN, in Monroe County, TN. · Monroe, Tennessee
TDS Telecom has requested to install approximately 2,000 feet of 25 pair copper cable along Oosterneck Road and to retire 650 feet of 25 pair copper cable on the Cherokee National Forest. This line would be on the new FLEC Oosterneck Road Project.
Special use management
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| TDS Telecom Oosterneck Road Project Decision Memo | Decision Signed Date: 09/27/2021 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 9/17/2021
The project is located approximately 4 miles east of Tellico Plains, TN in Monroe County, TN. · Monroe, Tennessee
Special use applicant has requested to add approximately 1,300 feet of 25 pair aerial cable along Shaw Mountain Road and to retire 1,250 feet of aerial cable along Seng Garden Road.
Special use management
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| TDS TELECOM SHAW MOUNTAIN PROJECT DECISION MEMO | Decision Signed Date: 09/17/2021 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/1/2021
Big Creek Boat launch; East Parksville Boat Launch, Parksville Boat Launch, Kings Slough Boat Launch. All locations are in Polk County, TN. · Polk, Tennessee
Maintenance of existing buildings, repair or replacement of existing site features and furnishings, repair and enlargement of boat ramps and launches, replacement of boat ramps, riverbank erosion repair, and drainage improvements.
Recreation management
Decision
09/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| 20210901 DM_GAOA Ocoee Water Access Site Repairs and Improvements_Signed | Decision Signed Date: 09/01/2021 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/27/2021
Compartment 51 and 52 · Johnson, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
06/2017 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Grindstone Knob, Holston Mountain and Rye Patch Prescribed Burn | Decision Signed Date: 06/13/2017 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/27/2021
Cocke County, TN · Cocke, Tennessee
Prepare a study for determination of an area with adequate suitability for beneficial re-use of treated wastewater.
Research
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 7/26/2021
Tellico and Ocoee Ranger Districts dry forest communities · McMinn; Monroe; Polk, Tennessee
Restore dry forest communities with proposed treatments including restoration harvesting, commercial thinning, and noncommercial thinning
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels managementForest products
Comment Period
06/18/2020
Objection Period Start
07/31/2020
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/8/2021
Thunder Rock Campground is located in Polk County, TN, approximately 8 miles west of Ducktown, TN. The project is located approximately .25 miles west of Thunder Rock Campground. · Polk, Tennessee
The Benton Mackaye Thunder Rock Bridge Relocation Project would remove the existing trail bridge, construct a multiple log stringer bridge, construct approximately 150 feet of new trail, and decommission approximately 130 feet of existing trail.
Recreation management
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 7/8/2021
The project is located approximately 4 miles east of Tellico Plains, TN. · Monroe, Tennessee
The project would install approximately 1,840 feet of three phase distribution powerline with approximately 10 new power poles and remove approximately 640 feet of electric line near Oosterneck Road.
Special use management
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/8/2021
Boomer Den area of Cocke County, Tennessee · Cocke, Tennessee
The purpose of this project is to improve passage for aquatic organisms, restore stream channel and protect the road crossing and stream from damage during flooding events.
Wildlife, fish, rare plantsWatershed management
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District; Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 6/29/2021
The project is located at Indian Boundary Recreation Area, approximately 11 miles east of Tellico Plains, TN, in Monroe County. · Monroe, Tennessee
Replace and relocate Bridge 13 30 feet downstream of the current location, construct 215 feet of new trail, and decommission 230 feet of existing trail. Work would be completed by USDA Forest Service personnel with heavy machinery and hand tools.
Recreation management
Decision
06/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 6/2/2021
Tellico River Road · Monroe, Tennessee
Replace Bald River Falls bridge with a similar structure that meets current safety standards. The structure would include a sidewalk on the downstream side and a sidewalk/viewing platform on the upstream (falls) side.
Road management
Decision
05/2020 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Travel Management |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/18/2021
Project is located adjacent to the North River Road approximately 13 miles east of Tellico Plains, TN in Monroe County · Monroe, Tennessee
Reconstruct and relocate the North River trail bridge with single log bridge, recontour soil around cabin to divert water away from the cabin, and relocate and potentially reconstruct the existing pit toilet and dig a new toilet pit.
Recreation management
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 4/27/2021
Project is located four miles east of Tellico Plains, TN, in Monroe County, TN. · Monroe, Tennessee
Install 2,300 feet of three phase distribution power line along Shaw Mountain Road and to retire 1,250 feet of overhead electrical facilities along Seng Garden Road. Clearing will be from ground to sky up to 40 feet in width.
Special use management
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| FORT LOUDOUN ELECTRICAL COOPERATIVE SHAW MOUNTAIN PROJECT DECISION MEMO | Decision Signed Date: 04/27/2021 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 4/27/2021
The project is located approximately 6 miles ESE of Tellico Plains, Tennessee. · Monroe, Tennessee
150 acre addition to the existing Gravelstand burn unit. The additional acreage is adjacent to the existing Gravelstand unit with similar vegetation, wildlife habitat, and topography. The connector would be burned in conjunction with the main unit.
Fuels management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Gravelstand Connector Prescribed Burn Project Decision Memo | Decision Signed Date: 04/26/2021 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 4/14/2021
The project is located approximately 7 miles east of Benton, TN in Polk County, TN · Polk, Tennessee
The Thornburg Ridge Restoration Project includes prescribed burning and selective release/improvement treatments on 2,241 acres
Fuels management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 4/6/2021
Approximately seven miles south of Etowah, TN. Part of the project is adjacent to state hwy 30 and part of the project is adjacent to Hambright Rd. · Polk, Tennessee
Install approximately 13,000 feet of fiber optic line aerially on existing power poles along Hwy 30 and across the Hiwassee River and subsurface in existing conduit line along Hambright Road. Install two hand holes at river crossing.
Special use management
Decision
03/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 4/6/2021
The project is located approximately 4.3 miles NE of Coker Creek, TN in Monroe County, TN. · Monroe, Tennessee
Install the following at the Waucheesi Communication Tower : new radio system with antennas, microwave system with dish and wave guide, backup power with generator and propane tank, and a HVAC unit for climate control inside the shelter.
Special use management
Decision
03/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 3/22/2021
The end of Stone Mtn Tower Rd in Cocke County, TN. · Cocke, Tennessee
Hazardous Fuels Mitigation along the Stone Mtn Tower Road and around the communication towers at the end of the Stone Mtn Tower Road. Thinning trees around towers and road in conjuction with tree removal work TN Dept. of Forestry is conducting.
Fuels management
Decision
03/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 3/5/2021
All streams on the south zone of the Cherokee National Forest · McMinn; Monroe; Polk, Tennessee
The proposed project would enhance and restore stream habitat for fish and amphibians and improve hydrological function across the South Zone of the Forest.
Watershed managementWildlife, fish, rare plants
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 2/8/2021
Coker Creek TN vicinity between Joe Brown Highway and Unicoi Lakes Road · Monroe, Tennessee
Remediate damage to a 1 mi. portion of the Trail of Tears National Historic Trail.
Watershed managementHeritage resource management
Decision
12/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management; Watershed Improvements |
| Trail of Tears Sacred Site Remediation | Decision Signed Date: 12/19/2019 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/4/2020
This project is planned for areas within the Appalachian Trail corridor along Roan and Unaka Mountains. · Mitchell; Carter; Unicoi, North Carolina; Tennessee
Restore Spruce-fir habitat on Roan and Unaka Mtn by using gap creation to improve age class distribution and enhance T&E species habitat, under plant with spruce seedlings if necessary,& restore understory growth around the Roan High Knob shelter.
Wildlife, fish, rare plantsSpecial area management
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Special Area Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/3/2020
Polk County · Polk, Tennessee
installation of approximately 2700 square feet of fiber optic cable from Hwy 64 at Boyd Gap Overlook following along access road to Sheeptop Communication Tower
Special use management
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 4/27/2020
Compartment 344 · Unicoi, Tennessee
Non-commercially thin and prescribe burn approximately 113 acres in Compartment 344.
Vegetation management (other than forest products)
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 4/20/2020
Doe River Watershed · Carter, Tennessee
This project focuses on controlling illegal access and rehabilitating disturbed, eroding or compacted areas in the Doe River watershed.
Wildlife, fish, rare plantsWatershed management
Decision
04/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 4/8/2020
Appalachian Trail - near U.S 321 · Johnson, Tennessee
This project proposes relocation of approximately 0.45 miles of the Appalachian Trail, decommissioning the old trail and re-blazing the new section of trial and installation of two gates.
Recreation management
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/19/2020
Fairview Road · Polk, Tennessee
AT&T would like to place approximately 11.3 KF of fiber cable and six 30%u201Dx48%u201Dx36%u201D hand holes in the ROW and under the gravel roadway of Fairview Rd from existing HH feeding the Verizon tower at 831 Fairview Rd to a new AT&T tower.
Special use management
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/19/2020
Sheep Top Communication Site · Polk, Tennessee
ATT proposes to install an 8%u2019x8%u2019 equipment cabinet on an existing concrete foundation, 20kw AC generator, H-Frame with meter and disconnect, and underground copper grounding wire and antenna installation on an existing tower structure.
Special use management
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| AT&T Mobility Communication Site Project | Decision Signed Date: 12/13/2019 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/19/2020
35.05.55.9 84.37.04.7 · Polk, Tennessee
Install a water meter near the entrance of recreation residence. Connect water from main line and install water line along centerline of road leading to recreation residence(Approx. 600 ft.) The water line will be placed 18" deep and 12" wide.
Special use management
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/19/2020
35.08.53.5 84.36.22.8 · Polk, Tennessee
VEC proposes setting one pole, changing out one pole and putting up some new wire over the hiking trail in the ROW on Clemmer trail-where the hikers go in at Chilhowwee lake and go hiking to Benton Falls. There are safety concerns for the trail users
Special use management
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 3/13/2020
Dennis Cove area · Carter, Tennessee
This project focuses on vegetation management (commercial, non-commercial thinning, and prescribed burning) activities designed to restore forest communities to those vegetation types that would be predicted to occur at each given location.
Vegetation management (other than forest products)
Decision
03/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 3/11/2020
Buffalo Mountain · Washington, Tennessee
The objectives of this project are to move the stands toward a more open woodland condition; with pockets of mature timber with grassy herbaceous layers, and a mosaic feature of pine/oak regeneration.
Vegetation management (other than forest products)
Decision
03/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 3/10/2020
The Rogers Ridge area is located approximately 6 miles northeast and 4.5 miles northwest of Mountain City, TN. · Johnson, Tennessee
Project will include approximately 8,760 acres that would receive a treatment of mating disruption pheromones to control the gypsy moth. These acres include approximately 2,290 acres of private land and 6,470 acres of National Forest System land
Vegetation management (other than forest products)
Comment Period
11/19/2019
Decision
02/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 2/18/2020
Short Mountain · Greene, Tennessee
The purpose of this project is to restore the Blue Ridge Table Mountain Pine-Pitch Pine Woodland ecosystem (9F), a designated rare community in the Cherokee National Forest Revised Land and Resource Management Plan (CNFRLMP)
Vegetation management (other than forest products)
Decision
02/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Special Area Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 1/21/2020
Wolf Creek · Cocke, Tennessee
This proposal would improve aquatic organism passage on Forest Service Road (FSR) 96 where it crosses Wolf Creek upstream of Wolf Creek Falls.
Watershed managementWildlife, fish, rare plants
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 12/16/2019
Along Citico Road · Monroe, Tennessee
The Forest Service proposes to acquire 557.72 acres, more or less, situated in Civil District No.5 of Monroe County, Tennessee, located in part along Citico Road, being all of Tax Parcel 35.00 (Map 61).
Land acquisition
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 12/16/2019
Between Highway 68 and Unicoi Lakes Road in Coker Creek. · Monroe, Tennessee
The FS proposes to accept a land donation for a total of 5.37 acres. The two parcels of land are located on Unicoi Lakes Road and known as USA Tract K-1608(1.79 ac) and USA Tract K-1610(3.5 ac) Includes survey, mark & placement of boundary monuments.
Land acquisition
Decision
12/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 11/13/2019
Furnace Branch, Lock Ridge and Rutter Ridge · Carter; Johnson, Tennessee
This project focuses on moving the stands toward a more open woodland condition, with pockets of mature timber with grassy herbaceous layers, and a mosaic feature of pine/oak regeneration.
Fuels managementVegetation management (other than forest products)
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/23/2019
Around the Ocoee/Hiwassee District Office · Polk, Tennessee
Treatments would include the severing of selected stems (chainsaw/manual), application of herbicide, and the use of prescribed fire within the designated unit (212 acres.
Vegetation management (other than forest products)Fuels management
Decision
11/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Tellico Ranger District · updated 9/18/2019
Entire SZ of the CNF. · McMinn; Monroe; Polk, Tennessee
To implement management actions to restore "departed" plant communities found within "dry" forest types to their ecological potential. A variety of activities may be used such as: prescribed fire, herbicides, and mechanical and manual treatments.
Vegetation management (other than forest products)Forest productsWildlife, fish, rare plantsFuels management
Comment Period
05/01/2019
Objection Period Start
07/10/2019
Decision
09/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| DN for Rest Dry Forest Communities South Zone | Decision Signed Date: 09/11/2019 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 8/28/2019
Vicinity of Cataska Mountain, Pine Mountain and Borin Top · Monroe; Polk, Tennessee
Manual TSI slashdown and leave on approximately 5,600 acres of selected stands. Approximately 239 stands would have non-preferred wildlife trees in the 1-12 inch (229 stands, 5,157 ac)or 1-5 inch (10 stands, 482 ac) DBH range cut and left on site.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
10/2019 (Estimated)
Decision
02/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/29/2019
Walnut Mountain · Carter, Tennessee
This project proposes a multiple loop horse trail in the White Rocks / Walnut Mountain / Roan Mountain area to provide recreational opportunities and economic growth opportunities for the community of Roan Mountain
Recreation management
Decision
05/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/22/2019
Childers Creek Road approximately .5 mile east of Hwy 30 at the Childers Creek parking area( fishing access point on the Hiwassee River). · Polk, Tennessee
Currently the area is being treated for NNIS. Once the treated is completed it is proposed to use a combination of mechanical treatments(girdling, felling) and fire to create more favorable habitat conditions for the existing river cane to expand.
Wildlife, fish, rare plants
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/22/2019
Starr Mountain Horse Trail System east of Etowah TN. · McMinn; Polk, Tennessee
Ocoee Horseride LLC submitted a proposal to conduct outfitter and guide service on three trails (NFST 104, 105, and 119) in the Starr Mountain Horse Trail System.
Special use management
Decision
07/2019 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/22/2019
Three locations on the Ocoee River with access from Highway 64. · Polk, Tennessee
Issue a Special Use Permit to TDEC to take over the operations, maintenance and improvement/replacement of USDA Forest Service, Ocoee River Water Access Facilities %u2013 Big Creek Launch, Rogers Branch Launch and Upper Put-In.
Special use management
Decision
07/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 6/3/2019
Compartments 380-382 and 384 · Unicoi; Washington, Tennessee
This project is proposing to conduct understory maintenance burning to promote open woodland conditions, create a mixed hardwood/pine system, reduce hazardous fuels, and improve wildlife habitat.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
06/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/3/2019
Along NFSR 345H1 and 345H in Indian Boundary Recreation Area. · Monroe, Tennessee
FLEC has proposed to relocate a distribution line in the Indian Boundary Recreation Area. Approximately 500 ft. of aerial cable will be removed and then 1,000 feet of aerial cable and 200 ft. of buried would be installed along NFSR 345H1 and 345H.
Special use management
Decision
04/2019 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/3/2019
Waucheesi Mountain Electronic Site · Monroe, Tennessee
Issue a permit to Monroe County to add a repeater with rack, antenna, transmission lines and backup at an existing Communication Site building and tower on Waucheesi Mountain.
Special use management
Decision
04/2019 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/3/2019
Various locations on the District. See maps. · Polk, Tennessee
Applicant is proposing to use NFS land to conduct guided mountain biking, hiking, running, and lake tours. Various designated trailheads and trails proposed based on type of tour. Stand-up paddle board tours would occur on Lake Ocoee via NFSR 33210.
Special use management
Decision
04/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/3/2019
At Ocoee Marina on Highway 64 · Polk, Tennessee
VEC would like to remove 850 ft. of overhead line near the Ocoee Marina. The line would be replaced with 227 ft. of buried cable adjacent to the Marina parking area.
Special use management
Decision
04/2019 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Unaka Ranger District · updated 4/18/2019
The Meadow Creek analysis area is located in southeastern Cocke and southwestern Greene counties, TN. · Cocke; Greene, Tennessee
Create early successional habitat, improve forest health and vigor, promote mast-producing species, prescribed burning, wildlife habitat improvements, and maintain, decommission, and authorize roads.
Vegetation management (other than forest products)Wildlife, fish, rare plantsForest productsRoad management
Comment Period
10/12/2018
Objection Period Start
12/04/2018
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 3/29/2019
Unicoi County, Tennessee. · Unicoi, Tennessee
This project is proposing a combination of midstory and crop tree treatments as well as prescribed burning.
Vegetation management (other than forest products)
Decision
03/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 2/15/2019
Citico Creek Wilderness and Joyce Kilmer-Slickrock Addition Wilderness Study Area · Monroe, Tennessee
A proposal to O&G backpacking trips in the Citico Creek Wilderness has been submitted. A base camp is proposed at Citico 13 campsite. Numerous trails proposed to be used to introduce approximately 90 students each March to wilderness backpacking.
Special use management
Decision
02/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 12/3/2018
East of Big Frog Wilderness, west of State Highway 68, south of State Highway 64 and north of the Georgia state line. · Polk, Tennessee
The project is designed to improve or maintain wildlife habitat, species diversity of stands, and forest health through vegetation management and other treatments.
Forest productsFuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsRoad management
Comment Period
02/17/2016
Objection Period Start
10/12/2018
Decision
12/2018 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Dinkey. | Decision Signed Date: 12/03/2018 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 11/14/2018
Compartment 167 near Ditney Mountain off NFSR 66. · Polk, Tennessee
Commercially thin approximately 69 acres.
Wildlife, fish, rare plantsForest products
Decision
11/2018 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 11/1/2018
Paint Creek · Greene, Tennessee
This project focuses on controlling illegal access and rehabilitating disturbed, eroding or compacted areas in Paint Creek.
Wildlife, fish, rare plantsWatershed management
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cherokee National Forest All Units · updated 9/5/2018
Cherokee National Forest · Carter; Cocke; Greene; Johnson; McMinn; Monroe; Polk; Sullivan; Unicoi; Washington, Tennessee
manage permanent grassy & herbaceous openings using a combination of treatment methods; openings include permanent openings benefiting wildlife species & utility corridors under special use permit by utility agencies
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
11/29/2017
Objection Period Start
07/10/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements |
| Forests | Cherokee National Forest |
| Districts | Cherokee National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 8/10/2018
South of Hwy 64. · Polk, Tennessee
TVA proposes to replace three steel structures in a transmission line. A temporary road is needed to access the utility line ROW and it would be 12 ft. wide by approx. 1,500 ft. long. Trucks & trailers would use the road to transport the materials.
Special use management
Decision
08/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 8/10/2018
Cabin 1 south of Hwy 64 · Polk, Tennessee
Remove existing overhead line and install an approximately 340 foot underground utility line in same location.
Special use management
Decision
08/2018 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 8/10/2018
YMCA Camp Ocoee · Polk, Tennessee
Disassemble and remove Brown cabin from the permit area to a location off National Forest System land. After removal the cabin site would be allowed to revert to a natural condition.
Special use management
Decision
08/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 8/9/2018
Compartment 110 · Sullivan, Tennessee
This project focuses on moving the stands toward a more open woodland condition and promote Shortleaf Pine.
Vegetation management (other than forest products)Fuels management
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Tellico Ranger District · updated 8/9/2018
Project area is 6 to 18 miles east of Etowah, TN and 1 to 7 miles south of Tellico Plains, TN · Monroe, Tennessee
Vegetation Management through various tools for forest health and wildlife habitat improvement. Also, watershed and trail improvements with connected road management.
Forest productsRecreation managementWildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementRoad managementWatershed management
Comment Period
10/01/2014
Objection Period Start
08/31/2016
Decision
12/2016 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 8/9/2018
Sina Branch Road NFSR 67 at Davis Branch crossing. · Polk, Tennessee
The existing 66" round culvert at Davis Branch on Sina Branch Road is a barrier to aquatic organism passage. The project consists of removal of the existing culvert and installation of an aluminum bottomless box culvert.
Wildlife, fish, rare plantsRoad management
Decision
07/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 8/9/2018
Compartment 301 and 302 · Carter, Tennessee
This project focuses on vegetation management (thinning) activities designed to maintain a healthy forest. This project also focuses on low intensity bum to develop open woodland conditions and create mixed hardwood/pine system.
Fuels managementVegetation management (other than forest products)
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 8/9/2018
northeastern Sullivan County, TN · Sullivan, Tennessee
The project would provide early successional forest for wildlife, restore forest and wetland comm., release mast-producing trees, improve forest health, provide wildlife habitat components (nest boxes, etc), and manage NFS system and non-system roads
Wildlife, fish, rare plantsVegetation management (other than forest products)Road managementFuels managementForest products
Comment Period
02/29/2016
Objection Period Start
07/25/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Unaka Ranger District · updated 8/9/2018
Approximately 10 (linear) miles south of Greeneville, TN · Greene, Tennessee
Create early successional habitat, promote mast-producing species, prescribed burning, wildlife habitat improvements, and maintain, decommission, and authorize roads.
Road managementVegetation management (other than forest products)Forest productsWildlife, fish, rare plants
Comment Period
07/15/2015
Objection Period Start
11/23/2015
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 8/9/2018
Rocky Top Road near Rocky Top Gap · Cocke, Tennessee
Construction of a 1 mile foot travel only trail that parallels Rocky Top Road in Cocke County, TN.
Recreation management
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 8/9/2018
Forest Service Road 25 and 188. · Washington, Tennessee
Remove existing culverts on Briar Creek Road (#188) over Briar Creek and on Clark Creek Road (#25) over Sill Branch and replace with arched culverts.
Watershed managementWildlife, fish, rare plants
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 8/9/2018
Compartment 335 · Unicoi, Tennessee
Non-commercially thin approximately 368 acres to focus on moving the stand toward a more open woodland condition and promote shortleaf pine.
Fuels managementVegetation management (other than forest products)
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 8/9/2018
Compartment 232 · Cocke, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Decision
06/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 8/8/2018
Pheasant Field Rearing Pools on the Tellico River · Monroe, Tennessee
TWRA requested permission to construct a handicapped accessible fishing pier The proposed structure will consist of a wooden walkway that would end in a wooden fishing pier that will be attached to concrete piers located on bedrock on the river.
Special use managementRecreation management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/25/2018
Off NFSR 23 · Polk, Tennessee
TVA proposes to replace existing structure 16 of Apalachia Hydro Plant transmission line with a 10 ft. taller pole in order to raise the conductors further from the ground. An existing access road would be utilized to access the site.
Special use management
Decision
07/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/12/2018
Location of T&E plant not to be disclosed. · Polk, Tennessee
Open the canopy at one of the two locations of white fringeless orchid on the Forest using chainsaws to directionally fell one to three trees in the immediate vicinity of the site. The felled trees would be left on site.
Wildlife, fish, rare plants
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/10/2018
North Zone Cherokee National Forest · Carter; Cocke; Greene; Johnson; Sullivan; Unicoi, Tennessee
This project focuses on maintaining and improving ponds and waterholes across the North Zone of the Cherokee National Forest on a regular basis.
Wildlife, fish, rare plants
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District; Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 7/9/2018
Approximately 4 locations along Conasauga Creek Road · Monroe, Tennessee
OHVs are illegally driving off NFSR 341 into Conasauga Crk and also creating mud holes and ruts in some dispersed campsites. The CNF plans to place natural barriers such as boulders, trees, or tree stumps to block access to the creek and campsites.
Recreation managementRoad managementWatershed management
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Dispersed Recreation Mgmt.; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 6/8/2018
Various National Forest System Roads on the Tellico Ranger District · Monroe, Tennessee
Various activities not limited to: replace culverts draining existing ditches, construct broad-based dips, scarify roadbed to remove large rocks, asphalt resurfacing of existing paved sections, place and grade aggregate, and replace gates.
Road management
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Travel Management |
| Road Maintenance Trail of Tears/Unicoi Turnpike Sacred Sites Corridor | Decision Signed Date: 06/06/2018 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 5/16/2018
Ocoee River Corridor · Polk, Tennessee
TVA is proposing a management agreement with the Ocoee River Outfitters Association, U.S. Forest Service, and the State of Tennessee that would establish partner responsibilities to provide recreational management along the Ocoee River.
Recreation managementFacility management
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/2/2018
Along Hwy 64 near the Ocoee Marina · Polk, Tennessee
Open the canopy so the existing population can spread. Cut trees(small diameter Virginia Pine and a few hardwood) using chainsaws. The downed trees would then be pulled back a short distance into the forested area adjacent to the site.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 4/20/2018
Buffalo Mtn ATV Trail · Greene; Unicoi, Tennessee
Relocate a section of the Buffalo Mtn ATV trial off the pinch point to the newly acquired FS land.
Recreation management
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Tellico Ranger District · updated 3/9/2018
Three miles southeast of Coker Creek TN. Compartments 114, 131, 132, 133, 134, and 137 · Monroe; Polk, Tennessee
Restore selected natural vegetative communities and enhance wildlife habitat.
Road managementVegetation management (other than forest products)Recreation managementWildlife, fish, rare plants
Comment Period
07/04/2007
Decision
08/2007 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Tellico Ranger District · updated 3/9/2018
South of Parksville Lake · Polk, Tennessee
Restore selected natural vegetative communities and enhance wildlife habitat.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementRecreation management
Comment Period
02/06/2008
Decision
05/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Stewardship Contract, Consolidated Appropriations Resolution Of 2003 |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Hogback | Decision Signed Date: 05/13/2009 Legal Notice Date: 05/20/2009 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Environmental Assessment · Tellico Ranger District · updated 3/9/2018
Lost Creek Watershed - Northwest of Ducktown TN and southeast of Reliance TN · Polk, Tennessee
Wildlife habitat improvement, forest health management and connected actions.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Comment Period
03/22/2006
Decision
12/2006 (Estimated)
Implementation
03/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Hiwassee Ranger District; Ocoee - Hiwassee Ranger District |
Decision Memo · Watauga Ranger District · updated 1/16/2018
Compartment 117 · Carter, Tennessee
Non-commercially thin and prescribe burn approximately 890 acres
Fuels managementVegetation management (other than forest products)
Decision
01/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 12/14/2017
Ford #2 on Conasauga Creek Road (NFSR 341) · Monroe, Tennessee
Address deteriorating road and resource conditions at Ford #2 on Conasauga Creek Road (NFSR #341), which is coincident with the Unicoi Turnpike (40MR408) a declared Sacred Site by the federally recognized Cherokee and Muscogee Creek Tribes.
Watershed managementHeritage resource managementRoad management
Decision
12/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management; Road Maintenance; Travel Management; Watershed Improvements |
| Decision Decided Date | 12/14/2017 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/11/2017
Compartments 50/51 · Johnson, Tennessee
742 acres of Non Commercial thinning to improve forest structure and vigor.
Vegetation management (other than forest products)
Decision
12/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/7/2017
Hwy 30 · Polk, Tennessee
TDOT has proposed to cut approximately 32 hazard trees along approximately 4,100 feet of Highway 30. TDOT would cut and leave the trees located outside of the ROW and cut and remove the trees that are located within the ROW.
Special use managementRoad management
Decision
12/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Maintenance |
| Decision Decided Date | 12/07/2017 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 12/5/2017
Compartment 346 · Unicoi, Tennessee
Non-commercially thin and prescribe burn approximately 172 acres.
Vegetation management (other than forest products)
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 11/27/2017
Citico Creek Road NFSR 35-1 near campsite #3 · Monroe, Tennessee
Use heavy equipment to dig up to 10 soil pits and collect samples for waste characterization. Samples would be delivered to an offsite laboratory for analysis. All holes would be backfilled with excavated material and covered with soil from onsite.
Watershed management
Decision
11/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Decision Decided Date | 11/27/2017 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 11/16/2017
Compartment 232 · Unicoi, Tennessee
Non-commercially thin and prescribe burn approximately 512 acres in Compartment 232
Vegetation management (other than forest products)
Decision
11/2017 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 11/16/2017
Compartment 342 and 343 · Unicoi, Tennessee
This project focuses on vegetation management (commercial thinning) activities designed to maintain a healthy forest. This project also focuses on low intensity burns to develop open woodland conditions, promote upland oak, and shortleaf pine.
Fuels managementVegetation management (other than forest products)
Decision
11/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 10/26/2017
Whigg Meadow Vicinity · Monroe, Tennessee
Red spruce trees would be spot planted by hand in an approximately 1,600 ac area. Planting will occur generally above 4,000 feet elevation and in locations with dead or dying hemlock or north facing slopes. Mechanical release would occur as needed.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 9/28/2017
Compartment 21 and 22 · Johnson, Tennessee
Non-commercially thin approximately 516 acres in Compartments 21 and 22. Conduct site preparation prescribed burns to promote shortleaf pine and oak regeneration.
Vegetation management (other than forest products)
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 9/28/2017
Old Homestead Trail · Johnson, Tennessee
Relocate the northern 1.7 miles of the Old Homestead Trail onto the existing dozer line that parallels the trail.
Recreation management
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 8/7/2017
All trails on the South Zone of the CNF. · McMinn; Monroe; Polk, Tennessee
Perform maintenance on all SZ trails (including Wilderness) to include: brushing and limbing within 2-3 feet of trail edge, hazard tree removal, slough and berm, inserting water drainage structures in trail tread, and switchback rebuilding.
Recreation management
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Trail Maintenance Tellico | Decision Signed Date: 08/07/2017 |
| Trail Maintenance Ocoee/Hiwassee | Decision Signed Date: 08/07/2017 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/19/2017
Sullivan County, Compartment 118. · Sullivan, Tennessee
Area 1 - 41 ac; Area 2 - 47 ac; Area 3 - 18 acres. Variable density thinning; damaged/diseased trees followed by poplar, red maple, scarlet/black oak, white pine. Longer-lived species, such as oaks and hickory, favored.
Forest products
Scoping Start
05/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 7/19/2017
Compartment 118, Sullivan County · Sullivan, Tennessee
Low intensity midstory control burn in three blocks: burn block 1 = 131 acres; block 2 - 270 acres; block 3 - 140 acres. Goal to move area towards open woodland conditions.
Wildlife, fish, rare plantsFuels management
Scoping Start
05/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Environmental Assessment · Watauga Ranger District · updated 7/19/2017
Rogers Ridge Burn Unit W-08 in upper East Tennessee · Johnson, Tennessee
Fuel Reduction Prescribed Burn 958 acres
Fuels management
Comment Period
02/04/2011
Decision
01/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/18/2017
Along Hwy 64 from Ocoee #1 Dam to Ocoee Marina · Polk, Tennessee
BellSouth has requested to install 880 feet of conduit for fiber optic cable installation along Hwy 64.
Special use management
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 7/18/2017
164 Unicoi Lakes Road, Tellico Plains, TN · Monroe, Tennessee
Purchase of approximately 3.55 acres of land. Project includes painting and posting of National Forest System boundary line around the tract.
Land acquisition
Decision
07/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Decision Decided Date | 07/18/2017 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/18/2017
Trail 24 · Greene, Tennessee
This project proposes constructing approx. 330 ft. of new trail to relocate the trail away from an existing spring.
Recreation management
Decision
04/2017 (Estimated)
Decision
08/2016 (Estimated)
Implementation
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/18/2017
Unaka and Watauga Ranger Districts · Carter; Johnson; Washington, Tennessee
Block access to user created trails in the Flatwoods, Halls Top East and West, Ripshin, Rich Mountain, and Buffalo Mountain areas.
Road management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District; Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/18/2017
Compartment 105 and 108 · Sullivan, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Decision
06/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/18/2017
Near Conasauga River · Polk, Tennessee
Purchase of approximately 640 acres of land. Project includes painting and posting approximately 1/2 mile of National Forest System boundary line.
Land acquisition
Decision
07/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Decision Decided Date | 07/18/2017 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/18/2017
Compartment 200 · Greene, Tennessee
Routine maintenance on approximately 2.5 miles of the Appalachian Trail (A.T.) and 2 relocations from Jerrys Cabin Shelter to Gravel Knob.
Recreation management
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/18/2017
Compartment 69 and 72 · Carter, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Decision
06/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/18/2017
Nine perennial stream crossings on Sina Branch Road (NFSR 67). · Polk, Tennessee
In-stream work extending approximately 250 ft. upstream and downstream of each of the nine culverts on NFSR 67.
Wildlife, fish, rare plantsWatershed managementRoad management
Decision
05/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 7/18/2017
Compartment 24 · Carter, Tennessee
Commercial timber sale (<70 acres). Non-commercial timber sale (93 acres). Multiple prescribed burns are associated within the Point Break project area.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
06/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/18/2017
Indian Boundary Lake · Monroe, Tennessee
Utilize native materials to enhance Indian Boundary Lake habitat for non-game and game fish species and macro-invertebrates by adding natural brush and woody vegetation to the lake bed.
Recreation managementWildlife, fish, rare plants
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 5/17/2017
Compartments 29 - 34; Carter County, TN · Carter, Tennessee
Vegetation management and wildlife activities in vicinity of Little Pond Mountain
Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)Road managementForest products
Comment Period
01/17/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 3/13/2017
Northwest of Turtletown · Polk, Tennessee
The project is designed to improve or maintain wildlife habitat, species diversity of stands, and forest health through vegetation management and other treatments.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Road managementFuels management
Comment Period
09/2016 (Estimated)
Objection Period Start
02/2017 (Estimated)
Decision
06/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/13/2016
Starr Mountain Road · McMinn; Monroe, Tennessee
Seasonally close NFSR 297 annually from 12/1 to 3/1 to prevent resource damage and prohibit illegal activities.
Road management
Decision
01/1970 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Decision Decided Date | 07/02/2026 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 8/17/2016
East of Watauga Lake, Compartment 123 · Johnson, Tennessee
Salvage 172 acres of dead, down and wind thrown timber to reduce public safety hazards, decrease remaining wildfire fuel loads, and promoting a healthy forest. Reforest the harvested area following salvage operations.
Fuels managementForest products
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 8/17/2016
West of Watauga Lake, Compartment 30 · Carter, Tennessee
Salvage 233 acres in Compartment 30 of dead, down and wind thrown timber to reduce public safety hazards, decrease remaining wildfire fuel loads, and promoting a healthy forest. Reforest harvested areas following salvage.
Forest productsFuels management
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 7/29/2016
Smokey Branch and Citico Creek Roads · Monroe, Tennessee
Tellico Area Services System (TASS) has requested a permit for approximately 21,000 feet of existing water lines buried along road right-of-ways in multiple locations.
Special use management
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 6/22/2016
AT Bridge Wildermine · Carter, Tennessee
Replace existing structure with a single span structure approximately 20 ft long. Construct new abutments & sills. Bridge will be sited approximately 20 ft downstream of existing location.
Special use management
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 6/22/2016
Compartments 316-318 · Carter, Tennessee
70 acre thinning and 175 acre prescribe burn.
Vegetation management (other than forest products)Fuels management
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 6/1/2016
Compartments 236 and 241 · Cocke, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Decision
06/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/31/2016
All recreation and administration sites/areas on the Ocoee/Hiwassee Ranger District. · Polk, Tennessee
Work includes, but is not limited to:mowing, cleaning, repair, maint, & replacement of existing structures and improvements;operation & maint. of utility systems;selective hazard tree & brush removal;and use of pesticides; all in boundaries of sites.
Facility managementRecreation management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Facility Maintenance |
| Decision Decided Date | 05/31/2016 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 5/31/2016
All recreation and administrative facilities/areas on the Tellico Ranger District. · Monroe, Tennessee
Work includes, but is not limited to:mowing, cleaning, repair, maint, & replacement of existing structures and improvements;operation & maint. of utility systems;selective hazard tree & brush removal;and use of pesticides; all in boundaries of sites.
Facility managementRecreation management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Facility Maintenance |
| Decision Decided Date | 05/31/2016 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/31/2016
National Forest System Roads on the Ocoee/Hiwassee Ranger District · McMinn; Polk, Tennessee
Various activities not limited to: replace culverts draining existing ditches, construct broad-based dips, scarify roadbed to remove large rocks, asphalt resurfacing of existing paved sections, place and grade aggregate, and replace gates.
Road management
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 05/31/2016 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 5/16/2016
Rattlesnake Ridge Trail · Unicoi, Tennessee
This project consists of demolition of the existing trail bridge, including deck, handrails & log stringers, and construction of a replacement bridge in the existing location.
Special use management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/12/2016
Located in Indian Creek/Hawkins Branch drainage of the Ocoee River watershed. Accessed by NFSR 33741. · Polk, Tennessee
Purchase approximately 160 acres of land that is currently an inholding on the Cherokee National Forest.
Land acquisition
Decision
05/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Decision Decided Date | 05/12/2016 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | North half of the northwest quarter of section thirty-two and the south half of the southwest quarter of section twenty-nine of T2S, R3E |
Decision Memo · Cherokee National Forest All Units · updated 4/28/2016
Cherokee National Forest · Carter; Cocke; Greene; Johnson; McMinn; Monroe; Polk; Sullivan; Unicoi; Washington, Tennessee
compliance with the 2012 Planning Rule monitoring transition requirement
Land management planning
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Plan Amendment |
| Forests | Cherokee National Forest |
| Districts | Cherokee National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 4/21/2016
Pigeon River in the Bluffton/Hartford area · Cocke, Tennessee
Cocke County Emergency Services are requesting to improve two locations along the Pigeon River in the Bluffton/Hartford area.
Special use managementRecreation management
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cherokee National Forest All Units · updated 4/6/2016
Located in the First Civil District of Unicoi County and approximately 3 miles west of Interstate 26, south of Flag Pond, TN. · Unicoi, Tennessee
The Forest Service proposes to acquire 77.5 acres
Land acquisition
Decision
04/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Decision Decided Date | 04/06/2016 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 2/11/2016
Washington County, TN · Washington, Tennessee
This project is designed to improve the vegetation of the proposed area by thinning the stands with variable density to a range of basal areas from 35 to 60 sq ft per acre.The proposed area is <70 acres and is located in Compartment 385.
Fuels managementVegetation management (other than forest products)
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 1/12/2016
Compartment 80 · Johnson, Tennessee
This project focuses on thinning activities designed to maintain a healthy forest.Also,this project focuses on low intensity burns to move stand toward an open woodland condition and promote upland oak,shortleaf pine and a more open forest condition.
Fuels managementVegetation management (other than forest products)
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/29/2015
Compartment 51 and 52 · Johnson, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 12/29/2015
Compartments 236 and 241 · Cocke, Tennessee
Understory maintenance burning to improve habitat conditions for wildlife and reduce hazardous fuels.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/9/2015
Watauga Dam Topo Map · Carter, Tennessee
This project consists of demolition of the existing trail bridge, including deck, abutments and sills, and construction of a replacement bridge in the existing location. The new bridge will be a single span structure, approximately 20 feet long.
Special use management
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/9/2015
Rich Knob area · Johnson, Tennessee
This project proposes relocation of approximately 0.45 miles of the Appalachian Trail running south from Double Springs, along a decommissioned FS road connecting back with the existing trail.
Special use management
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 11/30/2015
Compartment 48 · Johnson, Tennessee
This project focuses on thinning activities designed to maintain a healthy forest.Also,this project focuses on low intensity burns to move stand toward an open woodland condition and promote upland oak,shortleaf pine and a more open forest condition.
Fuels managementVegetation management (other than forest products)
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 11/30/2015
Compartment 49 · Johnson, Tennessee
This project focuses on thinning activities designed to maintain a healthy forest.Also,this project focuses on low intensity burns to move stand toward an open woodland condition and promote upland oak,shortleaf pine and a more open forest condition.
Fuels managementVegetation management (other than forest products)
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 11/16/2015
Hiwassee River from Apalachia Powerhouse east to Hwy 411. Access to the river will include both the Apalachia and Towee Creek Boat Launch sites accessed by NFSR 108 (Hiwassee River Road). · Polk, Tennessee
The CNF will advertise,though a prospectus,to fill 2 vacant outfitter guide, fly-fishing permits.The permits will initially be issued for a 2-yr probationary period and upon reaching a successful operation and permit compliance will be extended 8 yrs
Special use management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 11/16/2015
Oswald Dome Electronic Site · Polk, Tennessee
Install 150' communications tower and associated 20'X 25' building. Proposal changed to: 180' self supporting tower; 8'X18' building; install generator; install 500 gal in-ground propane tank; and install 8' fence around facility.
Special use management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Polk County Emergency Management Agency | Decision Signed Date: 11/17/2014 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 11/16/2015
Tellico Hatchery special use site on Tellico River Road · Monroe, Tennessee
Tennessee Wildlife Resources Agency (TWRA) has requested permission to place a 60' X 36' metal equipment shed within the Tellico Hatchery compound. This would be granted through an amendment to the existing TWRA Hatchery permit.
Special use management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 10/2/2015
Citico Creek downstream of Doublecamp Creek confluence · Monroe, Tennessee
Remove dam on Citico Creek just downstream of Doublecamp Creek to restore aquatic organism passage, natural geomorphology and bedload transport regime.
Watershed managementWildlife, fish, rare plants
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 10/2/2015
Reliance · Polk, Tennessee
Volunteer Electric Cooperative proposes burying a powerline in a roadbed that crosses 100 ft. of National Forest System lands. The line will be 7200 volts and buried in a trench 6 inches wide by 36 inches deep.
Special use management
Decision
12/2010 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| VEC Buried Powerline | Decision Signed Date: 12/16/2010 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | T1 R3E Section 2 |
Environmental Assessment · Tellico Ranger District · updated 9/29/2015
Greasy Creek watershed · Polk, Tennessee
Restore selected natural vegatative communities and enhance wildlife habitat.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)Forest products
Comment Period
05/27/2009
Decision
06/2010 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Stewardship Contract, Consolidated Appropriations Resolution Of 2003 |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green); Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 9/29/2015
Rocky Top, Hall Top and The Gulf · Cocke, Tennessee
The 4x4 tour group is requesting a special use permit that would allow them to lead guided jeep/street legal UTV tours in and around Rocky Top, Hall Top and The Gulf.
Special use management
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 9/29/2015
Rocky Top, Hall Top and The Gulf · Cocke, Tennessee
The 4x4 tour group is requesting a special use permit that would allow them to lead guided jeep/street legal UTV tours in and around Rocky Top, Hall Top and The Gulf.
Special use management
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ocoee - Hiwassee Ranger District · updated 9/29/2015
Spring Creek Watershed · McMinn; Monroe; Polk, Tennessee
Vegetation manipulation for ecological restoration; ephemeral pond construction; road daylighting; fuel reduction burns; road construction and road maintenance; and development of a parking area and horse trail.
Fuels managementRoad managementWildlife, fish, rare plantsVegetation management (other than forest products)Forest productsRecreation management
Comment Period
06/27/2012
Decision
08/2012 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Tellico Ranger District · updated 6/27/2015
Middle and Upper Tellico River watersheds · Monroe, Tennessee
Vegetation management for wildlife habitat and forest health.
Vegetation management (other than forest products)Fuels managementSpecial use managementForest productsWatershed managementWildlife, fish, rare plantsRoad management
Comment Period
06/02/2013
Decision
09/2013 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Tellico | Decision Signed Date: 09/25/2013 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Tellico Ranger District · updated 6/10/2015
Huckleberry Ridge area off of Rafter Road. · Monroe, Tennessee
Presribed burn approximately 995 acres.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cherokee National Forest All Units · updated 5/15/2015
Unicoi and Carter Counties · Carter; Unicoi, Tennessee
proposing using biocontrol agents when ash trees become infected
Research
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Emerald Ash Borer Research Project (Unaka Ranger District) | Decision Signed Date: 04/07/2015 |
| Emerald Ash Borer Research Project (Watauga Ranger District) | Decision Signed Date: 04/06/2015 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District; Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 5/15/2015
Cocke County, TN; Big Creek Road and Messer Branch Road in Hartford, TN · Cocke, Tennessee
approx. 2500 ft burial of waterline to service Grassy Fork Community of Cocke County. Placement in current roadbed/ditchline. All areas are considered previously disturbed.
Special use management
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Hartford Waterline | Decision Signed Date: 05/08/2015 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 5/15/2015
non-commercial thinning · Unicoi, Tennessee
non-commercial thinning
Vegetation management (other than forest products)
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Rich Mountain Forest Health Project | Decision Signed Date: 03/19/2015 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 5/15/2015
Sullivan County · Sullivan, Tennessee
remove existing tower/guides and install free standing tower; some road widening and new gravel road;
Special use management
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sullivan County Communication Tower | Decision Signed Date: 04/07/2015 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cherokee National Forest All Units · updated 5/15/2015
Unicoi County TN; AT just west of Big Bald · Unicoi, Tennessee
approx. 0.4 mile trail relo on the AT just west of Big Bald
Recreation management
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Wolf Laurel AT Relo | Decision Signed Date: 05/13/2015 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/11/2015
Ocoee Ranger District · Polk, Tennessee
This is a 100 mi. foot race that would utilize National Forest System Roads and Trails, private and state lands, and less than 1 mi of non-system roads and trails. The event would occur 2 days in May with less than 300 participants.
Special use management
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 3/30/2015
Compartment 301 · Carter, Tennessee
Stands are mixed pine/hardwood forest with pockets of almost pure white pine; coordination with AT Community will occur;
Forest products
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 3/30/2015
Comp 301 · Carter, Tennessee
low intensity burn; develop open woodland conditions; 92 acres
Vegetation management (other than forest products)
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Otherside Prescribed Burn | Decision Signed Date: 03/30/2015 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 3/11/2015
Compartment 353 · Unicoi, Tennessee
non=commercial thinning; move stand toward open woodland condition & promote shortleaf pine
Vegetation management (other than forest products)
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Cherokee Mountain Project | Decision Signed Date: 03/04/2015 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 1/16/2015
Big Ridge area approximately 2 miles southest of Tellico Plains, TN. · Monroe, Tennessee
Prescribe burn approximately 2,034 acres.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
12/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Big Ridge | Decision Signed Date: 12/15/2014 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 12/11/2014
The property to be exchanged is located north of Gilbert Br. Rd, near the intersection of Gilbert Br Rd and Spivey Mtn Rd, US Hwy 19W/St Rt 36; Tract U-1598 · Unicoi, Tennessee
Federal Property Tract U-1598 disposal to be covered for land for land exchange to Paul Farnor; 53 acres
Land ownership managementLand acquisition
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 12/11/2014
Tract U-1241e · Unicoi, Tennessee
Grading, graveling, & tree removal to improve the existing woods road for ingress/egress and providing a small trailhead parking area on a portion of USA Tract U-1241e.
Land acquisition
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (6), 36 Cfr 220.6(D)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Lower Higgins Creek | Decision Signed Date: 12/10/2014 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 12/11/2014
Rock Creek YCC Bathhouse · Unicoi, Tennessee
conversion of a portion of the existing Rock Creek YCC Bathhouse to a camp store. Store would be operated by concessionaire. No structural changes to the building. Any changes would non-permanent changes to the interior.
Special use management
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 12/11/2014
Compartment 234 · Cocke, Tennessee
public safety; fence off 3 entrances
Wildlife, fish, rare plants
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Williams Mine Closure Project | Decision Signed Date: 12/10/2014 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 11/19/2014
The federal tract is near the intersection of Towee Falls Road and Fingerboard Road. The non-federal tract is located off of Joe Brown Highway in the Coker Creek area. · Monroe, Tennessee
The FS is proposing to exchange an approximately 71-acre tract containing the church, cemetery and picnic pavilion for an approximately 71-acre tract containing a portion of the Unicoi Turnpike and the Trail of Tears National Historic Trail.
Land acquisitionLand ownership management
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Towee Falls Baptist Church | Decision Signed Date: 11/17/2014 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Federal Tract: FT1N R4E Section 33 |
Decision Memo · Tellico Ranger District · updated 11/3/2014
. · Monroe, Tennessee
Prescribe burn approximately 767 acres.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
11/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Wildcat | Decision Signed Date: 11/03/2014 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Watauga Ranger District · updated 9/4/2014
Backbone Rock Recreation Area · Johnson, Tennessee
Salvage Hemlock infested with Hemlock Wooly Adelgid.
Vegetation management (other than forest products)
Scoping Start
11/2013 (Estimated)
Decision
01/2014 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 9/4/2014
Compartments 101 and 102, Watauga RD, Carter County, TN · Carter, Tennessee
Construct a 3-mile multi-use trail utilizing railbed from FSR 87B to Holston Mountain Trail #44.
Recreation management
Decision
01/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 9/4/2014
Compartment 332, Watauga RD, Carter County, TN · Carter, Tennessee
Close FSR 4331 by placing a gate at milepost 2.31. Establish a parking area at milepost 2.27 for public access to FSR 4331 beyond gate.
Road managementWatershed management
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management; Watershed Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Environmental Assessment · R8 - Southern Region All Units · updated 8/29/2014
Chattahoochee National Forest, Cherokee National Forest , Pisgah National Forest, George Washington and Jefferson National Forest · Appling, Georgia; North Carolina; Tennessee; Virginia
The Southern Region of the Forest Service is proposing to change its limits of stay at shelters and designated dispersed campsites along the Appalachian National Scenic Trail on several forests of the Southern Region.
Recreation management
Comment Period
08/16/2013
Objection Period Start
03/31/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Limits of Stay on the Appalachian National Scenic Trail | Decision Signed Date: 07/16/2014 |
| Forests | Chattahoochee-Oconee National Forests; Cherokee National Forest; George Washington and Jefferson National Forest; National Forests In North Carolina |
| Districts | Chattahoochee-Oconee National Forest All Units; Cherokee National Forest All Units; George Washington and Jefferson National Forest All Units; Pisgah Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/9/2014
Rhododendron Trail and Ocoee Whitewater Center · Polk, Tennessee
To install a new reliable Fiber Optic line along the Rhododendron Trail for the Tailwater Warning System and to issue a Special Use Permit to TVA for the Tailwater Warning System.
Special use management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| TVA Tailwater Warning System | Decision Signed Date: 07/02/2014 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 7/9/2014
Along Highway 64 near Lake Ocoee Marina and along Oswald Dome Road near the intersection with Benton Springs Road. · Polk, Tennessee
Amend Volunteer Energy Cooperative's existing permit to relocate approximately 1.3 miles of aerial power line. The three existing locations would be abandoned and the new lines will be buried in the ROW of Highway 64(1.6mi) or Oswald Dome Road(.3mi)
Special use management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| VEC Utility Line Relocation | Decision Signed Date: 07/02/2014 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 6/13/2014
. · Monroe, Tennessee
Prescribe burn approximately 694 acres.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 6/13/2014
. · Monroe, Tennessee
Prescribe burn approximately 3,117 acres.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 6/13/2014
. · Polk, Tennessee
Prescribe burn approximately 4,134 acres.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 6/12/2014
. · Monroe, Tennessee
Prescribe burn approximately 1,605 acres.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 6/12/2014
. · Monroe, Tennessee
Prescribe burn approximately 522 acres.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · R8 - Southern Region All Units · updated 6/3/2014
National Forest Systems lands: KY, VA, TN, NC, SC, MS, AL, GA, FL, LA, TX, AR, OK · Cherokee; Covington; Hale; Lawrence; Macon; Lake; Okaloosa; Santa Rosa; Chattooga; Murray; Oglethorpe; Jackson; Morgan; Whitley; Natchitoches; Vernon; Winn; Chickasaw; Pontotoc; Craven; Randolph; Berkeley; Edgefield; Newberry; Cocke; Monroe; Unicoi; Angelina; Nacogdoches; San Augustine; Ashley; Benton; Montgomery; Botetourt; Charlotte; Roanoke; Shenandoah; Roanoke, Alabama; Arkansas; Florida; Georgia; Kentucky; Louisiana; Mississippi; North Carolina; Oklahoma; South Carolina; Tennessee; Texas; Virginia; West Virginia
The purpose of the action is to close caves and mines to minimize the transmission potential of white nose syndrome and for the protection of associated wildlife species.
Wildlife, fish, rare plants
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements |
| Southern Region Caves and Abandoned Underground Mine Closures | Decision Signed Date: 06/02/2014 |
| Forests | National Forests in Alabama; Daniel Boone National Forest; Chattahoochee-Oconee National Forests; Cherokee National Forest; National Forests In Florida; Kisatchie National Forest; National Forests In Mississippi; George Washington and Jefferson National Forest; Ouachita National Forest; Ozark-St. Francis National Forests; National Forests In North Carolina; Francis Marion and Sumter National Forests; National Forests In Texas; Savannah River Natural Resource Management and Research Insititute; Land Between the Lakes National Recreation Area |
| Districts | National Forests in Alabama All Units; Daniel Boone National Forest All Units; Chattahoochee-Oconee National Forest All Units; Cherokee National Forest All Units; National Forests In Florida All Units; Kisatchie National Forest All Units; National Forests In Mississippi All Units; George Washington and Jefferson National Forest All Units; Ouachita National Forest All Units; Ozark-St. Francis National Forest All Units; National Forests In North Carolina All Units; Francis Marion and Sumter National Forest All Units; National Forests In Texas All Units; Savannah River Natural Resource Management and Res All Units; Land Between the Lakes National Recreation Area All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 3/28/2014
Compartments 15, 41 and 123; Johnson County, TN · Johnson, Tennessee
Vegetation management and wildlife activities in the Iron Mountain, Stone Mountain and Watauga Lake areas.
Vegetation management (other than forest products)Forest productsWildlife, fish, rare plantsWatershed management
Comment Period
01/17/2012
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Unaka Ranger District · updated 2/28/2014
Compartments 242/243/249-251,Unaka RD, Cocke Co., TN · Cocke, Tennessee
Prescribed burn approximately 1512 acres in compartments 242, 243, 249, 250, 251. Never been burned. This is the second half of the Chestnut Ridge Prescribed Burn as outlined in the 2008 Decision.
Wildlife, fish, rare plantsFuels management
Comment Period
07/15/2013
Decision
02/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 2/6/2014
Benton Springs Road · Polk, Tennessee
Place approximately 1700 ft of fiber optic cable in a 30" X 12" trench adjacent to Benton Springs Road.
Special use management
Comment Period
11/26/2013
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| ATT Fiber Optic Cable | Decision Signed Date: 01/22/2014 Legal Notice Date: 02/05/2014 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 2/6/2014
. · Polk, Tennessee
Five trail improvements (totaling 4 mi.) to enhance non-motorized trail opportunities. Work will consist of new construction on Rainbow Falls & Seed Orchard Connectors and Dry Pond Lead Bypass, and reroutes on John Muir and Yellow Creek Trails.
Recreation management
Comment Period
08/14/2013
Decision
01/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 1/3/2014
. · Washington, Tennessee
Reburn approximately 953 acres in Compartments 353/354. Previously burned in March of 2005.
Wildlife, fish, rare plantsFuels management
Comment Period
07/15/2013
Decision
12/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Unaka Prescribed Burn Projects (4) | Decision Signed Date: 12/30/2013 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 1/3/2014
Comp. 215 - 218, Unaka RD, Greene County, TN · Greene, Tennessee
Reburn approximately 1816 acres in Compartments 215, 216, 217 and 218. Previously burned in March, 2004.
Fuels managementWildlife, fish, rare plants
Comment Period
07/15/2013
Decision
12/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Unaka Prescribed Burn Projects (4) | Decision Signed Date: 12/30/2013 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 1/3/2014
Comp. 373 - 376, Unaka RD, Unicoi Co., TN · Unicoi, Tennessee
Reburn approximately 1571 acres in Compartments 372/373/374/375/376. Previously burned in March, 2005.
Fuels managementWildlife, fish, rare plants
Comment Period
07/15/2013
Decision
12/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Unaka Prescribed Burn Projects (4) | Decision Signed Date: 12/30/2013 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 1/3/2014
Weaver's Bend-French Broad Fields, Cocke Co., TN · Cocke, Tennessee
Reburn approximately 211 acres in the Weaver's Bend-French Broad Field Cluster, N52. Previously burned in February, 2011.
Fuels managementWildlife, fish, rare plants
Comment Period
07/15/2013
Decision
12/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Unaka Prescribed Burn Projects (4) | Decision Signed Date: 12/30/2013 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cherokee National Forest All Units · updated 12/23/2013
Tellico River Corridor and Parksville Lake · Monroe; Polk, Tennessee
Develop and adopt Standard and Guides for managing recreation residences on the forest. Approve a new Master Plan for Camp Cherokee.
Special use management
Comment Period
07/24/2013
Decision
09/2013 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Recreation Residence Standards and Guidelines and Camp Cherokee Master Plan | Decision Signed Date: 05/07/2012 (FS Withdrawn) Legal Notice Date: 05/22/2012 |
| Camp Cherokee Master Site Plan | Decision Signed Date: 09/23/2013 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District; Tellico Ranger District |
Decision Memo · Tellico Ranger District · updated 9/26/2013
South of the Tellico River and less than 1/4 mile west of the community of Green Cove. · Monroe, Tennessee
Prescribe burn approximately 1,640 acres.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/26/2013
South of the Hiwassee River and approximately 4 miles southeast of the community of Reliance. · Polk, Tennessee
Prescribe burn approximately 720 acres.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 9/26/2013
South of the Tellico River and approximately 3 miles west of the community of Green Cove. · Monroe, Tennessee
Prescribe burn approximately 1,600 acres.
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/26/2013
South of the Hiwassee River and approximately 6 miles southeast of the community of Reliance. · Polk, Tennessee
Prescribe burn approximately 1,470 acres.
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/26/2013
South of the Hiwasse River and approximately 5 miles southeast of the community of Reliance. · Polk, Tennessee
Prescribe burn approximately 1,470 acres.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 9/26/2013
East/North of the Tellico River and approximately 4 miles southeast of the community of Green Cove. · Monroe, Tennessee
Prescribe burn approximately 3,200 acres.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 9/26/2013
North of the Tellico River approximately 1.5 miles northwest of the community of Green Cove. · Monroe, Tennessee
Prescribe burn approximately 520 acres.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
02/06/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Watauga Ranger District · updated 9/20/2013
Compartments 66-68 and 70-73, Watauga RD, Carter Co., TN · Carter, Tennessee
Utilize commercial and non-commercial harvest to create approximately 383 acres of early successional habitat for wildlife; encourage mast-producing species; provide wildlife habitat; maintain roads, create temporary roads, and authorize roads.
Road managementWildlife, fish, rare plantsForest products
Comment Period
07/25/2013
Decision
09/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Travel Management; Timber Sales (Green) |
| Stony Creek Project | Decision Signed Date: 09/17/2013 Legal Notice Date: 09/20/2013 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Environmental Assessment · Tellico Ranger District · updated 9/17/2013
Project area includes Indian Boundary Campground north to Little Citico Creek and east to Doublecamp Creek · Monroe, Tennessee
Vegetation management for wildlife habitat and forest health.
Wildlife, fish, rare plantsForest productsRoad managementVegetation management (other than forest products)Watershed managementRecreation managementFuels management
Comment Period
01/20/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Middle Citico Equestrian Trail Network | Decision Signed Date: 07/16/2013 Legal Notice Date: 07/21/2013 |
| Middle Citico Vegetation Management | Decision Signed Date: 09/12/2013 Legal Notice Date: 09/15/2013 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Tellico Ranger District · updated 8/26/2013
. · Monroe, Tennessee
Vegetation management for forest health and wildlife habitat improvements.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
09/2013 (Estimated)
Decision
01/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tellico Ranger District · updated 8/6/2013
. · Monroe, Tennessee
Prescribe burn approximately 1,334 acres.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Scoping Start
08/2013 (Estimated)
Decision
02/2014 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Unaka Ranger District · updated 7/9/2013
At it's closest point, the extension is approximately 1.0 miles northwest of the town of Erwin, TN. · Unicoi; Washington, Tennessee
Convert old FS roads to the ATV trail. This would provide approximately 5 miles of additional ATV trail in the Buffalo Mt area.
Recreation management
Scoping Start
08/2013 (Estimated)
Decision
10/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Unaka Ranger District · updated 7/9/2013
The trail is located approximately 1.5 miles north-northwest of Unicoi, TN. · Washington, Tennessee
Construct an approximately 7 - 10 mile mountain bike trail on Buffalo Mountain.
Recreation management
Scoping Start
07/2013 (Estimated)
Decision
10/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 6/27/2013
Card Spur Road (NFSR 55B) · Polk, Tennessee
Cabin 47 has requested permission to install a well on their lot to substitute the current lake drawn water source.
Special use management
Comment Period
02/15/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Cabin 47 | Decision Signed Date: 06/24/2013 Legal Notice Date: 06/27/2013 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | T1 R2E Sec 25 |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 1/29/2013
South of Highway 64 adjacent to Parksville Lake · Polk, Tennessee
The owner of recreation residence #1 has requested authority to demolish and replace the existing structure. New construction would meet federal, state and local codes.
Special use management
Comment Period
07/27/2012
Decision
10/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Cabin #1 Improvements | Decision Signed Date: 10/15/2012 Legal Notice Date: 11/09/2012 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 1/29/2013
Highway 64 adjacent to Parksville Lake · Polk, Tennessee
Lake Ocoee Inn and Marina have been under permit for 70 years.The current 20-year permit expires December 2012. The permit holder has requested a renewal permit for a term of 30 years. No changes to the existing authorized facilities are requested.
Special use management
Comment Period
07/27/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Lake Ocoee Inn and Marina Renewal | Decision Signed Date: 11/02/2012 Legal Notice Date: 11/09/2012 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Watauga Ranger District · updated 12/12/2012
Turkeypen Gap along the AT · Carter; Johnson, Tennessee
Construct approx. 2400 feet of new trail, with approx. 600 feet along a sidehill, to replace a steep, eroding section of the AT at Turkey Pen Gap
Recreation management
Comment Period
04/25/2012
Decision
11/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/12/2012
North of Hiwassee River approximately 6 miles east of Reliance TN · Polk, Tennessee
Prescribe burn approximately 4,250 acres
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
05/02/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Duckett O-14 Prescribed Burn | Decision Signed Date: 11/28/2012 Legal Notice Date: 12/12/2012 |
| Forests | Cherokee National Forest |
| Districts | Hiwassee Ranger District; Ocoee - Hiwassee Ranger District |
Decision Memo · Tellico Ranger District · updated 12/12/2012
South of Highway 165 (Cherohala Skyway) approximately 11 miles east of Tellico Plains, TN · Monroe, Tennessee
Prescribed burn approximately 1,425 acres
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Comment Period
04/25/2012
Decision
12/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| McIntyre T-27 Prescribed Burn | Decision Signed Date: 12/04/2012 Legal Notice Date: 12/12/2012 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/12/2012
North of Parksville Lake approximately 4 miles southeast of Benton, TN · Polk, Tennessee
Prescribe burn approximately 1,875 acres
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
05/02/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Thornburg O-35 Prescribed Burn | Decision Signed Date: 11/28/2012 Legal Notice Date: 12/12/2012 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/11/2012
Various locations · Polk, Tennessee
Western Carolina University has requested a permit to provide outfitting and guiding services to 6th-8th grade school groups for approximately 2 weeks in April for the next 5 years. Activities would occur at established recreation sites.
Special use management
Comment Period
10/09/2012
Decision
12/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| WCU Talent Search 5 Year Outfitter & Guide Permit | Decision Signed Date: 12/05/2012 Legal Notice Date: 12/11/2012 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 12/4/2012
Generally north of Highway 64 from NFSR 77 to west of Goforth Creek and South of Peavine Sheeds Road just west of Trail #61 · Polk, Tennessee
Plant shortleaf pine and do mechanical release on approximately 200 acres in 15 units over the next 4-year period. The areas proposed for this treatment are areas where the existing forest was killed or severely damaged by the wildfires in 2012.
Vegetation management (other than forest products)
Comment Period
09/12/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Tellico Ranger District · updated 9/10/2012
Near Indian Boundary Recreation Area · Monroe, Tennessee
Create and maintian wildlife openings adjacent to the power line ROW located near Indian Boundary Recreation Area. The project would be completed through partnership with Fort Loudoun Electric Cooperative and National Wild Turkey Federation.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
06/06/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| IBRA Wildlife Openings | Decision Signed Date: 09/04/2012 Legal Notice Date: 09/09/2012 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Tellico Ranger District · updated 9/4/2012
12 miles southeast of Vonore · Monroe, Tennessee
The Tellico Ranger District proposes the removal of tornado down and damaged trees from approximately a 1 mile segment of the Cold Springs Road. These trees are completely blocking the road and not allowing usage of the road as a through road.
Forest productsRoad management
Comment Period
06/10/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Tellico Ranger District · updated 9/4/2012
Waucheesi Communication Site · Monroe, Tennessee
In order to comply with current FCC regulations FLEC has requested permission to replace their current 2-way radio system located at Waucheesi. The proposed action is to authorize installation of a new pole, microwave dish and line of site clearance.
Special use management
Comment Period
06/10/2012
Decision
08/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Watauga Ranger District · updated 8/3/2012
Compartments 75, 103 and 104, Watauga RD, Carter County, TN · Carter, Tennessee
Relocate approx. 1 mile of Holston Mt Trail #44 onto an exisiting road bed to remove section of trail with unsustainable grade.
Recreation management
Comment Period
04/18/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 6/28/2012
Sullivan County, northwest of Jacob's Crk Civilian Conservation Center, compartments 91, 92, 94, and 95 · Sullivan, Tennessee
Low intensity burn to develop open woodland conditions.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Environmental Assessment · Watauga Ranger District · updated 6/14/2012
Clarke Mountain, Compartments 322, 323, 332, 333, · Carter, Tennessee
Vegetation Management and Wildlife Habitat activities in the Clarke Mountain area
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
11/08/2011
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Noxious Weed Treatments; Species Population Enhancements; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Tellico Ranger District · updated 6/8/2012
Beaverdam Road -beginning 1/4 mile from junction with Tellico River Road and continuting to North Carolina state line. · Monroe, Tennessee
Salvage dead hemlock greater than 10 inches DBH within approximatley 100 feet above and below Beaverdam Road. There would be no road construction.
Road managementFuels managementVegetation management (other than forest products)Forest products
Comment Period
04/22/2012
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/8/2012
Camp Cherokee Organizational Camp · Polk, Tennessee
The camp will tear down and rebuild the 20' X 24' caretaker's workshop with a new 20' X 24' workshop in the existing location within the organizational camp.
Special use management
Decision
11/2011 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | T2, R3E sec 16. |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/8/2012
Parksville Lake Lot 26 of Block 18-B tract · Polk, Tennessee
The owner of cabin 33 proposes to demolish the existing residence and replace the structure in the same location. New construction will be in accordance with the plan submitted to the FS and will meet federal, state, and local building codes.
Special use management
Decision
11/2011 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/7/2012
Three miles south of Ocoee Ranger Station · Polk, Tennessee
Prescribe burn approximately 1,700 acres.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 5/7/2012
Six miles west of Ducktown, TN · Polk, Tennessee
Prescribe burn approximately 1,200 acres
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Watauga Ranger District · updated 3/20/2012
Coon Den Falls Trail Near Dennis Cove · Carter, Tennessee
Relocation of AT from White Rocks Mtn to Coon Den Falls Trail
Recreation management
Comment Period
01/14/2011
Decision
03/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Dennis Cover to White Rocks Mountain Appalachian Trail Relocation | Decision Signed Date: 03/16/2012 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 3/16/2012
South of Highway 64 and adjacent to Parksville Lake · Polk, Tennessee
The permit for Recreation Residence #5 would be amended to permit improvements to the dock, deck and other items located on the lot.
Special use management
Decision
03/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Tellico Ranger District · updated 2/28/2012
Ten miles southeast of Tellico Plains, TN · Monroe, Tennessee
Prescribe burn approximately 4,500 acres.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Beaverdam Prescribed Burn | Decision Signed Date: 02/27/2012 |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Watauga Ranger District · updated 2/22/2012
Compartment 91, Stand 12, Compartment 92, Stand 16; Sullivan County · Sullivan, Tennessee
Thin approximately 52 total acres in compartment 91, stand 12 and compartment 92, stand 16, then conduct a midstory control prescribed burn to reduce undesirable understory competition.
Vegetation management (other than forest products)
Comment Period
09/27/2010
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 2/1/2012
Along TN State Route in vicinity of Backbone Rock Recreation Area · Johnson, Tennessee
Install approximately 910 feet of underground water line from where TSR 133 crosses the Cherokee NF boundary to an existing well-house in the Backbone Rock Rec Area. This is a small portion of a larger water line project in TN and VA.
Recreation management
Comment Period
02/04/2011
Decision
10/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Washington County Service Authority Waterline Project | Decision Signed Date: 10/28/2011 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Unaka Ranger District · updated 11/15/2011
Rock Creek Recreational Area · Unicoi, Tennessee
Remove dead and dying trees for safety reasons along Hwy 395 (Rock Creek Rd), and within the developed recreational area. Trees to be removed include hemlock considered past recovery (>60% needle loss) due to Hemlock Wooly Adelgid.
Recreation managementForest productsVegetation management (other than forest products)
Comment Period
01/21/2011
Decision
11/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Nolichucky Ranger District · updated 10/3/2011
Pete Creek in Compartment 409 along Appalachian Trail · Unicoi, Tennessee
Prescribed Burn for Appalachian Trail Vistas and wildlife habitat.
Wildlife, fish, rare plantsVegetation management (other than forest products)Recreation management
Decision
02/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Trail Management |
| Pete Creek Open Area Burn | Decision Signed Date: 02/15/2011 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Nolichucky Ranger District · updated 10/3/2011
Compartments 198 and 200 in Greene County, TN · Greene, Tennessee
Construct an approx. 2-mile multi-use trail paralleling the AT, to connect FDR #88 (Round Knob) to FDR #94 (Horse Creek).
Recreation management
Comment Period
01/14/2011
Decision
03/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Round Knob - Parallel - Horse Trail | Decision Signed Date: 03/04/2011 |
| Forests | Cherokee National Forest |
| Districts | Nolichucky Ranger District |
Decision Memo · Ocoee - Hiwassee Ranger District · updated 9/19/2011
Buck Bald Overlook · Polk, Tennessee
Camp Living Stones has requested authorization to take 100 students to the Buck Bald overlook on Thursday afternoons during the 10 week summer months of camp for up to 2 years.
Special use management
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Environmental Assessment · Cherokee National Forest All Units · updated 9/6/2011
entire Cherokee National Forest · Carter; Cocke; Greene; Johnson; McMinn; Monroe; Polk; Sullivan; Unicoi; Washington, Tennessee
use fungus treatments asa biocontrol agent, use the chemical dinotefuran, expand the scope of potential treatment areas beyond the original design, use additional predator beetles species as they become available, expand the use of imidacloprid
Vegetation management (other than forest products)
Comment Period
04/29/2011
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Cherokee NF 2011 Suppression of Hemlock Woolly Adelgid Infestations | Decision Signed Date: 09/02/2011 |
| Forests | Cherokee National Forest |
| Districts | Cherokee National Forest All Units |
Decision Memo · Unaka Ranger District · updated 3/31/2011
Unicoi Work Center and adjacent to Rock Creek Campground · Unicoi, Tennessee
Install approx. 30 ft of underground powerline and limited aerial powerline on NFS lands.
Special use management
Decision
03/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Erwin Utilities Project | Decision Signed Date: 03/14/2011 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Watauga Ranger District · updated 3/31/2011
Compartments 52 and 53, Watauga RD, Johnson County, TN · Johnson, Tennessee
Bury approx. 8607 feet (1.6 miles) and aerially attach approx. 1911 feet (0.4 miles) of fiber optic cable in the area of Shady Valley, Johnson County, TN
Special use management
Decision
02/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Skyline Telephone Cable Project | Decision Signed Date: 02/03/2011 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Tellico Ranger District · updated 3/2/2011
Wauchessi Electronic Site · Monroe, Tennessee
Continuance of Monore County E-911 private moble radio service at the Wauchessi Electronic Site for a new term of 20 years
Special use management
Decision
03/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Nolichucky Ranger District · updated 2/22/2011
From Cloudland,Tennessee north to Ash Gap · Carter, Tennessee
2nd phase of an Appalachian Trail relocation project from Hughes Gap to Cloudland. About 4,500 feet of relocation from Ash Gap to the historic Cloudland Hotel Historic Site.
Recreation management
Decision
02/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Forest Service Energy Implementation Plan |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Ash Gap to Cloudland Appalachian Trail Relocation | Decision Signed Date: 02/18/2011 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Watauga Ranger District · updated 2/15/2011
Cedar Gap Watauga Ranger District · Carter, Tennessee
Road Use agreement for the use of existing Forest Service Roads #293A and B.
Special use management
Decision
01/2011 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 2/15/2011
NFS lands of Cherokee National Forest in Johnson, Carter, Greene, Unicoi, Washington and Cocke Counties · Carter; Cocke; Greene; Johnson; Unicoi; Washington, Tennessee
Proposed permittee to offer guided hunting/fishing trips to public within the North End of the Cherokee NF.
Special use management
Comment Period
06/15/2010
Decision
12/2010 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Tennessee Outdoor Adventures Guide Permit | Decision Signed Date: 12/01/2010 |
| Forests | Cherokee National Forest |
| Districts | Nolichucky Ranger District; Unaka Ranger District; Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 2/15/2011
Road Easement near Wilbur Dam on Watauga Lake · Carter, Tennessee
Road Easement to access water intake station near Wilbur Lake
Special use management
Comment Period
04/01/2009
Decision
11/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Watauga River Regional Water Authority Access Road and Pipeline Project | Decision Signed Date: 11/17/2010 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Tellico Ranger District · updated 2/2/2011
Nine miles east of Tellico Plains, TN · Monroe, Tennessee
Prescribed burn approximately 2,000 acres
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
01/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Tellico Ranger District |
Decision Memo · Tellico Ranger District · updated 2/2/2011
Five miles northeast of Benton, TN · Polk, Tennessee
Prescribe burn a maximum of 2,700 acres
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Decision
01/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Tellico Ranger District · updated 11/30/2010
Starr Mountain Electronic Site · McMinn, Tennessee
The TDA has requested to expand their existing special use permit at the Starr Mountain Electronic Site.
Special use management
Decision
07/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Hiwassee Ranger District |
Decision Memo · Tellico Ranger District · updated 9/2/2010
Parksville Lake · Polk, Tennessee
Installation of buried waterline at Recreation Residence Cabin #1
Special use management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Tellico Ranger District · updated 9/2/2010
Parksville Lake · Polk, Tennessee
Installation of a buried electric line, water and septic system at Recreation Residence Cabin #5.
Special use management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
Decision Memo · Nolichucky Ranger District · updated 8/11/2010
Beartown Mountain between Hughes Gap and Cloudland · Mitchell; Carter, North Carolina; Tennessee
About 12,000 feet of trail relocations between Hughes Gap and Beartown Mountain. This is the lower part of a larger relocation from Hughes Gap to Cloudland. Beartown Mountain to Cloudland is now a seperate project
Recreation management
Decision
04/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Appalachian Trail Relocation Hughes Gap to Beartown Mountain | Decision Signed Date: 04/27/2010 |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Nolichucky Ranger District · updated 7/12/2010
Near Stateline, Rocky Fork Aquisition, Snakeden Ridge · Greene, Tennessee
Relocation of AT onto recently acquired Rocky Fork Tract
Recreation management
Decision
04/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Watauga Ranger District · updated 6/15/2010
Burn Unit W-31 · Carter; Sullivan, Tennessee
Prescribed burning for fuel reduction and wildlife habitat
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Comment Period
06/17/2009
Decision
04/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Big Gap Prescribed Burn Project | Decision Signed Date: 04/08/2010 |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Environmental Assessment · Watauga Ranger District · updated 6/15/2010
Rutter Branch, Parks Branch, Beaverdam Creek · Johnson, Tennessee
Gypsy Moth eradication of isolated population in Johnson County, TN; ahead of the main front in VA.
Vegetation management (other than forest products)
Comment Period
03/02/2010
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 6/15/2010
Burn Unit W-36 · Carter, Tennessee
Fuel Reduction Prescribed Burn
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Comment Period
06/17/2009
Decision
04/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 6/15/2010
Burn Unit W-34 · Carter, Tennessee
Prescribed burning for fuel reduction and wildlife habitat
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Comment Period
06/17/2009
Decision
04/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 6/15/2010
Burn Unit W-40: seven miles north of Elizabethton, TN · Sullivan, Tennessee
Prescribed burning for fuel reduction and wildlife habitat
Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Decision
04/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 6/15/2010
Compartment 99: nine miles southeast of Bristol, TN · Sullivan, Tennessee
Prescribed burn and thinning to promote forest health and restoration
Vegetation management (other than forest products)
Comment Period
07/31/2009
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Watauga Ranger District · updated 6/15/2010
Compartment 100 near Camp Tom Howard · Sullivan, Tennessee
Prescribed burn and thinning to promote forest health.
Vegetation management (other than forest products)
Comment Period
07/31/2009
Decision
05/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Forests | Cherokee National Forest |
| Districts | Watauga Ranger District |
Decision Memo · Unaka Ranger District · updated 4/30/2010
Along Forest Service Road #4365 near Rock Creek Recreation Area · Unicoi, Tennessee
Salvage dead and dying hemlock along road to remove safety hazards.
Road managementHeritage resource managementVegetation management (other than forest products)
Comment Period
08/05/2009
Decision
04/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Unaka Ranger District · updated 1/15/2009
Uncoi County just off of Exit 32 of Interstate 26 · Unicoi, Tennessee
Multi-use trail to Pinnacle Fire tower in Unicioi County
Recreation management
Decision
01/2009 (Estimated)
Implementation
02/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Cherokee National Forest |
| Districts | Unaka Ranger District |
Decision Memo · Tellico Ranger District · updated 2/21/2008
Lake Ocoee Inn Marina Boat Slip C · Polk, Tennessee
Amend existing special use permit to add a 7.2 KV buried electric line at Lake Ocoee Inn. The ROW is 260 feet in length and 10 feet wide.
Special use management
Decision
02/2008 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lake Ocoee Marina Powerline | Decision Signed Date: 02/08/2008 |
| Forests | Cherokee National Forest |
| Districts | Ocoee - Hiwassee Ranger District |
| Legal Land Description | T1S, R3E, Section 13 |
Detail fetch failed: 404 Client Error for https://www.fs.usda.gov/r08/cherokee/projects/56195
R8 - Southern Region All Units
Short-term (up to 2 years) closure order for all caves and abandoned mines in the Southern Region (2 exceptions)to minimize transmission potential of the fungus that continues to cause white nose syndrome in bats that has affected populations.