Ottawa National Forest — Project Detail

166 projects with crawled detail · milestones · contacts · documents

Ottawa National Forest

R09 Eastern · 166 projects · crawled 2026-08-01
Completed 156 Cancelled 10
Decision Memo 136 Environmental Assessment 23 7
159 with documents 52 with comments page 7 fetch errors
Decision Memo · Iron River Ranger District · updated 8/27/2025
Forest Road 2130-M on the east side of Perch Lake. · Iron, Michigan

proposal for a special use road permit that covers Forest Road 2130-M for use and maintenance to access private property. Approximately 0.45 miles of road.

Special use management
Scoping Start
05/23/2019
Comment Period
03/06/2020
Decision
04/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Michelle Holland · michelle.m.holland@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT46N, R35W, Sec. 26, SWSW, SESW
Decision Memo · Kenton Ranger District · updated 11/18/2024
Kenton District · Ontonagon, Michigan

This project proposes to construct a new segment of trail, in order to bypass a sharp corner on a steep hill that is unsafe for users and grooming equipment. This segment of trail is southwest of Kenton, Michigan on the Kenton Ranger District.

Recreation management
Scoping Start
08/20/2024
Decision
10/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Austin Walworth · austin.walworth@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 8/22/2024
Ontonagon District Courtney Lake Campground · Ontonagon, Michigan

Creation of an additional trailhead and new trail segment to better accommodate users, equestrian and others, of the multi-use trail system associated with the Courtney Lake campground.

Recreation management
Scoping Start
07/27/2023
Decision
08/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Austin Walworth · austin.walworth@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Watersmeet Ranger District · updated 6/20/2024
Bessemer and Watersmeet District · Gogebic, Michigan

Replacement of old and deteriorating bridges located on Bessemer Snowmobile Trail 2 and Watersmeet Snowmobile Trail 3.

Recreation management
Scoping Start
05/02/2024
Decision
06/2024 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Teresa Maday · Jacob.Bowman3@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 5/1/2024
J.W. Toumey Nursery is located within Sections 22 & 27 of Township 45N, Range 39W in Watersmeet, MI in Gogebic County, 1.5 miles NE of the intersection of US-2 and US-45, on Old US-2. · Gogebic, Michigan

The purpose of this project is to modernize the JW Toumey Nursery to meet the reforestation and restoration demands of the 21st Century associated with climate change response, tribal food sovereignty, and watershed protection.

Facility management
Scoping Start
06/12/2023
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Amanda Stear · Amanda.Stear@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21); 32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bessemer Ranger District · updated 2/21/2024
Gogebic County · Gogebic, Michigan

Removal of ski lift portion on National Forest System Lands.

Special use managementRecreation management
Scoping Start
08/31/2023
Decision
02/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Randi Ellsworth · randi.ellsworth@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 2/12/2024
Brush Lake, Mallard Lake, Sucker Lake and The Middle Branch of the Ontonagon River are all located in Watersmeet Township in Gogebic County Michigan. · Gogebic, Michigan

Construction and reconstruction of roads, trails, a board walk and canoe access points to improve tribal access to wild rice resources in four spots on the Watersmeet district.

Regulations, directives, ordersHeritage resource managementRoad managementEnvironmental justice
Scoping Start
02/01/2023
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Mitchell Ives · mitchell.ives@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (23), 36 Cfr 220.6(E)(23); 32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Trail Management; Road Maintenance; Road Improvements/Construction
Manoomin Access ProjectDecision Signed Date: 02/09/2024
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 1/5/2024
North Country Trail, Lookout Mountain overlooking Victoria Reservoir. · Ontonagon, Michigan

Construct new North Country Trail (NCT) segment accessing Lookout Mountain on the Ottawa National Forest which will reconnect to rerouted NCT segment on adjacent private land.

Recreation management
Scoping Start
06/15/2023
Decision
01/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Amber Tembreull · Amber.Tembreull@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 12/29/2023
Access is located in T49N R38W Section 3, Ontonagon County, MI. · Ontonagon, Michigan

Vehicle access on an existing non-system road for approximately 0.61 miles (3,220ft or 1.49 acres). Access requires brushing and tree removal for 0.19 miles of road construction (Plan amendment) to avoid sensitive soils and hydrological features.

Special use management
Scoping Start
03/02/2023
Comment Period
08/21/2023
Objection Period Start
09/28/2023
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Marlanea French pombier · marlanea.french-pombier@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Plan Amendment; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Kenton Ranger District · updated 12/20/2023
The project area is located on roads designated for motorized use on the Kenton and Ontonagon Ranger Districts. · Baraga; Houghton; Iron; Ontonagon, Michigan

The Ottawa is proposing to authorize use of approximately 89 miles of road under federal jurisdiction for the next ten year period of the Lake Superior Performance Rally, an annual, one-night motorized recreational event.

Recreation managementSpecial use management
Scoping Start
05/31/2023
Comment Period
10/12/2023
Decision
12/2023 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Amanda Stear · Amanda.Stear@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Travel Management
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 11/9/2023
It is located at the intersection of Bluff Creek and Choate Road in Ontonagon County, Michigan. · Ontonagon, Michigan

The goals of the proposed project are to restore channel processes to a 2,000 linear foot stretch of Bluff Creek and enable fish passage through the Choate Road crossing and into the upstream reaches of Bluff Creek and its tributaries.

Watershed management
Scoping Start
05/15/2023
Decision
11/2023 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
Amanda Stear · Amanda.Stear@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionSection 1, T46N, R40W, and Section 6, T46N, R39W.
Perch Lake Access Completed
Decision Memo · Watersmeet Ranger District · updated 6/27/2023
Located on the east side of Perch Lake, east of Watersmeet, south of FR 4700. · Gogebic, Michigan

The project proposes the reconstruction, use and maintenance of existing Forest Roads, as well as construction of 3 short segments of non-system road, on order to access private property.

Special use management
Scoping Start
09/21/2021
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Michelle Holland · michelle.m.holland@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionSW, Sec. 5, NW, S1/2, Sec. 8, NENW Sec. 17, T. 45 N., R 38 W.
Environmental Assessment · Kenton Ranger District · updated 5/31/2023
The Tepee Lake VMP is located on the Kenton and Iron River Ranger Districts, in Houghton, Iron, and Ontonagon Counties, Michigan. · Houghton; Iron; Ontonagon, Michigan

The Tepee Lake VMP is located on the Kenton and Iron River Ranger Districts, in Houghton, Iron, and Ontonagon Counties, Michigan. The project area includes approximately 45,940 acres, of which about 33,021 acres are National Forest System lands.

Vegetation management (other than forest products)Road managementWildlife, fish, rare plantsFuels managementForest productsRecreation managementMinerals and geologyWatershed management
Scoping Start
03/05/2021
Comment Period
11/05/2021
Objection Period Start
03/18/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Christopher Kovala · christopher.kovala@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Minerals Or Geology Plans Of Operations; Trail Management; Road Maintenance; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionT47N, R37W, Sec 13-14, 24-28, 32-36; T45N, R36W Sec 5-7; T45N, R37W Sec 1-4, 10-15; T46N, R38W Sec 10-15, 24; T46N, R37W Sec 1-27, 33-36; T46N, R36W Sec 3-10, 15-22 and 27-34
Environmental Assessment · Ottawa National Forest All Units · updated 3/16/2023
The Baraga II VMP is located within Baraga, Houghton, Ontonagon, and Iron Counties, Michigan. Iron and Ontonagon counties only include scattered jack pine stands outside of the primary project area. · Baraga; Houghton; Iron; Ontonagon, Michigan

The Baraga II VMP includes approximately 21,674 acres within Baraga, Houghton, Ontonagon, and Iron Counties, Michigan. Approximately 865 of these acres are comprised of jack pine stands located outside of the primary project area.

Watershed managementWildlife, fish, rare plantsForest productsClimate change adaptationRoad managementVegetation management (other than forest products)Fuels managementHeritage resource managementRecreation management
Scoping Start
07/16/2021
Comment Period
07/15/2022
Objection Period Start
12/15/2022
Decision
02/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
Christopher Kovala · christopher.kovala@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Geothermal; Facility Maintenance; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Watershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionT48N,R35W,S1-3,10-15,22-24,26-27;T49N,R35W,1-3,10-15,22-26,35-36;T50N,R35W 13,23-26,34-36;T47N,R35W,19,30-31;T47N,R37W,2-3;T48N,R35W,S7-8,16-21;T48N, R36W,5-6,8,17;T48N,R37W,1,8-9,16-20,22,29-3, etc.
Decision Memo · Kenton Ranger District · updated 1/20/2023
Sparrow Rapids Campground · Ontonagon, Michigan

Reroute section of trail to new location so as to avoid areas of erosion.

Recreation management
Scoping Start
07/19/2022
Decision
01/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Amber Tembreull · Amber.Tembreull@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 11/7/2022
Berland and Ontonagon Districts · Houghton; Ontonagon, Michigan

Motorized Access to private property.

Special use management
Scoping Start
01/28/2022
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Shawn Brown · shawn.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District
Legal Land DescriptionT49NR41W Sect18 NW1/4 NWNE,T49NRR41W Sect 2 SENE. T50NR36W Section 23 SESE SWSE SESW NWSW, and T50N R37W Section 29 S1/2SW Section 32 NWNW.
Environmental Assessment · Ottawa National Forest All Units · updated 4/13/2022
The project area is in the vicinity of Watersmeet, Michigan. · Gogebic; Iron, Michigan

Project proposal includes activities associated with vegetation management, wildlife habitat, fire and fuels, old growth classification, aquatic resource, transportation system, designated public motorized access and non-motorized trails, and gravel.

Fuels managementRecreation managementVegetation management (other than forest products)Watershed managementMinerals and geologyForest productsWildlife, fish, rare plantsRoad management
Scoping Start
02/11/2021
Comment Period
10/28/2021
Objection Period Start
02/04/2022
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
Christine Makuck · christine.makuck@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Trail Management; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsOttawa National Forest
DistrictsIron River Ranger District; Watersmeet Ranger District
Legal Land DescriptionT43N, R39W Sec 1-5; T44N, R37W Sec 3-9, 17-19; T44N, R38W Sec 1-36; T44N, R39W Sec 1-36; T44N, R40W Sec 2-4; T45N, R37W Sec 15-24, 26-34; T45N, R38W Sec 7, 8, 13-36; T45N, R39W Sec 13, 14, 19-36;T45N, R 40W Sec 13, 21-28, 33-36
Decision Memo · Ottawa National Forest All Units · updated 1/4/2022
Approximately 8 miles south of Ontonagon on Norwich Road, then 6 miles east on Forest Road 690, to 696, then 696-C north into the NWNW corner of Section 3. · Ontonagon, Michigan

Access is requested to utilize Forest system and non-system travelways to their private land.

Special use management
Scoping Start
05/26/2016
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Shawn Brown · spbrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
2021 Mill Creek AccessDecision Signed Date: 10/18/2021
ForestsOttawa National Forest
DistrictsBergland Ranger District
Legal Land DescriptionT50N, R40W, Sections 3, 4, 9, 10, 16
Decision Memo · Iron River Ranger District · updated 1/4/2022
Project is located off of CR 657, approx. 2 miles west of its intersection with Gibbs City Road. · Iron, Michigan

The proposal is to issue a long-term special use permit to landowners for use and maintenance of FR 3460 and other existing roads approx. 0.83 miles in length on NFS lands in order to access private property.

Special use management
Scoping Start
11/14/2013
Decision
12/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Iron River Special Uses - 2021Decision Signed Date: 12/30/2021
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R36W, Sec. 1, SESE, SENW; Sec. 12, N1/2NW and T44N, R35W, Sec. 6, SESW
Decision Memo · Ottawa National Forest All Units · updated 1/4/2022
Forest Roads 2184, 4020 and 4020-A. · Iron, Michigan

The proposal is to issue special use permits on Federal roads for landowner use to access private land.

Special use management
Scoping Start
11/22/2016
Decision
12/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Iron River Special Uses - 2021Decision Signed Date: 12/30/2021
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R37W, Sec 9 and 10; T45N, R35W, Sec 25 and 26
Decision Memo · Iron River Ranger District · updated 1/4/2022
Forest Roads 3212, 3409, and 3476 on the Iron River District · Iron, Michigan

The proposal is to issue three special use permits on Federal roads for landowner use to access private land.

Special use management
Scoping Start
05/18/2015
Decision
12/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Iron River Special Uses - 2021Decision Signed Date: 12/30/2021
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT43N, R37W, Sec. 10; T45N, R36W, Sec. 8
Decision Memo · Iron River Ranger District · updated 1/4/2022
Non-system roads on the south side of FR 3340, approx. 1.5 miles west of FH16. · Iron, Michigan

The proposal is to issue a special use permit for existing roads, in order to access private land.

Special use management
Scoping Start
10/19/2015
Decision
12/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Iron River Special Uses - 2021Decision Signed Date: 12/30/2021
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT45N, R37W, Sec. 21
Decision Memo · Kenton Ranger District · updated 12/21/2021
Walton Crk-T47N R37W Sections 26 and 35, Houghton Cty. FR1750-T50N R36W Section 21, Houghton Cty. FR2210-I-T48N R35W Sections: 6, 18, and 19, Houghton Cty. · Houghton; Ontonagon, Michigan

Proposal to issue three new Special Use Permits to separate private landowners to access their private property across National Forest land using existing and new travel ways. Permits would set terms/conditions for use up to 10 years starting in 2021

Special use management
Scoping Start
11/01/2020
Decision
11/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
Shawn Brown · spbrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Bridge Replacement Completed
Decision Memo · Watersmeet Ranger District · updated 12/21/2021
Watersmeet and Iron River District · Iron; Ontonagon, Michigan

Replace 4 bridges that have deteriorated with time, and currently are posted for reduced load limits.

Road management
Scoping Start
04/01/2021
Decision
12/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Bryan Hewitt · Bryan.Hewitt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 12/21/2021
M-38 and Sleepy Hollow road Right of Ways (see legal description). · Ontonagon, Michigan

Ontonagon County Telephone Company is planning on placing a new fiber optic line in Ontonagon County, MI. Approximately 1.2 miles of fiber optic cable will be placed within the road right-of-way along Ottawa National Forest land.

Special use management
Scoping Start
01/11/2021
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Shawn Brown · spbrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ontonagon County Telephone Company Fiber Optics Special use Permit Amend. 1Decision Signed Date: 08/19/2021
ForestsOttawa National Forest
DistrictsOntonagon Ranger District; Watersmeet Ranger District
Legal Land DescriptionM-38: T50N, R39W, Sec 4 W1/2W1/2, Sect. 5 N1/2N1/2, W1/2NW, W1/2SW. Sleepy Hollow: T46N, R39W, Sect. 9 N1/2N1/2, Sect. 8 N1/2N1/2, Sect. 7 NENE, W1/2NE, Sect. 6 W1/2SE and T46N, R40W, Sect.11 NENE
Decision Memo · Kenton Ranger District · updated 9/8/2021
Lines located near: Rockland, Agate (Trout Creek), Markley Lake, Kenton, and Perch Lake · Baraga; Houghton; Iron; Ontonagon, Michigan

Fiber optic placement. Will use the vibratory and/or static plow and directional bore methods. The fiber will be placed entirely within road right of way. Best management procedures will be followed to prevent and minimize erosion and sediment runoff

Special use management
Scoping Start
05/17/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Shawn Brown · spbrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bessemer Ranger District · updated 8/20/2021
T49N, R36W, Section 3 · Gogebic, Michigan

The project seeks to replace approximately 1,200ft of dock infrastructure in the Black River Harbor Recreation Area. The dock is requiring extensive maintenance and repair. This project also includes potential improvements to interpretative displays.

Facility management
Scoping Start
05/13/2021
Decision
08/2021 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
Nathaniel Dulaney · Nathaniel.Dulaney@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
Black River Harbor Dock Improvement II Project Decision MemoDecision Signed Date: 08/19/2021
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ontonagon Ranger District · updated 6/30/2021
The Bergland-Presque Isle VMP is located on the Bessemer and Bergland Ranger Districts, in Gogebic and Ontonagon Counties, Michigan. · Gogebic; Ontonagon, Michigan

Vegetation management project with associated resource projects.

Road managementForest productsVegetation management (other than forest products)Recreation managementMinerals and geologyWatershed managementFuels managementWildlife, fish, rare plants
Scoping Start
02/28/2020
Comment Period
02/28/2020
Objection Period Start
03/02/2021
Decision
02/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Minerals Or Geology Plans Of Operations; Trail Management; Road Maintenance; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionGogebic County: T48N, R45W T46-47N, R45W T47N, R4W T48N, R44W T47N, R43W Ontonagon County: T48N, R43W T49N, R44W T49N, R43W T49N, R42W T48N, R42W
Decision Memo · Iron River Ranger District · updated 6/30/2021
Iron River District on South Branch Paint River · Iron, Michigan

The FR3470 MP 5.23 Bridge spanning the South Branch Paint River has deteriorated with time, and currently is posted for reduced load limits.

Road management
Scoping Start
03/05/2021
Decision
06/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Anthony Holland · aholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 4/1/2021
The project area is within the Kenton and Iron River Ranger Districts in Houghton, Iron and Ontonagon Counties. There are 45,940 acres (33,021 are National Forest System land. · Houghton; Iron; Ontonagon, Michigan

Project #59633 has been cancelled as it is a unintentional duplicate entry. Those interested in information related to this project should refer to project #59634. This duplicate project will remain on the SOPA for one quarter, and then removed.

Vegetation management (other than forest products)Fuels managementHeritage resource managementRoad managementForest productsWildlife, fish, rare plantsWatershed managementRecreation management
Scoping Start
03/05/2021
Comment Period
03/05/2021
Objection Period Start
10/2021 (Estimated)
Decision
01/2022 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Heritage Resource Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Watershed Improvements
ForestsOttawa National Forest
DistrictsIron River Ranger District; Kenton Ranger District
Legal Land DescriptionT47N,R37W S13-14,24-28,32-36;T45N,R36W S5-7;T45N,R37W S1-4,10-15;T46N,R38W S10-15,24;T46N,R37W S1-27,33-36;T46N,R36W,S3-10,15-22,27-34;T47N,R37W S13,14,23-28,32,34-36;T47N,R36W,S15-22,27-34
Decision Memo · Ottawa National Forest All Units · updated 3/31/2021
The project is located on the East Branch Ontonagon River in Houghton County, Michigan. · Houghton, Michigan

This project proposes to restore stream connectivity in the East Branch of the Ontonagon River within the Ottawa National Forest by removing Lower Dam and restoring the river to pre-impoundment conditions.

Watershed management
Scoping Start
06/29/2018
Comment Period
08/21/2020
Decision
01/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionHoughton County, Michigan: T47N R36W Sec 22-23
Environmental Assessment · Ottawa National Forest All Units · updated 3/26/2021
The project area is midway between Iron River, Michigan and Watersmeet, Michigan with US Highway 2 and Forest Highway 16 traversing the middle of the project area. · Gogebic; Iron, Michigan

The project proposal includes vegetation treatments (est. 200 MMBF), hazardous fuels reduction, refinements to transportation system and old growth classification, wildlife and aquatic habitat improvement (including WSR treatments) and gravel pits.

Road managementVegetation management (other than forest products)Minerals and geologyFuels managementWatershed managementWildlife, fish, rare plantsRecreation managementForest products
Scoping Start
01/27/2020
Comment Period
09/29/2020
Objection Period Start
01/12/2021
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Christine Makuck · christine.makuck@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Minerals Or Geology Plans Of Operations; Trail Management; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsOttawa National Forest
DistrictsIron River Ranger District; Watersmeet Ranger District
Legal Land DescriptionT43N,R37WSec1-11,14,15,17,18;T47N,R38WSec1-16,22-25;T43N,R39WSec1,2,12;T44N,R36WSec2-11,14-23,26-33;T44N,R37WSec1-4,8-36;T44N, R38WSec25,29-36;T44N,R39WSec25,36;T45N,R36WSec21,22,26-35;T45N,R37WSec23-
Decision Memo · Ottawa National Forest All Units · updated 3/5/2021
21 permit roads spread out on the Bessemer, Watersmeet and Iron River Ranger Districts. · Gogebic; Iron, Michigan

This project is to reissue 21 special use road permits that are expiring on 12/31/2020. Routes are located Forest-wide, with the majority on the Bergland and Ontonagon Districts.

Special use management
Scoping Start
06/04/2018
Decision
11/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 2/11/2021
Project is located on the south side of Old U.S. 2, approx. 1 mile west of FH16. · Iron, Michigan

The proposal is to issue a long-term special use permit to an individual for use and maintenance of FR 4020 and a non-system road, to access private property. Proposed access is approx. 0.30 miles long x 20 feet wide.

Special use management
Scoping Start
11/22/2016
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R37W, Sec. 9, NENE; Sec. 10, NWNW
Decision Memo · Iron River Ranger District · updated 2/11/2021
Access off of Forest Roads 3409, 3212, 3476 in Iron County, and a non-system road in Gogebic County · Iron, Michigan

Proposal is to issue a special use authorizations to four individuals for use and maintenance of Forest Roads to access private property.

Special use management
Scoping Start
04/10/2014
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District; Iron River Ranger District
Legal Land Description(Iron County) T45N, R36W, Sec. 8; T43N, R37W, Sec. 10; T44N, R36W, Sec. 23; and (Gogebic County) T44N, R36W, Sec. 23
Decision Memo · Ottawa National Forest All Units · updated 2/4/2021
Ottawa National Forest · Gogebic; Houghton; Iron; Ontonagon, Michigan

Improve aquatic habitat, by adding large natural woody material to lakes and streams across the Forest.

Wildlife, fish, rare plantsWatershed management
Scoping Start
10/13/2020
Decision
02/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Holly Jennings · hjennings@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 1/5/2021
Kenton Ranger District. Davidson Lakes Hunter Walking Trail area · Houghton; Ontonagon, Michigan

Proposal to use prescribed fire to improve wildlife and plant habitat conditions and reduce fuels within the Davidson Lakes hunter walking trail (HWT) area. The project area is on the Kenton Ranger District.

Wildlife, fish, rare plantsFuels management
Scoping Start
07/22/2020
Decision
01/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Francis Paukert · francis.paukert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Hoist Lake Access Completed
Decision Memo · Watersmeet Ranger District · updated 12/1/2020
Route is on the west side of Dinner Lake Rd., approx. 0.75 miles north of the intersection with CR 210. · Gogebic, Michigan

To issue a special use authorization for an existing, non-system road for approx. 275', and to relocate the entrance onto Dinner Lk. Rd. for improved line-of-sight. Route previously under permit.

Special use management
Scoping Start
07/27/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Hoist Lake Reissue and RelocationDecision Signed Date: 11/18/2020
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT44N, R39W, Sec. 26, SENW
Decision Memo · Ottawa National Forest All Units · updated 11/16/2020
Roads to be reissued are located on every district of the Ottawa National Forest. Legal descriptions are included under "Other Project Information" · Gogebic; Houghton; Iron; Ontonagon, Michigan

This project is to reissue 21 special use road permits to allow for access to private property. Roads are located on the Ontonagon, Bergland, Kenton, Bessemer, Watersmeet and Iron River Ranger Districts.

Special use management
Scoping Start
02/24/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Watersmeet Ranger District · updated 11/13/2020
Access on non-system road on the west side of FR6930 · Ontonagon, Michigan

The proposal is to issue special use permit on Federal roads for landowner use to access private land.

Special use management
Scoping Start
10/19/2015
Decision
01/2016 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT47N, R40W, Sec. 31, T46N, R40W, Sec. 6
Decision Memo · Watersmeet Ranger District · updated 11/9/2020
Watersmeet District · Gogebic; Ontonagon, Michigan

Reissue special user permit to Sylvania Outfitters for outfitting on the Ottawa National Forest.

Special use management
Scoping Start
11/02/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Randi Ellsworth · randiellsworth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 11/3/2020
The culvert is located on a segment of Snowmobile Trail 8 running between Kenton and Sidnaw MI. · Houghton, Michigan

The Michigan Department of Natural Resources is seeking to replace a culvert on the Kenton to Sidnaw portion of Snowmobile Trail 8. This analysis is for extending the culvert onto National Forest Service lands outside of the state's right of way.

Recreation management
Scoping Start
08/04/2020
Decision
10/2020 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Nathaniel Dulaney · Nathaniel.Dulaney@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Road Maintenance
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 11/3/2020
Kenton District Camp Nesbit · Iron, Michigan

Special Use Permit reissue to Copper Country Intermediate School District for the utilization and maintenance of the high and low confidence ropes course at the Ottawa National Forest Camp Nesbit Environmental Center.

Special use management
Scoping Start
10/30/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Randi Ellsworth · randiellsworth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 10/28/2020
Various existing right-of-ways on the north zone of the Ottawa N.F. · Houghton; Ontonagon, Michigan

To reissue 6 existing special use road authorizations currently issued to private landowners and one special use authorization issued to a Township for use of an existing utility line.

Special use management
Scoping Start
04/06/2018
Decision
12/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
2018 North Zone Special Use Road ReissuesDecision Signed Date: 12/05/2019
ForestsOttawa National Forest
DistrictsBergland Ranger District; Kenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 10/16/2020
Project area is on the south side of FR 3475, approx. 1 mile west of intersection with Goldmine Road. · Iron, Michigan

Use and maintenance of an existing non-system road to access private property.

Special use management
Scoping Start
08/19/2019
Decision
06/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R36W, Sec. 15, E1/2SE
Decision Memo · Ottawa National Forest All Units · updated 10/2/2020
Kenton Ranger District · Houghton, Michigan

FR1360 has multiple areas of erosion and drainage issues resulting in rutting and sedimentation into adjacent wetlands and streams. Recent surveys have identified the need to replace additional culverts within drainages, not associated with streams.

Road management
Scoping Start
05/21/2020
Decision
10/2020 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Justin Blake · justin.blake@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsOttawa National Forest
DistrictsKenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 7/23/2020
Kenton District · Houghton, Michigan

The FR3500 Bridge spanning the East Branch Ontonagon River has deteriorated with time and currently is posted for reduced load limits. Therefore, there is a need to improve and maintain safety for users, while protecting water quality and free flow.

Road management
Scoping Start
04/27/2020
Decision
07/2020 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Justin Blake · justin.blake@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 6/26/2020
These can be located in T47N, R37W Section 11, Houghton County. The pilings are located in Kenton, MI, approximately 50 feet south (or upstream) of where the East Branch Ontonagon River flows under the East M-28 bridge. · Houghton, Michigan

There are remnant pilings within the East Branch Ontonagon River causing aquatic organism passage issues. This project will remove the pilings and restore the river to its natural state.

Watershed management
Scoping Start
02/03/2020
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 5/14/2020
Kenton District · Iron, Michigan

The FR3610 Bridge spanning the Jumbo River is in need of replacement. It has deteriorated with time and currently is posted for reduced load limits.

Road management
Scoping Start
06/24/2019
Decision
05/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Barbara Van Alstine · bcvanalstine@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Iron River Ranger District · updated 4/27/2020
Iron River District · Iron, Michigan

The FR3350 Bridge spanning Bush Creek has deteriorated with time and currently is posted for reduced load limits. It needs to be replaced.

Road management
Scoping Start
06/24/2019
Decision
04/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Anthony Holland · aholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 4/22/2020
The project area includes aspen stands covering approximately 30,000 acres of National Forest System (NFS) lands within management areas 1.1a, 3.1a, 4.1a, and 4.2a. · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

This project will implement Forest Plan Objectives for aspen. We propose to clear cut approximately 1700 acres of aspen each year for 10-20 years, up to 30,000 acres. Road maintenance and reconstruction will also be proposed, as needed.

Vegetation management (other than forest products)Wildlife, fish, rare plantsForest products
Scoping Start
05/05/2014
Comment Period
02/12/2015
Objection Period Start
06/08/2015
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Susanne Adams · smadams@fs.fed.us
NEPA / regulatory detail
Special AuthorityStewardship Contract, Consolidated Appropriations Resolution Of 2003
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Watersmeet Ranger District · updated 4/22/2020
Project is located on Watersmeet and Kenton Ranger Districts in Ontonagon and Gogebic counties. · Gogebic; Ontonagon, Michigan

Developed through public collaboration efforts, the project would maintain and/or improve conditions based on Forest Plan direction to provide for healthy/resilient/diverse ecosystems; and actions outlined in local Community Wildfire Protection Plans

Minerals and geologyForest productsWatershed managementRoad managementWildlife, fish, rare plantsFuels managementRecreation management
Scoping Start
07/30/2013
Comment Period
07/30/2013
Objection Period Start
04/07/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Marlanea French-Pombier · mfrenchpombier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Trail Management; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District; Watersmeet Ranger District
Legal Land DescriptionT45N R38W S 3-5, 9, 10; T46N R38W S 3-10,15-22, 28-33; T46N R39W S 1-18, 22-27, 34, 36; T47N R38W S 7, 8, 16-21, 28-33, T47N R39W S 13-36; T47N R40W S 13, 24, 25, 36
Environmental Assessment · Kenton Ranger District · updated 4/22/2020
The project is located in both Ontonagon and Houghton Counties, Michigan, and is positioned west of Highway 16, south of Highway 38, north of Kenton and east of Mass City. · Houghton; Ontonagon, Michigan

The Pori Vegetative Management Project includes timber, wildlife, riparian, and recreation projects, and is designed to promote a healthy and resiliant forest ecosystem that is well positioned for the long term effects associated with climate change.

Regulations, directives, orders
Scoping Start
08/09/2013
Comment Period
03/24/2014
Objection Period Start
05/29/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Victoria Hahka · vhahka@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityBiomass; Road Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
Decision Notice for the Pori Junction Vegetation Management ProjectDecision Signed Date: 09/10/2014
ForestsOttawa National Forest
DistrictsKenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionT50N, R37W, Sec. 3-5, 8-10, 15-17, 20, 21, 29, 30-33; T49N, R38W, Sec. 1-3, 10-15, 22-27, 35, 36; T49N, R37W, Sec. 3-10, 15-22, 27-34; T48N, R38W, Sec. 1, 12; T48N, R37W, Sec. 4-8, 17, 18.
Environmental Assessment · Ontonagon Ranger District · updated 4/22/2020
The project is located on the Ontonagon Ranger District in Baraga and Houghton Counties. The project area is 36,000 total acres; of which 24,000 acres are National Forest land. · Baraga; Houghton, Michigan

The Ottawa National Forest is proposing to manage approximately 14,100 acres on Forest Service land as well as the transportation system needed to facilitate timber harvest and provide recreational access near Prickett Lake.

Recreation managementFuels managementRoad managementVegetation management (other than forest products)
Scoping Start
11/16/2016
Comment Period
06/21/2017
Objection Period Start
08/11/2017
Decision
11/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Travel Management; Timber Sales (Green)
Prickett Vegetation Management Project Decision NoticeDecision Signed Date: 11/22/2017
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 4/22/2020
The project area includes several plantation stands, and groups of plantations, across the Iron River, Kenton, Ontonagon and Watersmeet Ranger Districts. · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

14,700 acres of red pine plantation thinning to maintain health and quality; maximize optimal growth rates; address insect and disease factors; and provide long-term source of timber products. Transportation refinements would facilitate harvest.

Forest productsRoad management
Scoping Start
01/31/2014
Comment Period
05/19/2014
Objection Period Start
07/18/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Barbara Van Alstine · bcvanalstine@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Scenery Management; Timber Sales (Green)
Red Pine Thinning Project Decision NoticeDecision Signed Date: 12/05/2014
ForestsOttawa National Forest
DistrictsIron River Ranger District; Kenton Ranger District; Ontonagon Ranger District; Watersmeet Ranger District
Legal Land DescriptionThis area covers several sections within the township and ranges of the counties identified. More information is available from the project contact.
Environmental Assessment · Bessemer Ranger District · updated 4/22/2020
Southwest corner of the Bessemer Ranger District and west of the city of Marenisco, Michigan. · Gogebic, Michigan

The project includes timber management, enhancement to wildlife, fisheries, and riparian habitat, recreation and transportation system improvements. This project proposes to clearcut some areas that would exceed 40 acres in size to regenerate aspen.

Special use managementWildlife, fish, rare plantsRoad managementWatershed managementForest productsVegetation management (other than forest products)
Scoping Start
05/25/2011
Comment Period
04/05/2013
Objection Period Start
06/11/2013
Decision
01/2014 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Marlanea French-Pombier · mfrenchpombier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
Draft Decision and FONSI for the Redboat Resource Management ProjectDecision Signed Date: 06/07/2013
Final Decision and FONSI for the Redboat Resource Management ProjectDecision Signed Date: 01/06/2014
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT45N R43W, Sections 5-7; T45W R44W Sections 1-12, 13-15, 22-24; T46N R43W, Sections 16-21, 28-33; T46N R44W Sections 5-9, 13-36
Decision Memo · Ottawa National Forest All Units · updated 2/20/2020
along a segment of Gog-206 and a short segment of an unnamed road · Gogebic, Michigan

proposal to install a buried powerline to provide power to private property. approximately 220 feet of buried line.

Special use management
Scoping Start
06/25/2019
Decision
10/2019 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N R40W Section 31 & 32
Decision Memo · Iron River Ranger District · updated 1/31/2020
Silver Lake - Approx. 11 miles west of Iron River on the south side of U.S. 2. Fur Farm Pond - Approx. 2.5 miles north of the intersection of Basswood Rd. and FR 3470. · Iron, Michigan

To issue permits to two private landowners, for use and maintenance of Forest Roads and existing, segments of non-system roads, to access private property.

Special use management
Scoping Start
04/23/2018
Decision
10/2019 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionSilver Lake - T43N, R36W, Sec. 5, 6 & 8. Fur Farm Pond - T44N, R36W, Sec. 13 & 24.
Decision Memo · Kenton Ranger District · updated 10/31/2019
Kenton District · Houghton; Ontonagon, Michigan

A segment of the existing hunter-walking trail is now underwater due to beaver activity. Users must traverse a beaver dam, which can be precarious, or bushwhack through the surrounding woods, to bypass the flooded trail segment.

Recreation management
Scoping Start
07/16/2019
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Pamela Nankervis · pnankervis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 10/21/2019
Location of these special use roads are on the Bergland, Kenton, Ontonagon and Iron River Ranger districts · Houghton; Iron; Ontonagon, Michigan

This project will be to reissue 11 special use road permits that will be expiring at the end of 2019. This project contains 2 special use road located on the south zone and 9 special use roads on the north zone.

Special use management
Scoping Start
03/25/2019
Decision
10/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Iron River Ranger District; Kenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 10/3/2019
Forest Roads 2184, 4020 and 4020-A, 6945, 6950-E (along with non-system road) and 8173. · Gogebic; Iron; Ontonagon, Michigan

This project addresses authorizations to private landowners for the use and maintenance of existing and new access routes on National Forest System lands.

Special use management
Scoping Start
11/22/2016
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT45N R42W Section 24, SESE
Environmental Assessment · Bessemer Ranger District · updated 8/1/2019
The project area is located on the Bessemer Ranger District in Gogebic County, Michigan. The project area includes 19,800 acres; of which 19,400 acres are National Forest System lands. · Gogebic, Michigan

The Ottawa National Forest is proposing management on approximately 19,400 acres of National Forest System lands. Proposed activities address vegetation management, habitat improvement, hazardous fuels, system roads, and recreation.

Forest productsMinerals and geologyWildlife, fish, rare plantsFuels managementRecreation managementVegetation management (other than forest products)Road management
Scoping Start
03/02/2018
Comment Period
11/28/2018
Objection Period Start
03/02/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Christine Makuck · cmakuck@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Minerals Or Geology Plans Of Operations; Trail Management; Road Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionSections 4-6, 8, and 9 T44N, R42W; Sections 1 and 2 T44N, R43W; Sections 2-5, 7-11, 14-23, 26-33 T45N, R42W; Sections 13, 14, 23-26, 34-36 T45N, R43W; and Sections 26-28, 32-35 T46N
Englesby Lake Completed
Decision Memo · Watersmeet Ranger District · updated 7/25/2019
Proposed use area is on the north side of Old U.S. 2, approx. 7.5 - 8 miles east of its intersection with U.S. 45. Proposes using existing FR 4434 and an existing unnumbered road. · Gogebic, Michigan

Proposal is to issue a new special use permit for reconstruction, use and maintenance of existing roadd, in order to access private property. Road is accessed off of Old U.S. Hwy. 2 and is approx. 1,800 feet long

Special use management
Scoping Start
04/04/2012
Comment Period
04/04/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Krist Lands Special Use, Englesby LakeDecision Signed Date: 12/04/2012
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT45N, R38W, Sec. 23, SE
Decision Memo · Ottawa National Forest All Units · updated 7/25/2019
Project is located off of FR 8170, approx. 4 miles south of U.S. Hwy. 2. · Gogebic, Michigan

The proposal is to issue a special use permit to an individual for construction, use and maintenance of an OHV trail to access private property. Approx. 0.27 miles of route would be on existing FR 8173, and 0.30 miles would be new construction.

Special use management
Scoping Start
11/22/2016
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT46N, R44W, Sec. 17, S1/2SE, SESESW; Sec. 20, NENW
Decision Memo · Watersmeet Ranger District · updated 7/25/2019
Driveway is located off of Old U.S. 45, south of Paulding, MI. · Ontonagon, Michigan

Proposal is to issue a special use permit for use and maintenance of an existing driveway on National Forest System lands. Driveway is approximately 75 feet long.

Special use management
Scoping Start
08/30/2011
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N, R39W, Sec. 15, SWNW
Decision Memo · Watersmeet Ranger District · updated 7/25/2019
NFS land is adjacent to Ellenbecker's private property on Beaton's Lake. · Gogebic, Michigan

Proposal is to issue a new special use permit for maintaining and operating maple syrup collection lines and equipment on National Forest System lands.

Special use management
Scoping Start
08/05/2010
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT.45N,. R.41W., Section 1, NENE
Decision Memo · Watersmeet Ranger District · updated 7/17/2019
Ottawa National Forest, Watersmeet District, Watersmeet Township, Gogebic County, MI · Gogebic, Michigan

The FR4500 Bridge spanning the Tamarack River has deteriorated with time and currently is posted for reduced load limits. Therefore, there is a need to improve the condition of the bridge.

Road management
Scoping Start
05/17/2019
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Marlanea French-Pombier · mfrenchpombier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 11/30/2018
This project changes Forest Plan language and therefore is applicable at the Forest-wide scale. · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

Modification of a subset of the monitoring questions & indicators for the Forest Plan as a result of the 2017 Monitoring Report findings. Also, the visual quality objectives are being changed to be consistent with Amendment #1 in river corridors.

Land management planning
Scoping Start
07/09/2018
Comment Period
07/09/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Marlanea French-Pombier · mfrenchpombier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
Forest Plan Administrative Change II ProjectDecision Signed Date: 11/15/2018
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 11/19/2018
Project area is at the west end of Pori Rd. Proposed route for Wiberg is a non-system road off of FR 1199-H. Proposed route for Elmblad is FR 1199-H and a non-system road segment to private property. · Ontonagon, Michigan

To authorize the issuance of a special use permit allowing the use and maintenance of existing roads on National Forest System lands, for access to private property.

Special use management
Scoping Start
04/27/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionT50N, R37W, Sec. 31, S1/2
Decision Memo · Ottawa National Forest All Units · updated 11/19/2018
Foreswide · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

Improve wildlife habitat across the Forest

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
03/01/2018
Decision
11/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Pamela Nankervis · pnankervis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Bessemer Ranger District · updated 10/26/2018
Henry Lake Campground - Bessemer Dist. Imp Lake Campground - Watersmeet Dist. · Gogebic, Michigan

User created trails from some campsites along the shoreline of Imp and Henry Lakes have led to erosion causing sediment into the lakes and adjacent riparian areas. This project proposes to eliminate the erosion.

Watershed managementRecreation management
Scoping Start
05/01/2018
Decision
10/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Ellen Lesch · elesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bessemer Ranger District · updated 10/24/2018
Bessemer District · Gogebic, Michigan

The bridge on FR8100 spanning the South Branch Presque Isle River WSR has deteriorated with time and currently is posted for reduced load limits. This project proposes to replace the existing bridge with a new one.

Road management
Scoping Start
03/01/2018
Decision
10/2018 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Michael Bigelow · mbigelow@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 9/29/2018
Coontail Pits A and B; Lake 13 Pit and Onion Creek Pit are on the Kenton Ranger District. Forest Road 1470 Pit is on the Ontonagon Ranger District. · Baraga; Houghton, Michigan

Land clearing for gravel pit development or expansion in 5 areas, totaling approximately 9.5 acres. Updates to, or development of, pit plans would be included, which details pit operations and reclamation measures.

Minerals and geologyForest products
Scoping Start
06/28/2017
Comment Period
02/21/2018
Objection Period Start
05/11/2018
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations; Timber Sales (Green)
ForestsOttawa National Forest
DistrictsKenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionTownship(T) 47N, Range(R) 35W, Sections(Sec)1 and 18; T48N, R36W, Sec 6 and T49N, R37W, Sec 3
Decision Memo · Bessemer Ranger District · updated 9/26/2018
Project is located in the cleared area on the west side of M-64, just south of its intersection with the Enbridge pipeline. · Gogebic, Michigan

Activity would include issuing a permit amendment to Enbridge Energy, adding approx. 30 feet of an existing cathodic bed to their current authorization. Activity would also include the upgrade and maintenance of the cathodic bed.

Special use management
Scoping Start
04/20/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Enbridge Cathodic Bed Maintenance - M64, Amendment #3Decision Signed Date: 09/14/2018
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT46N, R43W, Sec. 14, NENW, Gogebic County, MI
Decision Memo · Ottawa National Forest All Units · updated 6/29/2018
FR 2117 and 2117-F; FR 3574 · Houghton; Ontonagon, Michigan

Applicant wish access under special use permit to their private land across Forest Service lands.

Special use management
Scoping Start
03/15/2016
Decision
06/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Shawn Brown · spbrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionBelmas T47N R36W Sec 26
Decision Memo · Ontonagon Ranger District · updated 6/29/2018
FR 841, 841-C off Gardner Road North of Trout Creek; FR 360-G off Hwy64 N of Bergland; FR 710,715,715-F, 715-F5 South of Rockland. · Ontonagon, Michigan

4 long time permit holders are requesting to reissue their access permits to private lands across Forest Service lands.

Special use management
Scoping Start
03/15/2016
Decision
06/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Kenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 6/29/2018
Follows road right-of-way beginning at Lake 13 Road and ending at 14465E Norway Lake Road, at the Nesbit Lake Organization Camp. · Houghton, Michigan

Midway Telephone Company proposes to complete fiber optic construction in spring of 2018. Placement of fiber will be in road right-of-way, possible need to accommodate trench machine. They will also construct 4 terminals(hand holes) along the route

Special use management
Scoping Start
04/01/2018
Decision
06/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Shawn Brown · spbrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Midway Telephone Special Use Permit, Amendment #3Decision Signed Date: 06/07/2018
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionT47N R35W Section 18, 19, 29, 30, and 33
Decision Memo · Ottawa National Forest All Units · updated 6/28/2018
four roads located on the Bessemer and Watersmeet Ranger Districts · Gogebic; Ontonagon, Michigan

This project is to reissue 5 separate special use road permits that had previous been issued, but are expiring at the end of 2017.

Special use management
Scoping Start
02/21/2017
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District; Watersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 3/29/2018
The travelway proposed for continued use lies on the north side of Perch Lake, approximately 10 miles south and two miles east of Sidnaw, MI. · Iron, Michigan

This travelway was built across FS lands to access cabins along the north side of Perch Lake approx. 50 years ago & an easement was never acquired. Permit is required to perform maintenance on the road and provide access to 9 current cabin owners.

Special use management
Scoping Start
10/28/2016
Decision
08/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionT46N R35W Sections 14, 22, 23.
Decision Memo · Watersmeet Ranger District · updated 3/28/2018
Project area is on north side of CR 527, using FR 6945 and non-system roads to private property in Sec. 3 and 4. · Ontonagon, Michigan

To issue new special use permits for use and maintenance of FR 6945, and use and maintenance of existing, non-system road segments to two private landowners to access private property via OHV. Total area approximately 1.71 miles long, 12 feet wide.

Special use management
Scoping Start
04/16/2013
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Dix-Kennedy, Kafczynski and Wester Special Use ProjectsDecision Signed Date: 03/27/2018
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N, R40W, Sec. 3, W1/2SW; Sec. 10, W1/2
Decision Memo · Ottawa National Forest All Units · updated 3/28/2018
CR 535 is located approx. 3.5 miles west of Watersmeet, MI on U.S. Project is approx. 2.5 miles south of U.S. 2 on CR 535. · Gogebic, Michigan

The proposed activity would authorize the Gogebic County Road Commission to implement the replacement of an existing culvert on the Middle Branch Ontonagon River, a Wild and Scenic River (designated Recreational)CR535.

Special use management
Scoping Start
08/09/2017
Decision
02/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT45N, R40W, Sec. 34, SESW
Decision Memo · Ottawa National Forest All Units · updated 3/28/2018
Project is on the north side of CR 527, approx. 6.5 miles west of its intersection with U.S. 45. · Ontonagon, Michigan

The proposal is to issue a long-term special use permit to an individual, for reconstruction, use and maintenance of FR 6942, 6942-C and a non-system road, in order to access private property. Total length approx. 1.16 miles by 15' wide.

Special use management
Scoping Start
10/19/2015
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Dix-Kennedy, Kafczynkski and Wester Special Use ProjectsDecision Signed Date: 03/27/2018
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N, R40W, Sec. 9
Decision Memo · Ottawa National Forest All Units · updated 2/7/2018
Ontonagon District. · Houghton, Michigan

Silver Mountain is a popular site for hikers and rock climbers. This project proposes: to change how visitors access the top of Silver Mountain, improvements to vistas for viewing, and considerations for rock-climbing routes.

Recreation management
Scoping Start
11/13/2017
Decision
02/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Melissa Simpson · mdsimpson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Scenery Management
Silver Mountain Recreation Site Improvement DecisionDecision Signed Date: 02/05/2018
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 1/30/2018
Forestwide · Gogebic, Michigan

Tree planting within ash dominated stands, traditional deer winter range including connective corridors, and along warm water streamside riparian areas. To restore/enhance, where possible, the diversity and structural composition within these areas.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
02/01/2017
Decision
01/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Pamela Nankervis · pnankervis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 1/26/2018
Ontonagon Disrict · Houghton, Michigan

This project proposes to place a new radio repeater tower on Silver Mountain replacing the Greenland radio tower, which is no longer working properly.

Recreation management
Scoping Start
11/2017 (Estimated)
Decision
01/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Melissa Simpson · mdsimpson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityScenery Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 1/23/2018
Ontonagon District · Ontonagon, Michigan

Reroute short section of NCT along the Middle Branch Ontonagon River where trail conditions are wet and has sections that are steep and eroding. This project proposes to move this section of trail to a less wet and steep location.

Recreation management
Scoping Start
02/01/2017
Decision
01/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Melissa Simpson · mdsimpson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 12/27/2017
10 mi SE of Bergland, MI off Hwy28 to Matchwood Tower Road known as FR 6930 . At Wannigan Creek, gated road FR 6930-Y heads east just north of the creek. · Gogebic, Michigan

Hokens permit expiring, resource survey of original route FR 6930Y w/2 other permittees using 6930 signed 4/2016. 3/2016 requested to keep .5 mi of orig routeadd .5 mi of new rd and drop .6 mi old rd OR drop.5 mi of orig rd add new 550'in sec 2.

Special use management
Scoping Start
03/09/2015
Decision
06/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 11/27/2017
Several routes across all Ranger Districts on the Ottawa National Forest. · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

Improving the motorized access system to provide diverse and quality Forest experiences. The Proposed Action was modified using public input to open 86 miles to off-highway vehicles; 428 miles open to all vehicles; and closure of 54 miles of road.

Road managementRecreation management
Scoping Start
08/10/2016
Comment Period
05/31/2017
Objection Period Start
08/23/2017
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Susanne Adams · smadams@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 8/23/2017
Kenton District · Houghton, Michigan

Repair of a breached groundwater confined aquifer on the Kenton District in Houghton County, Michigan.

Watershed management
Scoping Start
02/04/2017
Decision
08/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Ellen Lesch · elesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Kenton Ranger District · updated 8/22/2017
Kenton District. East of Sidnaw, Michigan · Baraga, Michigan

The Perch River wayside is no longer being maintained as a developed site. The original parking area remains, but amenities such as a restroom facility and picnic table have been removed. Proposed is to return the parking area to its natural state.

Watershed management
Scoping Start
06/08/2017
Decision
08/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Shelly Garber · shellygarber@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Iron River Ranger District · updated 7/18/2017
Forest Roads 3110, 3210, 3270, and 3910 in Gogebic and Iron Counties. · Gogebic; Iron, Michigan

This proposed project would allow OHV use on Forest Roads 3110, 3210, 3270 and 3920.

Recreation managementRoad management
Scoping Start
04/25/2016
Comment Period
12/16/2016
Objection Period Start
03/02/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
East Iron-Phelps OHV Connector ProjectDecision Signed Date: 06/27/2017
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Bessemer Ranger District · updated 7/18/2017
Bessemer District · Gogebic, Michigan

Replace FR8100 bridge that spans the West Branch Presque Isle River (Scenic), a congressionally designated Wild and Scenic River (WSR).

Road management
Scoping Start
02/01/2017
Decision
06/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Michael Bigelow · mbigelow@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 3/29/2017
Project area is located off of FR 6950, approx. 1 mile north of its intersection with CR 527. · Ontonagon, Michigan

Proposal is to issue a long-term special use permit to an individual for use and maintenance of FR 6950-E and a non-system road, in order to access private property. Proposed access is 950 feet long by 20 feet wide.

Special use management
Scoping Start
11/22/2016
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sorenson, Marion Lake; LaBeau, East County Line Lake; Sebela Special UseDecision Signed Date: 01/26/2017
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N, R40W, Sec. 10, NE; Sec. 3, SWSE
Decision Memo · Ottawa National Forest All Units · updated 3/29/2017
Project is located on the west side of Marion Lake, approx. 1.5 miles north of U.S., off of FR 3980. · Gogebic, Michigan

To issue a long-term special use permit to an individual, for use and maintenance of an existing road in order to access private property. Driveway is approx. 260 feet in length x 20 feet wide.

Special use management
Scoping Start
12/04/2015
Decision
01/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sorenson, Marion Lake; LaBeau, East County Line Lake; Sebela Special UseDecision Signed Date: 01/26/2017
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT45N, R28W, Sec. 30, SWSE
Decision Memo · Ottawa National Forest All Units · updated 1/31/2017
FR1360 is located on the Kenton and Ontonagon Districts, Houghton County, Michigan · Houghton, Michigan

Improvement of road surface to address erosion and drainage issues resulting in rutting and sedimentation into adjacent wetlands and streams. Replace failing culverts. Includes replacing culvert at Boulder Creek to allow for aquatic organism passage.

Road management
Scoping Start
11/01/2016
Decision
01/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Susanne Adams · smadams@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsOttawa National Forest
DistrictsKenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 12/27/2016
one permit is located on the Watersmeet Ranger District and the other 7 are located on the Iron River Ranger District · Gogebic; Iron, Michigan

This project is to reissue 8 special use road permits on the Watersmeet and Iron River Ranger District.

Special use management
Scoping Start
03/16/2016
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District; Watersmeet Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 11/7/2016
Two Non-Federal parcels are located on the west and SW side of Victoria Reservoir, and one is located NE of Watersmeet, MI. The federal parcel is SW of Watersmeet near the MI and WI border. · Gogebic; Ontonagon, Michigan

Michigan & Wisconsin Realty, LLC, has proposed a land exchange with the Ottawa. The proposed land exchange includes approximately 259.38 acres of non-federal land and 218.25 acres of National Forest System lands.

Land ownership management
Scoping Start
04/29/2016
Comment Period
06/01/2016
Objection Period Start
10/2016 (Estimated)
Decision
02/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District; Watersmeet Ranger District
Legal Land DescriptionNon-Federal: T50N, R40W, Parts of Sec. 36, SE; T49N, R40W, Parts of Sec.1 and Sec. 2, SE. T45N, R39W, Sec.15, NESE. Federal: T44N, R41W, Parts of Sec.9, S1/2 and Sec.16, N1/2.
Decision Memo · Ontonagon Ranger District · updated 11/2/2016
The trail, located on the Bergland and Ontonagon Ranger Districts, starts just east of Bergland, Michigan and extends to Victoria. · Ontonagon, Michigan

The Pioneer Trail is a 23-mile long multiple use trail that is open to Off-Highway Vehicles. The trail has sections of erosion and improper drainage that need to be addressed. A new trailhead and parking area will also be created East of Bergland, MI

Recreation management
Scoping Start
06/01/2016
Decision
11/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Shelly Garber · shellygarber@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 10/17/2016
The O Kun de Kun waterfall trailhead is located on the east side of M45, approximately 8 miles north of Bruce Crossing. The trail runs approximately 1.3 miles to the East to the Baltimore River and O Kun de Kun waterfall. · Ontonagon, Michigan

This Trail segment is part of the North Country Hiking Trail. It is in need of reconstruction in some areas to improve trail surface, rutting and ponding issues. A segment of trail will be rerouted and a foot bridge placed to avoid a step area.

Recreation management
Scoping Start
06/24/2016
Decision
10/2016 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Shelly Garber · shellygarber@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Watersmeet Ranger District · updated 9/27/2016
County Road 535 (Thousand Island Lake Road), is located approx. 5 miles west of Watersmeet, MI, south of U.S. Hwy. 2. · Gogebic, Michigan

The proposed activity would authorize the Gogebic Cty. Rd. Commission (GCRC)to replace 9 culverts on CR535. The GCRC holds a 66' wide Easement for portions of CR535; this work is outside of the easement area and will need a special use permit.

Special use management
Scoping Start
05/05/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT45N, R40W, Sec. 25, 26, 34, 35, 36 and T44N, R40W, Sec. 3, 4 and 5, Gogebic County, MI.
Decision Memo · Iron River Ranger District · updated 9/19/2016
Iron River, Watersmeet, Bessemer Districts · Gogebic; Iron, Michigan

An outbreak of spruce budworm in recent years has caused extensive mortality and fuels buildup. The most affected areas are in stands of balsam fir and spruce. Project proposes activities to restore areas via forest restoration and fuels reduction.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/17/2016
Decision
09/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Ted Frank · tjfrank@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Road Maintenance; Timber Sales (Salvage)
ForestsOttawa National Forest
DistrictsIron River Ranger District; Watersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Watersmeet Ranger District · updated 9/16/2016
7 miles southeast of Watersmeet Michigan · Gogebic, Michigan

Proposal would reconfigure 65 feet of the Middle Branch Ontonagon River at the Crooked Lake Outlet. This project would improve aquatic organism passage.

Watershed management
Scoping Start
07/22/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Christine Makuck · cmakuck@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT45N, R40W, Section 34
Decision Memo · Ottawa National Forest All Units · updated 8/25/2016
Proposed water bodies wild rice restoration: Mallard Lake, Pomeroy, Echo Lake, Glitter Lake, Bob Lake, Bobcat Lake, Lake Ottawa, Moosehead Lake, Presque Isle River flowage and Sucker Lake. · Gogebic; Iron, Michigan

Proposing the establishment of new wild rice beds or the supplementing of existing ones on several proposed water bodies within the Bessemer, Iron River, Kenton, Ontonagon, and Watersmeet Districts.

Wildlife, fish, rare plants
Scoping Start
05/05/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Lauren Romstad · lrromstad@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsOttawa National Forest
DistrictsBessemer Ranger District; Iron River Ranger District; Kenton Ranger District; Ontonagon Ranger District; Watersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 7/13/2016
Bergland Ranger District, Norwich IRA · Ontonagon, Michigan

This project proposes to maintain openings within the Norwich Inventoried Roadless Area (IRA) to prevent them from becoming overgrown

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
02/17/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Brian Bogaczyk · bbogaczyk@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other; Ira - Inventoried Roadless Area Activities Requiring Chief's Approval
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsOttawa National Forest
DistrictsBergland Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 6/30/2016
Many streams and lakes across the Ottawa National Forest could benefit from habitat improvement. Specific sites will be determined by specialists annually. · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

We propose to restore aquatic habitat over the next 10 years (2016-2026) by adding large woody material to lakes and streams across the Ottawa National Forest.

Wildlife, fish, rare plantsWatershed management
Scoping Start
01/02/2015
Comment Period
04/02/2015
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 6/30/2016
Underground copper telephone line lies near Alston, MI, alongside portions of South Laird Road, Pricket Dam Road, and Cemetery Road. · Houghton, Michigan

Continued use and maintenance of buried telephone line across National Forest lands for 3.03 acres.

Special use management
Scoping Start
04/04/2015
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Baraga Telephone Special Use Permit Reissue Decision MemoDecision Signed Date: 03/30/2016
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionT50N R35W Sections 6, 10, 15, 16. T50N R36W Sections 23, 36.
Decision Memo · Ottawa National Forest All Units · updated 6/30/2016
Varied. Dependent on structure condition and resource need. · Baraga; Gogebic; Houghton; Iron; Ontonagon, Michigan

We propose to restore aquatic habitat connectivity by replacing existing stream crossing structures that are barriers to aquatic organisms with appropriately designed structures that allow passage for fish and other aquatic organisms.

Watershed managementRoad managementWildlife, fish, rare plants
Scoping Start
01/09/2015
Comment Period
06/17/2015
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Christopher Kovala · christopherskovala@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 6/30/2016
FR 1823 off of FH 16,appx. 3 mi south of MI State Hwy38; FR 511 appx. 1 mile south of Bergland, MI off East Shore Road. · Ontonagon, Michigan

Issuance of Forest Road Special Use permits to two separate individuals for access to their private property across Forest Service lands.

Special use management
Scoping Start
04/04/2016
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Scott and Schott Forest Road Special Use Permits Decision MemoDecision Signed Date: 04/04/2016
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District
Legal Land DescriptionScott T50N R37W Sec. 14,15,22 FR 1823,1674-E1; Schott T48N R42W Sec 8,16,17 FR 511, 511-G
Decision Memo · Ottawa National Forest All Units · updated 6/30/2016
Radio Tower is located approximately six miles north of Bergland, MI one mile east of State Highway M-64. · Ontonagon, Michigan

Continued use and access to a radio antenna owned by Trap Hills Amateur Radio Club mounted on the Forest Service Trap Hills Radio Repeater Tower, allowing for their emergency short wave radio communications.

Special use management
Scoping Start
04/06/2016
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Trap Hills Amateur Radio Club Permit Reissue Decision MemoDecision Signed Date: 04/06/2016
ForestsOttawa National Forest
DistrictsBergland Ranger District
Legal Land DescriptionT49N R42W Section 5; T50N R42W Section 32
Decision Memo · Watersmeet Ranger District · updated 6/13/2016
Watersmeet District · Gogebic, Michigan

This project proposes to relocate two trail segments to improve overall user experience and provide a safer turnaround for grooming equipment; and to improve trail conditions where it crosses Forest Road (FR) 6320.

Recreation management
Scoping Start
05/29/2015
Decision
06/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Melissa Simpson · mdsimpson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Watersmeet Ranger District · updated 4/29/2016
Watersmeet District · Gogebic, Michigan

Wilderness Lakes Bike Trail System is the name given to the 37 mile bike trail loop surrounding the Sylvania Wilderness. This project proposes to add new bike trail segments and relocate the Whitefish Lake Trailhead parking area.

Recreation management
Scoping Start
08/03/2015
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Melissa Simpson · mdsimpson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Iron River Ranger District · updated 3/25/2016
Access is from Basswood Rd. west of Iron River, MI, then to Goldmine Rd., then approx. 1.30 miles north to FR 3476. · Iron, Michigan

The proposal is to issue a special use permit to an individual for use and maintenance of existing FR 3476.

Special use management
Scoping Start
05/19/2015
Decision
01/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R36W, Sec. 23, W1/2SE, NESW, SENW
Hinton Special Use Completed
Decision Memo · Ottawa National Forest All Units · updated 3/25/2016
Access road is directly off of FR 3320, traveling west to private property in T44N, R37W, Sec. 1, SW. · Iron, Michigan

The project includes issuing a special use authorization to a landowner for use and maintenance of an existing, non-system road (0.58 miles x 20') on National Forest System lands in order to access private property.

Special use management
Scoping Start
10/19/2015
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R37W, Sec. 1, Iron County, MI
Decision Memo · Watersmeet Ranger District · updated 3/25/2016
Access road is located approximately 6 miles north of U.S. 2,off of CR 527. · Ontonagon, Michigan

The proposal is to issue a special use authorization to an individual, for use and maintenance of FR 6924 and an existing non-system road, to access private property.

Special use management
Scoping Start
04/23/2014
Decision
01/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N, R40W, Sec. 18, E1/2SW, SWSE; Sec. 19, NE, N1/2SE; Sec. 20, NWSW, S1/2NW
Decision Memo · Ontonagon Ranger District · updated 1/14/2016
North of Bergland, Michigan. · Ontonagon, Michigan

Improve ski trail surface, drainage, and bridges.

Recreation management
Scoping Start
11/19/2015
Decision
01/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Shelly Garber · shellygarber@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Iron River Ranger District · updated 12/30/2015
The FR 3925 proposed access in directly off FR 3925, south of U.S. 2. The James Lake access is north of U.S. 2 off of FR 3920, and is reached by first crossing Keweenaw Land property. · Iron, Michigan

The project proposes to issue a special use authorization to Keweenaw Land for the use and maintenance of two existing, non-system roads in order to access private lands for timber hauling. No tree removal is proposed. Total project area

Special use management
Scoping Start
10/20/2015
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R37W, Sec. 28, NENENE; Sec. 31, SENW, Iron County, MI
Decision Memo · Ottawa National Forest All Units · updated 12/9/2015
Bessemer, Iron River and Watersmeet Districts · Gogebic; Iron, Michigan

The purpose of this project is to reissue 2 special use road permits that will be expiring at the end of 2015. 1 on the Bessemer District & 1 on the Iron River District.

Special use management
Scoping Start
04/28/2015
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District; Iron River Ranger District; Watersmeet Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 11/23/2015
Federal Parcel 1: approx. 0.75 mls. north of Bergland, MI. Federal Parcel 2: approx. 0.25 mls. north of Kenton, MI, adjacent to cemetery. Non-Federal Parcel: approx. 1.5 mls. SW of Rockland, MI. · Houghton; Ontonagon, Michigan

The proposed land exchange with Mr. Norman Pestka, proposes to exchange approx. 51.07 acres of federal land, for approx. 48.70 acres of non-federal land in Houghton and Ontonagon Counties of Michigan.

Land ownership management
Scoping Start
06/16/2014
Comment Period
02/10/2015
Objection Period Start
06/26/2015
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsOttawa National Forest
DistrictsBergland Ranger District; Kenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionFederal Parcel 1: T49N, R42W, Sec. 33, N1/2NW, Ontonagon Co. Federal Parcel 2: T47N, R37W, portion of land in Sec. 2, SESE, Houghton Co. Non-Federal: T50N, R39W, Sec. 20, portion of SWNE, Ontonagon, C
Decision Memo · Bessemer Ranger District · updated 10/14/2015
Bessemer District, Westside Lake Gogebic · Gogebic, Michigan

Maintain the open rock native plant community. Reconstruct portions of the hiking trail leading to the overlook, such as the failing steps near the trailhead ; and to block access to the trail from unauthorized use by off highway vehicles.

Recreation management
Scoping Start
06/01/2015
Decision
10/2015 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Susan Trull · strull@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Trail Management
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 10/2/2015
Approximately 8 miles south of Rockland, MI off US Hwy 45 to Forest Roads 710, 715, and 715-G to private land. · Ontonagon, Michigan

Mr. Christensen has requested access across Forest System land to access his private property.

Special use management
Scoping Start
05/29/2013
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionT49N R39W Sec. 13 and 21-24
Decision Memo · Watersmeet Ranger District · updated 10/2/2015
Intersection of Old US-45 Hwy and Trail #3 · Gogebic, Michigan

Installation of two culverts on an existing trail.

Recreation management
Scoping Start
05/29/2009
Decision
10/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Richard McVey · rmcvey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT44N, R39W, Section 9
Decision Memo · Bessemer Ranger District · updated 9/28/2015
Black River North Country Trail, Bessemer District · Gogebic, Michigan

This project proposes to reroute sections of the NCT, between Copper Peak trailhead and Conglomerate falls, where the trail has eroded into the Black River

Recreation management
Scoping Start
06/01/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Melissa Simpson · mdsimpson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Black River North Country Trail Project DecisionDecision Signed Date: 09/25/2015
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 9/23/2015
Carlson12 miles n. of Kenton, MI east of FH 16;Darbyshire 6 miles s. of Rockland, MI west of US45;Johnson 14 miles w. and s. of Baraga, MI off FR2270; McCoy 6 mi. east of Bergland, MI then s. off M28. · Houghton; Ontonagon, Michigan

Four separate parties, previously under permit, request continued access across Federal lands to their private property.

Special use management
Scoping Start
09/23/2014
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District
Legal Land DescriptionCarlson T49N R36W Sec7 FR 1550, 1552,un-named spur Houghton Co; Darbyshire T49N R39W Sec21 FR 730-B Ontonagon Co; Johnson T50N R35W Sec31 FR 2270-R Houghton Co; McCoy T48N R42W Sec24 FR558 OntonagonCo
Decision Memo · Ottawa National Forest All Units · updated 9/23/2015
Beauchamp S of Sidnaw,W on FR 2127,2127-K;Gazda 6 mi NW Sidnaw FR 1357;Helka E of Kenton FR 1219; Kalsd.Shamion SW Ont off Norwich FR639,639-B; Tucker E of Bergland to FR 530, 6 mi NE to 530-S · Houghton; Iron; Ontonagon, Michigan

Mr. Beauchamp, Mr. Gazda, Mr. Helka, Mr.s Kalousdian and Shamion, and Mr. Tucker request access to their private separate properties via Forest System lands.

Special use management
Scoping Start
12/17/2013
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Kenton Ranger District
Legal Land DescriptionBeauchamp T46NR36W S1,12 Iron Co; Gazda T48NR36W S11 Houghton Co; Helka T47NR36W S6 Houghton Co; Shamion-Kalousdian T50NR41W S9,10,15 FR639,639-B, spur Ont Co.; Tucker T49NR41W S16 FR 530-S OntCo.
Decision Memo · Ottawa National Forest All Units · updated 9/23/2015
The segment of railroad across Forest system lands begins 1 mile east of Bergland, MI and runs 6.3 miles to the north and east. · Ontonagon, Michigan

Wisconsin Central, LTD, a subsidiary of Canadian National Railroad, has requested to continue to operate and maintain a standard gauge railroad across Forest System lands.

Special use management
Scoping Start
01/31/2014
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District
Legal Land DescriptionT49N R42W Sections 1,11,12,14,15,27,28,34
Decision Memo · Kenton Ranger District · updated 7/16/2015
Kenton Ranger District · Houghton, Michigan

Decommission unauthorized road where resource damage from illegal off-highway vehicle (OHV)use is impacting Onion Creek and downstream the E. Br. Ontonagon River (segment classified Wild), a congressionally designated Wild and Scenic River (WSR).

Watershed management
Scoping Start
04/27/2015
Decision
07/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Ellen Lesch · elesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning
Onion Creek Unauthorized Road Decommission DecisionDecision Signed Date: 07/08/2015
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 3/25/2015
North Country Trail(NCT) and Bush Creek, Bergland District. NCT and Boulder Creek and Silver River, Houghton County. Ottawa National Forest, Michigan. · Houghton; Ontonagon, Michigan

Placement of trail bridges where the North Country Trail crosses Bush Creek, Boulder Creek, and Silver River.

Recreation management
Scoping Start
12/18/2014
Decision
02/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Susanne Adams · smadams@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ottawa National Forest All Units · updated 3/10/2015
Parcels are within Bergland, Haight and Stannard Townships of Ontonagon County, Michigan · Iron; Ontonagon, Michigan

Mr. Robert Delich has proposed a land exchange with the Ottawa National Forest. The proposed land exchange includes approximately 421.5 acres of land owned by Mr. Delich and 320 acres of National Forest System (NFS) lands.

Land acquisitionLand ownership management
Scoping Start
02/10/2009
Comment Period
10/18/2011
Decision
12/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
Delich Land Exchange ProjectDecision Signed Date: 12/28/2011 Legal Notice Date: 01/12/2012
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District; Watersmeet Ranger District
Legal Land DescriptionDelich: T50N, R43W, sect 18; NFS Lands: T49N, R39W, sect 27; T48N, R43W, sect 14; and T46N, R40W, sects 27, 34 and 35
Decision Memo · Bessemer Ranger District · updated 12/30/2014
The proposed route is approximately 6 miles east of Marenisco, MI, on the north side of U.S. Hwy. 2. · Gogebic, Michigan

The proposal is to issue a special use authorization to a private landowner, for use and maintenance of approximately 80' of existing road to access private property. No additional clearing of the ROW is proposed.

Special use management
Scoping Start
08/26/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Palmquist Special Use, Slate RiverDecision Signed Date: 12/12/2014
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT46N, R42W, Sec. 21, NESE
Decision Memo · Iron River Ranger District · updated 12/30/2014
The project area is north of Iron River, MI. FR 2195 is located off Ponozzo Road, approx. 11.5 miles north of its intersection with U.S. Hwy. 2. · Iron, Michigan

The project proposes to issue a special use authorization for use and maintenance of FR 2195, and a short segment of existing, non-system road, in order to access private land.

Special use management
Scoping Start
03/24/2014
Decision
11/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT45N, R35W, Sec. 28, S1/2S1/2
Decision Memo · Iron River Ranger District · updated 12/30/2014
Proposed access is FR 2185, east of FR 2180 (Blockhouse Road). · Iron, Michigan

Proposal is to issue a special use permit for use and maintenance of existing roads on National Forest System lands.

Special use management
Scoping Start
08/31/2011
Decision
11/2014 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Flatiron Association (Tarsi) Special Use, Net RiverDecision Signed Date: 11/03/2014
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT45N, R35W, Sec. 25, S1/2, 26 and 36
Environmental Assessment · Kenton Ranger District · updated 9/30/2014
The proposed route is located on roads currently open to motorized use on the Kenton, Watersmeet and Ontonagon Ranger Districts. · Gogebic; Houghton; Ontonagon, Michigan

The Forest Service is proposing to authorize a special use permit to establish a set of routes on 86 milse of Forst Roads for use in the annual Lake Superior Performance Rally (LSPR) for to the Sports Car Club of America.

Special use management
Scoping Start
05/06/2014
Comment Period
05/06/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Marlanea French-Pombier · mfrenchpombier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Lake Superior Performance RallyDecision Signed Date: 07/02/2014
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 9/29/2014
2 special use roads on the Bessemer District, 6 special use roads on the Iron River District & 3 special use roads on the Watersmeet District. · Gogebic; Iron, Michigan

The purpose of this project is to reissue 11 special use road permits for access to private property.

Special use management
Scoping Start
01/22/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (10); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
2014 South Zone Special Use Road ReissueDecision Signed Date: 09/16/2014
ForestsOttawa National Forest
DistrictsBessemer Ranger District; Iron River Ranger District; Watersmeet Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Watersmeet Ranger District · updated 6/25/2014
The proposed project area is on the north side of FR 3940, providing access to private land on the south end of Tamarack Lake. · Gogebic, Michigan

The proposal includes issuing a special use permit for the use and maintenance of an existing road, approximatley 300' in length.

Special use management
Scoping Start
04/17/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rucinski Special Use, Tamarack Lake AccessDecision Signed Date: 06/12/2014
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT44N, R37W, Sec. 7, SWSW; Sec. 18, NWNW
Decision Memo · Ottawa National Forest All Units · updated 6/25/2014
Project is west of Calderwood Road, on FR 5383-D and a non-system road segment to private land. · Ontonagon, Michigan

To issue a new special use permit for use and maintenance of an existing Forest Road, and use and maintenance of a non-system road segment.

Special use management
Scoping Start
04/16/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sunnyside Special UseDecision Signed Date: 06/20/2014
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT47N, R38W, Sec. 30 and 31
Decision Memo · Ottawa National Forest All Units · updated 6/11/2014
Forest-wide · Baraga; Gogebic; Houghton; Iron; Marquette; Ontonagon, Michigan

We propose to maintain numerous non-forested openings across the Ottawa National Forest. Openings consisiting of various grass, forb and shrub species require periodic maintenance to prevent forest growth from overtaking them.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/21/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Robin McCartney · rmccartney@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
Openings Maintenance projectDecision Signed Date: 06/09/2014
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ottawa National Forest All Units · updated 5/1/2014
Forestwide cold and cold-transitional stream riparian areas · Gogebic; Houghton; Iron; Ontonagon, Michigan

Restore long lived tree species within some cold and cold water transitional stream riparian areas on the Forest.

Vegetation management (other than forest products)Watershed management
Scoping Start
01/13/2014
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Mark Fedora · mfedora@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Watershed Improvements
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Ontonagon Ranger District · updated 4/10/2014
(Dix) appx 14 mi south of Ontonagon off Norwich Road and FR 630; (Dekker) appx 16 mi south of Ontonagon off Norwich Road; (Lusk) 10 mi west of Baraga off FR 2270. · Houghton; Ontonagon, Michigan

Renewed use of National Forest System lands to access private property has been requested by 3 separate permittees on the Ontonagon and Bergland Ranger Districts. The parcels are not contiguous.

Special use management
Scoping Start
12/10/2012
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Ontonagon Ranger District
Legal Land DescriptionDix T50N R41W SESW Sec 35 Bergland Ranger District; Dekker T49N R41W NWNE Sec 11 Bergland Ranger District; Lusk T50N R35W Sec 16 FR 2279-B.
Decision Memo · Ottawa National Forest All Units · updated 4/10/2014
Approximately 13 miles south of Mass City, MI off Forest Road 1100. · Houghton; Ontonagon, Michigan

Private land owner requesting use of Forest system roads to access their private land.

Special use management
Scoping Start
09/23/2013
Decision
04/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionT49N R37W Sec.19,30; T49N R38W Sec 24,25 Forest Road 1157, 1157-G, and spur road into private.
Decision Memo · Ontonagon Ranger District · updated 3/31/2014
Krueger spur off FR 2125 near Marten Lake; Kearly FR 2108-F 4 miles SE of Sidnaw; Minerick spur off FR 2276 south of Alston, MI; Petrie FR 6938 and un-named spur 9 mi south and west of Ewen, MI · Gogebic; Houghton; Iron, Michigan

Access across National Forest System lands has been requested by 4 separate landowners to reach their private properties on the Bergland, Kenton, and Ontonagon Ranger Districts.

Special use management
Scoping Start
10/30/2012
Comment Period
02/06/2013
Decision
02/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBergland Ranger District; Kenton Ranger District; Ontonagon Ranger District
Legal Land DescriptionKrueger T46N R35W Section 9; Kearly T47N R35W Sec 17,16, 20; Minerick T50N R36W Section 36; Petrie T47N R41W Section 15 and 22.
Decision Memo · Ottawa National Forest All Units · updated 11/12/2013
Ottawa National Forest, Bessemer, Bergland, Watersmeet, Ontonagon, Kenton, and Iron River Districts · Gogebic; Houghton; Iron; Ontonagon, Michigan

Restore up to 21 crossings by replacing impaired culverts with appropriately designed structures to allow for fish and other aquatic organism passage; improve water quality; restore stream characterisics; accommodate at least a 100 year flow event.

Wildlife, fish, rare plantsRoad managementWatershed management
Scoping Start
04/08/2013
Comment Period
04/08/2013
Decision
11/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Mark Fedora · mfedora@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Watershed Improvements
Road and Stream RestorationDecision Signed Date: 11/06/2013 Legal Notice Date: 11/08/2013
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionState of Michigan: Gogebic, Ontonagon, Iron, and Houghton Counties
Decision Memo · Watersmeet Ranger District · updated 9/27/2013
The project is located to the east of FR 6320, on the west side of Duck Lake. · Gogebic, Michigan

The proposal includes issuing a special use permit for the use and maintenance of an existing road. It also includes construction of approx. 200' of road to realign the intial segment of road for improved seasonal access.

Special use management
Scoping Start
04/16/2013
Comment Period
05/16/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Pytlarz, PG Road Association Special Use, Duck LakeDecision Signed Date: 08/05/2013 Legal Notice Date: 08/07/2013
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT44N, R39W, Sec. 19, NENESW, SENE
Decision Memo · Iron River Ranger District · updated 9/25/2013
The project area is on the north side of Smoky Lake Road, west of Homan Lake. · Iron, Michigan

This project includes issuing a special use permit for use and maintenance of an existing road, to access private land.

Special use management
Scoping Start
04/17/2013
Comment Period
05/17/2013
Decision
06/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Ned Lake Special Use PermitDecision Signed Date: 06/28/2013
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT43N, R36W, Sec. 19, NWSW, W1/2NW
Decision Memo · Watersmeet Ranger District · updated 9/25/2013
The existing tower is located on the west side of Helen Lake, south of CR 535, oustide of the Sylvania Wilderness. · Gogebic, Michigan

The proposal is to issue a special use permit to the University of Wisconsin, Madison, for continued use and maintenance of an existing, 110' research tower, as well as an area within a 164' radius of the tower, for research purposes.

Special use management
Scoping Start
04/04/2012
Comment Period
04/04/2012
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Univesity of Madison, Ameriflux Research TowerDecision Signed Date: 09/13/2013
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT44N, R40W, Sec. 6, NE
Decision Memo · Iron River Ranger District · updated 9/25/2013
The project area is within the cleared area of FH16 and a road leading to private property on the east side of FH16. · Iron, Michigan

The project includes issuing a permit amendment authorizing the placement, use and maintenance of approx. 650 feet of buried electric line. The line is proposed to be buried in the cleared ROW of FH16 and an existing road, to serve private property.

Special use management
Scoping Start
04/17/2013
Comment Period
04/17/2013
Decision
06/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
WE Energies Special Use Permit Amendment #4Decision Signed Date: 06/14/2013
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT46N, R37W, Sec. 36, NESE, Iron County
Decision Memo · Iron River Ranger District · updated 9/25/2013
The project is in the cleared right-of-way of FR 3940, north of U.S. 2, and an existing driveway traveling west to private property. · Iron, Michigan

Installation of approximately 370 feet of buried electric line in the cleared right-of-way of FR 3940 and a driveway, to service private landowners.

Special use management
Scoping Start
06/27/2013
Comment Period
06/27/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
990 Lalley Road · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
WE Energies Special Use Permit Amendment #5Decision Signed Date: 09/13/2013
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT44N, R37W, Sec. 5, NWSW
Decision Memo · Bessemer Ranger District · updated 9/11/2013
Special use permit is on Forest Road 9322 which is off of FR9300 · Gogebic, Michigan

The purpose of this project is to reissue one existing road permit on the Bessemer Ranger District

Special use management
Scoping Start
05/23/2012
Comment Period
05/23/2012
Decision
09/2012 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2012 Bessemer Ranger District Special Use Road ReissueDecision Signed Date: 09/18/2012 Legal Notice Date: 05/23/2013
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT46N R44W, Sec. 3 NE
Decision Memo · Bessemer Ranger District · updated 3/29/2013
The project area is approximately 4 miles northeast of the town of Bessemer, MI. · Gogebic, Michigan

The proposal is to issue a special use permit amendment to Xcel Energy, for the construction of a 115kV, electric tansmission line corridor; the cleared area will be approx. 100'x100'. It's not expected that any structures will be placed on FS land.

Special use management
Scoping Start
04/04/2012
Comment Period
04/04/2012
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Xcel Energy Special Use Permit AmendmentDecision Signed Date: 03/28/2013
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT48N, R46W, Sec. 13, SESE
Decision Memo · Kenton Ranger District · updated 3/28/2013
Approximately 7 miles south of State Hwy M-28 and Sidnaw, Michigan · Iron, Michigan

Continued access to private land requested on Forest Road 2119

Special use management
Scoping Start
01/03/2011
Comment Period
10/31/2012
Decision
01/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionT46N R35W Section 6 Forest Road 2119
Decision Memo · Bessemer Ranger District · updated 3/28/2013
Located west of FR 8170 · Gogebic, Michigan

To issue a new special use permit for use and maintenance of an existing Forest Road, and reconstruction, use and maintenance of a non-system road segment.

Special use management
Scoping Start
05/14/2008
Comment Period
04/04/2012
Decision
02/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsBessemer Ranger District
Legal Land DescriptionT46N, R44W, Section 17
Decision Memo · Kenton Ranger District · updated 3/28/2013
Iron County Approximately 10 miles south of Sidnaw, MI · Iron, Michigan

Access to private land requested by private landowner across Forest Road 2135

Special use management
Scoping Start
10/30/2012
Comment Period
10/31/2012
Decision
01/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsKenton Ranger District
Legal Land DescriptionT46N R35W Section 23 Forest Road 2135
Decision Memo · Iron River Ranger District · updated 3/19/2013
Iron River Ranger District · Iron, Michigan

This project includes reissuing special use permits to the private landowners involved, for use and maintenance of existing roads on National Forest System lands. Use of these roads is needed to access their private property.

Special use management
Scoping Start
05/23/2012
Comment Period
05/23/2012
Decision
11/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2012 Iron River Ranger District Special Use Road ReissueDecision Signed Date: 11/27/2012 Legal Notice Date: 12/12/2012
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT45N R36W Sec. 26; T44N R35W Sec. 11; T42N R36W Sec. 5; T44N R37W Sec. 4; T43N R36W Sec. 19
Decision Memo · Watersmeet Ranger District · updated 3/19/2013
A road off FR5257. The other road is FR6766 · Gogebic, Michigan

This project is to reissue 2 existing special use road permits on the Watersmeet Ranger District

Special use management
Scoping Start
05/23/2012
Comment Period
05/23/2012
Decision
11/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Caleb Butcher · cbutcher@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2012 Watersmeet Ranger District Special Use Road ReissueDecision Signed Date: 11/27/2012 Legal Notice Date: 12/12/2012
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT45N R41W Sec.11 NE, Sec. 2 S1/2SE; T46N R38W Sec. 20 NENW, N1/2NE
Environmental Assessment · Ottawa National Forest All Units · updated 12/17/2012
Selected Forest System Roads east of Forest Highway 16 between Iron River, Sidnaw, and Mass City. · Houghton; Iron; Ontonagon, Michigan

This project designates roads for off-highway vehicle travel to provide connections between the State of Michigan Multi-Use trails, on the eastern side of the Forest .

Road managementRecreation management
Scoping Start
04/11/2012
Comment Period
09/05/2012
Decision
12/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Susanne Adams · smadams@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Road Improvements/Construction; Travel Management
Eastern Off-Highway Vehicle Connector Route ProjectDecision Signed Date: 12/12/2012 (Reversed in Appeal (215)) Legal Notice Date: 12/17/2012
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Decision Memo · Ottawa National Forest All Units · updated 10/18/2012
Ottawa National Forest, Gogebic County, Michigan · Gogebic, Michigan

Enbridge Energy is seeking to perform maintenance on a section of pipeline that crosses under the Cisco Branch Ontonagon River (Recreational), a congressionally designated Wild and Scenic River (WSR).

Special use management
Scoping Start
05/22/2012
Comment Period
05/22/2012
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Michael Jacobson · mjacobson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOttawa National Forest All Units
Legal Land DescriptionTownship 45N Range 41W Section 11
Decision Memo · Iron River Ranger District · updated 4/7/2011
Road off Forest Highway 16, west of East Paint Lake · Iron, Michigan

Reissue King Permit to Kinsey for use of existing non-system road

Special use management
Scoping Start
10/19/2007
Decision
11/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Kinsey Special Use, East Paint Lake AccessDecision Signed Date: 11/30/2009
ForestsOttawa National Forest
DistrictsIron River Ranger District
Legal Land DescriptionT46N, R37W, Section 36 SW1/4 SW1/4
Decision Memo · Watersmeet Ranger District · updated 3/31/2010
Driveways are located on the north side of County Line Lake. · Ontonagon, Michigan

Proposal is to issue new special use permits to four landowners for access to private property. Driveways are existing and have been in place for many years.

Special use management
Scoping Start
10/22/2009
Decision
02/2010 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
County Line Lake AccessDecision Signed Date: 02/17/2010
ForestsOttawa National Forest
DistrictsWatersmeet Ranger District
Legal Land DescriptionT46N, R40W, Section 35, NWSW
Decision Memo · Ontonagon Ranger District · updated 12/31/2009
Appx. 13 miles north of Hwy M-28 and Trout Creek, MI or 13 miles south of Mass City, MI off Gardner Tower Road or 13 miles south of Mass City, MI · Ontonagon, Michigan

Access via Forest Road 859 has been requested to continue into private property as a reissued special use permit.

Special use management
Scoping Start
03/03/2009
Decision
11/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
Dawn Buss-Glodowski · dbussglodowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsOttawa National Forest
DistrictsOntonagon Ranger District
Legal Land DescriptionT49N R38W Sections 19 and 20
Decision Memo · Watersmeet Ranger District · updated 12/30/2009
New lines located in the ROW of Hwy. 64, U.S. 2 and U.S. 45 · Gogebic, Michigan

Proposal is to install buried fiber optic line in cleared road right-of-ways between Marenisco, MI & North Land O'Lakes, MI. Existing permit areas will also be reissued under the same permit.

Special use management
Scoping Start
06/29/2009
Decision
10/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Michelle Holland · mholland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
U.P. Telephone New Fiber Optic Line and Existing Line ReissuanceDecision Signed Date: 10/19/2009
ForestsOttawa National Forest
DistrictsBessemer Ranger District; Watersmeet Ranger District
Legal Land DescriptionT46N, R43W, S. 15,14,13; T46N, R42W, S. 20,25; T46N, R41W, S. 31,32; T45N, R41W, S. 5,4,9,16,15; T45N, R40W, S. 21,26,25; T45N, R39W, S. 30,29,27,34; T44N, R39W, S. 3,9
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/51517 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/51517
Bergland Ranger District

Reissuance of 23 permits across the North Zone of the Ottawa, 20 on the Kenton RD, 2 on the Ontonagon RD and 1 on the Bergland RD

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/39675 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/39675
Bergland Ranger District

Continued access has been requested to private land via Forest Service land.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/58005 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/58005
Bergland Ranger District

The Michigan DNR is rerouting a segment of the NCT within the Porcupine Mountains Wilderness State Park. To reconnect this rerouted segment back to the adjacent NCT segment on the Ottawa, there is a need to construct a new segment.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/53581 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/53581
Bergland Ranger District

Construct a new section on Snowmobile Trail 8, so as to bypass a sharp blind corner trail section. Oncoming snowmobiles as well as the groomer cannot be seen by users when approaching this corner. Trail safety would be improved with this proposal.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/67094 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/67094
Bergland Ranger District

The South Branch Ontonagon River is popular with canoeists and kayakers. Currently there are limited sites to access the river especially for users desiring shorter distances between existing landings.

Recreation management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/39681 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/39681
Bergland Ranger District

Continued access has been requested to private land beginning on FR 511 and an un-named portion of travelway on Federal land.

Special use management
Detail fetch failed: failed to fetch https://www.fs.usda.gov/r09/ottawa/projects/38891 after 3 attempts: 500 Server Error: 500 Service unavailable (with message) for url: https://www.fs.usda.gov/r09/ottawa/projects/38891
Bergland Ranger District

Trans Superior Resources, Inc is proposing to prospect for metallic minerals that are considered federal minerals located on National Forest System lands. The company will be looking for gold, platinum, nickel, and cobalt.

Minerals and geology