Environmental Assessment · Cedar City Ranger District · updated 5/14/2026
Cedary City Ranger District. Garfield, Iron and Kane Counties, Utah. · Garfield; Iron; Kane, Utah
This project proposes pinyon and juniper removal designed specifically to maintain and/or improve vegetative resilience, improve wildlife habitat, and reduce the risk of high intensity and high severity wildfires to public and firefighters.
Fuels managementVegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
NEPA Start Date
11/19/2021
Finding/Decision Date
2/14/2023
Project documents
NEPA / regulatory detail
| Decision Signed Date | 2/14/2023 |
Decision Memo · Pine Valley Ranger District · updated 5/30/2025
Various riparian corridors throughout the District. See attached maps. · Iron; Washington, Utah
The goal of the project is to install fencing around six riparian areas to force livestock to disperse, establish the ability to graze the fenced areas in a more controlled manner, and over time improve riparian health.
Wildlife, fish, rare plantsGrazing managementWatershed management
Decision
05/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Several located throughout the District, see maps. |
Decision Memo · Powell Ranger District · updated 4/17/2025
Robinson Canyon 3 miles East of Alton, UT · Kane, Utah
Kane County has applied for a 50ft right way within Robinson Canyon and proposes to convert the Robinson Canyon nonmotorized trail to a motorized trail limited to vehicles less than 50 inches in width.
Recreation management
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Valley Ranger District · updated 3/13/2025
Occur approximately 1.5 miles NW of the Town of Pinto in the NE quarter of T37S R15W section 28. Also reconfigure the intersection of Cove Mountain Road (FSR 30343) and the Pinto Road (FSR 30009). · Washington, Utah
Re-route Forest Service Route (FSR) 30343 in two different locations. Re-route intersection of FSR 30343 and FSR 30009 due to inadequate sight distance. Re-route around the riparian area to decrease sediment into streams and create road stability.
Road management
Decision
03/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 2/21/2025
In the vicinity of 820 North Main Street, Cedar City Utah, a continuation of the current 100 east road alignment. · Iron, Utah
Proposal to issue Cedar City a FRTA easement for a transportation corridor across National Forest System (NFS) lands and issue all other appurtenant special use permits for construction of the road and other uses within the easement corridor.
Special use management
Decision
02/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 12/16/2024
Approximately 2 miles east of the town of Duck Creek along Forest Service Road FS 30064 between Utah State Hwy 14 and the Mammoth Creek Road (FH50). · Garfield; Kane, Utah
Project would authorize creation of 26 additional designated dispersed camp sites, 0.16 miles of system roads, and 4 vault toilet/kiosk/fee tube areas within the 2011 Decision project area. Project would also authorize closing 22 existing sites.
Recreation management
Decision
12/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T 38 S, R 7 W, Sections 1, 10, 11, 14, and 15, and T 37 S, R 7 W, Sections 23, 26, and 36 |
Decision Memo · Pine Valley Ranger District · updated 11/5/2024
Close to Pine Valley Ut · Washington, Utah
Pine Valley Irrigation Company is requesting a reissuance of their special use permit. In addition, they propose to construct a well, pump house, pipeline, and a power line.
Special use management
Decision
11/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Sections 22 and 24, T. 39 S., R. 15 W., SLB&M |
Decision Memo · Cedar City Ranger District · updated 9/23/2024
The Cooper Knoll and Haycock Peak area in Garfield County, Utah. Approximately, 0.4 miles east of Panguitch Lake. · Iron, Utah
The proposed project would improve forest health and resiliency across 2,937 acres by removing mistetoe infected, as well as insect infested, trees and thinning overstocked stands using sanitation harvest, commercial thinning, and prescribed fire.
Vegetation management (other than forest products)
Decision
09/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T35S R6W Sections 19, 20, 29, 30, 31, 32 T35S R7W Sections 25, 34, and 35 T36S R7W Sections 1, 2, 3, 10, 11, 12, 13, and 14 |
Decision Memo · Pine Valley Ranger District · updated 9/17/2024
Forest Service Road (FSR) 033 from the private boundary north of the Blake-Gubler Trailhead south to the FSR 031 intersection and spur FSR 322.. · Washington, Utah
The purpose of creating a fuel break is to increase community safety, create defensible safe space for firefighting personnel, and increase the likelihood of effective fire suppression in the event of a wildfire.
Fuels management
Decision
08/2024 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 8/27/2024
East of the Johns Valley road, North of South Creek and running roughly parallel to Forest Service road 133. · Garfield, Utah
Construct a 3.2 mile, four strand barbed wire fence that would restrict livestock movement between pastures, thereby maintaining more desirable and even livestock utilization rates. This will improve forage production for big-game wildlife.
Wildlife, fish, rare plantsGrazing management
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements; Grazing Structural Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T34S, R2W, Sections 25&26 /T34S, R1W, Section 31 |
Decision Memo · Cedar City Ranger District · updated 8/16/2024
Township 35S Range 7W Sections 32 and 33 and Township 36S Range 7W Section 6 · Kane, Utah
The project would bury 1.7 miles of single, non-electric fiber optic cable in duct conduits in a 10 foot (2.1 acres) Right of Way and 15 foot (3.1 acres) construction Right of Way, 1.2 acres and 1.7 acres of which are on Forest Service lands.
Special use management
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Dixie National Forest All Units · updated 7/26/2024
This Decision could be applied throughout the Dixie National Forest with the exception of designated Wilderness and Research Natural Areas. · Garfield; Iron; Kane; Washington, Utah
Dixie NF is proposing a forest-wide prescribed fire project to reduce the risk of uncharacteristic wildfire, increase resilience of existing vegetation groups and improve ecological function in native vegetation communities and wildlife habitats.
Watershed managementFuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
11/22/2022
Objection Period Start
08/25/2023
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pine Valley Ranger District · updated 6/21/2024
Approximately 181,575 acres of the Pine Valley Ranger District are under review for treatments including approximately 101,765 acres in IRA outside of wilderness areas. · Iron; Washington, Utah
The intent of this project is to improve habitat conditions for wildlife species associated with sagebrush and pinyon-juniper communities and to trend the existing habitat conditions to meet desired conditions established by the Forest Plan.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Comment Period
10/16/2022
Objection Period Start
09/2023 (Estimated)
Decision
10/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Rangeland Vegetation Improvements |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cedar City Ranger District · updated 3/21/2024
Approximately 2 miles east of the town of Duck Creek along Forest Service Road FS 30064 between Utah State Hwy 14 and the Mammoth Creek Road (FH50). · Garfield; Kane, Utah
Duplicate project entry. See project 65864.
Recreation management
Scoping Start
04/2024 (Estimated)
Comment Period
05/2024 (Estimated)
Decision
11/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T 38 S, R 7 W, Sections 1, 10, 11, 14, and 15, and T 37 S, R 7 W, Sections 23, 26, and 36 |
Environmental Assessment · Cedar City Ranger District · updated 3/5/2024
North of State Highway 143, approximately 4.5 miles southwest of Panguitch Lake. · Iron, Utah
The project will analyze authorizing livestock grazing on 663 acres in Castle Valley consistent with the Dixie National Forest Land and Resources Management Plan (LRMP) and subsequent land management designations made in 2020.
Grazing management
Comment Period
09/20/2023
Objection Period Start
12/06/2023
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T38S, R8W, Sections 15, 16, 22, and 23 |
Environmental Assessment · Powell Ranger District · updated 12/21/2023
The project area is located approximately ten miles east of Panguitch in Southern Utah. The elevation in the project area ranges from 8,680 to 8,020 feet. · Garfield, Utah
The Forest Service proposes to develop one well and a water conveyance system located on National Forest System lands to feed water troughs on approximately 43,230 acres.
Grazing management
Comment Period
12/15/2022
Objection Period Start
03/17/2023
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T35S R4W 1, T35S R4W 2, T35S R4W 3, T35S R4W 4, T35S R4W 9, T35S R4W 11, T35S R4W 12, T35S R4W 13, T35S R4W 16, T35S R3W 17, T35S R3W 18, T35S R3W 19, T35 |
Environmental Assessment · Pine Valley Ranger District · updated 11/27/2023
Iron County and Washington County, about 2 miles northwest of Enterprise · Iron; Washington, Utah
Collaborative analysis for continued wild horse management in southern Utah lands administered by USDI Bureau of Land Management and USDA Forest Service-Dixie National Forest.
Grazing managementSpecial area management
Comment Period
07/16/2018
Objection Period Start
07/31/2019
Decision
11/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements; Rangeland Vegetation Improvements; Special Area Management; Grazing Structural Improvements |
| North Hills Wild Horse Joint Management Area Plan and Gather Plan | Decision Signed Date: 11/05/2019 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Township 37 South, Range 18 West, sections 1-5 and 7-36 and Range 1 Salt Lake Base and Meridian |
Decision Memo · Pine Valley Ranger District · updated 11/1/2023
Pine Valley to Pinto, Pinto to New Castle, Pine Valley Campground%u200B · Washington, Utah
These lines provide electrical service to businesses, residences, Washington County and Forest Service facilities. Re-issue and response to the application from Dixie Power would allow for the continuation of service.
Special use management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Section 30 T 38 S R 14 W |
Decision Memo · Fremont River Ranger District · updated 9/26/2023
The analysis area, where management activities are proposed, would take place on the Teasdale portion of the Escalante Ranger District of the Dixie National Forest (administered by the FNF) · Garfield, Utah
The Fishlake National Forest proposes the installation of a up to two fish passage barriers on Pleasant Creek Ditch to protect Colorado River cutthroat trout. The barriers will be constructed from boulders on site.
Wildlife, fish, rare plants
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Dixie National Forest; Fishlake National Forest |
| Districts | Fremont River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 8/30/2023
This project proposes to place a communication line, and related structures within a new 10-foot wide (.16 acre) right-of-way (ROW) from Orderville to Bear Valley, contained within the Highway 89 corridor · Kane, Utah
The Dixie National Forest is analyzing a proposal from Arcadian Infracom, Inc. (Arcadian), for the installation of a fiber optic cable (communication line) and related facilities on approximately 683 linear feet of National Forest System Lands.
Special use management
Decision
08/2023 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 8/15/2023
Upper Valley area, north of Highway 12 and west of Forest Road 144 · Garfield, Utah
Treat a 52.5-acre parcel adjacent to the Upper Valley Landscape Improvement Project using the same treatment prescription analyzed in the Upper Valley Landscape Improvement Environmental Assessment.
Forest productsVegetation management (other than forest products)Fuels management
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Valley Ranger District · updated 6/6/2023
Both systems are located on the Pine Valley Ranger District, Dixie National Forest, and are approximately 6 miles north of New Harmony, Utah, along Forest Road 30029, near Grants Ranch. · Iron; Washington, Utah
The proposed action is to issue a special use permit to Monarch Investment Company, LLC, authorizing the operation and maintenance of the two existing water systems. No new construction would be authorized.
Special use management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Monarch Investments LLC - Stucki Water System | Decision Signed Date: 05/10/2023 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Sections 25 and 26, T. 37 S., R. 14 W and Section 36, T. 37 S., R. 14 W., SLM, Iron County, Utah; and Section 36, T. 37 ? S., R. 14 W., Salt Lake Base Meridian |
Decision Memo · Escalante Ranger District · updated 5/24/2023
Escalante Ranger District, Forest Road 143. The Lower Box trailhead. · Garfield, Utah
The purpose of this project is to provide a designated parking area for a popular trail known as the Box. This hike is in the Pine Creek drainage of Box-Death Hollow Wilderness Area.
Special area managementRecreation management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Wilderness Management |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T34S R2E Sect 12 |
Decision Memo · Cedar City Ranger District · updated 10/14/2022
Indian Hollow stream near the confluence with Delong Creek. · Garfield, Utah
The Indian Hollow Road Reroute project proposes to reroute Forest Service Route 30085 from the Indian Hollow stream and riparian area to an existing roadbed that is currently closed. A damaged bridge would be replaced at the new road location.
Wildlife, fish, rare plantsWatershed managementRoad management
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T34S R6W Section 17 & 18 |
Environmental Assessment · Cedar City Ranger District · updated 5/5/2022
The collection system is located approximately seven miles west-northwest of Panguitch City, in Southern Utah. · Garfield; Iron, Utah
The purpose of this action is to issue a valid permit to the City of Panguitch for their current municipal water collection and conveyance system located on USFS lands.
Special use management
Comment Period
10/08/2021
Objection Period Start
03/06/2022
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T 34 S., R 7W section 13 and T24 S., R 6W Sections 16-18, 21 & 27. |
Decision Memo · Dixie National Forest All Units · updated 5/4/2022
Approximately 20 miles east of Cedar City, Utah near State Highway 148. The elevation is at approximately 10,000 feet on the Markagunt Plateau. · Iron, Utah
Salvage of dead Engelmann spruce trees on up to 250 acres of Forest Service System lands using 1/2 miles of temporary road. Slash would be available for fuelwood or burned and tree planting would follow if needed.
Forest products
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 4/4/2022
Approximately 1 mile southwest of Mammoth Creek, Utah. The elevation is at approximately 8,300 feet on the Markagunt Plateau. · Garfield, Utah
Burned Ponderosa Pine salvage using tractor logging and mechanical harvest equipment. Excess logs and landing slash material would be available for fuelwood or biomass product removal and burned at landings.
Forest products
Decision
03/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pine Valley Ranger District · updated 2/18/2022
The proposed Spring Hollow Network is situated to the north of St. George, Utah and the Red Cliffs Reserve. The proposed Grass Valley Network is situated to the northwest of Pine Valley, Utah. · Washington, Utah
The Dixie National Forest proposes to construct two non-motorized mountain biking trail networks in the Pine Valley Ranger District.
Recreation management
Comment Period
08/19/2020
Objection Period Start
12/10/2021
Decision
02/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Valley Ranger District · updated 12/23/2021
Washington County, State of Utah. · Washington, Utah
An exchange of three right-of-way segments between the Forest Service and M and M Revocable Trust. The owners have two private inholdings surrounded by FS land and their desire is to acquire access.
Special use managementLand acquisition
Decision
12/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | M&M to U.S. For Rd.30837, in S. 22, T. 38 S., R. 15 W. -Rd. 30835, in S. 26, T. 38 S., R. 15 W. from U.S. to M & M for Rd. 30835, in S. 26 & 35, T. 38 S., R. 15 W. |
Decision Memo · Dixie National Forest All Units · updated 10/12/2021
35 existing communication sites across the DNF · Garfield; Iron; Kane; Washington, Utah
The Communication Sites are located throughout Dixie National Forest.They include existing Communication Site Designations, Site Plans and inspection records, Site NEPA, and follow National and Forest Plan goals and directives.
Special use management
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 10/12/2021 |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 9/17/2021
The project area is located about 30 miles southeast of Cedar City, UT, near Duck Creek. · Iron, Utah
Vegetation treatment and harvest of trees affected and stands threatened by insect and disease and wildfire potential.
Vegetation management (other than forest products)
Decision
07/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T38S R7W Sections 17-20, and 21; T38S R8W Sections 13-15, 22-27, 35-36 and T39S R8W Section 1 of the Salt Lake Base and Meridian |
Decision Memo · Cedar City Ranger District · updated 9/2/2021
South of Panguitch Lake, UT · Garfield, Utah
Placement of a fiber optic line on the south side of Panguitch Lake. Line will be trenched in below ground.
Special use management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 8/6/2021
Approximately 32 miles NW of Escalante, Utah. · Garfield, Utah
There is a need to limit the grazing along a section of Antimony Creek on the Coyote Allotment in order to maintain and improve wildlife and fish habitat along Antimony Creek.
Wildlife, fish, rare plantsGrazing management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T31S R1W, Sections 35 and 36; and T32S R1W Section 1 |
Decision Memo · Dixie National Forest All Units · updated 7/14/2021
Forestwide · Garfield; Iron; Kane; Washington, Utah
Special Use Permit Authorization and Renewal for Outfitter/Guides
Special use management
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11); 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 5/17/2021
Boulder Town, Utah · Garfield, Utah
Approval to re-locate and drill the Boulder Farmstead culinary well 45 feet away from existing location due to the silting in of the original well.
Special use management
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | S23 T33S R4E |
Decision Memo · Escalante Ranger District · updated 3/19/2021
Coyote Hollow Allotment, Pacer and Antimony Creek Pastures · Garfield, Utah
The purpose of this project is to improve wildlife habitat by increasing livestock distribution on the Coyote Hollow allotment. There is a need to add & bury eight miles of water pipeline and a solar pump through the Pacer and Antimony Creek pastures
Wildlife, fish, rare plantsGrazing management
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T32S R1W sections 2,3,4,10,11,12,13, and T32S R1E section 18 |
Decision Memo · Cedar City Ranger District · updated 2/19/2021
Watersheds: 6th Field HUCs, Summit Creek, Dry Lakes Creek, Ashdown Creek · Iron, Utah
The Cedar City Ranger District, Dixie National Forest, proposes treatment of approximately 135 acres to restore the health and vigor of aspen stands.
Wildlife, fish, rare plants
Decision
02/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T 36 S R 9 W Sections 10,11,14,15 |
Decision Memo · Escalante Ranger District · updated 2/18/2021
Upper Valley, south of Highway 12 and north of Canaan Peak. · Garfield, Utah
In 2017 the Dixie NF signed a DN/FONSI for the Upper Valley Landscape Improvement Project. Three guzzlers were scoped and analyzed but not carried to the decision due to no cultural surveys for the guzzler locations. SHPO concurrence is now complete.
Wildlife, fish, rare plants
Decision
02/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T37S R1E Sect 4 and T36S R1E Sections 35 and 36 |
Decision Memo · Powell Ranger District · updated 2/10/2021
Treatment areas are all on the Paunsaugunt Plateau beginning approximately 14 miles southwest of Bryce Canyon City, UT and extending south. · Kane, Utah
This project would maintain and improve the status of the Paunsaugunt boreal toad population and other key wildlife species by increasing the availability of woody browse, such as aspen, adjacent to current, historic and potential use areas.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Valley Ranger District · updated 1/29/2021
The water improvements would be on FS land within the North Hills Wild Horse Joint Management Area, 2 miles northwest of Enterprise, Utah. · Iron; Washington, Utah
The project would provide additional water resources (one guzzler and two water catchments) to improve the distribution of wild horses and increase forage availability throughout the North Hills Joint Management Area.
Grazing management
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| North Hills Wild Horse Water Development Project Decision Memo | Decision Signed Date: 12/14/2020 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T 36 S., R. 18 W, sections 14, 21-22 and 36 |
Environmental Assessment · Cedar City Ranger District · updated 12/7/2020
Pass Creek Watershed, a tributary of the Sevier River System, approximately 1.5 miles due east of Panguitch Lake. Located on FSR 070 approximately 1.2 miles south of the junction with State Hwy 143. · Garfield, Utah
This project would drill a well in the Pass Creek area to provide water to wildlife and livestock in the area. A well will replace the current spring box and be attached to existing pipelines and tanks.
Wildlife, fish, rare plantsGrazing management
Comment Period
04/27/2020
Objection Period Start
07/11/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T36 S. R 7 W., section 2 |
Environmental Assessment · Escalante Ranger District · updated 9/25/2020
The project area includes the grazing allotments Boulder, Sand Creek and West Deer Creek. · Garfield, Utah
The purpose of this project is to continue to authorize livestock grazing in a manner that will continue to meet or satisfactorily move Dixie National Forest resources toward desired condition and meet Forest Plan objectives.
Grazing management
Scoping Start
03/2017 (Estimated)
Comment Period
07/2017 (Estimated)
Objection Period Start
10/2017 (Estimated)
Decision
11/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 9/23/2020
Off State Route 12 approximately 9 miles north of Boulder, UT, between trail numbers 34015 and 34016. · Garfield, Utah
Develop a new trail connector between the Chriss Lake and Deer Creek Trails. This will provide users with the option of a loop trail.
Recreation management
Scoping Start
10/2013 (Estimated)
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
Decision Memo · Dixie National Forest All Units · updated 8/31/2020
Activities would occur throughout the Dixie National Forest as permitted. · Garfield; Iron; Kane; Washington, Utah
Dixie National Forest Outfitter Guide Special Use Priority Permits. Issuance of priority permits to outfitter guides that have previously operated on the DNF.
Special use management
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 8/31/2020
The permits would be re-authorized throughout the DNF. · Garfield; Iron; Kane; Washington, Utah
Re-issuance of Special Use Permits throughout the Dixie National Forest.
Special use management
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 8/29/2020
Escalante District - Hogback to Boulder, Cedar City Ranger District - near Panguitch Lake · Garfield, Utah
South Central Communications requests a right of way permit to place fiber optic cable from Hogback to Boulder on the Dixie National Forest. The line would primarily follow an existing road corridor and be trenched underground.
Special use management
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 8/28/2020
Guides would operate throughout the Dixie National Forest where permitted. · Garfield; Iron; Kane; Washington, Utah
Outfitter/Guide Special Use Permit Re-issuance
Special use management
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 6/10/2020
T35S R1E Section 13 and 24; and T35S R2E Sections 7-8, and 14-23 · Garfield, Utah
Proposed Project Description: approximately 3,000 acres in the Dixie National Forest-Escalante Ranger District would receive vegetation treatments to improve forest health, reduce the threat of insect disease, and reduce fire threat and risk.
Watershed managementForest productsFuels managementVegetation management (other than forest products)
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 3/5/2020
Escalante, Powell and Cedar City Ranger Districts · Garfield; Iron, Utah
Reissue priority permits and issue new permits for outfitting and guiding.
Special use management
Scoping Start
01/2014 (Estimated)
Decision
01/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District; Powell Ranger District; Escalante Ranger District |
Environmental Impact Statement · Powell Ranger District · updated 2/25/2020
Powell Ranger District · Garfield; Kane; Piute, Utah
The Powell Ranger District of the Dixie National Forest is proposing to revise its system of motorized roads and trails. Some of the activities are proposed in Inventoried Roadless Areas.
Road management
NOI in Federal Register
01/08/2015
DEIS NOA in Federal Register
01/2020 (Estimated)
FEIS NOA in Federal Register
03/2020 (Estimated)
Objection Period Start
03/2020 (Estimated)
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Secretary/Undersecretary Approval |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Road Improvements/Construction; Travel Management |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Escalante Ranger District · updated 2/14/2020
The project is located approximately 19 miles north of Escalante, Utah on land surrounding Jacobs Reservoir. · Garfield, Utah
This project proposes to address forest health at both the stand and landscape level to maintain and enhance ecosystem function, watershed characteristics, visual aesthetics, recreational and implementation of the motorized travel plan.
Watershed managementVegetation management (other than forest products)Recreation management
Comment Period
12/07/2018
Objection Period Start
06/21/2019
Decision
02/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Scenery Management; Travel Management; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 12/10/2019
Project occurs primarily in the Asay Creek watershed. Sub-watersheds associated with this project are: Upper Mammoth Creek, Midway Valley-Midway Creek, Tommy Creek, and Deer Valley-Midway Creek. · Iron, Utah
Proposed Project Description: approximately 2,988 acres in the Dixie National Forest-Cedar City Ranger District would receive vegetation treatments to improve forest health, reduce the threat of insect disease, and reduce fire threat and risk.
Vegetation management (other than forest products)
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cedar City Ranger District · updated 12/10/2019
Located within Iron and Garfield County Utah. The project boundary extends from the town of Brian head East to Panguitch Lake and Highway 143 North towards Upper Bear Valley. · Garfield; Iron, Utah
In the summer of 2017 the Brian Head fire burned more than 71,000 acres of private, state, and federal land. This project focuses on rehabilitation for the burned area and areas immediately adjacent.
Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Comment Period
12/20/2017
Objection Period Start
05/12/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Facility Maintenance; Trail Management; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 12/10/2019
Located within Iron and Garfield County Utah. The project boundary extends from the town of Brian head East to Panguitch Lake and Highway 143 North towards Upper Bear Valley. · Garfield; Iron, Utah
This project will strive to improve public health and safety and natural resource conditions impacted by the Brian Head fire while continuing to promote multiple use management.
Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | Not Applicable / Other; National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Facility Maintenance; Trail Management; Roadless Area Management; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 12/10/2019
Intersection of SH 14 & SH 148. · Washington, Utah
The UDOT operates a transportation storage and maintenance facility on lands administered by the Dixie National Forest. Current permit is up for re-issuance. The UDOT is requesting permission to build two Snow Cat storage buildings.
Special use management
Decision
07/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cedar City Ranger District · updated 12/10/2019
Approximately 8 miles north of Duck Creek Village, Utah. · Garfield, Utah
Treat forest vegetation ground, ladder and crown fuels in areas surrounding private subdivisions in order to enhance fire prevention and fire control.
Vegetation management (other than forest products)Fuels management
Comment Period
02/10/2015
Objection Period Start
08/18/2015
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Decision Notice and FONSI for the Henrie Knolls North Vegetation Treatment | Decision Signed Date: 10/02/2015 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T36S,R8W,Secs 25-27,36; T36S,R7W,Secs 20,29-34; T37S,R8W,Secs 1,2 ;T37S, R7W,Secs 3-10,13-17,20-23,27-33; SLB&M. |
Decision Memo · Cedar City Ranger District · updated 12/10/2019
Cedar City Ranger District of the Dixie National Forest in Iron and Garfield County, Utah. The project area is located southeast of Brian Head, Utah and northwest of Panguitch Lake along Highway 143 and Forest Service Road 050 · Garfield; Iron, Utah
Salvage of merchantable dead Ponderosa Pine, Fir and Spruce that were burnt in wildfire. Salvage areas are in close proximity of the roadway and may pose a safety hazard. They also have economic value before they succumb to insect and disease.
Forest products
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T35S, R08W, Sections 25, 26; T36S, R08W, Sections 25, 26; and T36S, R07W, Section 30 |
Environmental Assessment · Cedar City Ranger District · updated 12/10/2019
Approximately 3 miles west and northwest of Long Valley Junction, UT. · Kane, Utah
The main purpose of this project would be to reduce the susceptibility of healthy ponderosa pine stands to bark beetle infestation. A secondary purpose would be to improve VSS composition by moving towards an un-even aged system creating VSS1 stands.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels management
Comment Period
01/19/2017
Objection Period Start
11/03/2017
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Rangeland Vegetation Improvements; Timber Sales (Green); Watershed Improvements |
| Ikes Valley Vegetation Improvement Project | Decision Signed Date: 01/02/2018 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T37S, R7W; T37S, R6W; T38S, R7W; T38S R6W, SLB&M |
Environmental Assessment · Cedar City Ranger District · updated 12/10/2019
Approximately 30 miles southeast of Cedar City, Ut. · Kane, Utah
Within the 8,062-acre Shingle Fire area, the following activitiesare proposed: salvage logging (1085 ac), soil stabilization/site prep/reforestation (6,351 ac.),
Forest productsVegetation management (other than forest products)Watershed management
Comment Period
07/13/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage); Watershed Improvements |
| DN/FONSI Shingle Fire Salvage and Restoration | Decision Signed Date: 09/26/2013 Legal Notice Date: 10/02/2013 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Parts of T38S, R7W; T38S, R6W; T39S, R7W; T39S, R6W; SLB&M |
Decision Memo · Cedar City Ranger District · updated 12/10/2019
all or parts of Township T36S R7W Section 31; T36S R8W Sections 5-10 and 15-36; T36S R9W Sections 11-14, 24-25 and 36; T37S R7W Section 6; T37S R8W Sections 1-6, 8-9 and 12; T37S RS.SW Sections 1-2 and 12, SLB&M. · Iron, Utah
The purpose of this project is to (1) improve forest health (2) reduce the threat of insect-induced forest mortality and to (3) increase forest wildfire resilience
Vegetation management (other than forest products)Fuels management
Decision
11/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Upper Mammoth Creek Farm Bill Categorical Exclusion | Decision Signed Date: 11/18/2016 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 11/19/2019
The proposed hut locations are within the administrative boundary of the Dixie National Forest, Powell and Escalante Ranger Districts, in Garfield County, Utah. See scoping notice for map. · Garfield, Utah
The DNF, Powell and Escalante Ranger Districts received a request from Escape Adventures, Inc. to continue their guiding activities and to install four (4) non-permanent huts.
Recreation management
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T35 S. R. 4 W., Sect 32; |
Environmental Assessment · Pine Valley Ranger District · updated 9/18/2019
Grassy Creek Watershed, Washington County, Utah · Washington, Utah
The Grass Creek Watershed was selected as a project area for NFMA analysis due to its departure from a healthy functioning ecosystem. Analysis will focus on fire restoration, fuels reduction, aspen regeneration, and biodiversity.
Vegetation management (other than forest products)Watershed managementFuels management
Comment Period
04/30/2018
Objection Period Start
06/08/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Rangeland Vegetation Improvements; Travel Management; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T38S R14W Sections 8-10, 14-17, 19-23, 26-36; T38S R15W Sections 25-26, 35-36; T39S R14W Sections 1-12, 14-20; T39S R15W Sections 1-2, 10-15 |
Environmental Assessment · Cedar City Ranger District · updated 9/10/2019
Approximately 6 miles northeast of Duck Creek Village, UT. · Garfield; Kane, Utah
Vegetation treatments to improve habitat and veg conditions
Fuels managementWildlife, fish, rare plants
Comment Period
07/20/2014
Objection Period Start
06/05/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements |
| DN/FONSI for Sawyer Point Vegetation Treatment Project | Decision Signed Date: 07/23/2015 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T37S, R6W, Sec 31-34; T38S, R6W, Sec 3-6. |
Decision Memo · Pine Valley Ranger District · updated 7/12/2019
Town of Pinto, UT, T37S, R15W, Section 27, Salt Lake City Baseline and Meridian in Washington County · Washington, Utah
The Pine Valley Ranger District proposes maintenance of the water table on Pinto Creek and restoration of stream channel character along 0.4 miles of Pinto Creek using standard stream restoration practices to restore stream channel morphology.
Watershed management
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 4/19/2019
The permitted area would include fishable waters (creeks and lakes) of the Escalante and Fremont River Ranger Districts of the Dixie National Forest and Fishlake National Forest. · Garfield; Wayne, Utah
Escalante Outfitters has requested a Special Use Permit to conduct guided fishing activities on the Dixie and Fishlake National Forests in Garfield and Wayne Counties. They have been operating on an annual basis since 2007.
Special use management
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pine Valley Ranger District · updated 4/12/2019
Located along the Pinto Road area of Pine Valley RD · Iron; Washington, Utah
WUI fuels reduction, winter range enhancement, grass and forbe diversity improvement, and watershed improvement to reduce TMDL to Newcastle reservoir.
Watershed managementHeritage resource managementVegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Comment Period
10/06/2017
Objection Period Start
02/16/2018
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Roadless Area Management; Scenery Management; Watershed Improvements |
| Pinto Watershed and Defensible Fire Space Improvement Project Decision | Decision Signed Date: 04/03/2019 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T37S R13W, T37S R14W, T37S R15W, T37.5S R14W, T38S R14W, and T38S R15W of the Salt Lake Base and Meridian. |
Decision Memo · Pine Valley Ranger District · updated 1/29/2019
The project area is an existing mineral pit located at mile 28.3 on Utah State Highway 18. It is accessed by Forest Service Road 33422 in Washington County. The pit is in T38S, R16W, Section 34. · Washington, Utah
Request from Utah Department of Transportation to use mineral materials as shouldering material to flatten steep slopes along Utah State Highway 18. Material has been requested for use from the California Hollow Minerals Material Pit.
Minerals and geology
Decision
01/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T 38 S R 16 W Section 34 |
Decision Memo · Dixie National Forest All Units · updated 11/8/2018
820 North Main Street, Cedar City, UT 84721 · Iron, Utah
The project would occur at an administrative site currently owned by the Forest Service in downtown Cedar City, UT. Old Forest Service facilities would be taken down to provide space for a new administrative office for the Forest Service.
Facility management
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Facility Maintenance |
| Decision Decided Date | 11/08/2018 |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Escalante Ranger District · updated 11/7/2018
Upper Valley Allotment, Lacey Cove Pasture · Garfield, Utah
The purpose of this project is to improve wildlife habitat by increasing livestock distribution on the Upper Valley West Allotment. There is a need to add three miles of water pipeline to the end of the existing pipeline in Lacey Cove pasture.
Grazing managementWildlife, fish, rare plants
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T36S R1W sections 13 and 24, and T36S R1E sections 18 and 19 |
Decision Memo · Dixie National Forest All Units · updated 11/5/2018
Lot 8, Big Mountain Communication Site, Washington County, UT · Washington, Utah
Construction, operation and maintenance of a communication facility to provide more reliable communication for T-Mobile customers. Construction would occur on Big Mountain Communication Site on the Dixie National Forest, Pine Valley Ranger District.
Special use management
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Lot 8, Big Mountain Communication Site Section 4, T. 38 S., R. 16 W., SLB&M, Washington County, UT |
Decision Memo · Powell Ranger District · updated 8/9/2018
The natural waterfall to be improved is on Deep Creek less than 0.1 miles upstream from the Forest boundary (T32S, R3W, Section 12: Map A and Map B) Salt Lake City Baseline and Meridian in Garfield County · Garfield, Utah
Reinforcement of a natural waterfall to create a fish barrier that will aid in the restoration of Bonneville cutthroat trout.
Wildlife, fish, rare plants
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T32S, R3W, Section 12 |
Environmental Assessment · Powell Ranger District · updated 8/9/2018
Powell Ranger District of the Dixie National Forest · Garfield, Utah
The purpose of the South Central Utah Telephone Association Special Use Project is to improve communication in the project area, update the Association's permit and reissue their permit for a new term.
Special use management
Comment Period
02/25/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 7/19/2018
The Upper Midway Salvage Project analysis area is located approximately 20 miles east of Cedar City, Utah near the junction of State Highway 14 and 148. The project is located on the Markagunt plateau at an elevation of approximately 10,000 feet. · Iron, Utah
Salvage of 168 acres of dead (beetle killed) spruce using tractor logging, mechanical harvest equipment and whole tree removal. Slash would be available as biomass or fuel load. Slash at landing burned through a burn plan. Replanting if needed.
Forest products
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Biomass; Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T37S, R9W, within parts of Section 22, 23 and 26 |
Decision Memo · Escalante Ranger District · updated 6/22/2018
The project is located in rights-of-way administered by the National Forest Service, UDOT and private property, from the town of Boulder to the Boulder King Ranch Estates turnoff. · Garfield, Utah
South Central Communications is proposing to construct, operate and maintain a telecommunications system north of Boulder on Hwy 12. Project components include placement of fiber and installation of access vaults, needed for improved services.
Special use management
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T 33 S, R 4 E, sections 2,11,14 and 23 |
Decision Memo · Powell Ranger District · updated 5/29/2018
Ahlstrom Hollow · Garfield, Utah
The project area contains ponderosa pine and mixed conifer stands that are infected with dwarf mistletoe. The removal of approximately 331 trees infected with mistletoe will help promote a healthier regeneration of the understory.
Vegetation management (other than forest products)Forest products
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 5/29/2018
The project area is located east of Panguitch, north of Highway 12, and east of Johns Valley Road. · Garfield, Utah
Protect and restore sage-steppe habitats for the benefit of the threatened Utah prairie dog and the Forest Service sensitive sage-grouse. Restore watershed conditions to facilitate improved wildlife habitat effectiveness. Reduce encroaching conifers.
Wildlife, fish, rare plants
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T34S, R04W, Sections 32-35; T34S, R03W, Sections 31-34; T35S, R04W, Sections 1-36; and T35S, R03W, Sections 3-10, 15-19, 30 and 31. |
Decision Memo · Pine Valley Ranger District · updated 5/25/2018
Off the Veyo/Shoal Creek Road south of Racer Canyon · Washington, Utah
Installation of a corral on already disturbed soil pad to aid in range management.
Grazing management
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management |
| Bull Valley "H" Corral Decision Memo | Decision Signed Date: 04/20/2018 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Escalante Ranger District · updated 4/3/2018
The project is approximately 15 miles south of Antimony, Utah. The NFMA analysis covers most of the Ranch Creek-Sevier River sub-watershed and the Horse Creek drainage on the Escalante RD. · Garfield, Utah
The project purpose is to improve riparian health, stream functioning, and upland watershed health throughout the drainages for the benefit of Bonneville cutthroat and other wildlife species requiring riparian and upland habitat.
Wildlife, fish, rare plantsWatershed management
Comment Period
12/12/2017
Objection Period Start
02/03/2018
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T33S R1W, T33S R2W, T34S R1W, and T34S R2W |
Environmental Impact Statement · R4 - Intermountain Region All Units · updated 3/20/2018
This project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, Utah, and Nevada. · Beaver; Duchesne; Emery; Garfield; Iron; Juab; Millard; Piute; Sevier; Uintah; Wasatch; Weber, Utah
This proposed 600 kV direct current transmission line is designed to carry renewable energy (primarily wind power) from generation sources in central Wyoming to markets in in the pacific southwest
Special use management
NOI in Federal Register
01/04/2011
DEIS NOA in Federal Register
02/18/2011
FEIS NOA in Federal Register
01/13/2017
Objection Period Start
01/21/2017
Decision
05/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Transwest Express Transmission Project | Decision Signed Date: 05/31/2017 |
| Forests | Ashley National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Uinta-Wasatch-Cache National Forest |
| Districts | Roosevelt Ranger District; Pine Valley Ranger District; Fillmore Ranger District; Richfield Ranger District; Ferron Ranger District; Heber-Kamas Ranger District; Spanish Fork Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Dixie National Forest All Units · updated 3/16/2018
The general location is approximately one mile east of Duck Creek Village on the north side of Hwy 14 and the east side of Forest Highway 50. · Kane, Utah
Kane County, Utah submitted an application for Townsite Act conveyance, dated June 2, 2015 for approximately 69 acres. The main purpose is to acquire and expand the existing Forest Service sewer lagoons for the Kane County Water Conservancy District.
Land ownership management
Comment Period
10/18/2017
Objection Period Start
01/18/2018
Decision
03/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Boundary Adjustments; Land Exchanges |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T38S R7W Sect 9 |
Decision Memo · Pine Valley Ranger District · updated 2/23/2018
Pace to Benson-Approximately .29 acres south of SH 56 and west of Cedar City, UT. FTV to Level 3-Generally running parallel to the Kern River Pipeline NE of Enterprise, UT. · Washington, Utah
The purpose of this project is 1.reissue a previously authorized special use permit for a spring development with a new term to a new owner; and 2.reissue a previously authorized special use permit for a fiber optic line right of way to a new owner.
Special use management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| D1 Special Use permit issuance for 1. Benson, and 2. Level 3 | Decision Signed Date: 02/23/2018 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Powell Ranger District · updated 12/22/2017
T39S, R4W, S 3,5-10,17-19; T39S, R4.5W, S 1,12-14,23,24; T38S, R4W, S 33, SLB&M. · Kane, Utah
Purpose is to trend vegetation toward desired conditions per Forest Plan, reduce risk of stand-replacing fire, improve wildlife habitat condition, improve and maintain Meadow Canyon riparian ecosystem.
Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)Fuels management
Comment Period
11/08/2016
Objection Period Start
08/08/2017
Decision
12/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Roadless Area Management; Watershed Improvements |
| Deer Springs Ranch Fuels Reduction Project | Decision Signed Date: 12/20/2017 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 10/30/2017
Dixie National Forest southwestern, Utah · Garfield; Iron; Kane; Washington, Utah
Water rights, water usage, and water diversion has decreased the amount of available water for wildlife on the landscape. This project is to develop water sources on the Forest to provide for wildlife use and improve habitat suitability.
Wildlife, fish, rare plants
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Dixie National Forest |
| Districts | Dixie National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Escalante Ranger District · updated 10/25/2017
The proposed 16,855-acre Upper Valley Landscape Improvement Project project is located in Garfield County, Utah (UT) approximately 15 miles southwest of Escalante, UT. Access is via Utah Highway 12. · Garfield, Utah
The project would use prescribed fire and mechanical and hand vegetation treatments to reduce wildfire hazard and improve forest health. It would also stabilize and restore streams and provide guzzlers for wildlife.
Vegetation management (other than forest products)Forest productsFuels managementWatershed management
Comment Period
06/16/2017
Objection Period Start
08/24/2017
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Rangeland Vegetation Improvements; Timber Sales (Green); Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Parts of Townships 35 and 36 South, Ranges 1 West and 1 East of the Salt Lake Base and Meridian. |
Decision Memo · Dixie National Forest All Units · updated 8/31/2017
East Fork Sevier River Drainage · Garfield, Utah
The purpose of this project is to maintain and enhance the status of Bonneville Cutthroat Trout through the construction of six permanent and three temporary fish barriers in various locations within the East Fork Sevier River drainage.
Wildlife, fish, rare plants
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District; Escalante Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 7/19/2017
The project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, and Utah. Project terminates at the Mona substation in central Utah. · Beaver; Duchesne; Emery; Garfield; Iron; Juab; Millard; Piute; Sevier; Uintah; Wasatch; Weber, Utah
This proposed 500 kV transmission line is designed to deliver power to Rocky Mountain Power utility costumers in Utah and the intermountain west. Generation sources are located in central Wyoming.
Special use management
NOI in Federal Register
04/01/2011
DEIS NOA in Federal Register
04/01/2011
FEIS NOA in Federal Register
01/13/2017
Objection Period Start
01/21/2017
Decision
05/2017 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Energy Gateway South Transmission Project | Decision Signed Date: 05/31/2017 |
| Forests | Ashley National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Uinta-Wasatch-Cache National Forest |
| Districts | Duchesne Ranger District; Pine Valley Ranger District; Fillmore Ranger District; Richfield Ranger District; Price Ranger District; Heber-Kamas Ranger District; Spanish Fork Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Powell Ranger District · updated 7/19/2017
Located in Garfield County, Utah within T36S R4.5W, section 4, approximately 5 miles northeast of Hatch, Utah, just off FS road 31145. · Garfield, Utah
Conduct analysis based on approving a Plan of Operations to Lookout Point Mining Company of Panguitch, Utah, to mine a diatomaceous earth deposit.
Minerals and geology
Comment Period
09/05/2016
Objection Period Start
03/10/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Chief's Approval |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T36S R4.5W, section 4 |
Environmental Assessment · Escalante Ranger District · updated 2/22/2017
Southern end of the Box Trail adjacent to the Pine Creek Road (FR 153) · Garfield, Utah
Relocate the lower trailhead for the Box Trail outside of the wilderness boundary.
Road managementRecreation management
Scoping Start
11/2014 (Estimated)
Comment Period
12/2014 (Estimated)
Objection Period Start
03/2015 (Estimated)
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Wilderness Management |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 12/19/2016
The project analysis area is within Washington County, Utah and is approximately four miles north of Central, Utah on the east side of Utah State Highway 18. · Washington, Utah
The Forest Service proposes to issue a special use permit to Holmstead Ranch, LLC for an existing water collection infrastructure and improvements to meet state culinary water standards.
Special use management
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T39S R16W Sections 25 & 26 |
Environmental Assessment · Pine Valley Ranger District · updated 12/12/2016
Surrounding Community of Pine Valley, UT. · Washington, Utah
Improvement of existing fuelbreak around community of Pine Valley, UT. Activities include removal of invading woody species (primarily juniper), widening, herbicide and seeding. Healthy Forest Restoration Act fuels treatment.
Vegetation management (other than forest products)Fuels management
Objection Period Start
10/08/2016
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Roadless Area Management |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T39S, R14W, Sec. 19, 20, 29, 30; T39S, R15W, Sec. 13-16, 21-24, SLBM. |
Decision Memo · Cedar City Ranger District · updated 9/28/2016
T37S R9W Section 17, in the southwestern part of Cedar City RD, near Cedar Canyon Campground, off Utah State Highway Route 14. · Iron, Utah
The permit has reached the end of its current term and needs to be renewed in accordance with policy at 36 CFR 220.6 (e)(15).
Special use management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cedar City Ranger District · updated 9/28/2016
The UDOT Cedar Mountain station is located on the Cedar City Ranger District of the Dixie National Forest within Iron County, Utah near the intersection of SR-14 and SR-143. · Iron, Utah
The Utah Department of Transportation is proposing to improve the non-potable water system at the UDOT Cedar Mountain station. The station is located near the intersection of SR-14 and SR-143.
Special use management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T37S R9W Section 23 of the Salt Lake City Baseline and Meridian |
Decision Memo · Escalante Ranger District · updated 9/17/2016
The project area is approximately 8 miles northeast of Tropic, Utah and 1 mile east of Pine Lake on Forest Road 132. · Garfield, Utah
Garkane Energy proposes to install up to 13600 feet of single-phase 7200-volt underground power line with a 20 foot easement to a depth of 42 inches along Forest Road 132. This proposal includes removing 14650 feet of existing overhead power line.
Special use management
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T35S, R1W, Sec. 19-21 & 30. |
Decision Memo · Powell Ranger District · updated 6/2/2016
Existing building and antenna tower located 12 miles southeast of Panguitch, Utah, on Mount Wilson. · Garfield, Utah
Renew an expired 20-year permit with the Federal Aviation Administration (FAA) to operate a mode-s calibration performance monitor system and modify the permit to allow the FAA to attach an additional 6' antenna to the existing antenna tower.
Special use management
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Federal Aviation Administration (FAA) Wilson Peak Permit Renewal | Decision Signed Date: 04/30/2016 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T36S, R4.5W, S11, Salt Lake Base & Meridian |
Decision Memo · Pine Valley Ranger District · updated 2/2/2016
Mountain Meadows Massacre site is located approximately four miles north of Central, Utah, on the east side of State Highway 18. · Washington, Utah
This project will re-issue the Mountain Meadows Massacre special use permit to Utah State Parks and Recreation and construct 4 information signs, 2 kiosks, and a vault toilet and improve the parking area at the lower site.
Special use management
Decision
01/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Decision Memo Mountain Meadows Massacre Site Special Use Permit Issuance | Decision Signed Date: 01/28/2016 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Township 38 South, Range 16 West, Section15, 21, 22, Salt Lake Meridian. |
Environmental Assessment · Pine Valley Ranger District · updated 1/12/2016
Western Iron and Washington Counties. · Iron; Washington, Utah
Analysis for continued wild horse management in southern Utah lands administered by USDI Bureau of Land Management and USDA Forest Service-Dixie National Forest. BLM NEPA completed. Dixie National Forest NEPA to be started under new NEPA in 2016.
Grazing management
Scoping Start
'/ (Estimated)
Comment Period
'/ (Estimated)
Implementation
'/ (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Valley Ranger District · updated 12/23/2015
North Richie Pasture, East Pinto Allotment · Washington, Utah
Improve an existing water development in one pasture within the East Pinto Allotment. The existing water development would be improved by extending the Cottonwood Spring pipeline and adding a stockwater trough in an advantageous location.
Grazing management
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Decision Memo East Pinto Pipeline Extension | Decision Signed Date: 10/09/2015 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Escalante Ranger District · updated 12/11/2015
The upper portion of the Birch Creek Watershed, adjacent to Main Canyon Road (FH 17) and downslope from Griffen Top Road (FR 140). · Garfield, Utah
Improve forest health by removing dead/dying Douglas fir and restore aspen and ponderosa pine stands.
Forest productsVegetation management (other than forest products)
Comment Period
07/21/2014
Objection Period Start
10/03/2015
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T 34N R 1W, Sections 11, 12, 13, 14, 15, 22, 23, 24,25, 26, & 27; T 34N R 1E Sections7, 8, 17, 18, 19, 20 & 30 |
Decision Memo · Dixie National Forest All Units · updated 9/24/2015
T38S, R8W, Section 9NE; SLB&M: North of Utah State Route (SR) 14 adjacent to Forest Service Road #30383. · Kane, Utah
Reclaim the 4.95 acre Navajo Cinder Pit. The proposed action is to re-contour the current cut slopes to a more natural slope along the base of the pit, place fill and growth medium on the surface of the re-contoured slopes, and restore vegetation
Minerals and geologyHeritage resource management
Decision
09/2015 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Scenery Management |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Dixie National Forest All Units · updated 7/31/2015
Mammoth Creek is a major tributary to the Sevier River in the Upper Sevier River 6th field Hydrologic Unit Code (HUC) watershed. · Garfield; Iron, Utah
The purpose of this project is to maintain and enhance the status of Bonneville cutthroat trout in Mammoth Creek drainage.
Wildlife, fish, rare plants
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Mammoth Creek Fish Barriers Project | Decision Signed Date: 07/23/2015 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T36S, R7W, Section 31 and T36S, R8W, Sections 14, 23, 26, 28, 29, SLB&M |
Environmental Assessment · Escalante Ranger District · updated 2/3/2015
Various locations throughout the Escalante and Powell ranger districts · Garfield, Utah
The Escalante and Powell ranger districts propose to analyze the expansion and development of mineral material pits to respond to mineral material needs of the Forest for the next 15-20 years. The project is consistent with 36 CFR 2850.2 and .3(2).
Minerals and geology
Comment Period
05/06/2013
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| DN/FONSI for East Zone Mineral Source Sites | Decision Signed Date: 01/21/2015 |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
Environmental Assessment · Powell Ranger District · updated 1/16/2015
Water Canyon to Robinson Cyn Trailhead · Kane, Utah
Designate motorized use on a 2.8-mile route from Alton, UT to Robinson Canyon Trailhead; construct 2 miles of non-motorized Grand View Trail. This project has been canceled as it has been included in the Powell Travel Management Project,#44203.
Recreation management
Scoping Start
08/2013 (Estimated)
Comment Period
10/2013 (Estimated)
Decision
10/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | R5W T39S Sections 3, 9, 10,15 and 16, SLBM |
Environmental Assessment · Powell Ranger District · updated 1/12/2015
Bryce Canyon City, UT; Bryce Canyon National Park; Dixie National Forest (0.8 mi) · Garfield, Utah
The NPS and USFS propose to construct a visitor path connecting Bryce Canyon City, Bryce Canyon National Park, and the Dixie National Forest, for a total of approx. 7.3 miles. Of this total length, 0.8 miles are within the Dixie National Forest.
Recreation management
Comment Period
10/18/2014
Objection Period Start
10/18/2014
Decision
01/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| MULTI-USE VISITOR PATH ENVIRONMENTAL ASSESSMENT | Decision Signed Date: 01/08/2015 Legal Notice Date: 01/08/2015 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pine Valley Ranger District · updated 11/24/2014
The Mill Canyon Trail is located in the Pine Valley Mountain Wilderness Area. The proposed connector trail is located in the Pine Valley Recreation Area. · Washington, Utah
Reroute and rehabilitate approximately 522 feet of the Mill Canyon Trail #31013, using primitive minimum tools. Construct a connector trail between Whipple Trail #31025 and Canal Trail #31031.
Recreation management
Decision
11/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Pine Valley Eastside Trails Enhancement Project | Decision Signed Date: 11/20/2014 |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T39S, R14W, Sec 27 & 28; T39S, R14W, Sec 29, SLB&M. |
Decision Memo · Cedar City Ranger District · updated 9/30/2014
Approximately 8 miles west of Panguitch, Utah. · Iron, Utah
Construction of effective stream crossings at three locations on Indian Hollow Road. Structures may include bridge, culvert or other variations necessary to protect fisheries and riparian vegetation.
Watershed managementRoad management
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements |
| Indian Hollow Road Crossing Improvement Project | Decision Signed Date: 09/30/2014 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T34S,R6W, Sec 18; SLB&M. |
Decision Memo · Escalante Ranger District · updated 9/22/2014
Dixie National Forest, Garfield County, Utah, approx. 6,000 feet elevation · Garfield, Utah
A Special Use Permit to Citation Oil for the maintenance and operation of an oil pipeline and telephone line across National Forest System Lands is expired and needs to be analyzed for the purpose of issuing a new Special Use Permit.
Special use management
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Citation Oil Special Use Permit Reissue Project | Decision Signed Date: 09/17/2014 |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T36S, R1E, Sections 9, 10, 15, 16, 17, 18, 19, and 30; SLB&M |
Decision Memo · Dixie National Forest All Units · updated 9/10/2014
Brian Head Ski Resort is located on the Cedar City Ranger District within the Dixie National Forest, approximately 12 miles south of Parowan, Utah. · Iron, Utah
The purpose and need of this project is to authorize PacifiCorp dba Rocky Mountain Power a Special Use Permit for the extension of their current underground power line to provide power to the new Brian Head Resort ski lift.
Special use management
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| PacifiCorp Underground Power Line Extension for Brian Head New Ski Lift | Decision Signed Date: 08/28/2014 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Township 36 South, Range 9 West, Section 11, S.L.M., East Quarter Corner, Salt Lake Baseline and Meridian |
Decision Memo · Cedar City Ranger District · updated 6/9/2014
North Panguitch Lake Boat Launch, Panguitch Lake, is located on the Cedar City Ranger District, within the Dixie National Forest, approximately 17 miles southwest of Panguitch, Utah. · Garfield, Utah
Issue a Special Use Authorization to permit Utah Division of Wildlife Resources to install a seasonal 80 ft x 8 ft courtesy dock. This will provide a better and safer loading and unloading area for all boat sizes, enhancing boater/angler experience..
Special use management
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Memo for Panguitch Lake Courtesy Dock Special Use Permit | Decision Signed Date: 05/30/2014 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | SW 1/4 Section 34, Township 35 South, Range 7 West, SLB&M |
Decision Memo · Powell Ranger District · updated 5/16/2014
Along Hwy 12 through Red Canyon about 12 miles southwest of Panguitch, UT, beginning near the Red Canyon Visitors Center, proceeding ~ 3.6 miles up Red Canyon to east of FS121. · Garfield, Utah
Enhance the reliability of an existing fiber optic line under a special use permit to South Central Utah Telephone Association, Inc. by amending the permit to allow them to relocate and maintain the fiber optic line outside of Red Canyon Wash.
Special use management
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| South Central Red Canyon Fiber Optic Amendment DM | Decision Signed Date: 05/16/2014 Legal Notice Date: 05/16/2014 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | Sections 22, 25, 26, 27 and 36 of Township 35 South, Range 4.5 West and Section 30 of Township 35 South Range 4 West. |
Environmental Assessment · Escalante Ranger District · updated 8/14/2013
On the Aquarius Plateau, approximately 15 miles northwest of Escalante, UT along FR 30140. · Garfield, Utah
Commercial and non-commercial thinning to reduce stand densities, provide for a more balance age-class distribution, and perpetuate aspen presences, within the spruce/fir dominated forest.
Fuels managementVegetation management (other than forest products)Forest productsWildlife, fish, rare plants
Comment Period
04/08/2011
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Scenery Management; Timber Sales (Salvage); Timber Sales (Green) |
| Decision Notice and Finding of No Significant Impact: Iron Springs | Decision Signed Date: 11/29/2012 (FS Withdrawn) Legal Notice Date: 12/06/2012 |
| DN/FONSI Iron Springs Vegetation Improvement and Salvage Project | Decision Signed Date: 03/08/2013 Legal Notice Date: 03/09/2013 |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | T33S, R1W and T33S, R1E, of the Salt Lake Baseline Meridian |
Environmental Assessment · Powell Ranger District · updated 8/14/2013
Within the E.F. Sevier River Subbasin at the southeast end of the Sevier Plateau. Immediately west of SR 22 (Johns Valley Road) approximately 10 miles north of its intersection with SR 12. · Garfield, Utah
The Dixie National Forest proposes to remove Pinyon and Juniper (PJ) from sage-steppe and riparian areas within Johns Valley to benefit wildlife and improve the environmental health of the area. A variety of treatments would be utilized.
Watershed managementVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
05/02/2011
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements |
| Decision Notice Johns Valley Vegetation Project | Decision Signed Date: 07/31/2013 Legal Notice Date: 08/13/2013 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T 33 S, R 3 W, Sec. 10-14, 22-27, 34-36; T 33 S, R 2 W, Sec. 17-20, 29-32; T 34 S, R 3 W, Sec. 1-4, 9-12, 15-17, 19-22, 27-34; T 34 S, R 4 W, Sec. 1-2, 12; T 34 S, R 4 W, Sec. 26, 35-36. |
Environmental Assessment · Cedar City Ranger District · updated 6/28/2013
Approximately 26 miles east of Cedar City, UT. · Iron, Utah
Conifer salvage harvest 766 acres, precommercial conifer thinning 766 acres, aspen regen and improvement 148 acres, permanent road relocation 1.03 miles.
Road managementWatershed managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)
Comment Period
03/04/2013
Decision
06/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Watershed Improvements |
| Reed Valley Vegetation Management DN/FONSI | Decision Signed Date: 06/05/2013 Legal Notice Date: 06/07/2013 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T36S, R8W, Sec 35,36; T37S,R8W, Sec 1,2,10-16 SLB&M. |
Environmental Assessment · Pine Valley Ranger District · updated 4/9/2013
Areas surrounding the communities of Central and New Harmony, UT. · Washington, Utah
Improvement of existing fuelbreak around communities of Central and New Harmony, UT. Activities include removal of invading woody speies (primarily juniper),widening, seeding and construction of 12-18" fireline.
Fuels management
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Dixie National Forest |
| Districts | Pine Valley Ranger District |
| Legal Land Description | T38S, R13W; T39S, R16W; SLBM. |
Environmental Impact Statement · Pine Valley Ranger District · updated 12/21/2012
Linear alignment from approximately 6 miles northeast of Richfield, UT to just southwest of the town of Central, UT · Beaver; Iron; Millard; Sevier; Washington, Utah
Construct a new 345 kV transmission line connecting the Sigurd substation located near Richfield, UT to the Red Butte substation located near Central, UT.
Special use management
NOI in Federal Register
01/05/2010
DEIS NOA in Federal Register
06/03/2011
FEIS NOA in Federal Register
10/05/2012
Decision
12/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Sigurd to Red Butte No. 2 - 345kV Transmission Project Record of Decision | Decision Signed Date: 12/07/2012 Legal Notice Date: 12/12/2012 |
| Forests | Dixie National Forest; Fishlake National Forest |
| Districts | Pine Valley Ranger District; Fillmore Ranger District; Beaver Ranger District |
Decision Memo · Cedar City Ranger District · updated 11/27/2012
Along Highway 14 and 148 from approximately 10-40 miles east of Cedar City, Utah. · Iron; Kane, Utah
Removal of danger trees along State Highways 14 and 148. Contract to be administered by Utah Department of Transportation.
Vegetation management (other than forest products)Forest products
Comment Period
09/25/2012
Decision
11/2012 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | Along Highway 14 and 148 in T37S, R9W, Sections 18, 17, 16, 19, 20, 21, 22, 23, 24, 25, 26, 27; T37, R8.5W, Sections 25, 26; T37, R8W, Sections 30, 31; SLB&M. |
Decision Memo · Escalante Ranger District · updated 11/19/2012
The Birch Creek 6th Field sub-watershed is located in the headwaters of the Escalante River Watershed, and is locally known as Main Canyon. The Dixie National Forest boundary in Main Canyon is approx · Garfield, Utah
The project will treat vegetation within riparian areas in the Birch Creek sub-watershed by removing pinyon, juniper, and, as needed, other conifer species. The project also includes placement and operation of a bat watering trough.
Land management planning
Comment Period
05/24/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
| Legal Land Description | 34S 1W, sec. 24, 25, 13; 34S 1E, sec. 46, 48, 47; 35S 1E, sec. 06, 07, 17, 08 |
Environmental Assessment · Powell Ranger District · updated 10/19/2012
The Blue Fly Vegetation Management (VMP) analysis area totals 9,275 acres and is located within the Powell Ranger District of the Dixie National Forest in Garfield County, Utah. · Garfield, Utah
The Powell Ranger District of the Dixie National Forest proposes a vegetation management project on the Paunsaugunt Plateau in southern Utah. (see additional information below under 'Other Project Information'.
Vegetation management (other than forest products)
Comment Period
09/24/2011
Decision
09/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| DN and FONSI for the Blue Fly Vegetation Management Project | Decision Signed Date: 09/11/2012 Legal Notice Date: 09/13/2012 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | The legal description for the analysis area includes all or parts of Township (T) 36S., Range (R) 4W., Sections 28, 29, 30, 31, 32, 33; T. 36S., R 4.5W., Sec. 25, 35, 36; T 37S., R 4W., Sec. 5, 6, 7, |
Environmental Assessment · Cedar City Ranger District · updated 9/24/2012
Approximately 4 miles southeast of Parowan, Utah. · Iron, Utah
Resurfacing of 6.0 miles of paved (3.8 miles) and gravel (2.2 miles) road. Replacement of one bridge. Issuance of easement for road to Iron County.
Road managementWatershed management
Comment Period
09/28/2010
Decision
01/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Road Improvements/Construction; Watershed Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T34N, R8W, Sec 31. T35S, R8W, Sec 6,7,8,9,16,17,20. |
Decision Memo · Escalante Ranger District · updated 9/21/2012
Somewhere on D4 · Garfield, Utah
NEPA sufficiency review prior to re-authorization of grazing permit.
Grazing management
Decision
10/2008 (Estimated)
Implementation
12/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Sec 339 |
| Special Authority | Grazing, Sec 339, 2005 Consolidated Appropriations Bill (Grazing Authorizations On An Allotment) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Grazing Authorizations |
| Pine Creek Allotment NEPA Sufficiency Review | Decision Signed Date: 10/10/2008 |
| Forests | Dixie National Forest |
| Districts | Escalante Ranger District |
Environmental Assessment · Powell Ranger District · updated 9/20/2012
Paunsaugunt Plateau south of Tropic Resevoir near juction of Upper Kanab Creek and East Fork Sevier River. · Garfield; Kane, Utah
The Powell Ranger District proposes a project on the Paunsaugunt Plateau to perform the following vegetation treatments: commercially harvest 866 acres of mixed conifer forest, regenerate 413 acres of aspen, reforest 194 acres of wildfire impacted...
Forest productsVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
08/30/2011
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| DN and FONSI for the Paunsaugunt Vegetation Management Project | Decision Signed Date: 05/22/2012 Legal Notice Date: 05/22/2012 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
| Legal Land Description | T 38 S, R 4 W, T 39 S, R 5 W, T38 S, R 41/2 W, T 39 S, R 4 1/2 W, and T 39 S, R 4 W multiple sections |
Environmental Assessment · Cedar City Ranger District · updated 8/27/2012
Approximately 6 miles south of Duck Creek Village, Utah. · Kane, Utah
Construction of 350,000 gallon culinary water tank and associated pipeline for adjacent subdivision.
Special use management
Comment Period
06/11/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T39S, R8W, Salt Lake PM |
Environmental Assessment · Cedar City Ranger District · updated 8/24/2012
Approximately 6 miles east of Duck Creek Village, Utah. · Kane, Utah
Construction of 0.4 mile of ATV trail on existing utility route. New route will provide access from private lands to National Forest roads and trails.
Recreation management
Comment Period
07/06/2012
Decision
08/2012 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T38S R7W Sec 24. |
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
Environmental Assessment · Cedar City Ranger District · updated 6/11/2012
Approximately 25 east of Cedar City, UT. · Kane, Utah
Salvage harvest of 3,800 acres of dead and dying Douglas-fir and other conifer. Regeneration of 177 acres of aspen. Conifer reforestation of approximately 760 acres.
Forest products
Comment Period
07/25/2011
Decision
03/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Navajo Basin Forest and Scenic Recovery | Decision Signed Date: 03/21/2012 Legal Notice Date: 03/23/2012 |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T38S R8W Sec 3-10,15-18; T38S R8S Sec 1-3, 11,12,13,14. |
Environmental Impact Statement · Powell Ranger District · updated 5/4/2011
Area between Tropic, UT on Hwy 12 west to Hatch, Utah on Hwy 89. · Garfield, Utah
Construction of upgraded transmission line from Tropic, UT to Hatch, UT. This project crosses multilple jurisdictions. The Dixie NF is the project lead.
Special use management
NOI in Federal Register
02/21/2008
DEIS NOA in Federal Register
12/11/2009
FEIS NOA in Federal Register
04/08/2011
Decision
04/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Secretary/Undersecretary Approval |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Tropic to Hatch 138 kV Transmission Line | Decision Signed Date: 04/01/2011 Legal Notice Date: 04/07/2011 |
| Forests | Dixie National Forest |
| Districts | Powell Ranger District |
Environmental Assessment · Cedar City Ranger District · updated 5/28/2009
Approximately 24 miles east of Cedar City, Utah south of Mammoth Creek private subdivision. · Garfield, Utah
Fuels treatments near private lands subdivision. Initial prescribed burn 2,000 acres. Precommercial thinning 40 acres. Followup maintenance prescribed burning in 5-10 years on 4400 acres.
Fuels management
Comment Period
03/26/2009
Decision
05/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Dixie National Forest |
| Districts | Cedar City Ranger District |
| Legal Land Description | T37S, R7W, Sec 2-10, 13-17, 20-23, 28-29, 32-33. |