Decision Memo · Monticello Ranger District · updated 5/6/2026
Project located approximately 6 miles north of Blanding Utah. · San Juan, Utah
The Manti La-Sal NF is proposing to allow the City of Blanding Utah to replace an aging main 8 inch waterline with a new 12 inch poly pipe line and repair or replace the diversion and other needed items in their existing right-of-way.
Special use management
Comment Period
05/22/2012
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Sections 28, 29, 32, and 33, of T34S, R22E; Sections 5, 8, and 17 of T35S, R22E. |
Decision Memo · Monticello Ranger District · updated 6/18/2025
Along North Creek Road and Pinyon Drive and into the USFS Baker Administration Site. · San Juan, Utah
Emery Telcom is proposing to bury approximately 2,500 ft of fiber line to the Baker Administration site along North Creek Rd, Pinyon Dr.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T33S R23E Sec 35 |
Decision Memo · Monticello Ranger District · updated 5/2/2025
Across the Monticello Ranger District including the Bears Ears National Monument. · San Juan, Utah
Implementing watershed restoration techniques in aquatic ecosystems on 40 sites within the Monticello Ranger District and Bears Ears National Monument, using multiple restoration and rehabilitation methods.
Watershed management
Decision
05/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 4/25/2025
Maverick Point area of the Monticello Ranger District. · San Juan, Utah
Thinning around 11 priority areas to increase the fire resiliency of the surrounding area and protect values at risk. Making up 45 total acres, thinning would be performed up to 40 meters surrounding the values at risk.
Vegetation management (other than forest products)Fuels management
Decision
04/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 1/16/2025
Along FS Rd 50032 and 50034 to Blue Mountain Ranches · San Juan, Utah
Emery Telcom is proposing to bury two approximately 6,200ft, HDPE conduit. Empire Electric is proposing to bury approximately 6,700ft of existing aerial powerline.
Special use management
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Emery Telcom - Empire Electric Utility Project | Decision Signed Date: 01/15/2025 |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34 S R23E Sec 28 & 32 |
Decision Memo · Ferron Ranger District · updated 10/22/2024
Blind Canyon Creek: 39.940547, -111.528511 · Utah, Utah
The goal of this project is to restore vital components of Blind Canyon Creek that have become degraded since the Pole Creek Fire in 2018. The project area is located south of Thistle, Utah, and includes an approx. 1-mile stretch of Blind Canyon.
Watershed management
Decision
10/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 10/1/2024
Ferron Ranger District · Emery; Sanpete, Utah
The Ferron Ranger District is proposing to make improvements or changes to the following roads: Forest Road (FR) 50043 (South Side Ferron Road) and Forest Road (FR) 50150 (Skyline Drive) at the intersection of 000008 Orangeville-Ephraim.
Road management
Decision
09/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Ferron Ranger District Road Reroutes Final CE and Decision Memo | Decision Signed Date: 09/30/2024 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 9/23/2024
La Sal Pass Road near the junction with Rd 54729 · San Juan, Utah
The proposal adds a hut location to San Juan Huts and Talking Mountain Yurts existing permits. While owned by San Juan Huts, this hut will be utilized by San Juan Huts during the summer months and by Talking Mountain Yurts in the winter months.
Special use management
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 6/26/2024
Within the Bears Ears National Monument/Monticello Ranger District Gooseberry area. · San Juan, Utah
The purpose of this project is to respond to a special use authorization application for a new SNOTEL communication site.
Special use management
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 6/10/2024
This proposed project is in the Bob Wright and Second Water Drainages, within the Gordon Creek 5th level watershed. These two tributaries occur on the Price Ranger District of the Manti-La Sal Nationa · Carbon, Utah
The Gordon Creek Watershed Restoration Project is a multiyear project with the goal of improving the aquatic function of Bob Wright and Second Water tributaries impaired by the 2012 Seeley Wildfire.
Wildlife, fish, rare plantsWatershed management
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Gordon Creek Watershed Restoration Project Final CE and DM | Decision Signed Date: 06/07/2024 |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 4/24/2024
Along Cty. Rd. B101 and west of the Baker Guard Station. · San Juan, Utah
The project is on an existing administrative site and will provide housing, temporary camping, and office space. The project includes construction of a bunkhouse, trailer pads, camping area, pavilion, and a Fire Operations Center.
Facility management
Decision
04/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 3/18/2024
Located off of County Rd B101, west of the Baker Guard Station. · San Juan, Utah
Demolition of the existing warehouse using heavy equipment and replacing it with a new building approximately 10'-15' from the original location. The new building will not exceed 50'x40'. Slope gradation may be done to the north of the new building.
Facility management
Decision
03/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 3/13/2024
proximity to Orangeville, Utah, the Northwest side of Joes Valley Reservoir, and State Road 29 · Emery, Utah
The Manti-La Sal National Forest, Ferron Ranger District, proposes constructing new non-motorized mountain bike emphasis trails and expanding an existing trailhead.
Recreation management
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sanpete Ranger District · updated 1/10/2024
Twelve Mile Canyon located in Sanpete County, Utah, approximately 7.4 miles east of the town of Mayfield in the Middle Mountain area. · Sanpete, Utah
The Forest Service proposed to install up to 80 post-assisted log structures in streams within Twelve Mile Canyon to improve and restore degraded waterways and their associated habitats or riparian areas.
Watershed managementWildlife, fish, rare plants
Decision
01/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 10/26/2023
Located in Emery County, Utah, approximately 13 miles Northwest of Huntington, Utah, atop East Mountain. · Emery, Utah
The East Mountain area is the only known breeding location for boreal toads on the Manti-La Sal National Forest. It has been determined that habitat work is needed to protect and improve habitat in the East Mountain area.
Wildlife, fish, rare plants
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 10/16/2023
Bald Mesa Communication Site · Grand, Utah
The purpose of this project is to respond to a special use authorization application for Bald Mesa Communication Site.
Special use management
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T26S R24E Sec19 |
Decision Memo · Moab Ranger District · updated 10/3/2023
The proposed project is located at the current Porcupine Rim Camping Area site, off Sand Flats Road FR 0067, approximately 13 miles east of Moab, Utah. · Grand, Utah
The Moab Ranger District is proposing a campground with additional amenities, a day use area, and fencing in the areas already impacted by dispersed camping.
Recreation management
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 9/11/2023
Moab and Monticello Ranger Districts of the Manti-La Sal National Forest · Grand; San Juan; Montrose, Colorado; Utah
The Manti-La Sal National Forest is proposing actions to mitigate physical safety risks posed by abandoned mine features such as adits, shafts, stopes, breakdown portals, subsidence portals, unstable rock, and historical mining structures.
Minerals and geology
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Abandoned Mine Land Clean-Up |
| Decision Decided Date | 09/11/2023 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 8/11/2023
The proposed project is located within the Manti-La Sal National Forest on the Monticello Ranger District within San Juan County, Utah. This includes Bears Ears National Monument lands. · San Juan, Utah
The purpose of this project is to improve watershed health in specific locations within Bears Ears National Monument and the Monticello Ranger District of the Manti-La Sal National Forest. The need for restoration is a result of past practices.
Watershed management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 6/29/2023
East Horn Communication site · Emery, Utah
The purpose of this project is to respond to special use authorization applications for East Horn Communication Site. PATTs Media Services is proposing to construct a 60-foot self-supporting tower for the purpose of hanging an FM broadcast antenna.
Special use management
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T18S R7E Sec 33 |
Decision Memo · Manti-La Sal National Forest All Units · updated 5/16/2023
San Pitch Mountain 8 sites, Order Mountain 1 site, and Horn Mountain 3 sites · Emery; Juab; Sanpete, Utah
The purpose of the proposed action is to provide water on a consistent, dependable basis to benefit wildlife on the North Zone of the Manti-La Sal Forest. Water guzzler installation/repair on the San Pitch, Horn Mountain, and Order Mountain areas.
Wildlife, fish, rare plants
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District; Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 5/16/2023
Seven locations on the Manti-La Sal National Forest, Sanpete Ranger District, and Ferron/Price Ranger District. · Emery; Sanpete, Utah
A proposal to construct, improve, or expand parking lots and trailheads at seven locations used for parking and/or off-loading association with recreation activity in the area.
Recreation management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22); 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District; Ferron Ranger District; Price Ranger District |
| Legal Land Description | Orange OlsenT17S R6E Sec. 31; Manti CanyonT18S R3E Sec. 9; Ephraim CanyonT17S R4E Sec. 18; Canal CanyonT16S R4E Sec. 15; Log CanyonT13S R2E Sec. 27; Gooseberry Res.T13S R6E Sec.7; Millers FlatT14S R6E |
Decision Memo · Sanpete Ranger District · updated 4/18/2023
Ephraim Canyon, approximately four miles east of Ephraim City · Sanpete, Utah
The Sanpete Ranger District of the Manti-La Sal National Forest proposes a Special Use Permit that will be issued to Ephraim City for the construction, operation, and maintenance of approximately 12,000 feet of 15kV buried electrical cable.
Special use management
Decision
04/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | T17S, R4E, Sections 18-21 |
Decision Memo · Moab Ranger District · updated 2/28/2023
The proposed hydrologic function rehabilitation and restoration project is located on the Moab Ranger District within Grand, San Juan and Montrose counties within UT and CO. · Grand; San Juan; Mesa; Montrose, Colorado; Utah
This project will take a phased approach to rehabilitating and restoring impairments to hydrologic function. Treatments include: in-stream structures, erosion control techniques, fencing, grazing stabilization, and others techniques.
Watershed management
Decision
02/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (19), 36 Cfr 220.6(E)(19); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Moab Watershed Restoration Project | Decision Signed Date: 02/23/2023 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 1/31/2023
T28S, R24E, sec 13, 14, 23, 24, 25, 26 and T28S, R25E, sec 18, 19 and 30. Two miles northeast of town of La Sal in San Juan County, Utah. · Grand, Utah
The Deer Springs Habitat Project is a mechanical mastication/thinning of pinyon-juniper and brush to improve habitat for big game and other wildlife and reduce vegetative fuels on 3700 acres.
Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)Fuels management
Decision
07/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Monticello Ranger District · updated 9/26/2022
Moab/Monticello Ranger District, Bears Ears National Monument · Grand; San Juan, Utah
The project is focused on four cultural sites within the Bears Ears National Monument. The project will involve designating and constructing access trails and parking areas, as well as installing signage
Heritage resource managementRecreation managementSpecial area management
Comment Period
06/01/2022
Objection Period Start
07/27/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Heritage Resource Management; Trail Management; Special Area Management |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ferron Ranger District · updated 8/3/2022
Located on the Northeast portion of the Ferron Price Ranger District · Carbon; Emery, Utah
Construction of two water developments with associated storage structures, pipelines, and four troughs. Also construction of two livestock sorting corrals
Vegetation management (other than forest products)Grazing managementWildlife, fish, rare plants
Comment Period
04/20/2022
Objection Period Start
06/08/2022
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Secretary/Undersecretary Approval |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements; Noxious Weed Treatments; Rangeland Vegetation Improvements; Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sanpete Ranger District · updated 7/11/2022
The proposed project is located on the Sanpete Ranger District within Sanpete County, Utah, approximately nine miles east of Mayfield, Utah. · Sanpete, Utah
The Sanpete Ranger District, Manti-La Sal National Forest proposes the South Manti Big Game Summer Range Restoration Project to improve vegetation and watershed conditions related to soils, ground cover, improve forage production for big game.
Forest productsFuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
07/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Timber Sales (Green) |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | The proposed project is located on the Sanpete Ranger District within Sanpete County, Utah, approximately nine miles east of Mayfield, Utah. The legal description is: Township 19S Range 3E Section. |
Decision Memo · Sanpete Ranger District · updated 3/22/2022
The project area is 9 miles east of Spring City, UT and is adjacent to the Spring City Canyon Road · Sanpete, Utah
This project is in an area designated in accordance with section 602(b) and (c) of the Healthy Forest Restoration Act. The project would authorize prescribed burning and/or mechanical thinning on approximately 2,277 acres above Spring City, Utah.
Forest productsVegetation management (other than forest products)Fuels managementWatershed management
Decision
03/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green); Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Township 16S Range 4E Sections 1,12; Township 16S Range 5E Sections 4,5,6,7,8,17,18 |
Decision Memo · Price Ranger District · updated 12/14/2021
Fish Creek Campground and Trailhead is located 1.6 miles west of Scofield Reservoir, in Carbon County, Utah · Carbon, Utah
Fish Creek Campground includes seven campsites with deteriorated wood plank tables and fire rings, an aging single unit vault toilet facility and inadequate parking. The purpose for this project is to address these deferred maintenance items.
Recreation management
Decision
12/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Road Maintenance |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Township 12 South, Range 6 East, Section 13 |
Decision Memo · Ferron Ranger District · updated 11/17/2021
Joe's Valley Reservoir northwest of Ferron, Utah · Emery, Utah
The operators of the Joes Valley marina are considering making changes to their current Special Use permit; including additional outbuildings, a proposed well, a 6,000 gallon drinking water tank, and a new septic tank.
Special use management
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T17S R6E Sect 6 |
Decision Memo · Manti-La Sal National Forest All Units · updated 9/24/2021
Snow Lake is located approximately 9 miles east of Manti, Utah just east of Skyline Drive at 10,162 feet. · Sanpete, Utah
The purpose of this project is to mitigate impact to soils, vegetation, and wetlands caused by prolonged unauthorized vehicle use from off National Forest System Road (NFSR) 52328, from Skyline Drive (NFSR 50150) and along the shoreline of Snow Lake.
Recreation managementWatershed management
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Township 18 South, Range 4 East, Section 15 |
Decision Memo · Moab Ranger District · updated 9/20/2021
Moab/Monticello RD of the Manti-La Sal National Forest in Southeastern Utah · Grand, Utah
Recreation Special Use Permit Renewal, Approval, and Amendments Fall 2020 (FY21)
Special use managementRecreation management
Decision
09/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/20/2021 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | National Forest System |
Decision Memo · Ferron Ranger District · updated 9/17/2021
Elevation at the proposed quarry ranges between 9,015-9,116 feet. The project site is located on an east facing slope that is part of the uplands forming the watershed of Cabin Hollow. · Sanpete, Utah
Cabin Hollow Quarry is located in T12S, R5E, E1/2, Sec. 35, Salt Lake Meridian, Sanpete County, Utah, 0.54 miles from Skyline Drive by access road. Total disturbed area associated with this project will be less than 5 acres.
Minerals and geologyFacility management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance; Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T12S, R5E, E1/2, Sec. 35, Salt Lake Meridian, Sanpete County, Utah |
Decision Memo · Price Ranger District · updated 9/17/2021
Cottonwood Canyon Road, Upper Joes Valley Road, Miller Flat Road, North Miller Flat Road, Jordan Seely Trail Head, Indian Creek, Rolfson Campground, Cleveland Feeder Canal, and at the top of Candland Mountain. · Emery, Utah
Andeavor Field Services for approximately 16 staging areas and seven access routes on National Forest System (NFS) lands. Andeavor Field Services has requested this permit to facilitate the removal of portions of the Clear Creek Pipeline.
Special use management
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | T16S R6E Sec 35, 27, 15, 33, 4 T15S R6E Sec 28, 21, 9 T14S R6E Sec 34, 27, 23 |
Decision Memo · Sanpete Ranger District · updated 9/17/2021
The Wales Canyon Parking Area project is located just west of Wales, Utah adjacent to National Forest System Roads (NFSR) 50101 and 50127, in T15 S, R2E, NW of Section 25, Salt Lake Meridian, Sanpete County, Utah (see attached project maps). · Sanpete, Utah
The purpose of this project is to provide a staging point for OHV use, alleviating some of the traffic congestion currently experienced at the bottom of Maple Canyon as OHV riders stage from that location.
Recreation management
Decision
05/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | T15 S, R2E, NW of Section 25, Salt Lake Meridian, Sanpete County, Utah |
Environmental Assessment · Moab Ranger District · updated 9/16/2021
Southeastern portion of the La Sal Mountains. Approximately 6.5 miles NE of La Sal town. · San Juan, Utah
This project will restore a stream crossing to it's original form, as well as provide more suitable fish and riparian habitat. We will use multiple methods to restore fish habitat, riparian vegetation, and water quality/quantity.
Watershed managementRoad management
Comment Period
05/20/2021
Objection Period Start
07/29/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Maintenance; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Sections 4, 5, and 9 of Township 28 South, Range 25 East |
Environmental Assessment · Manti-La Sal National Forest All Units · updated 9/15/2021
This project is located at the Trans La Sal Trailhead and along the Geyser Pass Road (NFS road 50071) from the junction of the Gold Basin Road and Geyser Pass Trailhead. · San Juan, Utah
To improve accessibility to trailheads (Trans La Sa, Clark Lake, and Geyser Pass) along the Geyser Pass Road and to widen the Upper Geyser Pass Road (NFS Road 50071) from Gold Basin Junction to Geyser Pass Trailhead from 18 to 20 feet.
Road management
Comment Period
02/25/2021
Objection Period Start
04/08/2021
Decision
05/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction; Road Improvements/Construction |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Located within the Mount Tukuhnikivatz Quad and Sections 1, 2, 3, and 5 of Township 27 South, Range 24 East. |
Decision Memo · Manti-La Sal National Forest All Units · updated 8/11/2021
Lot C and O of the Bald Mesa Communication site on the Moab Ranger District of the Manti-La Sal National Forest. · Grand, Utah
Replacement of existing Forest Service Communication Building with a BLM Pepro Building and removal of existing Forest Service and BLM buildings. Forest Service will be relocated to new BLM building.
Special use managementFacility management
Comment Period
05/21/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 19, Township 26 South, Range 24 East |
Decision Memo · Moab Ranger District · updated 8/11/2021
T27S, R24E Sec. 10 · San Juan, Utah
Install instrumentation near the end of the Gold Basin road for collecting snow and water content data.
Special use management
Decision
07/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Township 27 South, Range 24 East, section 10 |
Decision Memo · Ferron Ranger District · updated 2/9/2021
The proposed project is located in Emery County, Utah, approximately 4 miles west of the town of Orangeville in the North Horn Mountain area. · Emery, Utah
The Manti-La Sal National Forest (Forest Service) proposes to improve priority habitat management areas (PHMA) for greater sage-grouse and big game (elk and deer) key and general winter range (KWR and GWR) & reduce wildland fire risk.
Wildlife, fish, rare plantsFuels managementWatershed management
Decision
02/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 2/3/2021
The treatment is proposed on 204 acres of NFS lands on Harpole Mesa, along the La Sal Loop Road above Castle Valley on the north side of the La Sal Mountains. · Grand, Utah
The Harpole Mesa Sagebrush Restoration Project is proposed to improve winter range habitat for big game (mule deer and elk) and to reduce the continuity of vegetative fuels.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
01/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Rangeland Vegetation Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T25S, R24E, sec 31. T26S, R24E, sec 5&6 |
Environmental Assessment · Moab Ranger District · updated 12/18/2020
approximately 20 miles northwest of Blanding, UT and 20 miles west of Monticello, UT. · San Juan, Utah
Upgrade existing or install new range improvements in order to improve livestock distribution and movement on the Cottonwood Allotment. This includes about mile of fence with a cattle guard, 7 new stock ponds, and upgrading 3 developed springs
Grazing management
Comment Period
01/17/2018
Objection Period Start
02/12/2020
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | (Section 4&8 of T34S, R21E; Sections 6, 11, 15,16 of T34S, R20E, Sections 1&12 of T34S, R19E and Section 31&33 of T33S, R20E) |
Decision Memo · Ferron Ranger District · updated 12/4/2020
Located on the Ferron Ranger District 6 miles northwest of Emery, UT. 12 miles southwest of Ferron, UT. 50 miles southwest of Price, UT. 125 miles southeast of Salt Lake City, UT. · Emery; Sanpete; Sevier, Utah
The project proposes to use prescribed fire to maintain historical fire return intervals in Ponderosa pine veg type on 5,935 acres. Improve vegetation and watershed conditions, improve forage production and minimize uncharacteristic wildfire.
Wildlife, fish, rare plantsWatershed managementFuels management
Decision
12/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T21 S R5 E Sections 1-3, 9-16, & 22-26; T21 S R6 E Sections 7, 18, 19, & 30 Salt Lake Meridian |
Decision Memo · Monticello Ranger District · updated 11/16/2020
The proposed projects are located west and east of the Camp Jackson private inholding about 12 miles north of Blanding, UT. · San Juan, Utah
The modification of approximately 1.25 miles of fence that separates the Blanding Municipal Watershed from the Camp Jackson C&H allotment.
Grazing management
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Sections 22&23 of T34S, R22E |
Decision Memo · Manti-La Sal National Forest All Units · updated 11/13/2020
All locations are on the Moab Ranger District. · Grand; San Juan, Utah
Review unauthorized uses on National Forest System Lands and evaluate the need to add them into the special-use program. Under review; 2 water pipelines and 4 access roads to private property.
Road managementSpecial use management
Comment Period
09/09/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Travel Management |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 11/12/2020
Located in between the Pack Creek private inholding and the Pack Creek Picnic Area about 14 miles SE of Moab, UT. · San Juan, Utah
Construct about 0.75 miles of fence that extends from the existing Lower Dorry drift fence, west to a natural rock rim barrier just south of the Pack Creek private land inholding. Removing juniper trees and brush where needed along the fence line.
Grazing managementWatershed management
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 23&24 of T27S, R23E |
Decision Memo · Manti-La Sal National Forest All Units · updated 9/18/2020
Joes Valley Reservoir area · Emery, Utah
Emery County Water Users request easement for use & occupancy of NFS lands for the operation, maintenance, and replacement of the Emery County Project (Joes Valley Reservoir) and its improvements, fixtures and facilities.
Special area management
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Price Ranger District · updated 9/2/2020
Huntington Creek Watershed (Little Bear Canyon, Little Bear Campground, Left Fork of Huntington Creek, and Nuck Woodward Canyon). · Emery, Utah
The Utah Division of Wildlife Resources has requested authorization to improve fish and aquatic species habitat within the Huntington Creek drainage in the Little Bear Canyon, Little Bear. Stream habitat was damaged by the Seeley Fire in 2012.
Special use managementWatershed management
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Price Ranger District · updated 9/2/2020
T11S, R3E, Section 12, SLM · Utah, Utah
Utah County has requested a permit to construct silt fences & rock check dam structures to protect the Eagle Landing Subdivision, downstream riparian systems, and infrastructure from flooding and sediment flow resulting from the 2018 Pole Canyon Fire
Special use managementWatershed management
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Price Ranger District · updated 7/20/2020
Between the Skyline Mine facility in Eccles Canyon and the Swens Canyon Ventilation facility in Swens Canyon on the Price Ranger District. · Emery, Utah
Construction of a section of electrical transmission line for Canyon Fuel Company, LLC. located between the Skyline Mine facility in Eccles Canyon and the Swens Canyon Ventilation facility in Swens Canyon
Recreation management
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations; Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 6/10/2020
Various Locations across the Ferron/Price and Sanpete Ranger Districts · Carbon; Emery; Juab; Sanpete; Sevier, Utah
The proposed action would be to authorize the following permits to be renewed Emery County Priority Permit, issuance of a Priority Rec Event Permit to Top Notch Archery, and issuance of a permit to Asprio Wilderness Therapy.
Special use management
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ferron Ranger District · updated 5/27/2020
The project area is located about 18 miles west of Huntington, Utah. It is situated on the east slope of the Wasatch Plateau, extending from Skyline Ridge southeastward to the Millers Flat road. · Carbon; Sanpete, Utah
Analyzing effects and sustainability of Sheep grazing on six grazing allotments that are currently being grazed annually.
Grazing management
Comment Period
02/27/2014
Objection Period Start
03/25/2020
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Final Decision Notice for the Center Allotments Environmental Assessment | Decision Signed Date: 05/27/2020 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 5/14/2020
Moab and Monticello Ranger Districts of the Manti-La Sal National Forest · Grand; Mesa; Montrose; San Juan, Colorado; Utah
Spring 2020 Special use Permit Proposals and Renewals
Special use management
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | National Forest System |
Decision Memo · Sanpete Ranger District · updated 2/21/2020
The trail system will be located in Ephraim Canyon(Sanpete County)beginning at the forest boundary and extending east (up canyon) to Lake Hill Campground · Sanpete, Utah
Build a sustainable non-motorized trail system that is easily accessible throughout most of the calendar year. There will be approx. 7.4 miles of new trail construction and 3.3 miles of previously unauthorized trails, authorized.
Recreation management
Comment Period
12/11/2019
Decision
02/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | T17S R5E Sec. 17, 18, 19, 20 Salt Lake Meridian, Sanpete County, UT |
Decision Memo · Moab Ranger District · updated 1/31/2020
Moab and Monticello Ranger Districts · Grand; San Juan; Mesa; Montrose, Colorado; Utah
Recreation Special Use Permits (SUP), 5-Year Priority Permits, Renewals and Amendments, Fall 2019
Special use management
Decision
01/2020 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | National Forest System lands |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/10/2019
West Mountain and Camp Jackson range allotments, within the Cottonwood Wash and Recapture Creek Watersheds, partially in BENM. · San Juan, Utah
Blanding Irrigation Company has applied for special use authorization to install an irrigation water pipeline, approximately 1.7 miles (9,157 feet) long in a permanent 23-foot right-of-way.
Special use management
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Township 34 South, Range 22 East; Section 30, Lots 2, 3, 4, SE1/4SW1/4; PB47 (Section 31, E1/2); PB 48 & 49 (Section 32, W1/2W1/2); Salt Lake Base Meridian |
Environmental Assessment · Monticello Ranger District · updated 12/10/2019
Approximately 10 miles north northwest of Blanding Utah. · San Juan, Utah
The San Juan Water Conservancy District and Blanding City are proposing to increase the size of the Dry Wash Reservoir and add a pipeline from the dam to the existing City pipeline.
Special use management
Comment Period
07/23/2013
Objection Period Start
06/05/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Dry Wash Reservoir Expansion and Pipeline | Decision Signed Date: 07/28/2014 Legal Notice Date: 07/28/2014 |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34S R22E Sec. 31 |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/10/2019
Bald Mesa Area · Grand, Utah
The FS will analyze Emery telecom proposal to install a fiber optic telecommunications cable and facilities to upgrade services to an existing cell tower. Approximately 6.5 miles of cable would be placed on existing powerline poles across NFS lands.
Special use management
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/10/2019
T. 34S, R.22E SE1/4NE1/4 of Section 6 · Emery, Utah
In accordance with Special Use Regulations, Forest Service review of a request to replace and bury an existing powerline and place a communication cable in the same trench.
Special use management
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 12/10/2019
5 miles north of La Sal, Utah in the Lackey Basin, Pole Canyon and La Sal Creek drainages, La Sal Mountains · San Juan, Utah
Prescribed burn on approximately 3250 acres of aspen, aspen/mixed conifer, and ponderosa pine forest to stimulate regeneration of aspen clones on South Mountain in the La Sals near Moab, UT
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
09/06/2012
Decision
11/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T28S, R24E, sections 1, 2, 3, 10, 11, 12, 13, 14 and T28S, R25E, sections 7 and 18 and T27S, R24E sections 34, 35 and 36 |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/10/2019
The site is located 31.4 miles northwest of Huntington, UT along SR 31 in Sanpete County. · Sanpete, Utah
Liberty Pioneer submitted an Application to Drill and Surface Use Plan of Operation with the intent to exercise lease rights on the Federal Oil and Gas Lease #UTU-78000 and drill an exploratory well known as Skyline Unit #10-17.
Land management planning
Comment Period
02/07/2012
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (3) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Decision Memo for Liberty-Pioneer Energy Source, LLC, Skyline Unit 10-17 | Decision Signed Date: 10/16/2012 Legal Notice Date: 11/13/2012 |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | NW ¼ SE ¼ of Section 17, Township14 South, Range 6 East, SLB&M. |
Environmental Assessment · Moab Ranger District · updated 12/10/2019
Moab Ranger Distrct/La Sal Mountains · Grand; San Juan, Utah
The proposal will look at designating new system trails, removing system trails that are no longer needed and changing the allowable uses for some trails.
Recreation management
Comment Period
06/23/2011
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Trail Management |
| Moab Non-Motorized Trail Project DN/FONSI | Decision Signed Date: 09/09/2013 Legal Notice Date: 09/12/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | The entire La Sal Mountain Range |
Decision Memo · Monticello Ranger District · updated 12/10/2019
north portion of Monticello District, T33S, R20E sections 10,11,14,22,23,27,28,33-35 and T34S, R20E sections 2-4, 9-11, 15-17. · San Juan, Utah
The project will improve forage production for big game and draw animals away from adjacent aspen treatment areas. The treatments would reduce the continuity of vegetative fuels to reduce the chances of severe wildland fire and damage to watersheds.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Decision
02/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Monticello Ranger District · updated 12/10/2019
North Elk Ridge in San Juan County, UT approx 20 miles northeast of Blanding · San Juan, Utah
The project addresses the health and diversity of ponderosa pine and aspen communities on North Elk Ridge through thinning and prescribed burning treatments.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Comment Period
10/03/2012
Objection Period Start
07/30/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34S, R19/20E and T35S, R19/20E, SLM |
Decision Memo · Moab Ranger District · updated 12/10/2019
Located on the north side of the La Sal Mountains in Grand County, UT approx. 20 miles east of Moab, UT in the Beaver Creek watershed. · Grand, Utah
Vegetation management project on the north side of the La Sal Mountains to improve forage production for big game and to reduce the continuity of fuels for wildland fire management, utilizing mechanical (bullhog) and hand (chainsaw)treatments.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
08/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T 25S, R25E, sections 19, 20, 21, 27, 28, 34,35 |
Decision Memo · Moab Ranger District · updated 12/10/2019
Moab and Monticello Ranger Districts of the Manti-La Sal National Forest Service · Grand; San Juan; Mesa; Montrose, Colorado; Utah
Re-issuance of priority 5-year special use permits for recreation including amendments, outfitter and guides permits, and recreation events
Recreation managementSpecial use management
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 12/10/2019
Moab and Monticello Ranger Districts of the Manti-La Sal National Forest Service · Grand; San Juan, Utah
Authorization of Recreation Special Use Permits for Priority status for up to 5 years. Permittees include variety of outfitters/guide operations and recreation events on the districts.
Recreation managementSpecial use management
Decision
12/2018 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (10); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Renewal Priority Special Use Permits and Amemdments (Fall 2018) | Decision Signed Date: 12/19/2018 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 12/10/2019
Recreation Special Uses on the Moab and Monticello Ranger Districts. · Grand; San Juan, Utah
This project will authorize the renewal of existing recreation special use permits that have or will expire. This also covers amendments to existing permits. The exact permittees are listed in the CE(available at office) and the DM (attached)
Recreation managementSpecial use management
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (10); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 12/10/2019
The Shingle Mill project is an area of about 10,680 acres in the foothills east and south of Monticello, Utah. It is within the Vega-Montezuma Creek HUC 5 watershed of the San Juan River. · San Juan, Utah
A vegetation management project to address the health, productivity and resiliency of vegetation and soil resources near Monticello, UT. The project is designed for the improvement of wildlife habitat and for fuels reduction.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Located within T33S, R23E SLM sections 33,34 and T34S, R23E sections 3,4,5,8,9,10,15,16,17,20,21,22,27,28,33 |
Decision Memo · Monticello Ranger District · updated 12/10/2019
Approximately 15 miles northwest of Blanding, Utah in the southcentral part of the Monticello Ranger District. · San Juan, Utah
The Monticello District proposes to approve an existing ditch and a proposed 6 inch above-ground pipe in connection with two inholdings within the forest.
Special use management
Comment Period
01/24/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Sections 26 and 27, T34S, R21E. |
Environmental Assessment · Moab Ranger District · updated 12/10/2019
8300 acres on the west slope of the La Sal Mountains · Grand; San Juan, Utah
Hazardous fuels reduction on 8300 acres on the west slope of the La Sal Mountains.
Fuels management
Comment Period
04/24/2014
Objection Period Start
03/26/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| West Slope Wildland Urban Interface Hazardous Fuels Reduction Project | Decision Signed Date: 05/08/2015 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 12/10/2019
Approximately 1 mile east of Geyser Pass and 1 mile south of Mt. Tomasaki in the La Sals. · San Juan, Utah
The Forest will be analyzing a proposed spring development for culinary water near Geyser Pass.
Special use management
Decision
09/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 6, T27S, R25E SLBM |
Decision Memo · Manti-La Sal National Forest All Units · updated 10/3/2019
Meetinghouse Canyon, Rilda Canyon, and Mill Fork Canyon within the Huntington Creek Watershed. · Emery, Utah
Implement structural improvements designed to harden & improve, or restore temporary structures installed during BAER work following the Trail Mountain Fire (2018). Some new structures are proposed for additional protection.
Special use managementWatershed management
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 9/23/2019
Permits guided hunting for the full Manti-La Sal National Forest administered lands. · Carbon; Emery; San Juan; Sanpete; Sevier, Utah
The proposed action would be to authorize soon to expire Outfitter/Guide permits to be renewed for continued Outfitter/Guide (Hunting) Operations. This permits would go into effect in August 2019 prior to the fall hunting season.
Special use management
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Sanpete Ranger District · updated 7/16/2019
Manti-La Sal National Forest - Wasatch Plateau · Carbon; Emery; Sanpete, Utah
The Forest proposes to salvage dead Engelmann spruce trees and implement fuels reduction treatments under HFRA. About 33,500 acres of treatment proposed.
Fuels managementVegetation management (other than forest products)
Comment Period
11/07/2017
Objection Period Start
05/28/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage) |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District; Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Moab Ranger District · updated 6/12/2019
The special use authorization is North of Old La Sal and provides power to Mountain Meadows. · San Juan, Utah
Re-issuance of a special-use authorization for the Mountain Meadows Powerline.
Special use management
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Township 28 South, Range 25 East, Section 22 |
Environmental Assessment · Monticello Ranger District · updated 6/3/2019
7 miles from Blanding, UT municipal watershed surrounding Dry Wash Reservoir & Nizhoni Campground; Johnson Creek drainage. · San Juan, Utah
Reduce hazard fuels and associated risk to forest resources, life, and property by mechanical thinning (logging, bullhog, and chainsaw) and prescribed burn (about 1800 acres). Blanding City municipal watershed & Boy Scout Camp permit area.
Fuels managementVegetation management (other than forest products)Road managementForest products
Objection Period Start
07/07/2010
Decision
09/2010 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Municipal Watersheds |
| Notice and Comment Regulation | 218 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| DN & FONSI for the Johnson Creek Hazard Fuels Project EA | Decision Signed Date: 09/27/2010 |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34S, R22E and T35S, R22E, SLM. |
Environmental Assessment · Moab Ranger District · updated 6/3/2019
NW corner of the Moab Ranger District adjacent to the north boundary of the Willow Basin private inholding · Grand, Utah
Mechanical (ground-based fecon head machinery and chainsaw) thinning with prescribed burning within the Willow Basin Wildland-Urban Interface area adjacent to private lands. Gambel oak, PJ and ponderosa pine. 1000 acres of 1725 acre project area.
Vegetation management (other than forest products)Fuels management
Decision
10/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| DN & FONSI for the Willow Basin Wildland Urban Interface Fuels Treatment | Decision Signed Date: 10/03/2010 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T25S, R24E and T25S, R25E, SLM |
Decision Memo · Ferron Ranger District · updated 5/29/2019
T17S R5E, SW4 NE4 Section 6, San Pete County, Utah. Immediately south of Skyline Drive; approximately 6 miles north of the junction of Skyline Drive and Orangeville-Ephraim Road. · Sanpete, Utah
The proposed Horseshoe Quarry is located at the northern edge of Horseshoe Flat. Approximately 70,000 yd3 (in-situ bank volume) of Flagstaff Limestone is available within the proposed quarry. Resources will be used to maintain Forest projects.
Minerals and geology
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Monticello Ranger District · updated 3/6/2019
The project area is located north of National Forest System Road 5608 and between the Cherry Creek and Woodenshoe Canyons and South of the Dark Canyon Wilderness. · San Juan, Utah
Add a repeater to the Monticello Ranger District to provide better VHF radio communications for Woodenshoe and Cherry Canyons of the Dark Canyon Wilderness Area. The addition of a tower would enhance radio coverage.
Regulations, directives, orders
Decision
02/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | NE Quarter, Section 27, Township 35 S., Range 18 E. |
Environmental Assessment · Ferron Ranger District · updated 11/6/2018
The project area is about 15 miles northwest of Castle Dale, UT; situated on the east slope of the Wasatch Plateau, extending from Skyline Ridge southeastward to Joes Valley Reservoir. · Carbon; Emery, Utah
In response to the 1995 Rescission Act, the Ferron Ranger District will complete analysis of grazing activities on the Clay Banks, Olsen Bench, Ridley Ridge, and Becks Ridge Sheep & Goat Grazing Allotments.
Grazing management
Comment Period
01/22/2013
Objection Period Start
10/2018 (Estimated)
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 11/1/2018
Ferron-Price Ranger District · Emery, Utah
Elements Traverse provides wilderness therapy to young adults through a variety of outdoor activities. And Emery County Event permits include the ATV/UTV Jamboree and Joes Valley Bouldering Festival
Recreation managementSpecial use management
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 11/1/2018
Located on the Ferron/Price Ranger District Manti-La Sal National Forest in Emery County, Utah. The project is approximately 10 miles northwest of Orangeville, Utah. · Emery, Utah
The Ferron/Price Ranger District on the Manti-La Sal NF proposes to prescribe burn approximately 4,004 acres within a 17,115 project area to regenerate aspen, improve wildlife habitat, protect watershed values, & reduce hazardous fuel conditions.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plantsWatershed management
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Township 16S Range 6E Sections 22, 27, 28, 33-35; Township 17S Range 6E Sections 2-5, 8-11, 14-29, 32-35; Township 18S Range 6E Section 1-5, 11, and 12, Salt Lake Meridian |
Environmental Assessment · Richfield Ranger District · updated 10/4/2018
790 Acre Lease Modification in portions of: Sec. 11, T21S, R4E; Sec. 14, T21S R4E; Sec. 15, T21S R4E; Sec. 22, T21S, R4E; Sec. 23, T21S, R4E; Sec. 23, T21S, R4E. · Sevier, Utah
The BLM and U.S. Forest Service are preparing an environmental assessment to analyze the impacts of a request by Canyon Fuel Company, LLC to modify the lease boundaries for federal coal leases UTU-84102(Greens Hollow)and U-63214(Quitchupah).
Minerals and geology
Comment Period
09/07/2017
Objection Period Start
06/14/2018
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Fishlake National Forest; Manti-Lasal National Forest |
| Districts | Richfield Ranger District; Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 9/27/2018
Gentry C&H Allotment · Emery, Utah
Installation of a spring head box, 2500-foot pipeline, and a trough to provide water to livestock in 2 pastures (East & West McCadden) of the Gentry Allotment.
Grazing management
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T16S, R7E, Sec. 1, NE 1/4 of SW 1/4, SLM |
Decision Memo · Sanpete Ranger District · updated 8/9/2018
The proposed road construction is in Township 17 N., Range 4 E., and Sections 19 and 30 in the Willow Creek portion of Ephraim Canyon. · Sanpete, Utah
Private Land Access through Forest Service Lands
Special use management
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Willow Private Land Access Project Willow Private Land Access Project | Decision Signed Date: 04/23/2014 |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Township 17 N., Range 4 E., and Sections 19 and 30 |
Decision Memo · Price Ranger District · updated 5/18/2018
Joes Valley Reservoir. · Emery, Utah
Improvement of the Joes Valley boat launch and beach area. Expand parking, replace and lengthen boat dock, maintain paved areas, install invasive species boat wash & inspection area, and replace existing vault toilet.
Recreation managementSpecial use management
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · R4 - Intermountain Region All Units · updated 3/20/2018
This project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, Utah, and Nevada. · Beaver; Duchesne; Emery; Garfield; Iron; Juab; Millard; Piute; Sevier; Uintah; Wasatch; Weber, Utah
This proposed 600 kV direct current transmission line is designed to carry renewable energy (primarily wind power) from generation sources in central Wyoming to markets in in the pacific southwest
Special use management
NOI in Federal Register
01/04/2011
DEIS NOA in Federal Register
02/18/2011
FEIS NOA in Federal Register
01/13/2017
Objection Period Start
01/21/2017
Decision
05/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Transwest Express Transmission Project | Decision Signed Date: 05/31/2017 |
| Forests | Ashley National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Uinta-Wasatch-Cache National Forest |
| Districts | Roosevelt Ranger District; Pine Valley Ranger District; Fillmore Ranger District; Richfield Ranger District; Ferron Ranger District; Heber-Kamas Ranger District; Spanish Fork Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Monticello Ranger District · updated 3/6/2018
The project area is an area of about 17,000 acres, located about 14 miles from Blanding, Utah, and 14 miles from Monticello, Utah in the Abajo Mountains. Maverick Point and Chippean Rocks area. · San Juan, Utah
Project designed to increase the resistance and resilience of vegetation communities & watersheds to climate change stressors, promotes a sustainable/manageable road system, reclaims abandoned uranium mine adits/waste & restores spring/headcut areas.
Minerals and geologyFuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsRoad managementForest productsRecreation managementWatershed management
NOI in Federal Register
01/15/2013
DEIS NOA in Federal Register
02/14/2013
FEIS NOA in Federal Register
10/2017 (Estimated)
Objection Period Start
10/2017 (Estimated)
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Biomass; Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Abandoned Mine Land Clean-Up; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T33S, R20E & R21E and T34S, R20E & R21E, SLM. |
Environmental Assessment · Monticello Ranger District · updated 2/23/2018
Located approximately 3 miles east of La Sal. · San Juan, Utah
Denison Mines submitted a Plan of Operations Amendment for four underground uranium mines, known as the La Sal Mines Complex, to the BLM and Forest Service for approval. The BLM will act as lead agency with the Forest Service as a cooperating agency
Minerals and geology
Comment Period
02/22/2011
Objection Period Start
11/20/2014
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 5, T29S R 25E |
Decision Memo · Price Ranger District · updated 2/6/2018
North end of Skyline Drive, Forest Road #0150. 1/2 mile inside the National Forest boundary. · Utah, Utah
Construct a limestone aggregate quarry, crushing, and storage site.
Minerals and geology
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Sanpete Ranger District · updated 1/26/2018
Twelve Mile Canyon, Manti-La Sal National Forest. · Sanpete, Utah
Develop sustainable, resource sensitive transportation routes to camping and staging areas.Contain motorized use at many dispersed campsites, modify some and close others. Provide additional camping and trail opportunities to meet user demands.
Road managementWatershed managementRecreation managementHeritage resource management
Comment Period
06/26/2014
Objection Period Start
11/23/2017
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 11/16/2017
The site is 17 miles northwest of Orangeville, UT. State Road (SR) 29 and existing Forest Service Roads (FSR) Millers Flat (50014) and Lowry Water (50038) provide access to Middle Mountain Unit #1 · Emery, Utah
FS will evaluate the Application for Permit to Drill and Surface Use Plan of Operation. The FS will analyze the environmental impacts of the proposal on non-mineral resources and compliance with applicable laws, regulations, and the Manti-La Sal LRMP
Minerals and geology
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (3) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Emery County in the NE 1/4 SW 1/4 of Section 29, Township16 South, Range 6 East, SLB&M. |
Decision Memo · Moab Ranger District · updated 11/1/2017
The proposed fence extensions are located on North Elk Ridge in Section 33, T33S, R20E and Section 15, T34S, R20E.This is approximately 20 miles northwest of Blanding, UT and 20 miles west of Monticello, UT. · San Juan, Utah
The Moab/Monticello Ranger District, Manti-La Sal National Forest proposes to extend two existing pasture fences on the Cottonwood Allotment to improve control of livestock movement.
Grazing management
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ferron Ranger District · updated 10/4/2017
Straight and Cottonwood Canyons west of Orangeville, Utah · Emery, Utah
Bouldering and camping at Joe's Valley have contributed to recreation resource impacts throughout the area. The purpose is to mitigate current impacts to soil and vegetation while providing quality recreation opportunities and protecting resources.
Recreation management
Comment Period
05/28/2015
Objection Period Start
07/04/2017
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Straight Canyon along Utah Highway 29, Cottonwood Canyon along Forest Road 50040, and Grimes Wash near Utah Highway 57. These areas are located in Townships 17 and 18 South, Range 6 and 7 East. |
Decision Memo · Sanpete Ranger District · updated 9/29/2017
Levan Peak - Juab County, Sanpitch Mountains. · Juab, Utah
Fiber cable route serving facilities on South Levan Peak Communication Site. About 1/4 mile buried in Broad Canyon Road corridor and about 12,200 feet installed aerially on existing Rocky Mountain Power poles.
Special use management
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 9/29/2017
Existing powerlines in Moab and Monticello area · Grand; San Juan, Utah
The FS will analyze reissuing two special use permits to PacificCorp/Rocky Mountain Power for maintenance and operation of their Harley Dome to Castleton (Rattlesnake) powerline ROW and their Small Pine Ridge Powerline ROW.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Sanpete Ranger District · updated 8/16/2017
The proposed Willow Project area is located 2 miles east of Ephraim, Utah. · Sanpete, Utah
Reduce the probability of a high severity wildfire that is difficult to control; and reduce the negative consequences of a fire on the soil and vegetation resources in the area. Need: The current vegetation communities are in a condition that a
Fuels managementVegetation management (other than forest products)Forest products
Comment Period
02/28/2013
Objection Period Start
06/20/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Special Products Sales; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Manti-La Sal National Forest All Units · updated 7/20/2017
Emery County Utah. The pipeline would be constructed along National Forest System Road 50246 (Emery County Road 306) and State Hwy 31. · Emery, Utah
PacifiCorp submitted and application for a pipeline to convey intercepted groundwater from the Portals in Rilda Canon to a permitted discharge location at the Huntington Power plant to allow for final closure and reclamation of the mine.
Minerals and geologyWatershed management
Comment Period
06/14/2016
Objection Period Start
03/07/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 7/19/2017
The project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, and Utah. Project terminates at the Mona substation in central Utah. · Beaver; Duchesne; Emery; Garfield; Iron; Juab; Millard; Piute; Sevier; Uintah; Wasatch; Weber, Utah
This proposed 500 kV transmission line is designed to deliver power to Rocky Mountain Power utility costumers in Utah and the intermountain west. Generation sources are located in central Wyoming.
Special use management
NOI in Federal Register
04/01/2011
DEIS NOA in Federal Register
04/01/2011
FEIS NOA in Federal Register
01/13/2017
Objection Period Start
01/21/2017
Decision
05/2017 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Energy Gateway South Transmission Project | Decision Signed Date: 05/31/2017 |
| Forests | Ashley National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Uinta-Wasatch-Cache National Forest |
| Districts | Duchesne Ranger District; Pine Valley Ranger District; Fillmore Ranger District; Richfield Ranger District; Price Ranger District; Heber-Kamas Ranger District; Spanish Fork Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Ferron Ranger District · updated 7/19/2017
Potters Canyon · Emery, Utah
The Forest Service is evaluating a proposal to gather the roots of Veratrum californium for pharmaceutical research.
Forest productsVegetation management (other than forest products)
Comment Period
08/09/2016
Objection Period Start
03/21/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Products Sales |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T15S, R5E section 25, 36 and T15S, R6E section 31 |
Decision Memo · Ferron Ranger District · updated 7/19/2017
Ferron/Price Ranger District · Emery, Utah
Expand existing gravel pit to access limestone resources.
Minerals and geology
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 7/19/2017
South Horn · Emery, Utah
The Manti-La Sal National Forest proposes to remove invading pinyon and Utah juniper in the South Horn area to improve habitat for greater sage-grouse. Removal of PJ will emphasize retention of healthy sagebrush areas.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements |
| South Horn Wildlife Habitat Improvement Project | Decision Signed Date: 04/12/2017 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 9/28/2016
The existing Monument Peak Communication Site near Trough Springs Ridge. · Emery, Utah
The Forest proposes to issue a 30 yr SUP to UDOT Avalanche Forecasting program for the installation of a weather station on the existing Monument Peak Communication Site to assist avalanche forecasters in the collection of data for hazard evaluation.
Special use management
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 8/25/2016
Existing wells in Straight Canyon and Cottonwood Canyon · Emery, Utah
The Forest Service will analyze the effects of issuing a 20 year SUP for 5 existing water monitoring wells on National Forest System Lands. The SUP would include road access, parking, and the reclamation of the monitoring wells.
Special use management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Moab Ranger District · updated 8/18/2016
The project area is located on South Elk Ridge (Sections 3,4, 9 of T36S, R19E and Sections 27 &34 of T35S, R19E) about 21 miles west of Blanding, UT. · San Juan, Utah
Relocate and reconstruct about 2 mi. of Kigalia Canyon fence; construct exclosures to protect spring and riparian areas in Kigalia drainage; provide water developments outside of the drainage; and reconfigure the fence around Admin site.
Vegetation management (other than forest products)Grazing management
Comment Period
08/21/2013
Objection Period Start
02/2016 (Estimated)
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 7/21/2016
Boardinghouse Canyon and James Canyon · Emery, Utah
Reissuance of a SUP for the continued operation and maintenance of a linear ROW PRI-95.
Special use management
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 7/21/2016
Resources Monitoring sites are in Trough Springs, Candland Mountain and meeting house Canyon. The power line is in Rilda Canyon. · Emery, Utah
The forest proposes to re-issue 2 SUPs to Rocky Mountain Power. One for the continued operation and maintenance of resource monitoring sites. And one for continued operation and maintenance of an existing overhead power line.
Special use management
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 7/21/2016
Adjacent to existing facilities at the top of Fairview canyon on state route 31. · Emery, Utah
UDOT would construct a 40 foot by 50 foot shed for the purpose of storing their snow removal equipment
Special use management
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District; Price Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manti-La Sal National Forest All Units · updated 6/17/2016
The exploration area is located in central Utah approximately 15 miles northwest of Castle Dale, Utah · Emery, Utah
Reissuance of an expired special use permit for the remaining 6 exploration drill holes.
Minerals and geology
Decision
06/2016 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Moab Ranger District · updated 6/8/2016
The projects are located on West Slope of the La Sal's, Pinhook Valley and Andy Mesa areas (Sections 2 of T27S, R23E; Sections 7,8,9,16,19,20,29,30 of T26S, R24E and Section 24 of T25S, R24E). · Grand; San Juan, Utah
Relocate and/or expand two existing spring exclosures; protect 7 spring/seep areas and provide clean water for livestock and wildlife on the west La Sal Mountains and develop water in the Pinhook Valley to improve livestock distribution.
Watershed managementGrazing managementVegetation management (other than forest products)
Comment Period
09/26/2013
Objection Period Start
07/09/2015
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Ferron Ranger District · updated 5/20/2016
The proposed trail is located approximately 6 miles northwest of Orangeville and Castle Dale, UT. · Emery, Utah
The Ferron/Price RD of the Manti-La Sal NF has been approached by Emery County, the Emery County Trails Committee, and OHV groups to re-establish motorized trail access onto East Mountain via the reclaimed Des-B-Dove mine access road.
Recreation management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Township 17 South, Range 7 East, Section 25, 26. |
Decision Memo · Manti-La Sal National Forest All Units · updated 4/8/2016
Located approximately twenty miles east of Fairview, Utah in Fairview Canyon. · Sanpete, Utah
Wasatch Academy wants a special use permit renewed to operate and maintain a day use environmental science classroom.
Special use management
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Sec 23, T13S, R5E of the Salt Lake principal meridian. |
Decision Memo · Ferron Ranger District · updated 3/28/2016
The majority of the water developments will be on the Olsen Bench Allotment, located 15 miles northwest of the town of Castle Dale. The Gentry allotment is 11 miles northwest of Huntington. · Emery, Utah
Develop water resources for the use of livestock grazing distribution.
Grazing management
Decision
04/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Olsen Bench S&G, T17S R5E, SEC26 SLBM; Gentry C&H, Sec. 1, T16S R7E., SEC26 |
Environmental Impact Statement · Ferron Ranger District · updated 10/6/2015
Sevier and Sanpete Counties (UT), approximately 10.5 miles east of the town of Emery Utah and approximately 5 miles north of the SUFCO Mine portal. · Sanpete; Sevier, Utah
BLM received application for a lease on non-leased NFS coal lands and for FS consent to the lease. BLM and FS are co-leading preparation of SEIS in cooperation with Office of Surface Mining to disclose effects of proposed lease.
Minerals and geology
NOI in Federal Register
12/07/2004
DEIS NOA in Federal Register
02/12/2008
FEIS NOA in Federal Register
02/27/2015
Objection Period Start
03/03/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Record of Decision Greens Hollow Federal Coal Lease Tract UTU-84102 | Decision Signed Date: 10/05/2015 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Section 34, 33, T14S, R1E and Section 4, T15 S, R1E, SLB&M |
Environmental Assessment · Monticello Ranger District · updated 10/2/2015
Approximately 6 miles west southwest of Monticello Utah. · San Juan, Utah
Empire Electric is proposing to replace their existing aerial and buried powerline with a new buried line from a private inholding to the Abajo Peak Communication Site.
Special use management
Scoping Start
06/2015 (Estimated)
Comment Period
07/2015 (Estimated)
Objection Period Start
10/2015 (Estimated)
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34S R22E, Sec 1 & 12. T34S R23E, Sec 6. |
Environmental Assessment · Price Ranger District · updated 10/2/2015
Price Ranger District approximately 24 air miles west of Price Utah · Carbon; Emery; Sanpete, Utah
The project purpose is to salvage dead Engelmann spruce and treat fuels on approximately 5700 acres, using mechanical equipment and prescribed fire, construct 30 miles of temporary road and improve ingress and egress in Little Swens Canyon.
Fuels management
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Shalom Hazard Fuels Project | Decision Signed Date: 05/17/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | T.13S.R.6E.Sec2,3,4,5,8,9,10,11,13,14,15,16,17,20,21,22,23,24,25,26,27,28,29,32,33,34,35,36T.14S.R.6E.Sec1,2,3,4,5,6,7,8,9,10,11,12,13,14,15,16,17,22,23,24,25,26,27.T.14S.R.7E.Sec7,17,18,19,20,29,30,3 |
Decision Memo · Ferron Ranger District · updated 9/24/2015
The project is located on the Ferron-Price Ranger District, Manti-La Sal National Forest in Emery County, Utah · Emery, Utah
The Ferron-Price Ranger District proposes to use tracked skid steers with mastication heads on approximately 2,500 acres
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | The Dry Wash Wildlife Project Area is located in Township 19 South, Range 6 East, Sections 31 and 32, Township 20 South, Range 6 East., Sections 5, 6, 9, 10, 15, 16, 21, 24, 25, 27, 28, 32, 33, 34, an |
Environmental Assessment · Monticello Ranger District · updated 9/8/2015
West Side of the La Sal Mtns, along the La Sal Loop Road · San Juan, Utah
Construct 1.75 miles of fence on the western and northern parts of the Loop Rd within the Bald Mesa Allotment.
Grazing management
Comment Period
04/19/2012
Decision
10/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Structural Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Sec. 25 T26S, R23E and Sec. 18 T26S, R24E |
Environmental Assessment · Sanpete Ranger District · updated 6/30/2015
Lake Fork · Utah, Utah
Evaluate reissuance of Term Grazing Permits on the Allotment
Grazing management
Comment Period
05/29/2013
Objection Period Start
03/2015 (Estimated)
Decision
05/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Lake Fork C&H Allotment Grazing Reauthorization | Decision Signed Date: 09/30/2010 (FS Withdrawn) Legal Notice Date: 10/06/2010 |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | 2 miles east of Thistle |
Decision Memo · Monticello Ranger District · updated 6/30/2015
Marcy Look Project - south of Duck Lake on Elk Ridge. · San Juan, Utah
The Manti-La Sal National Forest, Moab/Monticello Ranger District, proposes to authorize Utah Energy Corporation to drill up to 76 exploration holes in their Marcy Look project area. The area is located on unpatented mining claims on Elk Ridge.
Minerals and geology
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | Unpatented mining claims located within Sec. 31, T34S, R20E. |
Decision Memo · Monticello Ranger District · updated 6/27/2015
Approximately 2 miles north of the town of Old La Sal. · San Juan, Utah
Bill Barrett Corp proposes to drill two gas wells on their existing lease.
Minerals and geology
Decision
02/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (17), 36 Cfr 220.6(E)(17) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Bill Barrett Exploration Drilling Pine Ridge #2 and #3 | Decision Signed Date: 02/15/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Sections 22 and 23, T28S, R25E, SLBM |
Environmental Assessment · Moab Ranger District · updated 6/27/2015
Located about 14 air miles from La Sal, Utah on the Moab Ranger District in Colorado · San Juan; Montrose, Colorado; Utah
Reduce hazard fuels within ponderosa pine stands in the Buckeye Reservoir recreation area by reducing tree and deciduous shrub densities through weeding, thinning, and prescribed burning.
Forest productsVegetation management (other than forest products)Fuels management
Objection Period Start
08/05/2008
Decision
10/2008 (Estimated)
Implementation
12/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (10) |
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Buckeye Reservoir Hazard Fuels Thinning Project | Decision Signed Date: 07/26/2006 |
| The Buckeye Reservoir Hazad Fuels Thinning Project | Decision Signed Date: 10/23/2008 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T48N, R20W, Sections 1,2,3,12,&13 New Mexico Principal Meridian |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/26/2014
Located along Trough Springs Ridge Road. · Carbon, Utah
Reissue a special use permit to PacifiCorp for the communication site along Trough Springs Ridge Road to operate and maintain an electronic data link at the communication site.
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Sec 30, T14S, R7E of the Salt Lake principal meridian. |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/26/2014
Nine air miles east of Ephraim, UT. · Sanpete, Utah
Sanpete County Sheriff Search and Rescue want a special use permit renewed to operate and maintain electronic communication equipment on the Horseshoe Electronic Comm Site for emergency services.
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Section 15, T17S, R4E of the Salt Lake principal meridian. |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/26/2014
Located approximately three miles east of Spring City, UT in Spring City Canyon. · Sanpete, Utah
Spring City Municipal Corporation wants a special use permit renewed to operate and maintain five spring collection areas and associated water transmission pipelines.
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Sec 1, 12, and 13, T16S, R4E of the Salt Lake principal meridian. |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/26/2014
The five seismographs are scattered throughout the northzone of the Manti-La Sal National Forest. · Carbon; Emery; Sanpete, Utah
The University of Utah wants to renew their special use permits for operating and maintaining five seismograph stations onto one unified permit.
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District; Ferron Ranger District; Price Ranger District |
| Legal Land Description | DBD Sec 25, T17S, R7E; TMU Sec. 35, T17S, R6E; SGU Sec. 1, T19S, R2E; LEVU Sec. 16, T15S, R1E; ELU Sec 36, T13S, R6E. |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/26/2014
Deep Lake is located in Twelvemile Canyon not far from Skyline Drive. · Sanpete, Utah
The Utah DWR wants a special use permit reissued to them for Deep Lake
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Section 36, T19S, R3E of the Salt Lake principal meridian. |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/26/2014
Approximately twenty miles east of Mayfield, Utah at the head of Twelvemile Canyon. · Sanpete, Utah
Utah Division of Wildlife Resources (DWR) wants a special use permit renewed for the operation and maintenance of Shingle Mill Reservoir and dam for the purposes of maintaining a public fishery.
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Section 6, T20S, R4E of the Salt Lake principal meridian. |
Decision Memo · Monticello Ranger District · updated 9/27/2013
Near Mesa Guard Station just west of Loop Road on Moab Ranger District · Grand, Utah
Project has been CANCELLED because this is a low priority project at this time.
Special use management
Scoping Start
11/2013 (Estimated)
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
| Legal Land Description | T26S R24E Sec. 30 |
Decision Memo · Monticello Ranger District · updated 9/27/2013
Willow Basin in the La Sals · Grand, Utah
This project has been CANCELLED because this is a low priority project at this time.
Special use management
Scoping Start
11/2013 (Estimated)
Decision
03/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 35, T25S, R24E, SLBM |
Decision Memo · Monticello Ranger District · updated 9/27/2013
Elk Ridge area of the Monticello Ranger District · San Juan, Utah
This project is the same as the Utah Energy Uranium Exploration Marcy Look (Project Number 32659)on this SOPA. For this reason this entry is CANCELLED.
Minerals and geology
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34S R19E Section 36 |
Decision Memo · Moab Ranger District · updated 9/27/2013
Approximately 1 mile west of Dark Canyon Lake in the La Sal Mountains · San Juan, Utah
A road measuring approximately 190 feet long by 16 feet wide is proposed to be constructed from FS road 0129 to the Forest boundary for access to private property. A locked gate will be installed at the junction with FR 0129 to limited access.
Special use management
Comment Period
08/02/2012
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 18, T27S, R25E, SLB&M |
Environmental Assessment · Manti-La Sal National Forest All Units · updated 9/27/2013
The project area is located up Twelvemile Canyon, approximately 10 miles east of Mayfield, UT. · Sanpete, Utah
Project proponent is not planning to pursue this project at this time.
Special use management
Scoping Start
12/2013 (Estimated)
Comment Period
12/2013 (Estimated)
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Secretary/Undersecretary Approval |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Townships 19 and 20 South, Range 3 East, Salt Lake Meridian |
Decision Memo · Moab Ranger District · updated 9/27/2013
Vision Mine: San Juan County, Utah, 15 miles southeast of Moab, UT. Valley View Mine: Montrose County, Colorado, 2 miles southeast of Buckeye Reservoir. · San Juan; Montrose, Colorado; Utah
This project has been CANCELLED because NEPA is not required for implementation.
Minerals and geology
Decision
04/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Abandoned Mine Land Clean-Up |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Vision Mine: T 27 N R 23 E, SWNENE Section 35, SLBM. Valley View Mine: T 48 N, R 19 W, S2NE4 Section 7, NMPM. |
Decision Memo · Moab Ranger District · updated 9/27/2013
Located approximately 15 miles SE of Moab. · Grand; San Juan, Utah
This project has been CANCELLED because NEPA is not required for implementation.
Land management planning
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T 27 N, R 23 E, Section 35, NE 1/4, SLBM. |
Decision Memo · Price Ranger District · updated 9/26/2013
Dairy Fork drainage · Sanpete, Utah
The Sanpete District Ranger is proposing a mechanical treatment of approximately 2,806 acres of pinyon/juniper encroachment into sagebrush-steppe vegetation types to improve winter habitat for deer and elk.
Fuels managementWildlife, fish, rare plantsWatershed management
Comment Period
02/28/2011
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | T.10S. R.5E. Sections 20-23 and 26-29. |
Decision Memo · Manti-La Sal National Forest All Units · updated 5/3/2013
Sec 16, T21S, R6E., SL Mer · Emery, Utah
The US Geological Survey (USGS) has applied to amend their special use permit to inclued an addtional stream gauging location. USGS would relocate a stream gauging station off of private land 0.6 miles upstream onto National Forest System lands.
Special use management
Comment Period
12/11/2012
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| U.S. Geological Survey Muddy Creek Stream Gauging Station | Decision Signed Date: 04/25/2013 Legal Notice Date: 04/30/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Sec 16, T21S, R6E., SL Mer |
Decision Memo · Manti-La Sal National Forest All Units · updated 5/3/2013
Sec 10, T19 S, R 4E., SL Mer · Sanpete, Utah
Utah Division of Wildlife Resources (UDWR) has applied to amend their special use permit to make modification to the Duck for fish trap to improve the conservation and management of Colorado River cutthrough trout.
Special use management
Comment Period
12/11/2012
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Sec 10, T19 S, R 4E., SL Mer |
Environmental Impact Statement · Sanpete Ranger District · updated 4/2/2013
Approximately 2 miles East of Levan, Utah · Juab, Utah
Sunroc has submitted a Plan of Operations for the Chicken Creek Gypsum Mine on their locatable mining claims. The Forest Service must evaluate the Plan and decide whether or not additional mitigations are needed to protect non-mineral resources.
Minerals and geology
NOI in Federal Register
08/01/2008
DEIS NOA in Federal Register
08/01/2008
FEIS NOA in Federal Register
11/06/2012
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Section 34, T14S, R1E and Section 4, T15 S, R1E, SLB&M |
Environmental Assessment · Manti-La Sal National Forest All Units · updated 3/27/2013
The two lease modification areas are located about 15 miles northwest of Orangeville, UT. · Emery, Utah
The BLM Utah State Office notified the MLNF that PacifiCorp applied to modify two federal leases, UTU-88554 and UTU-06039, by adding a total of 1180 acres of unleased federal lands to the existing leases.
Minerals and geology
Comment Period
02/07/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Ira - Inventoried Roadless Area Activities Requiring Secretary/Undersecretary Approval |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Deer Creek-Upper Cottonwood Two Lease Mod Leases UTU-06039 & UTU-88554 | Decision Signed Date: 01/25/2013 Legal Notice Date: 01/29/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Located in sections 22, 23, 24, 25, 26, & 27, T. 16 S., R. 6 E., SLB&M. |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/27/2013
Located on the Ferron-Price R.D. along Trough Springs Ridge Road at the Boardinghouse Ridge Comm Site · Carbon, Utah
The Town of Emery proposed replacing its existing electronic communications facility at the Boardinghouse Ridge communications site with an upgraded facility.
Special use management
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Emery County Boardinghouse Ridge Communication Site Special Use Permit | Decision Signed Date: 03/22/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | NW1/4, SW1/4, SE1/4 of Sec 25, T13S, R6E |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/27/2013
The telephone line is located on an existing power pole running along Forest Road 50040 to Trail Mnt. Mine. · Emery, Utah
Emery Telecom seeks renewing their special use permit for a telephone line across NFS lands to Trail Mountain Mine.
Special use management
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Emery Telephone Trail Mountain Line Special Use Permit Renewal | Decision Signed Date: 02/13/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Sec 25, T17S, R6E, Salt Lake Meridian |
Decision Memo · Manti-La Sal National Forest All Units · updated 3/27/2013
Approximately three miles east of Mayfield, Utah near Twelvemile Canyon. · Sanpete, Utah
The Town of Mayfield wants a special use permit renewed for the operation and maintenance of Olsen Canyon Spring Development and Water Transmission Line for the purpose of transporting culinary water.
Special use management
Decision
03/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Mayfield Olsen Canyon Spring and Water Transmission Line | Decision Signed Date: 03/11/2013 |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Section 11, T20S, R2E of the Salt Lake principal meridian. |
Decision Memo · Ferron Ranger District · updated 12/19/2012
Approximately 18 and 22 miles north of Huntington, UT along Utah State Highway 31 · Emery, Utah
The Ferron/Price Ranger District, Manti-La Sal National Forest is proposing improvement of two trailheads, perpetuating dispersed camping at these trailheads, approximately 0.5 miles of non-motorized trail and decommissioning one campsite.
Recreation management
Comment Period
04/03/2012
Decision
11/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Trail Management; Travel Management |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | T15 South, R 7 East, Section 29 (Horse Canyon) and T14 South, R 7 East, Section 31 (Engineer Canyon) |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/19/2012
The powerline is located approximately ten miles north-west of Orangeville, UT. · Emery, Utah
PacifiCorp wants to have renewed their special use permit for the operation and maintenance of a power transmission and distribution line to the Des-Bee-Dove Mine.
Special use management
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Sec 25 & 26, T17S, R7E of the Salt Lake principal meridian. |
Decision Memo · Manti-La Sal National Forest All Units · updated 9/28/2012
The project area is located northeast of Joe’s Valley Reservoir and about 10 miles northwest of Orangeville, UT. · Emery, Utah
Fossil Rock Fuels, LLC plans to drill 27 coal exploration borings using helicopter assisted and truck mounted units between 2012 and 1014.
Minerals and geology
Comment Period
02/07/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Fossil Rock Fuels, LLC SUP for Cottonwood Tract Lease, SITLA ML-51191-OBA | Decision Signed Date: 05/25/2012 Legal Notice Date: 06/05/2012 |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | The project location is: S L B & M, Township 17 South and Range 6 East, Sections 2, 3, 4, 8, 9, 10, 11, 14, 15, 17, 20, 21, 23, and 24. |
Decision Memo · Sanpete Ranger District · updated 9/28/2012
Maple Canyon Campground located five miles west of Foutain Green, UT · Sanpete, Utah
This project proposes to create two more single family campsites, improve one existing site, and increase day use parking to accomodate five more vehicles.
Recreation management
Comment Period
01/20/2012
Decision
06/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Township 14 South, Range 2 East, Section 34 |
Decision Memo · Moab Ranger District · updated 9/21/2012
Adobe Mesa · Grand, Utah
This project does not require a written decision (eg Decision Memo). Therefore, it was removed from the SOPA.
Land ownership management
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T25S, R24E, Section 21 |
Decision Memo · Moab Ranger District · updated 9/21/2012
Two air miles NE of the City of La Sal · San Juan, Utah
This project does not require a written decision (eg Decision Memo) and therefore was removed from the SOPA.
Land ownership management
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T28S, R24E, Section 25 |
Decision Memo · Moab Ranger District · updated 9/21/2012
Mason Draw · Grand, Utah
This project does not require a written decision (eg Decision Memo) and therefore was removed from the SOPA.
Land ownership management
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T26S, R24E Sections 17, 21 |
Decision Memo · Moab Ranger District · updated 9/21/2012
Southwest of Warner Recreation Site · Grand, Utah
This project does not require a written decision (ie Decision Memo) and therefore was removed from the SOPA.
Land ownership management
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T26S, R24E, Section 29 |
Decision Memo · Moab Ranger District · updated 9/21/2012
Near Mill Creek Canyon Overlook · San Juan, Utah
This project does not require a written decision (ie Decision Memo) and therefore was removed from the SOPA.
Land ownership management
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T26S, R24E, Section 32 |
Decision Memo · Moab Ranger District · updated 9/21/2012
Boundary of State and National Forest Land · San Juan, Utah
This project does not require a written decision (ie Decision Memo) and therefore was removed from the SOPA.
Land ownership management
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T28S, R25E, Section 3 |
Decision Memo · Moab Ranger District · updated 9/21/2012
La Sal Creek, North of Doe Creek · San Juan, Utah
This project does not require a written decision (ie Decision Memo) and therefore was removed from the SOPA.
Land ownership management
Decision
12/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | T28S, R25E, Section 7 |
Decision Memo · Sanpete Ranger District · updated 8/28/2012
Skyline Tractor Salvage Project area is located 12 miles east of Mayfield, Utah. · Sanpete, Utah
Salvage dead Engelmann spruce on 205 acres to remove all merchantable Engelmann spruce 10 inches Diameter at Breast Height (DBH) and greater, with the exception of wildlife snags, using ground-based systems and aerial (cable) systems.
Vegetation management (other than forest products)
Decision
02/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District; Ferron Ranger District |
| Legal Land Description | Township 19 South, Range 4 East, Sections 15, 16, 28, 29 and Township 20 South, Range 4 East, Sections 4, 5, 8, and 9. |
Environmental Assessment · Price Ranger District · updated 7/27/2012
Carbon County, Utah. The project site is located 2.7 miles west of Scofield Reservoir and 1.5 miles west of the Forest Service boundary on FR 009. · Carbon, Utah
Reclamation of the Pondtown Creek abandoned coal mine through removal of coal waste and concrete, recontouring, and revegetation to approximate pre-mining conditions.
Watershed managementMinerals and geology
Comment Period
03/09/2010
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Abandoned Mine Land Clean-Up; Watershed Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | T. 12 S. R 6 E., S1/2 SE1/4, Section 2 |
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
Environmental Assessment · Ferron Ranger District · updated 5/31/2012
The Millers Flat Project on the Ferron Ranger District of the Manti-LaSal NF · Emery; Sanpete, Utah
The Millers Flat Project proposed to harvest timber and perform fuels reduction treatments on 480 acres. Closed approximately 16.8 miles of routes. Identify 44 recreation sites for management, close 4 sites. Restore or protect 35 acres of wetlands
Road managementForest productsFuels managementRecreation managementWatershed managementVegetation management (other than forest products)
Comment Period
12/23/2008
Decision
08/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | The Millers Flat Project is located in T. 15 S., R. 6 E., Sections 3 thru 10, 15 thru 22, and 27 thru 33. |
Decision Memo · Monticello Ranger District · updated 2/2/2012
Carpenter Ridge area of Colorado - exact locations restricted due to sensitive nature of equipment. · Montrose, Colorado
The BOR proposed to install 2 seismic stations to monitor earthquakes.
Special use management
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Bureau of Reclamatio Seismic Stations | Decision Signed Date: 09/09/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
Decision Memo · Ferron Ranger District · updated 1/18/2012
Proposal is located approximately one mile north of Potters Ponds on the Ferron/Price RD · Sanpete, Utah
The Ferron/Price RD of the Manti-La Sal NF is proposing to construct a motorized trail in Sanpete County, Utah approximately one mile north of Potters Ponds. The trail would be about 1 mile in length. One mile of road would be closed.
Recreation managementRoad management
Comment Period
02/25/2011
Decision
05/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Trail Management; Travel Management |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Township 15 South, Range 6 East, Sections 32 and 33, Sanpete County, Utah |
Decision Memo · Monticello Ranger District · updated 1/17/2012
Bald Mesa Communications Site located on the Moab Ranger District · Grand, Utah
Verizon Wireless proposes to build a new tower and building with associated equipment on Bald Mesa Communications Site.
Special use management
Scoping Start
09/2010 (Estimated)
Decision
10/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
| Legal Land Description | T26S R24E Section 19 |
Decision Memo · Manti-La Sal National Forest All Units · updated 1/5/2012
The federal parcel is located in Crandall Canyon adjacent to the existing mine. The non-federal parcel is located in Huntington Canyon along SR 31 approximately 12 miles east of Huntington. · Emery, Utah
Emery County proposes exchanging 2.5 acres of NFS land for 7.5 acres of county land to give the County jurisdicition over the Crandall Canyon memorial established in honor of the six miners and three rescuers who died in the 2007 mine disaster.
Special use management
Comment Period
02/15/2011
Decision
12/2011 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Crandal Canyon Monument Land Exchange Decision Memo | Decision Signed Date: 12/27/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Federal Parcel: Section 6, T16S, R7E. Non-federal parcel: Section 15, T16S, R7E. |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/22/2011
There are sites on all the Ranger Districts on the Manti-La Sal National Forest (Ferron/Price, Moab/Monticello and Sanpete Ranger Districts). · Carbon; Emery; Grand; Juab; San Juan; Sanpete; Utah, Utah
Reissue Snotel and Snow Course permit for sites on all the Ranger Districts on the Manti-La Sal National Forest (Ferron/Price, Moab/Monticello and Sanpete Ranger Districts). The facilities authorized would include those currently on the sites.
Special use management
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| NRCS SNOTEL and Snow Course Sites Special Use Permit | Decision Signed Date: 12/12/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Manti-La Sal National Forest All Units |
| Legal Land Description | Manti-La Sal N.F. |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/15/2011
Electric Lake and its dam are located on private land approximately twenty-five miles north-west of Huntington, UT. About forty acres of the reservoir inundate NFS lands at the north end of the lake. · Carbon, Utah
PacifiCorp proposes reducing the minimum stream flow requirement out of Electric Lake Dam into Huntington Creek on NFS lands.
Special use management
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | Sec 14, T14S, R6E of the Salt Lake principal meridian. |
Decision Memo · Manti-La Sal National Forest All Units · updated 12/2/2011
Willow Creek Road is located in Ephraim Canyon approximately five miles east of Ephraim, UT. · Sanpete, Utah
Camp UTIBACA requests a special use permit to construct, operate, and maintain an underground electric cable in Willow Creek Road to the private camp.
Special use management
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Camp UTIBACA Underground Electric Cable Special Use Permit | Decision Signed Date: 08/30/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | Sections 19 and 30, T17S, R4E of the Salt Lake principal meridian. |
Environmental Assessment · Manti-La Sal National Forest All Units · updated 12/2/2011
The lease modification area is located approximately 28 miles northwest of Price, UT on the Ferron-Price RD, adjacent and north of the existing leases and current permitted area for Skyline Mine. · Carbon, Utah
Arch Coal through subsidiaries Ark Land Co and Canyon Fuel Co applied for a federal coal lease modification to the Winter Quarters Federal Coal Lease UTU-67939 through the BLM to add 770 acres of federal coal reserves.
Minerals and geology
Comment Period
05/17/2011
Decision
11/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Modification of Winter Quarters FEderal Coal Lease UTU-67939 | Decision Signed Date: 11/23/2011 Legal Notice Date: 12/01/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Price Ranger District |
| Legal Land Description | SL Mer, T12S, R6E, Sec 25: Lots 3, 4, SW4NE4, SW4, W2SE4; Sec 26: Lots 1-4, N2SW4, SW4SW4, N2SE4 (private); and Sec 34: NE4NE4. |
Environmental Assessment · Moab Ranger District · updated 10/11/2011
The Beaver allotment encompasses approximately 15,800 acres of National Forest System lands located about 32 miles northeast of Moab, UT. It is situated on the North and South Beaver Mesa and Polar M · Grand, Utah
The purpose of the proposal is to manage livestock grazing in a manner that meets or moves towards the desired conditions defined in the 1986 Manti-La Sal National Forest Land & Resource Management Plan (Forest Plan).
Grazing management
Comment Period
01/13/2011
Decision
09/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Authorizations |
| Beaver C&H Allotment | Decision Signed Date: 09/30/2011 Legal Notice Date: 10/06/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
Environmental Assessment · Monticello Ranger District · updated 10/11/2011
The allotment encompasses approximately 16,000 acres of National Forest System lands located about 16 miles southeast of Moab, UT. It is situated on the east slopes of the La Sal Mountains · San Juan, Utah
To authorize grazing on the Brumley Ridge allotment with a five unit, deferred rotation management system with a season of use from 6/06 to 10/19 for 300 head of cattle using an adaptive management strategy. Update the Allotment Mangement Plan.
Grazing management
Comment Period
03/05/2009
Decision
09/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Brumley Ridge C&H Allotment | Decision Signed Date: 09/30/2011 Legal Notice Date: 10/06/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
Environmental Assessment · Moab Ranger District · updated 10/11/2011
The South Paradox allotment encompasses approximately 25,000 acres of National Forest System lands located about 40 miles southeast of Moab, UT and about 4 miles west of Paradox, CO. It is situated o · San Juan; Montrose, Colorado; Utah
The purpose of the proposal is to manage livestock grazing in a manner that meets or moves towards the desired conditions defined in the 1986 Manti-La Sal National Forest Land & Resource Management Plan (Forest Plan).
Grazing management
Comment Period
01/13/2011
Decision
09/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Authorizations |
| South Paradox C&H Allotment | Decision Signed Date: 09/30/2011 Legal Notice Date: 10/06/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
Decision Memo · Monticello Ranger District · updated 10/5/2011
Southern Elk Ridge portion of the Monticello Ranger District · San Juan, Utah
Utah Energy Corporation proposes to drill 64 exploration holes to a depth of 250-350 feet in the previously explored area near Woodenshoe.
Minerals and geology
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Utah Energy Corporation Blue Jay Uranium Exploration | Decision Signed Date: 09/28/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T36S R18E Section 15 |
Decision Memo · Monticello Ranger District · updated 9/15/2011
San Juan County aproximately 9 air miles north of Blanding Utah in the Abajo Mountains. · San Juan, Utah
Restore Ponderosa Pine in Nizohni Fire area (2002). Fire and/or mechanical treatments will proceed manual planting to create openings in suitable areas for planting of Ponderosa Pine, reduce vegetative fuels and diversify age and size structure.
Vegetation management (other than forest products)Forest productsFuels management
Comment Period
12/03/2010
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Decision Memo for the Nizhoni Forest Restoration Project | Decision Signed Date: 08/11/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Monticello Ranger District |
| Legal Land Description | T34S, R22E and T35S, R22E SLM |
Decision Memo · Moab Ranger District · updated 9/8/2011
Approximately 3.5 miles east of La Sal, Utah. · San Juan, Utah
Kimmerle Mining LLC proposes to drill 8 uranium exploration holes to a depth of 560 feet on Pine Ridge near La Sal, Utah.
Minerals and geology
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 5, T29S R 25E |
Decision Memo · Monticello Ranger District · updated 8/10/2011
The Bald Mesa Communication Site is located on the Moab Ranger District approximately 1 mile east of the Loop Road, Wilcox Flat Communication Site is located approximately 1 mile east of Bald Mesa, · Grand; San Juan, Utah
The Manti-La Sal National Forest, Moab/Monticello District proposes to authorize five new communication facilities at existing communications sites.
Special use management
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New Communication Facilities on Bald Mesa and Wilcox Flat | Decision Signed Date: 07/05/2011 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District; Monticello Ranger District |
| Legal Land Description | Section 19, T26S, R24E; Section 20, T26S, R24E; and in Section 12, T34S, R22E SLB&M |
Decision Memo · Manti-La Sal National Forest All Units · updated 7/28/2011
The pipeline will follow the path of the existing Emery Canal. · Emery, Utah
The Town of Emery proposes piping Emery Canal parallel to the existing canal into the town to improve the reliability and quality of irrigation and culinary water.
Special use management
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | Sec 21, T21S, R6E |
Decision Memo · Ferron Ranger District · updated 7/5/2011
The project boundary is east of Skyline Drive, south of Potters Canyon Drainage, West of Middle Mountain Ridgeline and North of the Reeder Canyon Drainage. · Sanpete, Utah
The treatment is designed to reduce spruce and fir density in aspen stands.
Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Comment Period
09/28/2010
Decision
02/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | SL Mer. T15S, R5E, sec. 25, 26, 35, 36. T15S, R6E, sec. 31. T16S, R5E, sec. 1, 2, 10-16, 21-28, 33-36. T16S, R6E, sec. 4-9, 16-21, 28-33. T17S, R5E, sec. 1-3, 10-13, 24. T17S, R6E, sec. 5-8, 18, 19. |
Environmental Assessment · Sanpete Ranger District · updated 5/18/2010
North of Spring City Canyon · Sanpete, Utah
The project is a Wildfire Urban Interface hazardous fuels reduction project. The purpose is to protect the Whispering Pines subdivision with a fuel break along the Forest Service boundary.
Fuels management
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| WHISPERING PINES FUELS PROJECT | Decision Signed Date: 05/02/2010 |
| Forests | Manti-Lasal National Forest |
| Districts | Sanpete Ranger District |
| Legal Land Description | T.16 s., R. 4 E., Sec. 1; R. 5 E., Sec 5 and 6 |
Decision Memo · Ferron Ranger District · updated 4/6/2010
Muddy Creek Canyon, just west of County Road 806 · Emery, Utah
Construct an in-stream diversion, off-stream sediment basin (off Forest), and pipeline along Muddy Creek (On FS lands) north of the town of Emery, Utah. Add the existing Emery Canal to the Special Uses Permit. The canal has been present since 1880s.
Special use management
Decision
10/2009 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Manti-Lasal National Forest |
| Districts | Ferron Ranger District |
| Legal Land Description | T21S, R6E, Sec. 21 approximately 4 miles north of Emery in Emery County, Utah |
Decision Memo · Monticello Ranger District · updated 11/13/2008
Southeast side of the Moab District on Pine Ridge. · San Juan, Utah
The Manti-La Sal National Forest, Moab/Monticello Ranger District proposes to authorize Denison Mines Corp. to conduct uranium exploration activities approximately 3 miles east of La Sal. They propose to drill 12 holes approx. 600 feet deep.
Minerals and geology
Decision
11/2008 (Estimated)
Implementation
12/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Denison Uranium Exploration | Decision Signed Date: 11/03/2008 |
| Forests | Manti-Lasal National Forest |
| Districts | Moab Ranger District |
| Legal Land Description | Section 5, Township 29 South, Range 25 East, Salt Lake Base Meridian, San Juan County, Utah |
Detail fetch failed: 404 Client Error for https://www.fs.usda.gov/r04/manti-lasal/projects/61804
Manti-La Sal National Forest All Units
Breedlove access road to their private property. Road will be approximately 88 feet long with a 10' right-of-way
Special use management
Detail fetch failed: 404 Client Error for https://www.fs.usda.gov/r04/manti-lasal/projects/57144
Manti-La Sal National Forest All Units
Crandal Canyon Pipeline -General Resources 8" water pipeline carrying mine water discharge from the portals of the Crandall Canyon Mine to the western banks of Huntington Creek.
Special use management
Detail fetch failed: 404 Client Error for https://www.fs.usda.gov/r04/manti-lasal/projects/12
Darren Olsen (Ferron-Price District Ranger) signed the Decision Memo categorically excluding this project from documentation in an EA or EIS on April 11, 2018.
Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management