Willamette National Forest — Project Detail

482 projects with crawled detail · milestones · contacts · documents

Willamette National Forest

R06 Pacific Northwest · 482 projects · crawled 2026-08-01
Completed 435 Cancelled 47
Decision Memo 400 Environmental Assessment 76 Environmental Impact Statement 6
482 with documents 175 with comments page
Decision Memo · Detroit Ranger District · updated 5/18/2026
These decks are located North of Detroit City along French Creek road and Northeast of Detroit City along Highway 46 · Marion, Oregon

PGE cut and decked hazard trees along their powerline after the 2020 fires, in accordance to their Memorandum of Understanding. A deck sale is proposed to reduce fuel hazard by removing these decks.

Fuels management
Scoping Start
05/17/2022
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Mark Leis · mark.leis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S, R5E Sec 26-28,35-36, R6E Sec 12-17,21,29, R8E Sec 7
Decision Memo · McKenzie River Ranger District · updated 3/31/2026
McKenzie Bridge, Big Lake and Big Lake West, Mona, French Pete, Cold Water Cove, Ice Cap, Olallie, and Lookout Campgrounds. Terwilliger Parking Lot, and Bruckart Boat Launch. · Lane; Linn, Oregon

Mckenzie River Ranger District is planning multiple recreation site improvements at various sites. Projects will include parking lot light installation, bathroom installation, septic installation, and camp host site creation.

Recreation management
Scoping Start
05/22/2023
Decision
08/2024 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
Jessica Reed · jessica.reed2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S R5E Sections 20, 33: T16S R5E Sections 14, 6, 1: T14S R7 1/2E Section 10: T16S R4E Section 1: T14S R7E Sections 9, 20: T15S R6E Section 13: T14S R7 1/2E Section 2
Decision Memo · Middle Fork Ranger District · updated 10/27/2025
Black Canyon, Broken Bowl, North Waldo, Salt Creek, Shadow Bay, Warner Mountain, and Campers Flat Campgrounds · Lane, Oregon

Replace toilets at Black Canyon, Broken Bowl, North Waldo, Salt Creek and Shadow Bay Campgrounds

Recreation managementFacility management
Scoping Start
06/22/2022
Decision
04/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Chloe Goldade-Holbrook · chloe.goldade-holbrook@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Maintenance
Salt Creek Falls Toilet Replacements Decision MemoDecision Signed Date: 04/04/2024
Black Canyon, Broken Bowl, North Waldo and Shadow Bay Toilet ReplacementsDecision Signed Date: 03/14/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
2024 Peek Thin Completed
Decision Memo · McKenzie River Ranger District · updated 6/9/2025
Forest Service Roads: 1501, 1501198,and 1501236 · Lane, Oregon

The McKenzie River Ranger District is proposing approximately 109 acres of variable density thinning in three 46 to 48 year old plantation stands. Treatment would consist of thinning, dominant tree release, gaps up to 3 acres, and unthinned skips.

Forest products
Scoping Start
06/27/2024
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Patrick Dukelow · Patrick.Dukelow@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16 S, R5 E Sections 7, 8 and 18; T16S, R4E Section 13
Decision Memo · Middle Fork Ranger District · updated 6/3/2025
T22S R3E S33 and S34, T23S R3E S3 and S4 · Lane, Oregon

Vegetation would be removed and large wood would be placed in the floodplain while reconnecting side channels. Heavy equipment would be used to cut high areas and fill low areas while trying to maintain as much established vegetation as possible.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/22/2022
Decision
06/2025 (Estimated)
Implementation
06/2027 (Estimated)
Project documents
Lisa Kurian · lisa.kurian@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Bingham Bridge Floodplain Restoration Decision MemoDecision Signed Date: 06/03/2025
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 6/3/2025
R6e, T21, Section S7 & R5.5e, T21, Section S13 · Lane, Oregon

The purpose of this project is to return two stream crossings on the Jim Weaver Loop to a useable and safe state for public use. The Dam Camp and Elbow Lake bridges were burned in the 2022 Cedar Creek Fire and are now a hazard for public use.

Recreation management
Scoping Start
06/11/2024
Decision
06/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Cedar Creek Fire Trail Bridge Replacements and Guaging Station RepairDecision Signed Date: 06/03/2025
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 6/3/2025
T20s, R4e, Section 7 · Lane, Oregon

The purpose of this project is to rebuild the West Fork 8th creek trail bridge. The bridge has failed and collapsed. There is a need for the bridge to be replaced to enhance user safety and protect natural resources.

Recreation management
Scoping Start
06/11/2024
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
West Fork 8th Creek OHV Trail Bridge Replacement Decision MemoDecision Signed Date: 06/03/2025
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Sportsman's Thin Cancelled
Decision Memo · Detroit Ranger District · updated 5/22/2025
T10S,R5E, secs 11,12,14, Adjacent to Detroit Reservoir. · Linn, Oregon

Project is proposing commercial thinning of timber over 80 years old to increase health and vigor of stands.

Forest products
Scoping Start
12/16/2019
Decision
03/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Mark Leis · mark.leis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
PC Thin Completed
Decision Memo · McKenzie River Ranger District · updated 3/28/2025
The proposed project areas are located off Forest Service roads 2650000, 2650611, 2650613, 2650620 · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 70 acres located in two stands that are approximately 41 years old. Treatments would thinning, gaps, and skips. Thinning would primarily remove smaller, unhealthy trees.

Forest products
Scoping Start
03/30/2023
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S., R06E., T16S R06E Sections 02, 03; Willamette Meridian
Decision Memo · Detroit Ranger District · updated 3/17/2025
The proposed subsoiling tracks are located along highway 46, within 1-2 miles north of Detroit City · Marion, Oregon

This project will mitigate soil resource damage from hazard tree operations from late 2020/early 2021 necessitated by the Lionshead Fire of September 2020. To reduce soil compaction, ground-based tracked equipment will be used to break up soil.

Vegetation management (other than forest products)Road management
Scoping Start
05/17/2022
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Darrin Neff · darrin.neff@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S R5-6E Sec 29-36
Decision Memo · Sweet Home Ranger District · updated 3/11/2025
House Rock Campground · Linn, Oregon

Construction of a yurt to provide the public with more options when camping.

Recreation management
Scoping Start
06/20/2024
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 2/18/2025
T21S, R03e, Section 7 · Lane, Oregon

The purpose of this project is to provide a safe area for visitors to park their vehicles while using the local shuttle service.

Recreation management
Scoping Start
06/11/2024
Decision
02/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
McKenzie Jensen · mckenzie.jensen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Cog Wild Parking Lot Decision MemoDecision Signed Date: 02/18/2025
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 2/10/2025
Santiam Pass area off Forest Road 892 and Forest Road 723 · Linn, Oregon

McKenzie River Ranger District is proposing to connect Forest Road 892 to Forest Road 723 between Nash Crater and Potato Hill for OHV trail use. Approximately 1,158 feet would be enhanced trail currently in existence, and Road 462 would be new trail.

Recreation management
Scoping Start
05/19/2023
Decision
01/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Clinton Gorsuch · clinton.gorsuch@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT13S R7E Section 23
Decision Memo · McKenzie River Ranger District · updated 1/29/2025
Big Lake West Campground · Linn, Oregon

The McKenzie River Ranger District is proposing to drill a well to be used with the Big Lake West Campground water system. Ground disturbance would occur in the form of drilling and infrastructural upgrades

Recreation management
Scoping Start
06/27/2024
Decision
01/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Clinton Gorsuch · clinton.gorsuch@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R71/2E S2/S11
Decision Memo · Middle Fork Ranger District · updated 12/18/2024
Huckleberry Flats OHV Trail System #102 · Lane, Oregon

The purpose of this project is to replace the Ninth Creek bridge on the 102 trail at Huckleberry Flats OHV Area. Additionally, this project will reroute the crossing upstream where there is a more sustainable approach.

Recreation management
Scoping Start
06/22/2023
Decision
12/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/2/2024
McKenzie Bridge and Paradise Campgrounds · Lane, Oregon

The McKenzie River Ranger District is proposing to install electrical utility line to the McKenzie Bridge and Paradise Campground Host site and several premium sites within each campground.

Recreation management
Scoping Start
06/27/2024
Decision
12/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Allen Hambrick · allen.hambrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S R06E S09 NW for Paradise Campground and T16S R05E S14 for McKenzie Bridge Campground
Humbug GNA Thin Completed
Decision Memo · Detroit Ranger District · updated 11/27/2024
About 8 miles northeast of Detroit accessed from the 46 road and 4696 road. · Marion, Oregon

Thinning up to 70 acres in managed stands under 80 years old to improve stand growth and vigor and produce wood products for the economy. The project is in coordination with the Oregon Department of Forestry under the Good Neighbor Authority.

Forest productsVegetation management (other than forest products)
Scoping Start
09/29/2023
Comment Period
02/02/2024
Decision
11/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Forest Vegetation Improvements; Timber Sales (Green)
Humbug GNADecision Signed Date: 11/27/2024
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionTownship 09S, Range 06E, Sec 1, 2, and 11
Decision Memo · McKenzie River Ranger District · updated 10/8/2024
Cold Water Cove Campground · Linn, Oregon

The McKenzie River Ranger District is proposing to add a temporary dock to the boat launch at the Cold Water Cove Campground Boat Launch. The proposed dock will be a temporary dock that can be pulled in and out each season.

Recreation management
Scoping Start
06/27/2024
Decision
10/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Allen Hambrick · allen.hambrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT 14S R7E S9
Decision Memo · Sweet Home Ranger District · updated 9/26/2024
The meadows are located near Lost Prairie Campground off Highway 20, at Parks Creek on Forest Road 2067-560 near the South Pyramid Trail and at the junction of Forest Roads 11 and 1152. · Linn, Oregon

The meadows at Lost Prairie, Parks Creek, and the junction of the 11/1152 roads have evidence of vehicle encroachment in these sensitive habitats. Boulders or fencing would be constructed and signs would notify the public of the restricted access.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
07/20/2023
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Claire Bennett · claire.bennett@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionLost Prairie: Township 13 South, Range 6 East, Section 27; Parks Creek: Township 12 South, Range 6 East, Section 26; 11/1152 road junction meadow: Township 11 South, Range 6 East, Section 31
Decision Memo · Sweet Home Ranger District · updated 9/24/2024
The project is located near Parish and Daly Lakes, approximately three miles east of Highway 22 off Forest Roads 2266 and 2266-450. · Linn, Oregon

The Daly and Parish Lakes trails are in close proximity, but do not intersect. This project proposes three additional sections of new trail creating a loop connecting the two lakes and a trail re-route around the existing campsites at Daly Lake.

Recreation management
Scoping Start
07/20/2023
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionTownship 6 East, Range 12 South, Sections 10, 11, 14 and 15
Decision Memo · Middle Fork Ranger District · updated 9/24/2024
Fall Creek Recreational Trail 3455. Dolly Varden Bridge, Marine Creek Bridge, and an unnamed bridge approximately .5 miles East of Marine Creek Bridge. · Lane, Oregon

Plan is to repair 3 bridges on Fall Creek National Recreation Trail 3455. One bridge was damaged during a 2019 snowstorm, one was damaged during the Gales Fire, the third was damaged during the Jones Fire.

Recreation management
Scoping Start
06/22/2023
Decision
09/2024 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 9/24/2024
T24s, R05e, Sections 18 & 19 · Lane, Oregon

The purpose of this project is to enhance the Indigo Spring trail loop and providing interpretive signs at Indigo and Chuckle Springs to improve water quality, increase vegetation along the riparian and reduce impacted to listed fish habitat.

Recreation managementWildlife, fish, rare plants
Scoping Start
06/11/2024
Decision
09/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Trail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 9/10/2024
T.09S., R05E., Sections 30, 29, 28, 27, 26, 35, 36; T.09S., R06E., Sections 29, 21; T.09S., R07E., Section PB 39 · Marion, Oregon

Portland General Electric (PGE) is performing maintenance of their Bethel-Round Butte Transmission Line. In addition to routine maintenance, PGE is reopening old access roads and constructing limited access roads. Helicopter work may be necessary.

Special use managementRoad management
Scoping Start
08/14/2023
Decision
12/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Virginia Daniel · virginia.daniel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 9/5/2024
Dispersed locations along Forest Service Roads 1500, 1900, 2638, 2654-650, and Highway 242. · Lane; Linn, Oregon

McKenzie River Ranger District is proposing to boulder off 40- 50 user created spur and access roads that lead to popular dispersed sites. Project will close off locations to motor vehicle access, while allowing for walk-in traffic.

Recreation management
Scoping Start
06/27/2024
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Allen Hambrick · allen.hambrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Kinney GNA Thin Completed
Decision Memo · Detroit Ranger District · updated 8/16/2024
About 7 miles south of the Detroit Lake Dam accessed using the 2212 road to the 634 road. · Linn, Oregon

Thinning up to 70 acres of managed stands under 80 years old to improve stand growth and vigor and to produce wood products. The project is in coordination with the Oregon Department of Forestry under the Good Neighbor Authority.

Vegetation management (other than forest products)Forest products
Scoping Start
09/29/2023
Comment Period
02/02/2024
Decision
08/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Forest Vegetation Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionAbout 7 miles south of the Detroit Lake Dam accessed using the 2212 road to the 634 road.
Decision Memo · Detroit Ranger District · updated 8/16/2024
Project located on private land · Marion, Oregon

Under the Wyden agreement, a culvert at Panther Creek is proposed to be replaced by a cooperator who received federal funding to improve aquatic habitat quality. The project area is located on private land.

Watershed managementRoad management
Scoping Start
07/20/2023
Comment Period
07/21/2023
Decision
03/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Darrin Neff · darrin.neff@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 8/5/2024
Delta A, lot 39; Hoodoo, lot 15 · Lane; Linn, Oregon

The McKenzie River Ranger District is proposing to authorize the owners of Recreation Residence cabins; lot #39 in the Delta A tract, and lot #15 in the Hoodoo Tract to make improvements.

Special use management
Scoping Start
06/27/2024
Decision
08/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Megan Jones · megan.jones@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R5E, Sections 21 and 15; T14S, R7.5 E, Section 26
Decision Memo · Middle Fork Ranger District · updated 8/5/2024
T18S, R2E, Section 33 · Lane, Oregon

The purpose of this project is to document interactions between plant regeneration, microbial regeneration and post-fire soil water dynamicsin a novel reburn within the Bedrock Fires

Research
Scoping Start
06/11/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Cheryl Friesen · cheryl.friesen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
Bedrock Fire Soil Moisture Gauges Decision MemoDecision Signed Date: 07/27/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Crale Horse Trail Completed
Decision Memo · Middle Fork Ranger District · updated 8/5/2024
Forest Service road 5835-515 leading to the Goodman Creek Trail. · Lane, Oregon

To reestablish a horse trail that was made unusable by road storage actions on the 5835-515. At the end of the 515 road, old trail tread would be reestablished for .56 miles to tie into the Goodman Creek Trail.

Recreation management
Scoping Start
08/09/2023
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Crale Horse Trail Decision MemoDecision Signed Date: 03/08/2024 (FS Withdrawn)
Crale Horse Decision MemoDecision Signed Date: 08/02/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 8/5/2024
Middle Fork Trail 3609 at Iko Creek crossing, Legal Location: T24S, R4E, S12 · Lane, Oregon

The purpose of the replacement bridge will be to prevent trail users and stock from fording the stream. The work will be conducted by Middle Fork RD trail crews and volunteers using chainsaws, grip hoists and other hand tools.

Recreation management
Scoping Start
06/22/2023
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Iko Creek Bridge Replacement Decision MemoDecision Signed Date: 01/25/2024 (FS Withdrawn)
Iko Creek Bridge Replacement Decision Memo.Decision Signed Date: 08/02/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 8/5/2024
Lower Middle Fork Willamette River · Lane, Oregon

Implement the PODs (Potential Operational Delineations) strategy on the Middle Fork Ranger District by reducing fuels along preidentified WUI (Wildland Urban Interface) boundaries.

Fuels management
Scoping Start
06/22/2023
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Mariah Wallace · mariah.wallace@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Larison POD Fuels Reduction Project Decision MemoDecision Signed Date: 02/08/2024 (FS Withdrawn)
Larison POD WUI Decision Memo.Decision Signed Date: 08/05/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 8/5/2024
Middle Fork Trail #3609 · Lane, Oregon

We propose to build the Side Channel trail bridge on the Middle Fork Trail #3609 to meet National Health and Safety standards for trails.

Recreation management
Scoping Start
04/07/2021
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Side Channel Bridge Construction Decision Memo.Decision Signed Date: 08/02/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 8/2/2024
Next to CTC and Giustina land surrounding the Middle Santiam Wilderness and north of Highway 20. · Linn, Oregon

The Sweet Home Ranger District is proposing to create fuel breaks along Forest Service roads to reduce hazardous fuels north of Highway 20 and next to the Middle Santiam Wilderness.

Fuels management
Scoping Start
07/20/2023
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Gregory Ver · Gregory.Ver@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT 12S R 5E S 24, 25, 26, 27, 28, 29, 32, 34, 36. T 12S R 6E S 13, 14, 15, 16, 17, 18, 19, 20, 21, 22, 24, 25, 26, 29, 30, 32, 34. T 12S R 7E S 17, 18, 19, 20, 30
Decision Memo · Sweet Home Ranger District · updated 7/12/2024
Middle Santiam Wilderness · Linn, Oregon

A special use permit has been requested by the U.S. Geological Survey to monitor river temperatures. Temperature loggers would be installed using either rebar or anchors driven into the channel bed. The measuring device would be inside PVC.

Research
Scoping Start
06/20/2024
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Cheryl Friesen · cheryl.friesen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Sweet Home Ranger District · updated 7/1/2024
The proposed project would impact the first three miles of Gordon Road and approximately 4 miles of roads in the Moose Mt area including Moose Mt Road (2027), Forest Roads 2025, 2025-500 and 505. · Linn, Oregon

Since 2015, a Forest Order has been in place to prohibit overnight camping along the first few miles of Moose Mountain and Gordon Roads following many years of resource damages and trash dumping. This project would make the closure permanent.

Watershed managementRecreation management
Scoping Start
09/06/2023
Comment Period
12/11/2023
Objection Period Start
05/08/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 6/26/2024
McKenzie bridge and Belknap Springs area · Lane, Oregon

Fire and Fuels Management is proposing a hazardous fuels reduction treatment in the McKenzie and Belnap wildland urban interface (WUI) area. The treatment would cover a 733-acre area broken into 5 units.

Fuels management
Scoping Start
04/12/2022
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Dean Schlichting · dean.schlichting@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
McKenzie and Belknap WUI Hazardous Fuels DMDecision Signed Date: 06/26/2024
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S R6E Sec 9, 10, 11, 14, 15 & 16
Decision Memo · Middle Fork Ranger District · updated 5/20/2024
FSR 2127 at the Bearbones Bridge. · Lane, Oregon

This project would involve the Forest Service issuing a permit to allow the installation of equipment at the 2127 Road to be used by the US Geological Survey and Army Corps of Engineers for monitoring water flow.

Special use management
Scoping Start
06/22/2023
Decision
02/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Thomas Davis · thomas.davis1@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 5/20/2024
North Waldo Campground, Islet Campground, Harallson Campground · Lane, Oregon

The district is proposing to remove trees at North Waldo, Islet, and Harralson campgrounds damaged during the Cedar Creek Fire. This is to allow safe access to popular campgrounds.

Recreation managementVegetation management (other than forest products)Fuels management
Scoping Start
06/22/2023
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
McKenzie Jensen · mckenzie.jensen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels)
Waldo Lake Campgrounds Hazard Tree Abatement Decision MemoDecision Signed Date: 05/20/2024
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 3/25/2024
The project is located off Forest Road 2027-755 at the Cougar Rock Repeater site. · Linn, Oregon

The building that supports the Cougar Rock radio repeaters is insufficient. There is one structure that houses equipment to support the repeaters. The building is leaky allowing condensation to accumulate impacting the life of the equipment.

Special use management
Scoping Start
07/20/2023
Decision
03/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Hilary Henry · Hilary.Henry@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionRange 4 East, Township 12 South, Section 34
Decision Memo · McKenzie River Ranger District · updated 2/20/2024
Delta A, and Delta B Cabin Tracts off of Forest Service Road 2639-270 · Lane, Oregon

The McKenzie River Ranger District is proposing to authorize owners of Recreation Residence cabins in the Delta A and B Tracts to make improvements incidental to owning these cabins.

Special use managementRecreation management
Scoping Start
04/12/2022
Decision
01/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
Megan Jones · megan.jones@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionTownship 16 Range 5 Section 16
Environmental Assessment · Detroit Ranger District · updated 1/3/2024
Designated segments are from the Forest Service boundary on the common section line between Sections 12 & 13 T9S, R4E to the point where the segment leaves Federal ownership along the BLM boundary. · Marion, Oregon

Develop a comprehensive river management plan (CRMP), as required by the Wild and Scenic Rivers Act, to protect and enhance the values for which the rivers were designated (free-flowing, water quality, and outstandingly remarkable values).

Land management planningWildlife, fish, rare plantsRecreation managementSpecial area management
Scoping Start
05/23/2023
Comment Period
05/23/2023
Objection Period Start
09/13/2023
Decision
01/2024 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Heather Stewart · Heather.Stewart@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment; Special Area Management
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionSections 12 and 13 in Township 9 South, Range 4 East to Section 1, Township 9 South, Range 3 East.
Fork Thin Cancelled
Decision Memo · Middle Fork Ranger District · updated 12/18/2023
NW corner of Lowell Phase 5 · Lane, Oregon

Thin 55 acres in two managed stands to improve growth and structure to provide timber and promote habitat diversity.

Vegetation management (other than forest products)
Scoping Start
07/2023 (Estimated)
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Leslie Elliott · leslie.j.elliott@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 11/24/2023
National Forest Service Road 2209 at Henline Creek · Marion, Oregon

This project proposes replacement of the bridge located on NFS Road 2209 at Henline Creek that was destroyed in the 2020 Beachie Creek Fire. There is currently a temporary bridge at this location, which will be replaced with a permanent structure.

Road management
Scoping Start
07/21/2023
Decision
11/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Darrin Neff · darrin.neff@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT.8S., R.4E.,
HV Thin Completed
Decision Memo · McKenzie River Ranger District · updated 11/21/2023
The stands are in the Middle Horse Creek subwatershed and are accessed by Forest Service Road 2638356, off Road 2638000 (Horse Creek Road). · Lane, Oregon

The McKenzie River Ranger District is proposing approximately 41 acres of variable density thinning in two plantation stands about 44 years old in the Horse Creek Late-Successional Reserve.

Vegetation management (other than forest products)
Scoping Start
03/29/2023
Decision
11/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Patrick Dukelow · Patrick.Dukelow@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S R6E Sec 12-13
Decision Memo · Detroit Ranger District · updated 11/17/2023
Well located NE of the Breitenbush Campground, off of Hwy 46 · Marion, Oregon

This project is to construct a water well to supply Breitenbush Campground. Due to recent fires, we will drill a new water supply well near the water treatment system building to change supply sources from shallow to deep groundwater well source.

Recreation management
Scoping Start
07/21/2023
Decision
09/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT.9S., R.7E., Section 20
Environmental Assessment · Middle Fork Ranger District · updated 11/17/2023
Located in the 123,000 acre Fall Creek 5th watershed, on the western edge of the Middle Fork Ranger District, Township 17-20 and Range 2 - 4E of the Willamette Meridian. https://arcg.is/0KHXCq · Lane, Oregon

The project includes thinning of ~15,900 net acres of managed stands under 80 years of age to improve stand growth/vigor and to produce a sustainable supply of forest products, as well as maintain, store and/or decommission ~650 miles of roads.

Forest productsWatershed managementVegetation management (other than forest products)Road management
Scoping Start
11/27/2017
Comment Period
12/24/2018
Objection Period Start
12/10/2020
Decision
04/2021 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Mariah Wallace · mariah.wallace@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
Lowell Country Project, Phase 1Decision Signed Date: 07/10/2019
Lowell Country Project Phase 2Decision Signed Date: 04/14/2020
Lowell Country Project Phase 3Decision Signed Date: 04/13/2021
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 11/2/2023
Within the Cedar Creek fire perimeter · Lane, Oregon

The proposed action is to plant or aerial seed native conifers, hardwoods, and/or shrubs in up to approximately 15,300 acres within the 2022 Cedar Creek Fire.

Vegetation management (other than forest products)
Scoping Start
06/22/2023
Decision
11/2023 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Mariah Wallace · mariah.wallace@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 10/25/2023
Highway 58, Forest Service Roads - 18, 19, 24, 1802, and 5875, Laduke Rd., Hampton Boat Launch, and Kokane Way. · Lane, Oregon

There are several locations on the Forest that have been identified as having consistent issues with resource damage associated with dispersed camping. The intent of this project is to close dispersed sites in specific locations on the district.

Recreation management
Scoping Start
06/22/2023
Decision
08/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Chloe Goldade-Holbrook · chloe.goldade-holbrook@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 10/6/2023
Project located on Detroit Ranger Station administrative site, approximately 1.5 miles west of the city of Detroit, Oregon. · Marion, Oregon

The Detroit Ranger District seeks to build four structures to replace the four single-family residences that were lost due to the 2020 wildfires. Located on the previous general footprint, each unit is designed for operational and energy efficiency.

Facility management
Scoping Start
05/17/2022
Decision
10/2023 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Adrienne Strubb · Adrienne.Strubb@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S R5E Sec 2-3
Decision Memo · Sweet Home Ranger District · updated 7/25/2023
Forest System roads 1152-617, 634, 640, 649, 650, 651, and 652, and 2041-528. · Linn, Oregon

The Sweet Home Ranger district proposes to create fuel breaks along Forest Service roads to reduce hazardous fuels adjacent to the Middle Santiam Wilderness and private timber lands.

Fuels management
Scoping Start
10/13/2022
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Chris Mushrush · chris.mushrush@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionTownship 12 South, Range 5 East, Sections 1-4, 11-14, 23-26, and 29-30; Township 11 South, Range 5 East, Sections 28, 33 and 34; Willamette Meridian
Decision Memo · Willamette National Forest All Units · updated 7/17/2023
Location is at the EWEB Carmen-Smith Hydroelectric Project Carmen Campus · Lane, Oregon

EWEB is proposing to install two new manufactured homes, one site built garage, associated wastewater drain fields, and underground utilities. Additionally we plan to remove an existing building and replace it with an larger one.

Special use management
Scoping Start
05/18/2023
Decision
07/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Shane Kamrath · shane.kamrath@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Hydropower; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 7/13/2023
Beaver Creek at 2154-380 road, Beaver Creek at 2154 road, Beaver Creek at 2153 road, Swift Creek at 23 road, Skunk Creek at 21 road, Skunk Creek at 2100-400 road · Lane, Oregon

Six stream crossings are currently impeding passage for fish and other aquatic organisms. We plan to replace these culverts with structures that will allow aquatic organism passage (AOP) upstream and downstream from the crossings.

Wildlife, fish, rare plantsRoad management
Scoping Start
06/22/2022
Decision
07/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Olivia Guthrie · olivia.guthrie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 6/6/2023
Along existing EWEB transmission line corridor the 2600252 to the 2655713 road and within the McKenzie River, McKenzie Bridge, Boulder Creek, and Deer Creek subwatersheds (6th field) of McKenzie River · Lane, Oregon

Creating early seral habitat and wildlife trees along 10 miles of an EWEB transmission line corridor 35' on both sides. The project will remove 7,700 trees for habitat restoration and line safety and 1,619 trees for snag mitigation habitat trees.

Vegetation management (other than forest products)
Scoping Start
09/26/2022
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Jessica Reed · jessica.reed2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionThe legal description for the proposed action is Sections 13, 14, 15 T16S, R5E; Sections 2, 8, 9, 11, 18, T16S, R6E; Sections 11, 14, 23, 26, 35; T15S, R6E.
Decision Memo · McKenzie River Ranger District · updated 4/13/2023
The project is located along NFS Road 2618-305 (Pond Road), near the town of Nimrod, approximately 26 miles east of Springfield, Oregon · Lane, Oregon

The McKenzie River Ranger District is proposing to replace a bridge on U.S. Forest Service, National Forest System (NFS) Road 2618-305, 400 feet of this road would be reconstructed meet standards and to be above the modeled 100-year flood elevation.

Road management
Scoping Start
11/14/2022
Decision
04/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Kate Meyer · kate.meyer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 3/14/2023
Located on Road 46, MP 10.2; Road 4600-050, MP 0.1; Road 46, MP 10.5;road 4693X, MP 0.0; road 2231, MP 2.9; road 2231-870, MP 3.1; road 2223, MP 4.0; and road 4697-393, MP6.7; about 3 mi NE of Detroit · Marion, Oregon

Eight culverts need replacing to increase streamflow capacity and alleviate barriers to aquatic organism passages, including ESA-listed species. This project will improve longevity to roads by allowing debris flow resulting from 2020 wildland fires.

Road managementWatershed managementWildlife, fish, rare plants
Scoping Start
05/17/2022
Decision
02/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
Jamie Sheahan Alonso · jamie.sheahanalonso@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Watershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S R5E Sec 28; R6E Sec 6; R7E Sec 17, 19-20, 29, 34
Decision Memo · McKenzie River Ranger District · updated 3/13/2023
NFSR 1506 Lookout Creek, MP 7.0 (Lookout Creek TH West) to MP 15.0 (Jct. with Road 1506630) · Lane, Oregon

The District is proposing reconstructing 8 miles of NFSR 1506. Road work may include culvert replacement, fill slope repair and stabilization, roadway surface replacement, drainage repair and incidental tree removal associated with repair sites.

Road management
Scoping Start
04/12/2022
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Brandon Green · brandon.green@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 3/1/2023
The project site is located approximately 30 miles east of Sweet Home on US Highway 20 · Linn, Oregon

Federal Highways will be installing a series of pipes and drains to stabilize the hillside above a section of US Highway 20 that has been sinking for the past several years.

Special use management
Scoping Start
06/01/2017
Decision
10/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Joan Schmidgall · jschmidgall02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT. 13 S., R. 5 E., Sections 29 and 32
Buckeye Thin Completed
Decision Memo · McKenzie River Ranger District · updated 2/8/2023
The proposed project areas are located off Forest Service roads 1510611 and 1510612. · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 69 acres located in two stands that are approximately 45 years old. Treatments would include 54 acres of commercial thinning, 6 acres of gaps, and 9 acres of skips.

Forest productsFuels managementVegetation management (other than forest products)
Scoping Start
08/22/2022
Decision
02/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Jessica Reed · jessica.reed2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R4E, Sections 1 & 2; Willamette Meridian, Lane County, OR
Decision Memo · McKenzie River Ranger District · updated 1/26/2023
The Forest Service land in the Taylor/North Bank neighborhoods of the McKenzie Bridge area. Parts of T 16S, R 5 E Section 1 and T 16S, R 6 E Sections 18 & 7. · Lane, Oregon

The purpose of this project is to reduce hazardous fuels within the Taylor north Bank area of the district by thinning understory ladder fuels along roads.

Fuels management
Scoping Start
04/14/2021
Decision
01/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Dennis Rogers · dirk.rogers@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 1/11/2023
Approximately 8 miles north/northeast of Westfir, OR along the North Fork River. · Lane, Oregon

The bridge, which is located along the North Fork Trail, has failed and is unsafe to cross. The new bridge would be built with native log stringers by hand using skilled trail bridge builders.

Recreation management
Scoping Start
05/24/2019
Decision
01/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT20S, R3E, Section 13
Flat Country Completed
Environmental Impact Statement · McKenzie River Ranger District · updated 12/29/2022
The project area is located approximately 8 miles east of the community of McKenzie Bridge, Oregon. It is bound on the west by Highway 126, on the south by Highway 242 and Mt. Washington to the east. · Lane; Linn, Oregon

Treatments include commercial thinning, shelterwood with reserves, fuels reduction treatments, meadow enhancement, and early seral creation through gaps. This will require temporary roads, road maintenance and road decommissioning.

Road managementForest products
NOI in Federal Register
05/22/2018
DEIS NOA in Federal Register
01/31/2020
FEIS NOA in Federal Register
06/26/2020
Objection Period Start
06/26/2020
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Dean Schlichting · deandschlichting@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Road Maintenance; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 12/27/2022
Detroit Ranger District Compound outside the fence surrounding the CPI substation at the end of the water tower road 2200-108. Area less than 500 square feet. · Marion, Oregon

Approval of a special use permit to Consumer Power Inc. (CPI) for the installation of a new communications pole on the Detroit Ranger District Compound for mounting radio equipment.

Special use management
Scoping Start
09/15/2022
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Amelia Snook · Amelia.Snook@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S, R5E, Section 10, Willamette Meridian
Decision Memo · Willamette National Forest All Units · updated 12/19/2022
Delta Campground, near road 19 and Highway 126 intersection. T.16 S., R.4 E., Sections 19, 23 and 24, Willamette Meridian · Lane, Oregon

The McKenzie River Ranger District is proposing to decommission Delta Campground and remove all campground and trail associated infrastructure, including pavement from approximately 1 mile of the 1900400-access road. The project area is located thre.

Watershed managementRecreation management
Scoping Start
04/13/2022
Decision
12/2022 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
Dean Schlichting · dean.schlichting@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Watershed Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Willamette National Forest All Units · updated 12/5/2022
Forest System roads within the perimeters of the Holiday Farm (East of Eugene along OR-126), Beachie Creek and Lionshead Fires (Southeast of Salem along OR-22). · Lane; Linn; Marion, Oregon

Reduce the risks posed by fire-killed and injured trees that have fallen across or remain standing along important access routes of the 2020 fire-affected road system so that access to and through the burned area can be restored.

Forest productsFuels managementRoad management
Scoping Start
03/30/2022
Comment Period
06/17/2022
Objection Period Start
09/01/2022
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Elspeth Gustavson · elspeth.gustavson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityBiomass; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Road Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Sweet Home Ranger District; Detroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 12/2/2022
The project is located near Yukwah Campground on the south side of Highway 20 about 28 miles east of Sweet Home, OR. · Linn, Oregon

The platform stringers are rotten and beyond repair. The platform will be removed by hand and pulled off the bank with heavy equipment via an unnamed access road adjacent to Highway 20. The access road will be closed after project completion.

Recreation management
Scoping Start
06/17/2022
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionTownship 13 South, Range 4 East, Section 33.
Decision Memo · Sweet Home Ranger District · updated 10/26/2022
The 5 culverts are located in the north end of the Sweet Home Ranger District in the Quartzville Creek-Green Peter Lake watershed approximately 15 miles from Sweet Home, OR. · Linn, Oregon

The project proposes the removal and replacement of 5 undersized culverts that are currently barriers to upstream fish migration with structures that allow upstream and downstream passage for all aquatic organisms.

Watershed management
Scoping Start
04/13/2022
Decision
06/2022 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Lance Gatchell · lgatchell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT. 11S., R. 4E., Sec. 2, 3, 10, 34 and 25
Environmental Assessment · Sweet Home Ranger District · updated 10/26/2022
The project is located approximately 20 miles northeast of Sweet Home, Oregon · Linn, Oregon

Contribute a sustainable supply of timber to local communities while promoting health and diversity in Matrix and LSR land allocations. Vegetation management is proposed for about 7,800 acres. Road decommissioning and maintenance is also proposed.

Vegetation management (other than forest products)Forest productsRoad management
Scoping Start
12/18/2019
Comment Period
11/10/2021
Objection Period Start
05/23/2022
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Joan Schmidgall · jschmidgall02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
EWEB Load Bank Completed
Decision Memo · McKenzie River Ranger District · updated 10/17/2022
The proposed project is located within the Upper McKenzie Watershed on the McKenzie River Ranger District of the Willamette National Forest. The proposed project area is located off FS Road 2600730. · Linn, Oregon

EWEB is proposing to install a fenced area for the Load Bank with associated transmission line poles within an area of approximately 2.5 acres. Approximately 237 Trees would be removed and used exclusively for aquatic restoration projects.

Facility management
Scoping Start
09/12/2022
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Shane Kamrath · shane.kamrath@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHydropower
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S., R.6E., Section 1, Willamette Meridian
Decision Memo · Middle Fork Ranger District · updated 9/23/2022
This project will be located within the fire perimeters of the 2021 Gales and Kwis fires in the Fall Creek Watershed and the Salmon Creek Watershed. · Lane, Oregon

This project will plant or aerial seed native conifers, hardwoods, and/or shrubs in up to 2,400 acres within the 2021 Gales and Kwis Fires, which is 50% of the area that burned at moderate or high severity.

Vegetation management (other than forest products)
Scoping Start
02/09/2022
Decision
09/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Leslie Elliott · leslie.j.elliott@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Planting 2021 Fires Decision MemoDecision Signed Date: 09/23/2022
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 9/21/2022
The project is located off Forest Service Roads 1501 and 1500104 which originate off the 15 Road south of the Blue River Reservoir. Legal location T16S R04E SEC 13,14,22, T16S R05E Sec18, 19. · Lane, Oregon

Restore 117 acres of Oregon White Oak meadows affected by the 2020 Holiday Farm Fire. Treatments include revegetation of Oregon White Oaks and other native meadow species, under burning or pile burning to remove fuels and maintain meadow conditions.

Vegetation management (other than forest products)
Scoping Start
05/01/2021
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Sarah Ward · Sarah.Ward2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 9/15/2022
The project is located at the Iron Mountain Trailhead parking area at the end of Civil Road. · Linn, Oregon

The garage is no longer used for storage and has fallen into disrepair. Removal will be done by hand and with heavy equipment. Building materials will be re-purposed for historic structures on other districts or National Forests.

Facility managementRecreation management
Scoping Start
06/17/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Annmarie Kmetz · annmarie.kmetz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionTownship 13 South, Range 5 East, Section 36
Decision Memo · Detroit Ranger District · updated 9/9/2022
The decks will be located directly North and Northeast of the Detroit Ranger Station administrative site. · Marion, Oregon

BPA fell hazard trees along their powerlines in accordance to their Memorandum of Understanding. Skidding trees to deck locations and deck sale is proposed to remove the decks to reduce fuel hazard.

Fuels management
Scoping Start
05/17/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Adrienne Strubb · Adrienne.Strubb@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S R5E Sec 2, 3, and 10
Decision Memo · Detroit Ranger District · updated 9/9/2022
Halls Ridge communication site, off 2223-527 · Marion, Oregon

Oregon Department of Transportation Wireless Communications Section wishes to place a new site at Halls Ridge to construct multi-purpose public safety grade communications, including a tower, an equipment shelter, and other equipment.

Special use management
Scoping Start
07/29/2021
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Virginia Daniel · virginia.daniel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionSection 8, T 10S, R 5E
Decision Memo · Detroit Ranger District · updated 9/8/2022
Marion Forks Guard Station is located roughly 16 miles East on the Santiam Hwy 22 from Detroit City, Oregon. · Marion, Oregon

Project proposes to decommission the existing pit toilet at Marion Creek Guard Station and install a new, single-user vault restroom (CXT product). Installation of vault restroom would make this station fully functional for public to rent.

Facility managementRecreation management
Scoping Start
05/17/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Josh Weathers · Joshua.Weathers@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT11S R7E Sec 15
Chuckee Thin Completed
Decision Memo · McKenzie River Ranger District · updated 7/18/2022
The proposed project areas are located off Forest Service Road 1900431, 1900432 and 1900434 (Stand #1, Stand #2). · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 71 acres located in two stands that are approximately 42 years old. Treatments would include 58 acres of commercial thinning; 6 acres of gaps and 7 acres of skips.

Vegetation management (other than forest products)Forest products
Scoping Start
04/27/2022
Decision
07/2022 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.18S., R.06 E., Sections 31, & 32; T.19S., R.05.5 E., Section 03, Willamette Meridian
Tin Thin Completed
Decision Memo · McKenzie River Ranger District · updated 7/18/2022
The proposed project areas are located off Forest Service roads 1513000, 1513548, and 1513552 · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 61 acres located in two stands that are approximately 51 years old. Treatments would include 52 acres of commercial thinning, 6 acres of gaps, and 3 acres of skips.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
04/27/2022
Decision
07/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Jessica Reed · jessica.reed2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S., R.5E., Sections 5 & 6, Willamette Meridian
Decision Memo · Middle Fork Ranger District · updated 6/13/2022
Approximately 16 miles east of Oakridge, OR near Fuji Mountain. · Lane, Oregon

Whitebark pine is listed as threatened due to white pine blister rust, mountain pine beetle, fire suppression, and climate change. This project would plant approximately 500 Whitebark pine seedlings on 30 acres in the Fuji Mountain area.

Vegetation management (other than forest products)
Scoping Start
05/24/2019
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Sally Christensen · smchristensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land Descriptionis 22S 5 1/2 E Sec 14
Decision Memo · Detroit Ranger District · updated 6/9/2022
Tumble Creek: just downstream of water intake for the Detroit Lake State Park and upstream from the Hwy 22 bridge. Parkett Creek: in the headwaters of the North Santiam River, SW of Marion Forks. · Linn; Marion, Oregon

Diversify even aged stands along both Tumble and Parkett Creeks and restore large wood to the creeks (without removing dominant trees) by directionally felling to place woody material into the riparian area.

Watershed management
Scoping Start
05/20/2019
Decision
01/2022 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
Jamie Sheahan Alonso · jamie.sheahanalonso@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionParkett Creek: T.11S., R.07E., Section 19, NW 1/4 Tumble Creek: T.10S., R.05E., Section 10, NW 1/4
Environmental Assessment · McKenzie River Ranger District · updated 6/2/2022
The project area encompasses Tamolitch Pool on the McKenzie River as well as the surrounding area between Hwy 126, Trail Bridge Campground, road 2672-655 near Smith Reservoir, and road 2600-740. · Linn, Oregon

This project will manage Tamolitch Pool (Blue Pool) by building a parking lot on approximately 3 acres, re-routing a section of the McKenzie River National Recreation Trail, adding recreation amenities, and closing Tamolitch Pool to swimming.

Recreation management
Scoping Start
03/13/2018
Comment Period
04/29/2021
Objection Period Start
01/10/2022
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Dean Schlichting · deandschlichting@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Trail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S R6E Sections 1, 11, and 12, T15S R7E Section 6, T14S R6E Sections 25 and 36, and T14S R7E Sections 30 and 31
Knoll Salvage Completed
Decision Memo · McKenzie River Ranger District · updated 4/29/2022
The proposed project area is located off Forest Service roads 2654000 (Deer Creek), 2655616, and the 2655613. · Lane; Linn, Oregon

The McKenzie River Ranger District is proposing to salvage approximately 165 acres of fire damaged trees located in an area that was 34-140 years old prior to the Knoll Fire. The project will be harvested using skyline, and ground-based equipment.

Forest productsFuels management
Scoping Start
02/22/2022
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S., R.05E., Sections 14, 22, & 23
Decision Memo · Sweet Home Ranger District · updated 4/13/2022
Canal Creek T10,11S, R4, sections 2,3,10. Quartzville T10,11,12S, R4 sections 23,26,27,28,33,34,35, R5 sections 30,31. Galena and Hwy 20 T13S, R4,5,6,7 sections, 18,25,30,31,32. · Linn, Oregon

The proposal would rehab and improve dispersed camping sites in several popular areas by reconfiguring sites and closing unauthorized roads or trails. The project is needed to reduce safety concerns, vegetation damage, garbage and human waste issues.

Recreation managementWatershed management
Scoping Start
02/22/2021
Decision
04/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
Dispersed Camping Rehabilitation and ImprovementsDecision Signed Date: 04/13/2022
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionCanal Creek T10,11S, R4, sections 2,3,10. Quartzville T10,11,12S, R4 sections 23,26,27,28,33,34,35, R5 sections 30,31. Galena and Hwy 20 T13S, R4,5,6,7 sections, 18,25,30,31,32.
Decision Memo · McKenzie River Ranger District · updated 4/12/2022
McKenzie River Ranger District · Lane; Linn, Oregon

To pre-commercially thin (PCT) and conifer release approximately 4,222 acres of young managed conifer stands. The thinning and release operation would be accomplished using chainsaws and all associated actions will be performed on foot.

Vegetation management (other than forest products)
Scoping Start
01/11/2022
Decision
04/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.13S-T.20S., R.03 E.-R08E, All Sections, Willamette Meridian
Decision Memo · Willamette National Forest All Units · updated 4/12/2022
Roads that are open or where access is needed for forest management within the 176,000 acres of the Willamette National Forest that burned in the 2020 Holiday Farm, Beachie Creek, and Lionshead Fires. · Lane; Linn; Marion, Oregon

To improve safety along roads in fire burned areas of the Forest and reopen these roads as quickly as possible for public and administrative use, project would fell dead and injured trees which pose a danger to roads and those traveling along them.

Road management
Scoping Start
03/08/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Elspeth Gustavson · elspeth.gustavson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Sweet Home Ranger District; Detroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 3/7/2022
The target location is the end of the 1821-154 Road · Lane, Oregon

We have a need to improve communication within the Fall Creek Watershed and are proposing to install a new repeater. The impacted area is less than 1/4 acre.

Facility management
Scoping Start
04/07/2021
Decision
10/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Anne Trapanese · anne.trapanese@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 3/7/2022
Approximately, 15 miles East of Oakridge along highway 58. · Lane, Oregon

The trails and railings are deteriorating and failing. Replacement and maintenance is needed. There is also a small bridge replacement needed over Diamond Creek a the upper end of the Diamond Creek Falls Trail loop.

Facility managementRecreation management
Scoping Start
05/09/2018
Decision
10/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Maintenance; Trail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT23S, R5.5E, Sec 4
Decision Memo · McKenzie River Ranger District · updated 1/31/2022
South end of McKenzie River road · Lane, Oregon

This treatment aims to provide pre-established strategic suppression/containment opportunities for wildfires burning within and adjacent to the Three Sisters Wilderness

Fuels management
Scoping Start
03/03/2017
Decision
01/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Dennis Rogers · drogers02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 12/28/2021
Approximately six miles west of Diamond Peak. · Lane, Oregon

These meadows were identified as needing restoration to prevent the loss of high elevation meadows. The meadows total 200 acres and are being encroached upon by conifers. Conifer 11%u201D dbh or less would be cut, piled and burned.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
06/07/2017
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Molly Juillerat · mjuillerat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT23S and T24S, R5E, Section 33, 4 and 5
Dry Beard Completed
Environmental Assessment · Detroit Ranger District · updated 12/28/2021
This project is located south of the North Santiam River, east of Detroit Lake and north of FS Road 10 in the Headwaters North Santiam Watershed. · Linn, Oregon

Project will commercially thin approximately 1350 acres of second growth forest in the Headwaters North Santiam Watershed. Road storage, road decommissioning and bridge replacement or repair is included in the project.

Road managementForest products
Scoping Start
06/20/2018
Comment Period
08/26/2019
Objection Period Start
01/21/2020
Decision
03/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · McKenzie River Ranger District · updated 12/28/2021
The Green Mountain Project area is located within the Cougar Reservoir, Augusta Creek, Roaring River, and Elk Creek subwatersheds (6th field) of the South Fork McKenzie River Watershed (5th field). · Lane, Oregon

The Green Mountain Project proposes to commercially harvest on approximately 4,398 acres on the Willamette National Forest near the community of Blue River, Oregon.

Forest productsVegetation management (other than forest products)Watershed management
NOI in Federal Register
04/11/2014
DEIS NOA in Federal Register
06/03/2016
FEIS NOA in Federal Register
07/06/2017
Objection Period Start
03/27/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Dean Schlichting · deandschlichting@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Green); Watershed Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16SR4E s36; T16SR5E s31-32; T17SR4E s01-13; T17SR5E s05-34; T17SR6E s19,30; T18SR4E s01,12; T18SR5E s01-36; T18SR6E s06-36; T18SR7E s31-35; T19SR5E s01-24; T19SR6E s1-36; T19SR7E s02-31; T20SR6E s01
Environmental Assessment · Middle Fork Ranger District · updated 12/28/2021
approximately 5 miles north of Oakridge, Oregon · Lane, Oregon

This project would construct a campground complex and new single-track motorcycle trail at Huckleberry Flats Off-Highway Vehicle Area, and would also amend the Forest Plan to change 10 acres from General Forest to Developed Recreation.

Land management planningRecreation management
Scoping Start
11/26/2018
Comment Period
04/27/2020
Objection Period Start
07/10/2020
Decision
10/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Kevin Rowell · kevin.a.rowell@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityDeveloped Site Management; Plan Amendment
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionTownship 20S, Range 4E, Sections 7 and 18 of the Willamette Meridian, Lane County, Oregon
Hwy 46 Completed
Environmental Impact Statement · Detroit Ranger District · updated 12/28/2021
Breitenbush Watershed, Marion County, Oregon.T 9 S, R 6 E, sections 1, 11 %u2013 15, 21 %u2013 28, 35 and 36, T 9 S, R 7 E, sections 3 %u2013 22 and 30, T 9 S, R 8 E, section 7. · Marion, Oregon

Formerly Hwy 46 North. Treatments will occur in the Breitenbush Watershed, including commercial thinning, early seral creation, riparian reserve treatment, viewshed enhancements, meadow restoration, hazardous fuels treatments, PCT and pruning.

Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Watershed managementRoad management
NOI in Federal Register
03/09/2016
DEIS NOA in Federal Register
10/20/2017
FEIS NOA in Federal Register
03/09/2018
Objection Period Start
03/09/2018
Decision
05/2019 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Green)
Actions with No Effect on Upper Willamette Spring Chinook and their HabitatDecision Signed Date: 07/10/2018
Hwy 46 2nd DecisionDecision Signed Date: 05/23/2019
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 12/28/2021
Approximately 17 miles south of Oakridge, OR. · Lane, Oregon

The 80 foot single stringer bridge was cut down in 2017 due to significant decay and heavy scour. A better location with natural bedrock banks is found 250 feet upstream. The trail would be rerouted to this location and the old section abandoned.

Recreation management
Scoping Start
05/24/2019
Decision
02/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Indian Creek Bridge and Trail Reroute Decision MemoDecision Signed Date: 02/24/2021
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT24S, R3E, S4 SE
Environmental Assessment · McKenzie River Ranger District · updated 12/28/2021
The project area is approximately 835 acres and includes 4.5 miles of the lower South Fork McKenzie River below Courgar Dam to the McKenzie River mainstem. · Lane, Oregon

The project would reconstruct portions of the mainstem and side channels, by adding gravel and over 3000 pieces of wood to the stream and floodplain. Several levees and rip-rap would be removed to improve floodplain access.

Vegetation management (other than forest products)Wildlife, fish, rare plantsWatershed management
Scoping Start
11/12/2015
Comment Period
01/10/2018
Objection Period Start
03/07/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Kate Meyer · kmmeyer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S R4E Sections 23,24; T16S R4.5E Sections 24,25; T16S R5E Sections 19,30,31
Decision Memo · Middle Fork Ranger District · updated 12/28/2021
Approximately two miles of east of the Middle Fork Ranger Station office along the Middle Fork of the Willamette River. · Lane, Oregon

The Oakridge Water Treatment Plant is requesting a renewal of their existing Special Use Authorization MIF 38 for liquid waste treatment that will expire 12/2021. This action is administrative in nature and would reauthorize the SUP.

Special use management
Scoping Start
05/24/2019
Decision
12/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNW1/4 SE1/4 Section 18, T21S, R3E, NE1/4 NE1/4 Section 21, T21S, R3E
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 12/28/2021
Federal portions of the Lookout Point 5th-field watershed near the Lookout Point Reservoir near the cities of Westfir and Lowell, OR. · Lane, Oregon

Commercial thinning and fuels reduction on 4300 ac. of plantations; 110 mi. of road maintenance, closure of 130 mi. of road; special habitat restoration; 260 ac. of early-seral habitat maintenance/creation; snag creation, noxious weed abatement.

Wildlife, fish, rare plantsWatershed managementRoad managementForest productsFuels managementSpecial area managementVegetation management (other than forest products)
Scoping Start
01/14/2013
Comment Period
08/01/2016
Objection Period Start
12/05/2016
Decision
03/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Allen Hambrick · afhambrick@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionTownships 20 and 21 South, Ranges 1 and 2 East, of the Willamette Meridian.
Decision Memo · Middle Fork Ranger District · updated 12/28/2021
Approximately 12 miles north/northeast of Lowell, OR. · Lane, Oregon

The bridge was burned up during the 2017 Jones Fire. This bridge is along the Fall Creek National Scenic Trail. Surrounding snags that could hit the bridge would be cut.

Recreation management
Scoping Start
05/24/2019
Decision
02/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Slick Creek Bridge Replacement Decision MemoDecision Signed Date: 02/09/2021
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT18S, R2E, S27 SE of the Willamette Meridian, Lane County, Oregon
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 12/28/2021
This area is in the Little Fall Creek fifth-field watershed located approximately 16 miles northeast of the city of Lowell. · Lane, Oregon

The Middle Fork Ranger District proposes density management on ~1720 acres of young plantations in the Little Fall Creek subwatershed. The project would include reconstruction of existing roads, hazardous fuel treatments, and noxious weed treatment

Forest productsRoad managementVegetation management (other than forest products)Watershed managementFuels management
Scoping Start
02/24/2015
Comment Period
09/18/2017
Objection Period Start
03/12/2018
Decision
06/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Katie Isacksen · katie.isacksen@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
Upper Little Fall Creek ProjectDecision Signed Date: 06/28/2018
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT17S, R1E, Sections 4-7,9,17,18, T17S, R2E, Sections 1-3,10, and 11 of the Willamette Meridian.
Boulder Thin Completed
Decision Memo · McKenzie River Ranger District · updated 10/12/2021
The proposed project area is located off Forest Service Road 2653000 Boulder Creek. · Lane, Oregon

The McKenzie River Ranger District is proposing to treat 56 acres in a stand that is approximately 56 years old. Treatments would include 40 acres of commercial thinning including gaps and 16 acres within the riparian reserve left untreated as skips.

Fuels managementForest products
Scoping Start
04/08/2021
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R06E Sections 25 & 36
Decision Memo · Willamette National Forest All Units · updated 10/5/2021
Clear Lake resort · Linn, Oregon

Add three rental yurts, replace cabin, run utility (power lines) to them.

Special use management
Scoping Start
05/03/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Denise Mercer · denise.mercer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Facility Improvements/Construction; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 9/30/2021
westside of Highway 126 approximately 0.3 miles south the intersection of Highway 20. · Linn, Oregon

The purpose of this project is to install a gateway sign at the east end of the McKenzie River corridor as a part of the McKenzie River Wayfinding Plan.

Special use management
Scoping Start
06/02/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Megan Jones · megan.jones@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
EFR Thin Completed
Decision Memo · McKenzie River Ranger District · updated 9/29/2021
The proposed project areas are located off Forest Service Road 1993000 and 1993560. · Lane, Oregon

The McKenzie River Ranger District is proposing to treat 85 acres in three stands that are approximately 44 years old. Treatments would include 62 acres of commercial thinning 8 acres of gaps and 15 acres left unharvested as skips.

Vegetation management (other than forest products)Forest products
Scoping Start
02/03/2021
Decision
09/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S, R6E Sections 07, 08, 17 Willamette Meridain
Decision Memo · Sweet Home Ranger District · updated 9/27/2021
The legal description is T 13S, R 5E, section 31. The project is location approximately 36 miles east of Sweet Home, OR. · Linn, Oregon

The project proposes to re-route 500 feet of the Tombstone trail on the west side of the parking area. The current entrance to the trail is in close proximity to Highway 20 and this creates a safety hazard for both vehicles and hikers.

Recreation management
Scoping Start
02/25/2021
Decision
04/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 9/24/2021
On Forest System lands within the perimeters of the 2020 Beachie Creek, Lionshead, and Holiday Farm Fires. · Lane; Linn; Marion, Oregon

Plant native mix of conifers, hardwoods, and shrubs in up to 50% of those acres that burned at a moderate to high severity within the 2020 Beachie Creek, Lionshead, and Holiday Farm fire boundaries outside of wilderness areas.

Vegetation management (other than forest products)
Scoping Start
08/16/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Lindsay Anderson · lindsay.m.anderson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Sweet Home Ranger District; Detroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 9/21/2021
T21S, R3E, Sections 21, 22 · Lane, Oregon

Three miles of new trail (up to 48" wide and surfaced with pea gravel or wood chips) are proposed along with a 1/4 mile connector trail to the 5852 road and a few very short connector trails to make the trail system more useful and easy to follow.

Recreation management
Scoping Start
04/07/2021
Decision
07/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 9/21/2021
Middle Fork Ranger District · Lane, Oregon

The proposed action is to update existing documentation, specify new protections, and open up new opportunities for those seeking timber and non-timber special forest products on the district (excluding firewood).

Forest products
Scoping Start
04/07/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Oliver Bossert · Oliver.Bossert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 8/31/2021
Township 09 South, Range 05 East Sections 14, 15, 22, 23, and 26; Range 06 East Sections 29, and 32 & Township 10 South Range 06 East Section 5, 6, 7, and 8. · Linn, Oregon

The project would propose salvaging fire damaged trees of no more than 250-acres inside the Beachie Creek Fire area within the conjunction of the Upper North Santiam River, Breitenbush River, and Headwaters North Santiam River watersheds.

Forest products
Scoping Start
05/28/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Adrienne Strubb · Adrienne.Strubb@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 8/13/2021
the legal description is T 13S, R 4E, Section 32. The project is located approximately · Linn, Oregon

The project proposes to construct a new bat house at Walton Ranch to provide quality habitat and the ability to monitor bat populations for WNS. A new gate at the entrance would protect the sensitive area from illegal traffic.

Wildlife, fish, rare plants
Scoping Start
02/25/2021
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Esmeralda Bracamonte · esmeralda.bracamonte@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionThe legal description is T 13S, R 4E, section 32. The project is located approximately 30 miles east of Sweet Home, OR.
Decision Memo · McKenzie River Ranger District · updated 6/22/2021
The proposed projects areas are located off Forest Service Roads 1501 and 1500104. · Lane, Oregon

The McKenzie River Ranger District is proposing to salvage all fire damaged trees within a 213-acre area located in stands that are 60-115 years old. The project will be harvested using skyline, and ground-based equipment.

Fuels managementForest products
Scoping Start
03/29/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R04E Sections 13, 14, 22 & T16S, R05E Section 18
Decision Memo · McKenzie River Ranger District · updated 6/22/2021
The project is within the McKenzie Bridge Wildland Urban Interface (WUI). The proposed hazardous fuels treatment is located adjacent to County Road 2639 (King Road) and Forest roads 2639164/165/166/27 · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 49 acres to reduce hazardous vegetative fuel accumulations outside the Delta A Recreational Residence's cabin tracts. Treatments would include removal of surface and ladder fuels.

Fuels managementForest products
Scoping Start
05/17/2021
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Shadie Nimer · shadie.nimer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R05E, Section 16
Decision Memo · McKenzie River Ranger District · updated 6/11/2021
T.19S, R.05E, Sections 13, & 24; T.19S, R.06E, Sections 18, & 19; and T.13S, R.07E, Section 24, Willamette Meridian Lane & Linn County, OR · Lane; Linn, Oregon

The McKenzie River Ranger District is proposing to implement precommercial thinning (PCT) and conifer release on approximately 127 acres of young managed conifer stands. The thinning and release operation would be accomplished by using chainsaws.

Vegetation management (other than forest products)
Scoping Start
05/26/2021
Decision
06/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Autumn Metz · autumn.metz@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.19S, R.05E, Sections 13, & 24; T.19S, R.06E, Sections 18, & 19; and T.13S, R.07E, Section 24
SP Thin Completed
Decision Memo · McKenzie River Ranger District · updated 6/7/2021
The proposed project areas are located off Forest Service Road 2655000 (Stand 2), 2655509 (Stand 1), 2655504 (Stand 3). · Linn, Oregon

The McKenzie River Ranger is proposing to treat approximately 91 acres in three stands that are approximately 44 years old. Treatments would include 63 acres of commercial thinning, 7acres of gaps and 21 acres left unharvested as skips.

Vegetation management (other than forest products)Forest products
Scoping Start
12/30/2020
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S., R.06E., Sections 2, 10, 11, Willamette Meridian
Decision Memo · Middle Fork Ranger District · updated 6/7/2021
T21E, R3E, Sec. 34 SE NE · Lane, Oregon

The Middle Fork Ranger District is proposing the development of the West Abutment Quarry. A pit plan will be developed which maximizes the amount of suitable rock to be extracted from the pit while minimizing impact to the surrounding ground.

Minerals and geology
Scoping Start
04/07/2021
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Jered Hogansen · jered.hogansen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 5/5/2021
The Cascadia Day Use Area is located approximately 10 miles east of Sweet Home, OR. · Linn, Oregon

The project proposes to install US Postal Service mailboxes at the Cascadia Day Use area to give nearby residents access to mail service. The mailboxes would sit on a cement pad adjacent to the existing parking area and be maintained by the USPS.

Special use management
Scoping Start
02/25/2021
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Stefanie Gatchell · stefanie.gatchell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionThe legal description for the project site is: T. 13S., R. 3E., Section 36.
Decision Memo · McKenzie River Ranger District · updated 4/21/2021
T16S, R04E Sections 19 & 20 · Lane, Oregon

The McKenzie River Ranger District is proposing to remove all fire damaged danger trees within a 20-acre area located in 2 stands that are 120-200 years old. The dead and dying fire damaged trees will be removed with ground-based equipment.

Forest productsFuels management
Scoping Start
03/29/2021
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R04E Sections 19-20
Calapooia Completed
Environmental Assessment · Sweet Home Ranger District · updated 1/26/2021
The project boundary encompasses approximately 6,700 acres in the Calapooia River watershed located roughly 30 miles to the southeast of Sweet Home, Oregon. · Linn, Oregon

Contribute a sustainable supply of timber to local communities, promote health, vigor and resilience in timber stands younger than 80 years old and identify a minimum road system in the Calapooia watershed. Treatments are proposed for ~1,132 acres.

Forest productsRoad managementVegetation management (other than forest products)
Scoping Start
05/09/2018
Comment Period
12/19/2018
Objection Period Start
04/10/2019
Decision
06/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Joan Schmidgall · jschmidgall02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Road Maintenance; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionThe legal description of the area is T15S, R4E, Sections 7, 8, 9, 10, 15, 16, 17, 18, 19, 20, 21, 28, 29, 30, 31, 32, and 33 and T16S, R4E, Section 6.
Decision Memo · Middle Fork Ranger District · updated 12/2/2020
The site is located one mile northeast of the Middle Fork Ranger Station near Westfir, Oregon. · Lane, Oregon

American Tower and AT&T are proposing to extend the height of the cell tower by about 20 feet and install a new equipment shelter. The purpose of this extension and new equipment is to increase network coverage and support First Net services.

Special use management
Scoping Start
11/13/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT21S, R2E, Section 12 of the Willamette Meridian, Lane County, Oregon
Decision Memo · Willamette National Forest All Units · updated 11/3/2020
Along or north of OR Highway 58 between Oakridge, OR and Willamette Pass. · Lane, Oregon

ODOT seismic geoexploration and analysis on HWY 58 designated as a Lifeline Route that will lead to the selection of a practical cost-effective mitigations that will allow the highway to be restored for emergency and essential freight traffic.

Minerals and geology
Scoping Start
05/26/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Katie Isacksen · katie.isacksen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Tut Thin Completed
Decision Memo · McKenzie River Ranger District · updated 9/2/2020
T18S., R5E., Sections 11-12 · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 60 acres located in two stands that are approximately 60 years old. Treatments would include 60 acres of commercial thinning.

Vegetation management (other than forest products)Forest products
Scoping Start
01/14/2020
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 8/18/2020
On the eastern edge of the City of Oakridge, OR · Lane, Oregon

Replace equipment shed at State Fish Hatchery

Special use management
Scoping Start
05/26/2020
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Katie Isacksen · katie.isacksen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · McKenzie River Ranger District · updated 7/29/2020
Road 2633-706 is approximately 1 mile northeast of the town of McKenzie Bridge. Road 2654-782 is along Deer Creek, approximately 7 miles northeast of the town of McKenzie Bridge. · Lane, Oregon

We are proposing to install two gates (one on Forest Service road 2633-706 and the other on Forest Service road 2654-782) and establish a motorized closure on a combined total of 1.25 miles of road behind these gates to protect habitat.

Wildlife, fish, rare plantsRoad management
Scoping Start
06/16/2020
Comment Period
06/19/2020
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Eileen Kitayama · eileen.kitayama@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Travel Management
Decision Notice and FONSI for the MRRD Habitat Protection Gates ProjectDecision Signed Date: 07/28/2020
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S R5E Section 12 and T15S R6E Section 23
Environmental Assessment · Deschutes National Forest All Units · updated 7/28/2020
Project addresses five Central Cascades Wildernesses. Mt. Jefferson, Mt. Washington, Three Sisters, Waldo Lake, and Diamond Peak. · Deschutes; Jefferson; Klamath; Lane; Linn, Oregon

The Deschutes and Willamette National Forests are considering visitor use management strategies for five wilderness areas in the central Cascades in order to reduce resource impacts and negative effects to wilderness character due to high use.

Recreation management
Scoping Start
06/01/2017
Comment Period
04/20/2018
Objection Period Start
11/14/2018
Decision
05/2019 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Matt Peterson · matt.peterson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityWilderness Management
Central Cascades Wilderness Strategies Project Decision NoticeDecision Signed Date: 05/10/2019
ForestsDeschutes National Forest; Willamette National Forest
DistrictsBend/Fort Rock Ranger District; Sisters Ranger District; McKenzie River Ranger District; Detroit Ranger District; Middle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 7/21/2020
Ollalie Mountain Trail, T18S, R6E, Sec 2 & 3 · Lane, Oregon

A project to reroute approximately a mile of the Olallie Mountain Trail (Tr. No. 4100). The Olallie Mountain Trail is a Class 3 Pack and Saddle trail.

Recreation management
Scoping Start
03/03/2017
Decision
01/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Fawn Thin Completed
Decision Memo · McKenzie River Ranger District · updated 7/9/2020
The proposed project areas are located off Forest Service Road 1500000. · Linn, Oregon

The McKenzie River Ranger District is proposing to treat approximately 74 acres located in two stands that are approximately 60 years old. Treatments would include 60 acres of commercial thinning, 7 acres of gaps and 7 acres left unharvested.

Forest productsVegetation management (other than forest products)
Scoping Start
01/14/2020
Decision
07/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S., R6E., Sections 29-32
Decision Memo · Willamette National Forest All Units · updated 6/9/2020
These meadows are forest wide in scope and most can be seen on the maps provided. Contact for more location information. · Douglas; Lane; Linn; Marion, Oregon

The project is to conduct meadow restoration at 90 identified sites, and similar unidentified sites where restoration needs become known and treatments fall within the same scope of work, on Detroit, Sweet Home, McKenzie River, and Middle Fork RDs.

Vegetation management (other than forest products)Special area management
Scoping Start
12/16/2019
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Allen Hambrick · afhambrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Special Area Management
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 5/15/2020
Big Lake Campground, Willamette National Forest · Linn, Oregon

improve public safety by widening the turning radius of the campground access road at the turn around loop and to provide parking slots that are located off of the existing drivable portion of the access road.

Recreation management
Scoping Start
03/03/2017
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Dave Sanders · dgsanders@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 5/12/2020
The Calapooia River beginning at the Forest boundary for ~1 mile upstream. · Linn, Oregon

The project will increase stream resilience, hydrologic function and improve spawning, rearing, and forage habitat for Upper Willamette Winter Steelhead in the upper Calapooia River.~19 trees will be tipped or fallen into the stream.

Watershed managementWildlife, fish, rare plants
Scoping Start
10/25/2018
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Lance Gatchell · lgatchell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements; Watershed Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 5/7/2020
Approximately, nine miles northwest of Oakridge. · Lane, Oregon

Currently the Alpine Trail is coincident with a section of Forest Service road 5828-585 for 1/4 mile. The road is within a Burnt Stewardship harvest unit and the district wants to move the trail to improve the trail experience.

Recreation management
Scoping Start
05/09/2018
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT20S, R3E, Sec 6
Decision Memo · McKenzie River Ranger District · updated 4/21/2020
The proposed project areas are located off Forest Service Road 1500130 and 1500134 (Stand #1 and Stand #2). · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 43 acres located in three stands that are approximately 60 years old. Treatments would include 43 acres of commercial thinning.

Forest productsFuels management
Scoping Start
02/14/2020
Decision
04/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Guillermo Vera · guillermo.vera@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R05E, Sec 31; and T16S, R05E, Sec 06
Decision Memo · McKenzie River Ranger District · updated 4/15/2020
Where the McKenzie River trail crosses Boulder Creek T.16S, R.6E. Section 1 W, Willamette Meridian · Lane, Oregon

To replace the footbridge that crosses Boulder Creek on the McKenzie National Recreation Trail.

Recreation management
Scoping Start
03/27/2020
Decision
04/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 4/9/2020
Approximately, one mile northeast of the Oakridge Airport. · Lane, Oregon

The SUP for this area has expired. There is a need to renew the SUP.

Special use management
Scoping Start
05/09/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT21S, R3E, sec 8
Decision Memo · Middle Fork Ranger District · updated 4/9/2020
Approximately seven miles east of Oakridge, OR near Forest Service Road 24. · Lane, Oregon

The identified stands are densely stocked, ranging between 50 and 65 years of age. The overarching goal is to produce a healthy and vigorously growing stand for future management activity. Stands would be thinned at variable densities.

Forest products
Scoping Start
05/24/2019
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Robert Mickey · rmickey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT20S, R4E, Section 26 SE
Decision Memo · McKenzie River Ranger District · updated 3/24/2020
T.13S., R.7 1/2E. Section 11 S, Willamette Meridian T.16S., R.8E., Section 5 N, Willamette Meridian · Lane, Oregon

Commissioning the user trail between Big Lake YC and the PCT while closing and rehabing the user trail from Big Lake YC to Patjens Lake Trail and (2) closing and rehabing the 0.8-mile user trail between Obsidian Trail 3528 and Scott Trail 3531.

Recreation management
Scoping Start
05/17/2019
Comment Period
05/17/2019
Decision
03/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork Ranger District · updated 3/19/2020
Approximately, 15 miles east of Oakridge. · Lane, Oregon

A single track connection between the Bunchgrass segment of the Eugene to Crest Trail (3559) and the Fuji Mountain Trail is needed to give mountain off-road bicyclists a legal non-wilderness option to access the Waldo Basin.

Recreation management
Scoping Start
05/09/2018
Decision
02/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Bunchgrass ConnectionDecision Signed Date: 02/26/2020
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionT22S, R5.5E, Sec 9
Decision Memo · McKenzie River Ranger District · updated 3/17/2020
The proposed area is located off Hwy 126 at the 4.2 mile post. · Lane, Oregon

The McKenzie River Ranger District is proposing to remove danger trees from a 2 acre area that is approximately 80 years of age. The location of the project is in the WUI (Blue River Wildland Urban Interface) surrounding the Assembly of God property.

Vegetation management (other than forest products)
Scoping Start
12/20/2019
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R4E, Section 22
Casa Completed
Decision Memo · McKenzie River Ranger District · updated 3/17/2020
The proposed project areas is located off Highway 126 at mile point 52, and the project is located southeast of the McKenzie River Ranger Station. · Lane, Oregon

The McKenzie River Ranger District is proposing to remove trees across approximately 2 acres of an area that is 65 years of age. Treatment will provide a safe and adequate space for an administration facility to accomplish resource goals.

Forest productsFacility management
Scoping Start
01/07/2020
Decision
03/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Floyd Comer · floyd.comer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Timber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S., R.06E., Section 17, Willamette Meridian
Decision Memo · Detroit Ranger District · updated 2/13/2020
Surrounding Stahlman Summer Homes · Linn, Oregon

This project proposes to create defensible space around the Stahlman Summer Homes through various treatments, including brush reduction, commercial sales, and using the downed logs for fish habitat.

Fuels management
Scoping Start
05/26/2019
Decision
01/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Chris Mushrush · chris.mushrush@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green); Watershed Improvements
Stahlman Summer Home Hazardous Fuels ProjectDecision Signed Date: 01/23/2020
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land Description10S 5E sec 12, 13, 14
Decision Memo · Detroit Ranger District · updated 12/13/2019
Breitenbush Rd. and City of Detroit · Marion, Oregon

Fence to be installed around water building on Breitenbush Rd. Install emergency drainline from water storage tank. Reissue special use permit.

Special use management
Scoping Start
04/04/2011
Decision
10/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S, R5E, sec 1; T9S, R5E, sec 36
Decision Memo · Sweet Home Ranger District · updated 12/11/2019
Menagerie Wilderness · Linn, Oregon

Proposed change to existing seasonal closure boundary to provide species protection during the critical nesting and fledging period.

Recreation managementWildlife, fish, rare plantsRegulations, directives, orders
Scoping Start
10/05/2012
Decision
11/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Joan Schmidgall · jschmidgall02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments; Wilderness Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R4E, Sections. 14, 15, 22 and 23
Decision Memo · Sweet Home Ranger District · updated 12/11/2019
Smith Prairie in the Upper McKenzie watershed · Linn, Oregon

Enhance and maintain meadow complex by reducing encroachment of conifers (remove saplings under 4 inches), seed collection, girdling 1-2 trees/acre under 12 inches DBH and falling 1 tree/acre for down wood.

Wildlife, fish, rare plants
Scoping Start
09/09/2011
Decision
10/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Sonja Weber · sweber@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT14S, R6E, section 1; T14S, R7E, section 6, Willamette Meridian
2018 TSI pruning Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
T16S R6E Sections 11 & 12. The project will take place on a 30 acre unit on the 2655 road. · Lane; Linn, Oregon

Pruning of limbs to 12' or 1/2 tree height, 70 to 110 TPA at an average spacing of 25'x25'. Species to be pruned; Douglas-fir, western hemlock, western white pine, grand fir, noble fir and western redcedar. This will take place on one 30 acre unit.

Vegetation management (other than forest products)
Scoping Start
02/28/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Autumn Metz · admetz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Located south and west of FS 19 Road and adjacent transmission lines; north and east of the South Fork of the McKenzie River;and west of Strube Flats · Lane, Oregon

A 94 acre hazardous fuels reduction project to aid in wildfire prevention and management. There would be an understory thin (<7" dbh), completed with hand and mechanical work. Brush will be piled and burned, underburned, or chipped and scattered.

Fuels management
Scoping Start
11/08/2012
Decision
06/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Brenda Hallmark · bhallmark@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S R5E Sec 19, 30
Big Hoodoo Project Completed
Environmental Assessment · McKenzie River Ranger District · updated 12/10/2019
Santiam Pass area south of Hwy 20, in and around Hoodoo Ski Area and Big Lake. · Linn, Oregon

This project is being reissued with a new decision. The purpose of the project is to reduce hazardous fuels and improve forest health to protect values at risk in the Hoodoo/Big Lake area through 2,135 acres of treatments in the Santiam Pass area.

Forest productsVegetation management (other than forest products)
Scoping Start
04/11/2011
Comment Period
05/22/2012
Objection Period Start
05/26/2014
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Kevin Moran · kmoran@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green)
DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT Big Hoodoo ProjectDecision Signed Date: 07/25/2014 Legal Notice Date: 07/25/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT13S R7E Sec.’s 24,25, 36; T13S R7.5E Sec.’s 21-28, 33-36; T14S R7E Sec. 1; T14S R7.5E Sec.’s 1-4, 9-11
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Located on Forest road 2672 Ikenick road. · Linn, Oregon

To commercially thin 70 acres in a 50 year old stand using ground base equipment. This project will also include two gaps 1-3 acres in size to promote understory forbs and shrubs.

Forest productsFuels management
Scoping Start
03/14/2014
Decision
07/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT13S, R7E, Section 31
Breeze Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The proposed project areas are located off Forest Service Road 2643410 (Stand #1) and 2643418 (Stand #2). · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 37 acres located in two stands that are approximately 40 years old. Treatments would include 32 acres of commercial thinning and 5 acres of skips that would be left unharvested.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
05/13/2019
Decision
07/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Jessica Reed · jessica.reed2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S,R6E,Sections 20-21
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/10/2019
Approximately, 5 miles northwest of Oakridge. · Lane, Oregon

There is a need to build two segments of trail that would get trail users off the road system and back onto the trail system. These two connections will connect Clover Patch to the Clover Patch Tie and Alpine Trail.

Recreation management
Scoping Start
05/09/2018
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R2E, Sec 23
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/10/2019
Approximately, 17 miles south of Oakridge. · Lane, Oregon

Coal Floodplain Restoration is to improve the current habitat by(1)removing remnant constructed features that reduce channel complexity and restrict historic floodplain connectivity,(2)reconnect historic side-channels,(3)stabilize the stream bed.

Watershed management
Scoping Start
05/09/2018
Decision
01/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Lisa Kurian · lkurian@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Lower Coal Creek Floodplain RestorationDecision Signed Date: 01/30/2019
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S, R3E, Sections 14 and 11
Cub Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Cub Thin Project is located on Forest Service road 2653760, 2653762, and 2653765. · Lane, Oregon

The project proposes to commercially three stands for a total of 70 acres. The units are second-growth stands that are approximately 42 years old. The units would be harvested with ground base and skyline equipment.

Forest productsFuels management
Scoping Start
03/14/2014
Decision
05/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R7E, Section 6; T15S, R7E, Section 31
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/10/2019
Young plantations district-wide. · Lane, Oregon

Stand density management and conifer pruning in on about 5,700 acres of young plantations across the district. In the Staley Cr. area, thinning will occur through riparian reserves.

Vegetation management (other than forest products)
Scoping Start
02/13/2012
Comment Period
07/02/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Ray Holk · rholk@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
2012-2016 Young Stand Density Management and Conifer PruningDecision Signed Date: 09/05/2012 Legal Notice Date: 09/10/2012
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Decision Memo · Middle Fork Ranger District · updated 12/10/2019
Multiple locations across the Middle Fork Ranger District. · Lane, Oregon

This is a permit renewal for 11 recreation events, as they expire, for a new term of up to 5 years. This action is administrative in nature. There is no change to the existing uses for the currently expired permits at this time.

Recreation managementSpecial use management
Scoping Start
05/24/2018
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Mile 2.1 of the French Pete Creek Trail (FS Trail 3311) in the Three Sisters Wilderness · Lane, Oregon

The proposed project would harden the creek crossing at mile 2.1 of the French Pete Creek Trail (FS Trail 3311) to mitigate erosion.

Recreation management
Scoping Start
04/22/2013
Decision
06/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT18S, R5E, Sec. 3
Fresca Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Forest roads 2655504 & 2655507 · Linn, Oregon

The proposed project would treat approximately 66 acres located in two stands that are approximately 44 years old. Treatments would include 26 acres of commercial thinning, four acres of gaps, and 36 acres of skips.

Forest products
Scoping Start
06/29/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R6E Sections 3 & 10
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/10/2019
Approximately, nine miles north of Oakridge just south of the Huckleberry Lookout. · Lane, Oregon

Proposal is to thin managed stand according to appropriate silvicultural prescriptions to achieve condition described in the purpose and need. Which is to reduce overstory tree density to promote residual tree growth.

Forest products
Scoping Start
05/09/2018
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Robert Mickey · rmickey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
Frog SBA - Formerly, Frog Timber SaleDecision Signed Date: 08/16/2019
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R4E, Section 22
Environmental Assessment · McKenzie River Ranger District · updated 12/10/2019
2 gates near lookout creek and Blue River reservoir · Lane, Oregon

To install gates and permanent closures on 2 Forest Service system roads leading to research sites.

Regulations, directives, orders
Scoping Start
08/18/2017
Comment Period
08/28/2017
Decision
11/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityDispersed Recreation Mgmt.
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
HJ Andrews experimental forest, Blue River Oregon · Lane; Linn, Oregon

Renewal of existing Special Use Permit for a term of up to 20 years. This permit authorizes administrative facilities for research, education & residential.

Research
Scoping Start
04/18/2017
Decision
08/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
HooDoo Butte Communication site, Willamette National Forest · Linn, Oregon

Allow for upgrades to existing communication facilities on Hoodoo Butte. Crown Castle, a telecommunication company, currently holds a special use permit to operate and maintain facilities in the Willamette National Forest on Hoodoo Butte.

Special use management
Scoping Start
03/03/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Sandra Ratliff · sratliff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Hoodoo Butte Communication Site Improvement projectDecision Signed Date: 08/07/2017
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Ike Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Project area is located off Forest Service Road 2672655 · Linn, Oregon

There are approximately 160 trees per acre, with an average diameter of 10.0 inches acres located in five stands. These stands are characterized as being overstocked, dense and homogeneous with declining vigor that leads to poor tree health.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
05/10/2019
Decision
07/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Jessica Reed · jessica.reed2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.14S, R.6 & 7E, Sections 13,18,24,19
Knob Boughs Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Forest Service roads 2649 and 2649640 · Lane; Linn, Oregon

The Knob Boughs project would remove approximately one hundred eighty-one tons (362,000 pounds) of coniferous boughs over 723 acres, under a three-year commercial contract.

Forest products
Scoping Start
03/14/2014
Decision
04/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
Knob Boughs ProjectDecision Signed Date: 04/30/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R7E, Section 10,14,15,22,23,27,33,&amp; 34; T16S, R7E, Section 2,3,&amp; 4
Knoll Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Access to project areas from Forest roads 2654, 2655, and 2655616 · Lane; Linn, Oregon

The McKenzie River Ranger District is proposing to treat approximately 66 acres in a stand that is 80-120 years old. Treatments would include 62 acres of commercial thinning, 4 acres gaps, and a 15 acre area that would be left unharvested as a skip.

Forest products
Scoping Start
01/17/2017
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R6E, Sections 14 & 23
Lamb Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The Lamb Thin project is located off Forest Service roads 1993 and 1995. · Lane, Oregon

To commercially thin three stands for a total of 70 acres in 41 year old stands using ground base equipment. This project will include 51 acres of commercial thinning, 2 acres of gaps, and 17 acres of skips.

Forest productsFuels management
Scoping Start
05/05/2014
Decision
07/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S, R6E, Sections 9, 15, &amp; 16 Lane County
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
55805 McKenzie Hwy, Blue River, OR 97413 · Lane, Oregon

The McKenzie River Ranger District is proposing to re-issue a special use permit to the Lane County Waste Management Division in order to continue operating the transfer station for the community of Blue River and McKenzie Bridge.

Special use management
Scoping Start
08/24/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Nicole Gann · ngann@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
LangDam Project Completed
Environmental Assessment · McKenzie River Ranger District · updated 12/10/2019
The project area is located around Forest road 1900,1900408, and 1900411; north of Cougar Reservoir. · Lane, Oregon

The proposed project would commercially thin timber stands up to 120 years of age on approximately 645 acres.

Forest productsVegetation management (other than forest products)
Scoping Start
07/07/2014
Comment Period
12/05/2016
Objection Period Start
06/05/2017
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Dean Schlichting · deandschlichting@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 22-26, 35, & 36, T16S, R4E; Sections 24, 25, & 36, T16S, R4.5E; Sections 19, 20, 27-35, T16S, R5E; and Sections 4 & 5, T17S, R5E
Look Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Forest Roads 1501, 1501218, & 1501230 · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 63 acres in a stand that is approximately 40 years old. Treatments would include 58 acres of commercial thinning, 5 acres of gaps, and a 7 acre area that would be left as a skip.

Forest productsFuels management
Scoping Start
11/03/2016
Decision
01/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R5E Sections 7 & 18
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Lost Creek, Tamolitch Valley on the McKenzie River National Recreation Trail and Roaring River crossing of the Roaring River Ridge Trail. · Lane, Oregon

A project to replace three trail bridges that need replacement. Two bridges are located on the McKenzie River National Recreation Trail (MRNRT) (Tr. No. 3507). Another bridge crosses Roaring River on the Roaring River Ridge Trail (Tr. No. 3312).

Recreation management
Scoping Start
04/22/2013
Decision
06/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S,R7E,Sec30 & T16S,R6E,Sec10 & T19S,R5.5E,Sec12
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Forest road 19 and Hwy 126 Junction · Lane, Oregon

Hazardous fuels reduction and scotch broom treatment in the 19 Road/410 Road area. The treatment would cover a 520 acre area, broken into 13 units.

Fuels management
Scoping Start
12/20/2016
Decision
03/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Dennis Rogers · drogers02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The Summit of Macduff Mountain · Lane, Oregon

This scoping initiates a project to construct a small reroute on the O'Leary Mountain Trail (Tr. No. 3321) which will allow people to access the summit of the mountain on a hardened surface.

Recreation management
Scoping Start
03/03/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The project area is located west of the McKenzie River Ranger Station · Lane, Oregon

The McKenzie River Ranger District is proposing to remove approximately 113 dead and dying fire damaged trees within a 8 acre area. The dead and dying trees will be removed with ground based equipment.

Forest productsFuels management
Scoping Start
10/17/2017
Comment Period
11/14/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R06E, Section 17
Meadow Enhancement Completed
Decision Memo · Detroit Ranger District · updated 12/10/2019
Dusty, Big and Marion Creek Meadows · Linn, Oregon

Meadow enhancement and rehabilitation in 3 meadows on the Detroit Ranger District. Enchancements include tree removal, limbing, slash burning and monitoring.

Wildlife, fish, rare plants
Scoping Start
03/28/2013
Decision
12/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Daryl Whitmore · dwhitmore@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
Meadow Enhancement ProjectDecision Signed Date: 12/19/2014
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT11S, R07E, sec 26, 27; T12S R07E sec 29, 34
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Five meteorological stations located in HJ Andrews experimental forest · Lane, Oregon

To allow the routine clearing of vegetation around 5 meteorological (weather) stations on the HJ Andrews Experimental Forest (HJA).

Facility management
Scoping Start
07/27/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Muskee Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Project area is on Forest Service roads 2664510 and 2664508. · Linn, Oregon

The project proposes to commercially thin three 43 year old stands, one is 42 acres, 16 acres, and 9 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres.

Forest productsFuels management
Scoping Start
03/14/2014
Decision
05/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
Muskee Thin ProjectDecision Signed Date: 05/11/2015
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R7E, Section 29 &amp; 32
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
McRae Creek on HJ Andrews Experimental Forest, T15s, R5E, S 13. 15-1506-320-325 · Lane, Oregon

Access Trail ~2000%u2019 of construction, including a 7-step cribbed ladder stairway. Installation of Stream monitoring equipment and power source. Eight shallow groundwater monitoring wells are proposed to be installed around the creek.

Research
Scoping Start
03/03/2017
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Mt Hagen Communication site, Blue River, Oregon · Lane, Oregon

The McKenzie River Ranger District is proposing to renew the Communication Use Lease for the Oregon Department of Transportation at Mt. Hagen.

Special use management
Scoping Start
02/09/2017
Comment Period
02/10/2017
Decision
03/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16 S., R.3 E., Section 35, Willamette Meridian
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
OHV Trail 46 is located at the Santiam Pass OHV area near Hoodoo Ski Area. · Linn, Oregon

The proposed project would reroute approximately .1 mile of OHV Trail 46 (OHV Class III).

Recreation management
Scoping Start
05/22/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
OHV Trail 46 Reroute ProjectDecision Signed Date: 06/12/2015
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The project is located in the Santiam Pass OHV Area. · Linn, Oregon

This proposed project would reroute approximately .5 miles of OHV trails 22 and 42 in the Santiam Pass OHV Area. The work would be done with heavy machinery and the old trails would be decommissioned.

Recreation management
Scoping Start
07/11/2016
Decision
12/2016 (Estimated)
Implementation
02/2017 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 12/10/2019
T.15 S., R.5 E., Section 31 NE, Willamette Meridian T.15 S., R.5 E., Section 31 SW, Willamette Meridian T.15 S., R.5 E., Section 29 SW, Willamette Meridian T.15 S., R.6 E., Section 18 SW, Willamette Meridian · Lane, Oregon

The McKenzie River Ranger District is proposing to renew the Communication Use Lease for the Oregon State University (OSU) School of Forestry for a 30 year period. OSU manages four low power communication facilities.

Special use management
Scoping Start
05/17/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/10/2019
Approximately three miles southeast of Oakridge, Oregon. · Lane, Oregon

The proposal is the addition of two semi-truck trailers along with some earthwork, asphalt, and concrete placement. Additionally, the Special Use Permit for the transfer station has expired and is in need of a renewal

Special use management
Scoping Start
05/09/2018
Decision
11/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R3E, Section 26
PH Salvage Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
This area is located off Forest road 2600830 Potato Hill road. · Linn, Oregon

The McKenzie River Ranger District is proposing to remove approximately 240 dead and dying fire damaged trees within a 4 acre area. The dead and dying trees will be removed with ground based equipment and skidded to existing roadway (2600830).

Forest products
Scoping Start
10/17/2017
Comment Period
11/14/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT13S, R07E, Section 24
Park Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Access project from Forest roads 1500102 and 1500104. · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 85 acres in a stand that is 110 years old. Treatments would include 58 acres of commercial thinning, 6 acres of gaps, and 21 acres of skips that would be left unharvested.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
02/05/2018
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R4E, Sections 21 & 22
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/10/2019
See Map · Lane, Oregon

The Purpose of this project is to re-establish forest cover and the need of this project is to meet desired future condition of forest cover for all management allocations within the fire perimeters.

Vegetation management (other than forest products)
Scoping Start
05/09/2018
Decision
10/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Leslie Elliott · ljelliott@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Q Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Access project from Forest road 1509636. · Lane, Oregon

The McKenzie River Ranger District is proposing to treat approximately 90 acres in a stand that is 92 years old. Treatments would include 54 acres of commercial thinning, 6 acres of gaps, and 30 acres of skips that would be left unharvest.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
10/16/2018
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
Q Thin ProjectDecision Signed Date: 04/23/2019
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R5E, Sections 29, 30, 31, & 32
Quartz Completed
Environmental Assessment · McKenzie River Ranger District · updated 12/10/2019
The Quartz Project is located on the McKenzie River Ranger District within the Quartz creek subwatershed (6th field) of the McKenzie River. · Lane, Oregon

The project area is located on Forest Road 2618. The project area is approximately 27,090 acres. Treatments are proposed on approximately 1337 acres within the project area. All treatments are in previously managed stands under 80 years of age.

Forest productsVegetation management (other than forest products)
Scoping Start
10/12/2017
Comment Period
05/14/2018
Objection Period Start
07/09/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Dean Schlichting · deandschlichting@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT18S, R4E Sections 1-6, 9-15 and 22-24; T18S, R5E Sections 7,7,18 and 19; and T17S, R5E Section 31 Willamette Meridian, Lane County, Oregon.
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
T16S, R5E, Sec 16 & T16S, R5E, Sec 11. Delta A & Scott Cr Rec Res Tracts · Lane, Oregon

Allow current Recreation Residence permit holders to make improvements on their lots. All permit holders are currently in compliance with the terms and conditions of their permits

Recreation management
Scoping Start
03/03/2017
Comment Period
03/28/2017
Decision
04/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Three miles west of McKenzie Bridge Oregon on King Road. · Lane, Oregon

The McKenzie River Ranger District is proposing to authorize owners of Recreation Residence cabins in the Delta A and B Tracts to make improvements incidental to owning these cabins.

Recreation management
Scoping Start
02/23/2018
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
T.13 S., R.7.5 E., Section 23, Willamette Meridian The Lodge is located near the 80 mile marker on Us Highway 20, 17 miles west of Sisters, OR ( 44�25'19.74" N 121�51'55.11" W. ). · Linn, Oregon

a Special Use Permit be issued for the purpose of restoring the historic Santiam Pass Ski Lodge and the grounds surrounding. The Lodge is located near the 80 mile marker on Us Highway 20, 17 miles west of Sisters, OR

Special use management
Scoping Start
11/08/2017
Decision
12/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The project area is located in the Santiam Pass area. · Linn, Oregon

The proposed project would allow the removal of conifer species less than 6.9 inches in diameter and under 10 feet tall. The conifers would be removed using hand tools along existing roadways and approved by permit for personal use only.

Forest products
Scoping Start
08/31/2016
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Slip Thin Completed
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
The proposed project area is located off Forest Service Road 1516, 1516664, and 1516666. · Linn, Oregon

The McKenzie River Ranger District is proposing to treat approximately 60 acres in two stands. Stand #1 is 40 acres and Stand #2 is 10 acres; they are both approximately 43 years old. Including ten acres of skips.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
12/19/2018
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
Slip Thin ProjectDecision Signed Date: 04/08/2019
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R5E, Section 03, Willamette Meridian
Decision Memo · Detroit Ranger District · updated 12/10/2019
Upper North Santiam and Detroit Reservoir/Blowout watersheds · Linn; Marion, Oregon

Reduce stocking levels of stands 6-9 inches in diameter, 500-800 TPA. Offer biomass products such as posts and poles and firewood and other SFP such as bough and beargrass.

Wildlife, fish, rare plantsForest products
Scoping Start
03/28/2013
Decision
04/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Forest Vegetation Improvements; Special Products Sales
Decision Memo for the Str8 Thinning Restoration ProjectDecision Signed Date: 04/01/2015
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT. 11 S., R. 6 E., Sections 26, 27, 34 and 35, Willamette Meridian
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Loon: T18S, R5E, Sec 27 UnNamed: T18S, R6E, Sec 31 McRae: T15S, R5E, Sec 23 · Lane, Oregon

Fall and leave gap creation (1/4 ACRE), and in stream wood placement in 3 locations. Loon Creek, an unnamed tributary of the south fork, and Lookout creek.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/03/2017
Comment Period
03/31/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Nicholas Grant · ngrant02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
McKenzie River National recreation trail from Tamolitch Pools to just before the 2672655 Road. · Lane, Oregon

A project to build a bike specific bypass trail that originates on the McKenzie River NRT at Tamolitch Pools and terminates on the McKenzie River NRT just before the 2672655 Road. This project will also include the replacement of two failing bridges.

Recreation management
Scoping Start
02/22/2016
Comment Period
03/24/2017
Decision
05/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Carmen Smith Campus and Trail Bridge Campground · Linn, Oregon

Install a new 5000 gallon above ground water storage tank located adjacent to Bypass road. Provides water storage for TB campground and Carmen-s campus. Install a 3 inch water line connecting to new tank from location of old tank up to 450 linear fee

Facility management
Scoping Start
07/17/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Dean Schlichting · deandschlichting@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Project area is bounded by Forest roads 1985, 2618, 1927, and 19. · Lane, Oregon

The project would remove floral greens: beargrass, salal, fern fronds, and vine maple/ceanothus sticks. This would occur on approximately 18,760 acres of the McKenzie River Ranger District. The sale of these products will be done under permits.

Forest products
Scoping Start
03/14/2014
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
Verde Floral Greens Removal ProjectDecision Signed Date: 06/14/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S, R5E, Section 28-33; T18S, R4E, Section 1,2,11-15,23,24; T18S, R5E, Section 3,7,11,14-23,26-30
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
McKenzie River District · Lane; Linn, Oregon

Restore, maintain and create wildlife habitat, improving early seral habitat conditions by managing and manipulating vegetation.

Vegetation management (other than forest products)
Scoping Start
03/03/2017
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Various past project locations across the district. · Lane; Linn, Oregon

Pre-Commercial Thinning, Create/Rehabilitate Openings, Early Seral Habitat Improvement on 92 acres. Browse Cutback, In-Stream Down Wood, Pool Creation, may involve blasting pools. Wildlife Tree Creation. Down Wood Creation. Structural Improvements

Vegetation management (other than forest products)
Scoping Start
05/07/2019
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Wildlife Habitat Enhancement Projects 2019-2021 ground disturbingDecision Signed Date: 10/29/2019
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/10/2019
Foley, Upper Foley and Pebble Seed orchards · Lane, Oregon

Maintain and create wildlife habitat, improving early seral habitat conditions by managing and manipulating vegetation.

Vegetation management (other than forest products)
Scoping Start
03/03/2017
Decision
11/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 12/10/2019
For roads on Detroit, McKenzie River and Middle Fork Ranger District's within 2017 Jones, Whitewater, Avenue, Little Devil, Separation, Staley, and Tumblebug 2 fires. · Douglas; Lane; Linn; Marion, Oregon

Provide for long-term public and employee safety by reducing danger trees along roads. About 83 miles of road or 3,600 acres have some level of fire-killed trees that are next to an open road, resulting from the 2017 fires.

Fuels management
Scoping Start
11/27/2017
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Suzanne Schindler · sschindler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Special Products Sales; Road Maintenance; Timber Sales (Salvage); Watershed Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Detroit Ranger District; Middle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 11/20/2019
Huss Ridge is located on the Sweet Home Ranger District approx. 20 miles east of Sweet Home north of Hwy 20. Coffin Mountain is located on the south end of the Detroit Ranger District off the 1168 rd · Linn, Oregon

A new radio communications shelter with solar panels and propane tank are proposed for installation on the existing Huss Ridge communication site. Huss Ridge and Coffin Mountain are proposed for designation as non-commercial communication sites.

Special use management
Scoping Start
10/09/2019
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Joan Schmidgall · jschmidgall02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Solar
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionHuss Ridge Communication Site: Sec. 35, T. 13 S., R. 5 E; Coffin Mountain Communication Site: Sec. 14, T. 11 S., R. 6 E.
Environmental Assessment · Detroit Ranger District · updated 11/13/2019
The project area is located less than one mile north of Detroit, Oregon directly adjacent to the northern bank of the Breitenbush Arm of Detroit Lake in the French Creek Watershed · Marion, Oregon

Decommissioning 0.4 miles of Road 2225-450 along the Breitenbush Arm of the Detroit Reservoir. The site would be stormproofed, decompacted, and revegetated.

Road management
Scoping Start
05/20/2019
Comment Period
07/29/2019
Objection Period Start
09/20/2019
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Hilary Krieger · Hilary.Krieger@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning
Decommissioning the End of Road 2225-450Decision Signed Date: 11/12/2019
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S, R05E, Section 02, NE 1/4
Straight Creek AOP Completed
Decision Memo · Detroit Ranger District · updated 10/4/2019
AOP site - Culvert on Road 1164, MP 2.3, crossing Straight Creek. Waste site %u2013 Straight Creek Rock Pit on Road 11, MP 2.9. · Linn, Oregon

Replace the culvert barrier on FS road 1164 at Straight Creek with an open-bottom arch, the bottom to be restored to a stream bed with a natural gradient in order to allow for aquatic organisms at all life stages to cross under the road.

Watershed management
Scoping Start
03/30/2017
Decision
10/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
Straight Creek AOP ProjectDecision Signed Date: 10/04/2019
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 9/5/2019
Breitenbush Watershed, T.09S., R.07E., Sec. 21, NE1/4 · Linn; Marion, Oregon

A no-camping restriction is needed at the Jeff Bridge Fish Drop site on Road 4685. The site is currently being developed for dropping federally-listed, spring chinook spawners in the North Fork Breitenbush River.

Wildlife, fish, rare plants
Scoping Start
03/30/2017
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (2), 36 Cfr 220.6(D)(2); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Species Population Enhancements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Buck Tule Completed
Environmental Assessment · Detroit Ranger District · updated 9/3/2019
The main portion of the project area is bounded by Fisher Point, Trappers Butte and Scar Mountain to the west, Parish Lake Road to the south, Buck Mountain and Coffin Mountain to the north and Highway · Linn; Marion, Oregon

Timber harvest is proposed in densely stocked second growth stands generally ranging in age from 40 to 150 years old, and includes stands within Riparian Reserves and approximately 40 acres in the Jefferson Late-Successional Reserve.

Minerals and geologyVegetation management (other than forest products)Fuels managementLand management planningForest productsWildlife, fish, rare plants
Scoping Start
03/16/2012
Comment Period
01/26/2015
Objection Period Start
04/17/2015
Decision
07/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green)
Final Decision Notice / Finding of No Significant Impact Buck Tule ProjectDecision Signed Date: 07/31/2015
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT11S, R6E, Sections 13, 14, 22 - 28, 33-36 , T11S, R7E, Sections 16-21, 28-32, T12S, R6E, Sections 1-3, 12, 13, T12S, R7E, Sections 5-8, 17-20
Decision Memo · Detroit Ranger District · updated 8/30/2019
On the Detroit Lake in the Detroit Flats Day Use Area located adjacent to the sound side of the town of Detroit. · Linn; Marion, Oregon

The existing shoreline is eroding into Detroit Lake due to foot traffic and wave action. This project would replant native vegetation and stabilize the bank to allow for better fish habitat.

Watershed management
Scoping Start
05/20/2019
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT.10S, R.05E, Sect. 1
Decision Memo · McKenzie River Ranger District · updated 7/9/2019
Delta A and HooDoo cabins · Lane, Oregon

Delta A #14 needs a second access to/from the cabin for safety purposes. Delta A #58 needs to store wood and have a place for general storage. Hoodoo #15 needs to Install a pressure switch for the well. Install a sign and Re-roof the cabin.

Recreation management
Scoping Start
05/17/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 4/30/2019
T 11 S, R 07 E, Section 22: Marion Creek restoration reach, Marion Forks Fish Hatchery Intake to the Fork Thin TSA boundary · Marion, Oregon

This restoration project would improve habitat for native rainbow and cutthroat trout along 0.8 miles of lower Marion Creek.

Wildlife, fish, rare plants
Scoping Start
03/30/2017
Decision
04/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements
Marion Creek Phase III Wood Placement ProjectDecision Signed Date: 04/15/2019
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Mackey Creek Cancelled
Decision Memo · Detroit Ranger District · updated 3/9/2019
T. 10 S., R. 6 E., Section 7, T. 10 S., R. 5 E., Section 12, Upper North Santiam River Watershed · Marion, Oregon

This project would commercially thin 38 acres between Hwy 22 and Detroit Lake to improve stand health and improve motorist safety along Hwy 22.

Forest products
Scoping Start
09/2018 (Estimated)
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Mark Leis · mleis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green); Watershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 10/22/2018
JoJo Thin Units 33a, 35, 35b, 35h, 35j & 46: T.10S., R.07E, Sec. 30, 33, Sand Thin Unit T.11S., R.07E, Sec. 30, Downing ReOffer Units 2 & 41 T.11S., R.07E, Sec. 33 · Linn; Marion, Oregon

This project proposes to improve soil productivity and infiltration and would increase vegetative ground cover on soils compacted by legacy ground-based harvesting in three timber sale areas in the North Santiam Watershed.

Watershed management
Scoping Start
03/30/2017
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Dave Klug · dklug@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
2018 North Santiam SubsoilingDecision Signed Date: 10/10/2018
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 9/6/2018
Camp Pioneer · Linn, Oregon

Camp Pioneer is requesting authorization to install an vault for an outhouse next to the parking lot.

Special use management
Scoping Start
09/08/2016
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations; Special Area Management
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Mt. Ray Reroutes Cancelled
Decision Memo · Middle Fork - Inactive Ranger District · updated 8/20/2018
Approximately 18 miles east of Oakridge. · Lane, Oregon

There is a segment of Mount Ray Trail that is too steep and is heavily rutted due to its fall-line alignment. We propose to solve that alignment problem by rerouting the trail on gentle grades to prevent further impacts to the trail, soils

Recreation management
Scoping Start
05/09/2018
Decision
10/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R5.5E, Sec 14
Goose EIS 2015 Completed
Environmental Impact Statement · McKenzie River Ranger District · updated 8/9/2018
The Goose Project area is located on the McKenzie River Ranger District within the Upper McKenzie Watershed (5th field). It is located in the McKenzie Bridge Community. · Lane, Oregon

The Goose Project proposes to commercially harvest and reduce fuels on approximately 2,452 acres on the Willamette National Forest near the community of McKenzie Bridge, Oregon.

Wildlife, fish, rare plantsFuels managementForest products
NOI in Federal Register
04/30/2014
DEIS NOA in Federal Register
03/06/2015
FEIS NOA in Federal Register
08/11/2015
Objection Period Start
08/17/2015
Decision
02/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Elysia Retzlaff · elysiamretzlaff@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT 16S R 5E Sec: 1-5, 9-16, 24. T 16S R 6E Sec: 3-11, 13-25. T 16S R 7E 18, 19, 30.
Environmental Assessment · Willamette National Forest All Units · updated 8/1/2018
The project area includes the Mt. Washington Wilderness area on the McKenzie River Ranger District. · Lane, Oregon

The project would use prescribed fire in the Mt. Washington Wilderness area to modify vegetation and fuels to sufficiently reduce the threats to values outside of wilderness in order to allow fire to play a more natural role within wilderness.

Fuels management
Scoping Start
01/09/2013
Comment Period
08/17/2015
Objection Period Start
04/10/2017
Decision
07/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Matt Peterson · mbpeterson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionThe legal description for the project area is T15S, R07E, sections 23, 24, 25, 26, 27, 34, 35, 36; T15S, R07½ E, sections 21, 22, 26, 27, 28, 33, 34; and T16S, R07E, sections 2 and 3.
Trout Creek Completed
Environmental Impact Statement · Sweet Home Ranger District · updated 6/21/2018
Trout Creek, Moose Creek and portions of Canyon Creek within the South Santiam watershed to the north and south of Highway 20. · Linn, Oregon

Managed and fire-origin stands: Promote health, vigor, diversity and complexity, mimic mixed-severity fire, improve hardwood habitat, provide forest products on ~1,670 acres. Generate revenue to improve existing roads, decommission roads, treat fuels

Forest productsVegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
NOI in Federal Register
01/23/2017
DEIS NOA in Federal Register
12/29/2017
FEIS NOA in Federal Register
04/13/2018
Objection Period Start
04/13/2018
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Joan Schmidgall · jschmidgall02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT12S, R4E, Sec.34; T12S, R5E, Sec. 19,29,30-32; T13S, R3E, Sec.11-15, 22-27, 34-36; T13S, R4E, Sec. 1-12, 14-36; T13S, R5E, Sec.5,6; T14S, R3E, Sec 1-3, 12; T14S, R4E, Sec. 1-15
ODOT Right of Way Completed
Decision Memo · Sweet Home Ranger District · updated 6/12/2018
T13S, R5E, Section 28 at milepost 56.64 on Highway 20 where Sheep Creek crosses the highway. · Linn, Oregon

Granting right-of-way to ODOT for Sheep Creek bridge replacement on highway 20.

Special use management
Scoping Start
06/01/2016
Decision
10/2016 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 6/11/2018
District wide · Linn; Marion, Oregon

Reduce stocking on approximately 4800 acres, district wide, in overstocked stands less than 40 years old by thinning.

Vegetation management (other than forest products)
Scoping Start
04/07/2017
Decision
06/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Sardine Project Completed
Environmental Assessment · Detroit Ranger District · updated 6/7/2018
Project area is north of Highway 22 above the Detroit Dam and west of Hall Ridge · Marion, Oregon

This project proposes a variety of silvicultural treatments on 900 acres of young second growth forests to enhance the growth and structural complexity of stands in the project area.

Vegetation management (other than forest products)Forest products
Scoping Start
10/01/2008
Comment Period
07/26/2009
Decision
12/2009 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S, R5E, Sections 5-8, 17, 19, 30, and 31
Decision Memo · McKenzie River Ranger District · updated 6/5/2018
T13S,R7E, Sec. 32, Across Highway 126 from 2676 Road · Linn, Oregon

To widen the 301 snowmobile trail. The Mount Jefferson Snowmobile Club is interested in crossing the highway and grooming established snowmobile trails north of Highway 126.

Recreation management
Scoping Start
03/03/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 6/5/2018
T. 10 S., R. 6 E., Sec 13; T. 10 S., R. 7 E., Sec 18; Headwaters North Santiam River Watershed · Linn, Oregon

This project would improve forest health by decreasing competition, releasing the canopy, stimulating tree and ground vegetation growth rates, and reducing fuel loading in over stocked stands.

Forest products
Scoping Start
04/08/2016
Decision
05/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Forest Vegetation Improvements; Special Products Sales
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Slick Thin Completed
Decision Memo · Middle Fork - Inactive Ranger District · updated 5/3/2018
Approximately 13 miles north/northeast of Lowell, OR. · Lane, Oregon

This project proposes to thin densely stocked stand ranging in age from 44 to 59 years old that is composed of stands originally clear-cut from the 1950s through 1970s.

Vegetation management (other than forest products)Forest products
Scoping Start
06/07/2017
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
John Poet · jpoet@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT18S, R2E, Section 16 and 21
Decision Memo · Detroit Ranger District · updated 5/2/2018
Hall Ridge Communication Site is located in T9S, R5E, SECTION 8 · Linn; Marion, Oregon

AT&T and American Tower Communication Leases at Hall Ridge will expire in 12/31/2017. This will be a renewal of an existing Communication Lease with no new ground disturbance for a new term of 20 years.

Special use management
Scoping Start
05/15/2017
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Communication Lease Reissuance'sDecision Signed Date: 04/20/2018
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 3/14/2018
Detroit Reservoir T.10 S., R.05 E., Sections 1, 10, 15, 18, 19; T.10 S., R.06 E., Section 7 · Linn; Marion, Oregon

This project restores hiding cover at depths where salmonids have been found by ODF&W and USGS fish surveys to frequent.

Wildlife, fish, rare plants
Scoping Start
03/30/2017
Decision
05/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 3/14/2018
Minto Creek, Upper North Santiam Watershed, T.11S., R.07E., Sec. 10, SW1/4 · Linn; Marion, Oregon

This project proposes to restore the large wood component in 0.4 miles of Minto Creek with approximately 10 stream structures and to add 3 structures in 0.1 mile of a side channel and floodplain on the North Santiam River.

Wildlife, fish, rare plants
Scoping Start
03/30/2017
Decision
03/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Jamie Sheahan Alonso · jsheahanalonso@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/12/2018
One site is located approximately 4 miles south, southwest and the other is 10 miles north, northwest from Westfir Oregon. · Lane, Oregon

The Middle Fork Ranger District currently needs a steady supply of crushed rock for ongoing and upcoming road maintenance and projects. Formerly called the FY 16 Rock Crushing Project. Name was changed due to only one rock quarry being developed.

Road management
Scoping Start
06/06/2016
Decision
03/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Katie Isacksen · katie.isacksen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R2E, Sec 10 and T21S, R2E, Sec 23
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/7/2018
T21S, R3E, Section 2 (Dead Mountain), T20, R2, Section 19 (Lawler), and T20, R2, Section 10 (Tire Mountain) · Lane, Oregon

There are three sites where a reroute: Dead Mountain Trail (3566), and two bridge repairs: Lawler Trail (3473)and Tire Mountain Trail (3485)would occur.

Recreation management
Scoping Start
06/07/2017
Decision
02/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 2/1/2018
Approximately eight miles north/northeast of Oakridge, OR on Huckleberry Mountain. · Lane, Oregon

Renew a long-term (10 year) lands special use permit for seismic installation on forest, and updating the site with more modern equipment at a new location close to existing installation.

Special use management
Scoping Start
06/07/2017
Decision
01/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R4E, sec10 NWSE
Decision Memo · Middle Fork - Inactive Ranger District · updated 2/1/2018
Approximately 20 miles east of Oakridge, OR on Highway 58. · Lane, Oregon

ODOT needs to control the amount of loose rock that falls down onto the highway by hanging chain link fencing on the rock face. Prior to placing the fencing, equipment will be used to scrape the face of the rock slope to break free loose material.

Special use management
Scoping Start
06/07/2017
Decision
01/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ODOT Highway 58 Screening ProjectDecision Signed Date: 01/25/2018
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R5E, S25
Decision Memo · Middle Fork - Inactive Ranger District · updated 2/1/2018
Approximately 11 miles south of Oakridge, OR. · Lane, Oregon

The U.S. Geological Services would like to relocate an existing gauging station upstream of a split channel to increase the accuracy of flow measurements. The gauging station is being used to calculate flow levels coming into Hills Creek Reservoir.

Special use management
Scoping Start
06/07/2017
Decision
01/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
USGS Middle Fork Stream Gauging StationDecision Signed Date: 01/25/2018
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT23S, R3E, Section 9
Decision Memo · McKenzie River Ranger District · updated 1/18/2018
The proposed project area is located off Forest roads 2600296, 2600560, and 2600610. · Lane, Oregon

The McKenzie River Ranger District is proposing to remove approximately 30 dead and dying danger trees that have the potential to fall into Forest roads 2600296, 2600560 and 2600610, powerlines, and adjacent private structures.

Road managementForest products
Scoping Start
12/13/2017
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage); Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R06E, Sections 1 & 17
Decision Memo · Sweet Home Ranger District · updated 12/19/2017
The project is located across the district except for designated wilderness areas. · Linn, Oregon

This project reduces the stocking levels of young stands, in turn, improving forest health, tree growth and huckleberry habitat, reducing fuel loads, and providing forage and habitat for wildlife. The project area includes approximately 4,700 acres.

Vegetation management (other than forest products)
Scoping Start
06/12/2017
Decision
12/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Lindsay Anderson · landerson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 12/13/2017
Along Highway 58 from Willamette Pass to near the western edge of the Willamette National Forest. · Lane, Oregon

This project will install 6 commercial cell tower sites along Highway 58 from Willamette Pass to near the western edge of the Willamette National Forest.

Special use management
Scoping Start
05/2017 (Estimated)
Comment Period
07/2017 (Estimated)
Objection Period Start
11/2017 (Estimated)
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/6/2017
Twenty miles south of Oakridge, OR off FS Road 2129. · Lane, Oregon

The Forest Service proposes to under burn the Jim's Creek area to maintain the open forest component. The approximately 688 acres would be burned in phases and burns could be repeated.

Vegetation management (other than forest products)Fuels management
Scoping Start
06/06/2016
Decision
12/2017 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Molly Juillerat · mjuillerat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S, R3E, S11 and S12
Decision Memo · Detroit Ranger District · updated 10/30/2017
Pigeon Prairie Meadow Complex · Linn, Oregon

Meadow enhancement of the Pigeon Prairie meadow complex, on approximately 41 acres. Activities include removal of encroaching conifers and fuels treatments as appropriate.

Wildlife, fish, rare plants
Scoping Start
04/08/2016
Decision
10/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Daryl Whitmore · dwhitmore@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
Pigeon Prairie Meadow Restoration ProjectDecision Signed Date: 10/13/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 10/23/2017
On top of Wolf Mountain, approximately 14 miles south east of Oakridge Oregon. · Lane, Oregon

To upgrade existing ODOT communications systems on Wolf Mtn to meet the requirements of the State Radio Project (SRP) for emergency communications.

Special use management
Scoping Start
06/06/2016
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Wolf Mountain Tower Replacement ProjectDecision Signed Date: 10/20/2017
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R5E, Section 33 SW
Decision Memo · Detroit Ranger District · updated 10/19/2017
District wide · Linn; Marion, Oregon

This proposal would permit firewood collection of dead and down material from within the road prism (top of cut, bottom of fill) year round and from within 150 feet of motorized travel roadways from August 1 to December 31.

Forest products
Scoping Start
04/06/2017
Decision
02/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales; Road Maintenance
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 10/19/2017
The proposed project area is off Forest Service Road 2643410. · Lane, Oregon

The proposed project would remove all Douglas fir trees within a six acre area that has been identified to have extensive root disease. This project would remove alive and dead trees to create a buffer from the adjacent healthy forest.

Vegetation management (other than forest products)Forest products
Scoping Start
06/29/2016
Decision
11/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 10/19/2017
Mt. Hagan, McKenzie River District of the Willamette National Forest · Lane, Oregon

Complete updates needed to upgrade to LTE capacity of existing Cingular/AT&amp;T tower at Mt. Hagen, including the removal of 2 existing antennas, placement of 4 new antennas, and installation of a generator and propane tank.

Special use managementFacility management
Scoping Start
05/15/2014
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 35, T. 16S., R.3E.
Decision Memo · McKenzie River Ranger District · updated 10/19/2017
Lookout Mountain Meadow · Lane, Oregon

The purpose of this project is to restore native meadow habitat by cutting and girdling small diameter trees, and subsequently implementing a prescribed fire across an approximately 347-acre project area.

Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/2015 (Estimated)
Decision
04/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Ruby Seitz · ruseitz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R6E, Sections 31, 32; T16S, R6E, Section 6
Environmental Assessment · McKenzie River Ranger District · updated 10/19/2017
Trailbridge Reservoir · Linn, Oregon

Realignment of the existing bypass Forest Service Road 2672690 around the Eugene Water and Electric Board's Carmen power house in order to provide safe and adequate access for construction of the fish passage facilities at trailbridge reservoir.

Wildlife, fish, rare plantsSpecial use managementRoad management
Scoping Start
11/09/2012
Comment Period
11/09/2012
Objection Period Start
10/2015 (Estimated)
Decision
09/2015 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Hydropower; Special Use Authorizations; Species Population Enhancements; Road Improvements/Construction; Travel Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT 15 S R 6 E, SEC 1 & 12
Decision Memo · McKenzie River Ranger District · updated 10/19/2017
Forest roads 1500618, 1500735 & 1500734 · Linn, Oregon

The Wolf Boughs project would remove approximately one hundred thirty-one tons (62,000 pounds) of coniferous boughs over 123 acres, under contracts or permits.

Forest products
Scoping Start
02/26/2015
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R6E Sections 30, 31, & 36
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 9/14/2017
Power line corridor between Hills Creek Reservoir and Lookout Reservoir, following the Middle Fork of the Willamette through the town of Oakridge. · Lane, Oregon

BPA is proposing to re-align two sections of the Hills Creek Lookout Point Power line along with pole replacement along the line. To see the entire EA and more please go to the BPA website at http://www.bpa.gov/goto/HillsCreekLookoutPoint

Special use management
Scoping Start
08/23/2013
Comment Period
08/10/2016
Objection Period Start
06/29/2017
Decision
08/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Allen Hambrick · afhambrick@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/20/2017
Opal Creek Scenic Area · Marion, Oregon

Multiple dispersed recreation sites would have their footprint decreased and transitioned from drive into to walk in sites.

Special area managementWatershed managementRecreation management
Scoping Start
03/15/2016
Decision
07/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
Three Pools Respect the River ProjectDecision Signed Date: 07/10/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/18/2017
FSR 2223, FSR 46, FSR 10, Elk Lake · Linn; Marion, Oregon

Expansions of camping prohibitions already in place along Breitenbush Road/River, French Creek Road, and Blowout Road. Restrict camping at Elk Lake.

Recreation management
Scoping Start
03/28/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Josh Weathers · jweathers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
New Dispersed Camping Restrictions on the Detroit Ranger DistrictDecision Signed Date: 05/15/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 7/18/2017
This project will implement no camping restrictions on Moose Mountain Rd from the intersection with Hwy 20 to the intersection of FSR 2027 and Gordon Rd for 2 miles from the Hwy 20 junction. · Linn, Oregon

Overnight camping will be restricted 500 feet from both sides of the road on Moose Creek and Gordon Rd. Day-use is permitted. The purpose of this restriction is to reduce resource damage and improve water quality in the area.

Watershed managementRecreation management
Scoping Start
04/14/2017
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Josh Weathers · jweathers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 7/18/2017
The .8 mile trail is located to the south of Hwy 20 in the Hackleman Old Growth Grove near Hackleman Creek. · Linn, Oregon

Re-establish and improve the trail-side drainage ditch-lines along sections of Hackleman Trail(#3411). Work will include excavation to construct ~200 feet of new ditch-line. The current ditch is insufficient to handle seasonal water run-off.

Recreation management
Scoping Start
04/05/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionTownship 13 South, Range 6 East, Section 33
Decision Memo · Middle Fork - Inactive Ranger District · updated 7/18/2017
35 miles south of Oakridge at the Indigo Springs Campground · Lane, Oregon

Replacement of deck boards and two stringers at a bridge in Indigo Springs.

Recreation management
Scoping Start
05/19/2016
Decision
04/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S R5#, section 18, NW
Decision Memo · McKenzie River Ranger District · updated 7/18/2017
Mona Campground, Willamette National Forest · Lane, Oregon

The proposed action is to estabish a power line connection from the existing Pumphouse which has electrical power to campsite #23. The proposed power line will follow an existing water line.

Recreation management
Scoping Start
03/03/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Dave Sanders · dgsanders@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/18/2017
T12S R8E Sec. 17 · Linn, Oregon

Construction of one new trail section including brush work, log cutting, tree removal and tread surface construction

Recreation management
Scoping Start
09/02/2016
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Brandon Haraughty · bharaughty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
Pacific Crest National Scenic Trail Realignment ProjectDecision Signed Date: 05/25/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/18/2017
T9S R8E Secs. 26,35, T10S R8E Secs. 2, 11, Breitenbush Watershed · Marion, Oregon

Construction of ten new trail sections including brush work, log cutting, tree removal and tread surface construction.

Recreation management
Scoping Start
09/02/2016
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Brandon Haraughty · bharaughty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
Pacific Crest National Scenic Trail Realignment ProjectDecision Signed Date: 05/25/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/18/2017
Pacific Crest Trail. T13S R7.5E Sec. 13 · Linn, Oregon

Reroute a portion of the Pacific Crest Trail to reduce resource damage.

Recreation management
Scoping Start
09/02/2016
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Brandon Haraughty · bharaughty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
Pacific Crest National Scenic Trail Realignment ProjectDecision Signed Date: 05/25/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 7/18/2017
Approximately, 20 to miles south of Oakridge, Oregon near Timpanogas Lake. · Lane, Oregon

Middle Fork Recreation proposes to reroute 1500 feet of the Sawtooth trail in the Oregon Cascades Recreation Area to improve sustainability and to improve the trail user experience.

Recreation management
Scoping Start
05/19/2016
Decision
04/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT25S, R5.5E Sections 27, 28
Decision Memo · Detroit Ranger District · updated 7/18/2017
Adjacent to Southshore campground. Detroit Tribs Watershed, T.10S., R.05E., Sec. 15, NE1/4 · Linn, Oregon

Planting wetland plants is intended to stabilize sifting lake sediments in a shallow swimming area in an alcove at the Southshore Campground.

Watershed management
Scoping Start
03/15/2016
Decision
07/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Dave Klug · dklug@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/18/2017
T. 11 S., R. 6 E., Section 16 · Linn; Marion, Oregon

Removal of approximately 10 dead Pacific yew trees ranging in size from 3 inch diameter at breast height (dbh) to 12 inch dbh.

Forest products
Scoping Start
04/2017 (Estimated)
Decision
03/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 7/18/2017
Three Pools Day Use Area, T. 8 S., R. 4 E., Section 34, North Santiam Watershed · Marion, Oregon

Proposal is to ban alcohol use at the Three Pools Day Use Area.

Recreation management
Scoping Start
03/28/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Josh Weathers · jweathers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Alcohol Restriction at 3 Pools Day Use SiteDecision Signed Date: 05/15/2017
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Jude Ridge Completed
Environmental Assessment · Sweet Home Ranger District · updated 3/20/2017
Jude Ridge · Linn, Oregon

Harvest 3.6 MMBF from 13 stands aged 36-60 years old. Commercially thin 264 acres, leave ~27 acres of gaps (1/2-1 acre in size), leave ~143 acres of unharvested skips, and 27 acres of early seral creation leaving ~35% canopy cover in clumpy pattern.

Forest products
Scoping Start
12/16/2015
Comment Period
08/01/2016
Objection Period Start
09/19/2016
Decision
11/2016 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Suzanne Schindler · sschindler@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
Jude Ridge ProjectDecision Signed Date: 11/28/2016
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/14/2017
Approximately, 9.5 miles NE of Fall Creek Reservoir in the Fall Creek Area. · Lane, Oregon

Project would thin stand (37 acres) at a moderate spacing including gaps or openings typical with the adjacent LSR thinning project, Hehe. Sale would also perform road maintenance on approximately 11 miles of road 1817.

Forest products
Scoping Start
06/06/2016
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
John Poet · jpoet@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT.18s, R.2e, Sec. 2,11
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/14/2017
The location is at the former Pope and Talbot bridge crossing of Staley Creek on Forest Road 2134-244. This is located at approximately the 1.7 mile mark on Forest Road 2134. · Lane, Oregon

Stabilization of approx. 200 ft. of eroding stream bank, including large woody debris jam construction. Trees with root wads attached will be gathered and large trees will be hauled to the project area for bank stabilization and log jam construction.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/06/2016
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Joseph Helstab · jmhelstab@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S, R4E, NW 1/4 of Section 19.
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/2/2017
This project is spread out throughout the Middle Fork Ranger District and can best be describes by viewing the map. · Lane, Oregon

The Forest Service proposes to thin overstocked plantation stands for optimal growth, stand health, late successional reserve characteristics, watershed quality, and to favor desired species such as pine and oak, along with native forbs and grasses

Vegetation management (other than forest products)
Scoping Start
06/06/2016
Decision
02/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Ray Holk · rholk@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Young Stand Density Management and Conifer PruningDecision Signed Date: 02/13/2017
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 1/9/2017
These meadows fall within one of the listed watersheds as follows:Upper Middle Fork Watershed, Hills Creek, Hills Creek Reservoir,Middle Fork Willamette, and the North Fork of the Middle Fork · Lane, Oregon

The purpose of this project is to cover maintenance burning and whip felling for the next 10 years as needed to stop encroachment and maintain the meadows.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
09/03/2015
Decision
01/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Molly Juillerat · mjuillerat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 11/28/2016
Walker Creek Road System to the east of Cougar Reservoir and adjacent to the Three Sisters Wilderness. · Lane, Oregon

The proposed project would approve road maintenance on approximately 2.9 miles of road in portions of the Walker Creek Road System.

Road managementWatershed management
Scoping Start
06/09/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Kenny Gabriel · kgabriel@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 11/28/2016
Various locations across the McKenzie River Ranger District. · Lane; Linn, Oregon

The proposed project would include 188 acres of browse cutback, six acres of early seral habitat restoration, 29 acres of pre-commercial thinning, 27 acres of pool creation, create 676 down wood trees, and create 872 wildlife trees.

Wildlife, fish, rare plants
Scoping Start
05/10/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 11/17/2016
Trails are located to east and west of Highway 242 near McKenzie Pass. The Benson Trail is located in the Mount Washington Wilderness and the Obsidian Trail is located in the Three Sisters Wilderness · Lane, Oregon

The proposed project would reroute approximately 2.2 miles of the Obsidian Trail (FS Trail 3528) and one mile of the Benson Lake Trail (FS Trail 3502). Reroutes would reduce erosion and maintenance.

Recreation management
Scoping Start
04/08/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
D Blowdown Removal Completed
Decision Memo · McKenzie River Ranger District · updated 11/17/2016
Project is located off of Forest Road 2654650, within 180 feet from the the road. · Lane, Oregon

The proposed project would remove approximately 40 wind thrown and root sprung trees within a five acre stand that is 120 years old. Trees would be sold under a timber sale contract.

Forest products
Scoping Start
04/20/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 11/17/2016
McKenzie River Trail · Lane, Oregon

The proposed project would reroute several sections of the McKenzie River National Recreation Trail (#3507) to prevent trenching and erosion.

Recreation management
Scoping Start
04/08/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S,R6E,Sec. 14, 13, 24, 26 &amp; T16S,R6E,Sec.11, 10, 9, 17, 18 &amp; T14S,R7E,Sec. 5,8,17,30,31
Decision Memo · McKenzie River Ranger District · updated 11/17/2016
Frissell Point Communication Site tower. · Lane, Oregon

The proposed project would issue a Special Use Permit to authorize Oregon State University School of Forestry to install, maintain, and operate two 5.8 gigahertz radios at the Frissell Point Communication Site tower.

Special use management
Scoping Start
05/10/2016
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 11/17/2016
Delta A, Delta B, and Scott Creek recreation residence tracts. · Lane, Oregon

The proposed project would approve repairs and replacements for failed septic systems, as needed, in three recreation residence tracts (Delta A, Delta B, and Scott Creek) over the next five years.

Special use management
Scoping Start
05/09/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 11/7/2016
Approximately, 20 miles south of Oakridge Oregon just off of FS road 21. · Lane, Oregon

We are proposing to conduct a prescribed underburn (without any pre-treatment) in this 38-acre forest unit in order to thin the stand out through fire-induced mortality.

Fuels managementWildlife, fish, rare plants
Scoping Start
06/06/2016
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Joanne Lowden · jalowden@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S-R03E-S13
Toll Joe Completed
Environmental Assessment · Sweet Home Ranger District · updated 9/28/2016
South Santiam watershed · Linn, Oregon

Accelerate development of structural complexity in the LSR and strategically manage hazardous fuels along Highway 20. Improve health, vigor and contribute wood products in matrix. 880 ac. 36-80yr.old stands, 100 acres of 81-105 yr. old stands

Forest productsFuels management
Scoping Start
12/08/2011
Comment Period
02/10/2014
Objection Period Start
04/07/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Plan Amendment; Timber Sales (Green)
Toll Joe Project and Non-significant Forest Plan Amendment #55Decision Signed Date: 06/06/2014
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R4E, Sec. 36; T13S, R5E, Sec. 26, 28, 31-36; T13S, R6E, Sec.31; T14S, R4E, Sec. 1, 12 and 13; T14S, R5E, Sec. 1-24, 27-29; and T14S, R6E, Sec. 6,7,8,17 and 18
Decision Memo · Detroit Ranger District · updated 9/15/2016
T12S R8E Secs. 1,2, 12, 18 · Marion, Oregon

Sections of trail route are unsustainable. Excessive erosion on overly steep trail grades in burned area soil is causing heavy damage to the trail route. Rerouting these trail sections will create stable tread surface and reduce erosion issues.

Recreation management
Scoping Start
08/07/2015
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Brandon Haraughty · bharaughty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements; Wilderness Management
Minto Pass Trail Realignment ProjectDecision Signed Date: 09/06/2016
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Gold Lake Project Completed
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/13/2016
Approximately, 15 to 20 miles East of Oakridge just off of Hwy. 58 at and near the Gold Lake recreation site. · Lane, Oregon

The Forest Service proposes to replace the Gold Lake boat ramp and reroute trails in the area to better accommodate the type of trail use and the number of visitors.

Recreation management
Scoping Start
05/19/2016
Decision
09/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
McKenzie Jensen · mckenziejensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
Gold Lake Enhancement ProjectDecision Signed Date: 09/01/2016
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT2S R6E S30, S15 & S9
Decision Memo · Middle Fork - Inactive Ranger District · updated 8/8/2016
Approximately two to six miles east of Oakridge, OR along Salmon Creek. · Lane, Oregon

This project would subsoil, berm, obstruct and replant seven small user-created roads in the vicinity of dispersed campsites off the 2400 and 2408 forest service roads.

Recreation management
Scoping Start
09/29/2015
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Katie Isacksen · katie.isacksen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Travel Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S R3E Sec 12, 13, 14, 15 and T21S R4E Sec 4,5, 7, 8
Decision Memo · Middle Fork - Inactive Ranger District · updated 7/28/2016
Twenty miles south of Oakridge, OR off FS Road 2129. · Lane, Oregon

~200 trees blew down in the Jim's Creek Stewardship area this winter. There is a desire to remove as many of these trees as possible to reduce the risk of beetle infestation. Logs will be sold and/or used in watershed restoration work in Staley Creek

Vegetation management (other than forest products)Forest productsWatershed management
Scoping Start
06/06/2016
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
David Haupt · dhaupt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S R3E sect. 11, 12 Hills Creek Reservoir Fifth-field Watershed
2014 Lands Permits Completed
Decision Memo · Detroit Ranger District · updated 6/17/2016
Bureau of Reclamation Weather Station T.10S., R6E, SECTION 3 City of Idanha Waterline - T.10S., R6E. SECTION 22 Breitenbush Hot Spring Mobile Radio Service - T.9S., R7E. SECTION 16 · Linn; Marion, Oregon

Renew three lands special use permits, Bureau of Reclamation Weather station, City of Idanha Water system, and Breitenbush Hot Springs Mobile radio Service new term of 10 years. This is an administrative action no ground disturbance will take place.

Special use management
Scoping Start
04/01/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Various District-wide Term Special Use Authorization Reissuance'sDecision Signed Date: 04/29/2016
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 6/17/2016
Kanes Marina T.10S., R6E, SECTION 2 Detroit Marina - T.10S., R6E. SECTION 1 Chemeketans Club - T.10S., R7E. SECTION 27 · Linn; Marion, Oregon

Renew three recreation special use permits Detroit Lake Marina, Kanes Marina, and Chemeketans Club to a new term of 10 years. This is an administrative action no ground disturbance will take place.

Special use management
Scoping Start
03/30/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Various District-wide Term Special Use Authorization Reissuance'sDecision Signed Date: 04/29/2016
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 6/13/2016
Oregon Department of Transportation (ODOT) Santiam Junction Maintenance Station Compound located at the junction of Highway 20 and Highway 22. · Linn, Oregon

The proposed project would approve the installment of a 1,000 gallon in-ground holding tank for the Oregon Department of Transportation (ODOT).

Special use management
Scoping Start
03/25/2016
Decision
04/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Starr Sullivan · starrasullivan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 6/9/2016
Upper Blowout Creek T 11 S, R 06 E, Sections 5, 6, 7 & 8: Blowout & Divide Creeks restoration reaches, Lower Divide Creek Rock Pit T 11 S, R 05 E, Section 31; and T 11 S, R 06 E, Section 6: Roads 10 & 1011 roadside large wood sources · Linn; Marion, Oregon

This restoration project would improve habitat for rainbow and cutthroat trout and increase sediment storage along 1.0 miles of central Blowout Creek and 0.7 miles of lower Divide Creek.

Wildlife, fish, rare plantsWatershed management
Scoping Start
03/15/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Jamie Sheahan Alonso · jsheahanalonso@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements
Blowout-Divide Creeks Wood Placement ProjectDecision Signed Date: 05/09/2016
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 6/7/2016
King's Castle, McKenzie River District, Willamette National Forest · Lane, Oregon

The proposed project would reroute approximately 1.25 miles of the King Castle Trail (FS Trail 4326).

Recreation management
Scoping Start
04/08/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R5E, Sec. 28 &amp; 21
Decision Memo · McKenzie River Ranger District · updated 6/7/2016
The section proposed for reroute is approximately eight miles from the nearest trailhead and approximately one mile before the trail intersects with the Pacific Crest Trail in Three Sisters Wilderness · Lane, Oregon

The proposed project would reroute approximately one mile of the Foley Ridge Trail (FS Trail 3511) to prevent and reduce heavy erosion.

Recreation management
Scoping Start
04/08/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/6/2016
Road Brushing will be from Mile Post 0 at the junction of Highway 58 and road 5897 to the junction of 5897 and 5898 and then continue along 5898 to the junction of 5898/516, approximately 13 miles of road. · Lane, Oregon

Cut vegetation and conifers along road 5897 from the top of the cut bank to the bottom of the fill. Road brushing will be started with areas that are most prone to wildfire activity and continue to areas that are less prone to wildfire activity.

Fuels management
Scoping Start
08/25/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Jose Mercado · jemercado@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Lawler Connection Completed
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/1/2016
Approximately, one mile south of the Hampton boat launch along Highway 58. · Lane, Oregon

Two disconnected segments of Lawler Trail (3473) exist currently. The proposed segment will connect the currently orphaned trail segments only traveling on spur 5840-535 for 200' This will create a safer and more desirable trail user experience.

Recreation management
Scoping Start
09/29/2015
Decision
05/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R2E, west half of section 29
Decision Memo · McKenzie River Ranger District · updated 4/28/2016
The project area is approximately 42 acres and includes 1.6 miles of Deer Creek. · Linn, Oregon

The project will consist of channel reconstruction and floodplain enhancement using wood placement and side channel excavation. Wood sources for the logs will be located within a 5 mile radius of the channel.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
11/10/2015
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Kate Meyer · kmmeyer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 4/25/2016
Willamette National Forest- whole forest · Lane, Oregon

Amendment to add aminopyralid to list of approved herbicides on the Willamette NF.

Vegetation management (other than forest products)Land management planning
Scoping Start
01/22/2016
Comment Period
03/07/2016
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Jennifer Lippert · jlippert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment; Noxious Weed Treatments
Invasive Plant Management and Forest Plan Amendment#57 to add AminopyralidDecision Signed Date: 04/22/2016 Legal Notice Date: 04/22/2016
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 4/8/2016
30 miles East of Sweet Home, OR · Linn, Oregon

There are a total of 65 culvert replacements on National Forest Service Roads 2027-000, 2041-000, 2043-000, 2043-320, 2043-328, 2043-330, 2043-333, 2043-410, 2043-411, 2043-360 and 2043-402.

Road managementWatershed management
Scoping Start
02/11/2016
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Daniel Matthews · danielwmatthews@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Watershed Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R4E, Sections 1, 11-14, 24 and 25 T13S, R4E, Sections 3-10, 14-22, 28-30 Willamette Meridian, Linn Co., Oregon
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/30/2016
Approximately, one mile east of the town of Oakridge along the Salmon Creek corridor. · Lane, Oregon

Several sections of the Salmon Creek Trail and the connected Warrior Loops were destroyed by flooding and channel movements. This project is intended to connect the remaining trail segments and to make as much of the trail as sustainable as possible.

Recreation management
Scoping Start
09/29/2015
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R3E, Secs. 12, 13, 14 T21S, R4E, Sec. 7
Decision Memo · Detroit Ranger District · updated 3/17/2016
T.10S. R.7E. Sec. 09 · Marion, Oregon

Installation of a road closure device, such as a gate, at the 2233-635 road. Installation of educational signage at two locations in the vicinity.

Heritage resource managementRoad managementRecreation management
Scoping Start
01/12/2015
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Road Maintenance
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 3/16/2016
Multiple locations within the McCoy Motorized Recreation Area. · Linn; Marion, Oregon

This project will include the installation of a covered picnic shelter at the lower staging area, and the expansion of the upper staging area.

Recreation management
Scoping Start
10/2013 (Estimated)
Decision
01/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Decision Memo · McKenzie River Ranger District · updated 3/8/2016
Various meadows, ponds, pools, and wetlands across the McKenzie River Ranger District. · Lane; Linn, Oregon

The proposed project would restore and maintain meadows, ponds, pools, and wetlands to improve landscape diversity, wildlife habitat, and ecological functions.

Wildlife, fish, rare plants
Scoping Start
12/01/2015
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 3/8/2016
Various locations across Willamette National Forest · Lane; Linn; Marion, Oregon

The proposed project would renew existing outfitter and guide permits operating on the Willamette National Forest with Priority Use Permits for up to a 10-year term.

Special use management
Scoping Start
01/28/2016
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Sweet Home Ranger District; Detroit Ranger District; Middle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 3/8/2016
Forest road 2620-130 · Lane, Oregon

The proposed project would authorize sale of a USFS site which consists of six structures, a paved road, gravel driveways and roads, paved and graveled parking and loading areas, a gravel stockpile, and timber/vegetation areas.

Facility management
Scoping Start
05/14/2014
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Susan Beall · sebeall@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 21; T16S, R4E; W.M. Lane County
Flat Top Thin Completed
Decision Memo · McKenzie River Ranger District · updated 3/8/2016
Project area is off Forest road 2643410. · Lane, Oregon

The project proposes to commercially thin a 60 year old stand that is 70 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres.

Forest products
Scoping Start
03/31/2014
Decision
01/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R6E, Section 17 & 20
Ollie Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 3/8/2016
Project area is on Forest roads 2657830 & 2657834. · Linn, Oregon

The project proposes to commercially thin a 65 year old stand that is 52 acres. In addition to the thinning, approximately 10-15% of the stand will have gaps ranging in size from one to three acres.

Forest products
Scoping Start
03/31/2014
Decision
02/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R7E, Sections 7, 8, 17, & 18
Decision Memo · McKenzie River Ranger District · updated 3/8/2016
Forest road 2672655 · Linn, Oregon

The proposed project would remove approximately 15 dead and dying hazard trees that have a failure zone of hitting Forest Road 2672655.

Fuels managementRoad managementForest products
Scoping Start
04/21/2015
Decision
02/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R6E Section 25
Decision Memo · Willamette National Forest All Units · updated 3/8/2016
ODOT Santiam Junction Maintenance Station Compound located at the junction of Highway 20/126 and Highway 22. · Linn, Oregon

Proposed project would approve Oregon Department of Transportation (ODOT) to construct an extension to an existing truck shop. The extension would be approximately 21x15 feet.

Special use management
Scoping Start
02/01/2016
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Starr Sullivan · starrasullivan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 12/29/2015
Milepost 11.1 on the 2041 road. · Linn, Oregon

Relocate about 500-600 feet of road 2041 where its alignment has shifted due to an active slide. Replace and realign 5-6 foot culvert. Remove rock from the abandoned portion of road and use on relocated portion. Decommission abandoned roadbed.

Road management
Scoping Start
03/05/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Daniel Matthews · danielwmatthews@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Road Maintenance; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 12/29/2015
150 Feet either side of roads open to public on Sweet Home Ranger District. · Linn, Oregon

Hand gathering of a variety of special forest products within road prism and up to within 450 feet or roads open to public access.

Forest products
Scoping Start
03/18/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Lindsay Anderson · landerson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 12/16/2015
Sand Mountain · Linn, Oregon

The proposed project would repair and reroute portions of the Sand Mountain Lookout trail to prevent erosion and further trail damage.

Recreation management
Scoping Start
03/24/2014
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Saren Whitney · slwhitney@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R7.5E Section 1
Decision Memo · McKenzie River Ranger District · updated 12/15/2015
Cabin #27 of the Delta A tract. 55311 Delta Road · Lane, Oregon

The proposed project would authorize modification of cabin #27 in the Delta A recreation residence tract. Modification would include expansion to house a hot water tank.

Special use management
Scoping Start
05/22/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 12/14/2015
Canyon and Owl Creek Watersheds · Linn, Oregon

Enhance 40 acres of big game habitat including: browse cutback, planting and seeding native forage species, and collecting native seed for use in following years.

Wildlife, fish, rare plants
Scoping Start
03/11/2013
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Tiffany Young · tayoung@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 12/14/2015
Moose Creek drainage in the South Santiam Watershed approximately 15 miles east of Sweet Home, OR. · Linn, Oregon

Tip approximately 60 stream-adjacent trees approximately 30-45 in. in diameter, with root wads attached, into Moose Creek to improve steelhead habitat.

Watershed managementWildlife, fish, rare plants
Scoping Start
07/07/2015
Decision
11/2015 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Lance Gatchell · lgatchell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R3E, Sections 23, 24 and 27
Decision Memo · McKenzie River Ranger District · updated 10/21/2015
The project is located at 55359 Delta Drive in Township 16S, Range 5E, Section 16. · Lane, Oregon

The proposed project would authorize a repair for a failed septic system for a cabin on Lot #33 of the Delta A Recreation Residence Tract.

Special use management
Scoping Start
09/09/2015
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Willamette National Forest All Units · updated 10/21/2015
ODOT Santiam Junction Maintenance Station Compound at the junction of Highway 20 and Highway 22. · Linn, Oregon

The purpose of this project is to authorize ODOT to construct a standard de-icer containment building on the existing paved compound at the ODOT Santiam Junction Maintenance Station Compound.

Special use management
Scoping Start
09/09/2015
Decision
10/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Brandon Green · bkgreen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 10/7/2015
Generally within about 200 feet above and 100 feet below Forest Service roads 5850 and 5847. These roads are approximately,4 to 9 miles west of the town of Oakridge. · Lane, Oregon

The Forest Service MFRD is proposing to fell and remove fire-killed danger trees along the perimeter of ten roads within the 2014 Deception Creek Fire area for the purpose of providing for safe public and administrative use of those roads.

Road management
Scoping Start
07/02/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Katie Isacksen · katie.isacksen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 10/2/2015
There are two stands one near Two Girls Creek and the other near Moose Creek. Both stands are in the South Santiam watershed. · Linn, Oregon

Release established oak trees and propagate new oak trees from collected acorns from the site.

Vegetation management (other than forest products)
Scoping Start
06/10/2014
Decision
06/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Alice Smith · acsmith@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
Two Girls Oak Enhancement ProjectDecision Signed Date: 06/18/2015
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/23/2015
This project is approximately 2 miles southeast of the town of Westfir along FS road 5850 and 5847. · Lane, Oregon

The Middle Fork Ranger District is proposing to replant approximately 325 acres in plantations within the Deception Complex Fire that affected the Willamette National Forest . The purpose is to re-establish forest cover with a mix of native conifers.

Vegetation management (other than forest products)
Scoping Start
06/10/2015
Decision
09/2015 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Lisa Helmig · lhelmig@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R2E, Sections-10, 11, 14,15, 23, 26,27,28
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/21/2015
T20S R3E Section 7, Northfork of the Middle Fork Willamette River · Lane, Oregon

The proposed new influent pipeline will be constructed of ductile iron pipe, and a stainless steel self-cleaning intake screen satisfying ODFW requirements will be installed to protect fish life.

Special use management
Scoping Start
02/16/2015
Decision
06/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Darren Cross · dmcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Westfir Water Intake Extension ProjectDecision Signed Date: 06/23/2015
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S R3W Section 7
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/17/2015
This project is located at the Skookum Campground. Near the NE side of Waldo Lake Wilderness. · Lane, Oregon

To replace one failed and one rotten (eminent failure) trail bridge. One bridge is 31%u2019 long and has Western red cedar hand railing. The second bridge is 11.5 feet long and leads users over a small creek into Skookum CG.

Recreation management
Scoping Start
08/21/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Skookum Creek CG Trail BridgesDecision Signed Date: 09/16/2015
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT19S R5SE Sec 24
Cool Soda Completed
Environmental Assessment · Sweet Home Ranger District · updated 9/11/2015
In north eastern portion of the South Santiam watershed. About 30 miles east of Sweet Home, Oregon. · Linn, Oregon

Implement vegetation-related projects from Cool Soda All Lands Restoration Proposal. Thin 545 ac. of young stands, regen 71 ac. for noble fir boughs, regen 14 acres in mature stand, fuel treatments, special forest products, traditional resources

Forest productsVegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Scoping Start
12/11/2013
Comment Period
12/15/2014
Objection Period Start
02/09/2015
Decision
05/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Noxious Weed Treatments; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R4E, Sections 1, 11-14, 24 and 25; T13S, R5E, Sections 3-10, 14-22, 28-30.
Decision Memo · McKenzie River Ranger District · updated 9/9/2015
The proposed action is located at 55311 Delta Drive in T16S, R5E, Section 16 Lane County, Oregon. · Lane, Oregon

The proposed project would authorize a repair for a failed septic system for a cabin on Lot #4 of the Delta A Recreation Residence Tract.

Special use management
Scoping Start
07/30/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 9/8/2015
The legal location is T11S, R7 1/2E, Section 27. · Linn; Marion, Oregon

This project will repair a section of the Bingham Fire dozer line by removing up to 30 trees of the pushed and pulled from the site to be used in fish restoration projects. Remaining pushed/pulled trees will be scattered to mimic surrounding stand.

Special area managementWatershed managementWildlife, fish, rare plantsFuels management
Scoping Start
02/05/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNot Applicable / Other; National Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Watershed Improvements
Decision Memo for the Bingham Fire Dozer Line Rehabilitation ProjectDecision Signed Date: 07/20/2015
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Air Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 9/2/2015
The project area is located at the McKenzie Airstrip and can be accessed by Forest road 2600320 · Lane, Oregon

The project proposes to commercially thin one stand that is 28 acres. The stand is 60 years old with Douglas fir being the primary species. The stand consist of an estimated 140 trees per acre with an average diameter of 17.0 inches.

Forest products
Scoping Start
03/31/2014
Decision
09/2015 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R6E, Sections 9, 10, 15, & 16
Decision Memo · Willamette National Forest All Units · updated 9/2/2015
Peggy Creek Disposal site is located on the west side of Road 2650 at milepost .30. Existing disposal site is a long term centrally located sited used by the Forest Service, EWEB, and ODOT. · Lane, Oregon

The proposed project would expand the current Peggy Creek disposal site allowing for an additional 9,000 to 12,000 cubic yards of geologic spoils (waste).

Special use management
Scoping Start
07/30/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Brandon Green · bkgreen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Detroit Ranger District · updated 9/1/2015
Within the City of Detroit T.10S., R.5E., Section 2 · Marion, Oregon

The proposal is to remove a pocket of hazardous root rot infected trees adjacent to private property in the City of Detroit.

Vegetation management (other than forest products)Forest products
Scoping Start
08/20/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Grady McMahan · gmcmahan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Park Smith Thin Completed
Environmental Assessment · Sweet Home Ranger District · updated 7/8/2015
Upper McKenzie Drainage · Linn, Oregon

Commercial thinning in 35-60 years old stands in the Upper McKenzie drainage.

Forest products
Scoping Start
08/11/2008
Comment Period
07/22/2009
Decision
09/2008 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Park Smith Thin Timber SaleDecision Signed Date: 09/15/2008
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT12S, R6E, Sections 22-28, 33-36; T 12S, R7E, Sections 29-32; T13S, R6E, Sections 1-4, 9-12, 13-15, 22-36; T13S, R7E, Sections 4-9, 15-21, 29, 30; T14S, R6E, Sections 1-6, 8-17, 20-23, 27, 28; T14S, R
Decision Memo · McKenzie River Ranger District · updated 6/26/2015
Lot is #23 of the Scott Creek Recreation Residence Tract at 59611 McKenzie Hwy (RD 126-560). · Lane, Oregon

The proposed project would authorize repair and improvement of a failed septic system for lot #23 of the Scott Creek Recreation Residence Tract.

Special use management
Scoping Start
12/17/2014
Decision
02/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Willamette National Forest All Units · updated 6/16/2015
Sweet Home R.D. -Two Girls Cr.; McKenzie R.D.-Lookout Cr.; Middle Fork R.D.- N. Fk. M. Fk. Willamette, Middle Fk. Willamette River · Lane; Linn, Oregon

Develop treatment options for five riparian weed populations found throughout the Willamette National Forest.

Vegetation management (other than forest products)Watershed management
Scoping Start
03/25/2013
Comment Period
08/11/2014
Objection Period Start
09/19/2014
Decision
11/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Jennifer Lippert · jlippert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments
DN and FONSI for the Riparian Weed Treatment ProjectDecision Signed Date: 11/19/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Sweet Home Ranger District; Middle Fork - Inactive Ranger District
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/4/2015
Project location is approximately 30 miles SE of the town of Oakridge. Near Indigo Springs Campground. · Lane, Oregon

Proposing to reroute 1200 feet of unsustainable trail, rebuild four trail bridges and build one new bridge.

Recreation management
Scoping Start
12/15/2014
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S R4E Sec.11 and T24S R5E Sec.18,28
Decision Memo · McKenzie River Ranger District · updated 6/2/2015
Cabin on lot 8/9 of the Delta A Recreation Residence Tract at 55217 Delta Drive. · Lane, Oregon

The proposed project would authorize modification (installation of half bathroom) of cabin on lot 8/9 of the Delta A recreation residence tract. Modification would include installation of new transmission lines for existing water and septic.

Special use management
Scoping Start
02/12/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Sweet Home Ranger District · updated 6/1/2015
Along Moose Mtn. Road (2027) 1/8 mile from the junction with Highway 20 and Moose Creek Rd (2025), approximately 1 mile from beginning of road. Various sites along Quartzville Creek. · Linn, Oregon

Closing large dispersed sites that have been consistent problem areas for illegal camping, dumping of trash, improper waste disposal, and natural resource degradation. Sites will remain open for day use activities and increased day access to water.

Recreation managementWatershed management
Scoping Start
06/14/2013
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Jonathan Meier · jmeier02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (2), 36 Cfr 220.6(D)(2); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
Quartzvill and Moose Creek Dispersed Site RestrictionsDecision Signed Date: 05/20/2015
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R3E, Sections 27 and 34. T11S, R4E, Sections 25-28 and 33-34.
Decision Memo · McKenzie River Ranger District · updated 5/27/2015
Recently commercially thinned units, old plantations with low conifer stocking and the McKenzie Airstrip. · Lane; Linn, Oregon

The proposed project would include 738 acres of browse cutback, 34 acres of early seral habitat restoration, 26 acres of prescribed burning, creation of 1529 wildlife trees and 2050 down wood trees.

Wildlife, fish, rare plants
Scoping Start
12/07/2014
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Wildlife Habitat Enhancement and Restoration Project 2015-2016Decision Signed Date: 04/20/2015
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14SR7E S 18&19; T15SR6E S 2-4,10,11,14,22,23,25; T15SR7E S 8,17,18,30; T16SR4E S 22,23,27,28,33,34; T16SR5E S 4-9; T16SR6E S 23,25,26,36; T16SR7E S 31; T17SR5E S 28,29,33; T18R4E S 1-4,8,10,11,14,17
Environmental Assessment · Sweet Home Ranger District · updated 5/21/2015
South Santiam Watershed · Linn, Oregon

Proposed Forest Plan amendment to change about 10 ac. of an administrative site MA 13B to Developed Recreation MA 12a. Also, construct parking area for 8-10 vehicles, plant low-maintenance landscaping, and construct ADA interpretive tail.

Land management planning
Scoping Start
02/07/2013
Comment Period
12/15/2014
Objection Period Start
02/02/2015
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Jonathan Meier · jmeier02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Amendment
Cascadia Day Use Area Project and Forest Plan Amendment #56Decision Signed Date: 04/07/2015
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT 13 S, R 2 E, Section 36
Decision Memo · Willamette National Forest All Units · updated 3/18/2015
Willamette, Deschutes, Siuslaw and Mt Hood National Forests · Deschutes; Klamath; Lane; Linn; Marion, Oregon

The forest proposes to issue 2- 10 year priority use permits to outfitters and guides already under under special use permit for operation in wilderness and non-wilderness.

Special use management
Scoping Start
10/20/2014
Decision
12/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Renewal Existing Permits Commercial & Institutional Outfitters & GuidesDecision Signed Date: 12/18/2014
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · McKenzie River Ranger District · updated 2/10/2015
Across the McKenzie River Ranger District in both Lane and Linn Counties · Lane; Linn, Oregon

Browse would be cut back to enhance forage for elk and deer. Wildlife trees and down wood would be created to enhance habitat for cavity excavators, nesters, bats, amphibians, mammals, fungi, arthropods, bryophytes and other organisms.

Wildlife, fish, rare plants
Scoping Start
03/24/2014
Decision
04/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R7E Sec. 7, 18; T14S R6E Sec. 13; T15S R6E Sec. 12, 13, 25; T15S R7E Sec. 18, 30; T16S R4E Sec. 22; T16S R5E Sec. 4, 5, 8, 9, 31; T16S R6E Sec. 17; T16S R7E Sec. 29, 33; T18S R6E Sec. 32
MRRS Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 1/27/2015
The MRRS Thin Project is located at the 53 mile point on the south side of Hwy 126 that is adjacent to the McKenzie River Ranger Station (MRRS). · Lane, Oregon

To commercially thin a 80 year old stand that is 56 acres. The stand will include a one-1 acre gap and 30 acres of skips. The purpose of this project is to reduce ladder fuels, manage camping, and improve the security adjacent to Ranger Station.

Fuels managementForest products
Scoping Start
05/19/2014
Decision
01/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R06E; Sections 17 &amp; 18
Decision Memo · McKenzie River Ranger District · updated 12/9/2014
Hoodoo Butte · Lane, Oregon

This project will provide Sprint (located in the American Tower Facility) on Hoodoo Butte with a fiber optic connection ("back haul") back to the Bend Communication/Crown Castle building.

Special use management
Scoping Start
05/15/2014
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Bend Broadband - Hoodoo Butte Fiberoptic Backhaul ProjectDecision Signed Date: 06/30/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.13S., R.8E., Section 34, W.M. Lane County, OR
Goose EA 2010 Completed
Environmental Assessment · McKenzie River Ranger District · updated 12/9/2014
The Goose Project area is located on the MRRD within the Upper McKenzie Watershed (5th field). It falls within the McKenzie Bridge Community. · Lane, Oregon

The proposed action will commercially harvest stands 25-120 year-old (1,598 acres)and reduce fuels in the WUI (600 acres).

Forest productsFuels managementWildlife, fish, rare plants
Scoping Start
06/02/2009
Comment Period
11/06/2009
Objection Period Start
09/07/2010
Decision
09/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2005)
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
Goose ProjectDecision Signed Date: 09/13/2010 (FS Withdrawn) Legal Notice Date: 09/17/2010
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT 16S R 5E Sec: 1-5, 9-16, 24. T 16S R 6E Sec: 3-11, 13-25. T 16S R 7E 18, 19, 30
Decision Memo · McKenzie River Ranger District · updated 10/10/2014
Delta Road ; King Road ; Rd 15 to Blue River Reservoir Road ; near Hwy 126 - Rd 302 on the North side of the McKenzie River ; the McKenzie Air Strip ; near King Rd ; near Scott Creek · Lane; Linn, Oregon

Proposal to reissue 7 existing term special use permits. The term of each authorization would be 20-30 years (depending on type). There will be no change in the authorized facilities or increase in the scope or intensity of authorized activities.

Special use management
Scoping Start
03/24/2014
Decision
09/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Various District-wide Term Special Use Authorization ReissuancesDecision Signed Date: 09/30/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R5E Sec 16 &amp; T16S, R5E, Sec 20 &amp; T16S, R4E, Sec 14 &amp; T 16S, R6E, Sec 10 &amp; T16S, R6E, Sec 16 &amp; T16S, R5E, Sec 22 &amp; T16S, R6E, Sec 11
Decision Memo · McKenzie River Ranger District · updated 9/25/2014
55311 Delta Rd. · Lane, Oregon

This proposal is to replace two septic systems of Recreation Residence Cabin #13 & #27 in the Delta A Tract. The would include a septic tank between 1000 - 1500 gallons, a drain field of up to 150' and transmission lines from the cabin to the tank.

Special use management
Scoping Start
03/24/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16 S, R5E, Sec 16
Decision Memo · Detroit Ranger District · updated 9/19/2014
Marion Forks Creek at the Marion Forks Fish Hatchery and Day Use area. · Marion, Oregon

This project would improve fish habitat and curb bank erosion by adding large wood complexes in the side channels of lower Marion Creek. It is anticipated to enhance recreational viewings of spring chinook spawning near the new Day Use Area.

Wildlife, fish, rare plantsWatershed management
Scoping Start
04/24/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements
Marion Creek Tream Restoration ProjectDecision Signed Date: 07/10/2014
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/18/2014
La Duke Road · Lane, Oregon

This project proposes that testing would entail clearing & leveling two 40 ft by 10 ft work pads to set up the drilling equipment at each proposed structure location. This project is to determine foundation depth for future tower replacement.

Special use management
Scoping Start
07/30/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Kenneth Barbee · kbarbee02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Hills Creek-Lookout Point Geotechnical Drilling ProjectDecision Signed Date: 08/13/2014
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S,R3E, Section 21 and 22
Decision Memo · Detroit Ranger District · updated 9/18/2014
T9S, R6E Sec 16 &amp;21, Humbug Creek Watershed, 4697 road system · Marion, Oregon

The project will lessen impacts to federally listed fish habitat by decreasing sediment inputs, increasing the shade component and reducing the chance for petroleum products from vehicles entering the water by rehabilitating two dispersed campsites.

Recreation managementWatershed managementWildlife, fish, rare plants
Scoping Start
04/24/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
Humbug Dispersed Campsite ProjectDecision Signed Date: 09/18/2014
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S, R6E Sec 16 &amp;21
Environmental Assessment · McKenzie River Ranger District · updated 7/15/2014
About 13 miles NE of Blue River, OR, adjacent to FS Road 1517. · Lane, Oregon

A Supplemental Environmental Assessment will be prepared to disclose effects of harvesting timber on about 33 acres already under contract and to respond to analysis deficiencies identified by the 2011 U.S. District Court decision.

Forest productsWildlife, fish, rare plants
Scoping Start
02/11/2013
Comment Period
03/17/2014
Objection Period Start
05/19/2014
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R5E, Sections 34 and 35, W.M.
Decision Memo · McKenzie River Ranger District · updated 7/7/2014
Eugene Water and Electric Board's Carmen-Smith Hydroelectric Dam operators' residential campus. · Linn, Oregon

Replace office and manufactured home to accommodate local snow loading with a design compatible with historic character of the site. Water system upgrades to be in compliance with state regulations and meet future demands.

Facility managementSpecial use management
Scoping Start
03/24/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
Carmen-Smith Campus Improvements ProjectsDecision Signed Date: 07/03/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R6E Sec 12
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/26/2014
In Winberry Creek drainage, at jct of FS Roads 1902 and 1802-150. · Lane, Oregon

This campground receives a high amount of vandalism and homeless use and is the only developed receation site in this drainage. Improvements to be removed include 2 shelters, 5 fire rings, all picnic tables, all site numbers, the well, Romtec toilet.

Recreation management
Scoping Start
12/09/2013
Decision
02/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Karl Dietzler · kdietzler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.
Winberry Campground Decommision ProjectDecision Signed Date: 02/20/2014
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT19S, R2E, Section 19, NE 1/4 of SW 1/4
Decision Memo · McKenzie River Ranger District · updated 6/24/2014
Hwy 126 MP 51.5 to MP 53 and Hwy 242 MP 56 to MP 62 · Lane, Oregon

Replacement of overhead electrical system with underground system on Hwy 126 between Horse Creek Road and the McKenzie River Ranger Station. Upgrade of existing underground system along Hwy 242 between Camp Yale and Camp White Branch.

Facility managementSpecial use management
Scoping Start
03/24/2014
Decision
05/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
Lane Electric Underground Power Projects (2014-2017)Decision Signed Date: 05/01/2014
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionHwy 126: T16S, R5E, Sec 13 and T16S, R6E Sec 17, 18. Hwy 242 T16S, R6E, Sec 14, 15, 24 and T16S, R6E, Sec 19, 20, 21.
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/24/2014
The project will take place along Fall Creek from Forest Service boundary near Dolly Varden campground to confluence with Buzzard Creek and major tributaries including Portland Creek and Hehe Creeks. · Lane, Oregon

Resource damage will be minimized and restored at the dispersed campsites by providing a riparian buffer, planting native vegetation, subsoiling compacted soils, deterring campsite area growth and educational signage.

Recreation managementWatershed management
Scoping Start
11/26/2013
Decision
01/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Lisa Kurian · lkurian@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Noxious Weed Treatments; Watershed Improvements
Respect the River Project: Fall CreekDecision Signed Date: 01/01/2014
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Decision Memo · Detroit Ranger District · updated 5/19/2014
District wide · Linn; Marion, Oregon

The proposed action is to implement the sale of Special Forest Products in a permit and contract-controlled manner which regulates activities and manages the forest environment and meets the demand for these products by the public.

Forest products
Scoping Start
04/04/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Products Sales
Special Forest Product SalesDecision Signed Date: 05/16/2014
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionNot Applicable
Pass Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 5/16/2014
The Pass Thin project is located off Highway 243 on Forest Service roads 205/206 and off High 126 on Forest Service road 740. · Lane; Linn, Oregon

To commercially thin approximately 34 acres in a 40 year old stand using ground base and skyline equipment. This project will also include five gaps one acre in size to promote understory forbs and shrubs.

Forest productsFuels management
Scoping Start
03/14/2014
Decision
04/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S,R6E, Section 24 Lane Co; T14S,R7E, Section 31 Linn Co
Decision Memo · Sweet Home Ranger District · updated 5/14/2014
Upper McKenzie Watershed · Linn, Oregon

(Minor revision to name of project). The project proposes to change the north section of Park Creek Semi-primitive Nonmotorized Dispersed Recreation Management Area to a Special Habitat Management Area. This is a Forest Plan revision.

Land management planning
Scoping Start
04/02/2010
Comment Period
09/09/2013
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
Forest Plan Amendment #54 to Reallocate 906 Acres of Dispersed RecreationDecision Signed Date: 04/24/2014
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT 13S, R 7 E, Sections 5-8
Decision Memo · Detroit Ranger District · updated 5/14/2014
Halls Ridge Repeater, Marion Forks Guard Station, Camp Pioneer, Pamelia, Whitewater and Duffy Trailheads, Maxwell Snow Park, Detroit Ranger Station · Linn; Marion, Oregon

Project was formerly called "2012 Rec/Admin HF". This project proposes to cut and burn or chip brush and trees less than 10 inches in diameter at 4.5 feet from ground level (DBH) to increase the defensible space around district infrastructure.

Fuels managementRecreation managementFacility managementSpecial area management
Scoping Start
01/03/2014
Decision
05/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Christopher Donaldson · cdonaldson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Recreation and Administrative Site Hazardous Fuels Reduction ProjectDecision Signed Date: 05/14/2014
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S R5E Sec 5, T11S R7E Sec15, T12S R2E Sec 2, T10S R7E Sec 25, T10S R8E Sec 18, T13S R7E Sec 4, T12S R7E Sec 27, T10S R5E Sec 3
Olallie Reroute Cancelled
Decision Memo · McKenzie River Ranger District · updated 3/14/2014
Olallie Trail (Tr. No. 3529) near O'Leary Mountain · Lane, Oregon

This scoping initiates a project to reroute a 1/2 mile of the Olallie trail. This work would require removing trees <12 inches from the 96 inch wide trail prism and ground disturbance 22' wide to build the tread.

Recreation management
Scoping Start
04/23/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S, R6E, Section 9, W.M.
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/13/2014
Fall Creek drainage, about 10 miles east of Fall Creek Reservoir. · Lane, Oregon

This project proposes to eliminate the exposed section of trail by rerouting the trail over the slide-prone slope well above the steep bluff on terrain that is not slide prone. The total distance of this reroute will be about 0.85 mile.

Recreation management
Scoping Start
12/23/2013
Comment Period
12/23/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Flat Creek Trail RerouteDecision Signed Date: 02/11/2014 Legal Notice Date: 02/17/2014
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT18S, R3E, bottom of Section 21
Decision Memo · Detroit Ranger District · updated 2/26/2014
Upper North Santiam Watershed · Linn; Marion, Oregon

Reduce stocking levels of stands 6-9 inches in diameter, 500-800 TPA. Offer biomass products such as posts and poles and firewood.

Forest productsVegetation management (other than forest products)
Scoping Start
03/28/2013
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Forest Vegetation Improvements; Special Products Sales
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT. 10 S., R. 7 E., Section 28, Willamette Meridian
Environmental Assessment · Deschutes National Forest All Units · updated 12/30/2013
There are two focus areas: Scott Mountain on the Willamette NF and Cascade Lakes on the Deschutes NF · Deschutes; Lane; Linn, Oregon

The project would use prescribed fire in the Three Sisters Wilderness area to modify vegetation and fuels to sufficiently reduce the threats to values at risk outside of Wilderness in order to allow fire to play a more natural role within Wilderness

Vegetation management (other than forest products)Fuels management
Scoping Start
01/09/2013
Comment Period
12/2013 (Estimated)
Decision
03/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Michael Keown · mkeown@fs.fed.us
NEPA / regulatory detail
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Wilderness Management
ForestsDeschutes National Forest; Willamette National Forest
DistrictsSisters Ranger District; McKenzie River Ranger District
Legal Land DescriptionT15S R07E, sec. 21,22,23,24,26,26,27,28,33,34,35,36. T17SR08E, sec. 32,33,34,35,36; T17S R09E, sec. 31; T18S R08E, sec. 1,2,3,4,5,6,7,8,9,10,11,12,13,15,16,17,18. T18S R09E, sec. 5,6,7,8,17,18
North Fork Salvage Cancelled
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/14/2013
The north (uphill) side of Rd. 19, approximately 0.25 mile west of Rd. 1939. Trees would be yarded to both Rd. 5826 and Rd. 5821 on both sides of the railroad. · Lane, Oregon

The project consists of salvaging down trees along Road 19 and Road 5826. The Rd. 19 (<1 ac.) salvage consists of removing decked logs and downed trees from a landslide. The Rd. 5826 salvage (5 ac.) consists of bucking and removing blown down trees.

Forest products
Scoping Start
10/2013 (Estimated)
Decision
11/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
David Haupt · dhaupt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R2E, Section 25 and T19S, R5E, Section 29
Environmental Assessment · McKenzie River Ranger District · updated 12/9/2013
Big Lake Youth Camp, located south of U.S. Highway 20 on Big Lake Road, in the Santiam Pass area. · Linn, Oregon

The McKenzie River RD and the Big Lake Youth Camp Cooperator proposes to develop and approve a long-term master plan. The proposal includes a permit boundary expansion which requires a non-significant amendment to the Willamette Forest Plan.

Special use management
Scoping Start
02/03/2004
Comment Period
08/2013 (Estimated)
Decision
08/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Sandra Ratliff · sratliff@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Plan Amendment
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R7E, Sec. 11;W.M.
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/26/2013
AlpineTrail (3450) · Lane, Oregon

Relocate the only remaining portion of the Alpine Trail from its current location along roads 1912 and 1911 to a convenient side slope to the east of those roads through a recent harvest unit and a short section following the 1802-133.

Recreation management
Scoping Start
08/12/2013
Comment Period
08/12/2013
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Alpine Trail RelocationDecision Signed Date: 09/11/2013 Legal Notice Date: 09/11/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land Description20S, 3E, Section 17, Willamette Meridian
Decision Memo · McKenzie River Ranger District · updated 9/18/2013
McKenzie River Ranger District, Lane County, Oregon · Lane, Oregon

Young conifer thinning of approximately 40 acres to maintain and improve tree stand health and vigor. Conifer pruning of approximately 165 acres to improve wood quality.

Vegetation management (other than forest products)
Scoping Start
04/15/2013
Comment Period
04/15/2013
Decision
06/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Kevin Moran · kmoran@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R7E; T16S, R5E; T16S, R6E
Decision Memo · McKenzie River Ranger District · updated 9/18/2013
Hoodoo Recreation Residence Tract and Delta Lot on the McKenzie River Ranger District. · Lane; Linn, Oregon

Several requests for projects on Recreation Residence cabins are planned for 2013. This includes two outhouses that need to be repaired or replaced, a repair of an old septic system, and construction of a new wood shed.

Special use management
Scoping Start
04/29/2013
Comment Period
04/29/2013
Decision
06/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R5E, Sec 16 W.M. & T13S, R7.5E, Sec 26 W.M.
Decision Memo · McKenzie River Ranger District · updated 9/18/2013
Camp Melakwa on the McKenzie River Ranger District · Lane, Oregon

The Oregon Trail Council, Boy Scouts of America has requested renewal of their existing Special Use Authorization for Camp Melakwa on the McKenzie River Ranger District. This action would re-authorize the continuing use of the permit area for 20 yrs.

Special use management
Scoping Start
01/14/2013
Comment Period
01/14/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R7E, Sec. 1 and Sec. 12; W.M. Lane County, Oregon
Decision Memo · McKenzie River Ranger District · updated 9/18/2013
Carmen-Smith Campus at Trailbridge reservoir · Linn, Oregon

The project's purpose is to add garage units to three existing houses and replace siding on those houses. Work would also include relocation of fire hydrant and irrigation lines, excavation for garage concrete slabs and driveways.

Special use management
Scoping Start
07/01/2013
Comment Period
07/01/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Facility Maintenance
Carmen-Smith Garage Additions ProjectDecision Signed Date: 08/07/2013 Legal Notice Date: 08/19/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S R6E Sec. 1
Decision Memo · McKenzie River Ranger District · updated 9/17/2013
The Mud Lake Trail (Tr. No.3518 ) is located just north of Mink Lake in the 3 Sisters wilderness and is approximately one mile in length. · Lane, Oregon

This project proposes to eliminate Tr. No. 3518 from the maintained trail system and would involve removal of trail signs and disguising the trail tread with native vegetation/ debris while allowing nature to reclaim this ground.

Recreation management
Scoping Start
04/22/2013
Comment Period
04/22/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Wilderness Management
Mud Lake Trail (TR. No. 3518) DecommissioningDecision Signed Date: 06/21/2013 Legal Notice Date: 07/01/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT19S R7E Sec 17 and 18
Decision Memo · Detroit Ranger District · updated 9/16/2013
District Wide · Linn; Marion, Oregon

Precommercial Thinning, Tree Pruning, Post and Pole removal to occur on approx 5500 acres of 15 - 35 year old conifer stands.

Forest productsVegetation management (other than forest products)Watershed managementFuels management
Scoping Start
02/10/2012
Comment Period
03/28/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other; Stewardship Contract, Consolidated Appropriations Resolution Of 2003
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Noxious Weed Treatments; Watershed Improvements
2012 Young Stand Density ManagementDecision Signed Date: 09/03/2013 Legal Notice Date: 09/16/2013
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Environmental Assessment · Willamette National Forest All Units · updated 8/14/2013
Ten fish release sites. The watersheds are: Breitenbush, N & S Santiam, South Fork McKenzie, Fall Cr., and North Fork Middle Fork Willamette River. · Lane; Linn; Marion, Oregon

The proposed action would improve sites to make it easier for fish transport trucks to approach the water's edge and to have fish friendly pipes in place on site to carefully release threatened spring Chinook salmon and winter steelhead.

Wildlife, fish, rare plants
Scoping Start
01/29/2013
Comment Period
06/18/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Brett Blundon · bblundon@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Population Enhancements
Adult Salmonid Release Sites ImprovementsDecision Signed Date: 08/02/2013 Legal Notice Date: 08/06/2013
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionNot Applicable
Fritz Thin Project Completed
Decision Memo · McKenzie River Ranger District · updated 8/13/2013
The Fritz project is located on Forest Service road 2655 and is approximately 10 miles east of McKenzie River Ranger Station. · Linn, Oregon

This project proposes to commercially thin approximately 70 acres in a 50-year old second growth stand. The project will be harvested with ground base and skyline equipment using existing skid roads as much as possible.

Forest products
Scoping Start
04/22/2013
Comment Period
04/22/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Fritz ProjectDecision Signed Date: 08/04/2013 Legal Notice Date: 08/12/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R6E, Section 11 & 14
Decision Memo · McKenzie River Ranger District · updated 8/13/2013
Indian Holes Trail (Tr. No. 3524) in the Three Sisters Wilderness · Lane, Oregon

A project to reroute for approximately 1 mile of the Indian Holes Trail (Tr. No. 3524) near Indian Holes in the Three Sisters Wilderness where an inappropriate grade exists that is resulting in erosion.

Recreation management
Scoping Start
04/22/2013
Comment Period
04/22/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Wilderness Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S, R7E, Sec. 24
Decision Memo · McKenzie River Ranger District · updated 8/13/2013
Murphy meadow, Lane County, Oregon · Lane, Oregon

A meadow will be maintained by cutting of conifers less than 10 inches dbh and prescribed fire 1-2 years after. 57 acres of meadow will be maintained with a potential of an additional 84 acres of understory prescibed fire in forested vegetation.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
06/24/2013
Comment Period
06/24/2013
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Ruby Seitz · ruseitz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT19S R5E SEC 23 &amp; 24
O'leary Reroute Completed
Decision Memo · McKenzie River Ranger District · updated 8/13/2013
Off Forest Road 1993 near Cougar Reservoir · Lane, Oregon

A project to reroute a 1½Mi. of the O’leary trail (Tr. No. 3321). The trail was constructed too steep, resulting in trenching and erosion of the trail during the wet season and periods of spring snow melt.

Recreation management
Scoping Start
04/22/2013
Comment Period
04/22/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
O'Leary Trail RerouteDecision Signed Date: 08/04/2013 Legal Notice Date: 08/12/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S,R6E, Sec. 9
Decision Memo · Middle Fork - Inactive Ranger District · updated 8/12/2013
End of the 5826-130 road to the end of the 1910-683 road · Lane, Oregon

The proposed trail connection will tie the end of the 5826-130 road to the end of the 1910-683 road. This connection will be 1.9 miles long and is designed with 10% average grades and will be built by hand.

Recreation management
Scoping Start
06/03/2013
Comment Period
06/03/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Alpine ConnectionDecision Signed Date: 07/08/2013 Legal Notice Date: 08/12/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land Description20S, 2E, Section 25, NE and 20 S, 3E, Section 30, NW, Willamette Meridian
Decision Memo · Middle Fork - Inactive Ranger District · updated 8/8/2013
Along sections of roads 18, 2408, 19, 1934, and 5840-531. · Lane, Oregon

Repairing roads, reconstructing retaining walls, and replacing culverts along parts of Rd 18, Rd 2408, Rd 19, Rd 1934, Rd 5840-531 and quarry blasting/crushing within previously disturbed areas.

Road management
Scoping Start
07/02/2013
Comment Period
07/02/2013
Decision
08/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT 18S, R2E, Sec 29 NE/SE, T18S, R2E, Sec 25 SE/NW, T21S, R4E, Sec 5 SE/NE, T19S, R5E, Sec 29 SE/SW, T19S, R4E, Sec 36 NW/NW, T20S, R2E, Sec 28 SW/SW
Decision Memo · Middle Fork - Inactive Ranger District · updated 8/8/2013
This project is located in Little Fall Creek, along the FS Road 1806 from mile post 22 to 25. Appoximatley 3 miles in length. · Lane, Oregon

The project would add approximately 800 logs and or rootwads to the Little Fall Creek stream channel to enhance the existent aquatic habitat. Approximately 80 live trees would be pulled over to act as anchor points for the 800 logs or rootwads.

Wildlife, fish, rare plants
Scoping Start
07/02/2013
Comment Period
07/02/2013
Decision
08/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Doug Larson · dlarson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT18S, R2E, Sections 4, 5, 7, and 8
Decision Memo · Middle Fork - Inactive Ranger District · updated 7/31/2013
East of the Warner Mountain Lookout on the 2129-342 spur road. · Lane, Oregon

This project will move the Warner Mountain Repeater from its existing location on the 2129-438 spur to a new site on the 2129-342 spur.Because the project is non-ground disturbing, it will be covered with a non-documented CE and is cancelled in SOPA.

Facility management
Scoping Start
08/2013 (Estimated)
Decision
08/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Alison Richards · alisonrichards@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT23S R4E Sec 29 SWSW
Decision Memo · Detroit Ranger District · updated 7/30/2013
Breitenbush River Watershed, Humbug Creek Sub-Watershed. · Marion, Oregon

A stream restoration project is proposed to place large wood in Humbug Creek and East Humbug Creek to improve spring Chinook and resident fish habitat.

Watershed managementWildlife, fish, rare plants
Scoping Start
03/28/2013
Comment Period
05/28/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Darrin Neff · daneff@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements
Humbug Creek Large Wood Placement ProjectDecision Signed Date: 07/24/2013 Legal Notice Date: 07/30/2013
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT.09 S., R.06 E., Sections 15, 16, 21 and 22.
Decision Memo · Middle Fork - Inactive Ranger District · updated 7/15/2013
Wolf Mountain · Lane, Oregon

Velocitel requests replacement of the existing tower at Wolf Mt., which is failing. The new tower will be the same height at the existing tower and in the same location. Existing footings would be replaced. Work would be in already disturbed ground.

Special use management
Scoping Start
12/17/2012
Comment Period
12/17/2012
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
AT&amp;T/Cingular Wireless Wolf Mt. Tower Replacement ProjectDecision Signed Date: 07/01/2013 Legal Notice Date: 07/05/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R5E, SW 1/4 of Section 33
Decision Memo · McKenzie River Ranger District · updated 6/24/2013
Between Clear Lake and Hwy 126 · Linn, Oregon

A 110 acre Wildland/Urban Interface (WUI) fuels reduction is proposed between Clear Lake and Hwy 126. Trees and brush &#8804;7” dbh will be thinned to enhance defensible space around the resort, facility out-buildings, and access roads.

Fuels management
Scoping Start
08/20/2012
Comment Period
08/20/2012
Decision
06/2013 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Mei Lantz · mlantz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Clear Lake WUI Fuels Reduction ProjectDecision Signed Date: 06/17/2013 Legal Notice Date: 06/24/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R7E Sec 8; W.M.
Decision Memo · McKenzie River Ranger District · updated 6/24/2013
Tidbits, Mann, Quentin Creek watershed, the project area is bordered by Forest road 1500 and 1509. · Lane; Linn, Oregon

This project would remove two hundred tons (400,000 pounds) of floral greens that consist of beargrass, salal, Oregon grape, stick cuttings (mansanita, vine maple, ceanothus) harvest on the McKenzie River Ranger District.

Forest products
Scoping Start
04/22/2013
Comment Period
04/22/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R4E Section 36; T14S, R5E, Section 24-36; T14S,R6E, Section 19,30,31; T15S,R4E, Section 1,2,12-15, 22-25; T15S,R5E, Section 1-10,16-20,30; Willamette Meridian, Linn &
Decision Memo · Detroit Ranger District · updated 6/21/2013
T. 9 S., R. 5 E., Sec 19 and 30; T. 10 S., R. 6 E., Sec 34 and 35; T. 11 S., R 6 E., Sec 2 and 3 · Linn; Marion, Oregon

The proposed action is to implement the sale of conifer boughs, in a contract-controlled manner to help manage the forest environment and meet the demand for these products by the public.

Forest products
Scoping Start
03/28/2013
Comment Period
04/16/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
2013 Commercial Bough SlaesDecision Signed Date: 06/20/2013
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT. 9 S., R. 5 E., Sec 19 and 30; T. 10 S., R. 6 E., Sec 34 and 35; T. 11 S., R 6 E., Sec 2 and 3
Decision Memo · Detroit Ranger District · updated 6/18/2013
South Santiam Watershed · Linn, Oregon

The trail foot bridge at House Rock campground will be replaced with a pre-engineered steel bridge. Concrete abuttments would be required on either side of the South Santiam River.

Recreation management
Scoping Start
01/11/2013
Comment Period
03/25/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R5E, Section 32
Decision Memo · McKenzie River Ranger District · updated 6/14/2013
McKenzie River National Recreation Trail (MRNRT) (Tr. No. 3507) · Lane, Oregon

This project proposes to replace three bridges and conduct heavy tread maintenance activities on the McKenzie River National Recreation Trail (MRNRT) (Tr. No. 3507).

Recreation management
Scoping Start
01/14/2013
Comment Period
01/14/2013
Decision
03/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
2013 McKenzie River NRT Bridge Replacement ProjectDecision Signed Date: 03/06/2013 Legal Notice Date: 04/22/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S,R6E,Sec1 & T14S,R7E,Sec17 & Sec30
Decision Memo · McKenzie River Ranger District · updated 6/14/2013
The proposed building would be located near the Rodger Schmidt Shelter in the green ‘island’ created by the Ray Benson parking lots. · Linn, Oregon

Project proposes to allow the Mt. Jefferson Snowmobile Club (MJSC) to build a storage structure at the Ray Benson Sno-park. The structure would be utilized to house equipment that helps maintain the USFS snowmobile trails in the area.

Recreation managementSpecial use management
Scoping Start
01/14/2013
Comment Period
01/14/2013
Decision
03/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Special Use Authorizations; Trail Management
2013 Ray Benson Snow Groomer Storage Shelter Construction ProjectDecision Signed Date: 03/06/2013 Legal Notice Date: 04/22/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT13S, R7½E, Section 35, NE Quadrant
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/12/2013
ODFW Hatchery, Oakridge, Oregon · Lane, Oregon

Construct a new 3-Phase overhead service to new ODFW Recirculation Aquaculture System building.

Special use management
Scoping Start
03/25/2013
Comment Period
03/25/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityElectric Transmission
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionNW¼Sec. 15, T. 21 S., R. 3 E
Decision Memo · Sweet Home Ranger District · updated 6/3/2013
Bough harvest units proposed in 10-25 year old conifer stands district wide. · Linn, Oregon

Using hand tools only, conifer boughs may be harvested by removing up to ½ of the branch length on ½ the tree height. Bough collection provides supply for wreaths and decorative greens. This project may be split into multiple sales.

Forest products
Scoping Start
01/10/2013
Comment Period
04/01/2013
Decision
05/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Lindsay Anderson · landerson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
2013 Bough Sales projectDecision Signed Date: 05/24/2013 Legal Notice Date: 06/03/2013
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionDistrict-wide
Decision Memo · McKenzie River Ranger District · updated 6/3/2013
Cable television distribution lines in the Blue River area. · Lane, Oregon

This is administrative action, authorizing the continuing use of existing permit areas for cable TV lines for a new 20 year term. No changes in the scope or intensity of the uses. No ground disturbanc

Special use management
Scoping Start
02/11/2013
Comment Period
02/11/2013
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Renewal Falcon Cable Systems Special Use Permit Blue River Distrib. LinesDecision Signed Date: 04/15/2013 Legal Notice Date: 04/22/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionBeginning in SW¼ Section 21, T16S, R4E. Ending in NW¼ Section 18, T16S, R6E, Willamette Meridian
Decision Memo · McKenzie River Ranger District · updated 6/3/2013
Mt. Hagan, Hoodoo Butte, and Frissell Point Communications Sites · Lane; Linn, Oregon

Administrative actions to authorize the continuing use of communications permit areas for a new term of 20 years for four different permittees. There are no changes in the scope or intensity of the uses, and no ground disturbance is proposed.

Special use management
Scoping Start
02/11/2013
Comment Period
02/11/2013
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Renewal of Communications Use Leases for Cingular, Silke, American, &amp; LaneDecision Signed Date: 04/15/2013 Legal Notice Date: 04/22/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 35, T16S, R3E; Section 34, T13S, R7½ E; SE¼, SW¼, Section 33, T15S, R.6 E, Willamette Meridian
Decision Memo · Sweet Home Ranger District · updated 5/20/2013
South Santiam Watershed · Linn, Oregon

Construct parking area for 8-10 vehicles, install toilet and low-maintenance landscaping, construct interpretive trail, panels and kiosk, and stabilize CCC-era wall.

Recreation managementHeritage resource management
Scoping Start
03/01/2013
Decision
05/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Jonathan Meier · jmeier02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Heritage Resource Management
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT 13 S, R 2 E, Section 36
Decision Memo · Detroit Ranger District · updated 5/16/2013
Locations are adjacent to Stahlman Summer Home, Shady Cove Campground, Cleator Bend Campground, portions of Blowout Road (FSR 10), portions of French Creek Road (FSR 2223) · Linn; Marion, Oregon

Project proposes to close approximately 25 dispersed recreation sites to day use to reduce clnflict with adjacent land use, public health, safety, sanitation, and resource protection.

Recreation management
Scoping Start
03/01/2013
Comment Period
04/01/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Josh Weathers · jweathers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.
Dispersed and Developed Recreation Site RestrictionsDecision Signed Date: 05/02/2013 Legal Notice Date: 05/13/2013
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT 8 S, R 4 E, Sections 27-28; T 9 S, R 5 E, Sections 35-36; T 9 S, R 7 E, Section 19; T 10 S, R 6 E, Sections 7, 17-18; T 10 S, R 5 E, Sections 1, 2, 3, 10, 11-15,
Environmental Assessment · Detroit Ranger District · updated 5/16/2013
Mile post 66 on Highway 22, Marion Forks, Oregon · Linn, Oregon

This project aims to make the Marion Forks Hatchery Day Use safer to enter by widening the entrance and adding new signing. There will be other improvements to the area, including converting the lower camping area to a day use area and nature trail

Recreation managementSpecial area managementWatershed management
Scoping Start
03/05/2012
Comment Period
03/04/2013
Decision
04/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Jonathan Meier · jmeier02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Watershed Improvements
Marion Forks Day Use Improvements and Restoration ProjectDecision Signed Date: 04/25/2013 Legal Notice Date: 05/13/2013
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT11S, R7E, Sec 22
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 5/14/2013
Pioneer Gulch and Paddy's Valley in the Upper Middle Fork of the Willamette River watershed · Douglas; Lane, Oregon

The project proposes timber harvest on about 940 acres yielding about 12.7 mmbf. The project includes road maintenance and closures, big game forage enhancements activities, non-harvest fuel treatments, and fish habitat improvements.

Wildlife, fish, rare plantsRoad managementForest products
Scoping Start
08/25/2008
Comment Period
08/27/2012
Decision
04/2013 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Eric Ornberg · eornberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Road Maintenance; Timber Sales (Green)
Decision Notice and FONSI for the Pioneer Gulch ProjectDecision Signed Date: 12/18/2012 Legal Notice Date: 12/24/2012
Second Decision Notice and FONSI for the Pioneer Gulch ProjectDecision Signed Date: 04/23/2013 Legal Notice Date: 05/13/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S, R5E, Sections 1-36, T25S, R5E Sections 1-16, T25S, R5 1/2E Sections 4-11 and 13-23
Decision Memo · McKenzie River Ranger District · updated 5/13/2013
Across the McKenzie River Ranger District · Lane; Linn, Oregon

Enhance pre-existing areas of permanent, semi-permanent or ephemeral water sources. This will be done by falling trees into stream beds and in some areas add finer wood to create log jams; and decreasing conifer density around ponds.

Wildlife, fish, rare plants
Scoping Start
04/01/2013
Comment Period
04/01/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Pools, Ponds and Meadow Enhancement Projects 2013Decision Signed Date: 05/06/2013 Legal Notice Date: 05/13/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R7E Sec. 5, 6, 8, & 18; T15S R7E Sec. 20; T18S R4E Sec. 1 & 2
Decision Memo · McKenzie River Ranger District · updated 5/13/2013
The project area is between Forest road 2649 and Highway 126. · Lane, Oregon

This project proposes to remove approximately 19 dead or dying trees that are being affected with root rot disease. These trees have a failure zone of hitting Highway 126 and the 2649 Scott Creek road.

Forest productsRoad management
Scoping Start
03/11/2013
Comment Period
03/11/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage); Timber Sales (Green)
Scottish Danger Tree Removal (DTR) ProjectDecision Signed Date: 05/02/2013 Legal Notice Date: 05/13/2013
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 1, T16S, R6E
Decision Memo · McKenzie River Ranger District · updated 5/13/2013
Across the McKenzie River Ranger District in both Lane and Linn Counties · Lane; Linn, Oregon

The purpose of the project is to enhance forage for Roosevelt elk and black-tailed deer to increase herd health and survival rates through improved nutrition. Browse cutback as well as the creation of early seral openings would be implemented.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
04/01/2013
Comment Period
04/01/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R7E Sec. 5, 6, 7, 8, 17, 18, 19, & 30; T15S R6E Sec. 24, 25, 26, 35, & 36; T15S R7E Sec. 17, 19, & 20; T16S R4E Sec. 13; T16S R5E Sec. 18 & 32
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 5/10/2013
Flat Creek Work Center, 1.5 miles east of Oakridge · Lane, Oregon

There are 3 Houses and 2 garages at the Flat Creek Work Center in Oakridge that are no longer habitable, are in disrepair, and will either be demolished or allowed to be used under special use permit. The buildings are eligible for the NRHP.

Facility management
Scoping Start
04/30/2012
Comment Period
12/17/2012
Decision
04/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Kenneth Barbee · kbarbee02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Maintenance
DN/ FONSI for the Flat Creek Buildings Disposition ProjectDecision Signed Date: 04/02/2013 Legal Notice Date: 05/06/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R3E, Section 14
Decision Memo · McKenzie River Ranger District · updated 3/29/2013
Lower Delta and McKenzie Hwy from Horse Creek to the McKenzie River Ranger Station. · Lane, Oregon

This project is for the replacement of existing overhead distribution lines and improvements in the existing system. There are two areas to be upgraded, 1) Lower Delta and 2) McKenzie Hwy from Horse Creek to the McKenzie River Ranger Station.

Special use management
Scoping Start
11/06/2012
Comment Period
11/06/2012
Decision
01/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R6E., Sec 13-18, 21-24 and T16S. R5E., Sec 13, 14, 23, 24
Decision Memo · McKenzie River Ranger District · updated 3/28/2013
Between the Lookout Creek trail and the Discovery Old Growth Education Trail on the HJ Andrews Experimental Forest near Blue River, OR · Lane, Oregon

Construction of a connector trail (<1/4 mile) between the Lookout Creek trail and the Discovery Old Growth Education Trail on the HJA compound. This will allow for a loop educational hike using the 2 trails and the old road to the pump house.

Recreation management
Scoping Start
02/11/2013
Comment Period
02/11/2013
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16 S, R 5E, Section 6, W.M.
Decision Memo · McKenzie River Ranger District · updated 3/22/2013
RD 2611-060, McKenzie River Ranger District, Willamette National Forest · Lane, Oregon

Replace a wireless communication cell tower at the Mt. Hagan site. The existing tower will be removed upon completion of the new monopole tower.

Special use management
Scoping Start
11/06/2012
Comment Period
11/06/2012
Decision
01/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT 16S, R 3E, Sec 35 W.M.
Decision Memo · Mt. Hood National Forest All Units · updated 3/22/2013
Along the proposed route and alternatives on the Mt. Hood and Willamette National Forests. · Clackamas; Marion, Oregon

Geotechnical investigations on National Forest System lands for the proposed Cascade Crossing Transmission Project

Minerals and geology
Scoping Start
04/28/2012
Decision
11/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kristy Boscheinen · kboscheinen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMt. Hood National Forest; Willamette National Forest
DistrictsClackamas River Ranger District; Detroit Ranger District
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/14/2013
Middle Fork RD: Hway 58 and turnklines in Oakridge and Westfir. McKenzie River RD: Hwy 126, Hwy 242, and FS Road 19. · Lane, Oregon

Qwest Corporation requests renewal of the permit for telephone trunk lines on the McKenzie River and Middle Fork Ranger Districts.

Special use management
Scoping Start
11/07/2005
Comment Period
10/29/2012
Decision
12/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Qwest/CenturyLink Special Use Permit RenewalDecision Signed Date: 12/10/2012 Legal Notice Date: 12/17/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District; Middle Fork - Inactive Ranger District
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/14/2013
Wolf Mountain Communication Site · Lane, Oregon

Four holders request renewal of their leases for communications uses at Wolf Mt. for a 20-year term. No new ground disturbance for these leases, no increase in scope or intensity of authorized activities. Changes are administrative only.

Special use management
Scoping Start
12/17/2012
Comment Period
12/17/2012
Decision
02/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Renewal of Communications Use Leases at Wolf Mt. Communications SiteDecision Signed Date: 02/01/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R5E, SW1/4 of Section 33
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/14/2013
Willamette Fish Hatchery, Oakridge, Oregon · Lane, Oregon

Oregon Dept. of Fish & Wildlife requests renewal of the Special Use Permit for the Willamette Hatchery Facilities for a new 20-year term. The new permit would include the Recirculation Aquaculture Facility. No changes to existing facilities.

Special use management
Scoping Start
12/17/2012
Comment Period
12/17/2012
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Willamette Hatchery Special Use Permit Renewal (Long Term)Decision Signed Date: 02/01/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R3E, SE¼NW¼, S½NE¼, NE¼SW¼, and NW¼SW¼ of Section 15, W.M.
Decision Memo · Sweet Home Ranger District · updated 3/13/2013
10-25 year old conifer stands District-wide · Linn, Oregon

Conifer boughs may be harvested with hand tools; removing up to 1/2 of the branch length on 1/2 of the tree height to provide supply for wreaths and decorative greens. About 490ac. and 120 tons of boughs.

Forest products
Scoping Start
01/17/2012
Comment Period
06/19/2012
Decision
07/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
2012 Bough Decision MemoDecision Signed Date: 07/19/2012 Legal Notice Date: 07/19/2012
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionDistrict-wide
Pup Project Completed
Decision Memo · McKenzie River Ranger District · updated 3/13/2013
Located on Forest road 15 and 2656 tie road. Forest road 2654 Deer Creek access those roads. · Linn, Oregon

To commercially thin approximately 69 acres in a 55 year old stand using ground base and skyline equipment. This project will also include gaps 1-3 acre in size to promote understory forbs and shrubs.

Fuels managementForest products
Scoping Start
12/03/2012
Comment Period
12/03/2012
Decision
02/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 32,T14S R6E; and Section 5, T15S R6E
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/5/2013
Upper Middle Fork Willamette River Watershed meadows (exact locations to be identified) · Lane, Oregon

Restore and make meadows on the Calapooya Divide more resistant to fire and climate change. Includes whipfelling trees 10" diameter and less, removing invasive plants, prescribed fire, and placing boulders or fencing to restrict off-road access.

Wildlife, fish, rare plantsVegetation management (other than forest products)Watershed management
Scoping Start
11/12/2012
Comment Period
11/12/2012
Decision
01/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Molly Juillerat · mjuillerat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Noxious Weed Treatments; Watershed Improvements
Calapooya II Meadow RestorationDecision Signed Date: 01/30/2013 Legal Notice Date: 02/18/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/5/2013
Off Hwy. 58, m.p. 47.5, spurs 360 and 359 · Lane, Oregon

ODOT requests permission to expand an existing waste area site off Hwy 58 by 2 acres. Their long term need for waste storage for this section of Hwy 58 exceeds the current disturbed area. Cut trees to be sold as firewood or as a commercial deck sale.

Road managementForest products
Scoping Start
12/17/2012
Comment Period
12/17/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales; Road Maintenance; Timber Sales (Green)
ODOT Waste Area Expansion Decision MemoDecision Signed Date: 02/13/2013 Legal Notice Date: 03/04/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT. 22 S., R. 5 E., Sec 5, SW¼; Sec 6, SE¼.
Environmental Assessment · Umpqua National Forest All Units · updated 2/15/2013
Cougar Bluffs Inventoried Roadless Area · Douglas, Oregon

Exchange of 280 privately owned acres within the Cougar Bluffs Inventoried Roadless Area for an equal value of land within a 598 acre area administered by the U.S. Forest Service

Land ownership management
Scoping Start
01/28/2011
Comment Period
01/20/2012
Decision
01/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Scott Elefritz · selefritz@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
DN/FONSI for Cougar Bluffs Land ExchangeDecision Signed Date: 01/28/2013 Legal Notice Date: 02/15/2013
ForestsUmpqua National Forest; Willamette National Forest
DistrictsTiller Ranger District; North Umpqua Ranger District; Middle Fork - Inactive Ranger District
Legal Land DescriptionLand to be aquired T26S, R1W, Sec. 11, 12; Land to be exchanged: T27S, R1W, Sec. 20; T27S, R2W, Sec. 10, 12, 22; T32S, R2W, Sec. 12; T20S, R3E, Sec. 35; Willamette Meridian
Decision Memo · Middle Fork - Inactive Ranger District · updated 2/13/2013
Within the mixed conifer forest type that occurs in the Hills Creek Reservoir and Upper Middle Fork 5th Field watersheds · Lane, Oregon

Precommercial Thinning, brush cutting, under burning, pruning, snag creation, seeding, and noxious weed abatement within the mixed conifer forest type to maintain and restore oak woodland and savanna habitat.

Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/01/2012
Comment Period
11/12/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Dick Davis · ddavis01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
PineGrass Plantation Habitat Improvement ProjectDecision Signed Date: 02/08/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionTownships 22, 23 and 24 South, Ranges 3 and 4 East, of the Willamette Meridian
Decision Memo · Middle Fork - Inactive Ranger District · updated 2/4/2013
West side of Dead Mountain, terminating at communications site near top of mountain. · Lane, Oregon

G.O.A.T.S. is requesting approval/permission with NEPA analysis, to extend the Flat Creek Trail from its current north terminus on the west side of Dead Mtn, eastward to the communication site, a distance of about 9000 feet.

Recreation management
Scoping Start
11/26/2012
Comment Period
11/26/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Flat Creek Trail Extension BDecision Signed Date: 01/03/2013 Legal Notice Date: 01/21/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT 21 S., R 3 E., Sec. 1 and 2 ; T. 20 S., R 3 E., Sec. 35 and 36
GOATS Ride Center Completed
Decision Memo · Middle Fork - Inactive Ranger District · updated 1/25/2013
Various locations in and around Oakridge. Some sites are on City of Oakridge property and some are on National Forest. · Lane, Oregon

The Greater Oakridge Area Trail Stewards (GOATS) has secured federal funding to implement projects to promote mountain biking in and around Oakridge/Westfir. Projects include: trail extension, trail maintenance, and install information kiosk.

Recreation management
Scoping Start
05/09/2011
Comment Period
11/26/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Trail Management
Oakridge-Westfir Ride Center GrantDecision Signed Date: 01/03/2013 Legal Notice Date: 01/21/2013
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Decision Memo · McKenzie River Ranger District · updated 12/3/2012
Project starts at the 11.0 mile point (French Pete Campground) to the District Boundary located at the 25 mile point on Forest road 19. · Lane, Oregon

To remove approximately 120 danger trees located in a fourteen mile segment adjacent to Forest road 19. The trees are dead and dying and have a failure zone that would impact Forest road 19.

Road management
Scoping Start
06/01/2012
Comment Period
09/18/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Rd 19 DTR (Danger Tree Removal)Decision Signed Date: 11/16/2012 Legal Notice Date: 12/03/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S R5E Sec. 33; T18S R5E Sec. 3-4,10,11,14,23,25-26,31-33,36; T19S R5E Sec. 1-2,12-13
Environmental Assessment · Detroit Ranger District · updated 11/20/2012
the project area is bounded by Coopers Ridge to the west, Bachelor Mtn to the south, Boulder Ridge to the north and Hwy 22 to the east · Linn; Marion, Oregon

The project is proposed to commercially thin about 1500 acres of young second growth forests to enhance the growth and structural complexity of timber stands and complete hazardous fuels reduction on 225 acres.

Fuels managementForest products
Scoping Start
02/22/2011
Comment Period
08/14/2012
Decision
09/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S, R6E, sec 33-36; T9S, R7E sec 31; T10S, R6E, sec 1-5, 7-11, 13-39, 33-36; T10S R7E sec 5-8, 18-20, 28-33; T11S R6E sec 1,2,4,11-13; T11S, R7E sec 3-10
Decision Memo · McKenzie River Ranger District · updated 11/16/2012
Forest roads 2657-840 on the McKenzie River Ranger District · Linn, Oregon

To commercially thin three second growth stands in the upper McKenzie watershed. Project will be harvested with ground based equipment.

Forest products
Scoping Start
05/29/2012
Comment Period
05/29/2012
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Burtchell Thomas · bthomas03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Kafka Resource Thin ProjectDecision Signed Date: 09/26/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 8, 17,18; T15S, R7E; W.M. Linn County
Decision Memo · McKenzie River Ranger District · updated 9/11/2012
T16S, R7E, Section 32; T16S, R4E, Section 23; T15S, R6E, Section 4&5 · Lane; Linn, Oregon

This project combines 7 special habitat areas (totaling 49 acres) that are proposed to maintain and restore early seral vegetation conditions, which includes 4 meadows, a stand dominated by shrubs and hardwood, an orchard and an oak savannah.

Vegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
Scoping Start
06/05/2012
Comment Period
06/05/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Penny Harris · pjharris@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments; Watershed Improvements
2012 Wildlife Special Habitat Enhancement and Restoration ProjectDecision Signed Date: 09/10/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R7E, Section 32; T16S, R4E, Section 23; T15S, R6E, Section 4&5
Patjens Reroute Completed
Decision Memo · McKenzie River Ranger District · updated 9/11/2012
Patjens Trail (Tr. No. 3395) near Patjens Lake · Linn, Oregon

To reroute approximately 3 miles of Patjens trail. This would require cutting trees (<12") in the proposed trail prism (96" wide) and disturbing the ground via tread construction (18-22" wide).

Recreation management
Scoping Start
04/23/2012
Comment Period
04/23/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Decision Memo for the Patjens Trail RerouteDecision Signed Date: 09/10/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R7.5E, Sections 9 and 16
Sawyer Bar Reroute Completed
Decision Memo · McKenzie River Ranger District · updated 9/11/2012
Pacific Crest Trail (Tr. No. 2000) Near Sawyer Bar · Linn, Oregon

To reroute approximately 1.5 miles of the Pacific Crest National Scenic Trail near Sawyer Bar in the Three Sisters Wilderness. This work will be done with traditional tools, and will utilize trail crews, youth crews, and volunteers.

Recreation management
Scoping Start
04/23/2012
Comment Period
04/23/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Decision Memo for the Sawyer Bar Trail RerouteDecision Signed Date: 09/10/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R8.5E, Section 18
Castle Project Completed
Decision Memo · McKenzie River Ranger District · updated 8/28/2012
Located on Forest road 2639480 just past the private land. · Lane, Oregon

To commercially thin three stands; 30, 16, and 10 acres. These stands are second growth with an average age of 40 years. The project will be harvested with ground base and skyline equipment using existing skid roads as much as possible.

Forest products
Scoping Start
02/24/2012
Comment Period
06/05/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 28 and 29; T16S, R5E; W.M. Lane Co.
Dulce Completed
Decision Memo · McKenzie River Ranger District · updated 8/28/2012
Located on Forest roads 2600722 and 2600720. · Linn, Oregon

To commercially thin approximately 40 acres in a 50-year old stand using ground base equipment

Fuels managementForest products
Scoping Start
10/04/2011
Comment Period
05/29/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Dulce ProjectDecision Signed Date: 08/13/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionSection 12; T15S, R6E; and Section 7; T15S, R7E; W.M. Linn Co.
Decision Memo · McKenzie River Ranger District · updated 8/27/2012
Collier Glacier in the Three Sisters Wilderness and Sand Mountain both on the McKenzie River District (Linn County, Oregon) of the Willamette National Forest. · Linn, Oregon

Special use permit for the EPA to install equipment for monitoring melt on Collier Glacier and radio data receiver on Sand Mountain.

Special use management
Scoping Start
07/17/2012
Comment Period
07/17/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Collier Glacier Monitoring ProjectDecision Signed Date: 08/22/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S., R.8E., SE¼ Sec.20; T.16S., R.8E., NE¼ Sec.17; and T.14S., R7E., NW¼NW¼ Sec. 1
Decision Memo · McKenzie River Ranger District · updated 7/30/2012
McKenzie River Ranger District, Lane and Linn counties, Oregon. · Lane; Linn, Oregon

Approximately 350 acres of young conifer thinning to maintain and improve stand health and vigor. Conifer pruning of approximately 150 acres to improve wood quality.

Vegetation management (other than forest products)
Scoping Start
01/01/2012
Comment Period
05/21/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Kevin Moran · kmoran@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S R6E Sec.25; T15S R6E Sec.3, 9, 10, 14, 15, 16, 17, 21; T15S R7E Sec.9, 31, 32; T16S R7E Sec. 28, 29
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Decision Memo · Detroit Ranger District · updated 6/13/2012
McCoy OHV Area · Linn; Marion, Oregon

This project will include the expansion of the upper staging area, road brushing and striping, road access management, site preparation and installation of a vault toilet and picnic shelter.

Recreation managementFacility management
Scoping Start
04/16/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Facility Maintenance; Road Maintenance
2012-2014 McCoy Motorized Recreation Area ImprovementsDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT. 9,10S; R. 6,7E; Multiple locations
Decision Memo · McKenzie River Ranger District · updated 6/13/2012
Delta A Recreation Residence Tract Lots located at 55381 Delta Rd (lot #36), 55328 Delta Rd (lot#58), and 55314 Delta Rd (lot #57). · Lane, Oregon

This proposal would replace outhouses on three lots with Lane County approved septic systems.

Special use management
Scoping Start
03/12/2012
Comment Period
04/23/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Delta A Septic InstallationsDecision Signed Date: 06/06/2012 Legal Notice Date: 06/11/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S, R5E, Section 16; W.M., Lane County
Decision Memo · McKenzie River Ranger District · updated 6/13/2012
East Fork Trail (Tr. No. 3308) mile post .17 · Lane, Oregon

The project will replace, in-kind, a bridge on the East Fork Trail (Tr. No. 3308) at mile post 1.15. The original bridge is still in place, but inspections show that it needs replacement. This project will use the same base platform in replacement.

Recreation management
Scoping Start
03/21/2012
Comment Period
04/23/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT17S, R5E, Section 10; NE quadrant
Decision Memo · McKenzie River Ranger District · updated 6/13/2012
H.J. Andrews Experimental Forest Compound · Lane, Oregon

Construction of a 2200 square foot LEEDS certified residential building.

Special use management
Scoping Start
04/19/2012
Comment Period
04/20/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
H.J. Andrews Experimental Fores "Green House"Decision Signed Date: 05/25/2012 Legal Notice Date: 06/01/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT16S. R5E.,Section 6
Decision Memo · McKenzie River Ranger District · updated 6/13/2012
Along Administrative Sites on Horse Creek Road. · Lane, Oregon

This project is for the maintenance, construction & operation of electric distribution lines running within the administrative sites of Horse Creek.

Special use management
Scoping Start
04/11/2012
Comment Period
04/23/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionHorse Creek T16S, R5E Sec. 13 and 14, W.M.
Decision Memo · McKenzie River Ranger District · updated 6/7/2012
McKenzie River National Recreation Trail, Olallie Trail, Castle Rock Trail, O'Leary Trail, Echo Trail · Lane, Oregon

This project will replace, in-kind, the directional trail signs on several non-wilderness trails. Signs will be installed on the McKenzie River National Recreation Trail, Olallie Trail, Castle Rock Trail, O'Leary Trail, and Echo Trail.

Recreation management
Scoping Start
03/12/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Edward Cross · etcross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
McKenzie Front Country Trail Sign ProjectDecision Signed Date: 06/06/2012
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT13S, R7E, & T14S, R7E, & T17S, R6.5E, & T16S, R6E
Decision Memo · Sweet Home Ranger District · updated 6/5/2012
South Santiam and Upper McKenzie watersheds · Linn, Oregon

Harvest boughs on approximately 600 acres of 10-30 year old conifer stands, using hand tools. Remove up to 1/2 the length of the branch on 1/2 the height of the tree. This project may be split into two or more bough sales.

Forest products
Scoping Start
01/12/2012
Comment Period
04/23/2012
Decision
05/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Lindsay Anderson · landerson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
2012 Bough Sales ProjectDecision Signed Date: 05/29/2012 Legal Notice Date: 06/05/2012
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT13S, R6E, Sec. 25 and 36; T14S, R5E, Sec. 17; T14S, R6E, Sec. 1, 2, 11, 12,14-16, 21 and 23
Decision Memo · Sweet Home Ranger District · updated 6/5/2012
South, Middle and Upper North Santiams, Upper McKenzie, Blowout, Thomas, Wiley, Calapooia and Quartzville watersheds. · Linn, Oregon

Reduce stocking on 6000 acres of 10-30 year-old managed stands to improve growth, forest health; long-term fuel loads, improve huckleberry habitat and provide wildlife forage/habitat.

Vegetation management (other than forest products)
Scoping Start
01/12/2012
Comment Period
04/23/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Lindsay Anderson · landerson02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
2012 Young Stand Density ManagementDecision Signed Date: 05/30/2012 Legal Notice Date: 06/05/2012
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionDistrict Wide
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/5/2012
Upper Middle Fork Willamette River corridor (upstream of Coal Creek and Middle Fork confluence) and Staley Creek. · Lane, Oregon

Second phase of planning for the Respect the River program on the district, located along the Upper Middle Fork Willamette River and Staley Creek. The project will minimize resource impacts at dispersed campsites and improve riparian health.

Recreation managementWatershed management
Scoping Start
02/29/2012
Comment Period
04/23/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Lisa Kurian · lkurian@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Noxious Weed Treatments; Watershed Improvements
Respect the River Project: Phase IIDecision Signed Date: 05/24/2012 Legal Notice Date: 06/01/2012
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Decision Memo · Sweet Home Ranger District · updated 6/4/2012
Canyon Creek near the confluence with Owl Creek in the South Santiam watershed · Linn, Oregon

Place large wood in Canyon Creek and tributaries (primarily by helicopter) to improve juvenile steelhead rearing and foraging habitat.

Wildlife, fish, rare plantsWatershed management
Scoping Start
01/20/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Lance Gatchell · lgatchell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
2012 Canyon Creek Large Wood Enhancement ProjectDecision Signed Date: 05/25/2012 Legal Notice Date: 06/04/2012
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT14S, R4E, Section 20
Decision Memo · Detroit Ranger District · updated 5/21/2012
Bingham Trail # 3421 · Linn, Oregon

Santiam River Zone Trails program managers will be working with area specialists to plan a realignment route for the first 1/4 mile of the trail.

Recreation management
Scoping Start
04/16/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Watershed Improvements; Wilderness Management
Decision Memo Detrit Ranger District Trail Reconstruction ProjectsDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT11S R8E Sec 24
Decision Memo · Detroit Ranger District · updated 5/21/2012
Camp Pioneer · Linn, Oregon

Reissue special use permit for 20 years. No new ground disturbing activities planned. Administrative action.

Special use management
Scoping Start
03/15/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DM for Various District-wide Term Special Use Authorization ReissuanceDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT 12 S, R 7 E, sec 2
Decision Memo · Detroit Ranger District · updated 5/21/2012
LNS trail, Little Cedar Ck. crossing. Kopetski Trail at Opal Crossing to east side of Opal Crk. · Linn; Marion, Oregon

This project will address trail bridge maintenance and replacements on the Little North Santiam River(LNS) Trail and will reroute the Kopetski Trail in the Opal Creek Scenic recreation Area.

Facility managementRecreation management
Scoping Start
07/18/2011
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Trail Management
Decision Memo Detroit Ranger District Trail Reconstruction ProjectsDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT 8, R 4, sec 34; T 8 , R5, sec 28; T 8, R 5, sec 33
Decision Memo · Detroit Ranger District · updated 5/21/2012
Detroit Lake · Linn; Marion, Oregon

North Santiam Sportsman’s Club requests a new 10-year Term Special use Authorization.

Special use managementRecreation management
Scoping Start
04/16/2012
Comment Period
04/17/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Facility Maintenance
North Santiam SportsmanDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionSection 12, T.10S, R.5E, WM
Decision Memo · Detroit Ranger District · updated 5/21/2012
Opal Lake Trail #3372 · Marion, Oregon

Excessively steep routes and routes through swampy meadow area on trail length will be assessed and relocated. Trail reroute would be approximately 3/4 mile.

Recreation management
Scoping Start
03/14/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Brandon Haraughty · bharaughty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Watershed Improvements; Wilderness Management
Decision Memo Detroit Ranger District Trail Reconstruction ProjectsDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT8S R5E Sec 17
Decision Memo · Detroit Ranger District · updated 5/21/2012
South Breitenbush Gorge trail #3366 and South Breitenbush Trail #3375 T9S R7e Sec 21,26, 36 for 3366 Trail · Marion, Oregon

Reroute and/or install creek and swamp crossings on South Breitenbush Gorge trail. Reroute a few segments less than 1/4 mile in length of the South Breitenbush trail and install drainage structures along the trail.

Recreation management
Scoping Start
03/14/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Brandon Haraughty · bharaughty@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Watershed Improvements; Wilderness Management
Decision Memo Detroit Ranger District Trail Reconstruction ProjectsDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S R7e Sec 21,26, 36 for 3366 Trail, T9S R8E Sec 36 for 3375 Trail
Decision Memo · Detroit Ranger District · updated 5/21/2012
Swallow Lake Trail # 3488 · Linn, Oregon

Santiam River Zone Trails program managers will be working with area specialists to plan a realignment route for the ¾ mile section of the trail from Swallow Lake to the Meadow area just south of South Cinder Peak.

Recreation management
Scoping Start
04/16/2012
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Bradford Peterson · bcpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Wilderness Management
Decision Memo Detroit Ranger District Trail Reconstruction ProjectsDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT11,12S R8E Secs. 5,6,31,32
Decision Memo · Detroit Ranger District · updated 5/21/2012
Various locations on Detroit Ranger District · Linn; Marion, Oregon

Permits have expired and need to be reissued. These are all existing uses, no new ground disturbance. Private road use permits, boat docks, water lines, and stairs/pathways.

Special use management
Scoping Start
05/26/2010
Comment Period
04/16/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Penny Keen · pkeen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DM for Various District-wide Term Special Use Authorization ReissuanceDecision Signed Date: 05/17/2012 Legal Notice Date: 05/21/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Decision Memo · Detroit Ranger District · updated 5/17/2012
Project is located on the Detroit Ranger District, Willamette National Forest. Project areas are located throughout the District. · Linn; Marion, Oregon

Proposal is for the harvest and collection of Special Forest Products for the uses of Floral/Landscaping products, Christmas Season products, Furniture/building products and edibles/medicinal.

Vegetation management (other than forest products)Forest products
Scoping Start
02/01/2012
Comment Period
04/09/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Sue Crowder · sjcrowder@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
Special Forest Products Sales Decision MemoDecision Signed Date: 05/09/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Margie Project Completed
Environmental Assessment · Detroit Ranger District · updated 4/6/2012
the project area is bounded by Hall Ridge to the west, Detroit Lake to the south, the Opal Creek Scenic Recreation Area and Wilderness to the north and the French Creek Road (Road 2223) to the east. · Linn; Marion, Oregon

The project proposed to commercially thin about 1200 acres of young second growth forests to enhance the growth and structural complexity of timber stands. Decision was withdrawn on August 12, 2011. New decision is expected in March 2012.

Forest productsWildlife, fish, rare plants
Scoping Start
11/02/2009
Comment Period
01/11/2012
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Green)
Decision Notice and Finding of No Significant Impact Margie ProjectDecision Signed Date: 05/12/2011 (FS Withdrawn) Legal Notice Date: 05/17/2011
Decision Notice and FONSI Margie ProjectDecision Signed Date: 02/28/2012 Legal Notice Date: 03/05/2012
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT9S, R5E, Sections 27-35 and T10S, R5E, Sections 2-5, 7-10 and 15-19.
Decision Memo · Middle Fork - Inactive Ranger District · updated 2/13/2012
Upper Middle Fork Willamette River watershed · Lane, Oregon

Stream restoration work in the Upper Middle Fork Willamette River watershed. Placement of 1100 pieces of large wood in Swift, Staley, and Echo Crks. for bull trout and salmon habitat. Three fish passage structures in Windfall, Coal, and Maple Crks.

Wildlife, fish, rare plants
Scoping Start
05/16/2011
Decision
02/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mike Sheehan · msheehan02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Middle Fork Restovert ProjectDecision Signed Date: 02/01/2012
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S, R4E, Sec. 15, 19, 22, 27, 29, and 32; T23S, R5E, Sec. 29 and 31; T23S, R3E Sec. 4; T25S, R3E, Sec. 2; and T24S, R3E, Sec. 13
Decision Memo · Middle Fork - Inactive Ranger District · updated 1/25/2012
Parking area for day visitors along Hwy 58 that serves as a trailhead for the Hardesty Mtn trail, about 9 miles east of Lowell. · Lane, Oregon

The existing parking lot will be reconstructed with day use improvements added. Improvements to the parking area will help manage traffic flow and local resource impacts. Facility improvements will include toilets, signs, picnic tables.

Recreation management
Scoping Start
05/09/2011
Decision
12/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Karl Dietzler · kdietzler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Hardesty Mountain Trailhead Improvement ProjectDecision Signed Date: 12/29/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R1E, Section 11
Decision Memo · Middle Fork - Inactive Ranger District · updated 1/25/2012
Parking area for day visitors along Hwy 58 that serves visitors to McCredie Hot Springs, about 8 miles east of Oakridge. · Lane, Oregon

The existing parking lot will be reconstructed with day use improvements added. Improvements to the parking area will help manage traffic flow and local resource impacts. Facility improvements will include toilets, signs, picnic tables.

Recreation management
Scoping Start
07/13/2011
Decision
12/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Karl Dietzler · kdietzler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
McCredie Hot Springs Day Use Area Improvement ProjectDecision Signed Date: 12/29/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R4E, Section 36
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/15/2011
South side of Salmon Creek · Lane, Oregon

Relocating two sections of South Salmon Trail (# 4365) to replace sections lost during winter flooding and to avoid constructing a complex bridge over Salmon Creek.

Recreation management
Scoping Start
06/14/2011
Decision
12/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Kevin Rowell · karowell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
South Salmon Trail ReconstructionDecision Signed Date: 12/12/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R3E, Sec 13&14; T21S, R4E, Sec 7
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/8/2011
National Forest Land adjacent to and west of 46851 La Duke Road, Westfir OR · Lane, Oregon

The allowance of the Oregon Department of Forestry (ODF) to implement fuels treatments on a small portion of FS Land (.4 acres) near the Marconi residence adjacent to private land where ODF is implementing firewise projects around private land.

Fuels management
Scoping Start
10/12/2011
Decision
12/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Jose Mercado · jemercado@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionTownship 21 South, Range 3 East, section 18 SWSW
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/8/2011
Along the Union Pacific Railroad on the Middle Fork (Willamette NF) and Crescent (Deschutes NF) Ranger Districts. · Klamath; Lane, Oregon

Union Pacific Railroad requests a Special Use Permit to install fiberoptic cable conduits on the Middle Fork RD (Willamette NF) and Crescent RD (Deschutes NF).

Special use management
Scoping Start
06/20/2011
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsDeschutes National Forest; Willamette National Forest
DistrictsCrescent Ranger District; Middle Fork - Inactive Ranger District
Decision Memo · Middle Fork - Inactive Ranger District · updated 12/8/2011
Willlamette Fish Hatchery, Oakridge, Oregon · Lane, Oregon

The Oregon Department of Fish & Wildlife(ODFW) has requested a temporary special use authorization (permit) for construction of stage one of a Recirculation Aquaculture System(RAS) Facility at the existing Willamette Fish Hatchery site.

Special use management
Scoping Start
10/17/2011
Decision
11/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Oregon Department of Fish and Wildlife Willamette Fish HatcheryDecision Signed Date: 11/23/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionSec. 15, T. 21 S., R. 3 E
Johnny Salvage Cancelled
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/19/2011
West and east sides of Forest Road 1818 about 0.1 mile off Forest Road 18 in the Fall Creek drainage. · Lane, Oregon

Salvage of trees blown down during the March 13th, 2011 windstorm. Area to be salvaged is approximately 4 acres in General Forest allocation in the Fall Creek drainage.

Forest products
Scoping Start
04/18/2011
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
John Poet · jpoet@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT18S, R2E, Sections 26, 27, 33, and 34.
Decision Memo · Willamette National Forest All Units · updated 9/16/2011
Willamette National Forest · Lane; Linn, Oregon

The Forest proposes to re-issue Special Use Permit WIL67 to the NRCS for the continued operation of 12 existing SNOTEL Monitoring sites. 2 additional sites will be added to the permit and Soil moisture sensor added at an existing site.

Special use managementWatershed management
Scoping Start
05/03/2010
Decision
09/2010 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
USDA NRCS 2010 SNOTEL Site Installation & Permit Re-issuanceDecision Signed Date: 09/19/2010
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionT. 14 S., R 6 E. Sec. 28, W.M.:T. 15 S., R 5½ E. Sec. 1, W.M.
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 9/16/2011
The North Fork of the Middle Fork of the Willamette River fifth-field watershed, about 8 miles north of the City of Westfir · Lane, Oregon

4,600 acres of commercial thinning in managed young stands, special habitat restoration and maintence on 266 acres, 60 miles of road maintence and 95 miles of road closure, fuels reduction, and wildlife forage enhancment

Road managementVegetation management (other than forest products)Forest productsWatershed managementLand management planningFuels managementWildlife, fish, rare plants
Scoping Start
12/13/2007
Comment Period
05/16/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Tim Bailey · tbailey01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionTownship 19 South, Ranges 3, 4, and 5 East, Willamette Meridian
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/15/2011
Shadow Bay Campground group sites · Lane, Oregon

Oregon Trappers Association requests renewal of expiring permit for the Annual Waldo Lake Rendezvous, for a term of five years.

Special area managementSpecial use management
Scoping Start
07/27/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Special Area Management
Oregon Trappers AssociationDecision Signed Date: 08/03/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R6 1/2 E, Section 6
Decision Memo · Middle Fork - Inactive Ranger District · updated 8/2/2011
On the BPA powerline between Oakridge and Hills Creek Dam. · Lane, Oregon

Two poles installed on the BPA powerline between Oakridge and Hills Creek Dam in 1962 have major decay and need to be replaced. In addition, BPA needs to re-open the spur roads that access the line in order to improve response time for line outages.

Special use management
Scoping Start
07/01/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Facility Maintenance
Bonneville Power Administration Hills Creek Power Pole Replacement ProjectDecision Signed Date: 08/01/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R3E, Section 22
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 7/27/2011
Within 200 ft. above and 100 ft. below all or portions of roads 2144, 2143, 2143308, 2143311, 2144305, and 2144370. · Lane, Oregon

Removal of trees along certain roads within the 2009 Tumblebug Fire which were killed by the fire and pose future safety risk to road users. Merchantable tree removal on approximately 475 acres. Hazard tree felling on approximately 400 acres.

Forest productsRoad managementVegetation management (other than forest products)Fuels management
Scoping Start
07/28/2010
Comment Period
05/03/2011
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Tim Bailey · tbailey01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Road Maintenance; Timber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Respect the River Completed
Decision Memo · Middle Fork - Inactive Ranger District · updated 7/21/2011
The activity area will be the first 39 dispersed campsites along the upper Middle Fork Willamette River from Bingham Bridge to Deadhorse Creek. · Lane, Oregon

Resource damage will be repaired at dispersed campsites along the Middle Fork Willamette River by providing a riparian buffer, planting native vegetation, subsoiling compacted soils, deterring enlargement of dispersed sites, and posting signs

Recreation managementWatershed management
Scoping Start
03/08/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Lisa Kurian · lkurian@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Noxious Weed Treatments; Watershed Improvements
Respect the River ProjectDecision Signed Date: 06/28/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Horse Creek Completed
Environmental Assessment · McKenzie River Ranger District · updated 7/7/2011
The Horse Creek 5th field watershed and part of the Lost Creek 6th field sub-watershed. Primarily accessed by Foley Ridge and Horse Creek Roads. · Lane, Oregon

The project proposes: 1) Commercially harvest approximately 2,000 acres (Heavy Thin, Moderate Thin, Gaps, Dominant Tree Release, and Skips); 2) Non-commercial fuels thinning treatments and sugar pine realease treatments; 3) Decommission/Close roads.

Fuels managementForest productsRoad management
Scoping Start
10/13/2010
Comment Period
05/23/2011
Decision
06/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Brenda Hallmark · bhallmark@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Road Maintenance; Timber Sales (Green)
Horse Creek ProjectDecision Signed Date: 06/30/2011 Legal Notice Date: 07/05/2011
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT 16S R 5E Sec: 1-5, 9-16, 24; T 16S R 6E Sec: 3-11, 13-25; T 16S R 7E Sec: 18, 19, and 30.
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/16/2011
Black Canyon, Broken Bowl, Bedrock, and Puma Campgrounds and adjacent to Fall Creek Road #18. · Lane, Oregon

Salvage of downed trees from the March 13, 2011 windstorm. Approximately 200,000 bd. ft of blown down timber would be salvaged in two separate salvage sales located along roads and in campgounds in Fall Creek and Middle Fork Willamette drainages.

Recreation managementFuels managementForest products
Scoping Start
04/21/2011
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
John Poet · jpoet@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Timber Sales (Salvage)
2011 Middle Fork RD SalvageDecision Signed Date: 04/27/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 4/25/2011
Upper Middle Fork Willamette River and Hills Creek Reservoir watersheds. · Lane, Oregon

Approximately 132 miles of road are proposed for closure treatments to alleviate resource risk in the Upper Middle Fork Willamette River and Hills Cr. Reservoir watersheds. Most roads would be stored for future use, and a few roads decommissioned.

Wildlife, fish, rare plantsWatershed managementRoad management
Scoping Start
06/04/2010
Comment Period
11/29/2010
Decision
03/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Eric Ornberg · eornberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Road Maintenance; Watershed Improvements
Upper Middlefork Watershed Restoration and Road Closure ProjectDecision Signed Date: 03/01/2011 Legal Notice Date: 03/07/2011
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Canyon Thin Completed
Environmental Assessment · Sweet Home Ranger District · updated 3/16/2011
Canyon Creek · Linn, Oregon

Commercial thinning in about 1300 acres of 40-60 year old managed stands and 1000 acres of 90-120 year-old natural stands.

Forest products
Scoping Start
05/18/2007
Comment Period
10/11/2010
Decision
01/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT14S, R3E, Sec. 1 and 12; T 13S, R4E, Sec. 31 and 32; T 14S, R4E, Sec. 5-8, 22-28, and 31-36; T 15S, R4E, Sec. 1-9
Decision Memo · Middle Fork - Inactive Ranger District · updated 3/15/2011
The project would take place along the Calapooya Divide on the Middle Fork District of the Willamette National Forest · Douglas; Lane, Oregon

Removal of trees and shrubs that are encroaching on meadows on the Calapooya Divide. Methods include; hand cutting trees (<12"dbh) and shrubs, scattering, piling, burning, or leaving slash, weed treatments (manual and/or chemical), and seeding.

Vegetation management (other than forest products)
Scoping Start
01/04/2010
Decision
09/2010 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
Molly Juillerat · mjuillerat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Special Area Management; Watershed Improvements
Calapooya (1) Divide Meadow RestorationDecision Signed Date: 04/28/2010
Calapooya (2) Divide Meadow RestorationDecision Signed Date: 09/08/2010
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R2E, Section 15, T23S, R2E, Sections 10,11,14,15,22,23, and T24S, R3E Section 33, and T25S, R3E Sections 3,4 ,9,15
Environmental Assessment · Willamette National Forest All Units · updated 1/10/2011
Middle Fork Ranger District; West Fir Oregon; Lane County · Lane, Oregon

Expand the existing boundary for Gold Lake Bog Research Natural Area (RNA), from about 415 to 656 acres. This expansion will incorporate the springs and wetlands that support the unique flora and fauna for scientific study.

Research
Scoping Start
04/08/2010
Comment Period
08/24/2010
Decision
12/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Joseph Doerr · jdoerr@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityBoundary Adjustments; Research And Development
Gold Lake Research Natural Area Boundary AdjustmentDecision Signed Date: 12/15/2010
The Gold Lake Bog Research Natural Boundary AdjustmentDecision Signed Date: 12/15/2010 Legal Notice Date: 12/20/2010
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22 S, R6E, Sections 20, 21, 28, 29, 30.
Trapper Project Completed
Environmental Assessment · McKenzie River Ranger District · updated 10/20/2010
Blue River watershed · Lane; Linn, Oregon

Timber sale in Adaptive Management Area to implement Blue River Landscape Study. The BRLS proposed to restore the pattern of the landscape over a period of many decades while meeting the objectives of the NWFP.

Forest products
Scoping Start
02/01/2002
Comment Period
03/31/2003
Decision
05/2003 (Estimated)
Implementation
09/2003 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14S, R5E, Sections 34-36, Willamette Meridan
Environmental Assessment · Detroit Ranger District · updated 9/20/2010
Marion Forks area · Linn, Oregon

This project proposes to commercially thin about 160 acres and conduct hazardous fuels activities on 630 acres.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
08/21/2009
Comment Period
07/26/2010
Decision
09/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
Lynise Medley · lmedley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Decision Memo · Willamette National Forest All Units · updated 9/17/2010
The project is located on Forest Road 2600750 adjacent to Carmen Diversion Reservoir · Lane, Oregon

Replace the current poor condition bridge, with a new bridge that meets current safety standards. The bridge will be lengthened to move abuttments farther from the river and restore riparian function.

Road managementWildlife, fish, rare plantsSpecial use management
Scoping Start
02/24/2010
Decision
07/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Dave Kretzing · dkretzing@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Maintenance
Carmen Reservoir Bridge Replacement ProjectDecision Signed Date: 07/06/2010
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionTownship 14 South, Range 7 East, Section 20
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/10/2010
Hills Creek Reservoir at Packard Cr, CT Beach, and Bigham recreation sites. · Lane, Oregon

Repair of existing launch runways at Packard Cr., CT Beach, and Bingham recreation sites. Extension of existing boat dock at Packard Cr. recreation site. Relocation of damaged boat docks to day use sites.

Facility management
Scoping Start
01/04/2010
Decision
07/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Wendy Zustiak · wzustiak@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
Hills Creek Boat Dock Extension ProjectDecision Signed Date: 07/19/2010
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT22S, R3E, Section 11 and 34; T21S, R4E, Section 31
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/10/2010
Traveling along the North Fork of the Middle Fork Willamette River directly downstream of Rd. 1912. · Lane, Oregon

Replace a section of unstable trail by decommissioning approximately ¼ mile of existing trail and constructing approximatley ½ mile of new trail.

Facility management
Scoping Start
01/29/2010
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
David Tangen · dtangen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
North Fork Trail RerouteDecision Signed Date: 07/28/2010
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S, R3E, Section 27.
Decision Memo · Middle Fork - Inactive Ranger District · updated 9/10/2010
Buckhead Wildlife Area and adjacent side channel of Middle Fork Willamette River. · Lane, Oregon

A small (1/8) acre pond will be excavated in a historic flood plain of the Middle Fork Willamette River within the Buckhead Wildlife Area.

Wildlife, fish, rare plants
Scoping Start
06/01/2010
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Doug Larson · dlarson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S, R2E, Sections 34 and 35.
Environmental Assessment · Willamette National Forest All Units · updated 8/20/2010
Lowell Vacant Tax Lot 6502, on Moss Ave. adjacent to the Lowell Warehouse at 92 6th Steet Lowell, OR 97452 · Lane, Oregon

The Forest proposes to sell the vacant lot portion (1.7 acres) of the Lowell Warehouse property separately from the Lowell Warehouse and Pole Barn lots.

Facility management
Scoping Start
12/17/2008
Comment Period
06/29/2010
Decision
08/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Chuck Gladney · cgladney@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Use Adjustments
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionT 19 S, R 1 W, portion of SE ¼ of NW ¼ Section 11, Willamette Meridian
Cougar Creek Thin Completed
Decision Memo · McKenzie River Ranger District · updated 3/9/2010
Located east of the Cougar Reservoir along roads 19-411 and the 19-482. · Lane, Oregon

To commercially thin approximately 70 acres in a 50-year old second growth stand. The project will be harvested with ground base equipment using existing skid roads as much as possible.

Forest productsFuels managementWildlife, fish, rare plants
Scoping Start
08/17/2009
Decision
03/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Timber Sales (Green)
Cougar Creek Thin ProjectDecision Signed Date: 03/08/2010
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S, R.5E, Sec. 32 and 33; W.M.
Decision Memo · McKenzie River Ranger District · updated 3/9/2010
North Fork Quartz Creek Area · Lane, Oregon

Utilize 3 existing landing sites for helicopter logging by Giustina Resources from private land and haul approximately 200 loads on NF126. Two landings on NF 126 will be landing and load sites. One landing on NF610 will be a service landing.

Special use management
Scoping Start
01/01/2010
Decision
01/2010 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
Denise Mercer · dmercer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R4E, Sec34; T16S, R4E, Sec2,3&10
Environmental Assessment · McKenzie River Ranger District · updated 3/9/2010
Santiam Pass, Upper McKenzie River Watershed. · Linn, Oregon

Proposal to designate OHV system of routes in the Santiam Pass Dispersed Recreation Area and to restore portions of the Santiam Wagon Road. Includes a non-significant amendment to the Forest Plan to restrict OHVs to designated roads and trails.

Road managementHeritage resource managementRecreation management
Scoping Start
02/03/2005
Comment Period
12/17/2007
Decision
10/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Sandra Ratliff · sratliff@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Heritage Resource Management; Plan Amendment; Trail Management; Special Area Management; Travel Management
Santiam Pass Summer Motorized Recreation ProjectDecision Signed Date: 10/21/2008 Legal Notice Date: 10/27/2008
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.13S, R.7 and 7 1/2E; W.M.
Cascade Thin Completed
Decision Memo · McKenzie River Ranger District · updated 3/8/2010
North of Forest Road 19 between Forest Roads 428 and 429. · Lane, Oregon

The purpose of this thinning project, in two previously managed stands, is to create high quality elk forage in the short term, while encouraging the development of elk optimal cover in the long term.

Forest productsWildlife, fish, rare plants
Scoping Start
08/17/2009
Decision
01/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionTownship 18 South, Range 6 East, Section 32
Blowout Thin Completed
Environmental Assessment · Detroit Ranger District · updated 1/18/2010
Detroit Ranger District · Linn, Oregon

Proposal to commercially thin approx. 900 ac.and regenerate approx. 75 ac in the Blowout Creek drainage in units previously identified as Pin, Nasty, and Skyhawk timber sales in the Blowout EA Decision, May 1995. A new EA and DN will be completed.

Forest products
Scoping Start
06/22/2004
Comment Period
12/04/2006
Decision
01/2007 (Estimated)
Implementation
04/2007 (Estimated)
Project documents
Rich Hatfield · hatfield@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Blowout Thin ProjectDecision Signed Date: 01/30/2007 Legal Notice Date: 02/05/2007
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT10S, R5&6E; T11S, R4, 5&6E; multiple sections
Bridge Thin Completed
Environmental Assessment · McKenzie River Ranger District · updated 1/18/2010
McKenzie River/ Elk Creek Subwatershed. Includes the north and south side of McKenzie River. · Lane, Oregon

This proposal includes thinning in approximately 2,500 acres of both managed and unmanaged timber stands, along with watershed restoration projects for the McKenzie River/Elk Creek subwatershed.

Forest productsWildlife, fish, rare plantsWatershed managementFuels management
Scoping Start
05/18/2007
Comment Period
03/11/2008
Decision
04/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Shane Kamrath · skamrath@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
Decision Notice Bridge ThinDecision Signed Date: 04/18/2008 Legal Notice Date: 04/23/2008
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S, R.3, 4, and 5E, W.M.
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 1/18/2010
About 16 miles south of the City of Oakridge, between FS Road 21 and 2129. · Lane, Oregon

The proposal is the restoration of a 500 acre area to pre-settlement open forest conditions, of ponderosa pine, Douglas-fir, and Oregon white oak savanna.

Special area managementWildlife, fish, rare plantsFuels managementHeritage resource managementVegetation management (other than forest products)
Scoping Start
04/02/2004
Decision
08/2006 (Estimated)
Implementation
06/2007 (Estimated)
Project documents
Tim Bailey · tbailey01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Plan Amendment; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Special Area Management; Scenery Management; Travel Management; Timber Sales (Green)
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT24S,R3E,S.1-3,11,12
Environmental Assessment · McKenzie River Ranger District · updated 1/18/2010
South Fork McKenzie River near Homestead Campground to the confluence of Elk Creek and lower Roaring River. · Lane, Oregon

Proposal to enhance habitat for bull trout and spring Chinook in the South Fork McKenzie and Roaring Rivers through addition of large woody material, and closure of vehicle access to some dispersed campsites near rivers to improve water quality.

Recreation managementWildlife, fish, rare plantsWatershed management
Scoping Start
08/28/2006
Comment Period
11/13/2006
Decision
01/2007 (Estimated)
Implementation
07/2007 (Estimated)
Project documents
David Bickford · dbickford@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements
South Fork McKenzie River Enhancement ProjectDecision Signed Date: 01/11/2007 Legal Notice Date: 01/19/2007
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.18S, R.5E, Sec. 25, 26, 36; T.18S, R.5 1/2E, Sec. 31,32,33; T.19S, R.5E, Sec. 1 and 2; W.M.
South Pyramid Completed
Environmental Assessment · Sweet Home Ranger District · updated 1/18/2010
South Pyramid Subdrainage · Linn, Oregon

Harvest of about 4.0 MMBF of timber from the South Pyramid Cr. subdrainage and is considering regeneration and thinning harvest methods. No new road construction an existing logger's spur road will be reopened.

Forest products
Scoping Start
09/20/2004
Comment Period
12/18/2006
Decision
12/2006 (Estimated)
Implementation
12/2006 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Green)
South Pyramid Decision Notice and FONSIDecision Signed Date: 12/14/2006 Legal Notice Date: 12/18/2006
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land Description12S,R6E,S28-33; T12S, R5E,S25
Environmental Assessment · McKenzie River Ranger District · updated 1/18/2010
Frissell, Paradise, and Bruchart Boat Launches along the McKenzie River · Lane, Oregon

The District proposes to reconstruct or relocate boat launches at Frissell, Paradise, and Bruchart Launch Sites

Recreation management
Scoping Start
01/29/2003
Comment Period
02/26/2007
Decision
06/2007 (Estimated)
Implementation
07/2008 (Estimated)
Project documents
Ray Rivera · rrivera@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S, R.6E, Sec. 1; T.16S, R.6E, Sec. 9; T.16S, R.5E, Sec. 19; W.M
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 1/11/2010
Middle Fork Willamette Ranger District · Lane, Oregon

The proposal is to complete stream enhancement projects in the Upper Middle Fork Willamette River (HUC# 1709000101) and Hills Creek Reservoir (HUC# 1709000105) Watersheds to benefit bull trout and Spring Chinook salmon.

Wildlife, fish, rare plants
Scoping Start
01/01/2006
Comment Period
06/25/2007
Decision
07/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
Eric Ornberg · eornberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Legal Land DescriptionT.23S., R 3 E., Sections 9, 16, 21, 28, and 34 T.24S., R 3 E., Sections 3, 4, 10, 11, 12, and 13 T.24S., R 4 E., Sections , 10, 11, 12, 15, 16, 17, 18 T.24S., R 5 E., Section 18
Old Foley Thin Completed
Decision Memo · McKenzie River Ranger District · updated 1/11/2010
On forest Service road 2634-410 approximately 6 miles east of McKenzie River Ranger Station · Lane, Oregon

The project would implement a variable density commercial thinning with skips and gaps in a managed plantation stand that is approximately 51 acres in size and 54 years old.

Forest products
Scoping Start
08/17/2009
Decision
01/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Old Foley ProjectDecision Signed Date: 01/05/2010
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.16S, R.6E; Sec 20; W.M
Travel Management Completed
Environmental Assessment · Willamette National Forest All Units · updated 12/16/2009
Forestwide · Lane; Linn; Marion, Oregon

To comply with Final Travel Mgmt Rule [FR, Vol 70, No. 216 (2005)] for motorized access. Designation of National Forest System roads & trails open to motor vehicle use (including OHV use) by vehicle class and, if appropriate, by time of year.

Recreation management
Scoping Start
03/16/2009
Decision
10/2009 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Ryan Brown · rnbrown@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityTravel Management
DN and FONSI Travel Management Rule ImplementationDecision Signed Date: 10/15/2009 Legal Notice Date: 10/19/2009
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Big Blue Completed
Environmental Assessment · McKenzie River Ranger District · updated 9/10/2009
The project area is represented by the Upper Blue River subwatershed, and is located approximately 4 miles northeast of the Blue River Community. · Lane, Oregon

The project would improve stand conditions by commercially thinning and group select harvesting 35-to 80-year-old timber stands in the Upper Blue River sub-watershed. Road maintainenance, restoration, and decommissioning would also occur.

Forest productsWatershed managementRoad management
Scoping Start
12/15/2008
Comment Period
06/15/2009
Decision
07/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Kevin Bruce · kbruce@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Green); Watershed Improvements
Big Blue ProjectDecision Signed Date: 07/23/2009 Legal Notice Date: 07/30/2009
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT14SR4E Sec. 25, 36; T14S5E Sec. 19, 23-36; T14SRE Sec. 19, 30-31; T15SR4E Sec. 2, 10-16, 21-28, 35-36; T15SR5E Sec. 1-22, 28-31; T15SR6E Sec. 6-7; T16SR4E Sec. 1; T16R5E Sec. 6
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 6/15/2009
Flat Creek, Dead Mountain, the N Fork of the Middle Fork of the Willamette River, and areas north of Oakridge and east of High Prairie. · Lane, Oregon

The project proposes commerical thinning of about 35mmbf on 2070 ac in 70-100 year old stands within the wildland urban interface. The project proposes non-harvest fuel treatments on about 990 ac.Approximately 2.7miles of temporary roads are proposed

Forest productsFuels managementVegetation management (other than forest products)
Scoping Start
05/10/2007
Objection Period Start
03/02/2009
Decision
05/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Eric Ornberg · eornberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Green)
Oakridge/Westfir Thinning and Fuel Reduction Project and F.P. Amendment #51Decision Signed Date: 05/26/2009
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S,R3E,S.1,2,4,5,8,11-15;T21S,R4E,S.6,7;T20S,R3E,S.27,33-36;T20S,R4E,S.31
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 3/25/2009
Brush, North Winberry, Monterica, and Lower South Fork Creek drainages of the Winberry Creek sub-watershed · Lane, Oregon

Commercial thin of 2400 acres of 35-60 year old managed plantations. Project includes road maintenance and road closures, fuel reduction treatments, and big game forage enhancement projects.

Watershed managementForest productsRoad managementWildlife, fish, rare plantsFuels management
Scoping Start
07/16/2007
Comment Period
10/06/2008
Decision
03/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
Chris Tootell · ctootell@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT19S, R2E, Sections 16-36
Environmental Assessment · Detroit Ranger District · updated 12/16/2008
The Bethel-Round Butte transmission line crosses lands on the Willamette, Mt. Hood, and Ochoco NFs beginning on the Warm Springs Reservation. · Clackamas; Marion, Oregon

Authorize a special use permit for Portland General Electric to continue to operate electrical tranmission lines across National Forest lands on the Willamette, Mt. Hood, and Ochoco National Forests.

Special use management
Scoping Start
06/03/2008
Comment Period
11/07/2008
Decision
12/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
Rich Hatfield · hatfield@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
PGE Special Use PermitDecision Signed Date: 12/15/2008
ForestsMt. Hood National Forest; Ochoco National Forest; Willamette National Forest
DistrictsClackamas River Ranger District; Prineville Ranger District; Detroit Ranger District
Legal Land DescriptionT9S, R5,6,7,8E, multiple sections
Ball Park Thin Completed
Environmental Assessment · McKenzie River Ranger District · updated 9/11/2008
Deer Creek, Upper McKenzie Watershed · Lane, Oregon

This project proposes commercial thinning and prescribed fire stand treatments on about 1156 acres of young plantations and in unmanaged stands. Proposed actions also include watershed restoration and fish and wildlife habitat enhancement.

Vegetation management (other than forest products)Road managementForest productsWildlife, fish, rare plants
Scoping Start
05/24/2007
Comment Period
07/29/2008
Decision
09/2008 (Estimated)
Implementation
11/2008 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Noxious Weed Treatments; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements
Ball Park Thin ProjectDecision Signed Date: 09/05/2008 Legal Notice Date: 09/11/2008
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S, R.6E, Sec. 2-6, 7-11, 14-18, 19-23, and 26-29; T.14S, R5E, Sec. 24; T.14S, R6E, Sec. 19-21, 28-30, and 31-34; W.M
Environmental Assessment · Detroit Ranger District · updated 9/11/2008
Units are within the Breitenbush Watershed, along Humbug, French Creek and the Breitenbush Roads · Marion, Oregon

This project will thin approximately 1500 acres of managed stands in the Breitenbush Watershed.

Forest products
Scoping Start
09/14/2007
Comment Period
07/07/2008
Decision
09/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
Rich Hatfield · hatfield@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Environmental Assessment · McKenzie River Ranger District · updated 8/22/2008
Research plots in the Bunchgrass meadow and on the H.J. Andrews Experimental Forest · Lane; Linn, Oregon

The McKenzie River Ranger District (MRRD) on the Willamette National Forest (WNF) proposes to treat competing vegetation occupying research plots on approximately 5416 m2 with glyphosate. This treatment may occur at a yearly frequency for the next 1

ResearchVegetation management (other than forest products)
Scoping Start
05/12/2008
Comment Period
06/09/2008
Decision
07/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Cheryl Friesen · cfriesen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityResearch And Development
Research Vegetation Control Environmental AssessmentDecision Signed Date: 07/24/2008 Legal Notice Date: 08/11/2008
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT15S, R7E, SECTION 10 and T15S R5E SEC 28
Decision Memo · McKenzie River Ranger District · updated 3/14/2008
Upper McKenzie River Watershed, east of Trail Bridge Reservoir along Forest Road 2600612. · Linn, Oregon

Salvage approximately 17 acres of wind throw timber downed during winter storms. The proposal would salvage about 200 mbf of saw logs and reduce fuel buildup. Trees with roots attached would be used as fish habitat.

Fuels managementWildlife, fish, rare plantsForest products
Scoping Start
09/10/2007
Comment Period
12/05/2007
Decision
01/2008 (Estimated)
Implementation
03/2008 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Watershed Improvements
Trail Bridge Blowdown Salvage ProjectDecision Signed Date: 01/10/2008 Legal Notice Date: 01/15/2008
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S, R.6E, Sec. 1; W.M.
Environmental Assessment · Detroit Ranger District · updated 12/14/2007
The project area is in the Upper North Santiam watershed located about 14 miles southeast of Detroit, Oregon · Linn, Oregon

Revised proposal includes overstory removal on 1,000 acres of shelterwood plantations, thinning 680 acres of 100-150 yr.old stands and 162 acres of 40 yr.old plantations. Includes road maint.and closures, fuel treatments, and precommercial thinning

Forest productsRoad managementVegetation management (other than forest products)
Scoping Start
07/26/2005
Comment Period
07/30/2007
Decision
10/2007 (Estimated)
Implementation
03/2008 (Estimated)
Project documents
Christy McDevitt · cmcdevitt@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
PresleyDecision Signed Date: 10/11/2007 Legal Notice Date: 10/22/2007
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionT12S, R7E ,Sections 2-4, 9-11, and 14-16
Hehe Thin Project Completed
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 12/6/2007
Hehe Creek, Fall Creek · Lane, Oregon

This project proposes up to 4000 acres of thinning in young 30-60 year plantations in the Hehe Creek area of the Fall Creek LSR. Associated activities include road decommissioning, fuel treatment, and other watershed restoration projects.

Road managementVegetation management (other than forest products)Watershed managementFuels management
Scoping Start
06/01/2003
Comment Period
07/02/2007
Decision
10/2007 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Gary Marsh · gmarsh@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green)
Hehe LSR Thin ProjectDecision Signed Date: 10/31/2007 Legal Notice Date: 11/05/2007
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT18,R2E,S.1,12,13,24,25;T18S,R3E,S.1-12,14-22,27-30
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 9/17/2007
Huckleberry Flats OHV Trails, near Westfir, Oregon · Lane, Oregon

This project proposes to add approximately 30 miles of designated OHV trail in and adjacent to the existing Huckleberry Flats OHV Trail and will include a non-significant Forest Plan Amendment for big game.

Recreation management
Scoping Start
11/22/2004
Comment Period
04/25/2007
Decision
08/2007 (Estimated)
Implementation
11/2007 (Estimated)
Project documents
Wendy Zustiak · wzustiak@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Trail Management
Huckleberry Flats OHV Trail Expansion & FP Amendment #48Decision Signed Date: 08/31/2007 Legal Notice Date: 09/17/2007
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT20S,R3E,S.1;T20S,R4E,S.4-9, 16-21
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 9/12/2007
5th and 6th field watersheds;Upper Middle Fork, Echo, Staley, Lower Middle Fork, Lookout Point, Deception Cr, Salmon Cr, Lower Salmon Cr, NF Willamette, Dartmounth Cr, Larison Creek · Douglas; Lane, Oregon

Storm-proofing on about 12miles (Lane County) and 8.7miles (Douglas County)of maintenace level 1 and 2 roads. May include; water barring, ditching over culverts, ditch cleaning, blading, will close road access seasonally or year-round on 27 miles.

Watershed managementSpecial use managementVegetation management (other than forest products)Wildlife, fish, rare plantsRoad managementSpecial area management
Scoping Start
11/20/2006
Comment Period
05/03/2007
Decision
07/2007 (Estimated)
Implementation
08/2007 (Estimated)
Project documents
Eric Ornberg · eornberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management; Watershed Improvements
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Environmental Assessment · Willamette National Forest All Units · updated 6/29/2007
Known weed infestations forest-wide and new occurances · Douglas; Lane; Linn; Marion, Oregon

Development of an integrated strategy to manage noxious weeds using preventive, manual, mechanical, and herbicide control measures.

Vegetation management (other than forest products)
Scoping Start
01/09/2006
Comment Period
03/22/2007
Decision
06/2007 (Estimated)
Implementation
08/2007 (Estimated)
Project documents
Jennifer Lippert · jlippert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
Integrated Weed Management ProgramDecision Signed Date: 06/25/2007 Legal Notice Date: 06/28/2007
ForestsWillamette National Forest
DistrictsWillamette National Forest All Units
Environmental Assessment · Sweet Home Ranger District · updated 6/15/2007
Middle Santiam Watershed · Linn, Oregon

Commercial thinning of about 2000 acres in 30-60 year-old plantations in the Middle Santiam drainage.

Forest products
Scoping Start
04/02/2006
Comment Period
04/02/2006
Decision
05/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
Anita Leach · agleach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT12S, R 5E, Sec. 25-28, 34, and 36; T12S, R6E, Sec. 29, 30, and 32;T13S, R 5 E Sec. 2,10,12, and 24, and T13S, R5E, Sec. 6, 8, 17, 18,20, and 21
Decision Memo · Middle Fork - Inactive Ranger District · updated 6/14/2007
Upper Middle Fork of the Willamette River · Douglas; Lane, Oregon

This project involves stormproofing roads in the Upper Middle Fork Watershed. There may be some culverts removed, water barring and ditching. Some roads will be closed by installing gates or berms.

Road management
Scoping Start
03/09/2006
Decision
05/2007 (Estimated)
Implementation
07/2007 (Estimated)
Project documents
Ernie Ledbetter · eledbetter@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Travel Management; Watershed Improvements
Upper Middle Fork Watershed Road Storm Proofing and Restoration ProjectDecision Signed Date: 05/21/2007
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT25S,R3E,R4E,R5E,R51/2E;T24S,R3E,R4E,R5E,R51/2E;T23S,R4E,R5E
Environmental Assessment · Detroit Ranger District · updated 6/13/2007
Three Pools Day Use Area is located within the Opal Creek Scenic Recreation Area between Forest Road 2207 and the Little North Santiam River. · Marion, Oregon

Reconstruct the road/parking area to accommodate about 100 vehicles, construct or reconstruct trails and install fencing to provide for safe access, and install an additional toilet and signing. Formally designate site as developed rec site.

Recreation management
Scoping Start
11/14/2006
Comment Period
03/22/2007
Decision
05/2007 (Estimated)
Implementation
09/2007 (Estimated)
Project documents
Dani Pavoni · dpavoni@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Plan Amendment; Road Improvements/Construction
ForestsWillamette National Forest
DistrictsDetroit Ranger District
Legal Land DescriptionTownship 8S, Range 4 E, Section 34
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 6/12/2007
Waldo Lake Area, Willamette NF · Lane, Oregon

This proposal is to rework the earlier plan. Issues to be addressed include dispersed uses of the lakeside zone, outfitter uses of the basin, and motorized boat use of the lake. The project history is on the Willamette NF website.

Recreation management
Scoping Start
04/22/2004
Comment Period
12/11/2006
Decision
04/2007 (Estimated)
Implementation
05/2008 (Estimated)
Project documents
Brian McGinley · bmcginley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Special Use Authorizations; Plan Amendment
Managing Recreation Use on Waldo Lake, Forest Plan Amendment No. 47Decision Signed Date: 04/23/2007 Legal Notice Date: 04/23/2007
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT21S,R6E, T22S,R6E
Niner Thin Completed
Environmental Assessment · Middle Fork - Inactive Ranger District · updated 3/14/2007
Huckleberry Flats near Forest Road 1928 · Lane, Oregon

This project proposes 3300 acres of commerical thinning in managed stands along the Forest Road 1928 area.There may be up to 6 miles of temporary road built. Buzzard Thin was combined into Niner Thin.

Forest products
Scoping Start
07/01/2003
Comment Period
10/23/2006
Decision
01/2007 (Estimated)
Implementation
03/2007 (Estimated)
Project documents
Chip Weber · cweber@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green)
Niner ThinDecision Signed Date: 01/19/2007 Legal Notice Date: 01/26/2007
ForestsWillamette National Forest
DistrictsMiddle Fork - Inactive Ranger District
Legal Land DescriptionT19S,R4E,S.31;T20S,R3E,S.1,12,13,24;T20S,R4E,S.6-9.16-19.
Decision Memo · McKenzie River Ranger District · updated 3/15/2006
Logs are located on Forest Roads 2600655 near Trail Bridge Reservoir, 2643 on Foley Ridge, and Road 19 at Delta Campground. · Lane; Linn, Oregon

Project would sell approximately 19,000 board feet of sawlogs which are decked on Forest roads.

Forest products
Scoping Start
10/10/2005
Decision
01/2006 (Estimated)
Implementation
03/2006 (Estimated)
Project documents
Shadie Nimer · snimer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsWillamette National Forest
DistrictsMcKenzie River Ranger District
Legal Land DescriptionT.15S, R.6E, Sec. 1; T.16S, R.4E, Sec. 24; T.16S, R.6E, Sec. 16; W.M.
Decision Memo · Willamette National Forest All Units · updated 12/19/2005
Sweet Home Ranger District · Linn, Oregon

Request to renew existing Special Use Authorization permit for powerlines on Sweet Home Ranger District

Special use management
Scoping Start
02/01/2005
Decision
08/2005 (Estimated)
Implementation
01/2006 (Estimated)
Project documents
Shari Monson · smonson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
PACIFICORP - Pacific Power for PowerlinesDecision Signed Date: 08/08/2005
ForestsWillamette National Forest
DistrictsSweet Home Ranger District
Legal Land DescriptionT. 13 S, R 3 E, Sec. 25 & 34; T 13 S, R 4 E, Sec. 26, 27, 30, 31, 32, & 33