Categorical Exclusion · Manistique Ranger District · updated 1/8/2026
FR2109 between H-13 and FR2224 · Delta, Michigan
Upgrade 1.5 miles of FR2109 from operation maintenance level (OML) 3 to OML 4, by widening the surface to 20-22 feet, upgrading the surface and culverts, and improving the ditches. https://usfs.app.box.com/folder/359621917628
Forest productsRoad management
Finding/Decision Date
1/8/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-46d-USFS |
| Decision Signed Date | 1/8/2026 |
Categorical Exclusion · Hiawatha National Forest · updated 12/3/2025
Along Forest Road 2217 (near Bear Lake), S 3595 Road (near Raco), Clear Lake and Colwell Lake Roads, Doe Lake Road, 33rd Rd/CR 442, Forest Road 2432, High Banks Rd (North and South), and Pete's Lake Campground Rd · Chippewa; Mackinac, Michigan
Hiawatha Telephone Company proposes to extend underground fiber and supporting infrastructure on National Forest System Lands on the Hiawatha unit for an additional 13.61 miles under a 10 foot right-of-way as amendment #8 under their existing authorization RAR223 for such facilities.
Special use management
NEPA Start Date
9/16/2025
Finding/Decision Date
10/24/2025
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 10/24/2025 |
Decision Memo · Sault Ste. Marie Ranger District · updated 8/11/2025
M-123 @ Wilwin Rd. (FR 3145) · Chippewa, Michigan
The Chippewa County SORVA, in cooperation with the Michigan DNR will sign, grade, and potentially harden the approximately 250 foot user-developed trail that runs from M-123 to FR 3421.
Recreation management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/30/2025
0.1 acres in Delta County - North side of Co Rd 440, 1.18 miles West of Forest Hwy 13 · Delta, Michigan
Installation of underground electric beginning at an existing underground pedestal on the North side of Co Rd 440. From the pedestal via vibratory plow to 2 residents along an existing road right of way.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/30/2025
Au Train, Bass, Bear, Boot, Chicago, Clear, Colwell, Corner, East, Fish, Grassy, Ironjaw, Jackpine, Leg, Lion, Lyman, McKeever, Minerva, Mowe, Lake Nineteen, Petes, Red Jack, Sand, Scout, Skeels, Stue · Alger; Delta; Schoolcraft, Michigan
This guide provides guided kayak fishing, canoe floats, kayak tours, fly fishing, fishing classes and ice fishing (Ice fishing will be assessed after the summer season through a new permit if the Forest Service wishes to continue to permit this guide
Recreation managementSpecial use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/30/2025
Valley Spur and Bruno's Run Trail systems · Alger, Michigan
This is an adventure bike race that covers 500 hundred miles in 5 days from Peninsula Point to Copper Harbor. Will use existing roads and mountain bike trails in Bruno's Run and Valley Spur. Up to 75 racers.
Recreation managementSpecial use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/30/2025
South of Co Rd 440 in the vicinity of the Big Springs North Trailhead · Schoolcraft, Michigan
Temporary use permit for outfitting/guiding services during the 2025 bear season. Will not include the use of bait stations.
Recreation managementSpecial use management
Decision
06/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/30/2025
Several stream crossings along the Haywire Grade Snowmobile/ATV Trail · Schoolcraft, Michigan
Replace one trail/road bridge over the North Branch of the Stutts Creek on the Haywire Grade Snowmobile/ATV Trail. Replace the bridge decking on 10 additional bridges along the trail.
Recreation managementRoad management
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 6/30/2025
St Ignace Ranger District · Mackinac, Michigan
Establish a new population of Lakeside Daisy on the St. Ignace Ranger District. Creation of 1m x 4m plots where planting will occur at 3-5 inches deep.
Wildlife, fish, rare plants
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 6/4/2025
create a create a circuit tie between Trout Lake and Eckerman substations. Installation will consist of approximately three miles of 3%u0278 #350MCM concentric line in a 6" HDPE conduit. · Chippewa, Michigan
This project proposes adding a new line to the existing master special use permit, that will connect two critical substations allowing broader backup coverage of powered service when emergencies or line outages arise across currently isolated circuit
Special use management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Facility Improvements/Construction; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 5/30/2025
Along Highway 123, Interstate 75 and smaller roads in the southern portion of the St. Ignace Ranger District · Chippewa; Mackinac, Michigan
Install, maintain, and operate approximately 31.16 miles/2.35 acres of fiber optic cable, electronics, hand holds and small pedestals to increase broadband connections across the district. 12.12 miles bored, 19.05 miles plowed.
Special use management
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 5/6/2025
Bay Furnace Campground · Alger, Michigan
This line has reached end of life conditions, has failed beyond repair, and needs replacement as quickly as possible to limit recreational impacts on concessionaire campground hosts, services, and recreators.
Special use management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 4/18/2025
Inholding 1: On and east of Co Rd 509 South of Bills Creek through FR 2430, for 0.41 acres. Inholding 2: between Sand Lake and M-94, running west opposite of FR2316 off of FR2891 for 0.06 acres · Delta; Schoolcraft, Michigan
This is a proposed amendment by the Upper Peninsula Power Company to add infrastructure to their issued special use authorization RAR189 to service two private inholdings contained within National Forest.
Special use management
Decision
04/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 3/31/2025
Proclamation Boundary, Hiawatha National Forest · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
The proposed action is to authorize the repair or replacement of any human-made structure that impedes the natural passage of native and desirable non-native aquatic organisms at any life stage.
Wildlife, fish, rare plants
Decision
03/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 3/28/2025
Along the Bay de Noc - Grand Island Trail, between the middle and north trailheads. · Alger, Michigan
Construct 17 trail reroutes, each approximately 0.25 mile, between the middle and north trailheads. These reroutes would be designed to reduce erosion and increase users safety along the trail system.
Recreation management
Decision
03/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
Decision Memo · St. Ignace Ranger District · updated 3/14/2025
Carp River Campground - T42N, R3W, Sec18 - Between sites 10 and 19 · Mackinac, Michigan
Decommission the existing toilet building 96514, including demolition, removal, and restoration of the site.
Recreation managementFacility management
Decision
03/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 1/6/2025
Orkney and Red Delicious Burn Areas · Chippewa, Michigan
Update Red Delicious and Orkney Burn Areas. Change post-harvest treatment of 165 acres from mechanical site prep to prescribed burn, and 61 acres from prescribed burn to mechanical prep. Add 36 acres to burn areas for continuity.
Forest productsVegetation management (other than forest products)
Decision
01/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T.46N, R.4W sections 6, 7, 8, 17, 18; T.46N, R.5W sections 12 and 13 |
Decision Memo · Munising Ranger District · updated 12/19/2024
Along the Bruno's Run trail at the south end of Moccasin Lake · Alger, Michigan
Construct one trail re-route that will be approximately .25 mile in length, near the south end of Moccasin Lake along the Bruno%u2019s Run Hiking/Bicycling Traill. This trail is incurring erosion due to suboptimal trail location.
Recreation management
Decision
08/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T 44 N R 19 W Sec 1 |
Environmental Assessment · Rapid River Ranger District · updated 12/19/2024
Stonington Peninsula, Delta County, MI · Delta, Michigan
The Forest Service is proposing to treat vegetation on approximately 16,000 acres to benefit forest health, to treat hazardous fuels, and to enhance wildlife habitat.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementRoad management
Scoping Start
01/2024 (Estimated)
Comment Period
03/2024 (Estimated)
Objection Period Start
08/2024 (Estimated)
Decision
01/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 10/1/2024
Island Lake Campground, East Lake Site 1, Chicago Lake Site 3, Jack Pine Lake Site 2, Iron Jaw Site 1, Lyman Lake Site 9, Gooseneck Site 3, and Swan Lake Site 1 · Alger; Delta; Schoolcraft, Michigan
Replace 9 insufficient and aged outhouses with concrete vaulted outhouses.
Recreation managementFacility management
Decision
09/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 10/1/2024
McKeever Hills Cross Country Ski Trail System · Schoolcraft, Michigan
Construct a new beginner/intermediate loop at McKeever hills using approximately 580 feet of existing forest road and 220 feet of new trail construction.
Recreation management
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 10/1/2024
South of M-94, east of Valley Spur Trail system. · Alger, Michigan
Move the NCT away from M94 by constructing .26 mile of new trail, and reroute a segment of trail (0.2 mile) away from low lying wet area. Both actions will make a more sustainable trail system.
Recreation management
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 9/4/2024
Project activities would occur within the area known as the "thumb" of the island. · Alger, Michigan
Removal of three cabins and associated structures on Grand Island National Recreation Area, in addition to making road access improvements.
Special area management
Decision
06/2024 (Estimated)
Implementation
08/2024 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Road Improvements/Construction; Special Area Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 8/14/2024
Along FH 42, State Highway 28, FR3154, and FR3352 · Chippewa, Michigan
To bring broadband service to underserved communities. Construction, operation and maintenance of approximately 3.3 miles of buried fiber optic cable with the shoulders of existing roads. Replace existing copper with new fiber optic.
Special use management
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 7/26/2024
Nunns Creek Bridge on Snowmobile Trail 47 · Mackinac, Michigan
Construction of an access road for to the Nunns Creek Bridge replacement, reroute Trail 47 to use the new access road once the Nunn's Creek Bridge replacement is complete.
Recreation management
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 6/28/2024
Campgrounds located on the West Zone of the Hiawatha National Forest · Alger; Delta; Schoolcraft, Michigan
The proposed action is to authorize the Forest Service or approved concessionaires to implement maintenance activities in developed campgrounds to minimize environmental disturbance, enhance user experience and ensure public safety.
Recreation management
Decision
09/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Munising Ranger District |
Decision Memo · St. Ignace Ranger District · updated 6/11/2024
Multiple locations on the East Zone of the Hiawatha NF · Chippewa; Mackinac, Michigan
The objective of this proposal is to release red pine saplings from competing vegetation to promote a healthy and sustainable forest for optimal growth and timber production. Pruning red pine pole timber increases the quality for future timber produc
Vegetation management (other than forest products)
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 6/6/2024
Bruno's Run Moccasin Lake Trailhead, AuTrain Lake Campground, Ackerman Lake Trailhead · Alger, Michigan
Decommission three water systems at developed rec site. The wells have been inactive for several years with no plan to bring the wells back into operation. They need to be decommissioned to protect watersheds.
Watershed managementFacility management
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 4/22/2024
Hiawatha Slopes/Chatham Ski Hill · Alger, Michigan
Placement of approximately 1,125 ft of underground 7.2kV electric distribution cable due to existing cable reaching end of life and experiencing multiple faults creating outages to the Hiawatha Slopes/Chatham Ski Hill Recreation Area.
Special use managementRecreation management
Decision
04/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Rock River Township, T46N, R21W, sec 25 |
Decision Memo · St. Ignace Ranger District · updated 2/20/2024
Sault Ste. Marie and St. Ignace Ranger Districts in Chippewa and Mackinac counties of Michigan. · Chippewa; Mackinac, Michigan
Replace all vault toilet buildings that are stick built with concrete style vault toilet buildings on the Sault Ste. Marie and St. Ignace Districts.
Recreation managementFacility management
Decision
02/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt. |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 2/15/2024
FR2251/N Branch Stutts Creek · Schoolcraft, Michigan
Replace bridge on FR2251 over the North Branch of the Stutts Creek to reduce erosion and improve safety.
Road management
Decision
02/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction; Travel Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 1/18/2024
Proclamation Boundary, Hiawatha National Forest · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
Plan amendment to guide use of institutional controls on ecologically impaired lands.
Land management planning
Comment Period
12/21/2021
Decision
02/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Raco Institutional Control and Impaired Lands Project Decision Notice | Decision Signed Date: 02/09/2022 Legal Notice Date: 02/09/2022 |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 1/18/2024
NFS lands within Alger, Delta, and Schoolcraft counties. · Alger; Delta; Schoolcraft, Michigan
The West Zone of the Hiawatha National Forest proposes timber stand improvement (TSI) activities to meet the desired conditions of a diverse, productive, healthy and sustainable forest resilient to natural and human caused disturbances.
Vegetation management (other than forest products)
Decision
01/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 12/19/2023
Forest Road 2231 and adjacent (Sturgeon River to Rapid River / Delta County / Rapid River Ranger District); County Highway 40, Forest Highway 85, and adjacent (Chippewa and Mackinac Counties / Sault S · Mackinac, Michigan
Provide High Speed Internet
Special use management
Decision
11/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Merit-Highline Fiber Optic Proposal | Decision Signed Date: 11/21/2023 |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 9/26/2023
Stonington Peninsula · Delta, Michigan
Establishment of a 5 acre seed orchard.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
01/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 7/7/2023
Along the recreation segment of the Indian Wild and Scenic River. Users will launch and take out from designated launch sites. Dispersed campsites will be used only in case of emergency. · Alger, Michigan
special use permit authorization for offering kayak rentals and transportation for clients to facilitate trips along the Indian River within the Hiawatha National Forest.
Special use management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 7/7/2023
The north shoulder of Highway M-28, within the highway right-of-way, within the East Zone Hiawatha National Forest Boundary. · Chippewa, Michigan
Bury approximately 14 miles of fiber optic cable within the north shoulder of Highway M-28, within the highway right-of-way. The fiber optic cable would extend the entire length of M-28 on the East Zone of the Hiawatha National Forest.
Special use management
Decision
11/2022 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 5/9/2023
The project is located on the southwest side of Raco, MI on an unnamed trail off FR 3359 in the SE 1/4 SE 1/4 Section 19, T. 46 N., R. 3 W. · Chippewa, Michigan
Kenneth Busha is requesting vehicular access to his property via a trail off FR 3359 near Raco, MI. The driveway would be 177' long by 20' wide on existing sandy trail. It only needs to be graded to make it drivable.
Special use management
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 4/5/2023
Mr. Cranson's driveway request is along the Wilwin Road, and Mr. Drogowski's driveway request is along FR3511. · Chippewa, Michigan
Mr. Cranson is proposing to build about 100 long driveway. Mr. Drogowski is proposing to build about half mile long driveway. Both driveways would cross National Forest and could include use of gravel and heavy equipment.
Special use managementRoad management
Decision
02/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Travel Management |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 3/23/2023
The proposed road permit location is situated along the Private/Federal land boundary in T. 43 N. R 3 W, S. 12 SW and T. 43 N. R. 3 W., S.13 SE SE SW. · Mackinac, Michigan
New road construction for access to private property.
Special use management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · St. Ignace Ranger District · updated 1/19/2023
The project area is west of Hessel, east of Brevort, and north of Lakes Michigan and Huron, and includes Government Island. · Chippewa; Mackinac, Michigan
Manage natural resources to restore ecological conditions, and meet Forest Plan vegetation composition goals.
Wildlife, fish, rare plantsFuels managementRecreation managementWatershed managementVegetation management (other than forest products)Road managementForest products
Comment Period
10/20/2021
Objection Period Start
02/15/2022
Decision
12/2022 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Special Area Management; Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 12/13/2022
Intersestion of Forest Highway 13 and Forest Road 2259 · Alger, Michigan
Install sign along roadway to advertise store
Special use management
Decision
12/2022 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · St. Ignace Ranger District · updated 12/5/2022
North of FR3116 (Spring Road), east of East Lake Road. Approximately 2 miles southeast of East Lake. · Mackinac, Michigan
As part of a research project, irregular shelterwood harvest approximately 268 acres and thin approximately 111 acres of northern white cedar. Fence two 10-acre areas to exclude deer in the irregular shelterwood areas.
Research
Comment Period
12/15/2021
Objection Period Start
04/09/2022
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Road Maintenance; Research And Development |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 11/14/2022
Within the Rapid River Cross Country Ski Trail System · Alger, Michigan
Improve access to the trail system by designating two existing ski trails for summer and winter use and building a new ski loop of approximately 2 miles. Improve trail sustainability by installing culverts, and reconstructing the trail in one locale
Recreation management
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 8/12/2022
West Zone of the Hiawatha NF · Alger; Delta; Schoolcraft, Michigan
Request to guide bear hunters on the West Zone of the Hiawatha.
Special use management
Decision
07/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 4/19/2022
Three signs located at the intersection of M-94 and FR 2267, FR 2267 and FR 2254, and FFH-13 and FR 2249. · Alger, Michigan
Reissuance of three directional signs for the Buckhorn Resort.
Special use management
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 12/30/2021
This NCT segment is near FR2276 and Valley Spur Trail System. · Alger, Michigan
To enhance the recreation experience, the Forest proposes to move a segment of trail out of a seasonally wet area, and provide a small creek crossing with a wooden puncheon. The new bench cut trail will be approximately 0.5 mile.
Recreation management
Decision
12/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 12/15/2021
The sections of trail in the hills are located between Dam Road (FS3303) and the dam on Brevoort Lake. · Mackinac, Michigan
Reroute sections of the North Country Trail in the Brevoort Lake Dam area where slopes are steep and causing erosion.
Recreation management
Decision
12/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 12/15/2021
This project area includes a section of the North Country Trail starting at Naomikong Overlook traveling north and west toward Naomikong Creek suspension bridge. · Chippewa, Michigan
Fill would be added to low or uneven spots along the trail, replacement of current puncheon, and construction of new puncheon.
Recreation management
Decision
12/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 12/15/2021
One crossing is at 45.964353 -84.908464 near the Brevoort River and the other is at 45.941319 -84.86263 south of Round Lake. · Mackinac, Michigan
Reroute two sections of the NCT so it crosses the ATC corridor perpendicularly. Part of the trail goes through a wet area necessitating the construction of a structure through the wet area.
Recreation management
Decision
12/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 10/5/2021
Moran Work Center · Mackinac, Michigan
Decommissioning of the Moran Work Center
Facility management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 9/30/2021
Bruno's Run Trail Recreation Area · Alger, Michigan
Construct 16 sustainable re-routes on Bruno%u2019s Run where trail damage/erosion has occurred due to improper trail location/construction.
Recreation management
Decision
07/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T44N, R19W sections 1, 12, 13; T44N R18W sections 6, 7, 8, 18 |
Decision Memo · St. Ignace Ranger District · updated 9/29/2021
The bridge is approximately 4 miles northwest of Moran, Michigan. FR 3458 runs north off of the Burma Road. The bridge is approximately 1 mile north of the Burma Road on FR 3458. · Mackinac, Michigan
Replace existing bridge, abutments and associated piers over the Carp River with a single span bridge with steel pile foundations.
Road management
Decision
09/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 09/13/2021 |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 9/7/2021
Dukes Experimental Forest · Mackinac, Michigan
Decommissioning of the Dukes Warehouse
Facility management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 7/9/2021
Proclamation Boundary of the East Zone of the Hiawatha National Forest · Chippewa; Mackinac, Michigan
The Hiawatha National Forest is proposing to update the land use suitability mapping layers used in the 2006 Forest Plan to reflect current on the ground conditions and correct map boundary errors and update the plan for the East Zone of the Forest.
Land management planning
Comment Period
06/02/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Boundary Adjustments; Plan Amendment |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 6/2/2021
Hiawatha National Forest · Alger; Chippewa; Delta; Mackinac; Marquette; Schoolcraft, Michigan
The Forest Service proposes to reissue a new special-use permit with an associated operating plan to the American Transmission Company to update their existing permit and operating plan issued in 2001
Special use management
Comment Period
10/27/2020
Objection Period Start
12/18/2020
Decision
02/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 6/2/2021
Big Indian River Bridge 44N 18W Section 29 Fishdam River Bridge 41N 18W Section 9 · Delta, Michigan
Replacement of two bridges that have reached the end of their service life
Facility managementRoad management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance; Travel Management |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 6/2/2021
Forest Wide · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
The purpose of the proposed project is to protect and restore native ecosystems on the forest through an Integrated Weed Management approach.
Vegetation management (other than forest products)
Comment Period
05/30/2019
Objection Period Start
07/23/2019
Decision
09/2019 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Noxious Weed Treatments |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 4/14/2021
Discretionary archaeological excavations at Bar and Thunder lakes with sediment coring at Bar, Thunder, Hovey, Crow, and Jack Pine lakes. · Alger, Michigan
Archaeological investigations of two sites at Bar and Thunder Lakes, with discretionary sediment coring at Bar, Crow, Thunder, Hovey, and Jack Pine lakes. A UAS device will be utilized as a mapping device.
Heritage resource management
Decision
01/1970 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management; Special Use Authorizations |
| Decision Decided Date | 07/02/2026 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 3/23/2021
T43N R4W section 30, and T43N R5W section 35 · Mackinac, Michigan
Replace foot bridges along the North Country Trail crossing Taylor Creek and North Branch Carp River. Less than 1 mile of trail relocation to meet up with the new bridges.
Recreation management
Decision
03/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 3/9/2021
T42N R2W section 16 · Mackinac, Michigan
Replace snowmobile trail bridge across Nunn's Creek
Recreation management
Decision
03/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 11/19/2020
North Country Trail where it crosses M-123 north of Moran, Michigan. · Mackinac, Michigan
Reroute NCT where it crosses M-123. This includes installing a culvert on the west side of M-123, constructing new trail tread and moving all signs, and decommissioning and rehabilitating the abandoned trail section.
Recreation management
Decision
11/2020 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Sault Ste. Marie Ranger District · updated 11/17/2020
T46N R3W Sec 6; T46N R4W Sec 1-6, 12; T46N R5W Sec 1-20; T46N R6W Sec 1-3,12, 13, 24; T47N R3W Sec 8-33, 36; T47N R4W Sec 18-36; T47N R5W Sec 7-9, 13-36; T47N R6W 3-36 · Chippewa, Michigan
Manage natural resources to restore ecological conditions, and meet Forest Plan vegetation composition goals.
Fuels managementSpecial use managementRoad managementVegetation management (other than forest products)Forest productsWatershed managementRecreation managementWildlife, fish, rare plants
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Special Use Authorizations; Trail Management; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 11/17/2020
Approximately 12 miles west of St. Ignace, near the intersection of US-2 and Brevoort Lake Road (H57). · Mackinac, Michigan
Clarification of non-motorized, winter-only uses on Sand Dunes Trail to include cross-country skiing, skate skiing, snow shoeing and fat tire biking.
Recreation management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (2), 36 Cfr 220.6(D)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Rapid River Ranger District · updated 9/14/2020
T 44 N, R 17 W · Alger; Delta; Schoolcraft, Michigan
Project involves vegetation management, wildlife habitat improvement, and fuels management.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsWatershed managementForest products
Comment Period
04/01/2016
Objection Period Start
06/06/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| DN/FONSI Bass Boot Project | Decision Signed Date: 09/29/2016 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | T 44 N, R 17 W |
Decision Memo · St. Ignace Ranger District · updated 8/19/2020
East of East Lake on the St. Ignace District · Mackinac, Michigan
Perform routine wildlife opening maintenance and improve the suitability of alder habitat for ruffed grouse and deer.
Wildlife, fish, rare plants
Scoping Start
07/2020 (Estimated)
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T43N R3W Sections 18, 19, 28-30 and T43N R4W Sections 12-14, 26 and 27 |
Decision Memo · Munising Ranger District · updated 6/22/2020
Alger, Delta, and Schoolcraft counties. · Alger; Delta; Schoolcraft, Michigan
This project will restore and enhance hydrologic structure and improve aquatic habitat by introducing large woody material in streams and using tree drops and log cribs in lakes.
Watershed managementWildlife, fish, rare plants
Decision
05/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/1/2020
The race would start at Valley Spur and end in the City of Munising. · Alger, Michigan
The Munising Bay Trail Network (MBTN) is requesting a one year special use permit for the 2020 Mt. Goat Mash (formerly known as Tour Da Woods) mountain bike race.
Special use management
Decision
03/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46N/R20W, Sec. 12 AND T46N/R19W, Sec. 7, 18, 19, 20, 21, 28, 29, 30 |
Environmental Assessment · St. Ignace Ranger District · updated 4/22/2020
Throughout the Eastside of the Hiawatha National Forest. · Chippewa; Mackinac, Michigan
Commercial thin 3,704 ac. of red pine. Under plant white pine on 1,205 ac. Underburn 410 ac. of red pine stands. Construct about 1.4 mi. of new roads. Reinforce 15 existing road closures.
Fuels managementForest productsWildlife, fish, rare plantsRecreation management
Comment Period
02/27/2015
Objection Period Start
06/29/2015
Decision
11/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Special Area Management; Travel Management; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Sault Ste. Marie Ranger District · updated 1/31/2020
T44N R5W secs 5, 6, 18-20, 30-31; T44N R6W secs 1-25, 29, 30; T45N R5W secs 3-10, 15-22, 27-32; T45N R6W secs 1-36; T46N R5W secs 15-17, 19-22, 27-34; T46N R6W secs 3-5, 7-11, 13-36. · Chippewa, Michigan
Manage natural resources to restore ecological conditions, and meet Forest Plan vegetation composition goals.
Recreation managementWildlife, fish, rare plantsForest productsFuels managementRoad management
Comment Period
03/21/2019
Objection Period Start
07/22/2019
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Trail Management; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Special Area Management; Travel Management; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 1/31/2020
Multiple locations in Delta County. · Delta, Michigan
Implement watershed and aquatic improvements near the communities of Ensign, Rapid River, and St. Jacques.
Recreation management
Decision
12/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 12/10/2019
East of East Lake Road on the St. Ignace Ranger District · Mackinac, Michigan
Set back woody encroachment in 16 existing wildlife openings and treat 10 acres of aspen utilizing mechanical treatment or hand treatment. seed native flowers and plant 30 oak trees in wildlife openings.
Wildlife, fish, rare plants
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 12/10/2019
multiple locations. See attached maps. · Mackinac, Michigan
Outfitting and guiding proposals for priority use permits; three 5-year permits for outfitter and guiding and one 2-year probationary permit.
Special use management
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 12/10/2019
There are four grading locations along an established transmission line. · Delta, Michigan
ATC proposes to remove earth beneath existing transmission line in Delta County to improve ground-to-wire clearance.
Special use management
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Section 13 of T41N, R21N and Sections 22 and 23 of T41N, R20W |
Decision Memo · Hiawatha National Forest All Units · updated 12/10/2019
Access will be from M-28 to Middletown Rd (FS Rd 3081) to the right-of-way. Access will be down the ROW and along Dishpan Rd (FS Rd 3364). · Chippewa, Michigan
The purpose of this project is for ATC to replace a manual switch along their line with a remotely operated switch. A remotely operated switch provides safer more efficient access to activate and deactivate their telecommunication lines.
Special use management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T46N R4W Sections 16, 15, 21, 22, 28, 27 |
Decision Memo · Sault Ste. Marie Ranger District · updated 12/10/2019
Within the M-28 corridor from the Eckerman Corners area to the Raco area · Chippewa, Michigan
Install fiber optic cable underground within the M-28 corridor from Eckerman Corners area to Raco area.
Special use management
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 12/10/2019
St. Ignace, Sault Ste. Marie, and Manistique Ranger Districts. · Chippewa; Delta; Mackinac, Michigan
Special Use Permit Amendment for the construction of three new underground lines and the adoption of a new Operation and Maintenance Plan.
Special use management
Comment Period
07/15/2017
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District; Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 12/10/2019
The reconstruction of East Lake Road spans from Charles Moran Road in Brevort Township of Mackinac County to H40 in Trout Lake Township of Chippewa County, Michigan. · Chippewa; Mackinac, Michigan
The primary purpose of this project is to provide safe, more reliable access along East Lake Road while maintaining the remarkable natural features this area has to offer. The project will include culvert improvements and road reconstruction.
Facility management
Comment Period
04/29/2016
Objection Period Start
06/18/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T42N, R4W, sections 29, 32, 20, 17, 16, 9, 10, and 3, T43N, R4W, sections 34, 27, 22, 15, 10, and 3,and T44N, R4W, sections 34, 27, and 28 |
Decision Memo · Rapid River Ranger District · updated 12/10/2019
The project area is approximately 10.75 miles long within the FH-13 road corridor from CR-442 to the Delta/Alger County line. · Delta, Michigan
Clearing trees (merchantable and non-merchantable) FH-13 right-of-way. The clearing would be within the 66' right-of-way along approximately 10.75 miles of FH-13 from CF-442 to the Delta/Alger County line.
Road management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction; Timber Sales (Green) |
| FH-13 Road Work and Right-of-way | Decision Signed Date: 04/20/2017 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 12/10/2019
T42N R18W Sections 5, 7, 8, 18, & 19, T47N R5W Sections 13, 14, & 15, T47N R4W Sections 18, 19, 20, 23, 24, 27, 28, & 29, T46N R4W Sections 23, 26, & 34, T45N R4W Sections 4 & 9 · Chippewa; Delta, Michigan
The Hiawatha Telephone Company is requesting the installation of additional Fiber Optic lines, hand holes, and a remote site.
Special use management
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 12/10/2019
Highbanks Recreation Residences lot #2, 4, and 7. · Chippewa, Michigan
Proposals include amending the permit to include: propane tank on lot #2; yard light on lot #4; mailbox and deck on lot #7.
Special use management
Decision
01/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 12/10/2019
North Country Trail segment near Little Bear Creek. · Chippewa, Michigan
Relocate trail to a dryer location away from wetlands and remove old boardwalk.
Recreation management
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T 44 R 4 sections 25,26,27, 34,35,36 |
Decision Memo · St. Ignace Ranger District · updated 12/10/2019
Approximately 10 miles northeast of St. Ignace along US 2. · Mackinac, Michigan
Removal of buildings and other improvements on a recently acquired property in the Pte. Aux Chenes Research Natural Area.
Wildlife, fish, rare plants
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 12/10/2019
T46N,R18W, Sec 18-33; T46N,R19W, Sec 20, 21, 24, 25-36; T45N,R20W, Sec 1, 15, 19-21, 28-34; T45N, R19W, 31-33; T45N, R18W, 6, 7, 18, 19; T44N, R20W, Sec 4-9, 16-18. · Alger, Michigan
A procedural error relative to the Forest Plan Amendment was discovered during the project review of the environmental assessment (EA) for the Mirrorwood Project.
Land management planningRecreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Watershed managementRoad management
Comment Period
02/15/2013
Objection Period Start
11/25/2013
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Plan Amendment; Road Improvements/Construction |
| Mirrorwood Amendment | Decision Signed Date: 03/24/2014 |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 12/10/2019
Between Monocle Lake and Bay Mills Indian Community, west of Brimley, Michigan · Chippewa, Michigan
Develop a non-motorized trail from Monocle Lake Interpretive Trail and the Monocle Lake day use area to the Spectacle Lake area on Bay Mills Indian Community land
Recreation management
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 12/10/2019
The North Country Trail just east of the end of FR-I35b, which is a spur from FR-3114, from the East Lake Road. · Mackinac, Michigan
Permanently reroute a section of the North Country Trail to avoid resource damage.
Recreation management
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Sections 11, 12 and 15, T43N, R4W |
Decision Memo · Sault Ste. Marie Ranger District · updated 12/10/2019
Project is scattered across the Sault Ste. Marie District. Includes stands from Raco Plains EA (C29S26,C5S21,C74S10), Sand Clay EA (C91S71,C103S76,C104S42), Lake Superior Highlands EA (C72S43,C72S51) · Chippewa, Michigan
Remove overstory trees from 9 shelterwood units.
Vegetation management (other than forest products)
Decision
12/2014 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Overstory Removal Sault Ste. Marie District | Decision Signed Date: 12/17/2014 |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Munising Ranger District · updated 12/10/2019
The analysis area is located on the west unit of the Hiawatha National Forest. Munising is the closest town, but Marquette, Wetmore and Manistique are also located in the general vicinity. · Alger; Delta; Schoolcraft, Michigan
The proposed action includes vegetation management, recreation facilities rehabilitation, wildlife habitat improvement, hazardous fuels reduction, riparian structure management, non-native invasive plant control, and road system work.
Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Comment Period
09/07/2016
Objection Period Start
02/16/2017
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Sault Ste. Marie Ranger District · updated 12/10/2019
Raco Sand Plains area in north central part of the Eastern Administrative Unit of the Hiawatha National Forest. · Chippewa, Michigan
Manage natural resources to restore ecological conditions of a fire-dependent sand-plain. Adaptive management will be used to harvest and regenerate trees, manage fuels and improve habitat for fire-adapted species like Kirtland's warbler.
Wildlife, fish, rare plantsForest productsFuels management
Comment Period
01/07/2017
Objection Period Start
06/27/2017
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Special Area Management; Travel Management; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · St. Ignace Ranger District · updated 12/10/2019
In the SE portion of Eastside unit, south of Trout Brook Pond, east of East Lake, north of road FH84, and west of Hill Lake. · Chippewa; Mackinac, Michigan
Vegetation management, wildlife habitat improvement, transportation management, and non-native invasive plant management
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Road management
Comment Period
07/08/2013
Objection Period Start
12/11/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Improvements/Construction; Timber Sales (Green) |
| Rudyard Project Final Decision Notice and Finding of No Significant Impact | Decision Signed Date: 05/14/2014 |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | T42N R2W, Sec 4-6; T42N R3W, Sec 1-2; T43N R2W, Sec 2-8, 17-20, 29, 30-32; T43N R3W, Sec 1-16,22-24,25-27,34-36; T43N R4W, Sec 1, 2 11,12; T44N R3W, Sec 18,19,27-34; T44N R4W, Sec 23,24, 25-28, 33-36 |
Decision Memo · Sault Ste. Marie Ranger District · updated 12/10/2019
Compartment 52, Stands 12,73,74, 75 and 77. · Chippewa, Michigan
Salvage and reforestation of approximately 111 acres of spruce plantation due to budworm infestation.
Forest products
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N, R3W, Sections 20 and 29 |
Environmental Assessment · Hiawatha National Forest All Units · updated 12/10/2019
The project area encompasses the West Side of the Hiawatha National forest, which includes the Munising, Rapid River/Manistique Ranger Districts. · Alger; Delta; Marquette; Schoolcraft, Michigan
The proposed project includes thinning, and regeneration of red pine stands; and maintaining aspen where it currently exists, and increasing the aspen component across the landscape. Temporary openings could exceed 40 acres in size.
Wildlife, fish, rare plantsForest products
Comment Period
05/28/2018
Objection Period Start
09/11/2018
Decision
11/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · St. Ignace Ranger District · updated 12/10/2019
These stands are scattered throughout the St. Ignace and Sault Ste. Marie districts. · Chippewa; Mackinac, Michigan
Salvage dead and dying white spruce plantations that are being impacted by spruce budworm.
Forest productsVegetation management (other than forest products)
Comment Period
03/17/2017
Objection Period Start
05/23/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 9/23/2019
Delta County, see map. · Delta, Michigan
Construct 20 trail re-routes where the trail is incurring erosion due to suboptimal trail location. Additionally, trail crossings will be improved at Haymeadow Creek.
Recreation management
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 9/23/2019
Southern tip of the Stonington Peninsula · Delta, Michigan
Common Coast Research & Conservation (CCRC) proposes a partnership with Hiawatha National Forest modeled after the Escanaba Migratory Bird Enhancement Initiative (EMBEI) to increase the amount of stopover habitat available to migratory birds.
Recreation managementVegetation management (other than forest products)Heritage resource managementWildlife, fish, rare plants
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 8/5/2019
North of M-28 in Superior Township, Chippewa County, Michigan · Chippewa, Michigan
This project is for the reissuance of a permit and extension of the permit boundary for the Superior Township Cemetery. An unauthorized well added in 1986 and storage behind the chapel a both outside the permit boundary.
Special use management
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Superior Township Cemetery Reissue # 543 | Decision Signed Date: 08/02/2019 |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 7/10/2019
499 E. Lakeshore Dr. and Complex at 513 and 515 Washington Ave, Manistique, MI 49854 · Schoolcraft, Michigan
The Manistique office and warehouse/residence complex will be conveyed/sold out of the National Forest System
Facility management
Comment Period
08/09/2018
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | Section 18 T41N R15W--Complex Section 13 T41N R16W--Office |
Environmental Assessment · Hiawatha National Forest All Units · updated 6/12/2019
The analysis area is extends north from the town of Nahma along the Sturgeon River and east to the Indian River near Little Murphy Creek. · Delta; Schoolcraft, Michigan
The project involves forest, fire/fuels, and transportation management; watershed restoration, wildlife habitat enhancement, and invasive plant treatments.
Fuels managementRoad managementVegetation management (other than forest products)Wildlife, fish, rare plantsWatershed managementForest products
Comment Period
11/23/2017
Objection Period Start
02/01/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | MI, 42N17W,S2-24,28-31; 43N17W,S21-22,27-28,32-34; 40N19W,S1-12,15-22, 27-29; 40N20W,S1-2,11-14,23-24; 41N18W,S1-36; 41N19W,S1-5,7-36; 41N20W,S13,24-25,36; 42N18W,S7,9-36; 42N19W,S11-15,21-29,32-36 |
Decision Memo · Rapid River Ranger District · updated 6/10/2019
Bay de Noc- Grand Island Trail, Delta County, MI · Delta, Michigan
Replace Big Gully and Little Gully bridges with culverts.
Recreation management
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N, R21W, Sec 36. |
Decision Memo · Rapid River Ranger District · updated 5/20/2019
Project is located approximately 8 to 12 north of Rapid River, MI and east of US Hwy 41. · Delta, Michigan
Clearcut approximately 216 acres of plantation planted spruce due to infestation of spruce budworm which is killing the spruce trees. Some of the proposed harvested spruce areas will exceed 40 acres in size.
Vegetation management (other than forest products)Forest products
Comment Period
04/19/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Dutch Mill Spruce Budworm | Decision Signed Date: 09/19/2013 Legal Notice Date: 09/24/2013 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T 42N, R 21W, sec 16, 17, 20 & 21;T43N, R21W, Sec 25, 26, 35, & 36 |
Decision Memo · Munising Ranger District · updated 3/28/2019
Large opening complexes on the West Unit. · Alger; Delta; Schoolcraft, Michigan
Opening maintenance, wildlife habitat enhancement, and fuels management on about 5,000 acres on large opening complexes located on the West Unit of the Hiawatha National Forest.
Wildlife, fish, rare plantsFuels management
Scoping Start
04/2018 (Estimated)
Decision
12/2018 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 3/27/2019
This is a programmatic change across the forest. · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
This analysis would amend the 2006 Hiawatha National Forest Plan to reformat tables 2300-5, 2300-6 and 2300-7 to align with the Federal Trail Data Standards.
Land management planning
Comment Period
11/15/2018
Decision
03/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hiawatha National Forest All Units · updated 3/25/2019
Throughout the Hiawatha National Forest. · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
The Hiawatha National Forest proposes the evaluation of treatment of pine stumps following cutting to prevent the spread of Heterobasidion root disease in areas within 6 miles of a known infection to reduce spread of disease within pine stands.
Vegetation management (other than forest products)
Comment Period
12/08/2017
Objection Period Start
12/21/2018
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Munising Ranger District · updated 9/27/2018
Au Train River Access · Alger, Michigan
Collaborative project with Au Train Township to address access, parking and erosion issues along Au Train River. Proposed actions would include development of parking and access sites, vegetation management, and rehabilitation of river bank erosion.
Recreation management
Comment Period
02/08/2018
Objection Period Start
05/09/2018
Decision
08/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46 R20 Sections 5 and 6; T47 R20, Sections 31, 32 and 33; T46 R21 Section 1; T47 R21 Section 36 |
Decision Memo · Rapid River Ranger District · updated 9/27/2018
The project is adjacent to Haymeadow Creek. · Delta, Michigan
The proponent is requesting access to a parcel through the development of a new road. Currently, the proponent is not the owner of the parcel but interested in purchasing. The sale of the parcel is contingent on the possibility of ingress and egress.
Land ownership management
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N R20W Section 18 |
Decision Memo · Munising Ranger District · updated 9/27/2018
The project are is located off of FS Road 2163 near the McKeever Cabin site, East of McKeever Lake. · Alger, Michigan
Improve timber stand and habitat health in the McKeever Cabin and trails area for general forest health and to improve visitor experiences. Improve native vegetation through the reduction of small stems and ground litter using prescribed fire.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 9/26/2018
Southwest of Strongs, Michigan · Chippewa, Michigan
Long-term (5-6 year) reroute of Strongs snowmobile trail.
Recreation management
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 8/15/2018
Near the town of Raco. · Chippewa, Michigan
Reroute and add new section to the Raco-Rudyard snowmobile trail. Reroute and close sections of the Raco-Brimley and Raco-Bay Mills snowmobile trails off of private property and move to National Forest System lands.
Recreation management
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 8/9/2018
Project is located just north of M-28 and 2 miles west of Shingleton, MI · Alger, Michigan
Harvest windthrown red pine due to a wind event in September 2012 in the Hickey Creek area on the Munising Ranger District.
Vegetation management (other than forest products)Forest products
Comment Period
11/08/2012
Decision
01/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T 46N, R 18W, sec 23, 24, 25, & 26 |
Decision Memo · Sault Ste. Marie Ranger District · updated 7/2/2018
North of H-40 approximately 17 miles west of Rudyard, MI · Chippewa, Michigan
The dam structure would be removed and the waterway allowed to run its natural course.
Wildlife, fish, rare plantsWatershed managementRecreation management
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 6/15/2018
The complete project is within Alger Delta%u2019s existing powerline corridor. The line will be between Gooseneck Lake and Bear Lake. · Delta, Michigan
Alger Delta is proposing the conversion of 2.3 miles of overhead powerlines into underground.
Special use management
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 6/15/2018
The proposed instillation is within a mile of Muddy Lake and Lost Lake. · Alger, Michigan
The purpose of this project is for Alger Delta Electric to install a new underground line replacing a portion of overhead line for more efficient and reliable power to nearby private residents.
Special use management
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 6/1/2018
Rapid River/Manistique Ranger District office. 8181 Hwy 2, Rapid River, MI 49878 · Delta, Michigan
Construct a 2,736. ft. (72'x48') building in the center of the Forest Service office in Rapid River. It will house a tree seedling cooler and a 760 sq. ft. heated equipment room with a garage door. The building will blend with the historic buildings
Facility managementVegetation management (other than forest products)
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 5/16/2018
Along Snowmobile trails. · Alger, Michigan
The purpose of this project is to approve 5 directional signs for the Duck Pond Eatery along snowmobile trails.
Special use management
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · St. Ignace Ranger District · updated 5/15/2018
Located along the north shores of lakes Huron and Michigan. The city of St. Ignace is located south of project area. · Mackinac, Michigan
Vegetation management to provide forest products and wildlife habitat needs; and for insect and disease control/prevention. Provide a safe and efficient transportation system by decommissioning unneeded roads/constructing new roads where needed.
Vegetation management (other than forest products)Forest productsRoad managementFuels managementWildlife, fish, rare plants
Comment Period
05/20/2011
Decision
12/2011 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
Decision Memo · St. Ignace Ranger District · updated 4/5/2018
Throughout Chippewa and Mackinac Counties on the Hiawatha National Forest · Chippewa; Mackinac, Michigan
Outfitting and guiding permit for hunting trips in multiple locations on the east side of the Hiawatha National Forest.
Special use management
Decision
04/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 3/7/2018
Recreation Residence lots #3 and 6 along Highbanks Lake, northof Soldier Lake Campground and M-28. · Chippewa, Michigan
Highbanks Lake recreation residence lots #3 and 6 would like to amend their permit in order to add some improvements to their lots.
Special use management
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 12/18/2017
Adjacent to the Enbridge pipeline. · Delta, Michigan
The purpose of this project is to continue the groundwater monitoring adjacent to the Enbridge Pipeline. There is a historic crude oil release near the valve that requires quarterly monitoring by the Michigan Department of Environmental Quality.
Special use management
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 9/25/2017
Grand Island, Michigan · Alger, Michigan
Removal by owner of a private structure and improvements from NFS lands on Grand Island and restoration of disturbed areas upon termination of recreation residence special use permit.
Special use management
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T 47 N, R 19 W, Section 22 |
Decision Memo · Hiawatha National Forest All Units · updated 9/6/2017
Madigan: T42N R21W Section 13, Lortz: T44N R20W Sections 19 & 30, Smaniotto: T41N R21W Section 15 · Alger; Delta, Michigan
This project includes three right-of-way authorization renewals including the Over the hill Club access road, Lortz access road and Smaniotto access road for a period of 20 years.
Special use management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 8/2/2017
41N 18W Section 17, 41N 19W Section 13, 42N 18W Section 25, 42N 19W (Sections 2,3, 17, 19, 32), 43N 19W Section 35, 44N 17W (Sections 4, 20, 26), 44N 18W Sections 5, 44N 19W (Sections 3, 5, 16, 33), 45N 19W (Sections 17, 25) · Alger; Delta; Schoolcraft, Michigan
The North Country Hunting Adventures Inc. (NCHA) is requesting a 5 year permit for black bear baiting and hunting within Hiawatha National Forest. The NCHA has had outfitting and guiding permits for 5 consecutive years.
Recreation managementSpecial use management
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 7/18/2017
Access road runs off of Country Road 235. · Mackinac, Michigan
This project is for a road authorization renewal for Thomas Beaudry to access his private property for a period of 20 years.
Special use management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 7/18/2017
From US Highway 2 (T 40 N, R 19 W, Section 6) at Nahma Junction travelling south along FH-13 to Nahma (T 40 N, R 19 W, Section 20). · Delta, Michigan
Construct approximately 3 miles of multi-use trail (both motorized and non-motorized use) between Nahma Junction and the community of Nahma to improve year-round recreational opportunities.
Recreation management
Decision
05/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Nahma and Northern Grade Multi-Use Trail Construction | Decision Signed Date: 05/25/2017 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 40 N, R 19 W, Sections 6, 7, 17, 20 |
Decision Memo · Rapid River Ranger District · updated 7/18/2017
Canull: South of Pole Lake · Delta, Michigan
The HIF proposes a road authorization for access to Jeff Canull property that has recently been purchased. Previous owner had road authorizations to access the property.
Special use management
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Canull Road Authorization: SW, NW Section 5 of T43N, R20W |
Decision Memo · Hiawatha National Forest All Units · updated 7/18/2017
The Sundstrom access road is on the stonington peninsula. · Delta, Michigan
The purpose of this project is for Mark Sundstrom to obtain authorized access to his private property through National Forest System lands.
Special use management
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 7/18/2017
The powerline is adjacent to the Au Train Lake. · Alger, Michigan
The Upper Peninsula Power Company is requesting an amendment to their permit to convert 0.37 miles of overhead power to underground, replace 15 poles and add 4 pad mounted transformers to the line.
Special use management
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Sault Ste. Marie Ranger District · updated 3/28/2017
Lot 6 of Old Mission recreation residences on Lake Superior, in Bay Mills Township · Chippewa, Michigan
Issue recreation residence permit to new owners.
Special use management
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | section 13, T47N, R3W |
Decision Memo · Rapid River Ranger District · updated 3/22/2017
Pasi: Property is 1/8th of a mile away from County Road 503; Bunce: Property access road is off of Rock River Road. · Delta, Michigan
The HIF is proposing road authorization renewals for access to the Allan Pasi property and the Scott Bunce property.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Pasi Road Authorization: T39N, R20W Section 5; Bunce Road Authorization: T46N, R21W Section 15 |
Decision Memo · St. Ignace Ranger District · updated 3/22/2017
Roy - private road off Forest Road 3474 near Halfaday Creek. Tyner - private road off Forest Road 3811. Laux - private road off Forest Highway 42 (Lakeshore Drive). · Chippewa; Mackinac, Michigan
Renewal of 3 existing special use permits. Authorization will allow land owners continued access to their private land across National Forest land.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 1/23/2017
within the existing pipeline corridor southeast of Cheeseman Road. · Mackinac, Michigan
Enbridge is proposing an integrity dig to inspect their pipeline within the East Zone of the Hiawatha National Forest.
Special use management
Decision
01/2017 (Estimated)
Implementation
02/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T40N R4W Sections 3 and 4 |
Decision Memo · St. Ignace Ranger District · updated 12/30/2016
Nunns Creek Snowmobile Trail section south of St. Ignace Road and east of CR221. · Mackinac, Michigan
Temporarily reroute snowmobile trail section away from the Malibu timber sale to allow winter harvest access along the current trail.
Recreation management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 9/29/2016
The powerline is located off of County Road 509 on the 26.6 road. · Delta, Michigan
The Upper Peninsula Power Company (UPPCO) has requested to replace overhead powerlines with underground powerlines on National Forest System lands along the 26.6 road as part of a larger project.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 7/25/2016
Pine Marten Run Trail System within the Ironjaw Semi-primitive Non-motorized Area · Schoolcraft, Michigan
Great Lakes Distance Riding Association requests five-year recreation special use permit for annual Pine Marten Run Distance Ride (equestrian) occurring the last weekend in September.
Special area managementSpecial use management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Special Area Management |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | T44N R18W Sections 20-36 and T43N R18W Sections 1 and 2 |
Decision Memo · Munising Ranger District · updated 7/5/2016
Project area is located on the east side of US 41, approximately ½ mile north of the intersection between US41 and M94. · Marquette, Michigan
The Skandia/West Branch Township Water Authority requests a renewal of a 30-year special use permit (SUP), the inclusion of the water tank location into the SUP, and permission to dig a new well.
Special use management
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Overall project area is in the SW, NW to NW, SW of Section 29, T46N, R23W. The proposed new well location is in the NW, NW, SW of Section 29, T46N, R23W. |
Decision Memo · Munising Ranger District · updated 6/30/2016
Au Train 69kV Transmission Line · Alger, Michigan
Proposed project consists of maintenance and replacement of select structures
Special use management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 6/30/2016
Valley Spur trailhead is 8 miles southwest of Munising, MI. · Alger, Michigan
The project consists of expansion of the parking lot at Valley Spur Trailhead, construction of a garage to house ski trail grooming equipment, installing a yurt, replacing toilet building.
Recreation management
Decision
04/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Trail Management; Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46N R19W Section 20 |
Decision Memo · Hiawatha National Forest All Units · updated 6/27/2016
The three wells are located in Alger, Chippewa and Mackinac Counties, Michigan. · Alger; Chippewa; Mackinac, Michigan
Continued use by USGS of three existing ground water monitoring wells. Monitoring will include installation of small steel structures to well casings for housing instruments.
Special use management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District; Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | T64N R4W Section 24 SE 1/4; T42N R2W Section 7 NE 1/4; T45N R19W Section 25 NW 1/4 |
Decision Memo · Hiawatha National Forest All Units · updated 6/1/2016
Crooked Lake, Sturgeon River, and Steuben Lake · Schoolcraft, Michigan
Recreation residence improvements to include: Crooked Lake Lot 18 porch addition, Crooked Lake Lot 2 dock addition, Sturgeon River Lot 5 power pole installation, and Steuben Lake Lot 7 dock & shed replacement, fence & dock installation.
Special use managementRecreation management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 3/7/2016
T47N, R6W; T47N, R5W; T45N, R5W; T44N, R5W; T44N, R4W · Chippewa, Michigan
Restore and enhance hydrologic structure and improve habitat.
Watershed managementWildlife, fish, rare plants
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2016
Rapid River Cross Country Ski Trailhead · Delta, Michigan
This project would increase the size of the existing ski trailhead parking lot and would involve installation of a storage building for trail grooming equipment.
Recreation management
Decision
11/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Township 42 North, Range 21 West, Section 19 |
Decision Memo · Munising Ranger District · updated 1/12/2016
The Alger Delta Cooperative Association project is located along a 1.5 mile corridor on Mirror Lake Road in Sections 21 and 22 of T45N, R19W (south of Buckhorn Rd.) · Alger, Michigan
The Alger Delta Mirror Lake Project is associated with the Alger Delta Electric Cooperative Association. They are proposing to install 1.5 miles of new electrical line along Mirror Lake Road in Sections 21 and 22 of T45N, R19W.
Special use management
Decision
01/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Sections 21 and 22, T45N, R19W |
Decision Memo · St. Ignace Ranger District · updated 12/31/2015
Project is of a programmatic nature, and activities may be implemented in multiple areas of the St. Ignace Ranger District, Mackinac County Michigan · Mackinac, Michigan
Propose to introduce lakeside daisy (federally threatened) plants by direct seeding, propagation and outplanting, or a combination of these methods, at several new locations on the St. Ignace Ranger District.
Wildlife, fish, rare plants
Decision
02/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 10/2/2015
Township 47 North, Range 20 West, Section 31 · Alger, Michigan
The Au Train Township Board is requesting a renewal of their special use permit to use the baseball diamond on the Hiawatha National Forest. The activity has been permitted since 1977.
Special use management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Township 47 North, Range 20 West, Section 31 |
Decision Memo · Munising Ranger District · updated 9/30/2015
Forest Roads 2918 and 2915 in the Dukes Experimental Forest and the abandoned rail road grade north and south of M-94 near Dukes. · Marquette, Michigan
This project will construct and designate a new state groomed snowmobile trail that connects Trail 8 and Trail 417.
Recreation management
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46N R23W Section 14, 23, 27, and 35; T45N R23W Section 2 |
Decision Memo · Munising Ranger District · updated 8/6/2015
Valley Spur Trail, Bruno's Run Trail, Grand Island · Alger; Schoolcraft, Michigan
Youth group to hike and bike on Hiawatha National Forest trails every other year under special use permit.
Special use management
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Blythefield Hills Baptist Church Youth Group Trip | Decision Signed Date: 07/01/2015 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 8/6/2015
Township 44 North, Range 19 West, Section 25 · Alger, Michigan
Delta County EMS requests to install a repeater on the Hiawatha National Forest Tie Hill tower to assist with emergency response.
Special use management
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Delta County EMS Radio Repeater Install On FS Tower | Decision Signed Date: 07/08/2015 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Township 44 North, Range 19 West, Section 25 |
Decision Memo · Hiawatha National Forest All Units · updated 7/18/2015
Moccasin Lake Lot 2 · Alger, Michigan
Permit holder would replace the failing septic system at their recreation residence.
Special use management
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Township 44 North, Range 19 West, Section 1 |
Environmental Assessment · Hiawatha National Forest All Units · updated 7/12/2015
The site is an abandoned National Guard airbase in Raco, Michigan along Highway 28, approximately 18 miles west of Sault Ste. Marie. The site has been used for vehicle testing under permit since 1972. · Chippewa, Michigan
Proposed activities include reissuance of a 20-year SUP for use of the abandoned National Guard air base in Raco, Michigan (Raco Airbase). The existing permit was put in place on October 4, 1996, and expires on October 4, 2016.
Special use management
Comment Period
03/18/2015
Objection Period Start
05/11/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Final DN/FONSI Smithers RAPRA Special Use Permit Reissuance | Decision Signed Date: 07/09/2015 |
| Final DN/FONSI Smithers RAPRA SUP Reissuance-Project-specific FP Amendment | Decision Signed Date: 07/09/2015 |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | Township (T) 46N, Range (R) 4W, Section 26. |
Decision Memo · Hiawatha National Forest All Units · updated 7/5/2015
Northeast of Rapid River, Michigan, on the east side of County Road 509 · Delta, Michigan
Within existing corridor, Enbridge Energy LP proposes to exacavate section of pipeline to install emergency flow restriction device, install valve control building and communication pole with gravel and fence around, and construct gravel access road.
Special use management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Oil |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 41 N, R 21 W, SE 1/4 of SE 1/4 of Section 15 |
Environmental Assessment · Munising Ranger District · updated 6/30/2015
Near the Doucette Bridge over the AuTrain River on the AuTrain/Forest Lake Road. · Alger, Michigan
Construction of a 20 vehicle parking lot near the AuTrain River take out point on AuTrain/Forest Lake Road. ** Project marked as 'Cancelled.' Additional data necessary prior to proposal development. **
Recreation managementRoad management
Scoping Start
12/2013 (Estimated)
Comment Period
12/2013 (Estimated)
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Dispersed Recreation Mgmt.; Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T47N R20W Section 32 |
Decision Memo · Hiawatha National Forest All Units · updated 6/30/2015
Crooked Lake Lot 2 · Schoolcraft, Michigan
Permit holder would rebuild the existing dock at their recreation residence and also build a new section of dock. ** Project marked as 'Cancelled,' but analysis will proceed under Project name: "2015 Recreation Residence Improvements"
Special use managementRecreation management
Scoping Start
05/2015 (Estimated)
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | Township 44 North, Range 17 West |
Decision Memo · Hiawatha National Forest All Units · updated 6/30/2015
The project area is approximately 8 miles east of Rapid River, Michigan, at US Highway 2 and the Ogontz River. · Delta, Michigan
Michigan Department of Transportation (MDOT) to install a temporary road and bridge for US Highway 2 traffic, while replacing the existing bridge on Highway 2 crossing the Ogontz River. ** NEPA analysis completed by MDOT. Action will proceed. **
Special use management
Scoping Start
04/2015 (Estimated)
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 41 N, R 20 W, Section 34 |
Decision Memo · Hiawatha National Forest All Units · updated 6/30/2015
Sturgeon River Lot 5 · Schoolcraft, Michigan
Permittee would install a power pole at recreation residence so electric lines could be removed from trees. ** Project marked as 'Cancelled,' but analysis for proposed action will proceed under Project: "2015 Recreation Residence Improvements" **
Special use managementRecreation management
Scoping Start
05/2015 (Estimated)
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | Township 41 North, Range 19 West, Section 3 |
Decision Memo · Hiawatha National Forest All Units · updated 6/10/2015
Permits are located on both the Eastside and Westside of the Hiawatha National Forest · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
There are 9 Special Use Permits expiring in 2010. The permits are for 4 directional signs, 4 roads, and 1 communication antenna.
Special use management
Decision
03/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
Decision Memo · Munising Ranger District · updated 6/10/2015
T 46 N, R 20 W, Section 17. Au Train Lake Lot 8 Recreation Residence. · Alger, Michigan
The proposed action is to replace the existing water well at Au Train Lake Lot 8 recreation residence.
Special use management
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T 46 N, R 20 W, Section 17 |
Environmental Assessment · Hiawatha National Forest All Units · updated 4/6/2015
Grand Island National Recreation Area · Alger, Michigan
Proposal to exchange federal lands for privately owned lands on Grand Island National Recreation Area. The Section 106 process did not result in agreement and has been terminated. The NEPA analysis has been cancelled.
Land ownership management
Comment Period
01/2015 (Estimated)
Decision
05/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Land Use Adjustments; Land Exchanges; Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Federal land T48N, R19W, Section 16, part of government lot 1. Non-federal land T47N, R19W, Section 24, part of government lot 2 |
Decision Memo · Rapid River Ranger District · updated 2/27/2015
NE 1/4 T41N R19W S20 · Delta, Michigan
The pipeline site will be excavated, inspected, and repaired as needed. The excavation will be approximately 60-80 feet long, 30-40 feet wide, and up to 10 feet deep. Repair may consist of welding a metal sleeve around and recoating the pipeline
Special use management
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | NE 1/4 T41N R19W, S20 |
Decision Memo · Hiawatha National Forest All Units · updated 2/23/2015
Along Enbridge Line 5, Mile Post 1373.13 in Nahma Township, Michigan. · Delta, Michigan
Install 4 or 5 eight inch diameter wells to monitor groundwater conditions at the site of a historic crude oil release.
Special use management
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Oil |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 41 N, R 19 W, SE1/4 of SE1/4 of Section 14 |
Decision Memo · Hiawatha National Forest All Units · updated 12/10/2014
The project area is approximately 6 miles south of Rapid River, Michigan, on the Stonington Peninsula. From County Road 513 west along the south side of Twin Springs Road (20.5 Lane). · Delta, Michigan
Alger Delta Coop proposes installing 3,798 feet of electric cable underground from County Road 513 west along the south side of Twin Springs Road (20.5 Lane).
Special use management
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 40 N, R 22 W, Section 26 |
Decision Memo · Hiawatha National Forest All Units · updated 12/10/2014
In the right-of-way on the west of County 509 Y Road, from 26.6 Road north to the Enbridge pipeline, then east along the south edge of the pipeline easement for approximately 200 feet. · Delta, Michigan
Install over 10000 feet of underground electric cable to power the Enbridge 1359 Site. Install 4 junction enclosures and one transformer.
Special use management
Decision
12/2014 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 41 N, R 21 W, Sections 15, 22, and 27. |
Decision Memo · St. Ignace Ranger District · updated 11/21/2014
Approximately two miles south of Raco, MI. Located on Waiska River Road (FS-3352), at the intersection with Bons Creek and an unamed creek just south of Bons. · Chippewa, Michigan
Remove two spile dams and replace with new crossings to restore aquatic organism passage and the ecological function of the area.
Watershed managementWildlife, fish, rare plantsRoad management
Decision
11/2014 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Watershed Improvements |
| Waiska River Road (FS-3352) Spile Dams Removal | Decision Signed Date: 11/17/2014 |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N R3W Sections 32 and 33 |
Decision Memo · Hiawatha National Forest All Units · updated 11/18/2014
The project area is approximately 15 miles northwest of Manistique, Michigan. From the Stevens Lake area along County Road N-3 south, east along NFSR 8136 (some closed), south on 2218F (some closed), and north on 2218 to 2218G. · Delta, Michigan
Hiawatha Telephone Company proposes installing 2.37 miles of fiber optic cable from near Stevens Lake to Gooseneck Lake, entirely buried within the road (open and closed) right-of-way or attached to existing power poles.
Special use management
Decision
11/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 43 N, R 18 W, Sections 32, 33 and T 42 N, R 18 W, Sections 3, 4, 5 |
Decision Memo · Hiawatha National Forest All Units · updated 9/2/2014
The residence is located on the east side of Crooked Lake about 18 miles northwest of Manistique. · Schoolcraft, Michigan
The owners of the recreation residence at Crooked Lake Lot 7 (7141 N Crooked Lake Drive) propose to build additions onto three sides of the cabin, sheathing the exterior in log siding and covering with a neutral asphalt roof.
Special use managementRecreation management
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | Township 44 North Range 17 West Section 15 |
Decision Memo · Munising Ranger District · updated 6/26/2014
Clear Lake Education Center · Schoolcraft, Michigan
Clear Lake Education Center is proposing a triathlon (kayak, bike, run). This project has been marked as cancelled. The project will be in a Categorical Exclusion that does not require a Decision Memo. The activity will only be authorized for 1 year.
Special use management
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T 45 N, R 17 W, Section 34 |
Decision Memo · Munising Ranger District · updated 6/18/2014
Event utilizes existing roads and trails from near Ackerman Lake: T46N, R20W, Sec 34 (northern most portion of event) to near Upper Eighteenmile Lake: T43N, R20W, Sec 17 (southern most portion). · Alger; Delta, Michigan
Great Lakes Distance Riding Association is proposing a horse and rider endurance race on the Grand Island Bay de Noc Trail.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Munising Ranger District |
| Legal Land Description | T 46 N, R 20 W, Section 34 |
Decision Memo · Rapid River Ranger District · updated 3/31/2014
The stands are between Nahma Marsh and Marsh Lake in Compartment 44 stands 6 and 11 and C-48 stand 108. T40N, R19W, Sections 17 and 18. · Delta, Michigan
Project designed to improve habitat for woodcock. Strip cut tag alder will be hand cut cut with alternating uncut strips.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T 40N, R 19W, Sections 17 and 18 |
Decision Memo · St. Ignace Ranger District · updated 3/28/2014
Dispersed recreation sites found across the St. Ignace and Sault Ste. Marie Ranger Districts. See maps. · Chippewa; Mackinac, Michigan
This project has been marked as "Cancelled" because it falls into a Categorical Exclusion that does not require a decision memo. Analysis of the project will proceed.
Watershed managementRecreation management
Scoping Start
02/2014 (Estimated)
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 3/27/2014
Herman Lake FR445, Beaton Lake FR2246, Pete's and Grassy Lakes FR2173, in Schoolcraft County; McComb Lake FR2265 in Alger County · Alger; Schoolcraft, Michigan
Fell 25 trees along the shoreline of Herman Lake and Beaton Lake in 2013. Trees would be dropped along the shores of Grassy Lake, Pete’s Lake, and McComb Lake in 2014 and 2015. Project would provide wood cover and forage areas for all.
Recreation managementWildlife, fish, rare plants
Comment Period
05/20/2013
Decision
01/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | T44N R18W, T44N R17W, T44N R19W |
Decision Memo · Hiawatha National Forest All Units · updated 3/27/2014
T 45 N, R 19 W, Section 28 · Alger, Michigan
Permit Amendment to authorize installing a buried cable at a depth of 48 inches within a permitted road to provide power to existing structures on private land. The action would begin at an existing permitted power pole and extend about 600 feet.
Special use management
Decision
02/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Township 45 N, Range 19 W, Section 28 |
Decision Memo · Hiawatha National Forest All Units · updated 1/27/2014
Tie Hill and Onota Hill communication towers in Alger County · Alger, Michigan
A special use permit is proposed for the installation of and continued access to repeaters on two Hiawatha National Forest radio towers in Alger County by Alger Countys Sheriffs Office to improve emergency services.
Special use management
Comment Period
11/21/2013
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Installation of Alger County Sheriff Repeaters on Tie Hill and Onota Hill | Decision Signed Date: 01/14/2014 Legal Notice Date: 01/24/2014 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 12/20/2013
Distribution line Rights of Way located across Eastside of HNF (Mackinac & Chippewa Counties) and a small portion of Manistique Ranger District (Delta County) · Chippewa; Delta; Mackinac, Michigan
Re-issue Special Use Permit to include: All existing distribution lines and Rights of Way within HNF lands, Electric substations at Eckerman and Raco locations.
Special use management
Comment Period
05/31/2013
Decision
11/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| 2013 Cloverland Electric Special Use Permit Re-issue | Decision Signed Date: 11/20/2013 Legal Notice Date: 12/11/2013 |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Rapid River Ranger District · updated 9/30/2013
Hiawatha National Forest-Rapid River Manistique Ranger District-south end of Clear Lake · Schoolcraft, Michigan
Relocating existing back-in boat launch approximately150 feet to the west of the current launch site. PWCs will be prohibited from the lake. Permits will be required for camping at the campsite. Existing hiking trail will be relocated to the south.
Recreation managementWatershed management
Scoping Start
08/2013 (Estimated)
Comment Period
08/2013 (Estimated)
Objection Period Start
01/2014 (Estimated)
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Trail Management; Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T44N R17W Section 3 |
Decision Memo · Rapid River Ranger District · updated 9/17/2013
Between FH 13 and CR 440 in Delta County approximately 16 miles north of US 2. Approximately 1000 feet of new construction. Involves woods roads FR 2317,2109,2688,2690,2225, 2225B, 2720A, 2720. · Delta, Michigan
Project involves relocation of Snowmobile Trail 7 so as to improve safety and to facilitate more efficient maintenance and grooming of the trail. The new route will eliminate steep hills and sharp curves.
Recreation management
Comment Period
07/31/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Camel Riders Snowmobile Trail Relocation Project | Decision Signed Date: 09/13/2013 Legal Notice Date: 09/13/2013 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T43N R19 and 18 Sections 11,14,13,18,7,17,8,5, and 6. |
Environmental Assessment · Rapid River Ranger District · updated 9/4/2013
Approximately 3 miles north of US 2 at Nahma Junction, along FH13, just north of Flowing Well Campground. Access to the work area would be along the pipeline easement approx. 1/4 mile east of FH13. · Delta, Michigan
To issue a special use permit to Enbridge Pipelines for the excavation, inspection, and repair of their Line 5 petroleum/natural gas liquids pipeline at two sites near the Sturgeon River, just east of Forest Highway 13.
Special use management
Comment Period
12/21/2012
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T41N, R19W, Section 20 NE |
Decision Memo · Munising Ranger District · updated 7/3/2013
Bruno s River Hiking and Biking Trail located 20 miles south of Munising, MI along FH13 · Alger; Schoolcraft, Michigan
Project previously identifies as Bruno s Run Sustainable Trail Locations. Project involves several minor relocations of Bruno s Run Hiking/Biking Trail to eliminate erosion and damage to the trail surface so as to improve riding conditions.
Recreation management
Comment Period
03/05/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Bruno's Run Sustainable Trail ReRoutes Project | Decision Signed Date: 07/01/2013 Legal Notice Date: 07/02/2013 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T44N R19W Section 12, T44N R18W Section 7 |
Environmental Assessment · Munising Ranger District · updated 7/3/2013
This project is located in the north central part of the Munising Ranger District. · Alger, Michigan
Vegetation management, watershed and fisheries habitat improvements, mountain bike trail construction, non-native invasive plant treatments, non-significant Forest Plan amendment, and road construction, closures, and decommissioning.
Land management planningVegetation management (other than forest products)Recreation managementRoad managementWildlife, fish, rare plantsWatershed managementForest products
Comment Period
02/15/2013
Decision
06/2013 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Plan Amendment; Trail Management; Noxious Weed Treatments; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Mirrorwood Project | Decision Signed Date: 06/27/2013 Legal Notice Date: 07/02/2013 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46N,R18W, Sec 18-33; T46N,R19W, Sec 20, 21, 24, 25-36; T45N,R20W, Sec 1, 15, 19-21, 28-34; T45N, R19W, 31-33; T45N, R18W, 6, 7, 18, 19; T44N, R20W, Sec 4-9, 16-18. |
Decision Memo · Sault Ste. Marie Ranger District · updated 6/28/2013
The Sault Ste. Marie District Office is located at 4000 I-75 Business Spur, Sault Ste. Marie · Chippewa, Michigan
Hiawatha National Forest is proposing to sell the Sault Ste. Marie District Office
Land management planning
Comment Period
07/09/2009
Decision
05/2012 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Use Adjustments |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
Decision Memo · Rapid River Ranger District · updated 6/28/2013
All activities are located in a reach extending from the mouth of the Eighteenmile Creek downstream to about 0.3 miles below the FH-13 crossing of the river. · Delta, Michigan
Enhance salmonid habitat by installing eight spawning structures and twenty log groups.
Wildlife, fish, rare plants
Scoping Start
07/2013 (Estimated)
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N, R19W, Sections 33 and 34 |
Decision Memo · St. Ignace Ranger District · updated 5/31/2013
One fiber optic line will be constructed along Cheeseman Rd and short distance along US-2, other line along Worth Rd. Both in Mackinac County · Mackinac, Michigan
Merit Network, Inc. proposes to install two additional lateral fiber optical lines to an existing line under a Special Use Permit, which will provide broadband technology to additional businesses and schools via Cheeseman Rd and Worth Rd.
Special use management
Comment Period
04/22/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Merit Network, Inc. Fiber Optic Cable Moran Schools and Worth Road Laterals | Decision Signed Date: 05/24/2013 Legal Notice Date: 05/29/2013 |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
Decision Memo · Sault Ste. Marie Ranger District · updated 4/15/2013
Project is located along M-28, east and west of FH87 (Ranger Road) · Chippewa, Michigan
MDOT has requested permission to remove approx. 350 trees within their right-of-way along about 5 miles of M-28 near Raco, MI to allow them to improve the slope of the shoulder when they repave concrete. This will improve travel surface and safety.
Special use management
Comment Period
02/13/2013
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Timber Sales (Green) |
| Highway M-28 Shoulder Project Categorical Exclusion (CE) | Decision Signed Date: 03/18/2013 Legal Notice Date: 03/20/2013 |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N, R4W Sections 22, 23, 24, 26, and 27. T46N, R3W Sections 16, 17, 19, 20, and 21. |
Decision Memo · Rapid River Ranger District · updated 3/28/2013
Ogontz Bay boat launch at the mouth of Big River off County Road 503. · Delta, Michigan
Amendment to an existing special use permit to relocate a dry fire hydrant on National Forest System lands for fire suppression.
Special use management
Comment Period
08/24/2012
Decision
12/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T39N, R21W, Section 28 |
Decision Memo · Munising Ranger District · updated 3/28/2013
Island Lake Campground located between the Buckhorn Road and Doe Lake Road · Alger, Michigan
This project is marked as "Cancelled" because it falls into a Categorical Exclusion that does not require a Decision Memo. Analysis of the project will proceed. Project closes sites, reopens other sites and carry-in boat access, replaces toilet...
Recreation management
Scoping Start
01/2013 (Estimated)
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T45N R19W Section 26 |
Decision Memo · Rapid River Ranger District · updated 3/28/2013
Hiawatha National Forest-Rapid River/Manistique Ranger District-Snowmobile Trail 413 · Schoolcraft, Michigan
This project is marked as "Cancelled" because it falls into a Categorical Exclusion that does not require a Decision Memo. Analysis of the project will proceed. The existing bridge over Murphy Creek on Snowmobile Trail 413 will be replaced.
Recreation management
Scoping Start
01/2013 (Estimated)
Decision
03/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T42N R17W Section 4 |
Decision Memo · Manistique Ranger District · updated 2/12/2013
Project is located just south of County Road 442 and 2 miles east of Forest Highway 13 · Delta, Michigan
Harvest disease infested red pine from banded red pine rows which are infesting red pine regeneration.
Forest productsVegetation management (other than forest products)
Comment Period
11/09/2012
Decision
12/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | T 42N, R 19W, sec 23 & 26 |
Environmental Assessment · Rapid River Ranger District · updated 1/15/2013
On Delta County Road 497 along the Sturgeon River 1.8 miles south of US Highway 2. · Delta, Michigan
EA -- Relocate approximately 2,700 feet of CR 497 and an electric powerline to an existing railroad and utility corridor to address a meander bend in the Sturgeon River that threatens to undercut the road.
Watershed managementRoad management
Comment Period
12/24/2011
Decision
01/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Improvements/Construction; Travel Management; Watershed Improvements |
| Delta County Road 497 Relocation | Decision Signed Date: 01/02/2013 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T40N, R19W, Section 6 and 7 |
Decision Memo · Hiawatha National Forest All Units · updated 12/13/2012
Permits are located on both the Eastside and Westside of the Forest. · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
There are 15 special use permits expiring in 2011. The permits are for 3 directional signs, 10 roads, and 1 water storage tank.
Special use management
Comment Period
06/12/2012
Decision
11/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Re-issue of Special Use Permits | Decision Signed Date: 11/15/2012 Legal Notice Date: 11/20/2012 |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
Decision Memo · Rapid River Ranger District · updated 12/7/2012
18 Mile Creek in various locations, Little Black Creek, Black Creek, Tributary to Sturgeon River, Sturgeon River in various locations, Tributary to Black Creek · Delta, Michigan
Plant long lived conifers in the riparian corridors of the priority watersheds to restore important ecological functions.
Watershed managementVegetation management (other than forest products)
Comment Period
10/18/2012
Decision
12/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Stewardship Contract, Consolidated Appropriations Resolution Of 2003 |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Decision Memo: Priority Watershed Riparian Planting | Decision Signed Date: 12/03/2012 Legal Notice Date: 12/07/2012 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Township/Range 42N20W, Sections 1, 2, 11, 12, 13, 14, 23, 24; Township/Range 42N19W, Sec. 5, 6, 7, 13, 14, 20, 21, 22, 23, 28, 29, 31; Township/Range 42N19W, Sec. 18; Township/Range 42N19W, Sec. 36 |
Environmental Assessment · Hiawatha National Forest All Units · updated 8/27/2012
Along 11 miles of the Highway 94 corridor from Shingleton south to County Road 437. · Alger; Schoolcraft, Michigan
Install 11 miles of underground fiber optic cable within the right-of-way of Hwy 94, from Shingleton south to County Road 437. Construction methods would include vibratory and static plowing, directional boring, and aerial.
Special use management
Comment Period
03/08/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| DN/FONSI for the HTC Fiber Optic Project Environmental Assessment | Decision Signed Date: 07/18/2012 Legal Notice Date: 07/24/2012 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | T45N, R17W, Sections 4, 5, 9, 16, 21, 28, 32, 33 and T44N, R17W, Section 4, 5, 8, 9, 16, 21, 22 |
Decision Memo · Rapid River Ranger District · updated 6/23/2012
On Carr Creek in Delta County · Delta, Michigan
Replace deteriorating spawning habitat that was installed in Carr Creek over 30 years ago. Includes installing, primarily by hand, washed gravel and cobblestone to provide preferred spawning conditions for native brook trout.
Wildlife, fish, rare plants
Comment Period
04/24/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T43N, R18W, S36 NW |
Environmental Assessment · Hiawatha National Forest All Units · updated 6/23/2012
The fiber optic corridor runs the length of the Forest on US Highway 2 from Rapid River to St. Ignace. · Delta; Mackinac; Schoolcraft, Michigan
EA -- Installation of a buried and overhead fiber optic cable along the existing road right-of-ways for approximately 24 miles.
Special use management
Comment Period
09/07/2011
Decision
05/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; St. Ignace Ranger District |
Decision Memo · Rapid River Ranger District · updated 6/23/2012
Snowmobile trail segments on the Rapid River and Manistique ranger districts, including Snowmobile Trails #2, #411, #413, and #7. · Delta; Schoolcraft, Michigan
CE -- Relocate wetland segments of snowmobile trails to higher, drier ground to prevent wetland damage resulting from illegal ORV use on the snowmobile trail during the snow-free season. Old wetland segments would be closed and rehabilitated.
Watershed managementRecreation management
Comment Period
04/10/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
Environmental Assessment · Hiawatha National Forest All Units · updated 5/11/2012
Powerline corridor is found on the Eastside of the Hiawatha National Forest. The 6904/6905 Line Corridor is from St. Ignace, MI to Rudyard, MI. · Chippewa; Mackinac, Michigan
Rebuild and up grade of an existing powerline from St. Ignace, MI to Rudyard, MI. The upgrade will increase the voltage from 69 volts to a 138KV transmission line.
Special use management
Comment Period
07/19/2011
Decision
04/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | T43N R3W, S. 12-14, 22, 23, 33, 34; T42N R3W S 4, 8, 17-19, 30, 31; T41N R4W S 1, 12, 13, 24, 25, 36; T40N R4W S 1, 12. |
Environmental Assessment · Hiawatha National Forest All Units · updated 5/11/2012
On National Forest System lands across the entire Hiawatha National Forest · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
HNF proposes to use mechanical, manual, chemical and biological techniques, either singly or in combination, to treat and control Non-native Invasive Plant infestations on approx. 5,000 acres of FS land across the entire HNF
Wildlife, fish, rare plants
Comment Period
10/01/2011
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
Decision Memo · Rapid River Ranger District · updated 2/15/2012
Wedens Bay Area on the Stonington Peninsula · Delta, Michigan
Obliterate approximately 16.3 miles of illegal ORV trails and open approximately 2 miles of maintenance level 1 roads to motorized vehicle use.
Recreation managementRoad management
Decision
01/2012 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T38N, R21W, Sections 1-9 and T39N, R21W, Sections 26-36 |
Decision Memo · Munising Ranger District · updated 2/14/2012
Across the Munising Ranger District · Alger, Michigan
CE -- Perform stand improvement projects throughout the district via the personal use firewood program, including some stands that are not currently within the emerald ash borer quarantine area.
Vegetation management (other than forest products)Forest products
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Special Products Sales; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
Decision Memo · Munising Ranger District · updated 2/2/2012
Several locations on the Munising and Rapid River/Manistique ranger districts · Alger; Schoolcraft, Michigan
CE -- Create/enhance small openings in eight densely-stocked jack pine stands to improve Kirkland warbler habitat, a federally-endangered species. When possible, existing openings or gaps would be widened or extended.
Wildlife, fish, rare plants
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | T46N, R18W, Section 29 and 32; T43N, R18W, Section 9 and 28; T44N, R17W, Sections 36 and 36 |
Decision Memo · Rapid River Ranger District · updated 1/20/2012
Stands adjacent to the Colwell Lake CG -- bounded by Colwell Lake on the north/west, M-94 and Forest Road 2246 on the west/south, and FR2248 on the east. · Schoolcraft, Michigan
CE -- Harvest dying and diseased beech trees near the Colwell Lake Campground to improve campground safety.
Recreation management
Decision
11/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T44N, R17W, Section 9 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
Existing road is on the Rapid River Ranger District · Delta, Michigan
CE -- Issue a road special use permit to access private property.
Special use management
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N, R20W, Sec 20 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
Existing non-system road FRD 2369, west of FH 13 for approximately 125 feet, to access private land. · Delta, Michigan
CE -- Issuance of a raod special use permit.
Special use management
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T43N, R19W, Section 2 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
Munising Ranger District along the M-28 corridor. · Alger, Michigan
CE -- Install approximately 2,357 feet of fiber optic cable within the Highway M-28 right-of-way.
Special use management
Decision
10/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46N, R18W, Section 21 and 22 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
Road is located on the Sault Ste. Marie Ranger District · Chippewa, Michigan
CE -- Issue a 2-year road special use permit to access private property.
Special use management
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T45N, R6W, Sec 7 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
Existing road is on the Munising Ranger District. · Alger, Michigan
CE -- Issue a road special use permit to access private property.
Special use management
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T45N, R20W, Sec 17 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
Existing road is on the Munising Ranger District · Alger, Michigan
CE -- Issue a road special use permit to access private property
Special use management
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T45N, R18W, Sec 21 |
Decision Memo · Hiawatha National Forest All Units · updated 1/20/2012
St. Ignace Ranger District · Mackinac, Michigan
CE -- Issuance of a special use road easement to the Mackinac County Road Commission to realign 780 feet of Black Point Road, which crosses National Forest System Land on the St. Ignace Ranger District.
Special use management
Decision
01/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T42N, R5W, Section 22 |
Decision Memo · St. Ignace Ranger District · updated 1/20/2012
80-acre National Forest System land adjacent to the St. Ignace Ranger District · Mackinac, Michigan
CE -- Construction of a multi-purpose, non-motorized, community-based trail network on the 80-acre National Forest parcel adjacent to the St. Ignace Ranger District office.
Recreation management
Decision
11/2011 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T40N, R4W, W1/2, NE1/4 of Section 8 |
Decision Memo · Hiawatha National Forest All Units · updated 1/3/2012
Part of government lot 2 north of M-28 adjacent to National Forest System land to the west and adjacent to the city of Munising lands to the east. · Alger, Michigan
Acquisition of a tract from the city of Munising using timber fund receipts from the Little Pole Timber Sale in Alger and Delta counties. Project receipts will provide financing for Munising's fire department building project.
Heritage resource managementLand ownership management
Decision
01/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T47N, R19W, Section 28 |
Decision Memo · St. Ignace Ranger District · updated 12/7/2011
Located on scattered stands throughout the Westside of the Hiawatha National Forest. · Chippewa; Mackinac, Michigan
Pre-commercial thinning on approximately 1,348 acres and pruning on about 3,474 acres.
Vegetation management (other than forest products)
Decision
12/2011 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
Decision Memo · Hiawatha National Forest All Units · updated 11/29/2011
On the St. Ignace Ranger District · Mackinac, Michigan
Removal of overhead powerline lines and poles and replace with underground line within the existing corridor.
Special use management
Decision
11/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T42N, R5W, Sections 22 and 27 |
Decision Memo · Hiawatha National Forest All Units · updated 11/10/2011
The powerline corridor is on the west side of the Hiawatha National Forest · Delta, Michigan
Replacement of 15 damaged electric poles recently purchased from the Upper Peninsula Power Company (UPPCO).
Special use management
Decision
11/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T40N, R20W, Sections 1-4, T41N, R20W, Section 31, 34, & 35, and T41N, R21W, Section 27 |
Decision Memo · Hiawatha National Forest All Units · updated 11/1/2011
Westside of the Hiawatha National Forest · Delta, Michigan
Installation of 1,980 feet of powerline in the County Road KK road right-of-way. The line would feed power to an Enbridge Energy pipeline emergency shut-off valve.
Special use management
Decision
10/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Alger Delta Cooperative Electric Association County Road KK powerline | Decision Signed Date: 10/31/2011 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T41N, R19W, Sections 14 and 23 |
Environmental Assessment · Hiawatha National Forest All Units · updated 10/5/2011
Five miles south of Shingleton, MI on the westside of Hwy 94 and west of Boot Lake. · Schoolcraft, Michigan
Construct a road to gain access to a landlocked parcel of National Forest System land and change the maintenance level of Forest Road 2284 from ML2 to ML1.
Road management
Comment Period
07/12/2011
Decision
09/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Improvements/Construction; Travel Management |
| Forests | Hiawatha National Forest |
| Districts | Manistique Ranger District |
| Legal Land Description | T45N, R17W, Section 20, 29, and 32 |
Decision Memo · Hiawatha National Forest All Units · updated 9/27/2011
Corridor on the Westside of the Hiawatha NF along US-2. · Delta, Michigan
Change overhead powerlines to underground powerlines within the US 2 right-of-way.
Special use management
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T40N, R20W, Sections 2-4 and T41N, R20W, Sections 35 and 36. |
Decision Memo · Sault Ste. Marie Ranger District · updated 9/20/2011
Project activities located on various streams (Biscuit Creek, Bear Creek, Creek Number Nine) on the Eastside of the Hiawatha National Forest · Chippewa, Michigan
Increase natural reporduction of brook trout by installing spawning habitat in Bear Creek, Biscuit Creek, and Creek Number Nine. Design would duplicate previous successful projects.
Wildlife, fish, rare plants
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T44N, R4W, Sections 17, and 26; T46N, R6W, Section 24 |
Decision Memo · Rapid River Ranger District · updated 9/20/2011
17 sites in Alger, Delta, and Schoolcraft counties · Alger; Delta; Schoolcraft, Michigan
Maintain productivity of existing brook trout and steelhead spawning habitat by removing sand and organic material from 17 existing sediment basins.
Wildlife, fish, rare plants
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
Decision Memo · Sault Ste. Marie Ranger District · updated 8/8/2011
Creek Number Nine, Unnamed creek, and Creek Number Eight along the Strongs Grade · Chippewa, Michigan
Improve aquatic organism passage in tributaries to the East Branch Tahquamenon River by removing culverts on the Strongs Grade that are no longer needed and often plugged by beaver.
Wildlife, fish, rare plantsWatershed managementRoad management
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N, R6W, Section 24 SW-SE; T46N, R5W, Section 30 NW-NW; T46N, R5W, Section 30 NW-NE |
Decision Memo · Hiawatha National Forest All Units · updated 7/5/2011
West side of the Hiawatha National Forest where the pipeline crosses County Road KK. · Delta, Michigan
Install an emergency flow restriction device to allow fast remote shut-off of the pipeline in case of emergency.
Special use management
Decision
07/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Enbridge EnergyLTD, Special Use Permit #RAR401201, Amendment #7 | Decision Signed Date: 07/01/2011 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T40N, R20W, Sections 1-4, T41N, R20W, Sections 31, 34, & 35, and T41N, R21W, Section 27 |
Decision Memo · Hiawatha National Forest All Units · updated 6/24/2011
Eastside of the Hiawatha National Forest in Chippewa County · Chippewa, Michigan
Install 2,600 feet of buried powerline within the M-123 road right-of-way.
Special use management
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N, R6W, Section 35 |
Environmental Assessment · Hiawatha National Forest All Units · updated 6/19/2011
This project is located in stands throughout the westside of the Hiawatha National Forest on the Munising, Rapid River and Manistique Ranger Districts. · Alger; Delta; Schoolcraft, Michigan
Project proposes treatments for uneven-aged management with follow-up canopy gap cleaning or timber stand improvement plus additional spot planting of white pine, hemlock, northern red oak or other native tree species and associated site preparation.
Vegetation management (other than forest products)
Comment Period
11/10/2009
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Beech Bark Disease Project Decision Notice | Decision Signed Date: 07/22/2010 Legal Notice Date: 07/30/2010 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
Decision Memo · Hiawatha National Forest All Units · updated 4/28/2011
The corridor is on the Rapid River Ranger District · Delta, Michigan
Amend the Chatham Telephone Co. special use permit for installation of a fiber optic cable crossing National Forest System land. The cable would be buried in a road right-of-way following an existing telephone corridor. No vegetation removal.
Special use management
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Chatham Telephone Company Fiber Optic Cable Installation-Amendment #1 | Decision Signed Date: 04/26/2011 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N, R21W, Sections 23 and 26 |
Decision Memo · Hiawatha National Forest All Units · updated 3/30/2011
Powerline corridor on the Eastside of the Hiawatha National Forest, parallel to Highway M-28. · Chippewa, Michigan
ATC is proposing to rebuild their 6952 powerline to correct many safety issues with low hanging powerlines. Rebuild will be within the existing corridor to provide reliable and safe service to rural customers.
Special use management
Decision
01/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N R3W, Secs 15, 18 & 19; T46N R4W, Secs 13-18; T46N R5W, Sec 23. |
Decision Memo · Hiawatha National Forest All Units · updated 3/30/2011
Corridor is located on the Westside of the Hiawatha National Forest · Alger; Delta, Michigan
Issue an amendment to the Chatham Telephone Company SUP for installation of a fiber optic cable crossing National Forest land. The cable will be buried in a road ROW following existing telephone corridor. No vegetation will be removed.
Special use management
Decision
01/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Chatham Telephone Company Fiber Optic Cable Installation Decision Memo | Decision Signed Date: 01/20/2011 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
Decision Memo · Rapid River Ranger District · updated 3/28/2011
Seven miles northeast of Rapid River, MI. One road segment is approximately 1 mile east of County Road 509 and the second road segment is 0.5 miles west of Forest Road 2235 · Alger, Michigan
Construction and reconstruction of two road segments not exceeding a total of 0.7 miles. The road segments are needed to access stands for timber management activities.
Forest products
Decision
02/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N, R20W, Sec 31; T42N, R21W, Sec 36; T41N, R20W, Sec 6; T41N, R20W, Sec 5, 6, 7, and 8. |
Decision Memo · Munising Ranger District · updated 3/28/2011
One sign would be placed at the intersection of FFH-13 and FR2193. The second sign would be placed at the intersection of FR2193 and FR2269. · Alger, Michigan
Issue a special use permit to authorize the placement of two directional signs on National Forest System land.
Special use management
Decision
03/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forest Glen General Store Sign Special Use Permit | Decision Signed Date: 03/17/2011 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Sec. 13 and 15, T44N, R19W |
Decision Memo · Hiawatha National Forest All Units · updated 12/27/2010
Gas pipeline corridor is found on the Westside and the Eastside of the Hiawatha National Forest · Chippewa; Delta; Mackinac; Schoolcraft, Michigan
Renewal of Special Use Permit for an existing gas pipeline corridor crossing National Forest System Land
Special use management
Decision
11/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Great Lakes Gas/TransCanada Pipeline Special Use Permit Renewal | Decision Signed Date: 11/10/2010 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Sault Ste. Marie Ranger District; St. Ignace Ranger District |
Environmental Assessment · Sault Ste. Marie Ranger District · updated 12/27/2010
South of Whitefish Bay Scenic Byway on Forest Road 3157 · Chippewa, Michigan
USFWS is proposing to update their facilities at Pendills Creek NFH. Some of these upgrades would occur on Forest Service system land
Facility management
Comment Period
04/19/2010
Decision
12/2010 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T47N, R4W, Sections 27, 28, 29, 32, 33, 34 |
Decision Memo · Rapid River Ranger District · updated 9/20/2010
Along County Road 499 between 1/4 and 1/8 mile west of the bridge crossing the Sturgeon River. · Delta, Michigan
Construct a 2-3 car parking area and wayside with 3-4 interpretive signs commemorating the history, culture, and contributions of this former Anishinabe logging and lumbering community.
Heritage resource management
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
Decision Memo · Rapid River Ranger District · updated 9/9/2010
One tower at St. Jacques and the other tower at Onota · Alger; Delta, Michigan
HNF proposes to build two 80-100 foot steel towers to improve radio communication. A small concrete building will also be built at the base of each tower and the entire site will be enclosed with a chain link fence.
Facility management
Decision
09/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Munising Ranger District |
| Legal Land Description | T40N R20W, SW 1/4 of SW 1/4 of Section 2; T47N R21W, NW 1/4 of Section 19 |
Decision Memo · St. Ignace Ranger District · updated 9/3/2010
Sand Dunes Ski Trail · Mackinac, Michigan
Implement a salvage timber harvest to remove hazardous trees along the Sand Dunes Ski Trail infested with beech bark disease.
Recreation management
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Timber Sales (Salvage) |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T41N, R5W, Sections 22 & 23 |
Decision Memo · Hiawatha National Forest All Units · updated 8/20/2010
Cable would be installed on the north side of Highway M-28 and the west side of Ranger Road · Chippewa, Michigan
Chippewa County Telephone Company has requested a Fiber Optic SUP for installation of a buried fiber optic cable along the Highway M-28 and Ranger Road right-of-way crossing National Forest System land.
Special use management
Decision
08/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Chippewa County Telephone Company Fiber Optic Cable Special Use Permit | Decision Signed Date: 08/20/2010 |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T46N R4W Sections 1, 12, 13 & 22-24; T46N R3W Sections 15-17 and 20; T47N R4W Sections 25 & 36 |
Decision Memo · Hiawatha National Forest All Units · updated 7/27/2010
Road is found on the West Zone of the Hiawatha National Forest off Forest Highway 13 · Alger, Michigan
Issue a private road special use permit to access private property. The road has been existing for many years and has just been discovered it is crossing National Forest System land.
Special use management
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T44N, R18W, Section 7 |
Decision Memo · Hiawatha National Forest All Units · updated 7/2/2010
Roads are located on Grand Island National Recreation Area, Munising Ranger District · Alger, Michigan
Issuance of a road special use permit to allow Grand Island residents motorized travel on roads closed to the general public for motorized use.
Special use management
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T47N, R18W, Secs 12, 13, 23, 24; T47N, R19W Sec. 2, 3, 4, 9, 10, 11, 14, 15, 22; T48N, R19W, Secs. 15, 16, 22, 28, 33. |
Decision Memo · Hiawatha National Forest All Units · updated 7/2/2010
Project is located on the St. Ignace Ranger District. · Mackinac, Michigan
Installation of fiber optic cable parallel to Mackinac Trail from St. Ignace to Chippewa County line. Cable will be buried by vibratory plow or directional bored.
Special use management
Decision
04/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | T43N R3W S 12, 13, 14, 22, 23, 34, 33; T42N R3W S 4, 8, 17, 18, 19, 31; T41N R4W S 1, 12, 13, 24, 25. |
Environmental Assessment · Munising Ranger District · updated 6/28/2010
The project is located less than 1/4 mile from Williams landing, off the Center Road on the Grand Island National Recreation Area. · Alger, Michigan
Construction of a bus garage and maintenance facility to facilitate administration of the Grand Island National Recreation Area
Facility managementRecreation management
Comment Period
11/30/2009
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
Decision Memo · Rapid River Ranger District · updated 6/17/2010
Boardwalk is located on the Westside of the Hiawatha National Forest · Delta, Michigan
Issue of Special Use Permit for a wooden boardwalk crossing National Forest System land to access private property.
Special use management
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T43N, R19W, Section 14 , N 1/2, NW 1/4 |
Decision Memo · Hiawatha National Forest All Units · updated 6/14/2010
Private road is found on the Westside of the Hiawatha National Forest within the boundary of the Big Island Lake Wilderness. · Alger, Michigan
Issue a private road special use permit to two landowners crossing National Forest System land to access private property.
Special use management
Decision
05/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T44N, R17W, NW1/4 , NE1/4 Sec. 30, W1/2, SE1/4, NW 1/4 Section 19 and SW1/4, SW1/4, Section 18. |
Decision Memo · Rapid River Ranger District · updated 6/2/2010
This project would take place on 4 streams across the Rapid River/Manistique District · Delta, Michigan
Maintenance on spawning habitat installed in 4 streams, 14-26 years ago. Work would consist of replacing rock that has washed away or settled into underlying sand and restoring channel morphology favorable for brook trout or steelhead spawning.
Wildlife, fish, rare plants
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | T42N, R19W, S29;T42N, R19W, S22; T42N, R18W, S17; T42N, R18W, S12. |
Decision Memo · St. Ignace Ranger District · updated 5/17/2010
3 mi. north of Strongs corner along FR3159; 8 mi. SW of Raco in riparian area of the N. Pine River along FR3132; Brevoort River from the lake outlet to pipeline · Chippewa; Mackinac, Michigan
CE -- Hand plant approx.100,000 long-lived conifer species on 400 acres in riparians areas within 500 feet of the Brevort River and the North Pine River. Also, hand plant approx. 8,500 red oak in canopy gaps on 175 acres in the Peck and Rye area.
Vegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
Decision
05/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | T41N, R1W, S 3, 4, 10, 11, 14, 15 & 33; T45N, R4W, S 7, 8, 17 & 18; T46N, R5W, S 7 & 8. |
Environmental Assessment · St. Ignace Ranger District · updated 4/26/2010
The Raco work center is north of M-28 and west of Raco; Moran work center is in town of Moran · Chippewa; Mackinac, Michigan
Hiawatha National Forest proposes to construct a new office, fire cache, and heavy equipment garage at the Raco Work Center; remove 2 buildings at the Moran Work Center; and use this area as outdoor storage.
Facility management
Comment Period
07/09/2009
Decision
04/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
Decision Memo · Hiawatha National Forest All Units · updated 4/21/2010
Powerline corridor is found on the Westside and the Eastside of the Hiawatha National Forest · Alger; Chippewa; Delta; Mackinac; Schoolcraft, Michigan
Renewal of a Special Use Permit for an existing powerline corridor crossing National Forest system Land
Special use management
Decision
07/2009 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Upper Peninsula Power Company Re-issued SUP for Powerline Co | Decision Signed Date: 07/27/2009 |
| Forests | Hiawatha National Forest |
| Districts | Hiawatha National Forest All Units |
Decision Memo · St. Ignace Ranger District · updated 3/19/2010
These activities are located throughout the Eastside of the HNF on the St. Ignace and Sault Ste. Marie Districts. · Chippewa; Mackinac, Michigan
Project would replace 18 existing culverts with pre-cast box, concrete span or metal culverts. Approaches to the culverts may be paved to further reduce sedimentation.
Wildlife, fish, rare plantsWatershed management
Decision
03/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
Decision Memo · Hiawatha National Forest All Units · updated 3/2/2010
Enbridge Energy Limited has its own corridor that runs through Rapid River, Manistique, St. Ignace Ranger Districts · Delta; Mackinac; Schoolcraft, Michigan
Develop an operation and maintenance (O & M) plan for the Enbridge Energy Limited Partnership ROW.
Special use management
Decision
01/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; St. Ignace Ranger District |
Decision Memo · Rapid River Ranger District · updated 3/2/2010
This project is located between FH-13 and M-94 · Delta; Schoolcraft, Michigan
Create a new Operation and Maintenance Plan as called for in their special use permit.
Special use management
Decision
10/2009 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Great Lakes Transmission Limited Partnership Pipeline O & M Plan DM | Decision Signed Date: 10/15/2009 |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T44N, R18W, Sections 12, 13, 24, 30 & 36 |
Environmental Assessment · Munising Ranger District · updated 3/1/2010
West of M94 and along FR 2246 · Alger, Michigan
Reconstruct trails to all camp facilities for accessiblity; reconstruct main entrance and gathering area to control erosion; reconstruct wastewater system and portions of water system; and construct new parking areas.
Facility management
Comment Period
09/23/2009
Decision
02/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T45N, R17W, Section 34 |
Decision Memo · Munising Ranger District · updated 2/5/2010
These activities are located throughout the Westside of the HNF on the Rapid River, Manistique, and Munising districts. · Alger; Delta; Schoolcraft, Michigan
Project would replace 18 existing culverts with pre-cast box, concrete span or metal culverts. Approaches to the culverts may be paved to further reduce sedimentation.
Wildlife, fish, rare plantsWatershed management
Decision
02/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
Environmental Impact Statement · St. Ignace Ranger District · updated 1/22/2010
Approximately 6 miles north of Moran, 2 miles east of Trout Lake, 1 mile west of Mackinac Trail. Includes National Forest lands in the East Lake, Kenneth, Old Dick and Ozark areas · Chippewa; Mackinac, Michigan
Project includes vegetation management (timber harvesting, regeneration of trees, habitat improvement, and transportation management (road construction, reconstruction, closure, decommissioning).
Forest productsWildlife, fish, rare plantsRoad managementVegetation management (other than forest products)
NOI in Federal Register
01/30/2008
DEIS NOA in Federal Register
06/26/2009
FEIS NOA in Federal Register
12/21/2009
Decision
12/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | T42N, R3W, S. 6; T42N, R4W, S. 1-3; T42N, R5W, S. 2, 3; T43N, R3W, S. 7,8, 15-22, 27-33; T43N, R4W, S. 2-36; T43N, R5W,S. 1-30; 32-36; T44N, R4W, S. 16, 18, 19-23, 26-35; T44N, R5W, S. 2, 9,-17, 19-36 |
Environmental Assessment · Munising Ranger District · updated 12/24/2009
Grand Island · Alger, Michigan
The project proposes to build 2 primitive cabins which would be available for rental by the general public on the southern part of the Grand Island National Recreation Area. Both cabins would be located in the roaded natural portion of the island.
Recreation management
Comment Period
07/09/2009
Decision
12/2009 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Cabin #1: T46N, R19W, section 21. Cabin #2: T47N, R19W, section 9 |
Decision Memo · Munising Ranger District · updated 12/23/2009
Located on Grand Island · Alger, Michigan
Prescribed burning of a portion of a historic farm field on Grand Island National Recreation Area. Effects of prescribed burning on non-native weeds will be compared to herbicide treatments in adjacent areas.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
12/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments; Research And Development |
| Grand Island NRA burn Project | Decision Signed Date: 12/04/2009 |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
Decision Memo · Rapid River Ranger District · updated 12/22/2009
Crooked Lake Home Group; Indian River Home Group; Steuben Lake Home Group; Sturgeon River Home Group located throughout Rapid River & Manistique Districts. · Delta; Schoolcraft, Michigan
Reissuance of the Recreation Residence Special Use Permits for Existing Recreation Residences.
Special use management
Decision
09/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District |
| Legal Land Description | T44N, R17W, Sec 15; T43N, R17W, Secs 2 & 11; T44N, R17W, Secs 15 & 22; T42N, R19W, Sec 34. |
Decision Memo · St. Ignace Ranger District · updated 12/22/2009
Bay View Home Group, Brevoort Lake Home Group, Highbanks Lake Home Group, Old Mission Home Group Located throughout St. Ignace & Sault Districts. · Chippewa; Mackinac, Michigan
Reissuance of the Recreation Residence Special Use Permits for Existing Recreation.
Special use management
Decision
09/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | T47N, R4W, Sec 22 & 23; T42N, R5W, Sec 27 & 28; T46N, R5W, Sec 24; T47N, R3W, Sec 12 & 13. |
Decision Memo · Hiawatha National Forest All Units · updated 12/22/2009
Autrain Lake Home Group, Grand Island Home Group, Moccasin Lake Home Group. · Alger, Michigan
Reissuance of the Recreation Residence Special Use Permits for Existing Recreation Residences located throughout the Munising District.
Special use management
Decision
09/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | T46N, R20W, Sec 17; T47N, R19W, Sec 4, 12 & 22; T48N, R19W Sec 16; T44N, R19W, Sec 1 |
Environmental Assessment · Munising Ranger District · updated 10/16/2009
Throughout the West Zone of the Hiawatha National Forest · Alger, Michigan
The West Zone of the Hiawatha National Forest is proposing to open 4 new common variety mineral sites and expand 1 existing pit.
Road managementMinerals and geology
Comment Period
12/18/2008
Decision
09/2009 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
| Legal Land Description | T45N R919W, S 35; T45N, R20W, S 9&10; T46N, R18W, S 24; T43N, R20W, S 31&32; T43N, R18W, S 10. |
Decision Memo · Munising Ranger District · updated 10/9/2009
The project is located at Grand Island Landing on the main land and at Williams Landing on the Grand Island National Recreation Area. · Alger, Michigan
Replace the existing sets of steps into the passenger ferry at Grand Island Landing and at Williams Landing on the Grand Island National Recreation Area with a route that meets current accessibility standards.
Recreation management
Decision
07/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
Environmental Assessment · Sault Ste. Marie Ranger District · updated 6/25/2009
The project is located northwest of Brimley, just west of Whitefish Bay Scenic Byway and Waiska Bay. · Chippewa, Michigan
Activities would relocate approximately 2,400 ft. of road way and reconstruct approximately 5,175 ft. of existing gravel road on FR 3153
Road management
Comment Period
04/09/2009
Decision
05/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
| Legal Land Description | T47N, R2W, section 31 and T47N, R3W, section 36. |
Decision Memo · Munising Ranger District · updated 4/15/2009
Small stands scattered across the Munising District. North of chatham, (along FR2483/Slapneck Rd.); south of Forest Lake (west of the Rapid River Truck Trail); west of Shingleton, (south of M-28). · Alger, Michigan
The Munising Ranger District of the Hiawatha National Forest is proposing to continue to do the "woodlot program" for personal use firewood.
Forest products
Comment Period
02/26/2009
Decision
04/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Products Sales; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
Environmental Assessment · Rapid River Ranger District · updated 3/26/2009
Bounded by Hwy 41 on the west and East Branch of Whitefish River on the east · Delta, Michigan
Analysis of regeneration treatments in conifers and hardwoods; intermediate treatments in conifers and hardwoods, transportation improvements; wildlife and fisheries improvements. Birchfarm was the original name of this project.
Vegetation management (other than forest products)
Comment Period
10/29/2008
Decision
01/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
Environmental Assessment · St. Ignace Ranger District · updated 9/26/2008
The project boundary is the Sand/clay transition north and south Landtype Association boundaries. M-28 runs through the project and County Road H-40 runs along the south · Chippewa, Michigan
Project would include vegetation management (timber harvesting, regeneration of trees, habitat improvements, noxious weed treatments) and transportation system management (road building, maintaining and decommissioning).
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Watershed managementRoad management
Comment Period
12/04/2007
Decision
07/2008 (Estimated)
Implementation
11/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District |
Decision Memo · St. Ignace Ranger District · updated 7/18/2008
These permanent openings are located across the Eastside Unit of the Hiawatha National Forest · Chippewa; Mackinac, Michigan
Permanent openings throughout the Eastside of the Hiawatha with most on the Raco Plains, maintained for wildlife habitat and fuel break will be analyzed. March decision was withdrawn and minor corrections made. A new decision will be issued.
Fuels managementWildlife, fish, rare plants
Comment Period
01/21/2008
Decision
07/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
Decision Memo · Rapid River Ranger District · updated 3/26/2008
Multiple permanent openings would be designated. The exact locations will be determined by the ID Team · Alger; Delta; Schoolcraft, Michigan
Identify and prioritize existing permanent openings for wildlife habitat maintenance and hazardous fuels reduction
Fuels managementWildlife, fish, rare plants
Comment Period
10/23/2007
Decision
12/2007 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Noxious Weed Treatments |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District |
Environmental Assessment · Hiawatha National Forest All Units · updated 6/27/2007
Across the HNF, primarily along roads, skid trails, and recreation trails; gravel pits; wetlands and riparian areas; disturbed sites; and utility corridors; also natural areas · Alger; Chippewa; Delta; Luce; Mackinac; Marquette; Schoolcraft, Michigan
Developing a list of high and medium priority sites across the HNF where invasive plant species are located, and methods for controlling their spread.
Vegetation management (other than forest products)
Comment Period
06/07/2007
Decision
06/2007 (Estimated)
Implementation
07/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Forests | Hiawatha National Forest |