Decision Memo · Manchester Ranger District · updated 12/18/2024
Town of Mount Tabor · Rutland, Vermont
Relocating a section of the Appalachian Trail/Long Trail that was destroyed by rain and flooding. This project has been cancelled. The activities proposed in this project have been incorporated into Project #67423.
Recreation managementClimate change adaptation
Scoping Start
10/2024 (Estimated)
Decision
04/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/18/2024
Town of Winhall · Bennington, Vermont
Application to reconstruct, use and maintain a private road across National Forest System land from French Hollow Road to private property year round to haul construction materials and use by vehicles and snowmobiles. Cancelled due to error.
Special use management
Scoping Start
02/2025 (Estimated)
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/13/2024
Town of Chittenden · Rutland, Vermont
A Special Use Permit would be issued with a term of twenty years for a road Right of Way that is 16 feet wide and includes the existing snowmobile trail (Blue Ridge Mountain Trail, #136) for 1,712 feet and new construction for approximately 600 feet.
Special use management
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 9/27/2024
Town of Goshen · Addison, Vermont
Application to authorize improvement of the Silver Lake and Sucker Brook Diversion Dam access roads, installation of temporary structures to allow for removal of accumulated sediment from impoundment, and deposition of the sediment at the Goshen Pit.
Special use management
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/30/2024
Town of Ripton · Addison, Vermont
Issuance of a special use permit to Vermont Elks Charities, Inc dba Silver Towers Camp authorizing the construction, maintenance, and use of a 500 ft. long trail between the camp and Forest Road 89.
Special use management
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/29/2024
Town of Peru · Bennington, Vermont
Maintenance and improvement of recreation features and facilities at Hapgood Pond to meet the needs of visitors and standards for safety, sustainability, and universal access.
Recreation managementFacility management
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/29/2024
Towns of Glastenbury, Mount Holly, Mount Tabor, Peru, Stratton, and Winhall · Bennington; Rutland; Windham, Vermont
Replace or repair 11 trail bridges that have significant maintenance needs. Project would involve heavy equipment and would be implemented in partnership with existing trail partners. Initially included Wardsboro Link #3, now Project #64533.
Recreation managementWatershed management
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 8/22/2024
Town of Rochester · Windsor, Vermont
Amendment of an existing right of way (ROW) special use permit to include year round use and to extend the ROW by approximately 460 feet from the end of Pine Gap Road to the existing ROW.
Special use management
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 7/22/2024
Towns of Middlebury and Ripton · Addison, Vermont
This project was 'Canceled' because it is a duplicate of Old Town Road Powerline Reconstruction Permit #65929. Project #66458 will remain on the public SOPA for one quarter, then be removed.
Special use management
Scoping Start
07/2024 (Estimated)
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/21/2024
Towns of Woodford and Glastenbury · Bennington, Vermont
This project would reauthorize the use of a three-mile long road within the Glastenbury Wilderness to access two private inholdings. No new road construction would occur.
Special use management
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 6/14/2024
Town of Lodi · Seneca, New York
This project includes all aspects of hedgerow removal within the Butcher Hill pasture including removal of overstory trees, understory vegetation, stumps and rocks, and grading of the land.
Wildlife, fish, rare plants
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Rangeland Vegetation Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/3/2024
Town of Chittenden · Rutland, Vermont
Issuance of a special use permit with a term of two years, authorizing work on the existing right of way. Fourteen hardwood trees would be cut and left in place, and the entire length of the right of way would be resurfaced with crushed stone.
Special use management
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/3/2024
Town of Winhall · Bennington, Vermont
Relocation of the Corridor 7 trail crossing of Vermont State Route 11/30 to improve safety and the relocation of a section of trail that is currently closed due to failing infrastructure with the goal of improving safety and the trail experience.
Recreation management
Decision
03/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 5/1/2024
Town of Norwich · Windsor, Vermont
The project would add several existing trails to the National Forest System while reducing or closing other unauthorized trails in the Town of Norwich, Vermont.
Recreation management
Decision
04/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 4/25/2024
Town of Dover · Windham, Vermont
Widen the High Traverse alpine ski trail to relieve congestion, replace 400 feet of buried power line along the trail and add a valve house in the same vicinity to improve snowmaking efficiency.
Special use management
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/26/2024
Town of Dorset · Bennington, Vermont
Repair an existing breached berm that reroutes Little Mad Tom Brook to a long-established diversion channel. Reconstruction of the berm is necessary to prevent flooding and protect property and infrastructure.
Special use management
Decision
02/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/1/2024
Town of Hector · Schuyler, New York
Restoration of riparian habitats by reducing the influence of anthropogenic features and incision on drainage. Process-based restoration practices will include utilizing natural materials to create check dams to slow and spread runoff.
Watershed management
Decision
03/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 2/29/2024
Town of Peru · Bennington, Vermont
Manage Jones Brook East trail for mountain bike use and relocate a section of the trail where it is currently unsuitable for summer use. Trail relocation would be 830 feet in length and implemented in partnership with existing trail partners.
Recreation management
Decision
02/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 1/30/2024
Town of Hector · Schuyler, New York
Removal and replacement of a communications tower and associated infrastructure.
Facility management
Decision
01/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 1/22/2024
Town of Hector · Schuyler, New York
Replace existing trail bridge with larger structure designed to meet current Trail Management Objectives. Stabilize streambank to prevent erosion and improve watershed resiliency.
Watershed managementFacility managementRecreation management
Decision
01/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance; Trail Management; Travel Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/22/2023
Town of Manchester. · Bennington, Vermont
The Lye Brook Trailhead parking area would be relocated on Lye Brook Road near its intersection with Benson and Glen Roads. The new parking lot would accommodate 30 to 40 vehicles.
Recreation management
Scoping Start
01/2024 (Estimated)
Decision
10/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 12/5/2023
Town of Hector · Schuyler, New York
This project would expand the current parking area to allow for a greater number of vehicles. Current design allows for four vehicles to safely park in the parking area. Our goal would be to expand the parking lot to accommodate 10 vehicles.
Recreation managementFacility managementRoad management
Decision
12/2023 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Road Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 12/5/2023
Town of Chittenden · Rutland, Vermont
This project would widen and grade trails to improve drainage, allow for safe travel by skiers and snowshoers, and improve visibility on corners on existing Nordic ski trails within the Mountain Top Resort special use permit area.
Special use managementRecreation managementWatershed management
Decision
12/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/29/2023
Town of Stamford. · Bennington, Vermont
The project would involve constructing approximately 0.3 miles of 6-foot-wide trail tread south of Sucker Pond to relocate this section of trail out of a wetland and into a more suitable area for multiple trail uses.
Recreation management
Scoping Start
03/2024 (Estimated)
Decision
09/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 9/26/2023
Town of Goshen · Addison, Vermont
Realignment of the Hogback Loop Trail (Catamount Trail) near the privately owned Blueberry Hill Inn. Construction of 0.14 miles of Class 4 Cross Country Ski Trail and a bridge, culvert, or ford. Decommissioning of 0.7 miles of ski trail.
Recreation management
Decision
09/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 9/8/2023
Along Dunn Road in the Town of Covert · Seneca, New York
The purpose of this project is to replace the failing water control structure on the pond/wetland along Dunn Road and enhance the pond/wetland by dredging.
Watershed management
Scoping Start
11/2022 (Estimated)
Decision
01/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/3/2023
Town of Rochester. · Windsor, Vermont
The former Bear Brook Picnic Ground parking lot would be renovated to provide up to 50 parking spaces for users of the Brandon Gap Backcountry Zones. The project would mostly utilize the existing footprint of the previous parking area.
Recreation management
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/30/2023
Town of Ripton · Addison, Vermont
The project would realign the Widow's Clearing Trail by Constructing .5 miles of multi-use nonmotorized trail, and decommissioning .6 miles of trail. The proposed new trail would be managed for bicycles, horses, xc skiing, and hiking.
Recreation management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/28/2023
Towns of Goshen, Salisbury, and Leicester · Addison, Vermont
The project would construct and maintain a nonmotorized recreation trail between Silver Lake and the Moosalamoo Campground.
Recreation management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/25/2023
Town of Stratton · Windham, Vermont
Replace Wardsboro trail bridge due to significant maintenance needs. Project would involve heavy equipment and would be implemented in partnership with existing trail partners. Originally part of and scoped under Project #63335.
Recreation managementWatershed management
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/3/2023
Town of Manchester · Bennington, Vermont
Plant native woody species to restore sugar maple-ostrich fern riverine floodplain forest in the 100-year floodplain.
Climate change adaptationWatershed managementVegetation management (other than forest products)
Decision
08/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/28/2023
Town of Leicester. · Addison, Vermont
This project involves installation of steps and staircases to reduce erosion, reduce sedimentation entering the lake and downstream waterways, and improve visitor experience and safety.
Recreation management
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 5/16/2023
Town of Hancock. · Addison, Vermont
This project would improve the public infrastructure and accessibility at the Texas Falls recreation area, remove features that may pose a public health and safety risk, and reduce deferred maintenance.
Recreation management
Decision
05/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 5/10/2023
Town of Lincoln. · Addison, Vermont
The project would renovate the upper and lower parking areas at Lincoln Gap to provide safe parking for up to 50 vehicles.
Recreation management
Decision
05/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 5/4/2023
Multiple Towns · Bennington; Rutland; Windham, Vermont
Treat ash trees with insecticide within 36 separate stands totaling up to 1,361 acres so they are more resilient to emerald ash borer infestation, conserve genetic diversity and maintain a seed source for future ash regeneration.
Vegetation management (other than forest products)Climate change adaptation
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 4/18/2023
Town of Hector · Schuyler, New York
This project would restore a scenic vista that previously existed at the Dunham Shelter on the Finger Lakes Trail. The vista has not been maintained in many years and now has brush and trees blocking the scenic view from the trail shelter.
Recreation management
Decision
04/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management; Scenery Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 4/3/2023
Town of Manchester · Bennington, Vermont
Project 63896 was Canceled because the same project (63821) already exists on the SOPA. Those interested in this project should refer to Project 63821. Project 63896 will remain on the public SOPA for one quarter, then be removed.
Watershed managementVegetation management (other than forest products)
Scoping Start
04/2023 (Estimated)
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/30/2023
Town of Hector · Schuyler, New York
The purpose of this project is to till and smooth fields to allow for desired future management. Old grape vineyard rows are present in the fields, which makes mowing and burning operations for grassland management very difficult.
Vegetation management (other than forest products)
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Rangeland Vegetation Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 3/29/2023
Town of Killington · Rutland, Vermont
Special use authorization of 0.08 acres of the Killington Town Hall parking lot on National Forest lands.
Special use management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/29/2023
Town of Manchester · Bennington, Vermont
This project would consist of the issuance of a special use permit amendment to the Wilcox Cultivation Permit. The amendment would allow Mr. Wilcox to cultivate the 8.3 acre field adjacent to his current permit area.
Special use management
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/6/2023
Town of Hector · Schuyler, New York
This project would maintain and restore the blueberry patch at the Blueberry Patch Campground. The desired outcome is to re-invigorate the patch, plant new blueberry shrubs, and increase health and productivity.
Recreation managementRoad management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management; Road Maintenance; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Middlebury Ranger District · updated 2/7/2023
Town of Lincoln · Addison, Vermont
The proposed action would authorize three maple tapping operations which have requested forest product special use permits to begin or expand operations.
Special use management
Comment Period
11/10/2022
Objection Period Start
12/16/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 1/6/2023
Town of Leicester · Addison, Vermont
Vermont Huts Association and the Moosalamoo Association are proposing the construction and operation of a hut at Silver Lake. The proposed hut would be open to the public for year-round recreation.
Recreation managementFacility managementSpecial use management
Decision
01/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.12 (12), 36 Cfr 220.6(D)(12); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 12/19/2022
Town of Lincoln · Addison, Vermont
Special use permit to Green Mountain Power (GMP) for a proposed above ground line extension on Cobb Hill Road. Upon completion of the project the new line would be added to the GMP Master Permit.
Special use management
Decision
12/2022 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 12/16/2022
Town of Hector · Schuyler, New York
The project purpose is to rehabilitate and restore natural soil water drainage rates by breaking up drainage tiles.
Watershed management
Decision
08/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 12/16/2022
New Jersey, Jefferson Township, Morris County · Rutland, Vermont
Complete a multi-resource management plan for an 145-acre New Jersey tract purchased via the Legacy Tract Program. Although under USDA Forest Service jurisdiction, management will be provided by the New Jersey Department of Environmental Protection.
Land management planning
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Creation/Revision |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/28/2022
Towns of Goshen and Bristol. · Addison, Vermont
This project would issue a permit for an application for construction and use of a skid road on Forest Service land to accomplish logging on adjacent private lands.
Special use management
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 11/28/2022
Town of Warren · Washington, Vermont
The purpose of this project is to prevent further resource damage from beaver activity by enhancing riparian vegetation at Blueberry Lake by live staking willow cuttings along sections of the shoreline.
Wildlife, fish, rare plantsWatershed management
Decision
12/2021 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/28/2022
Town of Salisbury. · Addison, Vermont
The proposed action is to reconfigure the parking area at the Falls of Lana Trailhead by widening and repaving the existing parking lot. This would allow for 15 additional parking spaces.
Recreation management
Decision
03/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 11/28/2022
Town of Hector · Schuyler, New York
Self-sustaining recreational fisheries would be created by stocking fish at four ponds on the Finger Lakes National Forest: Ballard, Teeter, Foster, and Potomac. Large woody debris would also be placed along the shoreline to provide cover for fish.
Wildlife, fish, rare plants
Decision
12/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 11/28/2022
Town of Lincoln · Addison, Vermont
The proposed action would authorize maple tapping operations through a Special Use Permit (SUP) to expand operations on lands administered by the GMNF. The permit would cover operations on 12 acres for up to ten years.
Special use managementForest products
Decision
11/2021 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/28/2022
Town of Goshen · Addison, Vermont
The proposed action is to amend the Goshen Dam Spillway permit (ROC365) in include an additional 0.5 acres to the permit area for the check dams (see project map), and to amend the expiration date to December 31, 2026.
Special use management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Town of Peru · Bennington, Vermont
This project would issue a SUP with a term of 5 years to Green Mountain Power, authorizing them to construct approximately 3,120 feet of underground powerline, five junction boxes, and 1,080 feet of new above-ground line.
Special use management
Decision
10/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Town of Readsboro · Bennington, Vermont
The project purpose is to mitigate impacts and degradation of a wetland complex that the trail currently runs through. This proposal also seeks to address the recent loss of access to a connector trail through private property.
Recreation management
Decision
11/2021 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hector Ranger District · updated 11/28/2022
Towns of Hector, Lodi, and Covert · Schuyler; Seneca, New York
The project aims to reduce the impacts that non-native invasive plants are having on the Forest by using a variety of treatment options for their control or eradication. This project would supersede the 2008 FLNF Invasive Plant Control decision.
Vegetation management (other than forest products)
Comment Period
03/11/2020
Objection Period Start
03/31/2021
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Noxious Weed Treatments |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Towns of Winhall and Dover. · Bennington; Windham, Vermont
Three trail bridges on the Manchester Ranger District would be replaced due to their poor structural integrity and to provide trail users with a safe and enjoyable route over water crossings.
Recreation management
Decision
06/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/28/2022
Town of Middlebury · Addison, Vermont
This project consists of the closure and conveyance of the Middlebury Office Administrative Site to reduce and align facilities and infrastructure with current staffing and budget levels.
Land ownership managementFacility management
Decision
05/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Town of Shrewsbury · Rutland, Vermont
The project would relocate the Minerva Hinchey Shelter onto National Forest land, construct a new moldering toilet, and decommission an unauthorized trail network near the shelter.
Recreation managementFacility management
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Facility Maintenance; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Town of Dover · Windham, Vermont
The project would remove three existing ski lifts and replace them with two higher-capacity lifts to reduce wait times and ease trail congestion.
Recreation management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/28/2022
Towns of Middlebury and Hancock. · Addison, Vermont
The project proposal includes activities at three sites: 1) Oak Ridge Trailhead reconstruction, 2) North Country National Scenic Trail construction (0.3 miles), and 3) existing trail improvements.
Recreation management
Decision
03/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 11/28/2022
Town of Lodi · Seneca, New York
This project would correct some deep channel cutting as a result of increased water flow from a culvert under Townsend Road.
Watershed management
Decision
02/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Town of Woodford · Bennington, Vermont
The project would construct new Nordic ski trail segments, widen existing trails, and install culverts to relieve trail congestion, increase skier safety, and enhance the recreational experience at Prospect Mountain.
Recreation management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 11/28/2022
Towns of Hector, Lodi and Covert · Schuyler; Seneca, New York
Releasing fruiting species from competing vegetation. Many heirloom varieties exist and have flourished on the FLNF. In order to keep them they need to be maintained.
Wildlife, fish, rare plantsVegetation management (other than forest products)Watershed management
Decision
02/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Scenery Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Towns of Winhall and Manchester · Bennington, Vermont
Add two sections of existing snowmobile trail totaling about 1.1 miles in use and maintained by the VT Association of Snow Travelers (VAST) to the Forest Service trail system. (Cancelled due to storm damage)
Recreation management
Decision
05/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 11/28/2022
Town of Warren · Washington, Vermont
The project would replace the slow 34-year-old fixed grip triple chairlift with a with a new, lower-profile, dependable fixed grip quad chairlift, giving better access to upper terrain of Lincoln Peak.
Facility managementSpecial use managementRecreation management
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 11/28/2022
Town of Warren · Washington, Vermont
The project would realign the current trail to a more downhill and skier friendly traverse connecting the top of Valley House chairlift to the bottom of Heaven's Gate chairlift.
Special use managementRecreation management
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 11/28/2022
Towns of Lodi and Hector. · Schuyler; Seneca, New York
This project would replace the deteriorating or failing water control structures at 8 ponds with new functional water control structures and associated plumbing. The ponds would then be dredged to reduce sediment levels.
Watershed management
Decision
01/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 11/28/2022
Town of Rochester. · Windsor, Vermont
This project would replace the West Hill bridge with a new structure meeting the load limit required for local and Forest Service needs.
Road management
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2022
Town of Dorset. · Bennington, Vermont
The purpose of this project is to establish white oak seedlings in a genetic test to evaluate which parents produce high quality seedlings, and which sources of white oak are best adapted to this site.
Research
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/28/2022
Town of Ripton · Addison, Vermont
The proposed action includes the decommissioning of 0.6 miles of multi-use nonmotorized trail and construction of 0.5 miles of multi-use nonmotorized trail. The newly constructed trail would be designated as a Class 3 cross-country ski trail.
Recreation management
Scoping Start
07/2022 (Estimated)
Decision
08/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/8/2022
Town of Readsboro · Bennington, Vermont
The project would create additional glades on the southern portion of Dutch Hill backcountry ski area to provide terrain for recreation and clear vegetation for vista improvement near the summit of Dutch Hill.
Recreation management
Decision
09/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Scenery Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/24/2022
Towns of Goshen and Bristol · Addison, Vermont
Authorization of two permits for construction and use of skid roads to accomplish logging on private lands under Vermont%u2019s land use program.
Special use management
Decision
06/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/24/2021
Forest-wide · Addison; Bennington; Rutland; Washington; Windham; Windsor, Vermont
Review of new information for Forest Plan roads management direction is documented in the Final Roads Management Supplemental Information Report dated July 2021. Conclusion is no amendment is needed but Plan administrative changes have been.
Road managementLand management planning
Comment Period
04/28/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/24/2021
Towns of Mount Tabor, Weston, and Stratton · Bennington; Windham; Windsor, Vermont
The project would remove encroaching, over-topping trees and other vegetation from around apple trees and would prune apple tree branches to restore their fruit production and overall vigor.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/25/2021
Town of West Dover · Windham, Vermont
This project would authorize Mt. Snow to install infrastructure associated with an interactive skiing app and increase areas on the mountain where electrical power would be available.
Recreation management
Decision
06/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt. |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 5/19/2021
Towns of Goshen and Bristol · Addison, Vermont
The purpose and need for this project is to respond to an application submitted by Green Mountain Power as part of an ongoing state-wide project to upgrade power lines to current standards and to provide more reliable service.
Special use management
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 5/14/2021
Towns of Wallingford and Weston · Rutland; Windsor, Vermont
The project would release apple trees by removing over-topping tree species and pruning excess vegetative growth to restore their fruit production and overall vigor.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hector Ranger District · updated 4/12/2021
Towns of Lodi and Hector · Schuyler; Seneca, New York
Improve forest health, restore ecological function and character to forest stands, and enhance wildlife habitat by harvesting timber and other vegetation management activities on approximately 800 acres throughout the Finger Lakes National Forest.
Vegetation management (other than forest products)Forest productsWatershed managementWildlife, fish, rare plants
Objection Period Start
11/18/2016
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/29/2021
Town of West Dover · Windham, Vermont
Project Cancelled - NEPA analysis no longer needed because the action was modified to fit within an existing pre-disturbed trail corridor and is covered by the ski area permit maintenance annual operating plan.
Watershed managementRegulations, directives, orders
Scoping Start
01/2021 (Estimated)
Decision
03/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Harzardous Waste Compliance Actions |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/16/2021
Towns of Sunderland and Glastenbury · Bennington, Vermont
This project consists of large wood placement on approximately 2.1 miles of stream along the South Fork of the Roaring Branch where chainsaws will be used to directionally fell and position trees from the adjacent streamside.
Wildlife, fish, rare plantsWatershed management
Decision
03/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/11/2021
Town of Woodford · Bennington, Vermont
The purpose for this project is to respond to an application for a right-of-way (ROW) permit from Woodford Lake Association Inc. for winter access by snowmobiles to an existing trail system.
Special use management
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 2/22/2021
Town of Sunderland · Bennington, Vermont
This project would remove trees on 21 acres from two permanent wildlife openings to allow for planned maintenance of the openings. This would be a complimentary action to a timber sale implemented for the Early Successional Habitat Project.
Wildlife, fish, rare plants
Decision
02/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 2/18/2021
Town of Hector · Schuyler, New York
Construction of new trails or upgrade existing trails and parking areas on the FLNF in order to provide a wide array of recreation opportunities, increase safety, and reduce resource impacts.
Recreation management
Decision
02/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 1/26/2021
Town of Landgrove · Bennington, Vermont
The purpose of the project is to respond to an application for winter use of an existing log landing and skid road from Cobb Lumber Inc. on National Forest Lands. Use of this log landing would be needed for two years.
Special use management
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Hector Ranger District · updated 11/5/2020
Towns of Hector, Lodi, and Covert · Schuyler; Seneca, New York
Plant native warm season grasses and pollinator mix on up to 450 acres of grasslands over a 15-year period using activities such as prescribe burning, herbicide (glyphosate product), no-till equipment and mowing.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
11/19/2019
Objection Period Start
09/12/2020
Decision
11/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 10/20/2020
Town of Goshen · Addison, Vermont
Re-establish and maintain low-bush blueberry openings on 63 acres in and around the Goshen Blueberry Management Area. Includes commercial removal of trees and control of brush with mastication and prescribed fire.
Fuels managementWildlife, fish, rare plants
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Timber Sales (Green) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/22/2020
Town of Weston · Bennington, Vermont
This project would designate 0.25 miles of Forest Road 299 as a hiking trail. No bridges or other trail tread infrastructure would be built.
Recreation management
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/3/2020
Town of Mount Tabor · Rutland, Vermont
Harvest mature trees that have encroached into the permanent opening since its creation in 1982. Trees would be removed with traditional harvest equipment on about 15 acres of the total 30 acre opening and restore it to early successional habitat.
Wildlife, fish, rare plants
Decision
07/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Timber Sales (Green) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 7/17/2020
Town of Ripton · Addison, Vermont
This project would relocate and upgrade trails at the Robert Frost Wayside site in order to improve user safety and universal accessibility, address streambank erosion, and respond to public feedback for future recreation site management.
Recreation management
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 7/17/2020
Towns of Leicester, Peru, Ripton, and Winhall · Addison; Bennington; Rutland; Windsor, Vermont
Release white pine, oak and hickory regeneration from competition via non-commercial, non-ground disturbing, hand felling on 54 acres in six separate stands across the Forest.
Vegetation management (other than forest products)
Decision
07/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/15/2020
Town of Bridgewater · Windsor, Vermont
Trail improvements are necessary to address erosion, slumping, sedimentation and hydraulic connectivity concerns. Improvements include a 500 foot trail relocation, installation of drainage structures, and gate installation.
Recreation management
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 5/20/2020
Towns of Hector and Lodi · Schuyler; Seneca, New York
Reauthorization of a special use permit for a term of five years, authorizing three annual Pioneer Youth Treks in which up to 90 people with wheeled hand carts re-enact the migration of early members of their church on a pre-approved route.
Special use management
Decision
05/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 5/20/2020
Town of Rochester · Windsor, Vermont
This project would authorize the Town of Rochester, Vermont to replace an existing road bridge on West Hill Road (Forest Road 41).
Special use managementRoad management
Decision
05/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 5/18/2020
Town of Goshen · Addison, Vermont
This project would authorize Green Mountain Power to install an electric line and fiber optic cable to Goshen Dam which would enable remote sensing of water levels and flows at the dam and remote operation of valves and gates.
Special use management
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Hydropower; Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 4/9/2020
Town of Granby · Essex, Vermont
Reissue a special use permit to Vermont Association of Snow Travelers for the operation and maintenance of a segment of a snowmobile trail located on a Forest Legacy Tract. The fee title of the tract located in Granby, VT is owned by the U.S.
Special use management
Scoping Start
04/2020 (Estimated)
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 4/8/2020
Town of Wallingford · Rutland, Vermont
The project would remove Feller Brook Trail and Wallingford Pond Spur C from the National Forest System Trails Database. These trails have not seen snowmobile use in several years and are missing two bridges.
Recreation management
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/30/2020
Town of Pownal · Bennington, Vermont
The Town of Bennington plans to harvest timber on lands adjacent to National Forest System (NFS) land in 2019-22. The proposal includes 0.8 miles of skid trails to be constructed/reconstructed on NFS land under the authority of a Special Use Permit.
Special use management
Scoping Start
07/2019 (Estimated)
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/26/2020
Towns of Hector and Lodi · Schuyler; Seneca, New York
Project cancelled. Duplicate entry of project number 56894.
Special use management
Scoping Start
04/2020 (Estimated)
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/20/2020
Town of Dover · Windham, Vermont
Sections of Moonwalk, Little Dipper, Big Dipper, and Moonbeam trails would be widened from 25 to 30 feet to better accommodate beginner level skiers.
Special use management
Decision
02/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 2/24/2020
Town of Woodford · Bennington, Vermont
A permit with a two year term would be issued to Green Mountain Power for construction of an underground powerline from an existing pole on Little Pond Road (Forest Road 275) and install approximately 600 feet of conduit.
Special use management
Decision
02/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 2/24/2020
Town of Peru · Bennington, Vermont
Issuance of a Special Use Permit to replace an expiring right of way easement for a road that is 3,160 feet long. The right of way width would be increased to 16 feet to allow for maintenance of drainage structures.
Special use management
Decision
02/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 1/30/2020
Towns of Hector and Lodi · Schuyler; Seneca, New York
Reauthorization of a Recreation Event permit for a term of five years, authorizing an annual long distance footrace.
Special use management
Decision
01/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 1/17/2020
Multiple towns. · Addison; Bennington; Chittenden; Orange; Rutland; Windham; Windsor, Vermont
Re-authorize the operation and maintenance of all existing Fairpoint Telephone lines located across the Forest.
Special use management
Decision
01/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 1/17/2020
Towns of Woodford and Bennington · Bennington; Windham, Vermont
Reauthorization of a Recreation Event permit for a term of five years, authorizing two annual snowmobiling events.
Special use management
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 1/14/2020
Town of Rochester · Windsor, Vermont
Flooding in 2019 has caused bank failure of Bingo Brook and erosion of Bingo Brook Road. The Town of Rochester has requested a permit to reroute 150 feet of road temporarily, and 575 feet rerouted permanently at a later date.
Road managementSpecial use management
Decision
01/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Maintenance; Road Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 1/14/2020
Multiple towns · Addison; Rutland; Washington; Windsor, Vermont
Reauthorization of Outfitter & Guide permits for True North, Confluence, Killington Mountain Guides, Alectoris Fontinalis and Alpine Endeavors for a term of ten years. Activities include backpacking, cross country skiing, fishing and rock climbing.
Special use management
Decision
01/2020 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 1/10/2020
Town of Chittenden · Rutland, Vermont
Re-issue a ten year Special Use Permit Mountain Top Inn & Resort to operate and maintain 12 miles of Nordic trail system and operate guided horseback rides on 3.6 miles of roads and trails on National Forest System lands.
Special use management
Decision
10/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/23/2019
Town of Peru · Bennington, Vermont
Reissue a 10-year special use permit authorizing Wild Wings Ski Touring Center to operate and maintain a system of cross-country ski trails totaling approximately 6.35 miles. Cancelled at decision memo level due to CE category change to 220.6(d)(9)
Special use management
Scoping Start
10/2019 (Estimated)
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (9), 36 Cfr 220.6(D)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 12/19/2019
Towns of Hector and Lodi · Schuyler; Seneca, New York
This project would authorize issuance of a permit to William Perry to place beehives on the National Forest. He would mow two locations 40 by 50 feet in size to place up to 30 hives in each from April 15 to October 15 annually.
Special use management
Decision
12/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 11/22/2019
Multiple Towns · Addison; Rutland; Washington; Windsor, Vermont
Decommission 31 miles of National Forest System (NFS) trails and add .25 miles of snowmobile trail. Trail decommissions include 15 miles snowmobile use; 14 miles pedestrian use; and 2 miles multiple use (x-country ski, snowshoe & mountain bike).
Recreation management
Decision
11/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Wilderness Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/23/2019
Towns of Mount Tabor and Peru. · Bennington; Rutland, Vermont
This project has been scaled back to only include trail maintenance and replacement of existing structures in-kind which does not require a Decision Memo.
Recreation management
Decision
10/2019 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/12/2019
Town of Rochester · Windsor, Vermont
The project consists of issuance of a Special Use Permit to Mr. Marques to reconstruct and maintain part of the Tunnel Brook trail to his private property. The trail on NFS lands is .15 mile long and 16 feet wide, covering approximately .55 acres.
Special use management
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 8/9/2019
Towns of Hector, Lodi, Covert · Schuyler; Seneca, New York
The FLNF Allotment Management Plan (AMP) guides the use of grazing/other activities on FLNF pastures through an Agreement with the Hector Grazing Association. The project will review the AMP and Agreement to ensure both are meeting Forest Plan goals.
Vegetation management (other than forest products)Grazing managementSpecial use managementWildlife, fish, rare plants
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Grazing Authorizations; Rangeland Vegetation Improvements; Grazing Structural Improvements |
| Finger Lakes National Forest Allotment Management Plan and Grazing Agreement Reissuance Project | Decision Signed Date: 08/08/2019 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/6/2019
Green Mountain National Forest, Town of Somerset · Windham, Vermont
Close about 1/4 mile section of the Catamount Cross Country Ski Trail that is within a streambed and replace with new trail construction in an adjacent upland forested area to the west.
Recreation management
Decision
06/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Catamount Trail East Branch Somerset Relocation Project | Decision Signed Date: 06/30/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/6/2019
Shared cross country ski trail and powerline route between Vermont Route 73 and the Blueberry Management Area in Goshen. · Addison, Vermont
Relocate a portion of the Catamount Trail, a cross country ski trail, between Vermont Route 73 and the Blueberry Management Area in Goshen. The new route would improve safety and decrease trail tread maintenance.
Recreation management
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Catamount Trail Relocation (Goshen Power Line) Project | Decision Signed Date: 08/05/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/1/2019
Towns of Peru and Winhall · Bennington, Vermont
The project would consist of issuance of a special use permit to the Green Mountain Trailblazers for a private snowmobile trail. The trail would be maintained to Forest Service standards for a snowmobile trail. Other use would be excluded.
Special use management
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 7/31/2019
Town of Chittenden · Rutland, Vermont
Construct an approximate 1.6 mile segment of the Catamount Trail to provide connectivity between Forest Trail 134, Round Robin Trail, and the South Pond parcel. The trail will be managed for cross-country ski use.
Recreation management
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 7/25/2019
Town of Winhall · Bennington, Vermont
Isaiah Slade has applied for a special use permit authorizing the construction of a driveway that is 85 feet long, and 20 feet wide to reach his private property. Surrounding private property is too steep to reach the building site.
Special use management
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 7/25/2019
Town of Ripton · Addison, Vermont
The project would consist of the issuance of a road right-of-way permit to Mr. Smith for the reconstruction, utilization, and maintenance of a timber haul road and a gate. The road would be 16 feet wide and 0.46 miles long, covering 0.89 acres.
Special use management
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Rochester Ranger District · updated 7/24/2019
Rochester Ranger District, Town of Hancock, Vermont · Addison, Vermont
Decommission and restore Boyden Brook Road/Trail (FR 49/FT 749) to improve watershed conditions. The relocation of Boyden Brook Trail (FT 749) has been removed from the proposal pending confirmation of a sustainable route across private land.
Watershed managementRoad managementRecreation management
Comment Period
05/01/2014
Objection Period Start
04/28/2015
Decision
06/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Trail Management; Travel Management; Watershed Improvements |
| Boyden Brook Road Decommission, Watershed Restoration, and Trail Relocation | Decision Signed Date: 06/22/2015 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 7/24/2019
Towns of Mt. Tabor and Peru · Bennington; Rutland, Vermont
Repair of trail segments along a three mile stretch of Forest Trail 385 (VAST Corridor 7) between Forest Road (FR) 30 and FR 58 that were damaged from Tropical Storm Irene. Repair work consists of bridge and culvert replacement, and fill in washouts.
Recreation managementWatershed management
Comment Period
07/23/2012
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Watershed Improvements |
| Forest Trail 385 Repairs Project | Decision Signed Date: 06/24/2013 Legal Notice Date: 06/26/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Green Mountain And Finger Lakes National Forest All Units · updated 7/24/2019
Green Mountain National Forest · Addison; Bennington; Rutland; Washington; Windham; Windsor, Vermont
Control non-native invasive plants throughout the Green Mountain National Forest using mechanical, manual, chemical, biological, or experimental methods, prescribed fire, or a combination of these.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
07/23/2010
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Forest-wide Non-native Invasive Plant Control Project | Decision Signed Date: 10/19/2010 Legal Notice Date: 10/27/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Throughout the Forest. |
Decision Memo · Rochester Ranger District · updated 7/11/2019
Town of Rochester · Windsor, Vermont
The project consists of issuance of a Special Use Permit to Mr. Beane to reconstruct and maintain part of the Tunnel Brook trail to his private property. The trail on NFS lands is 0.9 mile long and 16 feet wide, covering approximately 1.75 acres.
Special use management
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/28/2019
Multiple Towns · Addison; Rutland, Vermont
Cut and remove over-topping trees on multiple sites to provide apple trees access to sunlight across the Middlebury Ranger District. Includes pruning apple trees to promote tree health and fruit production. Project has been cancelled.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
10/2017 (Estimated)
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/28/2019
Town of Ripton · Addison, Vermont
Issue a long-term special use permit to 'Ride it if You Can' for a rest area in the parking area on Lincoln Gap during the Gran Fondo riding event. Cancelled at decision memo level because event was permitted for less than one year.
Special use management
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/27/2019
Town of Stratton · Windham, Vermont
Approximately 0.2 mile of AT/LT near Stratton Pond would be relocated away from the eastern shore of the pond to reduce impacts to the shoreline and improve water quality. Access to Stratton Pond would still be provided.
Recreation managementWatershed management
Decision
05/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/27/2019
Granville Vermont · Addison, Vermont
The Town of Granville has applied for a special use authorization to make necessary repairs to FR55. This includes moving the roadbed up to 25 feet to re-contour and stabilize a slumping bank with rip rap to increase its stability.
Special use managementRoad management
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/27/2019
Town of Goshen · Addison, Vermont
The project consists issuing a special use permit to Green Mountain Power Corporation for the purpose of reconstructing and extending the spillway at Goshen Dam to withstand floods and meet FERC requirements. The permit area is 0.71 acres.
Special use management
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/27/2019
Town of Warren · Washington, Vermont
Removal and replacement of the existing culvert structure on Hanks Brook at the intersection of Lincoln Gap Road and Hanks Road in the Town of Warren. the new structure will allow free aquatic passage along the stream.
Road managementWildlife, fish, rare plants
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements |
| Lincoln Brook Aquatic Organism Passage | Decision Signed Date: 04/30/2019 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 6/27/2019
Towns of Lodi and Covert · Schuyler; Seneca, New York
Issue permit to NYSEG for 30 years for 5.02 acres of existing aerial powerlines and anchors. Routine maintenance and mechanical vegetation management would be authorized. This project replaces 3 existing permits and reduces duplication.
Special use management
Decision
04/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| New York State Electric & Gas Master Permit Reissuance | Decision Signed Date: 04/22/2019 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/27/2019
Town of Warren · Washington, Vermont
Relocation of the ski patrol building at the top of Heaven's Gate ski lift, to a site adjacent to the skier unload area. The project would require the clearing of a 20 foot by 30 foot area of spruce and fir trees.
Special use management
Decision
05/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 6/27/2019
Hector, New York · Schuyler, New York
Re-create wetlands where agricultural modifications drained wetlands to provide habitat for native reptiles, amphibians, wildlife and native vegetation, and hold water on the landscape longer, slowing rates of runoff and reduce flooding.
Wildlife, fish, rare plantsWatershed management
Decision
05/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/27/2019
Town of Woodford · Bennington, Vermont
Designate 1.6 miles of existing snowmobile trail on a powerline and FR280. Grade trail, install water bars, ditches, 2 culverts, inspect bridge. Remove/block off 2 unauthorized access trails. Remove snowmobile use on 4 miles of Dome Trail, FT393.
Recreation management
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Woodford Lake Estates Powerline Trail Project | Decision Signed Date: 06/07/2019 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Middlebury Ranger District · updated 5/10/2019
Green Mountain National Forest, Towns of Ripton and Lincoln · Addison, Vermont
integrated resource project being designed to increase efficiencies across program areas by using commercial and non-commercial veg management, stewardship contracts, partnerships and CCS agreements to improve ecological conditions and habitat.
Watershed managementWildlife, fish, rare plantsSpecial use managementRoad management
Comment Period
11/10/2007
Decision
03/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Special Use Authorizations; Trail Management; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements |
| Natural Turnpike Project | Decision Signed Date: 03/14/2008 Legal Notice Date: 03/19/2008 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Hector Ranger District · updated 3/21/2019
Towns of Hector, Lodi and Covert · Schuyler; Seneca, New York
Enhancing wildlife and pollinator habitats by planting desirable species in grasslands, shrublands and riparian areas on approx. 1,954 acres. Site preparation/planting include use of mowing, burning, disking, harrow, rototiller, and seed drill.
Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)
Decision
02/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Scenery Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/21/2019
Town of East Dorset · Bennington, Vermont
A private timber sale will occur in conjunction with and adjacent to the Forest Service (FS) Beech Ridge Timber Sale. Timber from the private sale will be skidded over skid trails from the FS sale, under the authority of a Special Use Permit.
Special use management
Decision
02/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 3/12/2019
Town of Warren · Washington, Vermont
VELCO proposes to improve worker safety and emergency response by replacing their 10 foot tower with a taller tower and consolidating all other site users under the authority of an amendment to the Lincoln Peak Electronics Site Association Permit.
Special use management
Decision
03/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 2/26/2019
Towns of Lodi and Hector · Schuyler; Seneca, New York
The Burnt Hill Riders Association has applied to continue to conduct up to 2 competitive horseback riding events per year on trails designated for horseback riding. These events have occurred under special use authority for over 10 years.
Special use management
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/20/2018
Town of Weston · Windsor, Vermont
Bring a pre-existing spring, water pipeline and parking spot that serve a private camp in to compliance with Forest Service regulations by authorizing them under a special use permit.
Special use management
Decision
12/2018 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 12/20/2018
Town of Ripton · Addison, Vermont
Green Mountain Power proposes to reconstruct a power line on VT Route 125 in Ripton, with 5 foot taller poles & covered conductors, under the authority of a Special Use Permit. 808 feet of the line crosses National Forest Lands.
Special use management
Decision
12/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 12/13/2018
a. Ranger District: Manchester b. Town: East Dorset c. County: Bennington · Bennington, Vermont
Timber from a private sale will be skidded over skid trails on adjacent National Forest land the authority of a Special Use Permit. CANCELLED because the project is duplicated in our reporting system.
Special use management
Scoping Start
10/2018 (Estimated)
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/10/2018
Town of Stratton · Windham, Vermont
Relocate section of Lye Brook trail away from Stratton Pond, replace shelter and tenting area privies, relocate north shore tenting area to former Stratton View site, construct 10 person shelter at Stratton View site.
Recreation management
Decision
12/2018 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/3/2018
Town of Warren. · Washington, Vermont
Two sections of Sleeper Trail would be widened between 20-40 feet in order to meet intermediate level standards totaling 0.40 acres. Trees would be removed, stumps pulled and final grading. Blasting not anticipated, but may be necessary in locations.
Recreation managementSpecial use management
Decision
11/2018 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/27/2018
Town of Winhall · Bennington, Vermont
Reissue a 3 year permit for 13.85 acres for an open sewage lagoon, septic spray field, private building, sign, vendor, and parking lot.
Special use management
Decision
11/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 11/7/2018
Town of Lincoln · Addison, Vermont
Issue a 20 year term permit to build a 12-16 foot wide, 0.76 miles long private road to access private property and install a sap line for removing maple sap from the property. The road would extend from Cobb Hill Road to the private property.
Special use management
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Crossman Right of Way Special Use Permit | Decision Signed Date: 11/05/2018 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/7/2018
Town of Woodford · Bennington, Vermont
Reissue expired permit for 20 years to State of VT for 2 hiking trails that connect to Woodford State Park. Relocate one trail out of Aiken Wilderness. Trail right of way will be 4 ft vy 1.36 mi long for 0.43 acres.
Recreation managementSpecial use management
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Woodford State Park Right of Way Special Use Permit | Decision Signed Date: 11/05/2018 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/28/2018
Town of Granville · Addison, Vermont
Issue a 20 year Trail Right of Way permit to the Town of Granville to construct, operate and maintain a hiking trail. Work would include vegetation clearing, constructing drainage features and a 16 foot bridge for a total of 1.75 acres. Cancelled.
Special use management
Scoping Start
07/2018 (Estimated)
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/19/2018
Town of Killington · Rutland, Vermont
Re-issue a 10-year permit to operate and maintain existing nordic trail system. The trail system is comprised of approximately 10.9 miles of trails, of which 1.4 miles, or 13%, is on National Forest land. The permit term would be for 10 years.
Special use managementRecreation management
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Mountain Meadows Special Use Permit Re-issuance | Decision Signed Date: 08/31/2018 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/18/2018
Green Mountain National Forest, multiple towns · Addison; Bennington; Rutland; Windham; Windsor, Vermont
Re-issue Special Use Permit to authorize all existing Green Mountain Power (GMP) power lines located across the Forest and to authorize transfer of permit from Central Vermont Public Service (CVPS).
Special use management
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Multiple counties and towns. |
Decision Memo · Rochester Ranger District · updated 9/17/2018
Town of Warren, Vermont · Washington, Vermont
Issuance of a temporary Special Use Permit to allow logging access to a private parcel of land.
Special use management
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/5/2018
Town of Manchester · Bennington, Vermont
Relocate a 0.4 mile section of the Bald Mountain Trail within the Glastenbury Wilderness to a more sustainable route.
Watershed managementRecreation management
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 8/9/2018
Towns of Chittenden, Goshen and Rochester. · Addison; Rutland; Windsor, Vermont
Designate four trial backcountry ski project sites. Activities include thinning of vegetation to enhance skiable terrain while maintaining a healthy forest structure. Additional activities include installing signage and monitoring impacts of the use.
Recreation management
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 8/6/2018
Town of Chittenden · Rutland, Vermont
Issue a special use permit to Vermont Hut Association to construct and operate a year-round cabin/hut at campground site 16 within the Chittenden Brook campground.
Special area management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Area Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/29/2018
Town of Salisbury · Addison, Vermont
Reissue a Right of Way Special Use Permit for 20 years to the Keewaydin Foundation for the purpose of operating and maintaining 4.53 miles of trail and a trail shelter.
Special use management
Decision
02/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/29/2018
Town of Rochester · Windsor, Vermont
Issue a permit for 20 years for installation of a 2 by 3 foot cistern on the west side of Pine Gap Road to contain spring water for a residence on adjacent private land. The permit area would be less than 0.1 acres.
Special use management
Scoping Start
04/2018 (Estimated)
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/19/2018
Towns of Mendon, Chittenden and Leicester · Addison; Chittenden, Vermont
Issuance of a 10 year Priority Special Use Permit for Outfitting/Guiding of hiking, camping, orienteering, canoeing, kayaking, and rock climbing in pre-approved areas of Chittenden Reservoir, Lefferts Pond and Deer Leap.
Special use management
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 4/24/2018
Town of Hector · Schuyler, New York
Enhance wetland function and reduce erosion around a recovering wetland by re-establishing original wetland outlet and dimensions, dismantling old drainage ditches, and reducing flow through a failing culvert draining into a deeply eroding gully.
Wildlife, fish, rare plantsWatershed management
Decision
04/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments; Special Area Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 3/27/2018
Multiple towns and counties. · Addison; Washington, Vermont
Issuance of an Outfitting and Guiding (O&G) permit for a term of ten years to The Keewaydin Foundation for the purpose of guided backpacking and day hiking.
Special use management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 3/27/2018
Towns of Ripton, Goshen (Addison County), Winhall, Peru (Bennington County), and Pomfret (Windsor County. · Addison; Bennington; Windsor, Vermont
Replace 6 existing bridges on snowmobile and cross country trails, 100 feet of trail relocation on a cross country trail.
Recreation managementWatershed management
Decision
01/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 3/27/2018
Town of Shrewsbury. · Rutland, Vermont
Issuance of a ten year livestock area permit to Aaron Korzun for the purpose of grazing up to 35 cattle and 2 horses.
Special use management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/22/2018
Town of Mount Tabor · Rutland, Vermont
Issue a Special Use Permit to the Danby-Mount Tabor Volunteer Fire Department for a period of two years to maintain an existing sports field on National Forest System lands.
Special use management
Decision
02/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 3/20/2018
Town of Warren · Washington, Vermont
Issue an Outfitting and Guiding (O&G) permit for a term of ten years to Clearwater Sports for the purpose of canoe, kayak and standup paddleboard rentals, lessons, and demos at Blueberry Lake.
Special use management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 3/20/2018
Town of Goshen · Addison, Vermont
Issue a Recreation Event permit for a period of five years to Blueberry Hill Inn, Inc. for the purpose of conducting an annual cross-country trail run.
Special use management
Decision
02/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/8/2018
Town of Hector · Schuyler, New York
Remove hedgerow for grassland birds, provide better access to one of the haying units on the east side of the grassland. Remove the old fences, clear the brush, cut <5 trees over 3 inch dbh using trucks, tractors, chainsaws, and brush cutters.
Special use managementWatershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
02/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Special Use Authorizations; Noxious Weed Treatments; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/7/2018
Town of Woodford · Bennington, Vermont
Upgrade and repair the Upper Loose Moose, Mountain, Hawthorne, Shea's and Danish Delight Nordic ski trails. Work includes the removal of boulders, removing 10 trees, installation of 9 culverts, and some widening and short reroutes of trails.
Special use managementRecreation management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Prospect Mountain Nordic Trail Improvement Decision Memo | Decision Signed Date: 02/16/2018 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 2/26/2018
Towns of Burdett, Hector, Interlaken, Lodi and Ovid (Seneca and Schuyler County) · Schuyler; Seneca, New York
Maintenance of existing grassland and shrubland openings through prescribed fire and mechanical means such as mowing and mastication.
Fuels managementVegetation management (other than forest products)Grazing managementWildlife, fish, rare plantsHeritage resource managementWatershed management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Grazing Allotment Management; Grazing Authorizations; Species Habitat Improvements; Heritage Resource Management; Noxious Weed Treatments; Rangeland Vegetation Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 1/8/2018
Aman East Pasture, East Town Line Road, Covert, NY · Seneca, New York
Remove a culvert and replace with a permanent hardened ford in Boardman Creek east of East Town Line Road in the Aman East Pasture to improve cattle access and water quality
Grazing managementWildlife, fish, rare plantsWatershed management
Decision
01/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Scenery Management; Grazing Structural Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 1/4/2018
Town of Chittenden · Addison, Vermont
Remove old Boondocks Bridge and replace with a groomer bridge on a short relocation. Trail system managed by Mountain Top Resort.
Special use managementRecreation management
Scoping Start
02/2018 (Estimated)
Decision
03/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/20/2017
Town of Killington · Rutland, Vermont
Reissue the existing special use permit authorizing the operation and maintenance of the 0.3 mile segment of the Town of Killington 4 mile River Road Loop Trail that is on National Forest System land.
Special use management
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Killington Town River Road Loop Trail Special Use Permit Reissuance | Decision Signed Date: 12/01/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/28/2017
Town of Peru · Bennington, Vermont
Issue a special use permit for use of an existing 0.25 acre log landing, for temporary storage of 50,000 bf of logs from a 20 acre adjacent private tract. The applicant has an easement to use the road for hauling logs.
Special use management
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sargent Log Landing Special Use Permit Decision Memo | Decision Signed Date: 11/27/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/22/2017
Town of Sunderland · Bennington, Vermont
Relocate approximately 1 mile of Branch Pond Trail out of three significant state wetlands. A combination of trail relocations, puncheons and drainage structures construction will take place.
Watershed managementRecreation management
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements; Wilderness Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/22/2017
Burnt Hill Communications Site, Town of Burdett, NY · Schuyler, New York
Issuance of a Special Use Permit to the New York State Police for the use of Burnt Hill Communications Site.
Special use management
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/22/2017
Multiple towns · Addison; Rutland; Windham; Windsor, Vermont
Reissuance of existing special use permits for six separate maple tapping operations located across the Forest.
Special use management
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forest-wide Maple Tapping Special Use Permits Reissuance | Decision Signed Date: 06/13/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/22/2017
Towns of Readsboro, Woodford, Bristol, Vermont · Addison; Bennington, Vermont
Installation of 4 utility poles and 1,180 feet of powerline to bring power to private parcels in the Towns of Readsboro and Woodford; Reconstruction of 2 utility poles and approx. 300 feet of powerline in the Town of Bristol.
Special use management
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Green Mountain Power 2017 Construction/Reconstruction Special Use Permits | Decision Signed Date: 08/14/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 9/22/2017
Towns of Mendon, Chittenden and Leicester · Addison; Rutland, Vermont
Issuance of a priority use special use permit to conduct guided rock climbing and hiking on National Forest System land. Decision Memo cancelled due to permit not to exceed 1 year thus lower level of NEPA documentation is applicable.
Special use management
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/22/2017
Town of Rochester · Windsor, Vermont
Issue a special use permit to use an existing right-of-way .03 mile in length, 15 feet in width to spur road 62A off of Forest Road 62. Uses include wheeled vehicles during appropriate times of the year, and snowmobile use during the winter.
Special use management
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Maher FLPMA Road Special Use Permit | Decision Signed Date: 06/26/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/22/2017
Towns of Wallingford and Mount Holly (Rutland County), Weston and Ludlow (Windsor County) and Peru (Bennington County) · Bennington; Rutland; Windsor, Vermont
Release of newly identified apple trees in 12 stands. These stands are in addition to those authorized by a separate Decision Memo in January 2017.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
09/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/22/2017
Town of Dover · Windham, Vermont
Authorize the use of National Forest System lands under permit at the Mountain Snow Ski Resort for the establishment and maintenance of a disc golf course. Also, use of existing trails for downhill bike race.
Special use management
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/22/2017
Town of Landgrove · Bennington, Vermont
Issue special use permits to use National Forest System land to 1) the Red Pine Landowners Association for a road (Red Pine Drive) to access private land; and 2) Green Mountain Power for a buried powerline along the road to provide power.
Special use management
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Red Pine Drive Green Mountain Power Powerline Special Use Permit Project | Decision Signed Date: 06/07/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/22/2017
Town of Warren, Washington County, Vermont · Washington, Vermont
Authorize the removal of the existing Village double chairlift and the construction of a fixed-grip quad chairlift in a slightly realigned corridor within the Sugarbush Resort Special Use Permit Area.
Special area managementRecreation management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sugarbush Village Chairlift Replacement Project | Decision Signed Date: 07/18/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 9/11/2017
Town of Ripton · Addison, Vermont
Reissue a special use ski trail permit to Rikert Nordic Center with no changes to operations on the ground.
Recreation managementSpecial use management
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Middlebury College - Rikert Ski Trail Special Use Permit Re-issuance | Decision Signed Date: 08/31/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/5/2017
Town of Mendon · Rutland, Vermont
Reconstruct the Tucker Johnson shelter along the Long Trail (LT) that burned down in 2011. Includes the construction of a short trail (about 200 feet) to connect the shelter to the LT and includes a new privy with a footpath.
Recreation management
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Trail Management |
| Tucker-Johnson Shelter and Privy Replacement Project | Decision Signed Date: 08/24/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 7/18/2017
Ballard Pasture, Town of Hector, NY · Schuyler, New York
Installation of a solar array on one acre located in Ballard Pasture consisting of 56 panels arranged in 2 rows (2 feet x 14 feet) covering 1500 square feet.
Facility management
Decision
05/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Solar Array Installation Project | Decision Signed Date: 05/30/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 7/18/2017
Town of Dover · Windham, Vermont
Construct 800 foot access road, trailhead parking and add existing trail to NFS system. Decision Memo cancelled because the proposal will now be included in the Somerset integrated resource project with scoping anticipated in late 2018.
Recreation managementRoad management
Decision
10/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Road Improvements/Construction |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/24/2017
Towns of Manchester and Mount Tabor · Bennington; Rutland, Vermont
Formalize agreements or issue special use permit to mow existing permanent upland openings near Richville Road. The Mount Tabor ball field opening has been removed from this project because it is covered by an existing NEPA decision.
Wildlife, fish, rare plants
Decision
03/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 3/22/2017
Town of Stockbridge · Windsor, Vermont
Re-issuance of an expired special use permit to cultivate fields on National Forest System land on 2 separate tracts totaling about 25 acres along the White River. This project is now called the Liberty Hill Farm Special Use Permit project.
Special use management
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Liberty Hill Farm Special Use Permit Project | Decision Signed Date: 03/21/2017 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 3/1/2017
Towns of Ripton and Goshen · Addison, Vermont
Issuance of a 5 year Recreation Event permit for an annual Endurance Race in the Moosalamoo National Recreation Area
Recreation managementSpecial use management
Decision
02/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/1/2017
Towns of Hector, Lodi, Covert · Schuyler; Seneca, New York
Issuance of a 5 year Recreation Event Special Use Permit for conducting Springer Spaniel Field Trials. Decision Memo cancelled due to permit not to exceed 1 year thus lower level of NEPA documentation is applicable.
Recreation managementSpecial use management
Scoping Start
02/2017 (Estimated)
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 1/20/2017
Towns of Somerset, Searsburg, Readsboro, Dorset and Wilmington · Windham, Vermont
Release and prune living apple trees in 18 separate stands across the southern portion of the Manchester Ranger District.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
01/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 1/3/2017
Town of Pomfret · Windsor, Vermont
Issuance of a long-term special use permit to use an existing trail on National Forest System land for part of a runner and equestrian endurance race. This annual event would cross the Appalachian Trail near Dana Hill.
Special use management
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 12/23/2016
Town of Goshen. · Addison, Vermont
Remove existing bridge from Elsie's Loop Trail and move it intact to a the Sucker Brook #1 location. The analysis at this level was cancelled because the project fit a category not requiring a Decision Memo.
Special use managementRecreation management
Decision
12/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/23/2016
Multiple towns · Addison; Rutland, Vermont
Issuance of a 5 year Recreation Event permit for Endurance Races. The Endurance Society holds two foot races every year on trails starting at Blueberry Inn.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Endurance Society Priority Special Use Permit Project | Decision Signed Date: 12/16/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/23/2016
Towns of Pittsfield, Chittenden and Ripton · Addison; Rutland, Vermont
Placement of large wood debris in the upper parts and tributaries of Michigan Brook, tributaries of Middle Branch Middlebury River, and Sparks Brook to restore stream functions and improve aquatic habitat. This project was completed in 2015.
Watershed managementWildlife, fish, rare plants
Scoping Start
05/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/22/2016
Town of Hartford · Windsor, Vermont
Relocate a 400-foot section of the Appalachian Trail from private to federal land in Hartford, VT. The analysis at this level is cancelled because the project fits a category not requiring a Decision Memo.
Recreation management
Scoping Start
02/2017 (Estimated)
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/22/2016
Town of Peru · Bennington, Vermont
Relocate about 6,400 foot power line corridor managed by Green Mountain Power (GMP) along North, Savage and Mad Tom Roads. Project cancelled because it is included in the Forest-wide GMP permit reissuance.
Special use management
Decision
12/2016 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/22/2016
Green Mountain National Forest, Town of Winhall · Bennington, Vermont
Special Use Permit for use of a road on National Forest System lands authorizing private individual access to private land for recreation and logging. Cancelled pending further investigation.
Special use management
Scoping Start
10/2014 (Estimated)
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/22/2016
Towns of Pittsfield and Chittenden · Rutland, Vermont
Issuance of a 5 year Recreation Event permit for Endurance races. Peak holds 2 endurance races from Amee Farm on Route 100 in the Pittsfield area.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Peak.com Priority Special Use Permit | Decision Signed Date: 12/16/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 12/22/2016
Town of Valois · Schuyler; Seneca, New York
Issuance of a 5 year special use permit to conduct a 4-H Primitive Pursuits Summer Camp on National Forest System land.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 12/5/2016
Town of Chittenden · Rutland, Vermont
To improve the recreation experience at Lefferts Pond Day Use Area, this project would construct an accessible fishing structure on Lefferts Pond, construct a new 35 car parking area, and improve/widen Forest Road 412 for enhanced access.
Recreation managementRoad managementFacility management
Decision
11/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Road Improvements/Construction |
| Lefferts Pond Day Use Area Parking Expansion and Accessibility Project | Decision Signed Date: 11/28/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/30/2016
Town of Hancock · Addison, Vermont
Relocate and construct an approximate 2 mile segment of the Boyden Brook Snowmobile Trail (Forest Trail 749) in a more sustainable trail location. Complete improvements to the Taylor Brook Trail (FT 700) to bring it to a Class 4 trail standard.
Recreation management
Decision
08/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 9/30/2016
Town of Peru · Bennington, Vermont
Designate and reconstruct trail tread on 5.6 miles existing cross country ski trails and Forest Road 46 for mountain bike use. Cancelled because it was authorized by a category not requiring a Decision Memo.
Recreation management
Scoping Start
07/2016 (Estimated)
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 9/30/2016
Middlebury Ranger District, Town of Goshen · Addison, Vermont
Andrew Marks has applied for access to his private land off the Fay Road in Goshen. Consists of constructing an 80 ft long by 14 ft wide low standard road for wood lot management and recreation use.
Special use management
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/26/2016
Town of Granby · Essex, Vermont
Issue a special use permit to the Town of Granby to relocate an existing hiking trail onto a portion of a Forest Legacy Tract where the fee title is owned by the U.S.
Special use management
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/15/2016
Town of Killington · Rutland, Vermont
The construction of a new, 15 car parking lot located adjacent to Route 100, just north of Kent Pond in Killington, VT. This parking area would serve as an access point to the designated Killington mountain bike trail network.
Road managementRecreation management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Dispersed Recreation Mgmt.; Road Improvements/Construction |
| Killington Parking Lot Project | Decision Signed Date: 09/15/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/7/2016
Town of Warren · Washington, Vermont
Issue a special use permit to authorize Summit Ventures NE, LLC to add the test water well to their community water system by adding buried power to a pump on the well and pipe from the well.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sugarbush Community Well Development Special Use Permit | Decision Signed Date: 09/02/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/19/2016
Town of Woodford · Bennington, Vermont
Rehabilitate roads and trails within the Glastenbury Wilderness. Add barriers to roads and trails that lead into the wilderness; remove Hell's Hollow bridge; and improve existing non-system trail and add it to the trail system.
Watershed managementRecreation management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements; Wilderness Management |
| Bolles Brook Watershed Restoration Partnership Project | Decision Signed Date: 08/11/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 8/9/2016
Town of Hector · Schuyler, New York
Restore wetland function to a drained swamp white oak swamp north of Blueberry Patch Campground by dismantling a drainage ditch, burying non-native invasive plants, and restoring pit and mound topography.
Wildlife, fish, rare plantsWatershed management
Decision
08/2016 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments; Special Area Management; Watershed Improvements |
| FLNF Blueberry Patch Wetland Creation Project | Decision Signed Date: 08/01/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 7/11/2016
Vicinity of Crystal Pond and Haystack Pond, primarily located on US Tract 390a in the town of Wilmington · Windham, Vermont
Place a series of wells and springs on NFS lands near Crystal Pond, and Crystal and Haystack Ponds that provides water to the Town of Wilmington under the proper authorization. There may be new source springs requested.
Special use management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Wilmington Water District Spring Development Special Use Permit | Decision Signed Date: 06/18/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/30/2016
Town of Rochester · Windsor, Vermont
Placement of large wood in Bingo Brook to provide aquatic habitat and restore natural stream functions.
Watershed managementWildlife, fish, rare plants
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 6/28/2016
Green Mountain & Finger Lakes National Forests · Schuyler; Seneca; Addison; Bennington; Rutland; Washington; Windham; Windsor, New York; Vermont
Modify the existing Forest Plan Monitoring Program in compliance with the 2012 Forest Service Planning Rule (36 CFR 219). This is NOT a NEPA project or Forest Plan Amendment. Comment period for proposed changes ended on April 29, 2016.
Regulations, directives, orders
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (2), 36 Cfr 220.6(D)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 6/28/2016
Town of Hector · Schuyler, New York
Replace failing water control structures for Foster and Teeter ponds. This work may require the ponds to be drained, existing structures to be removed, new structures and piping installed, and the dams to be rebuilt.
Wildlife, fish, rare plantsWatershed management
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 4/11/2016
Town of Lincoln · Addison, Vermont
Modify an existing special use permit to Don Gale authorizing the expansion of a permitted sugarbush by adding 12 acres in the northeast corner of his tapping area for the remainder of the current permit term. Access would remain the same.
Forest productsSpecial use management
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Special Products Sales |
| Gale Maple Tapping Expansion Special Use | Decision Signed Date: 03/14/2016 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/24/2015
Towns of Mt. Holly and Weston · Windsor, Vermont
Salvage of wind thrown timber on approximately 30 acres. Salvage will include dead and dying trees.
Forest products
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 10/2/2015
Town of West Dover, Manchester Ranger District, Vermont · Windham, Vermont
Widen alpine ski trail to better accommodate beginner level skiers/riders from the summit at Mount Snow Ski Resort.
Special use managementRecreation management
Decision
06/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Long John 2010 Trail Widening, Summit Local and Sunbrook Lifts Replacement | Decision Signed Date: 06/02/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 10/2/2015
Town of Ripton · Addison, Vermont
Relocate and construct an approximate 0.15 mile segment of the Norske Trail in a more sustainable trail location within the Breadloaf Wilderness that will not require the construction of a new bridge. Remove the dilapidated bridge from wilderness.
Recreation management
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Wilderness Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 10/2/2015
Town of Rochester. · Windsor, Vermont
Designate approximately 3 miles of hiking, biking or multiple use trail adjacent to the Rochester Ranger Station. A trail by the administrative site would provide employees and the public with a multiple loop system of varying skill level/terrain.
Recreation management
Decision
10/2015 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 10/2/2015
Rochester RD, Town of Warren, Vermont · Washington, Vermont
Construct new tree skiing opportunities in designated areas at Sugarbush Ski Resort.
Special use managementRecreation management
Decision
08/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Special Products Sales |
| Sugarbush Tree Skiing Project | Decision Signed Date: 08/04/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Sugarbush Resort, National Forest System land |
Decision Memo · Rochester Ranger District · updated 9/29/2015
Towns of Leicester and Hancock · Addison, Vermont
The project includes the issuance of a two special use permits for the construction/reconstruction and use of roads on National Forest System lands to provide access to seasonal camps and for logging operations on private lands.
Special use management
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Middlebury Ranger District · updated 9/29/2015
Towns of Bristol and Lincoln · Addison, Vermont
Re-establish regenerating and young age class component in aspen/birch communities by commercial timber harvest in mature and high risk stands. Harvest areas include small multiple sites totaling about 60 acres.
Wildlife, fish, rare plantsForest products
Comment Period
04/08/2015
Objection Period Start
07/24/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Timber Sales (Green) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 9/29/2015
Towns of Ripton and Lincoln. · Addison, Vermont
Issue a special use permit to Green Mountain Power to extend, replace, and/or upgrade approximately 4,088 feet of electric distribution line at 3 seperate sites for a total of 1.74 acres of National Forest System land.
Special use management
Decision
07/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 7/22/2015
Town of Peru · Bennington, Vermont
Remove three bridges, build one new bridge, and construct two separate short sections of trail reroute along the existing nature trail.
Recreation management
Decision
07/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Hapgood Nature Trail Project | Decision Signed Date: 07/22/2015 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/29/2015
Town of Woodford · Bennington, Vermont
Reissue a special use permit to the VT Association of Snow Traveler local club Woodford SnoBusters to use an 800 foot long trail for groomer access from their private building onto Forest Road 74.
Special use management
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Woodford SnoBusters Groomer Trail Special Use Permit Re-issue Project | Decision Signed Date: 04/20/2015 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 6/22/2015
Towns of Lodi, Covert and Hector · Schuyler; Seneca, New York
Application of biological and chemical control measures to control the spreading infestation of hemlock wooly adelgid and reduce the chances of widespread hemlock mortality in areas of high hemlock density across the Forest.
Vegetation management (other than forest products)
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/31/2015
Towns of Somerset and Woodford · Bennington; Windham, Vermont
Reissue a special use permit to the VT Association of Snow Travelers local club Woodford SnoBusters for annual day use event at Somerset Landing, and Special People Ride at Red Mill.
Special use management
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Snowmobile Events 2015 Special Use Permit Project | Decision Signed Date: 03/31/2015 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 3/30/2015
Mulitple Towns · Addison; Bennington; Rutland; Windham; Windsor, Vermont
Clarify the management direction for existing communication sites Forest-wide including the Philidelphia Peak repeater within the Battell Wilderness with modification of Forest-wide and Wilderness Area Management Area standards and guidelines.
Land management planning
Comment Period
02/2015 (Estimated)
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
Decision Memo · Hector Ranger District · updated 3/30/2015
Town of Lodi · Seneca, New York
Issue a special use permit to authorize the use of pastures and grasslands for the 2015 English Spaniels National Amateur Championship.
Special use management
Decision
03/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| FLNF Springer Spaniel Field Trial Special Use Permit | Decision Signed Date: 03/27/2015 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 12/23/2014
Town of Killington · Rutland, Vermont
Issue a special use permit for the use of a skid trail and landing to harvest timber on adjacent private land near State Route 100.
Special use management
Scoping Start
02/2014 (Estimated)
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 12/17/2014
Towns of Hector and Lodi · Schuyler; Seneca, New York
Issue a special use permit to authorize the Church of Latter Day Saints youth group to reenact the 19th century Mormon pilgrimage using National Forest trails.
Special use management
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 11/13/2014
Town of Hector. · Schuyler, New York
Approve the renewal of a 5 year Special Use Permit for a long distance footrace on trails and roads within the Finger Lakes National Forest.
Recreation managementSpecial area management
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 11/13/2014
Town of Killington. · Rutland, Vermont
Designate and construct an approximate 15 mile mountain bike loop system composed of beginner, intermediate and advanced trails.
Recreation management
Decision
11/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 11/13/2014
Town of Winhall · Bennington, Vermont
Relocate existing snowmobile trail from Snow Valley private property onto adjacent private property and NFS lands. The portion on NFS lands would be approximately 0.6 mile of newly constructed trail and 0.1 mile of improved existing trail.
Recreation management
Decision
11/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 9/30/2014
Town of Hector · Schuyler, New York
Create an improved and cleaner water source for stock users at Backbone Horse Camp and Trail by dredging and piping to a frost free hydrant.
Recreation managementWatershed management
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/29/2014
Town of Woodford. · Bennington, Vermont
Use the existing trail network at Prospect Mountain to create a 5 km homologated race course. Includes the construction of about 0.4 km of new trail with the remainder to be regraded and brought up to standard.
Special use managementRecreation management
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Prospect Mountain Homologated Racecourse Project | Decision Signed Date: 08/27/2014 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 8/15/2014
Town of Lodi · Seneca, New York
Create a dry fire hydrant along Smith Road for use by local volunteer fire departments and Agency resources to aid in fire protection. The pond would also be dredged to install the hydrant and improve water quality.
Special use managementWatershed management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 8/11/2014
Town of Mount Tabor · Rutland, Vermont
Reroute about 0.7 mile of the existing Old Job hiking trail (FT 412) to a more sustainable location along Lake Brook.
Watershed managementRecreation management
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 8/5/2014
Towns of Shresbury, Mendon and Killington. · Rutland, Vermont
Relocate a portion of Catamount Trail Section 12 to a more sustainable location designed for trail use. This project was covered by a previous analysis decision so a new Decision Memo is no longer needed.
Recreation management
Scoping Start
07/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/5/2014
Middlebury Ranger District, Town of Ripton · Addison, Vermont
GMP has applied to add an electric distribution line to an existing pole-mounted phone line south along the Ripton-Lincoln Road near the intersection with the North Branch Road. This project is now part of the North Zone GMP Special Use project.
Special use management
Scoping Start
07/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/5/2014
Town of Ripton · Addison, Vermont
Issue a permit to Gree Mountain Power (GMP) to bury a new power line in an opening behind a screen of vegetation north of State Route 125 near Rober Frost interpretive site. Now part of the North Zone GMP special use project.
Special use management
Scoping Start
07/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 8/5/2014
Town of Lincoln · Addison, Vermont
Issue permit to Green Mountain Power (GMP) to replace old aerial powerline on NFS land on east side of Downingville Road. This is now part of the North Zone GMP Special Use project.
Special use management
Scoping Start
07/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 8/4/2014
Towns of Granville, Ripton, and Hancock. · Addison, Vermont
Project will address the non-conforming infrastructure (roads) that may inhibit naturally occurring ecological processes to take place. Roads within the Battell and Breadloaf will be restored closer to natural conditions.
Road managementRegulations, directives, orders
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Use Adjustments; Road Decommissioning; Wilderness Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Rochester Ranger District |
| Legal Land Description | Forest-wide |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 7/22/2014
Multiple Towns · Addison; Rutland; Windsor, Vermont
Maintenance of existing permanent open areas on the Middlebury and Rochester Ranger Districts, and Appalachian Trail Corridor by mowing, hand-cutting, chipping, and/or prescribed fire on 155 seperate sites for a total of about 1,309 acres.
Road management
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Scenery Management; Timber Sales (Green) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 7/21/2014
Town of Peru · Bennington, Vermont
Create and maintain three glade skiing trails approximately 25 feet wide at Bromley Ski Area. Includes minimal clearing and has no earth disturbance. The closed canopy will be maintained.
Special use managementRecreation management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management; Special Area Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 7/11/2014
Town of Lodi · Schuyler; Seneca, New York
Construct shallow water depressions in the A-House West and Potomac North grasslands, and reshape existing pond in the Terry Berry grassland to re-create natural-appearing and functional wetland habitat.
Wildlife, fish, rare plantsWatershed management
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 7/1/2014
Town of Warren. · Washington, Vermont
Install a new communication line in a trench that would upgrade chairlift safety switches, and telephone and electronic lines. Includes the removal of selected trees to provide a safer approach. Decision Memo not needed due to scope of the project.
Recreation managementSpecial use management
Scoping Start
04/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 6/30/2014
Green Mountain National Forest; Manchester RD, Town of Mt. Tabor · Rutland, Vermont
Reissue existing Special Use Permit for cultivation of NFS lands. Cancelled because the permit is no longer needed.
Special use management
Scoping Start
05/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 6/30/2014
Towns of Pittsfield, Chittenden and Ripton · Addison; Rutland, Vermont
Placement of large woody debris within the upper portions and tributaries of Michigan Brook, tributaries of Middle Branch Middlebury River, and Sparks Brook to restore stream functions and improve aquatic habitat.
Watershed managementWildlife, fish, rare plants
Decision
06/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 6/30/2014
Town of Hancock · Addison, Vermont
Relocate a portion of existing snowmobile trail (FT777) to a more sustainable location. Activities include construction of 0.8 mile of new trail, decommissioning 1.0 mile of existing trail, watershed restoration, and issuing 2 special use permits.
Watershed managementRecreation management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 4/3/2014
Town of Lodi · Seneca, New York
Removal of all hedgerows within the Peterson pasture that are not adjacent to streams or cattle ponds making this pasture more open and more appealing to grassland nesting birds.
Grazing managementWildlife, fish, rare plants
Decision
04/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 3/31/2014
Multiple towns and counties. · Addison; Bennington; Rutland; Washington; Windham; Windsor, Vermont
Non-commercial timber stand improvement activities within multiple stands across the Forest to release desireable hardwood and softwood tree species from competing vegetation. Stands and acres to be treated will be determined prior to formal scoping.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/31/2014
Kelley Stand Parking Lot to IP Road, Town of Stratton, Manchester Ranger District · Windham, Vermont
Designate existing roads / snowmobile trails for mountain bike and equestrian use. Some trail hardening will occur.
Recreation management
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/31/2014
Town of Dover · Windham, Vermont
Reconstruct 1,800 ft of existing trail, construct 1,300 ft of new single track trail in tree islands between ski trails with mini-excavator. Minimal removal of trees, build up tread with native or imported mineral soil, install drainage structures.
Special use managementRecreation management
Decision
04/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 3/31/2014
Hapgood Pond and Utley Brook Areas, Town of Peru, Manchester Ranger District · Bennington, Vermont
Designate existing roads and trails for mountain bike use. No construction of new trails, although some trail hardening will occur.
Recreation management
Scoping Start
10/2011 (Estimated)
Decision
12/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/31/2014
Town of Manchester · Bennington, Vermont
B. Potekhen will log land he owns next to US Tract 304 purchased by the U.S. Government last year. Historic logging has used a landing on this tract. Issue a permit to authorize the use of the existing landing.
Special use management
Scoping Start
01/2014 (Estimated)
Decision
03/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 3/31/2014
Town of Warren · Washington, Vermont
Replacement of existing double chair lift with a new four passenger lift. Includes excavation needed to install new lift tower and terminal foundations, and improving skier unloading and trail intersection congestion at top of new lift.
Special area managementRecreation management
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 3/31/2014
Wagonwheel Extension is an old road from Rikert Ski Touring Center to an intersection with the shared VAST / Catamount trail in Ripton, VT · Addison, Vermont
Provide a long, groomed outer woods loop opportunity for Nordic skiers at Rikert Ski Touring Center which is apready permitted to operate a Nordic ski center. Loop will also provide access to the Catamount Trail from Rikert; a gate may be required.
Special use managementRecreation management
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Rochester Ranger District · updated 3/31/2014
Town of Rochester · Windsor, Vermont
Restore a segment of the West Branch White River that was damaged by gravel mining operations following tropical storm Irene. Work includes the placement of woody debris and boulders to reduce erosion and provide high quality fish habitat
Wildlife, fish, rare plantsWatershed management
Decision
04/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 3/31/2014
Town of Woodford, Manchester Ranger District, area around Woodford Lake Estates housing association · Bennington, Vermont
Designate a section of the powerline corridor, FR 280 & two access trails connecting Woodford Lake Estates to the NFS snowmobile trail system. The proposal includes the decommissioning of the 4 mile Dome Trail (FT 393) in the Lamb Brook area.
Recreation management
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 3/30/2014
Towns of Shrewsbury, Killington, Bridgewater, Pomfret and Hartford · Rutland; Windsor, Vermont
Maintenance of permanent open areas within the Appalachian Trail corridor between the towns of Shrewsbury and Hartford, VT. Includes mowing, handcutting and chippiing on multiple sites to provide wildlife habitat and improve scenery along the trail.
Recreation managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
01/2014 (Estimated)
Decision
03/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Trail Management; Scenery Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/30/2014
Town of Hector · Schuyler, New York
Construct three shallow water depressions in the eastern portion of the Potomac North grassland for wildlife to recreate natural appearing and functional wetland habitat.
Wildlife, fish, rare plantsWatershed management
Scoping Start
03/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 3/30/2014
Town of Hector · Schuyler, New York
Reshape existing, unused constructed pond into a shallow wetland to recreate natural appearing and functional wetland habitat.
Watershed managementWildlife, fish, rare plants
Scoping Start
03/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Manchester Ranger District · updated 12/30/2013
Town of Readsboro · Bennington, Vermont
Issue permit to Green Mountain Power to replace aerial powerline running both cross country north of West Hill Rd and along that road in Readsboro. About 0.205 acre of NFS land will be affected.
Special use management
Comment Period
08/19/2013
Decision
12/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Green Mountain Power Powerline Relocation - Town of Peru | Decision Signed Date: 12/16/2013 Legal Notice Date: 12/23/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 12/30/2013
Green Mountain NF, Town of Winhall · Bennington, Vermont
Reissue an expired special use permit to The Lodge at Pinnacle View for the use of 13.85 acres of NFS lands for miscellaneous facilities.
Special use management
Comment Period
09/13/2013
Decision
11/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 12/27/2013
Town of Hector · Schuyler, New York
Place large woody debris into Breakneck Brook to restore aquatic habitat functions. Trees and rootwads would be placed and anchored with a small tracked excavator.
Watershed managementWildlife, fish, rare plants
Comment Period
07/23/2013
Decision
10/2013 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 11/19/2013
A variety of locations across Green Mountain National Forest System lands. · Addison; Bennington; Rutland; Washington; Windham; Windsor, Vermont
Project will review issue of Special Use authorizations to Outfitters and Guides for recreational/educational trips which have not caused significant resource impacts in the past. Authorizations may exceed one year and cover a range of activities.
Recreation managementSpecial use management
Comment Period
03/19/2013
Decision
10/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 215 |
| Project Activity | Dispersed Recreation Mgmt.; Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 9/30/2013
Town of Killington · Rutland, Vermont
Construct a trail within the special use permit area for winter snowshoe use. The trail would be about two feet wide and 1500 feet long and connect with the snowshoe trail on private lands to create a loop.
Special use managementRecreation management
Comment Period
07/22/2013
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Trail Management |
| Mountain Meadows Snowshoe Trail | Decision Signed Date: 09/26/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rochester Ranger District · updated 9/30/2013
Town of Shrewsbury · Rutland, Vermont
Issue a special use permit to the Federal Highway Administration to replace a bridge on Town Highway 13 that was damaged by Tropical Storm Irene in 2011.
Special use management
Scoping Start
07/2013 (Estimated)
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hector Ranger District · updated 9/29/2013
Towns of Hector and Lodi · Schuyler; Seneca, New York
Issuance of a Special Use Permit to allow a bi-annual competitive horse ride on the existing National Forest Horse Trail System. The permit would be for a five year period.
Special use management
Comment Period
06/05/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Rochester Ranger District · updated 9/29/2013
Towns of Pomfret and Hartford · Windsor, Vermont
Reclaim the vistas and wildlife habitat by re-opening these fields. Howard Hill involves removal of woody vegetation from interior and edges. Briggs-Peters involves mowing grass and golden rod.
Wildlife, fish, rare plants
Comment Period
04/02/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Scenery Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 9/29/2013
Town of Warren · Washington, Vermont
Construct new 75 foot approach to In Road Trail which connects Easy Rider Trail to Out to Lunch Trail to improve site distance and grade. Approximately 10 trees would be removed, stumps pulled and trail graded for a total of about 1,200 square feet.
Special use managementRecreation management
Comment Period
07/01/2013
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Sugarbush Inroad Tral Improvement | Decision Signed Date: 09/06/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/28/2013
Multiple Towns · Bennington; Rutland; Windham; Windsor, Vermont
Cut and remove over-topping trees to provide apple trees access to sunlight within 72 stands across the Manchester Ranger District. Includes pruning apple trees to promote health of the trees and enhance fruit production for wildlife.
Wildlife, fish, rare plants
Comment Period
01/24/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| District-wide Apple Tree Maintenance and Release | Decision Signed Date: 05/31/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/28/2013
Multiple Towns · Bennington; Rutland; Windham; Windsor, Vermont
Maintain existing permanent upland openings by hand, mowing, machine, or prescribed burn within 146 stands across the Manchester Ranger District. Total area maintained includes about 1,568 acres.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
01/24/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/28/2013
Town of Somerset · Windham, Vermont
Close and decommission cabin due to extensive safety and maintenance needs including inadequate lateral bracing for piers, vandalism and rodent issues. It was determined that this project is a category of action that does not require a Decision Memo.
Recreation management
Scoping Start
07/2013 (Estimated)
Decision
07/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 6/28/2013
Town of Ripton · Addison, Vermont
Reroute the Catamount Trail to the periphery of the Rickert Nordic Center trail system by constructed 2 short trail segments to seperate Catamount trail and Nordic Center trail users.
Recreation managementSpecial use management
Comment Period
11/20/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Rikert Blue Bed & Brown Gate Trails and Catamount Trail Relocation | Decision Signed Date: 05/30/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Rochester Ranger District · updated 6/27/2013
Town of Pomfret · Windsor, Vermont
Relocate a 750 foot section of Appalachian Trail (AT) from private land to federal land in the Town of Pomfret.
Recreation management
Comment Period
04/02/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Middlebury Ranger District · updated 5/29/2013
Towns of Middlebury and Ripton · Addison, Vermont
Relocate approximately 0.5 mile of the Abbey Pond Trail to remove portions of the trail from wetland locations and improve open water crossings. The purpose of the project is to protect wetland resources and improve safety.
Watershed managementRecreation management
Comment Period
04/02/2013
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Watershed Improvements |
| Abbey Pond Trail Relocation Project | Decision Signed Date: 05/24/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Middlebury Ranger District · updated 5/29/2013
Town of Goshen · Addison, Vermont
Reconstruct approximately 300 foot section of the Hogback Trail within the Blueberry Hill Nordic trail system. Includes repair of a drainage ditch and trail tread, installation of 5 new culverts, and replacement of an existing culvert.
Special use managementRecreation management
Comment Period
11/20/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Blueberry Hill Hogback Mountain Loop Trail Project | Decision Signed Date: 04/17/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Hector Ranger District · updated 5/29/2013
Towns of Hector and Covert, Schuyler and Seneca Counties · Schuyler; Seneca, New York
Construct a series of shallow water depressions up to three feet deep to create naturally-appearing wetland habitat in the southwestern quarter of the Dogue parcel (5 depressions) and in portions o fthe Aman North grassland (5 depressions).
Wildlife, fish, rare plantsWatershed management
Comment Period
03/01/2013
Decision
05/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments; Watershed Improvements |
| Dugue Road and Aman North Wetlands Creation Project | Decision Signed Date: 05/15/2013 Legal Notice Date: 05/18/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Middlebury Ranger District · updated 5/29/2013
Town of Chittenden · Rutland, Vermont
The projects consists of reconstructing and adding additional water-bars, installing 6 culverts, with drainage ditch, and constructing a 100’ relocation of the trail.
Recreation management
Comment Period
11/20/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Mountain Top Boondocks Trail Project | Decision Signed Date: 04/16/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Middlebury Ranger District · updated 5/29/2013
Town of Ripton · Addison, Vermont
Using the existing trail footprint, install a raised boardwalk on the Robert Frost interpretive trail to reduce safety hazards and maintenance concerns associated with unstable decking, a damaged bridge, and increasingly frequent tread washouts.
Recreation managementWatershed management
Comment Period
04/02/2013
Decision
05/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Watershed Improvements |
| Robert Frost Interpretive and Robert Frost Wetland Trails Improvement Project | Decision Signed Date: 05/03/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Environmental Assessment · Manchester Ranger District · updated 4/11/2013
National Forest System lands in and around the towns of Dorset and Peru, Bennington County, Vermont · Bennington, Vermont
Multi-resource project activities to meet desired future conditions provided by the 2006 Forest Plan.
Watershed managementVegetation management (other than forest products)Wildlife, fish, rare plantsRecreation managementRoad managementForest productsHeritage resource management
Comment Period
08/13/2012
Decision
02/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Trail Management; Noxious Weed Treatments; Scenery Management; Timber Sales (Green); Watershed Improvements; Wilderness Management |
| Dorset Peru Integrated Resource Project Decision Notice and FONSI | Decision Signed Date: 02/28/2012 Legal Notice Date: 04/12/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 4/1/2013
Town of Covert, Seneca and Schuyler Counties · Schuyler; Seneca, New York
Plant a mix of trees and shrubs in riparian areas in the Woodard, Tunison, Ballard, and South Stevens pastures to enhance the riparian habitat. The areas will be fenced to exclude livestock prior to planting.
Vegetation management (other than forest products)Wildlife, fish, rare plantsWatershed management
Comment Period
02/08/2013
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Grazing Allotment Management; Species Habitat Improvements; Noxious Weed Treatments; Watershed Improvements |
| Finger Lakes National Forest Riparian Planting Project | Decision Signed Date: 03/29/2013 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Manchester Ranger District · updated 3/30/2013
Manchester Ranger District, Towns of Woodford and Somerset · Bennington, Vermont
Designate existing snowmobile trails and roads for horse and bike use. May involve some trail improvements.
Recreation management
Scoping Start
07/2012 (Estimated)
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 3/30/2013
Towns of Stockbridge, Rochester and Pittsfield · Rutland; Windsor, Vermont
Plant native riparian trees and shrubs along the banks of the White River at Peavine, Corral, Tupper Terraces, Auction Barn Flats, River Bend and North Hollow Farms. Includes planting conifer trees at Tupper Terraces.
Watershed managementWildlife, fish, rare plants
Comment Period
09/17/2012
Decision
12/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Hector Ranger District · updated 3/29/2013
Military Lot 8 on the north side of Searsburg Road opposite the end of Grove Road, and in ML 13 on the west side of Wardner Corners Road. · Schuyler, New York
Hay harvesting in existing fields on two tracts of NFS land in Grassland for Wildlife MA. One field is in Military Lot (ML) 8 on the north side of Searsburg Rd. opposite the end of Grove Rd; the second is in ML 13 on the west side of Wardner Corner.
Special area managementWildlife, fish, rare plants
Scoping Start
01/2013 (Estimated)
Decision
03/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Manchester Ranger District · updated 3/29/2013
Manchester RD, Town of Wardsboro, VT · Windham, Vermont
Perkins Logging plans to harvest private land in Wardsboro, VT. They’ve requested winter use of about 600’ of skid trail to a landing on NFS land next to a Town Highway for a period of 3 years.
Special use management
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 1/30/2013
Town of Lodi, Seneca County · Seneca, New York
Apply chemical (insecticide) to control the existing hemlock wooly adelgid that are affecting hemlock trees within the Caywood Point Recreation and Education Special Area.
ResearchRecreation managementSpecial area management
Comment Period
11/27/2012
Decision
01/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Research And Development; Special Area Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Hector Ranger District · updated 1/17/2013
Town of Hector, Schuyler County · Schuyler, New York
Cut and leave mature aspen on about 4 acres to create early successional aspen habitat for wildlife. The site is located near the Potomac ponds in the northeast portion of Compartment 35, Stand 103.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
10/02/2012
Decision
11/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Early Successional Wildlife Habitat Improvement Project | Decision Signed Date: 11/29/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Manchester Ranger District · updated 12/31/2012
Towns of Shrewsbury and Wallingford · Rutland, Vermont
Authorize crossing National Forest System lands to access high points around the Rutland Airport to upgrade existing towers and beacons.
Special use management
Scoping Start
10/2012 (Estimated)
Decision
10/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 11/27/2012
Town of Hector, Schuyler County · Schuyler, New York
Construct approximately 800 feet of newly created Finger Lakes Trail (part of North Country Trail) to separate the Interloken and Finger Lakes Trails which are currently co-located.
Recreation management
Comment Period
10/02/2012
Decision
11/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Finger Lakes Trail Reroute Project | Decision Signed Date: 11/20/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Manchester Ranger District · updated 11/27/2012
Manchester RD, Town of Sunderland · Bennington, Vermont
Repair and reopen Kelley Stand Road (Forest Highway 6) that was damaged by Tropical Storm Irene. Work includes road and bridge restoration, rock excavation, stream restoration and other activities on both NFS and private lands.
Watershed managementRoad managementWildlife, fish, rare plants
Comment Period
08/03/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Road Maintenance; Travel Management; Watershed Improvements |
| Kelley Stand Road Flood Repairs Project | Decision Signed Date: 11/27/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 9/28/2012
Town of Shrewsbury · Rutland, Vermont
Relocate a segment of the Appalachian National Scenic Trail/Long National Recreational Trail approximately 2500 feet in length near Cold River Road. Includes vegetation de-brushing, and installation and maintenance of water drainage structures.
Recreation management
Comment Period
07/14/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Appalachian Trail/Long Trail Cold River Road Relocation Project | Decision Signed Date: 08/23/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 9/28/2012
Town of Killington · Rutland, Vermont
Relocate a segment of Bucklin Trail that was damaged from Tropical Storm Irene to move it away from Brewers Brook. This is a popular Appalachian Trail/Long Trail sidetrail to acess Killington Peak.
Recreation management
Comment Period
06/05/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Bucklin Trail Re-route Project | Decision Signed Date: 07/11/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 9/28/2012
Finger Lakes NF, Town of Hector · Schuyler, New York
Establish a butternut seed orchard within Grassland for Wildlife Management Area to develop disease resistant trees. Area occupied by the orchard is estimated to be 250 feet x 250 feet.
Research
Comment Period
07/19/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Research And Development |
| Butternut Seed Orchard Project | Decision Signed Date: 09/28/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Manchester Ranger District · updated 9/28/2012
Green Mountain National Forest, Manchester RD, Towns Glastenbury and Woodford · Bennington, Vermont
Issuance of special use permits to authorize the Lauzon and Sausville families to access their private land inholdings within the Glastenbury Wilderness Area by private road.
Land ownership management
Comment Period
06/13/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Lauzon/Sausville Private Land Access Special Use | Decision Signed Date: 08/15/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 9/28/2012
Town of Leicester · Addison, Vermont
Re-connect Corridor 7 and Minnie Baker snowmobile trails using existing old trails/roads on both federal and non-federal lands. Consists of 0.2 miles of new trail on National Forest land while closing the same amount where former connectivy was lost.
Recreation management
Comment Period
06/05/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Minnie Baker-Corridor 7 Connector Trail Project | Decision Signed Date: 09/12/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Middlebury Ranger District · updated 9/28/2012
Towns of Salisbury, Leicester, and Goshen · Addison, Vermont
Increase health of forest stands surrounding the Silver Lake and Moosalamoo developed campgrounds using unevenaged harvest methods on about 69 acres. This would also decrease the safety risk associated with hazardous trees.
Forest productsRecreation management
Comment Period
04/23/2012
Decision
09/2012 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 9/28/2012
Existing opening, Compartment 55 on Hapgood Pond Rd in the town of Peru. · Bennington, Vermont
Restore and maintain an existing upland opening on about 4.5 acres with a possible combination of hand, mechanical and prescribed fire treatments.
Wildlife, fish, rare plants
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 9/28/2012
Richville Road, Town of Manchester · Bennington, Vermont
Project will remove cultivated crops, restore vegetation, and ultimately provide enhanced public recreational access to the Battenkill River. Opening maintenance will include hand, mechanical and/or prescribed fire treatments.
Recreation managementWildlife, fish, rare plantsWatershed management
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Species Habitat Improvements; Noxious Weed Treatments; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/28/2012
Towns of Leicester, Chittenden, Middlebury, Ripton, Mendon, Lincoln and Salisbury · Addison; Rutland, Vermont
Remove the minimum vegetation required to open scenic vistas on the following trails:Chandler Ridge, Bloodroot Gap, Alphonse Quesnel, Mount Carmel, Rattlesnake Cliffs, Canty, Oak Ridge, Lincoln Gap West Vista, and also at Lefferts Pond Day Use Area.
Recreation management
Comment Period
06/05/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Trail Management |
| North Zone Vista Opening and Maintenance Project | Decision Signed Date: 09/04/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Rochester Ranger District |
Decision Memo · Middlebury Ranger District · updated 9/27/2012
Towns of Leicester and Goshen · Addison, Vermont
Plant about 500 chestnut seedlings at the existing progeny plantation in Fay's Meadow, and Dutton Brook II Units 12 and 13 for research purposes. Includes establishing a fence at the Fay's Meadow site to protect the seedlings from browsing.
Vegetation management (other than forest products)
Comment Period
07/24/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Research And Development |
| American Chestnut Restoration and Fencing Project | Decision Signed Date: 09/25/2012 Legal Notice Date: 09/26/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/27/2012
Towns of Lincoln, Warren, and Goshen · Addison; Washington, Vermont
The project reroutes parts of 3 separate trails (x-country ski routes that are part of the Catamount Trail system) to provide for trails that are more sustainable, less prone to erosion, easier to maintain & improve safety.
Recreation management
Comment Period
06/05/2012
Decision
09/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Catamount Trail Relocations Project | Decision Signed Date: 09/04/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Green Mountain And Finger Lakes National Forest All Units |
Decision Memo · Middlebury Ranger District · updated 9/27/2012
Green Mountain NF, Middlebury RD, Town of Ripton, VT · Addison, Vermont
Restore a wetland on the west side of Forest Road (FR) 59 and north of FR 130 in the Town of Ripton, VT.
Wildlife, fish, rare plantsWatershed management
Decision
07/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Noxious Weed Treatments; Watershed Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Rochester Ranger District · updated 9/27/2012
Town of Warren · Washington, Vermont
Increase the size of the existing parking lot along VT Route 100 to provide a safe access for Warren Falls.
Recreation management
Comment Period
06/05/2012
Decision
09/2012 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Trail Management |
| Warren Falls Parking Lot Expansion Project | Decision Signed Date: 09/18/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/30/2012
Town of Winhall · Bennington, Vermont
Re-route approximately 450 feet of the Catamount Trail (x-country trail).
Recreation management
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 6/30/2012
Green Mountain NF, Town of Killington · Rutland, Vermont
A 4 mile loop trail that encompasses portions of River Rd., Valley Park Rd., Thundering Brook Rd., Killington town land and NFS land. About 3.7 miles of the loop is located on town property and public roads and about 0.3 mile on NFS land.
Recreation managementSpecial use management
Comment Period
04/27/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Trail Management |
| Killington Town River Loop Trail Project | Decision Signed Date: 06/08/2012 Legal Notice Date: 06/11/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 2/21/2012
The Homer Stone trailhead on the side of Homer Stone Road north of Homer Stone Brook, Town of Wallingford · Rutland, Vermont
SWWC has asked to build a State required water treatment facility on NFS lands at the Homer Stone trailhead on the side of Homer Stone Road north of Homer Stone Brook. The building will be approx. 8x10 ft, mimicking other outbuildings in appearance.
Land management planning
Decision
02/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| South Wallingford Water Company Authorization Project | Decision Signed Date: 02/03/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 1/13/2012
Between Forest Roads 59 and 130 in the Town of Ripton · Addison, Vermont
Develop and manage a gravel pit on the west side of an elongated hill-shaped landform between Forest Road 59 and Forest Road 130 on National Forest System land in the Town of Ripton.
Minerals and geology
Decision
01/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Steam Mill Gravel Pit Project | Decision Signed Date: 01/10/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Environmental Impact Statement · Manchester Ranger District · updated 1/12/2012
Green Mountain National Forest, Towns of Readsboro and Searsburg · Bennington, Vermont
Application for Special Use Permit to erect wind turbines and develop a commercial wind power facility on National Forest lands. Supplemental DEIS released in late December 2010; FEIS/ROD released in January, 2012.
Special use management
NOI in Federal Register
07/15/2005
DEIS NOA in Federal Register
12/23/2010
FEIS NOA in Federal Register
01/06/2012
Decision
01/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Deerfield Wind Project | Decision Signed Date: 01/03/2012 Legal Notice Date: 01/10/2012 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 12/30/2011
Green Mountain NF, Town of Killington · Rutland, Vermont
Issue special use authorization to provide State contractor access to repair the Kent Pond spillway damaged during Tropical Storm Irene. Access is by road across NFS land for approximiately 800 feet,
Special use management
Decision
11/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Kent Pond Overflow Spillway Access and Repairs Special Use | Decision Signed Date: 11/17/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 12/29/2011
Along Town Highway 18, National Forest land in the town of Peru, Bennington County, Vermont · Bennington, Vermont
Project is to authorize a yarding corridor and a landing on NFS land so a private inholding can be logged. The skid trail is 20 feet wide by 400 feet long, and the landing is approximately 0.25 acres in size.
Special use management
Decision
12/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Kelly Logging Access Special Use Permit Project | Decision Signed Date: 12/09/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 12/29/2011
Lefferts Pond Trail (Forest Trail 133), Lefferts Day Use Area access road (FR412), and Round Robin snowmobile and horse trail, all in town of Chittenden. · Rutland, Vermont
Remove snowmobile and horse access from Lefferts Pond Trail (FT 133) to reduce wetland impacts and maintenance costs; reroute horse use onto Lefferts Day Use Area access road (FR412); improve Round Robin snowmobile and horse trail to restore access.
Recreation management
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Lefferts Pond Area Trail Access and Restoration Project | Decision Signed Date: 10/26/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 9/30/2011
NFS land west of State Route 8 and north of Heartwellville; Town of Readsboro · Bennington, Vermont
One alternative for logging N ½ of Romeo tract is to stay on Romeo land and truck over an old truck road which is now VAST Corridor 9. Two alternatives to log the S ½: both involve skidding to landings on NFS land and trucking from there to SR 8.
Special use management
Decision
09/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Travel Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 9/29/2011
Blueberry Lake area in the town of Warren, Washington County · Washington, Vermont
Intent is to add trails to National Forest trail system, improve parking opportunities on west side of the lake, connect the northern parking area to the trail system, remove the southern parking lot, and implement erosion control and restorations
Recreation management
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Blueberry Lake Site Additions and Restoration Project | Decision Signed Date: 08/10/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 8/15/2011
Cow Mountain Pond VAST trail where it passes through a National Forest Legacy Tract in the town of Granby. · Essex, Vermont
Reroute section of existing snowmobile trail through the VELCO corridor to existing old logging road on the Cow Mtn Pond Legacy tract. Construction of 1500ft of new snowmobile trail will include cutting small trees, debrushing, stumping & waterbars.
Recreation management
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Cow Mountain Pond Snowmoblie Trail Relocation Project | Decision Signed Date: 08/11/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 8/12/2011
Bromley Ski Resort, Town of Peru, Bennington County · Bennington, Vermont
Widen a 300' section of an existing trail an average of 50'. A 300' long tree skiing area, averaging 60' wide, would be created adjacent to the trail widening project, between Havoc and Pushover ski trails.
Recreation managementSpecial use management
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 8/12/2011
Town of Ripton, Steam Mill Road west to the Rikert Nordic Center trail system. · Addison, Vermont
Relocate a portion of the Catamount Trail off of Steam Mill Road to reduce the amount of shared miles with snowmobiles. Trail will be rerouted west of Steam Mill Road and connect to the Rikert Nordic Center trail system.
Recreation management
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Catamount Trail Steam Mill Road Relocation Project | Decision Signed Date: 07/18/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 8/12/2011
Manchester Ranger District, Town of Dover · Windham, Vermont
An 80 ft long trench, two ft deep, would be dug between the top of Lift #17 to the Summit Lodge to carry fiber optic lines. Some blasting may be necessary. An existing 800 ft trench would be opened to replace a conduit with fiber optics.
Special use management
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Mount Snow Fiber Optic Line Installation Project | Decision Signed Date: 07/06/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 8/12/2011
Green Mountain NF, Middlebury Ranger District, Town of Salisbury · Addison, Vermont
Dispose up to 1,500 cubic yards of material dredged from Centrail Vermont Public Service (CVPS) managed diversion dam along Sucker Brook. The material would be disposed of at an abandoned gravel pit site on NFS lands just north of Silver Lake.
Special use management
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
| Legal Land Description | Town of Salisbury |
Decision Memo · Hector Ranger District · updated 6/24/2011
Finger Lakes National Forest, Hector Ranger District, Towns of Hector and Lodi · Schuyler; Seneca, New York
Use of existing trails by outfitter guide for horse riding.
Special use management
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Rochester Ranger District · updated 6/24/2011
Sugarbush Resort, Town of Warren, Rochester Ranger District · Washington, Vermont
Widen the intersection at the top of Steins Run Trail at Sugarbush Ski Area to improve skier and groomer access safety. Area to clear of vegetation would be about 0.2 acres.
Special use management
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Sugarbush Ski Resort Stein | Decision Signed Date: 06/22/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 6/24/2011
Sugarbush Ski Resort, Town of Warren, Washington County, Vermont · Washington, Vermont
Provide tree skiing access within the permit area into Slide Brook basin with limited tree thinning and limbing of some low branches. Also, improve beginner terrain and add conveyor carpet lift near Sugarbear Road ski trail.
Recreation managementSpecial use management
Scoping Start
04/2011 (Estimated)
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/23/2011
Green Mountain National Forest, Town of Winhall · Bennington, Vermont
Special Use Permit for use of a road on National Forest System lands authorizing private individual access to private land for recreation and logging. Part of route requires reconstructing abandoned Town Road; the remainder requires new construction
Special use management
Scoping Start
05/2010 (Estimated)
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/23/2011
Private inholding off of FR 264, along Cardinal Brook and east of the Appalachian Trail · Bennington, Vermont
Road permit to access a private inholding across NFS lands in the Town of Stamford to harvest timber. Permittee would truck logs down FR 264 and FR 265, both of which need road improvement work.
Road managementSpecial use management
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Travel Management |
| Tatro Logging Access Road Use Permit | Decision Signed Date: 06/21/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/23/2011
Towns of Dorset, Winhall, Landgrove, Woodford, Searsburg, and Readsboro, Manchester Ranger District · Bennington, Vermont
12.75 miles of broadband network are proposed for addition to existing aerial utility lines on NFS lands on Manchester District. These utility lines already have access roads or trails. Their authorizations allow for maintenance of their systems.
Special use management
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Vermont Broadband Special Use | Decision Signed Date: 06/21/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Environmental Assessment · Green Mountain And Finger Lakes National Forest All Units · updated 5/17/2011
NFS lands in towns of: Goshen, Hancock, Granville, Rochester, Lincoln, Ripton, Mount Tabor, Winhall, Stratton, Sunderland, and Woodford. · Addison; Bennington; Windham; Windsor, Vermont
Amend the Forest Plan to re-allocate Wilderness Study Areas, Remote Backcountry Forest, and Candidate Research Natural Areas Management Area (MA) remnants to other MAs resulting from the New England Wilderness Act.
Land management planning
Comment Period
09/10/2010
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Plan Amendment |
| Forest Plan Amendment #1: Reallocation of Management Area Remnants | Decision Signed Date: 04/28/2011 Legal Notice Date: 05/16/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
Decision Memo · Manchester Ranger District · updated 2/28/2011
The Waldo Tract (#303) in Medburyville, north of SR 9; Town of Wilmington · Windham, Vermont
Mr. Sprague has about 900 of his 1,400 taps on that portion of the Waldo Tract (#303) in Medburyville, north of SR 9 in Wilmington, that the U.S. will purchase in October/November 2010. He would like to retain those taps under special use permit.
Special use management
Decision
02/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sprague Maple Tapping Special Use Authorization | Decision Signed Date: 02/23/2011 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 12/30/2010
Forest Roads 273 and 75, plus a short piece of non-system road in the town of Woodford. · Bennington, Vermont
Mr. & Mrs. Suss have asked to use a tracked snow machine over Forest roads 273 and 75, plus a short piece of non-system road connecting the two, for winter access to their home in the Town of Woodford.
Special use management
Decision
12/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Travel Management |
| Suss ATV Access Special Use Authorization | Decision Signed Date: 12/03/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 12/22/2010
NFS Land in the Town of Peru, Manchester Ranger District · Bennington, Vermont
Bromley Mountain Equity Limited Partnership (Bromley Mountain Ski Resort) has requested to access land they own in the Town of Winhall. Their access would require using existing roads/landings on NFS land to harvest timber on their property.
Special use management
Decision
12/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Bromley Logging Access Special Use Project | Decision Signed Date: 12/21/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 11/18/2010
East of Potomac Rd, west of Chicken Coop Rd, and near the Potomac Trail. Compartment 31 Stand 11, Schuyler county, Hector Ranger District, New York · Schuyler, New York
Increase amount of regenerating aspen for benefit of early successional wildlife species (such as ruffed grouse) by cutting about 7 acres of mature aspen in Compartment 31 Stand 11.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
11/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Early Successional Aspen Stand Enhancement Project | Decision Signed Date: 11/10/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Environmental Assessment · Manchester Ranger District · updated 10/1/2010
Mount Snow Ski Resort, towns of Dover and Somerset, Vermont · Windham, Vermont
Install 37,950 feet of air and snowmaking pipelines on trails located on NFS lands that currently do not have snowmaking to increase the snowmaking on Mt. Snow Ski Resort to 99%. Construct Carinthia Pond bypass to restore natural stream flow.
Special use managementRecreation management
Comment Period
08/14/2010
Decision
10/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Mt. Snow Resort Snowmaking Project | Decision Signed Date: 10/01/2010 Legal Notice Date: 10/01/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Mount Snow Ski Resort |
Decision Memo · Middlebury Ranger District · updated 9/27/2010
Fays Meadow, at end of Fay Road (FR 243), Compartment 108 , Stand 103, Middlebury Ranger District, town of Brandon, county of Addison · Addison, Vermont
To establish a 1 1/2 acre fenced plantation of grafted butternut (Juglans cinerea) tree seedlings within a clearing that was formally pastured and is maintained as an upland opening. Goal is to grow trees that are more resistant to butternut canker.
ResearchVegetation management (other than forest products)
Decision
09/2010 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Population Enhancements; Research And Development |
| Butternut Seed Orchard Project | Decision Signed Date: 09/02/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Green Mountain And Finger Lakes National Forest All Units · updated 9/27/2010
8 locations in Middlebury, 5 in Rochester, 5 in Manchester RD. Towns of Bristol, Lincoln, Middlebury, Ripton, Granville, Hancock, Rochester, Chittenden, Mt Tabor, Peru, Landgrove, Winhall, Somerset. · Addison; Bennington; Rutland; Windham; Windsor, Vermont
Reissuing expired permits for up to 18 roads or trails providing access to private lands within the Green Mountain National Forest. Individual roads or trails occupy from 0.03 to 2.91 acres of NFS land.
Special use management
Decision
09/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Road and Trail Special Use Permits Re-Issuance Project | Decision Signed Date: 09/24/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Manchester Ranger District; Rochester Ranger District |
Environmental Assessment · Rochester Ranger District · updated 9/23/2010
Green Mountain National Forest, Towns of Granville, Hancock, Ripton, Rochester, and Braintree · Addison; Orange; Windsor, Vermont
Multi-resource project activities to meet desired future conditions provided by the Forest Plan.
Vegetation management (other than forest products)Wildlife, fish, rare plantsRoad managementMinerals and geologyResearchForest productsLand management planningRecreation managementFuels managementHeritage resource managementWatershed managementSpecial area management
Comment Period
02/24/2010
Decision
09/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Heritage Resource Management; Facility Maintenance; Minerals Or Geology Plans Of Operations; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Research And Development; Special Area Management; Scenery Management; Timber Sales (Green); Watershed Improvements; Wilderness Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 9/22/2010
Green Mountain National Forest, Town of Killington · Rutland, Vermont
Special Use Permit for long-term access over existing roads/skid trails for private forest management purposes.
Special use management
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Ohly Property Private Road Special Use Authorization | Decision Signed Date: 09/21/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 6/30/2010
Bingo, Joe Smith and Perkins brooks, FR42a and B, FR142 · Addison; Chittenden; Windsor, Vermont
Restore stream habitat, function and morphology by removing barriers to aquatic organism passage and placing Large Woody Debris (LWD) in 3 headwater streams of the White River: Bingo, Perkins, and Joe Smith Brooks located in the Rochester District.
Wildlife, fish, rare plants
Decision
05/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Species Habitat Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Towns of Chittenden, Rutland County, Rochester, Windsor County, and Hancock, Addison County, Vermont |
Decision Memo · Manchester Ranger District · updated 6/23/2010
Mount Snow Resort, Town of Dover, Windham County, Vermont · Windham, Vermont
Replacement of two chair lifts in the same alignments. New lifts would replace older, slower fixed grip lifts with higher capacity and higher speed detachable grip lifts. Some excavation needed for new lift terminals and towers.
Recreation managementSpecial use management
Decision
06/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Long John 2010 Trail Widening & Summit Local and Sunbrook Lifts Replacement | Decision Signed Date: 06/02/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 6/7/2010
Forest Service land in the vicinity of Mt. Tabor, areas around FR 10 and FR 30. Town of Mt. Tabor, county of Bennington. · Bennington, Vermont
Large woody debris (LWD) would be placed in stream channels by Chop & Drop method without use of heavy equipment in the following brooks: Big Branch (3.9mi), Ten Kilns (2.7mi), and their un-named first order tributaries near FR10 and FR30.
Watershed managementWildlife, fish, rare plants
Decision
06/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Otter Creek Headwaters Large Woody Debris Project | Decision Signed Date: 06/01/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Hector Ranger District · updated 5/6/2010
Old vineyard (Compartment 60 Stand 103) located on Satterly Hill Rd. near the Finger Lakes Trail, town of Burdett, county of Schuyler, New York · Schuyler, New York
Project seeks to remove remnant fence posts and metal wires from old vineyard (Compartment 60 Stand 103) on Satterly Hill Rd. A bull dozer and/or backhoe will remove the hazards in late Aug / early Sept, 2010, allowing for safe future activities.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
04/2010 (Estimated)
Decision
05/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Rangeland Vegetation Improvements |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Hector Ranger District · updated 3/30/2010
Finger Lakes National Forest road and trail network, beginning at Potomac Group Campground in county of Schuyler, town of Hector. · Schuyler, New York
5-year permit to authorize an annual one day recreation event held on 4th of July weekend. A maximum of 250 participants run distances of 25 km, 50 km, or 50 miles on a 25 km loop in the Finger Lakes NF, beginning at the Potomac Group Campground.
Special use management
Decision
03/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Hector Ranger District |
Decision Memo · Middlebury Ranger District · updated 3/23/2010
Voter Brook Overlook to the North Branch Trail (FT 126) in the Moosalamoo National Recreation Area, town of Salisbury · Addison, Vermont
Create a new trail (approximately 0.2 miles) connecting Voter Brook Overlook to the North Branch Trail (FT 126) in the Moosalamoo National Recreation Area.
Recreation management
Decision
03/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 3/1/2010
AT/LT corridor land near town of Shrewsbury, Manchester Ranger District · Rutland, Vermont
Re-route of Catamount Trail across state land and AT/LT corridor administered by Green Mountain National Forest. Purpose is to move the trail off of a currently shared snowmobile trail, most of project will be on state land.
Recreation management
Decision
02/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Travel Management |
| Catamount Trail Shrewsbury Reroute | Decision Signed Date: 02/26/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 2/8/2010
Somerset Landing Strip, and Red Mill campground area, counties of Windham and Bennington, towns of Woodford and Somerset. · Bennington, Vermont
Three 1-day snowmobile events in the Red Mill Rd area (Woodford) and the Somerset Landing Strip: A Very Special People Ride on 13 Feb, a charity hot dog roast on 20 Feb, and a charity lunch/poker run on 6 Mar. Hosts: Woodford Snobusters/Rotary Club.
Special use managementRecreation management
Decision
02/2010 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management |
| Snowmobile Events 2010 Special Use Permit Project | Decision Signed Date: 02/05/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 2/3/2010
Rochester Ranger District, Sugarbush Resort, Town of Warren, VT · Washington, Vermont
Construction of new intermediate level mountain bike trails integrated into overall mountain trail system.
Special use managementRecreation management
Decision
01/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Special Use Authorizations; Trail Management |
| Sugarbush Mountain Bike Trail Construction Project | Decision Signed Date: 01/04/2010 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Sugarbush Resort, NFS lands, Warren, VT |
Decision Memo · Middlebury Ranger District · updated 11/6/2009
Green Mountain National Forest; Middlebury RD, Town of Leicester · Addison, Vermont
Determine and implement future use, design and location of the washed out Leicester Hollow Trail as a result of the August 2008 flood.
Recreation management
Decision
12/2009 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Leicester Hollow and Ridge Trails Project | Decision Signed Date: 11/03/2009 (FS Withdrawn) |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 9/30/2009
Green Mountain National Forest, Manchester RD, Town of Mount Tabor · Rutland, Vermont
The replacement, in-kind, of the Big Branch suspension bridge across the Big Branch River.
Facility management
Decision
07/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Trail Management; Wilderness Management |
| Big Branch Bridge Replacement Project | Decision Signed Date: 07/22/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 9/27/2009
Green Mountain National Forest, Middlebury RD, Town of Middlebury · Addison, Vermont
Maintain and improve Indiana bat roosting and forage habitat by removing selected woody vegetation in the understory and midstory forest canopy.
Wildlife, fish, rare plants
Decision
07/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Indiana Bat Habitat Improvement - Middlebury Site | Decision Signed Date: 07/30/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Rochester Ranger District · updated 9/27/2009
Green Mountain National Forest; Middlebury and Rochester RD, Towns of Chittenden, Ripton, Pittsfield and Salisbury · Addison; Rutland, Vermont
Create multiple use trails (hiking and biking) on existing Forest Trails 120, 181 and 797. Portions of these trails would need improvements to allow mountain bike use.
Recreation management
Decision
07/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Mount Moosalamoo, Oak Ridge, and Caryl Brook Trails Mountain Bike Access | Decision Signed Date: 07/14/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 6/28/2009
Green Mountain National Forest, Rochester and Middlebury RDs, Towns of Rochester, Hancock, Ripton, Leicester, Salisbury, Goshen, Middlebury, and Granville · Addison; Windsor, Vermont
Repair trails and recreation related infrastructure damaged by the record rainfalls that occured in August 2008. Repairs include: trail reroutes, bridge replacements, trail tread and waterbar repairs, rock stairs work, and culvert replacement.
Facility managementRecreation management
Decision
05/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Trail Management |
| North Zone Flood Repair Projects | Decision Signed Date: 05/01/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District; Rochester Ranger District |
Decision Memo · Rochester Ranger District · updated 6/23/2009
Town of Rochester · Windsor, Vermont
No change in service, simply a change in ownership with CVPS purchasing Rochester Electric in August of 2006. Some of the facilities are on NFS land under SUP, which expired with the sale of the company. CVPS has applied for a new SUP in their name
Special use management
Decision
06/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Rochester Electric Special Use Permit Re-Issue Project | Decision Signed Date: 06/19/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |
| Legal Land Description | Forest Service Lands within the Town of Rochester |
Decision Memo · Manchester Ranger District · updated 6/18/2009
Green Mountain National Forest; Middlebury RD, Town of Ripton · Addison, Vermont
Issue a Special Use Permit to authorize the construction, use and maintenance of a road across NFS lands to access private land.
Special use management
Decision
05/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Middlebury Ranger District · updated 4/1/2009
Green Mountain National Forest, Town of Goshen · Addison, Vermont
Place LWD into a 0.25 miles section of Dutton Brook using heavy equipment. Project initially called for hand-placed LWD in an additional 0.25 miles section, but this will not take place under the revised project proposal.
Watershed managementWildlife, fish, rare plants
Decision
03/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Dutton Brook Large Woody Debris Restoration Project | Decision Signed Date: 03/27/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 3/27/2009
Town of Mount Tabor, Manchester Ranger District · Rutland, Vermont
Removal and replacement of bridge along the Appalachian Trail/Long Trail; includes trail construction to tie in replaced bridge with existing trail.
Facility managementRecreation management
Decision
03/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Dispersed Recreation Mgmt.; Travel Management |
| Design and Replacement of Old Job Bridge | Decision Signed Date: 03/06/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
| Legal Land Description | Land within the Town of Mount Tabor, Manchester Ranger District |
Decision Memo · Middlebury Ranger District · updated 3/27/2009
Green Mountain National Forest, Middlebury RD, Town of Lincoln · Addison, Vermont
Special use authorization to expand an existing sugarbush operation on National Forest System lands. Includes a new mainline with feeders along Forest Road 348.
Special use management
Decision
02/2009 (Estimated)
Implementation
03/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Special Products Sales |
| Orvis Sugarbush Expansion Special Use Permit | Decision Signed Date: 02/19/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Middlebury Ranger District |
Decision Memo · Manchester Ranger District · updated 3/26/2009
Green Mountain National Forest, Town of Dover · Bennington, Vermont
Construct re-route of VAST snowmobile trail around highly eroded portion of existing trail with a dangerous curve.
Recreation management
Comment Period
08/29/2008
Decision
01/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Dispersed Recreation Mgmt. |
| Corridor 100 (C-100) Snowmobile Trail Relocation | Decision Signed Date: 01/29/2009 Legal Notice Date: 02/04/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Manchester Ranger District · updated 3/23/2009
Green Mountain National Forest, Manchester RD, Towns of Wallingford, Mount Holly, Mount Tabor, Weston, Landgrove, Peru, and Manchester · Bennington; Rutland; Windsor, Vermont
Release and prune living apple trees in multiple locations across the Manchester Ranger District using hand tools and chainsaws.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
02/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Manchester Apple Tree Release and Maintenance Project | Decision Signed Date: 02/17/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Manchester Ranger District |
Decision Memo · Rochester Ranger District · updated 3/23/2009
Green Mountain National Forest; Rochester RD, Towns of Rochester and Hancock · Windsor, Vermont
Remove non-conforming structures (road culverts) in newly created Wilderness on Forest Roads 39B, 39C and 61A. These culverts would be removed with a variety of non-motorized/mechanized methods such as hand crews and draft animals.
Recreation managementRoad managementWatershed management
Decision
01/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Watershed Improvements; Wilderness Management |
| NEWA Road Restoration Project Non-motorized/mechanized Removal of Culverts | Decision Signed Date: 01/07/2009 |
| Forests | Green Mountain And Finger Lakes National Forests |
| Districts | Rochester Ranger District |