White River National Forest — Project Detail

400 projects with crawled detail · milestones · contacts · documents

White River National Forest

R02 Rocky Mountain · 400 projects · crawled 2026-08-01
Completed 355 Cancelled 45
Decision Memo 271 Environmental Assessment 113 Environmental Impact Statement 16
400 with documents 157 with comments page
Decision Memo · East Zone/Dillon Ranger District · updated 4/20/2026
Jones Gulch is adjacent to the eastern operational boundary of Keystone Ski Resort, north of the Keystone Independence Bowl area. · Summit, Colorado

Restricting human use within Jones Gulch annually from November 1st - April 30th to prevent disturbance of important winter habitat for Canada Lynx.

Wildlife, fish, rare plants
Scoping Start
10/09/2024
Comment Period
10/09/2024
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityOrder Creation/Modification
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 4/20/2026
Copper Mountain, Colorado. Miners Creek Trail #38 starting approximately 500' north from the intersection of the Wheeler Trail #39 and the Miners Creek Trail #38. · Summit, Colorado

Construction of 1.7 miles of new, sustainable trail. Restoration and decommissioning of 1 mile of existing trail that is unsustainable and causing resource damage.

Recreation management
Scoping Start
11/2024 (Estimated)
Decision
11/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Tyler Kirkpatrick · tyler.kirkpatrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionConstruct 1.7 miles of new sustainable trail. Restore and decommission 1 mile of existing trail that is unsustainable and causing resource damage.
Decision Memo · East Zone/Dillon Ranger District · updated 4/20/2026
West side of Bald Mountain near Breckenridge, Colorado in SE Section 4 and SW Section 3, Township 7 South, Range 77 West, Summit County. · Summit, Colorado

Installation of buried electric power and fiber optic cable along a new alignment crossing roughly 4,432' of National Forest to replace an existing buried powerline serving Summit Public Radio and TV's broadcast site on Bald Mountain.

Special use management
Scoping Start
07/01/2022
Decision
12/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 6/23/2025
The improvements will be located on Peak 9, within the Breckenridge Ski Resort special use permit area and operational boundary. · Summit, Colorado

Breckenridge Ski Resort (BSR) is proposing projects on Peak 9 including the installation of a new gondola teaching terrain, and the replacement of C-Chair to relieve portal crowding and improve the experience for guests learning to ski and ride.

Recreation managementSpecial use management
Scoping Start
05/14/2024
Comment Period
05/14/2024
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 6/23/2025
Breckenridge Stables is located on Peak 9 within the Breckenridge Ski Resort special use permit area. · Summit, Colorado

Breckenridge Stables proposes the replacement of temporary mobile buildings with a permanent operations building and a permanent guest services building. Water and power utilities are planned to provide indoor toilets and options for food services.

Recreation managementSpecial use management
Scoping Start
01/17/2025
Comment Period
01/17/2025
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 4/16/2025
Various locations, all within the Special Use Permit Area for Aspen Skiing Company Resorts; Aspen Mountain, Aspen Highlands, Buttermilk and Snowmass. · Pitkin, Colorado

Installation of 11 Cellular Towers at 10 sites on National Forest lands at Aspen Skiing Company Resorts; Aspen Mountain, Aspen Highlands, Buttermilk, Snowmass. Including associated utilities (power, fiber optics) for each site.

Special use management
Scoping Start
08/07/2024
Comment Period
08/07/2024
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionRange 85w, Township 10s Sections 9, 10,12,13, 15, 22, 23,27
Decision Memo · White River National Forest All Units · updated 4/4/2025
The project takes place on National Forest System Land just north of HWY 9 in Keystone, Colorado. · Summit, Colorado

The Snake River Water District proposed to install and construct a new water tank on NFS lands in the Keystone area to supply the municipality with more water infrastructure. The project will involve issuance of a new special use permit.

Special use management
Scoping Start
10/04/2024
Comment Period
10/04/2024
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionW 1/4 Sec. 13, T. 5 S., R. 77 W., 6TH PRINCIPAL MERIDIAN
Decision Memo · West Zone/Aspen Ranger District · updated 4/4/2025
The Primo Chairlift, located on Sunlight Mountain Ski Resort. · Garfield, Colorado

Sunlight Mountain Resort is proposing to replace the existing Primo double chairlift built in 1966. They would like to replace the double fixed grip chairlift with a Poma Alpha fixed grip quad chairlift and associated utilities.

Special use management
Scoping Start
09/17/2024
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Jessica Moot · jessica.moot@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionPM6, Range 89W, Township 7S, Section 33 PM6, Range 89W, Township 8S, Section 4
Environmental Assessment · R2 - Rocky Mt. Region All Units · updated 1/30/2025
Thompson Divide · Garfield; Gunnison; Pitkin, Colorado

Public Land Order 7939 was approved by the Secretary of Interior on April 3, 2024.

Land management planningMinerals and geology
Scoping Start
10/17/2022
Comment Period
12/08/2023
Decision
03/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
Elysia Retzlaff · elysia.retzlaff@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGunnison Ranger District; Paonia Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 1/24/2025
Straight Creek Trailhead, in Dillon, Colorado, located between Tenderfoot Mountain and I-70. · Summit, Colorado

Construct approximately 1 mile of new, sustainable multi-use trail to connect with existing trail.

Recreation management
Scoping Start
06/28/2024
Comment Period
06/28/2024
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Tyler Kirkpatrick · tyler.kirkpatrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 5 South, Range 77 West Section 4, Dillon, Colorado.
Environmental Assessment · East Zone/Dillon Ranger District · updated 1/16/2025
Middle Fork of the Swan River drainage, approximately 7 miles east of the Town of Breckenridge. · Summit, Colorado

A proposal to approve a Plan of Operations for mining-related activities that would be conducted on National Forest System lands administered by the Dillon Ranger District of the White River National Forest.

Minerals and geology
Scoping Start
05/24/2024
Comment Period
05/24/2024
Objection Period Start
10/12/2024
Decision
01/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSection 20, Township 6 South, Range 76 West, Summit County, Colorado, 6th Principal Meridian.
Environmental Assessment · East Zone/Eagle Ranger District · updated 1/14/2025
The gravel pits are proposed to be developed off of Coffee Pot Road (FSR 600) on the White River National Forest, Eagle-Holy Cross Ranger District, Garfield County, Colorado. · Garfield, Colorado

The proposed action will create an economical gravel source used to maintain the road surface of Coffee Pot Road (NFSR 600) and other roads and facilities in the area. Formerly used gravel pits, Boom Boom #1 and #2 , would be reestablished/expanded.

Minerals and geologyRoad management
Scoping Start
03/27/2024
Comment Period
05/10/2024
Objection Period Start
11/21/2024
Decision
01/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Mae Watson · Mae.Watson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Minerals Or Geology Plans Of Operations; Road Maintenance
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 11/18/2024
Arapahoe Basin Ski Area, East Gully Cliffs on the Lower East Wall. Visitors access is by riding the Black Mountain Express chairlift and then hiking 0.4 miles on trail to the southwest. · Summit, Colorado

A Basin is proposing a new via ferrata route. The resort currently has a challenging via ferrata route on the upper East Wall rock face. The second route will be a shorter and less exposed route on a lower zone of the East Wall.

Recreation managementSpecial use management
Scoping Start
01/16/2024
Decision
11/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 11/18/2024
The parking lot is approximately 1 mile outside of the Town of Marble, CO in Gunnison County on County Road 3 at the base of Daniel's Hill. · Gunnison, Colorado

This project is to address ongoing concerns regarding parking, traffic flow, and provide a large enough area for tractor trailers and unequipped vehicles to turn around prior to reaching Forest Service Road 315

Road management
Scoping Start
07/22/2024
Decision
11/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Kendra Head · Kendra.Head@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionSection 25 Township 11 South Range 88 West
Decision Memo · East Zone/Dillon Ranger District · updated 10/28/2024
The project is in Silverthorne, Colorado, adjacent to the rodeo grounds. · Summit, Colorado

Construct 1.5 miles of new trail and decommission 1.01 miles of existing trail. The new trail construction will establish public access (due to new development precluding public access) and create a more sustainable grade that avoids riparian areas.

Recreation management
Scoping Start
06/28/2024
Comment Period
06/28/2024
Decision
10/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Tyler Kirkpatrick · tyler.kirkpatrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionT5S R78W Section 19 Dillon, Colorado
Decision Memo · East Zone/Dillon Ranger District · updated 10/24/2024
Pine Cove Campground boat ramp in Frisco, CO · Summit, Colorado

Proposal is to construct a new building and install a seasonal boat dock that would serve as a base of operations for the Lake Dillon staff of the Sheriff%u2019s Department.

Special use management
Scoping Start
02/06/2024
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionT. 5S., R. 78W., Sec. 24, 6th P.M., Frisco, Summit County, Colorad
Decision Memo · East Zone/Dillon Ranger District · updated 10/8/2024
Keystone area just west of the Landfill Road. · Summit, Colorado

Amending the existing PSCo permit#DIL462 to add 1,500 ft of existing gas line that was inadvertently deleted in 2001. In addition, a 6 inch steel main gas line would be installed to reinforce the existing line on approx.1500 ft of National Forest.

Special use management
Scoping Start
08/21/2023
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 5 South, Range 77 West, Section 22, 6th P.M.
Decision Memo · East Zone/Dillon Ranger District · updated 10/2/2024
Tank is located on the north side of the Dillon Dam Road between Frisco and Dillon. · Summit, Colorado

Town of Frisco is proposing to realign a steep portion of the access road to their water tank that is under an authorization in order to perform a tank restoration project.

Special area management
Scoping Start
04/22/2024
Comment Period
04/22/2024
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSec. 24, Township 5 South, Range 78 West, 6th Principal Meridian, Summit County, CO
Decision Memo · East Zone/Dillon Ranger District · updated 9/13/2024
The yurt site is located on Ptarmigan Pass, on the east side of the road and fence, in the Vail Pass Winter Recreation Area. · Eagle; Summit, Colorado

To provide a winter outpost a far distance from main entry station for the snow rangers in support of the management of the area for; compliance, managing non-motorized and motorized travel and providing information services to users

Recreation management
Scoping Start
08/15/2023
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Anne Gaspar · anne.gaspar@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 9/12/2024
The June Creek trail system is located on the north side of the I-70 corridor in the Wildridge residential community in the Town of Avon, Colorado. · Eagle, Colorado

The proposed action will authorize the Town of Avon Emergency Services the ability to use a shuttle system utilizing the existing June Creek Trail as an egress route for residences in the Wildridge community in the event of a natural disaster

Special use management
Scoping Start
02/15/2024
Decision
10/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Leanne Veldhuis · leanne.veldhuis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionThe legal location of the site is in Section 33, T. 4 S., R. 82 W., 6th P.M., Eagle County, Colorado.
Decision Memo · West Zone/Aspen Ranger District · updated 9/3/2024
Prospector ski trail and Riverside ski trail, near the Exhibition Chair Lift at Aspen Highlands Ski Area · Pitkin, Colorado

Aspen Skiing Company proposes to install approximately 3,600 feet of snowmaking pipe on Prospector ski trail and 3,000 feet of snowmaking pipe on Riverside ski trail. Collectively, the proposed snowmaking project would provide approx. 16.9 acres.

Recreation managementSpecial use management
Scoping Start
02/23/2024
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 8/19/2024
This project is located approximately 50 miles east of Meeker, CO at the outlet of Trappers Lake. · Garfield, Colorado

This proposed project is to reconstruct a 30' wooden bridge for foot and horse use located approximately 15' downstream from the existing similar bridge, then remove the existing bridge from within the Flat Tops Wilderness boundary.

Recreation management
Scoping Start
04/17/2024
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Aaron Grimes · aaron.grimes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionSec. 2 T1S, R88W
Decision Memo · East Zone/Holy Cross Ranger District · updated 8/13/2024
The proposed Aquatic Organism Passageway replacement locations are on Forest Service System Roads 600, 700, 720, 774, and 786. · Eagle; Garfield, Colorado

The proposed action is to update culvert infrastructure that is nearing the end of its lifespan and to provide improved aquatic organism passages at four locations on the Eagle-Holy Cross Ranger District.

Watershed managementWildlife, fish, rare plants
Scoping Start
06/26/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Mark Hane · mark.hane@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT 4S., R. 82W., Sec 33; T 4S., R 81W., Sec 26; T 4S., R 81W., Sec23; T 4S., R 81W., Sec 27
Decision Memo · East Zone/Holy Cross Ranger District · updated 8/13/2024
Project is located south of Highway 6 adjacent to the Eagle-Vail Metro district in Section 18 Township 5 South, Range 81 West 6th Principal Meridian · Eagle, Colorado

Construction of an approximate 1.6-mile non-motorized trail to extend the existing Eagle-Vail Trail # 2351, with 0.27 miles on National Forest Land. Additionally, 0.25 miles of social trail will be decommissioned and permit #HOL937 will be amended.

Special use managementRecreation management
Scoping Start
03/27/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Michael Beach · michael.beach@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · White River National Forest All Units · updated 8/6/2024
The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. · Eagle, Colorado

The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area.

Watershed management
NOI in Federal Register
03/16/2015
DEIS NOA in Federal Register
09/2018 (Estimated)
FEIS NOA in Federal Register
10/2018 (Estimated)
Objection Period Start
10/2018 (Estimated)
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Melvin Woody · melvin.woody@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityRoad Decommissioning; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Species Habitat Improvements; Facility Maintenance; Plan Amendment; Road Improvements/Construction; Special Area Management
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionTownship 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27.
Decision Memo · West Zone/Aspen Ranger District · updated 7/30/2024
NW1/4NW/14 Sec. 24, T.12S, R.85W., 6th PM, Pitkin County; Pearl Pass Basin Project is located with in proximity of Pearl Pass Road and south of Tagert Hut. · Pitkin, Colorado

Construction, operation and maintenance of a new SNOW TELemetry (SNOTEL) data collection site for collection of mutually beneficial hydrometeorologic data as part of the congressionally appropriated Snow Survey and Water Supply Forecasting Program.

Special use management
Scoping Start
10/13/2023
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 7/29/2024
Multiple locations across the forest · Eagle; Garfield; Gunnison; Pitkin; Rio Blanco; Summit, Colorado

White River National Forest (WRNF) Master Special Use Permit Reissuance to the Natural Resources Conservation Service (NRCS) for the operation and maintenance of 16 existing SNOTEL sites and 12 Snow Courses

Special use management
Scoping Start
07/30/2020
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionMultiple locations across the forest within Dillon, Eagle-Holy Cross, Blanco and Aspen-Sopris Ranger Disrricts
Environmental Assessment · East Zone/Dillon Ranger District · updated 7/22/2024
The Swan Mountain Project encompasses approximately 13,500 acres of National Forest System lands in and around Swan Mountain, Soda Creek, and the Swan River. · Summit, Colorado

Proposed activities include a mixture of fuels reduction, wildlife habitat improvement, stream improvement, transportation improvement and trail enhancements.

Vegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
10/08/2021
Comment Period
03/24/2023
Objection Period Start
04/05/2024
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Shelby Limberis · shelby.limberis@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Trail Management; Road Improvements/Construction; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 7/1/2024
Along CDOT Highway 133 right of way between Redstone and McClure or along historic wagon route · Pitkin, Colorado

Pitkin County has proposed to construct and maintain a natural surface, non-motorized, multi-use recreation trail from Redstone south to the summit of McClure Pass. The proposed trail is about 7 miles in length, of which, 5 miles is on NFS lands.

Recreation managementSpecial use management
Scoping Start
01/21/2020
Comment Period
01/21/2022
Objection Period Start
01/27/2023
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Shelly Grail · shelly.grail@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Double Eaton Mine Cancelled
Decision Memo · East Zone/Holy Cross Ranger District · updated 5/21/2024
Approximately 5 miles northwest of Fulford, Colorado. · Eagle, Colorado

Plan of Operations Review for the Double Eaton Mine. Mineral material will be excavated by hand and processed on site using a trowel and sluice box. Access to the mine will be by non-motorized means. No structures. Operations would be up to 2 mon/yr.

Minerals and geology
Scoping Start
10/28/2022
Decision
04/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Leanne Veldhuis · leanne.veldhuis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionLegal location: W 1/2, NE 1/2, SE1/4,of Section 6, Township 6S, Range 83W of the 6th meridian
Decision Memo · East Zone/Holy Cross Ranger District · updated 5/20/2024
The fiber would be attached to existing utility poles for Holy Cross Energy's electrical transmission line that crosses a portion NFS land 1,000ft N. of I-70 and 1 mile E. of Avon, CO. · Eagle, Colorado

Holy Cross Energy is proposing to install, own and maintain a broadband fiber optic cable on existing HCE-owned electric transmission line utility poles for customer use. No ground disturbance or additional utility poles are required.

Special use management
Scoping Start
08/16/2023
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionWhite River NF, Eagle County, Sec. 7, T.5 S., R.81 W., 6th P.M.
Decision Memo · East Zone/Dillon Ranger District · updated 5/8/2024
The project is located north of the Swan Mountain Road adjacent to the communities of Dillon and Frisco. · Summit, Colorado

Sapphire Point is a heavily used recreation area and trail. The project would enhance accessibility to the two overlooks and along the trail, propose human use rules, design the parking resource, and construct a second vault toilet.

Recreation management
Scoping Start
12/20/2023
Decision
05/2024 (Estimated)
Implementation
08/2027 (Estimated)
Project documents
Paula Peterson · paula.peterson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionThe project is located north of the Swan Mountain Road adjacent to the communities of Dillon and Frisco.
Decision Memo · West Zone/Aspen Ranger District · updated 5/2/2024
Various cabins and mine features in Pitkin County · Eagle; Pitkin, Colorado

This proposed project is to safeguard one (1) mine feature and demolish and remove three (4) unauthorized structures and one (1) former FS Administrative site situated on National Forest System lands managed by the Aspen-Sopris Ranger District.

Minerals and geology
Scoping Start
05/01/2023
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Cameron Brown · Cameron.Brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8); 32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 12/20/2023
Within Aspen Skiing Company's existing special use permit area at Snowmass · Pitkin, Colorado

Aspen Skiing Company proposes to construct the Blue Grouse Ski Trail Connector and Vapor to Squeezy Bike Trail Connector, reroute the Summit Hiking Trail, and replace and realign the Cirque and Coneygame lifts.

Recreation managementSpecial use management
Scoping Start
06/13/2023
Decision
12/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 11/28/2023
Grouse Lake Trail begins at the Grouse Creek Trailhead, located on US Highway 24, approximately one-half mile north of the Town of Minturn. · Eagle, Colorado

Grouse Lake Trail (#2127), open to stock, hikers and bicycles has several water crossings. The Forest Service is proposing to construct 2 new trail bridges over the 1st and 4th stream crossing and realign 300 ft. of trail.

Recreation management
Scoping Start
04/06/2023
Decision
11/2023 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Katherine Bazan · katherine.bazan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 11/6/2023
The project is located approximately 1 mile north of Aspen, Colorado in the Hunter Creek Valley · Pitkin, Colorado

Mitigation of runoff to ensure the stabilization of the historic buildings at the Hunter Creek site.

Heritage resource managementFacility management
Scoping Start
05/09/2023
Decision
11/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Jennifer Schuller · Jennifer.Schuller@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Facility Maintenance
Decision Decided Date11/06/2023
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionTS10, R84W, Section 5
Decision Memo · East Zone/Dillon Ranger District · updated 10/25/2023
The project area is located a 1/2 mile from the Buffalo Cabin Trailhead. Township 5 South, Range 78 West, Southeast corner of the Southeast corner of Section 9. · Summit, Colorado

Proposal to decommission and restore .5 miles of unsustainable trail that provides a poor recreation experience. Existing trail will be replaced with a new 1 mile sustainable trail that provides for public safety and positive recreational experience.

Recreation management
Scoping Start
08/21/2023
Decision
10/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Tyler Kirkpatrick · tyler.kirkpatrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Wilderness Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 5 South, Range 78 West, Southeast corner of the Southeast corner of Section 9.
Decision Memo · East Zone/Dillon Ranger District · updated 10/25/2023
Keystone Colorado near the Incline Trail #9035 access point. · Summit, Colorado

Realign and construct approximately 2 miles of new trail in a more sustainable location. Approximately 1 mile of the existing trail tread would be decommissioned and closed.

Recreation management
Scoping Start
08/21/2023
Decision
10/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Tyler Kirkpatrick · tyler.kirkpatrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 9/28/2023
The project is located at 620 Main Street, Carbondale, Colorado. · Garfield, Colorado

Redevelop the Aspen-Sopris Ranger District Office located at 620 Main Street in Carbondale, Colorado. Includes the demolition of 3 buildings, landscaping and construction of new 7,222 sqft office building.

Facility management
Scoping Start
07/21/2023
Decision
09/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Jennifer Schuller · Jennifer.Schuller@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 9/28/2023
The Work Center property is located along County Road 51 in unincorporated Summit County, Colorado next to the Town of Dillon Public Works site and the Tenderfoot Trailhead. · Summit, Colorado

Proposal to lease the 10.89-acre Dillon Work Center administrative site for the development of up to 177 affordable housing rental units under the authority of the Agriculture Improvement Act of 2018, Sec. 8623 (P.L. 115-334).

Land ownership managementSpecial use management
Scoping Start
11/30/2022
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments; Facility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 9/21/2023
Approximately 30 miles east of Meeker, CO adjacent to Rio Blanco County Road 12 in the Marvine drainage. · Rio Blanco, Colorado

Construct a parking area approximately 30' deep by 130' wide to accommodate parking for those participating in winter recreation activities in the Marvine drainage adjacent to Rio Blanco County 12 on Forest Service lands.

Recreation managementRoad management
Scoping Start
03/15/2023
Decision
09/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Aaron Grimes · aaron.grimes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Road Improvements/Construction
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 9/13/2023
NW Section 26, Township 7 South, Range 78 West, 6th PM, Summit County, CO · Summit, Colorado

Demolish and partially remove the Last Dollar Mine Cabin and associated trespass items that are encroaching on National Forest System that pose a health and safety risk to recreationists on the forest.

Watershed managementMinerals and geology
Scoping Start
06/01/2022
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 9/13/2023
Spot Cash Cabin: Section 2, T. 8 S., R. 78 W., 6th P.M. Summit County, Colorado · Summit, Colorado

Demolish an abandoned dilapidated mining cabin located near or immediately adjacent to heavily used Blue Lakes Road. The cabin poses a health and safety risk to recreationists on the forest.

Watershed managementMinerals and geology
Scoping Start
06/01/2022
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 8/15/2023
Southwest of Montezuma, Colorado. · Summit, Colorado

Reduce the risk to human health and safety of forest visitors and reclaim an abandoned mine site by closing mine features and demolition/removal of buildings/structures.

Minerals and geology
Scoping Start
07/12/2023
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
Burke Martin Abandoned Mine Land Safety Closure & Structure RemovalDecision Signed Date: 08/14/2023
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 7/10/2023
Project is located within the Special Use Permit area for Sunlight Mountain Resort · Pitkin, Colorado

Sunlight Mountain Resort is proposing to replace the existing Segundo double chairlift, with a triple chairlift due to the aged nature of the current installation. The replacement lift will have a capacity of 1400 people per hour.

Special use management
Scoping Start
05/18/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 6/28/2023
North of Town of Vail, East of Red Sandstone Rd and West of Black Gore Creek Bridge on Interstate 70. The project extends roughly 1.5 miles north of the forest boundary. · Eagle, Colorado

Proposed fuels reduction activities on National Forest System (NFS) lands within a 3,605-acre area near Vail, Colorado. Treatments correspond to areas identified within the Town of Vail Community Wildfire Protection Plan.

Fuels management
Scoping Start
03/04/2022
Objection Period Start
05/05/2023
Decision
06/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Leanne Veldhuis · leanne.veldhuis@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Roadless Area Management; Wilderness Management
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Sopris Ranger District · updated 6/23/2023
The Upper Parcel is approximately 30 acres and consists of three residences, one mobile home pad, horse pastures. · Eagle, Colorado

Proposal to convey (sale or lease) all or a portion of the Upper Parcel at its El Jebel Administrative Site pursuant to the Facility Realignment and Enhancement Act of 2005 P.L.109-54; 16 U.S.C. 580d note, as amended by P.L.112-74, Title IV, Sec. 421

Land ownership management
Scoping Start
12/07/2016
Comment Period
02/25/2022
Objection Period Start
09/16/2022
Decision
06/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Jennifer Schuller · Jennifer.Schuller@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSixth Principal Meridian T. 8 S., R. 87 W. N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4
Decision Memo · West Zone/Sopris Ranger District · updated 6/22/2023
Coal Basin is located approximately 4 miles west, northwest of Redstone, Colorado. The research site is spread over approximately 5.2 square miles of Coal Basin where previous coal mining occurred. · Pitkin, Colorado

Preliminary analysis to identify and quantify methane gas emission source locations within 5.2 square mile of Coal Basin to determine potential methane gas quality for future methane destruction or utilization projects.

Research
Scoping Start
05/08/2023
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Jennifer Schuller · Jennifer.Schuller@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3); 32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Rifle Ranger District · updated 6/16/2023
Butler Creek, Coulter Mesa, roughly 16 miles north of Rifle, Colorado. · Garfield, Colorado

The project would utilize untreated wood posts and on-site materials to build multiple beaver dam analogs (BDAs). These temporary structures would be constructed by hand and would mimic the influence of beaver dams on the stream and riparian area.

Watershed managementWildlife, fish, rare plants
Scoping Start
04/04/2022
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Robert Ramey · robert.ramey@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 6/16/2023
Adjacent to the east side of Minturn Rd. (C.R. P 14) from the current Eagle Valley Trail terminus near Dowds Junction extending to Downtown Minturn. · Eagle, Colorado

Construction of the Minturn Segment of Eagle Valley Trail. The Proposed Action is a 10-foot wide asphalt-paved trail from the current Eagle Valley Trail terminus near Dowds Junction extending to Downtown Minturn.

Special use managementRecreation management
Scoping Start
03/15/2023
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionWhite River National Forest, Eagle-Holy Cross Ranger District, Eagle County, CO. The legal description: Sections 22 and 23, T. 5 S., R. 81 W., 6th P.M., Eagle County, Colorado.
Environmental Assessment · East Zone/Dillon Ranger District · updated 6/12/2023
Copper Mountain Resort · Summit, Colorado

Installation of additional snowmaking, mountain biking and hiking trails, camping activity, and access road extension at Copper Mountain Resort.

Special use management
Scoping Start
11/09/2018
Comment Period
11/09/2018
Objection Period Start
03/15/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Copper Mountain Resort Snowmaking and Summer Uses Decision NoticeDecision Signed Date: 06/27/2019
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Blanco Ranger District · updated 6/5/2023
Proposed management activities would occur approximately 16 miles east-northeast of Meeker, Colorado within the vicinity of Wilson Park, Sawmill Mountain and Ellison Mountain, · Rio Blanco, Colorado

The Blanco Ranger District is proposing approximately 2,300 acres of vegetation management activities within the Wilson Park, Sawmill Mountain and Ellison Mountain area.

Forest productsVegetation management (other than forest products)Road managementFuels management
Scoping Start
02/10/2020
Comment Period
02/20/2020
Objection Period Start
08/04/2022
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher McDonald · christopher.mcdonald@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage)
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionSec. 1-3, 10-15, 22-27, 34-36, T2N, R92W; Sec. 4-9, 17-20, 26-36, T2N, R91W; Sec. 1-3 and 12, T1N, R92W; Sec. 1-17, 20-24, 26-29, 32-34, T1N, R91W; Sec. 7, 18, 19 T1N, R90W, Rio Blanco Co.
Decision Memo · East Zone/Eagle Ranger District · updated 5/19/2023
Hanging Lake Trail in Glenwood Canyon located east of Glenwood Springs, Colorado. Trail ascends Deadhorse Canyon up to Spouting Rock and Hanging Lake. · Garfield, Colorado

The purpose of this project is to rehabilitate, enhance and restore the trail and recreational features of the Hanging Lake Trail Recreation Area. This trail and its infrastructure were adversely impacted by post-fire debris flows in summer 2021.

Recreation managementSpecial area management
Scoping Start
01/25/2023
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Colleen Pennington · Colleen.Pennington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Special Area Management
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Eagle Ranger District · updated 5/8/2023
White Owl Dam is located on White Owl Lake in the Flat Tops 30 miles northwest of Dotsero, Colorado · Garfield, Colorado

White Owl Dam is a low hazard earthen dam that has been in a state of disrepair since at least 1999, with conditions worsening over time due to lack of funding for dam repairs. White Owl Dam will be decommissioned.

Watershed management
Scoping Start
04/06/2023
Decision
05/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Melvin Woody · melvin.woody@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 5/4/2023
Northeast of Meeker, Colorado, north off of Yellow Jacket Road (FS 250) · Rio Blanco, Colorado

Whole, live spruce would be pulled down and yarded into the stream channel. Beaver dam analogs (BDAs) or similar may be constructed to improve stream hydrology and cutthroat habitat. Riparian plantings and rec modifications will complement.

Wildlife, fish, rare plantsWatershed management
Scoping Start
03/15/2023
Decision
05/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Robert Ramey · robert.ramey@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT2N R91W S8
Decision Memo · East Zone/Dillon Ranger District · updated 4/14/2023
Breckenridge Ski Area. Bottom terminal is in the Peak 8 base area between the Colorado Super Chair and Rips Ride lift. · Summit, Colorado

The project involves the replacement of the Chair 5 lift within the resort's Peak 8 base area. The project would occur partially on National Forest System (NFS) lands within the Breckenridge Ski Resort's existing Special Use Permit Area.

Special use management
Scoping Start
01/04/2023
Decision
04/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 3/28/2023
Copper Mountain Resort, Summit County CO, SW intersection of I-70 and Hwy 91 · Summit, Colorado

Copper Mountain Resort proposes replacing the Timberline Express Chairlift and upgrading associated lift infrastructure. The project also includes constructing a downhill mountain bike park trail system accessed from the Woodward Express lift.

Recreation managementSpecial use management
Scoping Start
09/20/2022
Decision
03/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Eagle Ranger District · updated 3/22/2023
Treatment area is approximately 6 miles northwest of Glenwood Springs, CO and 10 miles west of Dotsero, CO in the headwaters of the the Wagon Gulch, Blue Gulch, Grizzly Creek Watersheds · Garfield, Colorado

This project is to intended to increase soil moisture holding capacity of soils impacted by moderate to high soil burn severity in the Wagon Gulch, Blue Gulch, Grizzly Creek Watersheds in the Grizzly Creek Fire burn perimeter.

Watershed management
Scoping Start
03/16/2023
Decision
03/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Ryan Sparhawk · Ryan.Sparhawk@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNot Applicable / Other; National Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionPortions of S14, T5S, R88W; S15, T5S, R88W; S22, T5S, R88W; S23, T5S, R88W
Environmental Impact Statement · White River National Forest All Units · updated 3/10/2023
Located north of Interstate 70 in the vicinity of Edwards, Colorado. accessed by National Forest System Roads (NFSR) 774 and 780. · Eagle, Colorado

The Proposed Action would authorize Berlaimont to improve those existing segments of NFSR 774 and 780 as they lead up to the southeastern corner of the Berlaimont property from local public roads in Edwards.

Special use managementRoad management
NOI in Federal Register
09/23/2016
DEIS NOA in Federal Register
01/26/2018
FEIS NOA in Federal Register
09/25/2020
Objection Period Start
09/25/2020
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Cary Green · cary.green@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction; Travel Management
Berlaimont Estates Road Access RouteDecision Signed Date: 03/10/2023
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionThe project is within Sections 20, 29, 32, and 33 of Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado
Decision Memo · East Zone/Dillon Ranger District · updated 3/7/2023
National Forest land along the shoreline of Green Mountain Reservoir adjacent to private property at 083 Happy Landing Drive, Heeney, CO. · Summit, Colorado

To minimize shoreline erosion, the project would include grading of the slope (2:1), compaction of the soil, placement of geomembrane and rock rip rap at the toe of the slope. Revegetation and reseed the disturbed area.

Special use management
Scoping Start
08/03/2022
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 3/1/2023
Golden Horseshoe area near Breckenridge, CO · Summit, Colorado

DeConstruction of approx. 3.7 mi of non-motorized single-track trail and construction of approx. 5.0 mi of motorized single-track trail.

Wildlife, fish, rare plantsWatershed managementRecreation managementRoad management
Scoping Start
10/30/2012
Comment Period
10/30/2012
Decision
11/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Ken Waugh · kwaugh@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Watershed Improvements
Golden Horseshoe Trail constructionDecision Signed Date: 11/01/2013
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 1/6/2023
Forest-Wide · Eagle; Garfield; Gunnison; Mesa; Moffat; Pitkin; Rio Blanco; Routt; Summit, Colorado

Forest Plan Amendment to add a forest-wide standard to Chapter 2, Section One Physical, Water and Riparian Resources that supports the Army Corps of Engineers requirement within the Colorado Western Slope In Lieu Fee Final Instrument, Exhibit G

Land management planning
Scoping Start
08/12/2022
Comment Period
09/30/2022
Decision
01/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
Cary Green · cary.green@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 1/4/2023
The project is located in Section 15, Township 5 South, Range 77 West; east of the Summit County Public Shooting Range. Access is County Road 66, Keystone CO. · Summit, Colorado

The Forest Service is proposing to use prescribed fire (broadcast burn) on approximately 44 acres near the Summit County Public Shooting Range for the purpose of the reducing fuel quantities to prevent potential future wildfire.

Recreation managementFuels managementVegetation management (other than forest products)
Scoping Start
04/19/2022
Decision
01/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
Eric Hughes · eric.hughes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 12/8/2022
Treatments could occur in forests containing aspen that area within Forest Plan Management Areas 4.2, 4.23, 4.3, 4.32, 5.12, 5.13, 5.4, 5.41, 5.42, 5.43, 5.5, 7.1, 8.21, 8.25, and 8.32. · Eagle; Garfield; Gunnison; Mesa; Moffat; Pitkin; Rio Blanco; Routt; Summit, Colorado

The WRNF is proposing to conduct vegetation management activities (mechanical and prescribed fire) within forest stands that contain aspen. Management would improve the resiliency of aspen forests to disturbance agents and improve wildlife habitat.

Forest productsFuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
02/19/2021
Comment Period
02/19/2021
Objection Period Start
11/2022 (Estimated)
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Shelby Limberis · shelby.limberis@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 10/20/2022
NE1/4, NE1/4, Sec 16, 6S, 85W, 6th PM · Eagle, Colorado

Xcel Energy has proposed to replace a bridge over Gypsum Creek at the Cottonwood-Gypsum Creek Rd intersection to accommodate maintenance vehicle weight. This non-Forest System Road provides access to Xcel Transmission Lines and private land.

Special use managementRoad management
Scoping Start
10/27/2021
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 9/23/2022
Chicago Ridge Site SW 1/4 of SW 1/4 of S5 T7S R79W Ptarmigan Site NE 1/4 of NE 1/4 of S30 T6S R79W Homestake Site SE 1/4 of NE 1/4 of S6 T7S R80W · Eagle, Colorado

The USGS is proposing three temporary weather station sites on Holy Cross Ranger District. Each temporary site will consist of a 10 foot high weather station and an 8 foot by 9 foot weighing scale snow sensor with minimal soil disturbance.

Special use managementResearch
Scoping Start
10/29/2021
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · East Zone/Holy Cross Ranger District · updated 9/9/2022
Vail Mountain Ski Resort · Eagle, Colorado

In response to the Ski Area Recreational Opportunity Enhancement Act of 2011, Vail Mountain proposes 13 non-ski based projects to provide year-round recreation, taking advantage of existing infrastructure and designed for a variety of visitors.

Recreation management
NOI in Federal Register
11/26/2012
DEIS NOA in Federal Register
03/07/2014
FEIS NOA in Federal Register
08/15/2014
Objection Period Start
08/22/2014
Decision
10/2014 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Roger Poirier · rogerepoirier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Special Use Authorizations
Vail Mountain Recreation Enhancements Project Final EIS Record of DecisionDecision Signed Date: 10/16/2014
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 8/29/2022
The project is located along Wearyman Creek and FSR747 - Wearyman Road, east, northeast of Red Cliff, Colorado in T6S, R80W, Section 15, 6th P.M. · Eagle, Colorado

Construct a minor realignment of approximately 100 feet of FSR 747 Wearyman Road. The project would involve moving the road prism upslope just south of a large rock which is currently confining the road next to the streambed.

Wildlife, fish, rare plantsRoad managementWatershed management
Scoping Start
10/15/2021
Decision
08/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Melvin Woody · melvin.woody@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Species Habitat Improvements; Road Improvements/Construction; Watershed Improvements
Forest Service Road (FSR) 747 Realignment ProjectDecision Signed Date: 08/17/2022
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 8/4/2022
White River NF, Dillon RD, within Keystone Resort's Ski Area Term Special Use Permit area. · Summit, Colorado

Proposal to add lift-served terrain in Bergman and Erickson Bowls at Keystone Resort.

Special use managementRecreation management
Scoping Start
05/01/2020
Comment Period
05/01/2020
Objection Period Start
11/06/2020
Decision
02/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Samuel Massman · samuel.massman@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 8/3/2022
Within Pitkin and Gunnison Counties · Gunnison; Pitkin, Colorado

Braun Hut System permit renewal for a new (10) year term. No changes to the use or intensity.

Special use management
Scoping Start
10/18/2021
Decision
01/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 8/3/2022
Project is located T 2 S, R 90 W, Section 7 Accessible by Rio Blanco County Road 10, Peltier Trailhead Parking Lot · Rio Blanco, Colorado

This project involves the construction of a corral with loading chute and a small 'beef pasture' (7 ac) for livestock ingress and egress to the Hill Creek C&H grazing allotment.

Grazing management
Scoping Start
11/06/2020
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Mary Cunningham · mary.cunningham@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Hill Creek C&H Livestock Handling FacilityDecision Signed Date: 03/22/2022
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2022
Adjacent to Frisco, Colorado near the Zacks stop trailhead, 0.5 miles from the trailhead heading south on the Peaks Trail #45 · Summit, Colorado

The proposed project would realign and construct approximately 2500 feet of new trail. Approximately 1000 feet of the existing trail would be decommissioned and restored to a natural state using best management practices.

Recreation management
Scoping Start
04/04/2022
Decision
07/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Tyler Kirkpatrick · tyler.kirkpatrick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Hattie's Trail FDT #9078 Reconstruction Project (HTRP)Decision Signed Date: 07/26/2022
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 7/28/2022
The egress/ingress route is located at the ford for Lost Trail Creek, along the Lead King Basin Road (NFSR 315). · Gunnison, Colorado

The project is to authorize use and maintenance of roughly 60 feet of an existing 2 track, 10-foot-wide route to the subject parcel located along the Lead King Basin Road (NFSR 315).

Special use management
Scoping Start
12/01/2021
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Aspen Valley Land Trust Access RouteDecision Signed Date: 07/14/2022
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionSE1/4 Sec.19, T.11 S., R. 87 W., 6th PM, Gunnison County. Located in the immediate vicinity of North Lost Trail Creek Trailhead, off of Lead King Basin Road (NFSR 315)
Decision Memo · East Zone/Dillon Ranger District · updated 6/28/2022
This project is located within the Eagles Nest Wilderness Area on the Dillon Ranger District. · Summit, Colorado

Approximately 1.9 miles of new trail would be reconstructed in the Eagles Nest Wilderness area. The former trail alignment, which is 1.2 miles in length, would be decommissioned and restored to its natural condition.

Recreation management
Scoping Start
05/12/2021
Decision
04/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 6/17/2022
The proposed action crosses two slivers of NFS lands located along Hummingbird Road in Breckenridge, CO. · Summit, Colorado

Replacing 150' of 50-year old 2-inch steel natural gas line with a 4-inch polyethylene natural gas line across two slivers of NFS lands along Hummingbird Road to provide adequate service to community.

Special use management
Scoping Start
08/18/2021
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Public Service Company of Colorado Hummingbird Dr Natural Gas Permit AmendDecision Signed Date: 06/07/2022
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 6/13/2022
Long/Lost Trail head is located approx. 30 miles east of Meeker, CO along Rio Blanco County Road 8. · Rio Blanco, Colorado

This project proposes to construct a secondary entrance/exit approx. 100-200 feet east of the existing Long Lost Trail head park area entrance/exit. It is estimated that this entrance/exit will be approx. 30-50 feet wide and 20-40 feet in length.

Recreation management
Scoping Start
03/01/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Aaron Grimes · aaron.grimes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 5/31/2022
Intersecton of CSH-133 and Gunnison County Rd 3 through NFS lands to the Darien parcel (east side of Crystal River). · Gunnison, Colorado

Special use permit for the installation of fiber optic line and conduit along an existing overhead utility right-of-way from the intersection of State Highway 133 and Gunnison County Rd 3 to the Forest boundary at the Darien parcel in Marble.

Special use management
Scoping Start
11/10/2021
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 5/26/2022
Project areas in Section 15, T5S, R78W, Section 7, T6S, R77W, Sections 12, 13, 15, T6S, R78, and Section 31, T4S, R77W, 6th Prime Meridian. · Summit, Colorado

Proposal to hand plant Lodgepole pine and Engelmann spruce seedlings in the Peak 2, Buffalo Mountain, and Ptarmigan areas affected by past wildfires.

Vegetation management (other than forest products)
Scoping Start
03/17/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Sarah Pearson · sarah.pearson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 5/12/2022
This project would be located within Soda Creek watershed upstream of the Keystone Ranch Community, Summit County, Colorado. T5S, R76W, Sections 34 and T6S, R76W, Sections 3 and 4, 6th PM. · Summit, Colorado

This project would issue a permit for the National Forest Foundation sub-contractor Westervelt Ecological Services to survey wetlands, complete stream surveys, collect some soil cores, and establish/monitor groundwater monitoring wells.

Special use managementWatershed management
Scoping Start
03/17/2022
Decision
05/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Christopher Stewart · christopher.s.stewart@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 4/28/2022
The Mill Creek Trail and Vail Uphill Trail are within Vail Resorts Ski Area Boundary. The North Trail Connector is located on the north side of I-70 near the Town of Vail. · Eagle, Colorado

The Mill Creek Trail Reroute creates a new trail to allow for the full restorative potential for the Mill Creek road project. The Vail Uphill trail creates a new summer uphill trail on Vail Ski Area. North Trail Connector connects the North Trail.

Recreation management
Scoping Start
01/24/2022
Decision
04/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Calen Orlowski · calen.orlowski@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.; Trail Management
Mill Creek Trail RerouteDecision Signed Date: 04/26/2022
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 4/25/2022
Lake Hill Communications Site located off the Dillon Dam Road about 1 mile southwest of the intersection with Highway 6 in the Town of Dillon. · Summit, Colorado

Installation, operation, and maintenance of a 6'-diameter microwave antenna associated with FirstNet on the existing AT&T tower at the Lake Hill Communications Site.

Special use management
Scoping Start
10/01/2021
Decision
11/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 3/29/2022
This project is located within the special use permit boundary (Golden Horseshoe) that is issued to Summit County Government. · Summit, Colorado

Proposal from Summit County to construct approximately 5.40 miles of multi-use non-motorized trails on National Forest System Lands within the Golden Horseshoe Special Use Permit (SUP) boundary.

Recreation management
Scoping Start
07/01/2021
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 3/21/2022
The proposed location is within the Special Use Permit area for Snowmass Mountain Resort, approx. same location as the existing structure. · Pitkin, Colorado

Aspen Skiing Company has proposed to remove and replace the 'Elk Camp Wildlife Center and Ski Patrol Headquarters' at Snowmass Mountain Resort.

Special use management
Scoping Start
08/25/2021
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Elk Camp Wildlife Center/Ski Patrol Headquarters & Restaurant ProjectsDecision Signed Date: 03/21/2022
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 3/3/2022
NE1/4 Section 33, Township 6 South, Range 77 West of the 6th P.M., Summit County, CO · Summit, Colorado

Special use authorization for use, occupancy, construction and maintenance of a private driveway to access private property on the St Paul Lode mining claim (MS# 8884) in the Golden Horseshoe Area east of Breckenridge, CO.

Special use management
Scoping Start
03/15/2019
Decision
01/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Cynthia Ebbert · cynthia.ebbert@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
St. Paul Lode (MS #8884) Access RoadDecision Signed Date: 01/31/2022
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 2/15/2022
Treatments will principally occur within Eagle, Summit, Grand, and Pitkin counties where the majority of hazard trees exist. · Eagle; Grand; Pitkin; Summit, Colorado

Remove hazard trees within 150' of roads and trails and 200' of recreation sites on the White River National Forest over the next ten years. Lodgepole pine affected by the mountain pine beetle will be targeted for removal.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/13/2009
Objection Period Start
07/08/2009
Decision
09/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Jan Burke · jburke@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
DN/FONSI Forestwide Hazardous Tree Removal and Fuels ReductionDecision Signed Date: 09/28/2009
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Decision Memo · West Zone/Aspen Ranger District · updated 1/3/2022
This project occurs primarily within the areas commonly referred to as McFarlane Gulch/ Loushin's on Richmond Ridge, Aspen Mountain on groomed and maintained routes of Aspen Mountain Powder Tours. · Pitkin, Colorado

Issuance of an authorization to make motorized over-the-snow travel for residential purposes within an area closed to winter motorized use except by permit per the 2011 Travel Management Decision

Special use management
Scoping Start
12/10/2021
Decision
12/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 11/2/2021
Top of designated communications site on Sunlight Peak in Garfield Co. · Garfield, Colorado

This project will replace the existing overhead power line supply with a buried power supply. A buried conduit and line system will be installed from the existing power pole to facilities operate under Sunlight Peak Communications Site Lease #SOP371.

Special use management
Scoping Start
05/25/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionSW 1/4 Sec. 19, T.7 S., R. 89 W., 6th PM, Garfield Co.; Sunlight Peak Designated Communications Site.
Decision Memo · East Zone/Dillon Ranger District · updated 10/20/2021
The project is located within the Eagles Nest Wilderness adjacent to the Ruby Ranch subdivision in Silverthorne, Colorado. · Summit, Colorado

A proposed fuels reduction project to reduce the risks and repercussions of a wildfire escaping the Eagles Nest Wilderness and posing a threat to community safety and private and public infrastructure.

Fuels management
Scoping Start
03/31/2021
Decision
10/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Kathleen Gray · kathleen.gray@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Ruby Ranch Fuels Reduction ProjectDecision Signed Date: 10/14/2021
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 10/7/2021
North side of Highway 6 about 0.6 miles from the A-Basin Ski Resort base area near the Last Chance Lot. · Summit, Colorado

Placement and grading of material from the Grizzly Peak landslide to re-contour an embankment and decommission an unauthorized non-system road on National Forest system lands.

Special use management
Scoping Start
10/01/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 10/1/2021
Township 8S, Range 85W, Section 25; Near Kobey Park and Cow Camp on the Aspen-Sopris Ranger District · Pitkin, Colorado

The Recreation Residence has been impacted by water and sediment from erosion. To mitigate this problem, a berm would be built to divert water away from the cabin.

Special use management
Scoping Start
03/01/2021
Decision
09/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Mary Flynn · mary.flynn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 9/21/2021
Section 26, Township 5 South, Range 76 West, 6th P.M. in Summit County, CO. · Summit, Colorado

Allow occupancy and use of National Forest System lands adjacent to the Manila Lode for completion of Environmental Protection Agency CERCLA removal action.

Special use management
Scoping Start
08/23/2021
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 9/20/2021
Copper Mountain Resort's special use permit area and operational boundary · Summit, Colorado

Proposal from Copper Mountain Resort to replace the existing Lumberjack Chairlift and install snowmaking near the top terminal.

Special use managementRecreation management
Scoping Start
05/19/2021
Decision
09/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 9/10/2021
Located along the Eagle River about 0.5 miles northwest of Dowd Junction. · Eagle, Colorado

Authorization and replacement of existing Eagle-Vail Metropolitan District water diversion structure.

Special use management
Scoping Start
05/12/2021
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Eagle-Vail Metropolitan District Diversion Structure and ReplacementDecision Signed Date: 09/07/2021
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 9/10/2021
In the upper North Elk Creek watershed, at least in the Middle Fork of North Elk Creek. · Rio Blanco, Colorado

To construct one or more temporary fish barriers in the upper North Elk Creek watershed.

Wildlife, fish, rare plants
Scoping Start
05/27/2021
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Robert Ramey · rramey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionCentered on the boundary of T2S, R92W and R91W
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2021
T6S., R78W., Sec. 31, 6th P.M. · Summit, Colorado

AT&T has applied for the renewal of their Copper Mountain Communications Site Lease. Currently AT&T operates a communication site on National Forest Lands within Copper Mountain Ski Resort's Special Use Permit Area. No new disturbance are proposed.

Special use management
Scoping Start
06/21/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2021
Dillon Ranger District, PSCo (XCEL) powerline "Dillon-Robinson 115kV Line". · Summit, Colorado

PSCo transmission line 9188 needs to replace 2 failing structures and addition of weights to 1 structure in order to correct identified deficiencies.

Special use management
Scoping Start
05/17/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Carole Huey · clhuey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Amend PSCo (XCEL) Permit DIL796 to replace failing structures 63 and 8Decision Signed Date: 07/17/2021
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionLine 9188 - Structure 63 / 39.489913 -106.136833 / 6S 78W 32 Line 9188 - Structure 85 / 39.459798 -106.13945 / 7S 78W 8 Line 9188 - Structure 86 / 39.458515 -106.141104 / 7S 78W 8
Decision Memo · White River National Forest All Units · updated 7/29/2021
West portal of the Vidler Tunnel located below Argentine Pass in the Peru Creek Basin. · Summit, Colorado

In-kind replacement of 3,216 linear feet of existing, aboveground pipeline used to capture and convey water to the western portal of the Vidler Tunnel in the Peru Creek drainage for municipal drinking water.

Special use management
Scoping Start
03/24/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Vidler Tunnel Pipeline ReConstruction and ReplacementDecision Signed Date: 07/28/2021
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 6/30/2021
Project activities include all Ranger Districts on the White River National Forest. · Eagle; Garfield; Mesa; Pitkin; Rio Blanco; Routt; Summit, Colorado

White River National Forest proposes to perform density reduction treatments in over-crowded regenerating stands of trees. Treatments would reduce the number of trees per acre to improve overall stand health.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Scoping Start
12/18/2018
Decision
06/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Shelby Limberis · slimberis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
White River Forest Health and Fuels ProjectDecision Signed Date: 06/30/2021
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 6/14/2021
Within the Beaver Creek Ski Area Special Use Permit boundary. · Eagle, Colorado

Beaver Creek Resort is proposing add a ski patrol egress/temporary construction access road, a gray water leach field for the previously approved warming hut, signage corbels, and an additional toilet for lift operators.

Special use management
Scoping Start
04/08/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Calen Orlowski · calen.orlowski@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Beaver Creek McCoy Park ProjectsDecision Signed Date: 05/18/2021
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 6/14/2021
NE1/4SE1/4, Sec. 17, T. 8 S., R 83 W., 6th PM, Pitkin County,CO Site is located 1500 ft. northeast of the intersection of County Road 4 (Fryingpan Rd.) and County Road 4A.4 (Eagle-Thomasville Rd.) · Pitkin, Colorado

Construction of a new freestanding tower and installation of a communications cabinet adjacent to existing permitted facility. Removal and rehabilitation of the existing communications facility which includes the shelter and all towers/antennas.

Special use management
Scoping Start
02/23/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Michael Braudis · michael.braudis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNE1/4SE1/4, Sec. 17, T. 8 S., R 83 W., 6th PM, Pitkin County, CO White River NF
Decision Memo · East Zone/Dillon Ranger District · updated 6/9/2021
Located within the Frisco Nordic Center special use permit operational boundaries on the Frisco Peninsula. · Summit, Colorado

Construction of 1.3 miles of Nordic skiing trails, 4.6 miles of summer multi-use trails, and 2.1 miles of improvements to existing trails on National Forest System (NFS) lands within the Frisco Nordic Center Special Use Permit boundary.

Special use managementRecreation management
Scoping Start
04/15/2021
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Frisco Nordic Center Phase 2 Trails ProjectDecision Signed Date: 06/08/2021
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 6/9/2021
Eagle County, Colorado, Lime Creek Canyon, T8 R83 Section 4, T7 R83 Section 27, 28, and 33. · Eagle, Colorado

An order that restricts human occupancy in vicinity of active peregrine falcon nesting activity, May 15 to July 31, for a five year period starting 2021.

Recreation managementWildlife, fish, rare plants
Scoping Start
04/29/2021
Decision
07/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Philip Nyland · pnyland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Order Creation/Modification
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT8 R83 Section 4, T7 R83 Section 27, 28, and 33
Decision Memo · White River National Forest All Units · updated 5/5/2021
The proposed weather shelter is located in Glenwood Canyon at the Hanging Lake Rest Area, I-70 Exit 125, Garfield County. The site is adjacent to the Hanging Lake Area restroom facility. · Garfield, Colorado

The project would construct a 45'x44'x21' structure at the Hanging Lake Rest Area in Glenwood Canyon to provide shelter to visitors at the popular recreation area.

Recreation management
Scoping Start
01/06/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Sarah Strehle · sarah.strehle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Glenwood Canyon Weather Shelter Decision MemoDecision Signed Date: 05/04/2021
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 4/13/2021
Located within Arapahoe Basin Ski Area's special use permit area and operational boundary. · Summit, Colorado

Proposal from Arapahoe Basin Ski Area to replace the existing Lenawee Chairlift, expand existing food service facilities at Black Mountain Lodge and construct a warming hut near the Lenawee Parks ski trail.

Special use managementRecreation management
Scoping Start
02/17/2021
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Samuel Massman · samuel.massman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Rifle Ranger District · updated 4/7/2021
T8S, R92W, Sections 26, 27, & 34; 6th Principal Meridian, Mesa County, Colorado · Mesa, Colorado

Reissue special use permit (RIF-184) to Laramie Energy, LLC., including relocating the existing tower approx. 75ft south of current pad location and continued use of existing roads NFSR 815.1 & NFSR 815.1A to Hells Gulch Wellpad #26

Special use management
Scoping Start
09/23/2020
Decision
01/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
Corbin Shipp · corbin.shipp@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 4/6/2021
Upper Lost Man trailhead- Highway 82 corridor; 2 miles below Independence Pass Summit at 11,500 feet. Project coordinates: 39 07%u2019 18%u201D N, 106 34%u2019 18%u201D W · Pitkin, Colorado

Installation of a CXT toilet at the Upper Lost Man trailhead.

Recreation management
Scoping Start
03/22/2021
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Shelly Grail · shelly.grail@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management; Scenery Management; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 3/22/2021
The project area is located along Homestake Creek about 6 miles southwest of Redcliff, Colorado. Sec. 13 and Sec. 23 - T7S-R81W, 6th P.M., Eagle County, Colorado · Eagle, Colorado

Homestake Partners (City of Aurora and Colorado Springs Utilities) is requesting an authorization to conduct a fatal-flaw geotechnical investigation within the Homestake Valley located on National Forest System Lands in southeastern Eagle County.

ResearchMinerals and geologySpecial use managementFacility management
Scoping Start
05/28/2020
Decision
03/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Leanne Veldhuis · leanne.veldhuis@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations; Research And Development; Road Improvements/Construction
Decision Memo - Special Use Auth. Whitney Creek Geotechnical InvestigationDecision Signed Date: 03/22/2021
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionTownship 7 South - Range 81 West, 6th Principal Meridian, Eagle County, Colorado
McCoy Park 2020 Cancelled
Decision Memo · White River National Forest All Units · updated 2/17/2021
Beaver Creek Ski Area · Eagle, Colorado

Beaver Creek Resort is proposing to add a ski patrol egress/temporary construction access road, a gray water leach field for the previously approved warming hut, and signage corbels for the McCoy Park terrain development.

Special use management
Scoping Start
02/13/2020
Decision
04/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Calen Orlowski · cnorlowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 1/14/2021
General area of permit reauthorization is north end of Summit County · Summit, Colorado

Re-issuance of an existing authorization for variable kV electrical distribution lines and fiber optic cable.

Special use management
Scoping Start
07/30/2020
Decision
01/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Reissuance of Mountain Parks Electric, Inc Special Use PermitDecision Signed Date: 01/12/2021
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSec 11, 13, 14, 15, 35, 36 of T2S, R80W; Sec 34 T2S, R79W; Sec 18, 28, 29, 33 of T3S, R78W; Sec 2, 3 T3S, R79W: 6th Principal Meridian
Decision Memo · East Zone/Eagle Ranger District · updated 12/18/2020
T8S R81W Sect 9 - East Fork Homestake Creek site T7S R81W Sect 33 - Fancy and Missouri Creek sites · Eagle, Colorado

The project would replace existing road-stream crossing structures on the Homestake Road at East Fork Homestake Creek, Missouri Creek and French Creek in order to increase flood resiliency of the transportation system and reconnect aquatic habitats.

Watershed managementWildlife, fish, rare plantsRoad management
Scoping Start
12/01/2020
Decision
12/2020 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Mark Weinhold · mark.weinhold@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Maintenance; Watershed Improvements
Homestake Road Culvert ReplacementsDecision Signed Date: 12/17/2020
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 12/10/2020
The project is located north of Silverthorne, Colorado along a shared boundary between National Forest System Lands and private property located in Section 29, Township 3S, R78W, 6th P.M. · Summit, Colorado

The proposed activities consist of reshaping the bankfull channel of the Blue River by relocating alluvial material from within channel riffles to areas that will support the creation of holding pools.

Watershed managementWildlife, fish, rare plants
Scoping Start
09/16/2020
Decision
11/2020 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Melvin Woody · melvin.woody@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · R2 - Rocky Mt. Region All Units · updated 12/10/2020
Linear transmission lines located in Colorado, Utah, and Nebraska · Dawes; Daggett; Uintah; Chaffee; Delta; Dolores; Eagle; Grand; Gunnison; Jackson; Lake; La Plata; Larimer; Mesa; Montrose; Routt; Saguache; San Juan, Colorado; Nebraska; Utah

Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation.

Special use management
NOI in Federal Register
04/08/2010
DEIS NOA in Federal Register
09/27/2013
FEIS NOA in Federal Register
12/10/2020
Objection Period Start
08/10/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Matthew Custer · mscuster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
WAPA Right-of-Way Maintenance and ReauthorizationDecision Signed Date: 11/17/2020
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Nebraska National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Ashley National Forest
DistrictsGrand Valley Ranger District; Norwood Ranger District; Gunnison Ranger District; Paonia Ranger District; Yampa Ranger District; Hahns Peak/Bears Ears Ranger District; Pine Ridge Ranger District; Boulder Ranger District; Canyon Lakes Ranger District; Sulphur Ranger District; Salida Ranger District; Mancos/Dolores Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District; Ashley National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 11/10/2020
Sunlight Mountain Resort: T7S; R 89W; Section 33 · Garfield, Colorado

Sunlight Mountain Resort is proposing to install a new chairlift, construct a pit toilet and enhance trail improvements at Sunlight Mountain Resort (SMR).

Special use management
Scoping Start
01/23/2020
Decision
11/2020 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Devon Cotsamire · devon.cotsamire@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Sunlight Mountain Resort East Ridge Chairlift InstallationDecision Signed Date: 11/10/2020
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Derby Mesa Project Completed
Decision Memo · White River National Forest All Units · updated 10/21/2020
Project is located on Derby Mesa, west of Burns, Colorado on the Eagle/Holy Cross Ranger District. · Eagle, Colorado

Restore ponderosa pine forests to Fire Regime Condition Class I. Improve habitat for species dependent on ponderosa pine forests. Reintroduce surface fire to ponderosa pine ecosystems. Reduce pinon/juniper encroachment from sagebrush communities.

Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsGrazing managementForest products
Scoping Start
02/04/2020
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Brett Crary · brett.crary@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionT.2S, R.86W, Sections 13, 14, 23, 24, 25, 26, 36
Decision Memo · West Zone/Rifle Ranger District · updated 10/16/2020
Mine is located at the terminus of NFSR 602.3M, which intersects the Transfer Trail approximately 1/4 north of Windy Point · Garfield, Colorado

The Strong Mining Co. will implement final reclamation of the Apex (Strong) Mine. Plan includes safety closures of two adits, demolition and removal of all improvements, decommissioning access roads and trails, and site revegetation.

Minerals and geology
Scoping Start
03/04/2019
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Jason Gross · jason.gross@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations; Species Population Enhancements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionSE 1/4 Sec. 7, T5S, R88W; SW 1/4 Sec. 8, T5S, R88W; NW 1/4 Sec. 17, T5S, R88W; NE 1/4 Sec. 18, T5S, R88W, 6th Principal Meridian, Garfield County, Colorado
Decision Memo · White River National Forest All Units · updated 10/15/2020
Peak One and Pine Cove Campgrounds · Summit, Colorado

The project proposes to modernize and improve recreation facilities, reduce deferred maintenance costs, provide an improved visitor experience, and offer additional campsites and campground amenities at Peak One and Pine Cove Campgrounds.

Facility managementRecreation management
Scoping Start
10/01/2019
Decision
03/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Cory Richardson · coryrichardson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 5 South, Range 78 West, Sections 25 and 30
Decision Memo · East Zone/Dillon Ranger District · updated 9/24/2020
White River NF, Dillon RD, within Frisco Nordic Center's Ski Area Term Special Use Permit area. · Summit, Colorado

Proposal to construct winter Nordic ski trails and summer hike/bike trails within Frisco Nordic Center's special use permit area.

Special use managementRecreation management
Scoping Start
04/24/2019
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 9/24/2020
Upper front side of Vail Mountain above the town of Vail, Colorado · Eagle, Colorado

Construction of 262 acres of new snowmaking coverage on Vail Mountain, primarily the upper front side; includes 32.5 miles of new snowmaking pipeline and 14 new valve stations.

Special use managementRecreation management
Scoping Start
10/10/2018
Comment Period
10/10/2018
Objection Period Start
12/19/2018
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Noel Ludwig · nludwig@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/21/2020
Wildwood parcel put-in for the Roaring Fork River. Adjacent to the NorthStar Preserve · Pitkin, Colorado

This order is proposed to align the management of the Wildwood parcel on NFS lands with adjacent lands on Pitkin County Open Space and Trails

Recreation management
Scoping Start
05/18/2020
Decision
09/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Decision Decided Date09/21/2020
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionProject coordinates 39 09' 28"N, 106 47' 71"W
Decision Memo · West Zone/Aspen Ranger District · updated 9/8/2020
Project is located within the Snowmass Mountain Resort Special Use Permit Area · Pitkin, Colorado

Aspen Skiing Company proposal for minor trail re-routes for the Verde and Valhalla bike trails at Snowmass Mountain Resort

Recreation management
Scoping Start
08/05/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Monte Lutterman · monte.lutterman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Snowmass Mountain Resort Bike Trail ReroutesDecision Signed Date: 09/04/2020
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT10S; R85W; Section 12, 6th Principal Meridian
Decision Memo · East Zone/Dillon Ranger District · updated 9/2/2020
Northwest of Frisco adjacent to Eagles Nest Wilderness Area. · Summit, Colorado

The trail would be realigned to a more sustainable grade. Modern trail design standards would be incorporated including sustainable grades, grade reversals, and out sloping of the tread. The trail tread will be constructed to a 18-24 inch width.

Recreation management
Scoping Start
03/30/2018
Decision
04/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/2/2020
All sites identified for remediation are located in Summit Count near the headwaters of Blue River north of Hoosier Pass, and the Upper Blue River area east of the Town of Breckenridge. · Summit, Colorado

Environmental review and remediation of seventeen hazardous historic structures and mine features along heavily traveled recreation routes in (1) Monte Cristo Gulch, (2) Blue River area east of Breckenridge, and 3) Snake River area near Montezuma.

Land ownership management
Scoping Start
04/02/2020
Decision
07/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Paul Semmer · paul.semmer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/1/2020
Wise Mtn Cabin - North Fork Swan River; Bemrose Cr Cabin - east of Hoosier Pass; Mt Guyot Cabin, near Georgia Pass; Keystone Gulch near Keystone Ski area; and Peru Cr Cabin east of Keystone · Summit, Colorado

Demolition and removal of abandoned equipment, materials and structures at five abandoned mining cabins (Wise Mtn, Bemrose Creek, Mt. Guyot, Keystone Gulch and Peru Creek).

Land ownership management
Scoping Start
05/29/2019
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
South Summit Abandoned Mine Lands Cabin Clean-up and DemolitionDecision Signed Date: 08/27/2020
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionWise Mtn Cabin - Sec 20, T6S, R76W; Bemrose Cabin - Sec 12, T8S, R77W; Mt Guyot Cabin - Sec 6, T7S, R76W; Keystone Gulch - Sec 36, T5S, R77W; Peru Creek - Sec 19, T5S, R75W. 6th P.M. Summit County, CO
Decision Memo · White River National Forest All Units · updated 9/1/2020
Forest System Road 603 at the 1840 Trailhead · Garfield, Colorado

Project will add additional parking at FST1840 Main Elk, while staying within the existing USFS road easement

Recreation management
Scoping Start
05/13/2020
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Robert Rodriguez · rtrodriguez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT4S, R91W, Section 26; 39.67790 -107.56972 WGS84
Decision Memo · White River National Forest All Units · updated 7/31/2020
The Maid of Orleans lode claim is on the north side of Peru Creek Road about 1.3 miles from Montezuma Road. The trespass items are on NFS lands along the eastern property line of the lode claim. · Summit, Colorado

Demolition and removal of above and below grade infrastructure including a propane tank, concrete footings, gravel road, and debris followed by filling, grading, and re-vegetation to restore the site.

Special use management
Scoping Start
05/08/2020
Decision
07/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Anna Bengtson · anna.p.bengtson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/31/2020
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionWest 1/2, Section 24, Township 5 South, Range 76 West, 6th Principal Meridian, Summit County, Colorado
Decision Memo · White River National Forest All Units · updated 7/31/2020
39.311495, -107.532256. Work location is situated approximately 22 miles south of Silt, CO adjacent to Mosquito Creek Road - NFSR 824 · Mesa, Colorado

RMNG must perform maintenance/replacement on a section of existing 6" pipeline on the Rifle RD to meet PHMSA regulations. Proposed work would involve the replacement and/or reroute of approximately 100 feet of exposed natural gas pipeline

Special use management
Scoping Start
04/06/2020
Decision
07/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Karla Mobley · karla.mobley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Natural Gas
Mosquito Creek 6" Pipeline Replacement ProjectDecision Signed Date: 07/23/2020
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionSection 34, Township 8S, Range 91W, 6th P.M., Mesa County, Colorado
Decision Memo · White River National Forest All Units · updated 7/31/2020
Existing electric power line along Heeney Road (Summit County Road 30) & north of Green Mountain Reservoir Dam · Summit, Colorado

Construction, operation and maintenance of a fiber optic telecommunication line including 1.51 miles of underground cable and 560 feet of overhead cable on an existing electric distribution line right-of-way north of Green Mountain Reservoir

Special use management
Scoping Start
02/28/2018
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Anna Bengtson · annabengtson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionSections 11, 14 and 15, Township 2 South, Range 80 West, 6th PM, Summit County, CO
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2020
West of Silverthorne in the Mesa Cortina Area · Summit, Colorado

The purpose of this project is to improve the condition of the Arctic Placer Trail through realignment and construction. The existing trail is very steep, travels straight up the hillside, and is causing soil erosion during spring run.

Recreation management
Scoping Start
03/30/2018
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management
Dillon Trails Reconstruction ProjectsDecision Signed Date: 06/26/2020
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/29/2020
900 Grand Ave, Glenwood Springs, Colorado; T6S, R89W, Section 9, 6th P.M., Garfield County, Colorado · Garfield, Colorado

The City of Glenwood Springs would like to create an easement for an existing transformer located at 900 Grand Avenue, the White River National Forest Supervisor's Office.

Special use management
Scoping Start
06/01/2018
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Carole Huey · clhuey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
The City of Glenwood Springs Electric TransformerDecision Signed Date: 07/28/2020
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionT6S, R89W, Section 9, 6th P.M., Garfield County, Colorado
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2020
West of Breckenridge · Summit, Colorado

The purpose of this project is to improve the condition of the Broken Wheel Trail through realignment and construction. The existing trail is very steep, travels straight up the hillside, and is causing soil erosion during spring run.

Recreation management
Scoping Start
03/30/2018
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management
Dillon Trail Construction ProjectsDecision Signed Date: 06/26/2020
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2020
Soda Creek drainage near Summit Cove · Summit, Colorado

1. Realign a segment of the trail to remove it from a wet area. 2. Extend the trail by 1 mi through adopting an existing social trail. 3. Decommission trail #316W.1B (1.1 mi)which was identified in the Travel Management Plan to be decommissioned.

Recreation management
Scoping Start
03/27/2018
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management
Dillon Trail Reconstruction ProjectsDecision Signed Date: 06/26/2020
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 7/29/2020
South of Frisco and North of Breckenridge Ski Resort, between Highway 9 and Interstate 70. · Summit, Colorado

To improve the condition of the Miners Creek trail through the realignment of three segments where the trail is very steep and goes up the fall line. Trail reconstruction will be accomplished through hand crew and/or motorized construction.

Recreation management
Scoping Start
03/30/2018
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management
Dillon Trails Reconstruction ProjectsDecision Signed Date: 06/26/2020
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/29/2020
Nettle Creek water treatment plant · Garfield, Colorado

Town of Carbondale is requesting to ad a Micro Hydro Generator to the existing water treatment plant at Nettle Creek. The hydroelectric facility is expected to produce approximately 225,000kWh/year.

Special use management
Scoping Start
07/01/2020
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Carole Huey · clhuey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT9S, R88W, Section 10, 6th Principal Meridian, Garfield County, Colorado
Decision Memo · White River National Forest All Units · updated 7/28/2020
North Pole, Rock Creek Gulch, and Paradise Basins above the valley floor of the Schofield Pass area. Safety closure work also includes mine features on Treasury Mountain (Ragged Wilderness). · Gunnison, Colorado

Schofield Pass AML - Construction of approximately 20-25 barriers on open mine adits/shafts in the upper basins of the Schofield Pass area in Gunnison County. Additional restoration work includes road decommissioning, and trail maintenance.

Minerals and geology
Scoping Start
04/14/2020
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Olivia Garcia · ogarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSopris RD. Legal Description: Township 11 South, Range 87 West, Section 36 Legal Description: Township 12 South, Range 87 West, Sections 2, 3, 4, 10,11, 12, 13, 14, 21, 23, and 24.
Environmental Assessment · White River National Forest All Units · updated 7/20/2020
Project is located in the vicinity of FSR 300 between Four-mile Park and Baylor Park. · Garfield; Mesa; Pitkin, Colorado

The Aspen-Sopris Ranger District is proposing approximately 1600 acres of vegetation treatments along FSR 300. Additional projects identified in the area include recreation management enhancements and prescribed fire.

Vegetation management (other than forest products)Fuels managementRecreation managementForest products
Scoping Start
09/06/2018
Comment Period
09/06/2018
Objection Period Start
06/20/2019
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Shelby Limberis · slimberis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Special Products Sales; Timber Sales (Green)
County Line Project Decision NoticeDecision Signed Date: 07/17/2020
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSec. 19,30-32, T7S R89W; Sec. 24, T7S R90W; Sec. 6,7, T8S R89W; Sec. 1,11,12, T8S R90W, Garfield Co; Sec. 18, T8S R89W; Sec. 13-15,22-24,26,27, T8S R90W, Pitkin Co; Sec. 15,21,22, T8S, R90W, Mesa Co.
Decision Memo · White River National Forest All Units · updated 7/2/2020
Tours will occur on NFS lands within multiple districts on the White River, Pike & San Isabel, Arapaho-Roosevelt, Medicine Bow-Routt, GMUG, Shoshone and Rio Grande National Forests · Carbon; Fremont; Sublette; Chaffee; Conejos; Eagle; Fremont; Garfield; Grand; Gunnison; Park; Pitkin; Rio Grande; Routt; Saguache; Summit, Colorado; Wyoming

Issuance of a ten year outfitter and guide permit to Adventure Cycling Association to authorize multiple cycling tours to operate annually on National Forest System Lands across the Rocky Mountain Region.

Special use management
Scoping Start
06/18/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; Shoshone National Forest; White River National Forest
DistrictsGunnison Ranger District; Yampa Ranger District; Brush Creek/Hayden Ranger District; Hahns Peak/Bears Ears Ranger District; Rio Grande National Forest All Units; Sulphur Ranger District; Salida Ranger District; South Park Ranger District; Wind River Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 6/23/2020
Pitkin County, Colorado, between Snowmass Ski Area and Buttermilk Ski Area; T10S R86W, east 1/2 of Section 12, and T10S R85W portions of Section 7,8,16,17, and 18. · Pitkin, Colorado

An order that restricts human occupancy on and surrounding Government trail #1980 and connecting trails between Snowmass Ski Area and Buttermilk Ski Area from May 15 to June 27, and a smaller area adjacent to Snowmass Ski Area from May 15 to June 20.

Wildlife, fish, rare plants
Scoping Start
02/13/2020
Decision
06/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Philip Nyland · pnyland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Travel Management
Decision Decided Date06/23/2020
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT10S R86W, east 1/2 of Section 12, and T10S R85W portions of Section 7,8,16,17, and 18.
Decision Memo · White River National Forest All Units · updated 6/2/2020
Ruedi Day Use Area; adjacent to the ANS inspection station · Pitkin, Colorado

This project will authorize the installation of a well adjacent to the day parking lot for the Ruedi Boat Ramp. Water from this well will be used by ANS inspectors to decontaminate boats coming into Ruedi Reservoir

Recreation managementWatershed management
Scoping Start
04/29/2020
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
Ruedi WellDecision Signed Date: 06/02/2020
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 5/28/2020
NW1/4, Section 30, T. 10S., R. 84 W., 6th P.M., Pitkin County, Colorado. · Pitkin, Colorado

Analysis of summer residential use of an existing road (Loushin's Rd) within the existing permit boundary of Aspen Mountain Ski Area to be made by the residents and their assignees of an adjacent private parcel within the greater Pandoras areas.

Special use management
Scoping Start
11/04/2019
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Michael Braudis · mbraudis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Residential Use of FSR 2198.1 Loushin Road Special Use PermitDecision Signed Date: 05/28/2020
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionProject is located along an existing road commonly referred to as Loushin's Road; NW1/4, Section 30, T. 10S., R 84 W., 6th P.M., Pitkin County, Colorado.
Environmental Assessment · West Zone/Sopris Ranger District · updated 5/27/2020
Avalanche Creek drainage, approximately 9 miles south of Carbondale in the Crystal River Valley, Access via Forest Service Road 310. · Pitkin, Colorado

Evaluate the proposed Plan of Operations submitted by Elbram Stone Company, LLC to continue alabaster mining operations at the White Banks quarry.

Minerals and geology
Scoping Start
02/03/2011
Comment Period
09/12/2011
Decision
05/2013 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
David Francomb · dfrancomb@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
DN and FONSI White Banks Plan of OperationsDecision Signed Date: 05/23/2013 Legal Notice Date: 05/23/2013
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT9S, R88W, Section 28
Decision Memo · White River National Forest All Units · updated 5/19/2020
Castle Peak in Montezuma Basin outside of Aspen, CO in Pitkin County · Pitkin, Colorado

Construct a sustainable mountain ascent route, restore multiple user created paths and perform basic maintenance on the main summit ascent route to Castle Peak.

Recreation management
Scoping Start
04/14/2020
Decision
05/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 3/25/2020
Peak 7 Neighborhood - northwest of Breckenridge, CO · Summit, Colorado

Tiering to the 2011 the Breckenridge Forest Health and Fuels EA, the proposal is to remove the current adaptive management threshold of 60% minimum stand mortality to immediately reduce hazardous fuels on 522 acres within the WUI of Breckenridge.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/10/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Eric White · eric.white@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionPortions of Sec 27 and 28, T 6 S, R 77 W; Portions of Sec 23, 24 & 26, T 6 S, R 78 W; Portions of Sect 17, 19 and 30, T 7 S, R 77 W; Portions of Sect 1, 12 & 13, T 7 S, R 78 W; 6th Principal Meridian
Decision Memo · East Zone/Dillon Ranger District · updated 3/11/2020
Within the special use permit boundaries of Arapaho Basin Ski Area High Noon Sand Shed: UTM, 13S 425402m E, 4388542m N Il Refugio Expansion: UTM, 13S 424900m E, 4386506m N · Summit, Colorado

Proposal to 1) construct a sand shed in the High Noon parking lot for sand and equipment storage and 2) to expand the Il Refugio restaurant at A-Basin by enclosing the current deck and building a new deck of similar size.

Recreation managementSpecial use management
Scoping Start
01/02/2020
Decision
03/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 3/11/2020
Rocky Mountain Region, White River National Forest, Dillon Ranger District, Keystone Ski Resort's Ski Area Term Special Use Permit Area · Summit, Colorado

Proposed replacement of the existing Peru Lift with an upgraded 6 chair lift and the removal of the Argentine Lift.

Special use managementRecreation management
Scoping Start
02/05/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Marcus Dreux · marcus.dreux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land Description39 degrees 35' 12.96" N, 105 degrees 57' 25.92" W
Decision Memo · East Zone/Holy Cross Ranger District · updated 2/26/2020
1)Bighorn Trail, 2) North Trail, and 3) Pitkin Trail %u2013all in Vail, Eagle County, Colorado · Eagle, Colorado

Proposal to re-route portions of these trails are steeper than FS trail standards direct. The proposed action would lessen the trail grade and include more sustainable trail design

Recreation management
Scoping Start
02/27/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Michael Beach · mjbeach@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
2018 Eagle-Holy Cross Ranger District Trail ReroutesDecision Signed Date: 07/03/2018
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 2/24/2020
Administrative office building of the Aspen Ranger District, located at 806 West Hallam, Aspen, CO 81611 · Pitkin, Colorado

Issuance of a five year visitor center permit to Pitkin County Open Space and Trails to allow the holder to operate and maintain a visitor center in the Aspen Ranger District administration office in partnership with the White River National Forest.

Special use management
Scoping Start
05/22/2019
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Hillary Santana · hillary.santana@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land Description1 acre in NW1/4SE1/4 Sec. 12, T. 10 S., R. 85 W., 6th Principal Meridian
Decision Memo · White River National Forest All Units · updated 2/5/2020
Ruedi Hill Communications Site located 1,300 ft above and to the west of Ruedi Reservoir in Eagle County, CO · Eagle, Colorado

Re-development and access authorization of the existing Red Hill Communications site with increase in footprint and tower height to accommodate and provide public safety radio service, FM Transmission and broadband services.

Facility management
Scoping Start
07/11/2019
Decision
02/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Michael Braudis · mbraudis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance; Road Maintenance
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionSec. 7 of T*S, R84W and Secs. 1 and 12, T8S, R85W of the 6th P.M. Eagle County, CO.
Decision Memo · White River National Forest All Units · updated 1/31/2020
Snowmass Mountain Resort, Big Burn Pod · Pitkin, Colorado

Snowmass proposes to replace the outdated Big Burn high-speed detachable quad chairlift with a new high-speed detachable six-person chairlift. The design capacity of the new chairlift would equal that of the existing chairlift (2,200 people per hour)

Special use management
Scoping Start
10/07/2019
Decision
12/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Monte Lutterman · mlutterman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT.10S, R.85W, Sections 14, 23
Decision Memo · White River National Forest All Units · updated 1/31/2020
The Hercules Lode M.S. #4251 in located along the western ridge line of the Richmond Hill area, approximately 4 miles from the town of Aspen, CO above the Little Annie Basin. · Pitkin, Colorado

Temporary authorization for construction, maintenance and use of a road across National Forest System lands for construction of a private residence. Route may provide subsequent access on an limited per request basis following rehabilitation.

Special use management
Scoping Start
05/13/2019
Decision
11/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Michael Braudis · mbraudis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionHercules Lode Claim M.S. 4251 located in the SW1/4 of Sec. 31, T. 10 S., R. 84 W. of the 6th Principle Meridian, Pitkin County, CO
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 1/31/2020
Project is bound to the north by the Colorado River, to the east by Elliot's Ridge and the Eagle's Nest Wilderness, to the south by Interstate 70, and to the west by Colorado Highway 131. · Eagle, Colorado

The Muddy Pass/Sheephorn Project, located on the Holy Cross Ranger District, is proposing a variety of management activities designed to benefit multiple resources, including forest vegetation, fisheries, range, transportation, fuels, and wildlife.

Recreation managementWildlife, fish, rare plantsGrazing managementForest productsVegetation management (other than forest products)Fuels managementRoad management
Scoping Start
11/01/2018
Comment Period
11/01/2018
Objection Period Start
09/12/2019
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Brett Crary · bcrary@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityBiomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Grazing Structural Improvements; Timber Sales (Salvage); Travel Management; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 12/31/2019
Within the Snowmass Ski Area · Pitkin, Colorado

Provide additional snowmaking coverage on 33 acres of terrain in the Alpine Springs area and add a storage structure and tubing hill operations kiosk in the Elk Camp Meadows area.

Special use managementRecreation management
Scoping Start
08/23/2018
Comment Period
08/23/2018
Objection Period Start
12/17/2018
Decision
02/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Monte Lutterman · mlutterman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 12/10/2019
East Vail (approximately three miles east of Vail), between the Booth Creek and Pitkin Trails. · Eagle, Colorado

Across 40 acres, clear game trails of downed debris and prune mountain shrub vegetation to allow for re-sprouting and improved visibility for bighorn sheep.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
08/01/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Marcia Gilles · marcia.gilles@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
2019 Booth Hillside Project - East VailDecision Signed Date: 09/11/2019
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionT.5S, R. 79W, Section 2
Environmental Assessment · West Zone/Sopris Ranger District · updated 12/10/2019
The site can be accessed from Carbondale by traveling approx. 10 miles south on Hwy 133, then 3 miles east along Forest Road 310 (Avalanche Creek Road) · Pitkin, Colorado

Avalanche CG has reached a new level for action for public safety needs due to hazard trees falling on the campsites. To ensure visitor safety and promote a healthy forest the proposal is to close & relocate the 10 sites located in the hazard zone.

Recreation managementFuels management
Scoping Start
06/28/2011
Comment Period
11/24/2011
Objection Period Start
07/23/2014
Decision
09/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Martha Moran · mmoran@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218 (2013) HFRA
Project ActivityPlan Creation/Revision; Road Decommissioning; Developed Site Management; Facility Improvements/Construction; Forest Vegetation Improvements; Road Improvements/Construction
Avalanche Campground Healthy Forest Campsite Relocation EADecision Signed Date: 07/23/2014
Avalanche Healthy Forest Campground EAFONSIDecision Signed Date: 09/15/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionUTM NAD83 309759E 4346558N
Decision Memo · White River National Forest All Units · updated 12/10/2019
South of the I-70 right-of-way upstream of Hamilton Gulch (east of the Hamilton Box on I-70) east to the Eisenhower Tunnel in the Straight Creek drainage. · Summit, Colorado

Re-issuance of a long term special use permit for construction, operation, and maintenance of 14 sediment control ponds and associated arrays of horizontal drains south of the I-70 right-of-way, within the Straight Creek Watershed, Summit County, CO.

Special use management
Scoping Start
08/15/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Reissuance of CDOT I-70 Straight Creek Sediment Control PondsDecision Signed Date: 08/22/2019
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNE 1/4 & NW 1/4 Sec. 30, T.4S., R 76W., and SE 1/4 & SW 1/4 Sec. 25, T.4S., R.77W., 6th P.M., Summit County, CO
Decision Memo · White River National Forest All Units · updated 12/10/2019
Section: 30 Township: 3 Range: 91 PT OF HES #352(30.87). 10.6 miles From Forest Boundary on Forest service Road 245 · Garfield, Colorado

Issue a driveway easement off the Forest Service Road 245. Easement would be for private parcel #187130200006. Easement would be 20 feet long by 15 feet wide for the purpose of accessing private land. The driveway was established in 1930.

Land ownership managementRoad management
Scoping Start
12/03/2018
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
Joseph Fazzi · jfazzi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
Griefenberg Driveway Easement ProjectDecision Signed Date: 02/08/2019
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionSection: 30 Township: 3 Range: 91 PT OF HES #352(30.87)
Environmental Assessment · West Zone/Aspen Ranger District · updated 12/10/2019
Area encompassing Smuggler Mtn. and Hunter Creek Valley immediately east of the city of Aspen · Pitkin, Colorado

ACES, City of Aspen, & Pitkin Co. want to implement projects in the study area east of Aspen. Projects include improvements to the rec trail network, forest health & habitat quality, road network, & outdoor ed. The study area is about 4,681 acres.

Recreation managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/25/2013
Comment Period
04/11/2013
Objection Period Start
09/05/2013
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Martha Moran · mmoran@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.
Hunter Creek - Smuggler Mountain Cooperative PlanDecision Signed Date: 04/01/2014
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 12/10/2019
Indiana Creek Drainage - SE of Breckenridge · Summit, Colorado

To create an Aquatic Organism Passage at the open water ford at the intersection of Indiana Creek and Pennsylvania Creek Rd. The 2nd objective is to decommission a 1.3 mi segment of a non-system FS road that is causing sediment and bank instability.

Wildlife, fish, rare plantsWatershed managementRoad management
Scoping Start
04/01/2019
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Ashley Nettles · anettles@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Species Habitat Improvements; Travel Management; Watershed Improvements
Indiana Creek Aquatic Organism Passage ProjectDecision Signed Date: 05/24/2019
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 12/10/2019
Project begins on Forest boundary south of the "South Hayden" subdivision and continues adjacent to Castle Creek Road (Cty Rd 15) to Forest boundary south of Fall Creek Road, Pitkin County · Pitkin, Colorado

Sub-grade and aerial installation of fiber optic facilities within an existing electrical distribution system (HXE overhead line) as well as directly adjacent to County Road 15, Castle Creek Road, Pitkin County, CO.

Special use management
Scoping Start
07/15/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Michael Braudis · mbraudis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pathfinder Castle Creek Fiber Optic Broadband InstallationDecision Signed Date: 07/18/2019
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionInstallation of fiber optic facilities to be made between the following locations: NW 1/4 Sec. 35, T10S, R85W, south to SW 1/4 SE1/4 Sec. 12, T11S, R85W, of the 6th P.M., Pitkin CO, Colorado.
Decision Memo · White River National Forest All Units · updated 12/10/2019
Pattison Park is located approximately 30 miles east of Meeker, CO at an elevation of 8,800 ft. · Rio Blanco, Colorado

This project proposes to re-route FST 2292 approx. 1,500 ft. around a wetland, rehab approx. 1,100ft of FSR 292, and construct a vehicle turnaround to improve the transportation system, recreational opportunities, and reduce impacts to wetlands

Recreation managementWatershed managementRoad management
Scoping Start
08/26/2019
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Aaron Grimes · aaron.grimes@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Road Improvements/Construction; Travel Management; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT. 1N, R. 09W, Section 5. 6th P.M. Rio Blanco, Colorado
Piney 2012 Project Completed
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 12/10/2019
Northwest of Vail, Colorado · Eagle, Colorado

Approximately 1,200 acres of vegetation treatment and forest product removal. Associated activities would include road maintenance on system roads and temporary road use (construction, use and obliteration).

Forest products
Scoping Start
08/16/2012
Comment Period
05/24/2013
Objection Period Start
07/15/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Shelby Limberis · slimberis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
Piney 2012 Final Decision Notice and Finding of No Significant ImpactDecision Signed Date: 10/09/2014
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT4S, R81W, sections 8, 9, 16-23, 26-28, and 33-35
Decision Memo · West Zone/Sopris Ranger District · updated 12/10/2019
Basalt Mountain, off FSR 524 · Eagle, Colorado

Use prescribed fire and mechanical thinning on a 162-acre project area near Basalt Mountain in Eagle County, Colorado, for the purpose of wildlife habitat improvement and reduction of fuel quantities. Area is comprised of mountain shrubs and aspen.

Wildlife, fish, rare plantsFuels management
Scoping Start
06/25/2012
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Philip Nyland · pnyland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Decision Memo Roaring Fork Fuel Reduction Project Unit ADecision Signed Date: 07/08/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionTownship 7S, Range 87W, Sections 12 and 13
Decision Memo · West Zone/Aspen Ranger District · updated 12/10/2019
This project is located in the Elk Camp pod of the Snowmass Ski Area with new or modified trails from the top of the elk camp quad to the Gondola base area. · Pitkin, Colorado

This enhances the lift-assisted biking opportunities at Snowmass by improving the sustainability of two existing trails. It also creates a new beginner mountain bike trail and skills development areas within the Elk Camp Pod of the mountain.

Recreation managementSpecial use management
Scoping Start
10/18/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Scott Kaden · scottakaden@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Snowmass Ski Area New/Realigned Mountain Bike TrailsDecision Signed Date: 05/28/2014
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Aspen Ranger District · updated 12/10/2019
Snowmass Ski Area · Pitkin, Colorado

Snowmass Ski Area is proposing to construct of a segment of egress trail on the Burnt Mountain portion of the Snowmass special use permit (SUP) area.

Special use management
Scoping Start
02/22/2013
Comment Period
08/08/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Matthew Ehrman · mehrman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Notice and FONSI Snowmass Ski Area Burnt Mountain Egress TrailDecision Signed Date: 09/26/2013 Legal Notice Date: 09/27/2013
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Aspen Ranger District · updated 12/10/2019
Project Location is in the Elk Camp pod of Snowmass Ski area near the Elk Camp restaurant. See the project Map for more detail. · Pitkin, Colorado

Proposed action is to approve temporary nightime winter activities at the Elk Camp lodge. It also proposes new activities and infrastructure including a 500' long tubing area and surface lift, 15 permanent lighting towers, and snowcat tours.

Recreation managementSpecial use management
Scoping Start
10/18/2013
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Scott Kaden · scottakaden@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Snowmass Ski Area Winter Evening Activities ProjectDecision Signed Date: 05/28/2014
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 12/10/2019
Sunlight Mountain Resort, 10901 County Road 117. Glenwood Springs, CO 81601 · Garfield, Colorado

The proposed action is to establish a 9/18 hole disc golf course located near the base of the Sunlight Mountain ski area. The course construction would consist of portable and removable tee markers and baskets. This would be a walk only course.

Recreation managementSpecial use management
Scoping Start
06/04/2013
Comment Period
07/04/2013
Decision
08/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Matthew Ehrman · mehrman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Sunlight Mountain 2013 Summer Improvement DMDecision Signed Date: 08/02/2013 Legal Notice Date: 08/02/2013
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 12/10/2019
Within the Vail Special Use Permit boundary. · Eagle, Colorado

Vail Resort is proposing to install three Corbels (Top Chair 3, Top Chair 21, Top of Eagle's Nest), regrading on the Meadows trail and at the bottom of Chair 21, and install a snow fence along Eagle's Nest Ridge.

Special use management
Scoping Start
05/21/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Calen Orlowski · cnorlowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Vail Summer 2019 DMDecision Signed Date: 06/27/2019
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 12/3/2019
Area is adjacent to the junction of FSR 709.1A and the Shrine Pass Road near Shrine pass on the border of the Eagle-Holy Cross and Dillon ranger districts. · Eagle; Summit, Colorado

Proposal to build permanent sheep shipping corrals easily accessible by semi in the Shrine Pass area in order to spatially separate fall gathering and shipping operations from fall recreation demands at the very busy Shrine Pass Trailhead.

Grazing management
Scoping Start
02/27/2018
Decision
12/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Jessica Crawford · jessicacrawford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Grazing Allotment Management; Special Use Authorizations; Grazing Structural Improvements; Travel Management
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT6S R79W Sec 9
Environmental Assessment · West Zone/Sopris Ranger District · updated 11/6/2019
Project is located approximately 4 miles north of the Town of Basalt in Eagle County, Colorado. In the vicinity of Basalt Mountain along NFSR 524 and NFSR 509. · Eagle, Colorado

Proposing vegetation treatments to salvage fire killed timber, remove hazard trees and create defensible space near structures in the Cattle Creek area. Additionally, approximately 6,500 acres will be monitored for reforestation needs.

Fuels managementVegetation management (other than forest products)Watershed managementRoad managementForest products
Scoping Start
11/29/2018
Comment Period
11/29/2018
Objection Period Start
09/05/2019
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Christopher McDonald · cmcdonald@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityBiomass; Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage)
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionPortions of Sections 12-13, 24-25, T7S, R86W; Portions of Sections 7-9, 15-18, 19-21, 29-30, T7S, R87W; 6th Principal Meridian, Eagle County, Colorado
Decision Memo · East Zone/Dillon Ranger District · updated 10/24/2019
White River NF, Dillon RD, within Breckenridge Ski Resort's Ski Area Term Special Use Permit area. · Summit, Colorado

Proposed chairlift to improve skier circulation on existing lift-served terrain on Breckenridge Ski Resort's Peak 7.

Special use managementRecreation management
Scoping Start
08/01/2019
Decision
10/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 10/4/2019
Events will occur within the Blanco and Rifle Ranger Districts (see individual event maps). · Garfield; Rio Blanco, Colorado

Issuance of five year recreation event permits to authorize 2 recreation events to operate on the Blanco Ranger District. Events have been authorized in prior years under temporary permits. Events are ATV and snowmobile rides.

Special use management
Scoping Start
02/22/2018
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District; West Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 9/27/2019
Southeast portions of the Downey/ Frenchman C&H grazing allotment, Eagle County. · Eagle, Colorado

Rebuild existing spring development for improved water quality for livestock and wildlife, reduction of riparian/ wetland area trampling, and overflow mitigation.

Special use management
Scoping Start
06/2018 (Estimated)
Decision
12/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Samantha Dinar · samanthabdinar@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/27/2019
West end of Mesa Cortina Subdivision, SW 1/4 Section 15, Township 5 South, Range 78 West, 6th P.M., Summit County, CO · Summit, Colorado

Temporary access across National Forest land to facilitate removal of hazardous fuels on adjacent private land.

Special use management
Scoping Start
06/2019 (Estimated)
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Paul Semmer · paul.semmer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNE 1/4 Section 15, Township 5 South, Range 78 West, 6th P.M., Summit County, CO
Decision Memo · White River National Forest All Units · updated 9/25/2019
Wolf Creek Storage Wells in Pitkin County · Pitkin, Colorado

Proposal to Two new wells would be drilled to replace Wolf Creek Wells #5 and #9 at the existing Wolf Creek #9 location. Existing roads would be used. New buildings and well pad equipment would be installed on the existing pad.

Minerals and geology
Scoping Start
03/20/2019
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Jason Gross · jrgross@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/24/2019
Events will occur within the Rifle Ranger District (see individual event maps). · Garfield, Colorado

Issuance of five year recreation event permits to authorize 3 recreation events to operate on the Rifle Ranger District. Events have been authorized in prior years under temporary permits. Events are running races,and a multi-day archery shoot.

Special use management
Scoping Start
02/22/2018
Decision
06/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 7/1/2019
Within the Beaver Creek Special Use Permit boundary. · Eagle, Colorado

Beaver Creek Resort is proposing to install snowmaking near PHQ and the Sheephorn trail, tree clearing for the Slanderous Sams and Sheephorn Connector trails, and constructing a temporary construction access/ski patrol egress in the McCoy Park area.

Special use management
Scoping Start
05/20/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Calen Orlowski · cnorlowski@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Beaver Creek Summer 2019 DMDecision Signed Date: 06/27/2019
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 5/24/2019
Maroon Lake Scenic Area · Pitkin, Colorado

Proposal to prohibit drones at the Maroon Lake Scenic Area to maintain the character of the scenic area.

Regulations, directives, orders
Scoping Start
04/03/2019
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityOrder Creation/Modification
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionTownship 11S, Range 86W, Section 13
Environmental Assessment · White River National Forest All Units · updated 5/22/2019
White River National Forest, Aspen - Sopris Ranger District, Aspen Mtn. Ski Area special use permit area · Pitkin, Colorado

The following are proposed on USFS lands: approximately 60 acres cleared trail and gladed terrain; chairlift and ancillary infrastructure; bottom terminal access road; and 50 acres snowmaking, pump station, 18,000 feet line, and two storage ponds.

Recreation managementSpecial use management
Scoping Start
05/16/2018
Comment Period
05/16/2018
Objection Period Start
11/28/2018
Decision
03/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
Roger Poirier · rogerepoirier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT10S R84W S30
Environmental Impact Statement · White River National Forest All Units · updated 5/22/2019
Golden Peak. The area encompasses the easternmost boundary along the front side of the Vail ski area's special use administrative boundary. · Eagle, Colorado

The proposal focuses on improving racing/training terrain on Golden Peak at Vail, which is based on concepts included in the 2007 Master Development Plan (MDP) Update and which was site-specifically analyzed in the 2009 Final EIS.

Special use management
NOI in Federal Register
03/30/2017
DEIS NOA in Federal Register
04/06/2018
FEIS NOA in Federal Register
11/09/2018
Objection Period Start
11/09/2018
Decision
03/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · White River National Forest All Units · updated 5/22/2019
Snowmass Ski Area Special Use Permit · Pitkin, Colorado

Proposal at Snowmass Ski Area includes: 16 miles of mountain biking and hiking trails, a mountain coaster, a canopy tour, a zip line, a ropes challenge course, a climbing wall, and three multi-purpose activity areas.

Special use management
NOI in Federal Register
04/01/2016
DEIS NOA in Federal Register
11/25/2016
FEIS NOA in Federal Register
03/17/2017
Objection Period Start
03/17/2017
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Roger Poirier · rogerepoirier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Rifle Ranger District · updated 2/12/2019
East Divide Creek, approximately 20 miles southeast of Silt, CO · Mesa, Colorado

Ursa Resources is requesting to construct one well pad and to drill up to four wells on Federal lease #COC-66708. On Hold awaiting BLM leasing decision.

Minerals and geology
Scoping Start
04/18/2011
Comment Period
09/27/2012
Project documents
Jason Gross · jrgross@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT8S, R90W, Section 17
Decision Memo · White River National Forest All Units · updated 2/12/2019
Maroon Lake Trail (Maroon Bells Scenic Area) · Pitkin, Colorado

Installation of fencing along trails and lakeshore, regarding and hardening congregating areas, re-graveling existing lakeshore trails to maintain accessibility and discourage trampling of vegetation

Recreation management
Scoping Start
04/16/2018
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 2/11/2019
Just north of Minturn and south of Interstate 70, Eagle County. · Eagle, Colorado

CDOT proposes to install three subsurface inclinometers and monitoring wells all within a 0.75-acre footprint located adjacent to U.S. Highway 24 north of Minturn. Monitoring equipment will be by foot one to two times per month for up to one year.

Special use management
Scoping Start
02/27/2018
Decision
02/2019 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Matthew Klein · matthewklein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date02/11/2019
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 12/7/2018
Arapahoe Basin Ski Area · Summit, Colorado

Project includes approximately 9 miles of summer hike/bike trails and two via ferratas. All of the proposed projects are located within Arapahoe Basin's existing special use permit and operational boundary.

Recreation managementSpecial use management
Scoping Start
10/16/2018
Decision
12/2018 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 11/21/2018
Within the Beaver Creek Resort Special Use Permit Boundary · Eagle, Colorado

The McCoy Park proposal consists of various lift, terrain, snowmaking and operational developments. These improvements will provide for lift served skiing servicing beginner and low-intermediate terrain separated from advanced-level terrain.

Special use management
Scoping Start
04/27/2018
Comment Period
04/27/2018
Objection Period Start
09/14/2018
Decision
11/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionLocated within the Beaver Creek Resort Special Use Permit Boundary T5S R82W Sections 23, 26 & T5S R81W Section 30
Decision Memo · White River National Forest All Units · updated 11/14/2018
Aspen-Sopris Ranger District: Pitkin, Garfield, Gunnison and Eagle Counties; City of Aspen, Town of Basalt, Town of Carbondale, Redstone, Marble · Eagle; Garfield; Gunnison; Pitkin, Colorado

Special Use Permit Reissuance for Thirteen Outfitter and Guide Priority Use Permits on the Aspen-Sopris Ranger District

Special use management
Scoping Start
06/26/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Kelly Wood · kellylwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 11/7/2018
Sunlight Peak, Upper Red Mountain, Aspen Mountain · Garfield; Pitkin, Colorado

Reauthorization of 7 existing communication site leases on Sunlight Peak, Upper Red Mountain, and Aspen Mountain.

Special use management
Scoping Start
04/16/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Michael Braudis · mbraudis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionT. 10 S., R. 84 W., Section 30 Aspen Mountain; T. 9 S., R. 84 W., Section 31 Upper Red Mtn Aspen, CO; Pitkin County, CO and T. 7 S., R. 89 W., Section 19 Sunlight Peak, Garfield County, CO
Decision Memo · White River National Forest All Units · updated 11/7/2018
Federal lands adjacent to 0083 Happy Landing Drive, Green Mountain. Trespass and encroachment structures on National Forest land in Illinois Gulch located east of the town of Brecken · Summit, Colorado

Issuance of temporary special use permit for placement of rip-rap and slope stabilization for 200 feet of shoreline on the west side of Green Mountain Reservoir.

Special use management
Scoping Start
03/23/2017
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSE4 SEC14, T2S, R80W, 6TH PM, SUMMIT COUNTY, CO
Decision Memo · White River National Forest All Units · updated 10/23/2018
Permits also include off- district use in Chaffee and Lake County on the Pike/San Isabel National Forest (Leadville and Salida Ranger Districts) and in Summit County on the Dillon Ranger District. · Eagle, Colorado

The Forest Service is considering reissuing eight expiring outfitter/guide priority permits, extending one probationary two year priority use permit, and renewing one priority use permit.

Special use management
Scoping Start
08/01/2017
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Sara Miller · saramiller2@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 10/4/2018
Hanging Lake Trail accessed from I-70 through Glenwood Canyon via exit #125. The area included in this analysis involves the parking area, Hanging Lake Trail, Deadhorse Creek, the Lake & Spouting Rock · Garfield, Colorado

Design and implement a management plan for the Hanging Lake Area (parking area, trails, lake, and Spouting Rock) to protect and preserve the unique and fragile natural resources at the Hanging Lake Area sustaining a high quality visitor experience.

Recreation management
Scoping Start
08/22/2017
Comment Period
12/21/2017
Objection Period Start
02/20/2018
Decision
08/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Paula Peterson · pkpeterson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/28/2018
Forest Service Road 818, 39.428502 -107.77445 · Garfield, Colorado

Proposal to authorize permittees to construct 120 ft.by 120 ft.and broken up into two holding pens and aloading ally. The corral will be constructed of wood postsandawood top rail pole andcontinues steel panels.

Grazing management
Scoping Start
07/16/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Lydia LaBelle de Rios · llabellederios@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionTownship 7 South Range 92 West section 21
Decision Memo · West Zone/Aspen Ranger District · updated 9/10/2018
White River National Forest, Aspen - Sopris Ranger District, Aspen Highlands Ski Area special use permit area · Pitkin, Colorado

Install Goldenhorn Platter lift, remove trees and perform grading on Oly Face, and glade trees on slopes of Eden within the Aspen Highlands Special Use Permit Area. These projects are all referenced in the 2013 Aspen Highlands Master Development Plan

Special use management
Scoping Start
11/02/2017
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Theodore Broom · tbroom@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT10S R85W S22 & 27
Decision Memo · East Zone/Holy Cross Ranger District · updated 8/22/2018
Adjacent to Budges Flattops Wilderness Lodge. The existing structure is listed as an improvement on the resort permit. · Garfield, Colorado

The environmental analysis will focus on the removal of a culvert in Wagonwheel Creek adjacent to Budges Flattop Wilderness Lodge and replace the structure with a ford which can support vehicle traffic with low use.

Special use managementWildlife, fish, rare plantsRoad management
Scoping Start
02/27/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT 2 S. R 89 W. SW of SW Section 25
Decision Memo · White River National Forest All Units · updated 8/20/2018
Locations throughout the Eagle Holy Cross ranger district · Eagle, Colorado

Proposal to issue eight new priority permits is to provide a valid special use authorization to the permittees so that they may continue to operate and maintain their outfitting and guiding services on National Forest System lands.

Special use management
Scoping Start
02/27/2018
Decision
07/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Robert Rodriguez · rtrodriguez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 7/23/2018
Keystone Resort · Summit, Colorado

Project includes a new snowmaking valve house, carpet-style lift, grading a portion of Schoolmarm trail, and improving access to Bighorn and Porcupine trails. All of the proposed projects are located within Keystone's existing special use permit.

Special use managementRecreation management
Scoping Start
05/04/2018
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 7/20/2018
The project area is located in the Crystal River Valley in Pitkin and Gunnison Counties on the White River National Forest. · Gunnison; Pitkin, Colorado

Proposal to use mechanical treatment to reduce hazardous fuel loadings in the wildland urban interface.

Fuels management
Scoping Start
02/02/2018
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
James Genung · jgenung@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 6/19/2018
Within the current special use boundary of Vail Mountain Resort · Eagle, Colorado

Vail Resort proposes to upgrade Game Creek Express (Chair #7), install Family Learning Zone Corbels and Photo Stakes, pave a section of trail at Adventure Ridge, install Diesel Exhaust Fluid (DEF) storage tanks and improve Bell's Camp deck.

Special use management
Scoping Start
05/17/2018
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 6/7/2018
This pipeline project is located adjacent to the Basalt State Wildlife Area, just north of Basalt, Colorado. · Eagle, Colorado

CPW is planning to abandon a portion of an irrigation ditch and put the water into a 3070' pipeline. The pipeline will be under an existing road. The water will be used to irrigate a pasture for enhancing deer and elk habitat.

Watershed managementSpecial use management
Scoping Start
06/20/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Michael Braudis · mbraudis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionS1/2 Sec.31, T.7S, R.86W, 6th PM, Eagle County, Colorado
Decision Memo · White River National Forest All Units · updated 6/6/2018
Elephant Mountain is located approximately 10 miles south of Carbondale in Pitkin County, Colorado · Pitkin, Colorado

The building and towers currently located at the site are beyond their useful life and are in a state of disrepair, and will be replaced. The Existing six - 40 ft towers will be replaced with two 40 ft towers, and additional solar panels.

Special use management
Scoping Start
06/29/2017
Decision
03/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Carole Huey · clhuey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionSection 33, T. 9S, R. 88W., 6th P.M. - 39 degrees 14'20"N, 107 degrees 13'07" W, 8,618'
Environmental Impact Statement · White River National Forest All Units · updated 6/4/2018
Forest Wide · Eagle; Garfield; Gunnison; Mesa; Moffat; Pitkin; Rio Blanco; Routt; Summit, Colorado

The WRNF Oil & Gas Leasing EIS will revise the existing 1993, Oil & Gas Leasing availability decision for the WRNF. The proposal will make revisions to the availability of certain WRNF lands for lease and to the stipulations on lands available.

Minerals and geologyLand management planning
NOI in Federal Register
06/30/2010
DEIS NOA in Federal Register
10/26/2012
FEIS NOA in Federal Register
12/09/2014
Objection Period Start
12/12/2014
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Sarah Hankens · shankens@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 4/30/2018
The area is roughly bound by Jakeman and Miller creeks on the west, Crooked Creek Pass on the north, the Holy Cross Wilderness on the east and the Frying Pan River to the south. · Eagle; Pitkin, Colorado

Proposal to implement approx. 1,964 acres of vegetation management activities on NFS lands located in Eagle and Pitkin Counties, Colorado. Potential treatment areas have been identified within the upper Fryingpan watershed.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
10/06/2016
Comment Period
10/06/2016
Objection Period Start
12/21/2017
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Brett Crary · bcrary@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionPortions of sections 17, 20, 21, 27, 28, 29, 31, 32, 33, 34; T 7S, R 83W Portions of sections 30, 31; T 8S, R 82W Portions of sections 3, 4, 5, 6, 8, 9, 10, 14, 15, 23, 24, 25, 26; T 3S, R 91W
Decision Memo · Grand Valley Ranger District · updated 4/16/2018
The Ute Rifle to Collbran Transmission line runs along Silt/Collbran road south of Silt, Colorado. · Mesa, Colorado

Proposal to maintain grid reliability by replacing five overhead electric transmission structures and the installation of two new mid-span structures along PSCo line 3014, a 138 kV transmission line linking the Ute Rifle and Collbran Substations.

Special use management
Scoping Start
10/04/2016
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Jonathan Hare · jhare@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGrand Valley Ranger District; West Zone/Rifle Ranger District
Legal Land DescriptionSecs. 27, 28, 31, 32, and 33, T8S-R92W, 6thPM, Mesa County, Colorado
Decision Memo · White River National Forest All Units · updated 4/13/2018
Copper Mountain Resort · Summit, Colorado

Project includes replacing the American Eagle and American Flyer chairlifts at Copper Mountain Resort. Both lifts are located within CMR's existing special use permit and operational boundary.

Recreation managementSpecial use management
Scoping Start
03/07/2018
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 6 South Range 78 West
Decision Memo · East Zone/Dillon Ranger District · updated 3/19/2018
5 miles east of Silverthorne on I-70 at mile marker 211 on the south side of the highway. Site is within the highway right-of-way. · Summit, Colorado

New authorization for construction of a cellular phone comm site along I-70 between the Eisenhower Tunnel & East Dillon. The facility will be a multi-carrier facility consisting of one prefab equip shelter and 2 towers.

Special use management
Scoping Start
04/01/2013
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSection 25, T. 4 S., R. 77 W., 6th P.M.
Decision Memo · East Zone/Dillon Ranger District · updated 3/19/2018
immediately west and adjacent to Shadow Creek Ranch · Summit, Colorado

New authorization for operating and maintaining an existing irrigation ditch (Smith Ditch No. 2) that was previously authorized and expired in 1980. the ditch diverts water from Deep Creek to the Shadow Creek Ranch.

Special use management
Scoping Start
12/31/2013
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSections 7 & 18, T2S, R80W and Sections 13 & 24, T2S, R81W, 6th P.M.
Decision Memo · White River National Forest All Units · updated 3/19/2018
Golden Horseshoe Area east of the Town of Breckenridge, north of French Gulch Road, south of Prospect Hill Road and east of Rich Gulch. · Summit, Colorado

Special use authorization for use, occupancy, construction and maintenance of a private driveway to access private property on the St Paul Lode mining claim (MS# 8884) in the Golden Horseshoe Area east of Breckenridge, CO.

Special use management
Scoping Start
11/23/2015
Decision
02/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNE1/4 Section 33, Township 6 South, Range 77 West of the 6th P.M., Summit County, CO
Decision Memo · West Zone/Rifle Ranger District · updated 3/19/2018
Groomed trail network is located immediately east of the West Elk Trailhead off of County Road 245 (Buford-New Castle Road). · Garfield, Colorado

West Elk Trails Incorporated (WETI) maintains a network of approximately 12 miles of cross-country ski and snowshoe trails in the vicinity of CR-245. WETI has requested renewal of the use and occupancy authorized by its current special use permit.

Special use management
Scoping Start
01/08/2018
Decision
03/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Trevor Robinson · trevorrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionLEGAL- SW1/4SE1/4 Sec. 31, T. 3S, R. 91W., NW1/4SW1/4 Sec. 5, T. 4S., R. 91W., Sec 6, T. 4S, R. 91W, NW1/4NE1/4 Sec. 7, T. 4S, R. 91W, NW1/4 Sec. 8, T. 4S, R. 91W
Environmental Assessment · West Zone/Rifle Ranger District · updated 3/16/2018
Buford New Castle Road Corridor, Clark Ridge, Lake Park, Homestead, Cliff/Meadow Lake, Mansfield/Clark Point and Clinetop Cow Camp areas located approximately 12 to 17 miles north and NW of New Castle · Garfield, Colorado

Provide access from campsites to the BNC motorized trail system. Provide access to Clark Ridge by allowing mixed motorized use on a sect. of BNC road. Correct designations and mapping errors providing motorized and non-motorized trail opportunities

Road managementRecreation management
Scoping Start
06/06/2013
Comment Period
04/2015 (Estimated)
Objection Period Start
07/2015 (Estimated)
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Karla Mobley · kkmobley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNFSR 860 - Section 19, T3S, R91W and Sections 24, 25 and 36, T3S, R92W; NFSR 822 - Sections 10, 15, 22, T3S, R91W; NFSR 245 – Sections 3 and 10, T3S, R91W: NFSR 819 – Sections 5 and 6, T4S, R91W
Decision Memo · White River National Forest All Units · updated 3/13/2018
At the Coulter Mesa Road (FS 832)/Butler Creek crossing, north of Rifle. · Garfield, Colorado

The Rifle Ranger District proposes replacing the existing culvert at the Coulter Mesa Road (FS 832)/Butler Creek stream crossing with an aquatic organism passage (AOP) design in the later summer/fall of 2018.

Wildlife, fish, rare plantsWatershed management
Scoping Start
02/08/2018
Decision
03/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Robert Ramey · rramey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Travel Management; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionTownship 3 S, Range 93 W, Section 19.
Decision Memo · White River National Forest All Units · updated 2/28/2018
Copper Mountain Resort · Summit, Colorado

Project includes construction of a new chairlift on Tucker Mountain and other associated improvements within Copper Mountain Resort. All of the proposed projects are located within CMR's existing special use permit and operational boundary.

Recreation managementSpecial use management
Scoping Start
01/17/2018
Decision
02/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 7 South Range 79 West Sections 11 and 12
Decision Memo · East Zone/Dillon Ranger District · updated 2/20/2018
White River National Forest, Dillon Ranger District, Hippo and Salt Lick trail systems. · Summit, Colorado

The proposal is to improve trail conditions on the Dillon Ranger District through reconstruction of the Hippo Trail and creation of a new connector trail in the Salt Lick Trail System

Recreation management
Scoping Start
11/09/2017
Decision
02/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Travel Management; Wilderness Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 1/2/2018
The site is located south if I-70, 3 miles west of Frisco, CO accessed via the existing Tenmile Canyon Bike Path at Officers Gulch. · Summit, Colorado

ssuance of a Communications Site Lease for use, occupancy, and maintenance of two existing Public Service Company of Colorado transmission towers for collocation of antennae and associated telecommunications equipment.

Special use management
Scoping Start
06/21/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSE 1/4 NW 1/4 Section 8, Township 6 South, Range 78 West, 6th P.M., Summit County, Colorado
Decision Memo · White River National Forest All Units · updated 12/20/2017
Arapahoe Basin Ski Area Hwy 6 MM217.9 and 218.2 · Summit, Colorado

Proposal to authorize overflow parking at A-Basin on Highway 6 lots at mile marker 217.9 and 218.2.

Recreation managementSpecial use management
Scoping Start
11/17/2017
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 12/20/2017
Private drive east of Deer Creek Road (FDR5.1), approximately 2 miles south of the Town of Montezuma. · Summit, Colorado

Special use authorization for use, occupancy, construction and maintenance of a private driveway to access private property on the Erie West Mill Site (MS# 267) in the Deer Creek drainage south of the town of Montezuma, CO.

Special use management
Scoping Start
01/12/2017
Decision
11/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNW1/4 Section 2 Township 6 South, Range 76West of the 6th P.M., Summit County, CO
Decision Memo · White River National Forest All Units · updated 12/19/2017
Location is approximately 5 miles south-southwest of Battlement Mesa, Colorado and is accessible via FR 847 or the Battlement Trail in Garfield County. · Garfield, Colorado

Proposal to mitigate water loss through sinkholes identified within Battlement Reservoir #1 and maintain Colorado River cutthroat trout habitat. Would be implemented in a partnership with CPW in the fall when water levels are low.

Wildlife, fish, rare plantsWatershed management
Scoping Start
08/23/2016
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Robert Ramey · rramey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionGarfield County, Colorado, in T8S R95W S12, T8S R94W S7. Location is approximately 5 miles south-southwest of Battlement Mesa, Colorado and is accessible via FR 847 or the Battlement Trail.
Environmental Assessment · East Zone/Eagle Ranger District · updated 12/19/2017
Two geographic locations have been identified south of Eagle; Hardscrabble Mtn and adjacent to the town of Fulford. · Eagle, Colorado

Eagle/Holy Cross RD is proposing to implement approx. 1682 acres of vegetation management activities in the Hardscrabble area. Potential treatments include clearcuts, pre-commercial thinning, patch clearcuts, salvage and overstory removal.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
04/25/2016
Comment Period
04/25/2016
Objection Period Start
10/27/2017
Decision
12/2017 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Shelby Limberis · slimberis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionSections 3-11, 15-17, 20-23, 26 and 27, T6S, R84W; Sections 1, 2 and 12, T6S, R85W; Section 6, T7S, R85W and Section 11, T7S, R85W
Environmental Assessment · East Zone/Dillon Ranger District · updated 12/13/2017
Copper Mountain Ski Area Far East Parking Lot and runs south along Ten Mile Creek and State Highway 91 approx. 3 miles to just south of Graveline Gulch where Highway 91 widens from two to three lanes. · Summit, Colorado

Proposal to extend the paved recreation path south from Copper Mountain approximately three miles south towards Fremont Pass parallel to State Highway 91. The path would be maintained and operated by Summit County under a special use permit.

Special use managementRecreation management
Scoping Start
03/31/2016
Comment Period
03/31/2016
Objection Period Start
10/2017 (Estimated)
Decision
12/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 12/8/2017
outside of the existing powerline right-of-way and within 150 ft of any electric power transmission tower. There are approximately 754 towers, with a total project area of approximately 1,224 acres. · Eagle; Pitkin; Summit, Colorado

Vegetation/fuel profile management within 150 ft of all electric transmission towers on the Forest to decrease risk of critical damage to electric line support structures due to wildfire. Hand felling of live and dead trees to 30-40% canopy cover.

Fuels management
Scoping Start
04/25/2016
Comment Period
04/25/2016
Objection Period Start
01/2018 (Estimated)
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Doug Leyva · dleyva@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Eagle Ranger District · updated 11/6/2017
The project would connect the Stone Creek Trail #2349 to the Meadow Mountain Trail #2124 along with other minor trail reroute adjustments in the vicinity of the project. · Eagle, Colorado

The Eagle-Holy Cross Ranger District, WRNF is seeking comments on the proposed construction of a non-motorized trail. The proposed action aims to create a more sustainable trail system, enhance visitor opportunities, and improve trail connectivy.

Recreation management
Scoping Start
07/20/2017
Decision
10/2017 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Paula Peterson · pkpeterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Travel Management
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 11/6/2017
FS 824 between CPX%u2019s noncontiguous, privately owned parcels of land in Township 7 South, Range 94 West, Sections 24 and 25 · Garfield, Colorado

Proposal to allow CPX to construct an approx. 0.75-mile-long access road, continue commercial use of FS 824 between CPX' privately owned parcels, construct approx.. 1.55 miles of underground pipelines, & make improvements to Beaver Creek Trailhead.

Special use management
Scoping Start
09/06/2016
Comment Period
04/06/2017
Objection Period Start
07/31/2017
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Jason Gross · jrgross@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Special Use Authorizations; Trail Management; Noxious Weed Treatments; Road Improvements/Construction; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionTownship 7 South, Range 94 West, Sections 24 and 25
Environmental Assessment · White River National Forest All Units · updated 11/1/2017
Maroon Bells Snowmass Wilderness, Colorado · Gunnison; Pitkin, Colorado

In response to ongoing resource issues and in conformance with the 2002 Forest Plan, the Visitor Use Management Plan addresses implementation strategies to allocate numbers of overnight groups based on the wilderness areas visitor carrying capacity.

Special area management
Scoping Start
11/03/2016
Comment Period
03/29/2017
Objection Period Start
06/29/2017
Decision
11/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Erin Carey · ebcarey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Area Management; Wilderness Management
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGunnison Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 9/29/2017
Fryingpan road · Pitkin, Colorado

Reissuance of expired SU Permit for a spring development and pipeline approx. 1300 feet long. Also for a ditch for supplying water to fish ponds on private lands that is approx. 200 feet long. The permit will continuee to have a 10 foot wide use area

Special use management
Scoping Start
08/29/2014
Decision
06/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSections 20 & 21, T8S, R83W,6PM.
Decision Memo · West Zone/Blanco Ranger District · updated 9/29/2017
About 15 miles east of Meeker, Colorado, off of County Road 8, via North Elk Creek Road (FS 2-54.1), through Elk Creek Ranch and what this document will refer to as the Balcomb inholding. · Rio Blanco, Colorado

Proposal to construct a permanent barrier to upstream fish passage on the mainstem of North Elk Creek, on Forest Service land.

Wildlife, fish, rare plants
Scoping Start
02/16/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Robert Ramey · rramey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT2S R92W S13
Decision Memo · East Zone/Eagle Ranger District · updated 9/29/2017
Various locations on the White River · Eagle; Garfield; Lake; Pitkin, Colorado

Reissuance of transmission line permits to PSCo that have expired: Hopkins/Leadville Line, Wolcott-Avon-Vail line, and the Wolcott to Beaver Creek line.

Special use management
Scoping Start
11/20/2012
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Carole Huey · clhuey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; West Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 8/21/2017
Approx. 6.5 NNE of Thomasville. From the headwaters of Little Lime and Crooked Creeks to Crooked Creek Reservoir & downstream on Little Lime Creek to within 1/4 mile of its confluence with Lime Creek. · Eagle, Colorado

The USFS and CPW are proposing a cutthroat restoration project on Crooked and Little Lime Creeks. Actions include construction of fish barrier(s), removing whirling disease infected trout, and reintroducing native trout.

Wildlife, fish, rare plants
Scoping Start
07/22/2016
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Robert Ramey · rramey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Noxious Weed Treatments; Species Population Enhancements
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT7S R83W S10,11,14-17,19-22,28
Environmental Assessment · West Zone/Rifle Ranger District · updated 8/21/2017
The Rifle grazing allotment is N of the Rifle Ranger District and the Rifle gap State park, off of Buford New Castle Road, going W toward Coulter Mesa. · Garfield, Colorado

This analysis is to determine whether to continue permitting livestock grazing on all, none, or some portion of the Rifle Creek Grazing Allotment. If authorized, grazing would be managed in a manner that maintains or moves towards desired conditions.

Grazing management
Scoping Start
08/04/2015
Comment Period
04/27/2017
Objection Period Start
06/22/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Lydia LaBelle de Rios · llabellederios@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT 3 S, R 94 W, and R 93 W
Decision Memo · West Zone/Sopris Ranger District · updated 8/9/2017
The Nettle Creek Water Treatment Facility is on NFSL., and is accessed from Nettle Creek Road located approximately 8 miles south of Carbondale on CSH133. · Pitkin, Colorado

Re-issuance of expired special use permit SOP 109501 to the Town of Carbondale, Colorado for use of its water treatment facility and associated spring boxes, pipelines, buildings, tanks and other structures. Expired BLM easement C-0108815 is included

Special use management
Scoping Start
03/22/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionPortions of Sec.10, T.9S, R.88W, 6th PM, Pitkin County, CO
Decision Memo · White River National Forest All Units · updated 7/20/2017
Hubbard Cave is located approximately 6 miles east of Glenwood Springs, Colorado, on the south rim of Glenwood Canyon, Garfield County, off Forest System Road 535. · Garfield, Colorado

Proposal to protect the cave and bat colony that uses the cave from White Nose Syndrome and human disturbances by installing a combination of bat-friendly grates and gates at the three entrances of Hubbard (Hubbard's) Cave. Gates allow human entry.

Wildlife, fish, rare plantsRecreation management
Scoping Start
08/09/2016
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Philip Nyland · pnyland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT6 R88 Sec 4, NW1/4
Decision Memo · East Zone/Dillon Ranger District · updated 7/20/2017
Less than 1/2 mile due north from the Town of Montezuma · Summit, Colorado

The FS & the CO DOR, Mining, & Safety will be conducting final restoration work on the Lancaster Mine. Prior work has confirmed the presence of elevated lead & arsenic in the mine waste and zinc & lead in surface water below the mine.

Minerals and geology
Scoping Start
01/31/2014
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Olivia Garcia · ogarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionT5S, R76W, Sections 25 & 26
Decision Memo · East Zone/Dillon Ranger District · updated 7/20/2017
In Summit County, CO, near the town of Keystone. In the Frey Gulch area, in Keystone Gulch, along the Montezuma rd, and on Tenderfoot Mtn and Swan Mtn Rd. formerly "Keystone Forest Health and Fuels" · Summit, Colorado

The Dillon Ranger District proposes to implement approx. 857 acres of vegetation management and fuel reduction activities that reduces the extent of and increases resilience to current and potential insect and disease infestations.

Fuels management
Scoping Start
01/09/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Shelby Limberis · slimberis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionPortions of sections 7, 18, 21, 22, 30 and 31; Township 5 South, Range 76 West Portions of sections 13-16, 23-26, 29-32 and 36; Township 5 South, Range 77 West Portions of sections 6-10, 16 and 17;
Decision Memo · White River National Forest All Units · updated 7/20/2017
The Nettle Creek Bridge is owned by the Town of Carbondale, and is on NFSL. It is located approximately 8 miles south of Carbondale on CSH133 in Pitkin County, CO · Pitkin, Colorado

Roaring Fork Conservancy wishes to place a stream gage on the Nettle Creek Bridge for the purpose of monitoring water flows on the Crystal River. No disturbance is necessary. Data will be available to the pubic on state web sites.

Special use management
Scoping Start
03/03/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNW 1/4 Sec.10, T9S, R88W, 6th PM, Pitkin County, CO
Environmental Assessment · White River National Forest All Units · updated 7/19/2017
Burger Shack (Independence Pass), Lost Man Reservoir, Linkin Lake, Weller Lake, Upper Boulder Field Area (Ind. Pass), Kobey Park, Grottos, Classy Cliff (Ind. Pass), and Ditch Trail (Snowmass) · Pitkin, Colorado

Ajax Adventure Camp has requested a ten year priority use permit to host a summer camp for children ages 7-15. Activities include rock climbing, fishing, water dipping, bouldering, camping, biking, and outdoor education programming.

Recreation managementSpecial use management
Scoping Start
04/07/2016
Comment Period
04/07/2016
Objection Period Start
01/19/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Erin Carey · ebcarey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/19/2017
Located within the existing Beaver Creek Resort Special Use Permit Area · Eagle, Colorado

Replacement of the Drink of Water Lift (Chair #5) at Beaver Creek Resort. The current double chairlift is proposed to be replaced with a high speed quad.

Special use management
Scoping Start
04/05/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT. 5S R. 31W Section 31
Decision Memo · White River National Forest All Units · updated 7/19/2017
All projects are within the Breckenridge Special Use Permit · Summit, Colorado

Breckenridge Ski Resort proposes to replace the Falcon Chairlift on Peak 10, construct a storage building on Peak 7 and improve its communication infrastructure.

Recreation managementSpecial use management
Scoping Start
02/16/2017
Comment Period
02/21/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 7/19/2017
In general, proposed management activities would occur along the Buford New Castle Road (CR 245), where it pass through national forest system lands between the towns of New Castle and Buford, CO. · Garfield; Rio Blanco, Colorado

Proposed vegetation management activities along the Buford/New Castle Road. Vegetation management activities could include improvement harvests, clearcuts, patch clearcuts, precommercial thinning and other silvicultural activities.

Road managementForest productsVegetation management (other than forest products)
Scoping Start
11/19/2015
Comment Period
11/19/2015
Objection Period Start
03/09/2017
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Brett Crary · bcrary@fs.fed.us
NEPA / regulatory detail
Special AuthorityStewardship Contract, Consolidated Appropriations Resolution Of 2003
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District; West Zone/Rifle Ranger District
Legal Land DescriptionPortions of sections 15 and 22; Township 2 South, Range 91 West Portions of sections 2-4, 9, 10, 15, 17, 18, 19, 30 and 31; Township 3 South, Range 91 West Portions of sections 24, 25 and 36; Towns
Decision Memo · East Zone/Dillon Ranger District · updated 7/19/2017
Roads: Pennsylvania Gulch, Boreas Pass, Humbug Hill, Sally Barber, Prospect Hill, Trails: Peaks, Mt. Pride Mine, Little French Gulch, Spruce Creek, Wheeler, Miners Creek, Bakers Tank, Mount Royal, · Summit, Colorado

Proposal is to reissue seven recreation event special use permits under terms not to exceed five years. These permits are for multiple events that have been previously authorized on the Dillon District and are in full compliance w/ previous permits.

Special use managementRecreation management
Scoping Start
08/03/2015
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/19/2017
Local landmarks in Pitkin County include Conundrum Creek Trail #1981, Ruby Mine, Linkins Lake Trail #1979, Petroleum/Anderson Lakes Trail #1991, Warren Lakes, Snowmass Ski Area, and Margy's Hut · Pitkin, Colorado

Proposal to implement safety closures and demolition on abandoned mine lands in the greater Aspen area of Pitkin County. Areas include Conundrum Creek, Lincoln Creek, Linkins Lake, Petroleum/Anderson Lakes, Smuggler Mtn, Snowmass Mtn, and Mt. Yeckel

Minerals and geology
Scoping Start
02/16/2016
Decision
05/2016 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Olivia Garcia · ogarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT 11S, R 85W, Sec 15; T 12S, R 84W, in Sec 7 & 12; T 10S, R 83W, Sec 32 and T 11 S, R 82W, Sec 5; T 12S, R 83W in Sec 1 & 10; T 10 S, R 84W, Sec 15 & 22; T 10 S, R 85W, Sec 18; T 9 S, R 83W, Sec 7.
Decision Memo · White River National Forest All Units · updated 7/19/2017
former unpatented mining claims on the White River National Forest, Aspen-Sopris Ranger District. · Pitkin, Colorado

Proposal to implement the demolition and removal of eight (8) unauthorized structures, a former mining road (3,000 lineal feet) and access bridge on former unpatented mining claims on Aspen-Sopris Ranger District.

Minerals and geology
Scoping Start
06/01/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Olivia Garcia · ogarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT10S, R84W Sec 22 (Warren Lakes); T10S, R85W Sec 18 (Snowmass Mountain); T11S, R85W Sec 15 (Conundrum Creek); T12S R83W Sec 1 (along Petroleum/Anderson Lakes); and T12S R84W Sec 12 (Lincoln Creek)
Decision Memo · White River National Forest All Units · updated 7/19/2017
All projects are within the Keystone Ski Resort Special Use Permit. · Summit, Colorado

Keystone Ski Resort proposes to replace the Montezuma Chairlift, renovate LaBonte's Restaurant, improve the Spring Dipper ski trail, rebuild the Boy Scout mountain bike trail, and improve its communication infrastructure.

Special use managementRecreation management
Scoping Start
02/16/2017
Comment Period
02/21/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land Description39?34'44.79"N; 105?56'28.31"W
Decision Memo · White River National Forest All Units · updated 7/19/2017
Lot 21A and 21B Western Sky Ranch, 1 mile east of the Town of Breckenridge, CO · Summit, Colorado

Authorization of an existing sewer line between private land at Lot 21A and 21B Western Sky Ranch, east of the Town of Breckenridge

Special use management
Scoping Start
07/19/2016
Decision
03/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionSE1/4 Sec 30, T6S, R77W, 6th P.M., Summit County, CO
Decision Memo · West Zone/Sopris Ranger District · updated 7/19/2017
Snowmass Ski Area Special Use Permit · Pitkin, Colorado

Proposal from Aspen Skiing Company for the 2017 summer construction season to construct a Ski Patrol Facility at the top of Sam's Knob, expand the footprint of the Sam's Smokehouse Restaurant, and install two underground fiber-optics utility lines.

Special use management
Scoping Start
02/02/2017
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Monte Lutterman · mlutterman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/19/2017
The South Fork Campground is located approximately 12 miles south of the town of Buford, Colorado at the end of Rio Blanco County 10 on the South Fork White River. · Rio Blanco, Colorado

Proposed recreation improvement activities in the South Fork Campground and Spring Cave areas including campground parking area replacement, campground area revegetation, bridge renovation, & trail construction.

Recreation managementFacility management
Scoping Start
04/21/2016
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Victoria Houser · vhouser@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance; Trail Management
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT 2 S, R 90 W, Section 19
Decision Memo · East Zone/Dillon Ranger District · updated 7/19/2017
on the Blue River in Silverthorne, Colorado on the Dillon Ranger District of the White River National Forest. · Summit, Colorado

Proposal to issue Hammer Adventures Inc.and The Adventure Company and Arkansas Valley Adventures, LLC special use permits for a term of up to ten years authorizing guided white water rafting on the Blue River in Silverthorne

Recreation managementSpecial use management
Scoping Start
04/14/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Jackie Brown · jbrown05@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/19/2017
Located within the existing Vail Resort Special Use Permit Area · Eagle, Colorado

Replacement of the Northwoods Lift (Chair #11) at Vail Resort. The project proposal includes the construction of fourteen small shade canopies and tents around Adventure Ridge. These Adventure Ridge Improvements are permanent seasonal structures.

Special use management
Scoping Start
04/14/2017
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/19/2017
Black Lakes Road near Vail Pass on I-70 at the Summit / Eagle County line · Eagle; Summit, Colorado

Outfitter provided bicycle/client delivery service to Vail Pass where customers ride to either Frisco/Breckenridge or Vail, CO. This proposal is to replace existing temporary permits(19,525 user days)with a 10 yr special use permits(23,000 user days)

Special use managementRecreation management
Scoping Start
01/05/2017
04/28/2017
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Ken Waugh · kwaugh@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Area Management
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/19/2017
Trespass and encroachment structures on National Forest land in Illinois Gulch located east of the town of Breckenridge. · Summit, Colorado

Temporary construction activities include parking, staging and use of heavy equipment (back hoe, dump truck, and pick-up trucks) and materials associated with removal of trespass property including restoration of disturbed area.

Special use management
Scoping Start
03/10/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNE4 Sec 9, T7S, R77W, 6th P.M., Summit County, CO
Decision Memo · White River National Forest All Units · updated 7/18/2017
Elephant Hill (AKA: Mountain) is located approximately 10 miles south of Carbondale on CSH133. It is just south of Avalanche Creek. · Pitkin, Colorado

Pitkin County is proposing to rebuild the Elephant Hill Communication facility. A second surface and shallow-buried powerline, new towers,solar panels, and building are proposed. The use may include cell phones and Internet S.P. at a future date.

Special use management
Scoping Start
04/20/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Facility Improvements/Construction; Special Use Authorizations; Solar
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionThe Elephant Hill Communication site is located approximately 10 miles south of Carbondale off of CSH133. NW 1/4 Sec.33, T9S, R88W, 6th PM, Pitkin County, CO
Decision Memo · White River National Forest All Units · updated 3/8/2017
29 miles east of Meeker, Colorado · Rio Blanco, Colorado

Issuance of an authorization to Rio Blanco County for the use, operation and maintenance of the existing Sand Peak Communication Facilities. This has been in use since 1997.

Special use management
Scoping Start
12/02/2016
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT. 2 N., R. 89 W., Section 28
Environmental Assessment · White River National Forest All Units · updated 3/3/2017
Copper Mountain Resort, Summit County, CO · Summit, Colorado

Year-round recreation projects at Copper Mountain: (1) additional snowmaking coverage on West Encore and Collage trails; (2) construction of a year-round alpine coaster; (3) and a new mountain bike trail east of the American Eagle chairlift.

Special use management
Scoping Start
02/05/2016
Comment Period
08/25/2016
Objection Period Start
12/13/2016
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Roger Poirier · rogerepoirier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Sopris Ranger District · updated 2/8/2017
upstream from Crooked Creek Reservoir and below Crooked Creek Pass · Eagle, Colorado

Reconstruction of the degraded Crooked Creek stream channel; reconstruction of the Little Lime Creek stream channel and associated wetlands that were converted to open water ponds; and remove the non-system spur road.

Watershed management
Scoping Start
05/02/2013
Comment Period
05/02/2013
Objection Period Start
05/02/2013
Decision
09/2013 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Mark Weinhold · mweinhold@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityWatershed Improvements
Crooked Creek Stream and Wetland Restoration ProjectDecision Signed Date: 09/26/2013
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT. 7 S., R. 83 W., Section 22, 6th P.M.
Decision Memo · White River National Forest All Units · updated 1/4/2017
The location of the sediment basin is approximately 1/2 mile south of the Town of Vail, Colorado, adjacent to Interstate Highway 70 (I-70) at Mile Marker 183 in Eagle County. · Eagle, Colorado

Proposal to improve habitat conditions for aquatic life in Black Gore and Gore Creeks by extending the existing access road approx 275 feet along the NE edge of the settling basin. Also issuing a 10 year SUP to CDOT to use and maintain the basin.

Watershed managementSpecial use management
Scoping Start
11/14/2016
Decision
01/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Matthew Grove · magrove@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionSection 18, Township 5 South, Range 79 West
Environmental Assessment · East Zone/Dillon Ranger District · updated 12/7/2016
Adjacent to US Highway 6 right-of-way immediately south and east of A-Basin Ski Area. · Summit, Colorado

New authorization for construction of cellular phone comm site along US Highway 6 between Loveland Pass and Keystone (A-Basin). The facility will be multi-carrier facility consisting of one prefabricated equipment shelter and two towers.

Special use management
Scoping Start
07/2014 (Estimated)
Comment Period
07/2014 (Estimated)
Objection Period Start
08/2014 (Estimated)
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSection 2, T. 5 S., R. 76 W., 6th P.M.
Decision Memo · East Zone/Dillon Ranger District · updated 12/7/2016
The project includes approximately 20 miles of an existing 230kV overhead electric transmission line from the Dillon Substation (near the Summit County Landfill), to the Malta Substation. · Summit, Colorado

Reissuance of special use permit to Xcel Energy for the existing 230kV electric transmission line from Dillon Substation, to the Malta Substation. The permit was originally issued in 1978, reissued in 1983, and expired in 2008.

Special use managementLand ownership management
Scoping Start
02/25/2009
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNF lands on the WR and Pike/San Isabel National Forests in Townships 5, 6, 7, 8, 9 & 10 South, all in Range 77 West of the 6th PM and in Township 10 South Range 78 West of the 6th PM., CO.
Environmental Assessment · White River National Forest All Units · updated 12/5/2016
Guided snowmobile tours would occur in the areas of Larkspur Mountain, Red Canyon, and Kobey Park. Permittee would utilize National Forest System Road 103.2 to access these areas. · Pitkin, Colorado

WAI's priority special use permit expired on May 31, 2015. WAI proposes changes to their long-standing operations and changes the intensity of use. This project analysis is required to issue a new recreation special uses authorization.

Recreation managementSpecial use management
Scoping Start
11/19/2015
Comment Period
06/30/2016
Objection Period Start
09/01/2016
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Erin Carey · ebcarey@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · East Zone/Dillon Ranger District · updated 11/21/2016
Arapahoe Basin Ski Area · Summit, Colorado

Projects include the development on the Beavers area, installation of a surface lift at the top of Zuma Bowl and summer uses.

Special use management
NOI in Federal Register
11/21/2013
DEIS NOA in Federal Register
02/05/2016
FEIS NOA in Federal Register
08/03/2016
Objection Period Start
08/03/2016
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Matthew Ehrman · mehrman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Blanco Ranger District · updated 10/27/2016
The allotments are located on the extreme north side of the Blanco Ranger District, accessed by State Highway 13 to Moffat County Road 41 that turns into Rio Blanco County Road 58. · Moffat; Rio Blanco, Colorado

The proposal is to re-authorize sheep grazing on the Morapos Creek, Wilson Mesa and Deer Creek allotments and identify resource management opportunities.

Grazing management
Scoping Start
03/25/2014
Comment Period
01/22/2015
Objection Period Start
08/11/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Mary Gillespie · mlgillespie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionTownship 3 North, Range 90 West, Sections 7-10, 15-22, and 29-32 Township 2 North, Range 90 West, Sections 5-8 and 18 Township 2 North, Range 91 West, Sections 1, 2, 11 and 12
Decision Memo · White River National Forest All Units · updated 10/21/2016
8 miles southwest of Rifle, Colorado · Garfield, Colorado

Authorize issuance of a special use permit to CPX Piceance Holdings, LLC for the operation and maintenance of an existing natural gas pipeline crossing forest service lands.

Special use management
Scoping Start
06/01/2016
Decision
10/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT. 7 S., R. 94 W., Section 24 and 25
Decision Memo · White River National Forest All Units · updated 10/6/2016
10 miles southwest of Rifle, Colorado · Garfield, Colorado

Authorize repair work on the water collection system at Bear Springs. Operation and Maintenance of Bear Springs is authorized under an Agricultural Irrigation and Livestock Watering System Easement.

Special use management
Scoping Start
09/01/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT. 7 S., R. 94 W., Section 20
Decision Memo · White River National Forest All Units · updated 10/6/2016
23 miles east of Meeker, Colorado · Rio Blanco, Colorado

Authorize issuance of a special use permit to Horst and Sandra J. Rick for the operation and maintenance of existing spring development and waterline. This has been in use since at least 1978.

Special use management
Scoping Start
05/24/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT. 1 N., R. 90 W., Section 23
Decision Memo · White River National Forest All Units · updated 10/6/2016
16 miles southeast of Meeker, Colorado · Rio Blanco, Colorado

Authorize issuance of a special use permit to Seven Lakes Lodge for the operation and maintenance of irrigation ditches, spring developments, water pipelines, road and a lake. These facilities have been in use for at least 40 years.

Special use management
Scoping Start
05/25/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT. 2 S., R. 91 W., Section 5 and 6
Decision Memo · White River National Forest All Units · updated 9/15/2016
Events will occur within the Aspen-Sopris and Gunnison Ranger Districts (see individual event maps). · Gunnison; Pitkin, Colorado

Issuance of five year recreation event permits to authorize 11 recreation events to operate on the Aspen-Sopris Ranger District. Events have been authorized in prior years under temporary permits. Events are running, mountain bike, jeep, and ski.

Special use management
Scoping Start
02/05/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGunnison Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 9/14/2016
Breckenridge Ski Resort, Summit County, Colorado · Summit, Colorado

Proposed projects: installation of an electrical line from the T-Bar hut to the top of the Imperial lift; replacement/modification of the existing lift operations building and ski patrol hut located at the top of the Imperial lift.

Special use management
Scoping Start
02/18/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 9/14/2016
The allotments are located on the western side of the Aspen/Sopris Ranger District, accessed by State Hwy 82 to Pitkin County Rd. 11 (Snowmass Creek Rd.) to Pitkin County Rd 9 (Capitol Creek Road) · Pitkin, Colorado

Proposal to analyze cattle grazing for a total of 913 AUMs between July and October between Capitol Creek and East Sopris Allotments. If authorized, grazing would be managed in a manner that maintains or moves towards desired conditions.

Grazing management
Scoping Start
10/2016 (Estimated)
Comment Period
10/2016 (Estimated)
Objection Period Start
02/2017 (Estimated)
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Samantha Dinar · samanthabdinar@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT 9 S, R 87 W, Sec 2, 10-11, 14-16, 20-22, 26-30 and 32-36 T 9 S, R 86 W, Sec 31-33 T 10 S, R 86 W, Sec 4-6 T 10 S, R 87 W, Sec 1-5, 8-16 and 22-23.
Decision Memo · East Zone/Dillon Ranger District · updated 9/14/2016
Keystone Ski Resort, Summit County, Colorado · Summit, Colorado

An analysis of minor trail improvements- widening on Alamo, construction of a skier bypass at the base of the Outback Express

Special use management
Scoping Start
02/19/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 9/9/2016
parcel is located adjacent to the Eagle-Thomasville road, FSR 400, Eagle County, Colorado · Pitkin, Colorado

Existing Special Use Permit issued to Art Bowles in 1974, SOP528401 is terminated but will be reissued with new terms and conditions to the new property owner, Lime Creek Ranch, LLC. Permit is for a .7 mile two-track road.

Road managementSpecial use management
Scoping Start
08/12/2015
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionN 1/2 SEC 33., T7S, R 83W, 6th PM, Eagle County, Colorado
Environmental Assessment · White River National Forest All Units · updated 8/26/2016
The area within 1/4 mile of the Montezuma Road, between the communities of Keystone and Montezuma, Colorado. The corridor is approximately 4 miles long. · Summit, Colorado

Proposal to expand the existing camping closure to include the areas within 1/4 mile of the Montezuma Road, between the communities of Keystone and Montezuma. This would involve an area approximately four miles long and 1/2 mile wide.

Recreation managementHeritage resource management
Scoping Start
03/25/2016
Comment Period
03/25/2016
Objection Period Start
05/27/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Ken Waugh · kwaugh@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Heritage Resource Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 5S, Range 76W, Sections 19-23, 25
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 8/11/2016
The allotment is located just south of Eagle, CO. The main access points onto the allotment are via the Valley road in Gypsum, the Hardscrabble road (#413), and the Brush/Gypsum road (#414). · Eagle, Colorado

Proposal to continue grazing authorization for 592 cattle between June 16 and October 16 annually (3,204 AUMs), construct several range improvements to improve livestock distribution and management.

Grazing management
Scoping Start
12/02/2009
Comment Period
02/16/2011
Objection Period Start
02/2016 (Estimated)
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Jessica Crawford · jessicacrawford@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Rangeland Vegetation Improvements; Grazing Structural Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/28/2016
Loge Peak on Aspen Highlands · Pitkin, Colorado

20-year communications lease for the development and operation of four-post tower on Loge Peak to host a Digital Trunked Radio System, and expansion of Aspen Highlands Patrol Headquarters to host telecommunications equipment

Special use management
Scoping Start
06/03/2016
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Erin Carey · ebcarey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 6/15/2016
Snowmass Ski Area · Pitkin, Colorado

Sheer Bliss Pond is key snowmaking infrastructure at Snowmass, this facility is important to maintain the operational efficiency and recreational experience of the ski area. This project will bring the pond into compliance with CDWR compliance

Special use management
Scoping Start
03/18/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Monte Lutterman · mlutterman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 6/9/2016
The project area encompasses the lands around the Dillon Reservoir and the lower Snake River from the Reservoir to Keystone. · Summit, Colorado

Vegetation management in lodgepole pine to create species and structural diversity, to create defensible space, reduce future fuel loadings and promote regeneration of future forest.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
06/01/2006
Objection Period Start
03/19/2007
Decision
04/2007 (Estimated)
Implementation
05/2007 (Estimated)
Project documents
Cary Green · cgreen@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Municipal Watersheds; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
Dillon Reservoir Forest Health and Fuels ProjectDecision Signed Date: 04/26/2007
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Decision Memo · White River National Forest All Units · updated 5/31/2016
South of Redstone off Highway 133 accessible via Placita trailhead. · Pitkin, Colorado

Construction of permanent safety closures and restoration work to include minimize erosion, promote vegetation by application of soil amendments, removal of mining debris that does not contribute to the cultural heritage of this former coal mine area

Minerals and geology
Scoping Start
02/22/2016
Decision
05/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Olivia Garcia · ogarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT11S, R88W, Section 6
Decision Memo · White River National Forest All Units · updated 5/20/2016
Within the Beaver Creek Resort Special Use Operational Boundary · Eagle, Colorado

proposal to accomplish three projects at Beaver Creek Resort during the 2016 summer construction season: Women's Downhill Start Mound Removal, Finish Area Commentator Booth and Red Tail Grading Projects.

Special use management
Scoping Start
03/30/2016
Decision
05/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 5/11/2016
Redstone Campground adjacent to Colo Hwy 133 Crystal River · Pitkin, Colorado

The concern for future debris flows at Redstone Campground area has initiated the Forest Service to review, analyze, and propose actions to provide camper safety and a debris management plan to minimize sediment into the Crystal River.

Land ownership managementRoad managementRecreation managementFacility managementWatershed management
Scoping Start
04/2016 (Estimated)
Comment Period
04/2016 (Estimated)
Objection Period Start
10/2016 (Estimated)
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Martha Moran · mmoran@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Road Improvements/Construction; Watershed Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land Description39 18%u2019 09%u201D N %u2013 107 06%u2019 57%u201D W
Decision Memo · White River National Forest All Units · updated 5/9/2016
Projects located in Vail and Beaver Creek SUP boundaries · Eagle, Colorado

6 proposals: Sun Up Lift (17) Replacement, Chair 3&4 East Maze Re-grade and Corbel Installation, Removable Multi-Use Deck, Adventure Ridge (AR) Storage Building, AR Summer Tubing Lanes and the Eagle Nest Deck Upgrade, Facilities and Landscaping Plan.

Special use management
Scoping Start
03/18/2016
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 5/6/2016
Forestwide Monitoring Plan Transition · Eagle; Garfield; Gunnison; Mesa; Moffat; Pitkin; Rio Blanco; Routt; Summit, Colorado

The WRNF has begun a process to transition its forest plan to the 2012 Final Planning Rule (see: 36 Code of Federal Regulations 219). In particular, the WRNF will address the purpose of the monitoring plan program set forth in 36 CFR 219.12(a)(1)

Land management planning
Scoping Start
04/01/2016
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Matthew Ehrman · mehrman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityPlan Amendment
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 3/25/2016
The nine authorizations in this project range across the forest on the Eagle-Holy Cross and Aspen-Sopris Ranger Districts. See the attached table for specific location descriptions for each case. · Eagle; Gunnison; Pitkin, Colorado

Re-issuance of nine lands special uses authorizations

Special use management
Scoping Start
08/13/2015
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Marcia Rose-Ritchie · mroseritchie@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 3/24/2016
The entire Maroon Bells %u2013 Snowmass Wilderness in Pitkin and Gunnison counties, Colorado · Gunnison; Pitkin, Colorado

Two changes are proposed to the MBSW special regulations. Overnight visitors will be required to store all food, garbage and other attractants in bear resistant containers & changing the campfire prohibition to everywhere above 10,800 ft.

Regulations, directives, ordersRecreation management
Scoping Start
12/01/2015
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Martha Moran · mmoran@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityOrder Creation/Modification; Wilderness Management
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGunnison Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 3/21/2016
south side of I-70 and west of Vail Resorts Ski Area · Eagle, Colorado

Enhance the wildland urban interface community protection zone through vegetation and fuels reduction treatments adjacent to Vail Intermountain and West Vail. Helicopter yarding to accomplish fuels treatments is proposed.

Fuels managementVegetation management (other than forest products)
Scoping Start
03/04/2015
Comment Period
06/05/2015
Objection Period Start
02/12/2016
Decision
03/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Cary Green · cgreen@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionPortions of Sections 12, 13 and 14 , Township 5 South, Range 81 West, 6th Principal Meridian, Eagle County, Colorado
Decision Memo · White River National Forest All Units · updated 3/2/2016
East of Camp Hale where NFS Road 714-East Fork Eagle Road crosses the East Fork of the Eagle at the triple culverts; approximately 0.9 miles east of the East Fork Eagle Road/Old Highway Road junction. · Eagle, Colorado

Replacement of a triple-culvert crossing just east of Camp Hale. The intent is to restore stream habitat affected by the road-stream crossing, increase flood capacity and resiliency, reconstruct the rd and upgrade to current Forest Service standard

Watershed management
Scoping Start
01/22/2016
Decision
03/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Erica Borum · eborum@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionTownship 7S, Range 80W, Sect.30
Environmental Impact Statement · East Zone/Dillon Ranger District · updated 2/17/2016
Breckenridge Ski Resort · Summit, Colorado

Proposal includes ziplines, mountain bike trails, and challenge courses on Peaks 8 and 7.

Special use management
NOI in Federal Register
02/04/2014
DEIS NOA in Federal Register
01/16/2015
FEIS NOA in Federal Register
08/13/2015
Objection Period Start
08/14/2015
Decision
11/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Cynthia Ebbert · cebbert@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 2/9/2016
Copper Mountain Resort, Summit County, Colorado · Summit, Colorado

An analysis of a new mountain coaster at the base of the American Flyer; a new mountain bike trail; snowmaking on Collage and an associated drainage system.

Special use management
Scoping Start
02/05/2016
Comment Period
08/2016 (Estimated)
Objection Period Start
11/2016 (Estimated)
Decision
12/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 1/6/2016
Vail Pass Winter rec Area, Colorado River, Spraddle Creek area, Black Lakes, Homestake Creek, Eagle River, Fulford Cave, Camp Hale, Red Cliff & Homestake Climbing Areas, system roads/trails, & others · Eagle; Garfield, Colorado

The Eagle Holy Cross District needs to complete CE to reissue nine expiring priority use O/G permits as required by FSH 1909.15, Section 31.2 (15). One transitional permit is proposed for reissuance as priority use as required by FSH 2709.14, 53.1q.

Special use management
Scoping Start
11/06/2015
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Robert Rodriguez · rtrodriguez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Reissue eight expiring priority use O/G Permits & convert one transitionalDecision Signed Date: 01/06/2016
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Sopris Ranger District · updated 12/31/2015
The switchback is located approximately 5 1/2 miles south of Redstone, CO on Hwy 133. The fill will be inside the switchback. · Gunnison, Colorado

CDOT is proposing to permanently store natural road debris inside the bottom switchback east of McClure Pass on Hwy 133. Project will fill in a 16.1-acre depression from original road construction. Includes revegetation of the old Placita fill site.

Special use management
Scoping Start
02/27/2009
Comment Period
11/05/2014
Objection Period Start
08/14/2015
Decision
09/2015 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNW 1/4 of Section 18, T11S, R88W, 6th P.M.
Decision Memo · White River National Forest All Units · updated 12/18/2015
The bottom terminal would be adjacent to the existing terminal and the top terminal would be approx. 200 ft SW of the existing terminal adjacent to the Ruthie's Restaurant (see map for alignment). · Pitkin, Colorado

This project is to improve the reliability and safety of Aspen Mountain's Lift 1A in order to meet guest standards and enhance the recreation experience by replacing and realigning the outdated fixed-grip, double chairlift installed in 1972.

Recreation managementSpecial use management
Scoping Start
10/28/2015
Decision
12/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Scott Kaden · scottakaden@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 12/10/2015
Bald Mtn · Summit, Colorado

Reconstruction/replacement of the buried powerline (8,100' x 20')on Bald Mtn. The line provides power to an electronics communications facility on private land.

Special use management
Scoping Start
12/31/2013
Decision
10/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSections 9 & 10, T7S, R77W, 6th P.M.
Decision Memo · East Zone/Dillon Ranger District · updated 12/7/2015
Tailor Lode (south of the top of the Zendo Lift at the Breckenridge Ski Resort) · Summit, Colorado

Analysis to provide access to a private inholding between Peaks 6 and Peaks 7. Project would entail construction of 1,500 feet of new road from the top of the Zendo lift (BSR) to the private inholding.

Land ownership management
Scoping Start
05/04/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNW1/4 Sec 35 and NE1/4 Sec 34, T. 6 S., R. 78 W., 6th P.M. Summit County
Decision Memo · White River National Forest All Units · updated 9/22/2015
Copper Mountain Ski Resort · Summit, Colorado

Installation of the Tucker Lift was approved for construction in the 2006 Copper Mtn. Trail and Facilities EIS; however, the alignment has changed. This analysis is for the new lift alignment.

Special use management
Scoping Start
01/05/2015
Decision
10/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 8/19/2015
Aug 18th: Steamboat Springs - Arapahoe Basin Aug 19th: Copper Mountain ski area - Aspen Aug 20th: Aspen - Breckenridge Aug 22nd: Loveland - Fort Collins · Chaffee; Grand; Lake; Larimer; Park; Pitkin; Routt; Summit, Colorado

Classic Bicycle Racing LLC makes temporary use of NFS lands during 4 of the total 7 stages on four National Forests within Colorado for ancillary facilities such as staging areas with portable toilets, signs, barricades, message boards, and filming.

Special use managementRecreation management
Scoping Start
02/26/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date08/19/2015
ForestsMedicine Bow-Routt National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsHahns Peak/Bears Ears Ranger District; Canyon Lakes Ranger District; Sulphur Ranger District; Leadville Ranger District; Salida Ranger District; South Park Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 8/12/2015
Keystone Ski Resort · Summit, Colorado

Specific projects are to be determined but may include misc. tree removal along existing trails and utility installations.

Special use management
Scoping Start
05/21/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Keystone 2015 Summer Construction Projects DMDecision Signed Date: 08/11/2015
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 7/22/2015
FSR 816, South of Silt, Along Alkali Creek · Garfield, Colorado

The proposed action is to install a gravity fed water pipeline from the range improvement pond to the Hoot Owl Cow Camp corral for approximately 2,000 feet. The pipe will be a High Density Polyethylene commonly used for this purpose.

Grazing management
Scoping Start
05/12/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Lydia LaBelle de Rios · llabellederios@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 7/21/2015
Copper Mountain Ski Resort · Summit, Colorado

Copper Mountain Resort proposed a new mountain bike trail on the front side of the ski area located entirely within the existing special use permit boundary. This proposal was scoped with the Tucker Lift.

Special use management
Scoping Start
01/05/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Copper Mountain Bike TrailsDecision Signed Date: 06/03/2015
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · White River National Forest All Units · updated 7/8/2015
All of Deep Creek flowing through NFS lands and the Colorado River in Glenwood Canyon on NFS lands. · Garfield, Colorado

Interagency Wild and Scenic Suitability Study on the Colorado River and Deep Creek. USFS Draft ROD will be posted after the legal notice is posted in the Glenwood Post Independent. The entire EIS can be found: www.blm.gov/co/st/en/fo/crvfo.html

Land management planning
NOI in Federal Register
11/07/2008
DEIS NOA in Federal Register
09/16/2011
FEIS NOA in Federal Register
04/07/2014
Objection Period Start
04/07/2014
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Kay Hopkins · kchopkins@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Area Management
Wild and Scenic River Suitability Study Final Record of DecisionDecision Signed Date: 06/11/2015
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · White River National Forest All Units · updated 6/27/2015
WRNF: Forest-wide. · Eagle; Garfield; Gunnison; Mesa; Moffat; Pitkin; Rio Blanco; Routt; Summit, Colorado

This document seeks to update the travel management on the WRNF.

Road managementRecreation managementLand management planning
NOI in Federal Register
08/27/2002
DEIS NOA in Federal Register
11/07/2008
FEIS NOA in Federal Register
05/06/2011
Decision
03/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Wendy Haskins · whaskins@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
White River National Forest Travel Management PlanDecision Signed Date: 03/17/2011
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Decision Memo · White River National Forest All Units · updated 6/26/2015
Cayton Ranger Station site off of FSR 814 in the West Divide Creek area of the Rifle Ranger District · Mesa, Colorado

The purpose of this proposal is to replace the condemned outhouse and vault at the Cayton Ranger Station site off of FSR 814 in the West Divide Creek area of the Rifle Ranger District.

Special area managementFacility managementRecreation management
Scoping Start
05/15/2014
Decision
11/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Jason Pooler · jhpooler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Area Management
Cayton Ranger Station Outhouse Replacement Decision MemoDecision Signed Date: 11/13/2014
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT9S, R91W, Section 4; Mesa County, Colorado
Decision Memo · East Zone/Holy Cross Ranger District · updated 6/23/2015
Primarily Gypsum Creek drainage, Flattops area out of Sweetwater, and Spraddle Creek area. · Eagle; Garfield, Colorado

The Eagle Holy Cross District needs to complete CE to reissue five expiring priority use O/G permits as required by FSH 1909.15, Section 31.2 (15).

Special use management
Scoping Start
03/04/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Robert Rodriguez · rtrodriguez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Permit Reissuance for Five Priority Outfitter/Guide Permits DMDecision Signed Date: 05/27/2015
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Grand Mesa Uncompahgre and Gunnison National Forest All Units · updated 6/22/2015
North of Crested Butte, Colorado and overlaps the White River and Gunnison National Forests. Research can occur anywhere on four districts upon approval of a yearly plan of operations. · Gunnison; Pitkin, Colorado

RMBL has been conducting environmental research on the White River and the Gunnison National Forests since 1928. The proposal is to combine permits from both forests and have the GMUG N.F. take the lead on permit admin. See GMUG SOPA for more info.

Research
Scoping Start
05/01/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
RMBL Special Use Permit Reissuance Decision MemoDecision Signed Date: 06/02/2015
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGunnison Ranger District; Paonia Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionAll portions of the Aspen-Sopris, Paonia, and Gunnison Ranger Districts
Decision Memo · West Zone/Sopris Ranger District · updated 6/22/2015
23 miles south of Glenwood Springs · Pitkin, Colorado

Removal of hazard trees surrounding well pads, valves and other facilities for the protection of these sites.

Fuels management
Scoping Start
06/11/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
James Genung · jgenung@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Wolf Creek Hazard Tree Removal for Site Protection DMDecision Signed Date: 06/18/2015
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT8S, R90W, Sections 23, 26, 35, 36; T8S, R90W, Sections 1, 2
Decision Memo · White River National Forest All Units · updated 6/19/2015
Roadside pullouts in the White River National Forest; Pike-San Isabel National Forests and Grand Mesa/Gunnison/Uncompahgre National Forests · Chaffee; Delta; Gunnison; Lake; Park; Pitkin; Summit, Colorado

Special use authorization is for Bicycle Tour of Colorado (BTC) to make temporary use of NFS lands on 3 National Forests within Colorado for ancillary aid stations with portable toilets, signs, trash facilities and support personnel

Special use managementRecreation management
Scoping Start
04/28/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Mike Kenealy · mkenealy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rec EventDecision Signed Date: 05/29/2015
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsGunnison Ranger District; Paonia Ranger District; Leadville Ranger District; Salida Ranger District; South Park Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 6/18/2015
18 miles southeast of Silt, Colorado · Mesa, Colorado

Authorize issuance of a private road easement across an existing road to private lands.

Special use management
Scoping Start
04/07/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Dodd- Private Road Easement Decision MemoDecision Signed Date: 06/03/2015
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT. 9 S., R. 91 W., Lot 8 of Section 3 and Lot 3 of Section 10
Environmental Assessment · East Zone/Dillon Ranger District · updated 6/18/2015
Weber Gulch drainage above French Gulch Road (between Weber Gulch and Black Gulch) · Summit, Colorado

Proposed hut to be located in the Weber Gulch drainage above French Gulch Road (between Weber Gulch and Black Gulch). Parking lot would be constructed on French Gulch Road across from the Sallie Barber Trailhead.

Recreation managementSpecial use management
Scoping Start
10/24/2011
Comment Period
08/09/2013
Objection Period Start
07/30/2014
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Summit Huts Association_Proposed Weber Gulch Backcountry Hut Final DecisionDecision Signed Date: 06/17/2015
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Sopris Ranger District · updated 6/17/2015
Eagle County, Cottonwood Pass County Road 10, Red Table Road 514 · Eagle, Colorado

The action proposed by the Forest Service to meet the purpose and need consists of four elements: Construct a parking area, reconstruct approximately 8.2 miles of trail, restore a wetland, and rehabilitate- and close approximately 27 miles of trail.

Land management planningRecreation management
Scoping Start
07/02/2012
Comment Period
03/27/2014
Objection Period Start
04/15/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Jonathan Thompson · jonthompson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
Final DNFONSI Basalt to GypsumDecision Signed Date: 06/17/2015
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District; East Zone/Eagle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 6/10/2015
FSR 816, South of Silt, Along Alkali Creek · Garfield, Colorado

Replace the previous cow camp cabin with a small pre-constructed cabin at the Hoot Owl Cow Camp on the concrete pad where the previous building was located.

Grazing management
Scoping Start
05/12/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Lydia LaBelle de Rios · llabellederios@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Hoot Owl Cow Camp Building Replacement Decision MemoDecision Signed Date: 06/10/2015
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT8S R92W Section 35
Decision Memo · White River National Forest All Units · updated 6/10/2015
Vail and Beaver Creek Resorts · Eagle, Colorado

Proposal from Vail Resorts to identify major projects Vail and Beaver Creek Resorts would like to accomplish during the 2015 summer construction season that they believe are either already approved, are maintenance or can be approved with a Cat Ex.

Special use management
Scoping Start
03/04/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Vail Mountain Summer 2015 Projects Decision MemoDecision Signed Date: 06/05/2015
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 5/28/2015
Throughout the Blanco Ranger District and the Flat Tops Wilderness. · Garfield; Moffat; Rio Blanco, Colorado

Renewal of 18 existing outfitter/guide special use permits. Permits allow for hunting, packing, fishing, camping, horseback riding, hiking, snowmobiling, cross-country skiing and snowshoeing. Permit term will be for 10 years.

Special use management
Scoping Start
03/31/2014
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Patricia Wyatt · pwyatt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM: Blanco Ranger District Outfitter/Guide Permit ReissuancesDecision Signed Date: 05/28/2015
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Aspen Ranger District · updated 5/15/2015
Scattered patches of FS lands east of Aspen along the roaring Fork River. · Pitkin, Colorado

Mosquito control using a natural bacterial byproduct, "Bti" on areas east of Aspen near Wildwood School & Difficult CG. Less than 5 acres of wetland areas to be controlled on an as-needed basis. Treatment is by hand, after assessment is completed.

Watershed management
Scoping Start
06/30/2010
Comment Period
04/18/2013
Objection Period Start
03/23/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Mosquito Abatement DNFONSIDecision Signed Date: 05/15/2015
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land Description6th P.M., T. 10 S., R. 84 W., Sections 28, 33, and 34
Decision Memo · West Zone/Sopris Ranger District · updated 4/29/2015
CO-82 east of Aspen at winter closure gate. · Pitkin, Colorado

The current winter gate parking area located adjacent to CO-82 east of the town of Aspen will be redeveloped into an improved parking facility.

Facility managementRecreation managementRoad management
Scoping Start
01/13/2015
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Martha Moran · mmoran@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Travel Management
Winter Gate Decision MemoDecision Signed Date: 04/29/2015
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White River National Forest All Units · updated 4/21/2015
Snowmass Ski Area Special Use Permit; Town of Snowmass Village; Pitkin County, Colorado. · Pitkin, Colorado

Snowmass Mtn proposes construction of a Skill Level 3 Trail; construction of the Elk Camp Bypass; installation of snowmaking infrastructure; creation of gladed terrain in six distinct pods; and replacement/realignment of the High Alpine Chairlift.

Special use managementRecreation management
Scoping Start
08/26/2014
Comment Period
12/17/2014
Objection Period Start
02/25/2015
Decision
04/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Scott Kaden · scottakaden@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Snowmass Final Decision Notice and FONSIDecision Signed Date: 04/21/2015
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Dillon Ranger District · updated 4/2/2015
Breckenridge Ski Resort · Summit, Colorado

Installation of a snowmaking line between Peak 7 and the lower Peak 6 terrain; trail widening and grading on the Monte Cristo trail.

Special use management
Scoping Start
01/05/2015
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision NoticeDecision Signed Date: 03/24/2015
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 3/30/2015
All vacant grazing allotments on the east side of the Lower Blue River and north of Ute Pass. · Summit, Colorado

Construct water dev. to enhance sagegrouse brood-rearing habitat. Design & implement a livestock grazing prog. to enhance habitat conditions required for all sagegrouse life stages in partnership with current & future livestock grazing permittees.

Wildlife, fish, rare plants
Scoping Start
07/2014 (Estimated)
Comment Period
07/2014 (Estimated)
Objection Period Start
03/2015 (Estimated)
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Jessica Pettee · jcpettee@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Species Habitat Improvements; Species Population Enhancements; Rangeland Vegetation Improvements; Grazing Structural Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Decision Memo · West Zone/Sopris Ranger District · updated 3/25/2015
These Dithes are located approximately 12 miles SW of Carbondale, and are accessed from Capital Creek Road in Snowmass. · Pitkin, Colorado

Andlinger Properties Capital Corp. of Vero Beach, FL has requested a special use permit authorizing use of National Forest System Lands for two existing historic ditches in the Capital Creek area of the White River National Forest, the Finley #1 & #4

Special use management
Scoping Start
06/07/2010
Decision
01/2015 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Finley Ditches #1 & #4 SUP Decision MemoDecision Signed Date: 01/23/2015
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSW 1/4 Sec. 22, T.9S, R.87W, 6th PM, Pitkin County, Colorado
Decision Memo · White River National Forest All Units · updated 3/24/2015
COBS is based in Leadville, CO & is currently auth. to operate across a large area of the WRNF including portions of the Eagles Nest, Holy Cross, Hunter-Fryingpan & Maroon Bells/Snowmass Wilderness. · Eagle; Gunnison; Pitkin; Summit, Colorado

reissue COBS a new 10-year priority permit and consolidate all their use on the WRNF under a single permit

Special use managementRecreation management
Scoping Start
01/20/2015
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Mike Kenealy · mkenealy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo: 10 Year SUP Reissuance & Reclassification of the COB PermitDecision Signed Date: 03/20/2015
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 3/16/2015
The parking lot would sit east of the Humbug Hill Road and North of French Gulch Rd. · Summit, Colorado

The Dillon Ranger District will be analyzing an alternative parking lot location to the location that was analyzed in the July 2014 Environmental Assessment

Recreation managementSpecial use management
Scoping Start
01/2015 (Estimated)
Comment Period
01/2015 (Estimated)
Objection Period Start
04/2015 (Estimated)
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Sopris Ranger District · updated 2/9/2015
CO-82 east of Aspen at winter closure gate. · Pitkin, Colorado

The current winter gate parking area located adjacent to CO-82 east of the town of Aspen will be redeveloped into an improved parking facility.

Facility managementRecreation management
Scoping Start
02/2015 (Estimated)
Comment Period
03/2015 (Estimated)
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Todd Parker · toddmparker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Travel Management
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Eagle Ranger District · updated 1/22/2015
Proposed locations include No Name Gulch (NFSR 7050)and Hardscrabble Road (NFSR 441). · Eagle, Colorado

Designate common use areas for public to collect landscape rocks on the two districts

Minerals and geology
Scoping Start
03/15/2011
Comment Period
07/12/2013
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Aaron Mayville · awmayville@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Products Sales
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · East Zone/Holy Cross Ranger District · updated 1/22/2015
The project would be located along Turkey Creek and Gypsum Creek. Turkey Creek parallells Forest Service Road 709 (Shrine Pass). Gypsum Creek parallels Forest Service Road 412 (Gypsum Creek Road). · Eagle, Colorado

The objective of the project is to improve stream bank and riparian conditions to improve stream health in Gypsum Creek and Turkey Creek. This project would subsequently bring these areas into compliance with the Forest Plan.

Recreation managementWatershed management
Scoping Start
05/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Matthew Grove · magrove@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionTurkey Creek- T 6S, R 80W, Sect. 1, 10, 11, 15, 16 Gypsum Creek- T 6S, R 85 W, and Sect. 32, 33, 34, 35
Environmental Assessment · East Zone/Dillon Ranger District · updated 12/30/2014
District-wide, primarily on system roads and trails. · Summit, Colorado

Several priority use O/G permit holders have requested additional use. The use is available as determined by the District O/G Capacity Analysis. Proposed uses include hiking, biking, cross-country skiing, snowshoeing, rock climbing, & mountaineering.

Recreation managementSpecial use management
Scoping Start
05/09/2014
Comment Period
05/09/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Ken Waugh · kwaugh@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Dillon Ranger District Outfitter/Guides Additional UseDecision Signed Date: 11/14/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Decision Memo · White River National Forest All Units · updated 12/29/2014
The fifteen outfitter/guide priority use permits are authorized to operate in the Roaring Fork, Fryingpan and Crystal River watersheds. · Eagle; Gunnison; Pitkin, Colorado

The fifteen Outfitter/Guide priority use permit holders have conducted a variety of outfitting and guiding activities across the Aspen-Sopris Ranger District for many years and the Forest Service proposes to reissue 10-year priority use permits.

Recreation managementSpecial use management
Scoping Start
09/04/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Matthew Ehrman · mehrman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM: Special Use Permit Reissuance for 15 Priority Outfitter GuidesDecision Signed Date: 12/29/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Leadville Ranger District · updated 12/29/2014
Halfmoon Creek drainage north to the Mt Zion area including Turquoise Lake & Tennessee Pass area (includes Ski Cooper) · Eagle; Lake, Colorado

The project will include vegetation management for insect and disease, as well as wildfire mitigation. The project includes treatments that will improve wildlife habitat, watersheds and closes non system routes in the project area.

Forest productsFuels managementVegetation management (other than forest products)
Scoping Start
11/08/2012
Comment Period
12/19/2013
Objection Period Start
04/17/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Lisa Corbin · lcorbin@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements
Tennessee Creek ProjectDecision Signed Date: 11/13/2014
ForestsPike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsLeadville Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 12/17/2014
Various locations on the Eagle/Holy Cross Ranger District. · Eagle, Colorado

The Eagle-Holy Cross Ranger District of the White River National Forest is proposing to reclassify twelve existing transitional priority special use permits for outfitting and guiding as ten-year priority special use permits by the winter of 2014.

Recreation managementSpecial use management
Scoping Start
10/14/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Max Forgensi · mforgensi@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Eagle-Holy Cross transitional priority special use reclassification DMDecision Signed Date: 12/17/2014
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 12/17/2014
The seven transitional priority use permits are authorized to operate in the Roaring Fork, Fryingpan and Crystal River valleys. · Eagle; Gunnison; Pitkin, Colorado

The seven transitional priority use permit holders have conducted a variety of outfitting and guiding activities across the Aspen-Sopris Ranger District for many years and the Forest Service proposes to convert them to 10-year priority use permits.

Special use managementRecreation management
Scoping Start
08/05/2014
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Elke Schuster · eschuster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Permit Reissuance for 7 Transitional Outfitter/Guide PermitsDecision Signed Date: 12/10/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Rifle Ranger District · updated 11/5/2014
Approximately 21 miles south of New Castle, CO; 0.5 miles SE of Haystack Mountain · Mesa, Colorado

Willsource Enterprises is proposing to construct 1 well pad, access road, and pipelines; and to drill 1 exploratory well in Federal lease COC 058835 (Formerly called Little Beaver 2-20)

Minerals and geology
Scoping Start
07/2013 (Estimated)
Comment Period
07/2013 (Estimated)
Objection Period Start
09/2013 (Estimated)
Decision
11/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Jason Gross · jrgross@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityNatural Gas
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNW Sec 20 T8S R91W
Decision Memo · East Zone/Dillon Ranger District · updated 9/30/2014
Within the boundaries of the Town of Dillon, Colorado. The parcel is located adjacent to County Rd 51, approximately 1.5 miles from Interstate 70 on US-6. · Summit, Colorado

To offer for competitive sale to the public, or direct sale or exchange to a governmental org, an admin. site (Dillon Work Compound) comprising approx. 11 acres. This sale/exchange is being proposed under the authority of the FSFREA of 2005.

Land ownership management
Scoping Start
01/31/2012
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Carole Huey · clhuey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionT. 5 S., R. 77 W., Section 8, 6th P.M.
Decision Memo · East Zone/Dillon Ranger District · updated 9/30/2014
2 miles south of the Town of Montezuma · Summit, Colorado

Re-authorization of easement for operation and maintenance of a 50 foot long private road from the Deer Creek Road to the Erie Millsite, 2 miles south of the Town of Montezuma.

Special use management
Scoping Start
12/31/2013
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Erie Millsite Private Road Easement Decision MemoDecision Signed Date: 09/03/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNW1/4 of Section2, T. 6 S., R. 76 W., 6th P.M.
Decision Memo · West Zone/Sopris Ranger District · updated 9/30/2014
Mt Nast Colony · Pitkin, Colorado

Reissuance of expired special use permit for maintaining 1700 feet of waterline and spring development with a 2 foot wide use area. To be used for Mt Nast Summer home group, domestic and stock purposes.

Special use management
Scoping Start
08/27/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Carrie Surber · csurber@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Mount Nast Colony Homeowners Association - Water Conveyance SystemDecision Signed Date: 09/25/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSW Section 6 and N1/2 Section 7, T9S, R82W, 6th P.M.
Decision Memo · Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units · updated 9/21/2014
The 2014 route is on the White River, Gunnison, Pike, San Isabel and Arapahoe National Forests · Boulder; Chaffee; Eagle; El Paso; Gunnison; Park; Pitkin, Colorado

2014 Pro-Cycyle challenge is a professional bike race with 128 entrants. The course varies each year utilizing US Highways, State and County roads as it crosses 4 National Forests this year between August 18 and 26.

Special use management
Scoping Start
03/17/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Neal Weierbach · nweierbach@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
2014 Pro-cycle ChallengeDecision Signed Date: 07/24/2014
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsGunnison Ranger District; Paonia Ranger District; Boulder Ranger District; Salida Ranger District; Pikes Peak Ranger District; South Park Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · West Zone/Rifle Ranger District · updated 9/15/2014
The entire south portion of the Rifle Ranger District (south of I-70). From the Battlements on the west to Uncle Bob Mountain to the south to New Castle on the east. · Garfield; Mesa, Colorado

Implement wildlife habitat improvements on approximately 6,000 acres across the south side of the Rifle Ranger District. Treatments include cutting sagebrush, oakbrush, and mountain shrub and prescribed fire in aspen, pinyon-juniper, and Douglas fir.

Wildlife, fish, rare plants
Scoping Start
01/23/2014
Comment Period
01/23/2014
Objection Period Start
01/23/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Kim Potter · kmpotter@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements
Decision Notice South Rifle Habitat Enhancement ProjectDecision Signed Date: 07/11/2014
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 9/4/2014
approximately 15 miles East of Meeker, CO · Rio Blanco, Colorado

To issue a ditch bill easement to Big Beaver Ranch for operation and maintenance of Big Lick Reservoir and outlet ditch used for storage of irrigation and livestock water.

Special use management
Scoping Start
06/15/2010
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Ditch Bill Easement for Big Beaver Ranch Decision MemoDecision Signed Date: 08/08/2014
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT1N, R91W,Sec. 32, 6th P.M.
Decision Memo · West Zone/Blanco Ranger District · updated 8/1/2014
Approximately 1.1 miles east of Elbow Park (intersection of FSR 250 and 258) · Rio Blanco, Colorado

Construct 650 feet of new road and obliterate/rehabilitate section of FSR 250 damaged by ditch overflow in spring 2014. Install a culvert where Coal Creek Feeder ditch crosses east end of re-route.

Road management
Scoping Start
06/23/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Troy Osborn · tosborn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
Forest Service Road 250 Road RealignmentDecision Signed Date: 07/14/2014
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT2N, R91W, Sec 27
Decision Memo · East Zone/Dillon Ranger District · updated 7/24/2014
About 7 miles south of the Town of Breckenridge · Summit, Colorado

Request for road authorization to access private lands, north of Blue Lakes Road (County Road 850) using an existing unauthorized road. The road was built in the 1940’s to access the Monte Cristo Mine and has been used regularly since that time.

Special use management
Scoping Start
02/15/2013
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Monte Cristo Mine RoadDecision Signed Date: 07/24/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNW1/4 Section 1, T8S, R78W 6th PM
Decision Memo · West Zone/Sopris Ranger District · updated 7/15/2014
Sunlight Peak, SW of Glenwood Springs · Garfield, Colorado

Proposal to raise tower height from 103 ft. to 140 ft. at Sunlight Peak site #4. Trees are blocking microwave transmisions. The other option is extensive tree removal.

Special use management
Scoping Start
07/22/2013
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Public Service Co. of Colorado Sunlight Communication Site Tower Height ModDecision Signed Date: 07/11/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionNW1/4 Sec. 19, T7S, R89W, 6th P.M.
Arapahoe Basin EIS Cancelled
Environmental Impact Statement · East Zone/Dillon Ranger District · updated 6/30/2014
A-Basin Ski Area · Summit, Colorado

Lift/trails development in the Beavers, snowmaking reservoir expansion, new surface lift, etc.

Recreation managementSpecial use management
NOI in Federal Register
11/21/2013
DEIS NOA in Federal Register
11/2014 (Estimated)
FEIS NOA in Federal Register
05/2015 (Estimated)
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Area Management
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 6/30/2014
Specified campgrounds and high-use undeveloped camping sites from May to October annually. · Eagle; Garfield; Gunnison; Mesa; Pitkin; Rio Blanco; Summit, Colorado

A proposal to implement an order requiring storage of human food/garbage/attractants at specified campgrounds and high-use undeveloped camping sites.

Wildlife, fish, rare plantsRegulations, directives, orders
Scoping Start
02/14/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Philip Nyland · pnyland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityOrder Creation/Modification
Occupancy and Use Order for Food Storage and Refuse ContainmentDecision Signed Date: 06/17/2014
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Sopris Ranger District · updated 6/30/2014
Summit of Sunlight Peak, SW of Glenwood Springs · Garfield, Colorado

Removal of existing CATV cables, installation of 20' of underground conduit, and two splice vaults adjacent to communication site #3 for completion of fiber optics system between existing facilities.

Special use management
Scoping Start
07/22/2013
Decision
01/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Sunlight Peak Comm Site: Fiber Optics Cable InstallationDecision Signed Date: 01/09/2014
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionSE1/4 Sec. 19, T7S, R89W, 6th P.M.
Decision Memo · West Zone/Aspen Ranger District · updated 6/30/2014
Summit of Aspen (Ajax) Mountain · Pitkin, Colorado

Removal of overhead powerline and related equipment; replacement of damaged underground service wires; install of secondary voltage conduits & cables, and install of a 50' fiber optics cable between pre-existing comm facilities.

Special use management
Scoping Start
07/22/2013
Decision
01/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
James Kirschvink · jkirschvink@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Aspen Mountain Communication Site: Fiber Optics Cable & Powerline Improvem.Decision Signed Date: 01/09/2014
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionNE1/4 Sec. 33, t9S, R88W, 6th P.M.
Decision Memo · East Zone/Holy Cross Ranger District · updated 6/30/2014
This project is located within the special use permit area boundaries of Vail and Beaver Creek Mountain Resorts. · Eagle, Colorado

This project would pave approximately 1000 feet of Dally Road at Beaver Creek and expand the cellular coverage at key gathering points on Vail and Beaver Creek through the installation of cell node towers and upgraded fiber optic lines.

Special use management
Scoping Start
03/20/2014
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Samuel Massman · smassman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Vail and Beaver Creek World Alpine Ski Championship Improvement ProjectDecision Signed Date: 05/20/2014
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 6/25/2014
Eagle/Holy Cross RD · Eagle, Colorado

Allow unlicensed OHVs on certain segments of the open road system on Eagle/Holy Cross Ranger Districts

Road management
Scoping Start
06/27/2013
Comment Period
07/01/2013
Objection Period Start
03/13/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Paula Peterson · pkpeterson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 5/27/2014
Near the town of Breckenridge, along Tiger Road. · Summit, Colorado

Implement stream restoration activities on the Swan River in the existing dredge habitat. Project also includes riparian work and road/stream crossing relocations.

Watershed managementWildlife, fish, rare plants
Scoping Start
01/02/2014
Comment Period
01/02/2014
Decision
05/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Corey Lewellen · clewellen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Watershed Improvements
Swan River RestorationDecision Signed Date: 05/23/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 4/9/2014
Keystone Ski Resort · Summit, Colorado

Keystone proposes a variety of frontside improvements including relocation and replacement of the Summit House Restaurant, new mountain bike trails, ski school trail construction, etc.

Special use management
Scoping Start
02/10/2012
Comment Period
02/10/2012
Objection Period Start
02/05/2014
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Dercum Mountain Improvements ProjectDecision Signed Date: 03/27/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Rifle Ranger District · updated 3/25/2014
No Name Creek drainage, north of Glenwood Springs. · Garfield, Colorado

Apex Lode, Strong Mines has submitted a Plan of Operations to maintain a mine and infrastructure on their claims. Infrastructure consists of a cabin/tool shed, 1,600 feet of road with a gate as well as the mine. The Plan of Operations is for 1 year.

Minerals and geology
Scoping Start
06/27/2013
Decision
01/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Glen Davis · gddavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Apex Lode Project Plan of OperationsDecision Signed Date: 01/30/2014
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT5S, R88W, Section 7
Decision Memo · East Zone/Dillon Ranger District · updated 3/25/2014
Breckenridge Ski Area · Summit, Colorado

Replace the Colorado Chair lift at Breckenridge

Recreation managementSpecial use management
Scoping Start
01/13/2014
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management
Breckenridge Ski Resort Colorado SuperChair Upgrade (Peak 8)Decision Signed Date: 03/17/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 3/25/2014
The project area is east of the town of Dillon, CO and west of the town of Keystone, CO · Summit, Colorado

The Dillon Ranger District proposes to establish a 21 mile motorcycle trail system in the Frey Gulch and Tenderfoot Mountain areas. There would be about 8 miles of new construction and 13 miles of reconstruction of existing trails proposed.

Recreation management
Scoping Start
10/11/2011
Comment Period
10/15/2012
Decision
02/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Ken Waugh · kwaugh@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management; Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · West Zone/Blanco Ranger District · updated 3/24/2014
approximately 17 miles northeast of Meeker, CO · Rio Blanco, Colorado

Authorize a special use permit for the John Rescorla Ditch across National Forest lands for the purpose of irrigating private lands.

Special use management
Scoping Start
11/23/2010
Comment Period
03/25/2013
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Milk Creek Ranch - John Rescorla Irrigation DitchDecision Signed Date: 03/03/2014
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Decision Memo · East Zone/Dillon Ranger District · updated 3/24/2014
approximately 4 miles south of the Town of Frisco, East of CO State Hwy 9 on the East side of Blue River · Summit, Colorado

Request to approve issuance of a new Federal Land Policy and Management Act (FLPMA) Private Road Easement to replace the original 1961 authorization and allow for minor realignment of the road on NFS lands to meet Summit County road standards.

Special use managementLand ownership management
Scoping Start
05/11/2012
Comment Period
05/11/2012
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Private Road Easement Coolidge Placer and Government Lot 6Decision Signed Date: 01/14/2014
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSW1/4 Sec. 6, T6S, R77W, 6th P.M.
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 2/26/2014
Two Elk Creek, southeast of Minturn · Eagle, Colorado

to construct a permanent fish barrier that would eliminate upstream migration of non-native fish into Two Elk Creek from the Eagle River. The current population of fish would be chemically removed and replaced with native cutthroat trout.

Wildlife, fish, rare plants
Scoping Start
05/24/2010
Comment Period
07/2013 (Estimated)
Objection Period Start
10/2013 (Estimated)
Decision
12/2013 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Matthew Grove · magrove@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionSec. 1, T. 6 S., R. 81 W., 6th P.M.
Environmental Assessment · West Zone/Sopris Ranger District · updated 12/11/2013
Approximately 23 miles south of Eagle, Colorado following forest system roads 400 and 506. · Eagle; Pitkin, Colorado

Removal of larger lodgepole pine to follow direction for sustained yield even flow timber harvest, and to reduce mountain pine beetle risk and fuels in the area.

Forest products
Scoping Start
01/14/2010
Comment Period
10/04/2012
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Steven Goodson · sgoodson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
Burnt Mountain ProjectDecision Signed Date: 09/26/2013 Legal Notice Date: 10/31/2013
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT83W, R7S, Sec. 33-35 and T83W, R8S, Sec. 2-4, 9-17
Environmental Assessment · West Zone/Rifle Ranger District · updated 9/30/2013
Hunter is approximately 6 miles southwest of town of Rifle; access via CR 317. Wallace is approximately 7 miles northwest of town of Collbran; access via the Kimball Creek Rd. · Garfield; Mesa, Colorado

The Rifle Ranger District proposes to reauthorize domestic livestock grazing on Hunter & Wallace allotments. Includes construction of range improvements to aid in livestock distribution and management.

Grazing management
Scoping Start
12/22/2011
Comment Period
05/26/2013
Objection Period Start
05/26/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Lydia LaBelle de Rios · llabellederios@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
Hunter and Wallace Range AllotmentsDecision Signed Date: 09/30/2013
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionHunter T.7.S, R.93.W and Wallace T.8.S., R.95.W
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 9/26/2013
NFS and other lands between Beaver Creek Ski Resort and the Town of Buena Vista · Chaffee; Eagle; Lake, Colorado

Proposal for a 6-day trail running stage race from Beaver Creek to Buena Vista. Specific dates will vary annually but will occur in July or August.

Recreation management
Scoping Start
10/15/2010
Comment Period
11/22/2012
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Paula Peterson · pkpeterson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Transrockies Run Recereation EventDecision Signed Date: 09/17/2013 Legal Notice Date: 09/26/2013
ForestsPike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsLeadville Ranger District; Salida Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Environmental Assessment · R2 - Rocky Mt. Region All Units · updated 9/10/2013
Bighorn, San Juan, Pike and San Isabel and CC, Medicine Bow and Routt, Shoshone, Black Hills, White River, Rio Grande, Arapaho and Roosevelt and Pawnee · Adams, Colorado; Kansas; South Dakota; Wyoming

The US Forest Service is preparing an environmental analysis for cave and abandoned mine management options for the bat disease commonly known as white-nose syndrome (WNS).

Wildlife, fish, rare plantsMinerals and geologyRecreation management
Scoping Start
11/20/2012
Comment Period
12/21/2012
Decision
03/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Trey Schillie · tschillie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements
Cave and Abandoned Mine Management for WNS - ARPDecision Signed Date: 03/27/2013 Legal Notice Date: 03/30/2013
Cave and Abandoned Mine Management for WNS - BighornDecision Signed Date: 03/26/2013 Legal Notice Date: 03/31/2013
Cave and Abandoned Mine Management for WNS - Black HillsDecision Signed Date: 03/26/2013 Legal Notice Date: 04/05/2013
Cave and Abandoned Mine for WNS - GMUGDecision Signed Date: 03/26/2013 Legal Notice Date: 03/30/2013
Cave and Abandoned Mine Management for WNS - MBRDecision Signed Date: 03/27/2013 Legal Notice Date: 03/31/2013
Cave and Abandoned Mine Management for WNS - PSICCDecision Signed Date: 03/27/2013 Legal Notice Date: 04/04/2013
Cave and Abandoned Mine Management for WNS - Rio GrandeDecision Signed Date: 03/25/2013 Legal Notice Date: 03/28/2013
Cave and Abandoned Mine Management for WNS - San JuanDecision Signed Date: 03/27/2013 Legal Notice Date: 03/29/2013
Cave and Abandoned Mine Management for WNS - ShoshoneDecision Signed Date: 03/26/2013 Legal Notice Date: 04/01/2013
Cave and Abandoned Mine Management for WNS - White RiverDecision Signed Date: 03/28/2013 Legal Notice Date: 04/01/2013
ForestsBighorn National Forest; Black Hills National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; Shoshone National Forest; White River National Forest
DistrictsBighorn National Forest All Units; Black Hills National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; Shoshone National Forest All Units; White River National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · East Zone/Dillon Ranger District · updated 8/30/2013
Copper Mountain Ski Resort · Summit, Colorado

Project includes the replacement of the Kokomo Lift, conveyor installations across the mountain, spot grading, construction of a viewing deck in the terrain park, etc.

Special use management
Scoping Start
02/08/2013
Comment Period
02/08/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Copper Mountain Resort 2013 Mountain Improvements projectDecision Signed Date: 08/29/2013
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Decision Memo · White River National Forest All Units · updated 7/11/2013
White River NF; Pike-San Isabel NF and Cimarron-Comanche National Grasslands; Medicine Bow-Routt NF and Thunder Basin National Grassland; Arapaho-Roosevelt NF and Pawnee Nat'l Grassland · Eagle; Grand; Lake; Larimer; Park; Pitkin; Routt; Summit, Colorado

The proposed special use authorization is for Classic Bicycle Racing LLC to make temporary use of NFS lands on 4 National Forests within CO for ancillary facilities such as staging areas with portable toilets, signs, barricades, message boards.

Recreation management
Scoping Start
05/08/2013
Comment Period
05/08/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Mike Kenealy · mkenealy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2013 U.S. Pro Cycling Challenge RaceDecision Signed Date: 07/08/2013
ForestsMedicine Bow-Routt National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsHahns Peak/Bears Ears Ranger District; Canyon Lakes Ranger District; Leadville Ranger District; Salida Ranger District; South Park Ranger District; West Zone/Aspen Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Decision Memo · East Zone/Dillon Ranger District · updated 6/20/2013
Adjacent to the Keystone Ski area (east side) · Summit, Colorado

To construct a recreational trail from the River Run base area at Keystone Ski Area to the proposed Dercum’s Dash neighborhood. The trail would be 6 feet wide and 650 feet in length (251 feet of surface trail and 398 feet of boardwalk).

Special use management
Scoping Start
04/08/2013
Comment Period
04/08/2013
Decision
06/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Ken Waugh · kwaugh@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Dercum's Dash Trail ConstructionDecision Signed Date: 06/05/2013 Legal Notice Date: 06/13/2013
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionTownship 5S, Range 76W, Section 19, 6th P.M.
Environmental Assessment · East Zone/Eagle Ranger District · updated 4/26/2013
South of the Town of Gypsum on Gypsum Creek · Eagle, Colorado

The Town of Gypsum has submitted an application to enlarge L.E.D.E. Reservoir by raising the dam an additional 4 feet. The reservoir is currently under Special Use Permit and this would involve an amendment to the permit.

Special use management
Scoping Start
01/26/2011
Comment Period
01/26/2011
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Bill Johnson · bjohnson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
L.E.D.E. Reservoir Enlargement ProjectDecision Signed Date: 04/24/2013
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District
Legal Land DescriptionSection 9, T7S, R84W
Decision Memo · West Zone/Aspen Ranger District · updated 4/22/2013
Within the boundaries of the City of Aspen, Colorado. The parcel is located near HWY 82, and the corner of West Smuggler Street and 8th Street. · Pitkin, Colorado

To offer for competitive sale to the public, or direct sale or exchange to a governmental org., a portion of the Aspen RD Admin Site comprising approximately 1 acre. This sale/exchange is being proposed under the authority of the FSFREA of 2005.

Land ownership management
Scoping Start
12/28/2011
Comment Period
07/13/2012
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kevin Warner · kwarner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT10S, R85W, Section 12
Environmental Assessment · Gunnison Ranger District · updated 4/3/2013
Approximately 1.5 miles south of Taylor Pass. · Gunnison; Pitkin, Colorado

A 800 sq. ft., rustic, backcountry, winter use hut is being proposed to be built just south of Taylor Pass on the Gunnison Ranger District. The hut would be similar in scope and scale to the Friends Hut or the Markley Hut on the White River NF.

Special use managementRecreation management
Scoping Start
03/26/2009
Comment Period
03/26/2009
Decision
01/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
William Jackson · wfjackson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Special Use Authorizations
Taylor Pass Hut ProposalDecision Signed Date: 01/26/2012 Legal Notice Date: 02/06/2012
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; White River National Forest
DistrictsGunnison Ranger District; West Zone/Aspen Ranger District
Legal Land DescriptionT12S, R84W, SW 1/4 of Section 14
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 11/7/2012
Various parcels around Avon and Edwards · Eagle, Colorado

The Eagle Valley Land Exchange is proposed as an assembled land exchange involving the Town of Avon, the CO State Land Board, Eagle Co., the Eagle Valley Land Trust & the USFS. Then non-federal party wants to exchange 1,280 acres for 943 FS acres.

Land ownership management
Scoping Start
01/21/2011
Comment Period
06/07/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Bill Johnson · bjohnson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 11/5/2012
Within the Township of Minturn · Eagle, Colorado

To offer for competitive sale to the public or direct sale to local gov an 18.3 acre admin site and associated improvements located in Minturn, CO, under the authority of the FS Facilities Realignment and Enhancement Act of 2005 (P.L. 109-54).

Land ownership management
Scoping Start
02/15/2008
Comment Period
04/24/2012
Decision
09/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Kevin Warner · kwarner@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Use Adjustments
Minturn Administrative Site ConveyanceDecision Signed Date: 09/25/2012
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT5S, R81W Section 35, 11.147 acres; T5S, R81W Section 36, Lot 17
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 8/27/2012
at the south end of the Town of Minturn adjacent (to the northwest) to HWY 24 · Eagle, Colorado

To offer for competitive sale an administrative site (Minturn Equipment Yard) comprising approx. 4.39 acres, under the Forest Service Facilities Realignment & Enhancement Act of 2005 (P.L. 109-54).

Land ownership management
Scoping Start
02/28/2007
Comment Period
04/24/2012
Decision
08/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kevin Warner · kwarner@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityLand Exchanges
Minturn Equipment Yard ConveyanceDecision Signed Date: 08/15/2012
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionSec. 36, T. 5 S., R. 81 W.
Environmental Impact Statement · East Zone/Dillon Ranger District · updated 8/20/2012
Breckenridge Ski Resort · Summit, Colorado

Project includes developing new ski terrain and constructing a new lift and associated infrastructure on Peak 6 within the resort's Special Use Permit boundary.

Recreation managementSpecial use management
NOI in Federal Register
01/18/2008
DEIS NOA in Federal Register
06/10/2011
FEIS NOA in Federal Register
08/15/2012
Decision
08/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Joe Foreman · jgforeman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Road Improvements/Construction
Breckenridge Peak 6 Development Project Record of DecisionDecision Signed Date: 08/15/2012
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · West Zone/Sopris Ranger District · updated 7/19/2012
North Thompson/Fourmile and Coal Basin Grazing Allotments, on the west side of the Sopris RD, west of State Hwy 133 · Garfield; Pitkin, Colorado

Analyze domestic livestock grazing on the North Thompson/Fourmile and Coal Basin Grazing Allotments

Grazing management
Scoping Start
01/20/2010
Comment Period
03/29/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Wayne Ives · wives@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
North Thompson/Fourmile and Coal BasinDecision Signed Date: 07/19/2012
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Environmental Assessment · West Zone/Blanco Ranger District · updated 6/26/2012
approximately 21 miles East of Meeker · Rio Blanco, Colorado

Authorize use of an existing road crossing National Forest Lands to access the Rio Blanco County Marvine Communication Site.

Special use management
Scoping Start
02/09/2012
Comment Period
02/09/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Richard Haskins · rhaskins@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT1N, R90W, Sec 19, 6th P.M.
Environmental Assessment · West Zone/Blanco Ranger District · updated 6/21/2012
The Missouri Creek S&G grazing allotment is located on the north side of the Blanco Ranger District, accessible by FSR 230 · Rio Blanco, Colorado

Analyze domestic sheep grazing on the Missouri Creek S&G grazing allotmen. Resource management options developed will strive to move existing resource conditions towards desired conditions.

Grazing management
Scoping Start
02/24/2011
Comment Period
04/12/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Cunningham · mlcunningham@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT 1 N, R 89 W, portions of Sections 3-11; T 1 N, R 90 W, portions of Sections 12 & 13; T 2 N, R89 W, portions of Sections 28, 32-34
Environmental Assessment · West Zone/Rifle Ranger District · updated 6/14/2012
Proposed route parallels the Buford/New Castle (BNC) Road starting approx. at mile marker 17 to Triangle Park and NFSR 211. · Garfield, Colorado

Construct trail open to unlicensed OHVs parallel to the Buford/New Castle road (NFSR 245) between the West Elk (Winter) Trailhead and Triangle Park.

Recreation management
Scoping Start
01/26/2012
Comment Period
01/26/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Kyle Grambley · kgrambley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
DN/FONSI for Buford/New Castle Motorized TrailDecision Signed Date: 06/13/2012 Legal Notice Date: 06/14/2012
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT4S, R91W, Sec. 6; T3S, R91W, Secs. 8, 17-19, 30, 31;
Decision Memo · East Zone/Holy Cross Ranger District · updated 6/14/2012
the Eagle River in Camp Hale, S. of Red Cliff, and N. of Tennessee Pass. Areas proposed for treatment would include the existing stream channel and corridor from Rule Gulch to McAllister Gulch. · Eagle, Colorado

To improve pool and riparian habitat for trout for approximately 3 miles within the existing stream channel in the upper Eagle River.

Wildlife, fish, rare plants
Scoping Start
02/02/2012
Comment Period
04/19/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Matthew Grove · magrove@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Legal Land DescriptionT7S, R80W, Sections 4, 9, 10, 15, and 22
Decision Memo · East Zone/Eagle Ranger District · updated 5/30/2012
Seven areas identified for possible treatment: Berry Creek, Muddy Creek, High Trail Gulch, Cottonwood Mesa, Pipe Creek, Gypsum Creek, and Sunnyside. · Eagle; Routt, Colorado

Remove up to 1,400 acres of pinon-juniper, burn up to 1,650 acres of sagebrush, and mow up to 770 acres of sagebrush to benefit greater sage-grouse, mule deer, Brewer’s and sage sparrow and reduce fuels. Seed and replant the area.

Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
02/21/2012
Comment Period
04/19/2012
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Lara Duran · laraduran@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District
Environmental Impact Statement · East Zone/Holy Cross Ranger District · updated 5/11/2012
Beaver Creek Ski Resort · Eagle, Colorado

Beaver Creek Ski Resort is proposing to add a women's downhill racecourse next to the existing men's course with related snowmaking & safety infrastructure. Finish area reconstruction will include upgrades to Red Tail Camp & race building facilities

Special use management
NOI in Federal Register
12/14/2010
DEIS NOA in Federal Register
11/25/2011
FEIS NOA in Federal Register
05/11/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Don Dressler · drdressler@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Beaver Creek Mountain Improvements Project FEIS Record of DecisionDecision Signed Date: 05/03/2012 Legal Notice Date: 05/11/2012
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 3/20/2012
Federal parcels are Claimjumper 36+/- acres in Breckenridge & Cucumber Gulch Wedge 16+/- acres east of CR 3. Non-Fed Parcels include:160 acre Mitchell Lakes parcel & 407 acre Flattop Mtn parcel. · Dolores; La Plata; Summit, Colorado

Proposal for exchange of 407.05 acres of non-federal lands known as the Flattop Mtn & Mitchell Lakes parcels, located in the Mancos-Dolores RD & Columbine RD, San Juan NF & dispose of two Federal parcels located near the Town of Breckenridge, WRNF.

Land ownership management
Scoping Start
05/03/2011
Comment Period
05/25/2011
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
ForestsSan Juan National Forest; White River National Forest
DistrictsMancos/Dolores Ranger District; Columbine Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionClaimjumper T6S, R77W, Sec. 30 & 31; T6S, R78W, Sec. 25 & Sec. 36; Cucumber Gulch Wedge T6S, R78W, Sec. 36; Mitchell Lakes T37N, R9W, Sec. 23; Flattop Mtn. T41N, R10W, Sec. 35 & 2
Environmental Assessment · West Zone/Aspen Ranger District · updated 12/9/2011
Aspen Mountain, Aspen Highlands, Buttermilk, and Snowmass Ski Resorts · Pitkin, Colorado

Proposal to remove hazard trees and regenerate lodgepole and aspen in selected areas across the four SkiCo ski areas (Aspen Mountain, Aspen Highlands, Buttermilk, Snowmass).

Vegetation management (other than forest products)Special use management
Scoping Start
10/15/2010
Comment Period
06/29/2011
Decision
12/2011 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
Skye Sieber · ssieber@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
DN/FONSI Aspen Skiing Company Forest Health ProjectDecision Signed Date: 12/09/2011
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 12/8/2011
Copper Mountain Conoco Station · Summit, Colorado

Realignment of the recreation path from the Copper Mountain Conoco Station to the Corn Lot/Highway 91 stoplight. Formerly referred to as "Rec Path Realignment from Copper Mountain Conoco to Highway 91."

Special use managementRecreation management
Scoping Start
09/17/2010
Comment Period
10/07/2011
Decision
12/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Shelly Grail · sgrail@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
Tenmile Recreation PathDecision Signed Date: 12/06/2011
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · West Zone/Rifle Ranger District · updated 11/22/2011
The project area is about 16 miles south of Silt, Colorado · Mesa, Colorado

Project will include initial exploration and potential development of up to 52 wells directionally drilled from up to 7 well pads in the Alkali Creek/Bear Gulch area. Project includes new road building and pipeline installation in the road corridor.

Minerals and geology
Scoping Start
02/21/2006
Comment Period
01/29/2007
Decision
05/2008 (Estimated)
Implementation
07/2008 (Estimated)
Project documents
David Francomb · dfrancomb@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Plains Exploration and Production Company, HellDecision Signed Date: 05/02/2008 Legal Notice Date: 05/07/2008
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT8S, R92W, Sections 23, 24, 25 and 26
Environmental Assessment · East Zone/Eagle Ranger District · updated 11/22/2011
Grazing allotments on the Eagle/Holy Cross and Dillon Ranger Districts · Eagle; Summit, Colorado

Grazing allotments within the Holy Cross/Eagle and Dillon Ranger Districts will be analyzed for the development of Allotment Management Plans (AMPs). Also under consideration is the future status of certain vacant allotments.

Grazing management
Scoping Start
04/07/2007
Comment Period
09/16/2008
Decision
03/2009 (Estimated)
Implementation
04/2009 (Estimated)
Project documents
Linn Pettijohn · lpettijohn@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Holy Cross Sheep and Cattle Allotment Managment Planning NEPADecision Signed Date: 03/13/2009 Legal Notice Date: 03/25/2009
ForestsWhite River National Forest
DistrictsEast Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 11/22/2011
Ophir Mountain area west of State Highway 9 near Frisco from Miners Creek to North Barton Gulch · Summit, Colorado

Salvage forest products and reduce future fuel accumulations in forested stands affected by mountain pine beetle mortality.

Wildlife, fish, rare plantsRecreation managementWatershed managementFuels managementForest productsVegetation management (other than forest products)
Scoping Start
10/01/2010
Objection Period Start
08/19/2011
Decision
11/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Brett Crary · bcrary@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
Ophir Mountain Forest Health and Fuels Project DN/FONSIDecision Signed Date: 11/21/2011
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSections 1-3 and 10-15 located in T6S, R78W, 6th P.M.
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 11/22/2011
Vail Ski Resort · Eagle, Colorado

Proposal to remove hazard trees and regenerate lodgepole in selected areas across the ski area.

Vegetation management (other than forest products)Fuels management
Scoping Start
04/12/2010
Comment Period
04/01/2011
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Cynthia Keller · cpkeller@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Special Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 9/26/2011
Keystone Ski Area · Summit, Colorado

Proposal to remove hazard trees and regenerate lodgepole in selected areas across the ski area.

Vegetation management (other than forest products)Fuels management
Scoping Start
04/12/2010
Objection Period Start
05/12/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Cynthia Keller · cpkeller@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements; Special Use Authorizations
DN/FONSI Keystone Ski Area Forest Health ProjectDecision Signed Date: 08/04/2011
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 9/8/2011
Beaver Creek Ski Resort · Eagle, Colorado

Proposal to remove hazard trees and regenerate lodgepole in selected areas across the ski area.

Vegetation management (other than forest products)Fuels management
Scoping Start
04/12/2010
Comment Period
06/13/2011
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Cynthia Keller · cpkeller@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Special Use Authorizations
Beaver Creek Ski Area Forest Heath ProjectDecision Signed Date: 09/05/2011 Legal Notice Date: 09/05/2011
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 7/28/2011
Swan Valley, Boreas Pass, and Hoosier Pass areas of Breckenridge · Summit, Colorado

5,000 acres of proposed treatments for forest health and fuels reduction in the WUI in Breckenridge

Watershed managementVegetation management (other than forest products)Fuels managementForest products
Scoping Start
11/04/2009
Objection Period Start
10/30/2010
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Brett Crary · bcrary@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage); Watershed Improvements
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · West Zone/Sopris Ranger District · updated 6/28/2011
Glenwood Canyon, Crystal River Valley, S. Thompson Creek, Roaring Fork Valley, Red Table Mtn., and the Fryingpan River Valley · Eagle; Garfield; Gunnison; Pitkin, Colorado

Conduct prescribed fire and mechanical treatments in identified blocks of forest, shrubland, and grassland vegetation types to improve wildlife browse and foraging habitat.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
06/01/2010
Comment Period
12/16/2010
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Philip Nyland · pnyland@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Aspen-Sopris Wildlife Habitat Improvement ProjectDecision Signed Date: 06/27/2011
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; West Zone/Rifle Ranger District
Environmental Assessment · West Zone/Rifle Ranger District · updated 6/28/2011
Two NF grazing allotments covering approximately 77,000 acres, 15 - 20 miles south of Silt, CO · Garfield; Mesa, Colorado

Environmental process to analyze grazing on two NF allotments.

Grazing management
Scoping Start
05/24/2010
Comment Period
04/16/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Lydia LaBelle de Rios · llabellederios@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
DN and FONSI East and West Divide Grazing AllotmentsDecision Signed Date: 06/06/2011 Legal Notice Date: 06/06/2011
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT8-10S, R90-93W
Environmental Assessment · West Zone/Aspen Ranger District · updated 6/23/2011
3 miles north of Aspen on 251 acres in Trentaz and Gavin Gulches, west of Red Mountain, adjacent to the community of Starwood. · Pitkin, Colorado

Removal of approximately 3,000 dead or infested trees in Trentaz and Gavin Gulches

Fuels management
Scoping Start
11/22/2010
Objection Period Start
04/28/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Bill Kight · bkight@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements; Roadless Area Management; Timber Sales (Salvage)
Starwood Fuels Reduction ProjectDecision Signed Date: 06/20/2011
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Legal Land DescriptionT9S, R85W, Sections 25 and 36, 6th P.M.
Decision Memo · White River National Forest All Units · updated 6/9/2011
Various locations at targeted caves on Eagle/Holy Cross at Fulford Cave, on the Flattops near Coffee Pot, in the upper Fryingpan near Lime Park. Geology field trips to Camp Hale. · Eagle; Garfield; Pitkin, Colorado

NSS has applied for a SUP for this event under an exemption clause & consistent with decontamination procedures described in Regional Order # R2-10-01. Planned activities would occur from July 16-July 24, 2011 & include: Cave & Geology Field Trips.

Special use managementRecreation management
Scoping Start
03/08/2011
Decision
05/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Mike Kenealy · mkenealy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Special Use Authorizations
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units
Environmental Assessment · West Zone/Aspen Ranger District · updated 4/12/2011
Snowmass Ski Area · Pitkin, Colorado

Analyzing a proposal submitted by the Aspen Skiing Company to construct three new mountain bike trails at the Snowmass Ski Area which are intended to enhance summer lift-assisted biking opportunities.

Special use management
Scoping Start
09/03/2010
Comment Period
03/04/2011
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Jim Stark · jstark@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Trail Management
DN and FONSI Snowmass Ski Area Summer TrailsDecision Signed Date: 04/08/2011 Legal Notice Date: 04/12/2011
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Environmental Assessment · West Zone/Aspen Ranger District · updated 4/5/2011
Buttermilk Mountain Ski Area · Pitkin, Colorado

Proposal on NFS lands includes: Nordic jump venue, snowmaking on 9 trails, horseback trail rides, a lift maintenance facility. Grading Uncle Chuck's trail and constructing a Terrain Park Overpass was approved under a separate categorical exclusion.

Recreation managementSpecial use management
Scoping Start
06/16/2008
Comment Period
12/09/2009
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Skye Sieber · ssieber@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction
Decision Memo: Terrain Park Overpass and Uncle Chucks Glade Trail GradingDecision Signed Date: 04/13/2009 Legal Notice Date: 04/13/2009
Buttermilk Mountain Improvement PlanDecision Signed Date: 03/05/2010 Legal Notice Date: 03/08/2010
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District
Environmental Assessment · Medicine Bow-Routt National Forest All Units · updated 4/5/2011
All authorized power lines that cross the Arapaho, Roosevelt, Routt, and White River National Forests. · Boulder; Clear Creek; Eagle; Garfield; Gilpin; Grand; Jackson; Jefferson; Lake; Larimer; Park; Pitkin; Routt; Summit, Colorado

The Arapaho and Roosevelt, Medicine Bow-Routt, and White River National Forests are proposing to remove all dead and dying trees (i.e., hazard trees) along power lines crossing National Forest system lands in Northern Colorado.

Special use managementFuels managementVegetation management (other than forest products)
Scoping Start
08/19/2009
Objection Period Start
05/25/2010
Decision
11/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Jamie Kingsbury · jkingsbury@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest; Arapaho and Roosevelt National Forests; White River National Forest
DistrictsYampa Ranger District; Hahns Peak/Bears Ears Ranger District; Parks Ranger District; Boulder Ranger District; Canyon Lakes Ranger District; Clear Creek Ranger District; Sulphur Ranger District; White River National Forest All Units
Environmental Assessment · West Zone/Blanco Ranger District · updated 1/27/2011
The Lost Park/Moeller and Lower Fawn C&H allotments are located on the north side of the Blanco Ranger District, accessible by Forest Road 280 (Fawn Creek Road) and/or Forest Trail 1805 · Rio Blanco, Colorado

Analyze domestic cattle grazing on the Lower Fawn and Lost Park/Moeller C&H grazing allotments in conformance with the Rescission Bill (1995) schedule and requirements.

Grazing management
Scoping Start
11/03/2009
Comment Period
12/09/2010
Decision
01/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Mary Cunningham · mlcunningham@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Lower Fawn & Moeller Creek/Lost Park C&H Grazing AllotmentsDecision Signed Date: 01/12/2011 Legal Notice Date: 01/27/2011
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionT1N, R91W portions of sections 7,8,11-14, 17-19, 23, 24, 26; T1N, R90W portions of sections 2-5, 7-10, 15-19; T2N, R90W portions of sections 21, 22, 26-28, 33-35
Environmental Assessment · White River National Forest All Units · updated 11/18/2010
Roads and trails on the Aspen-Sopris, Eagle-Holy Cross, and Dillon Ranger Districts · Eagle; Garfield; Pitkin; Summit, Colorado

Amendment to design criteria contained in the Forest-wide Hazardous Tree Removal and Fuels Reduction Project EA. Specifically, revising the amount of time a level 3 road could be closed for treatment.

Fuels managementRoad management
Scoping Start
08/23/2010
Objection Period Start
10/14/2010
Decision
11/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Jan Burke · jburke@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityTravel Management
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Environmental Assessment · West Zone/Rifle Ranger District · updated 10/6/2010
Approximately 9 miles south of Rifle, Colorado · Garfield, Colorado

Laramie Energy II, LLC proposal for 3 new well pads on private land and 89 oil/gas wells. BLM has authority to approve the wells and well pads. Access across NFS lands (FSR 818) is under FS authority; existing road use permit expires 12/31/10

Special use managementMinerals and geology
Scoping Start
01/20/2010
Comment Period
07/05/2010
Decision
10/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Jason Gross · jrgross@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DN & FONSI West Mamm Master Development PlanDecision Signed Date: 10/01/2010 Legal Notice Date: 10/06/2010
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionT7S, R93W, Sections 29 and 32; T8S, R93W, Section 5
Environmental Assessment · West Zone/Sopris Ranger District · updated 10/4/2010
The Rocky Fork Trailhead, Ivanhoe Creek Portal Road area (NFSR 105.3), Frying Pan Lakes Road area (NFSR 505), Red Table Road area (NFSR 514) and (NFSR 464), and the Highway 82 Winter Closure gate site · Eagle; Pitkin, Colorado

Creation of a permitted public rock collection program that would include small volume, non-commercial, hand collection, and surface removal of decorative rocks from designated community "common use area(s)".

Minerals and geology
Scoping Start
03/19/2009
Comment Period
08/08/2010
Decision
09/2010 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Olivia Garcia · ogarcia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Products Sales
DN & FONSI Public Rock Collection ProgramDecision Signed Date: 09/21/2010 Legal Notice Date: 09/26/2010
ForestsWhite River National Forest
DistrictsWest Zone/Aspen Ranger District; West Zone/Sopris Ranger District
Legal Land DescriptionT8S, R84W, NW  of sec. 18; T9S, R82W, sec. 4 & 5; T9S, R82W, sec. 8,9,15, & 16; T6S, R86W, sec. 32 & 30, T7S, R86W, sec. 1, & T7S, R85W, sec. 6,7, & 8; T10S, R84W, SE  of sec. 34
Environmental Assessment · East Zone/Dillon Ranger District · updated 8/19/2010
Federal parcels: 1) 21+/- ac. near Keystone Ski Area; 2) 36+/- ac. in Town of Breckenridge; and, 3)16+/- ac. adjacent to town limits. Non-Federal Parcel includes the townsite of Chihuahua, 46+/- ac. · Summit, Colorado

The USFS, Chihuahua LLC, & the Town of Breckenridge are considering an exchange in the Snake River and Upper Blue basins of Summit Cty involving 3 NF parcels (74 acres). In exchange, the public would receive the 43-acre Chihuahua Town Site.

Land ownership management
Scoping Start
01/08/2008
Comment Period
05/15/2008
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Exchanges
Snake River Land Exchange with Chihuahua, LLC and the Town of BreckenridgeDecision Signed Date: 08/16/2010 Legal Notice Date: 08/18/2010
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · East Zone/Holy Cross Ranger District · updated 6/30/2010
The project falls within four geographical areas (or pods) in the upper Eagle River watershed on the HX District: Indian Creek, West Grouse, Tigiwon, and Yoder. · Eagle, Colorado

A supplement to the 2008 environmental assessment to analyze changed conditions and new information

Fuels management
Scoping Start
02/26/2010
Objection Period Start
04/14/2010
Decision
06/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Cynthia Keller · cpkeller@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
Upper Eagle River Beetle Salvage ProjectDecision Signed Date: 06/29/2010
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 6/29/2010
Green Mountain Reservoir · Summit, Colorado

Proposed actions at Cow Creek South, Cow Creek North, McDonald Flats, and Prairie Point include highway safety improvements, construction of marina facilities, a dump station, 40 campsites and host sites.

Wildlife, fish, rare plantsVegetation management (other than forest products)Recreation managementSpecial area managementRoad management
Scoping Start
08/27/2009
Comment Period
03/16/2010
Decision
05/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Jan Cutts · jcutts@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance; Road Maintenance; Road Improvements/Construction; Watershed Improvements
Green Mountain Reservoir Improvements Planning ProjectDecision Signed Date: 05/04/2010
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · West Zone/Blanco Ranger District · updated 6/15/2010
The Milk Creek S&G allotment is located on the north side of the Blanco Ranger District. · Rio Blanco, Colorado

Analyze domestic sheep grazing on the Milk Creek S&G allotment in conformance with the Rescission Bill (1995) schedule and requirements. Resource management options developed will strive to move existing resource conditions towards desired condition

Grazing management
Scoping Start
01/07/2009
Comment Period
01/21/2010
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Mary Cunningham · mlcunningham@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Blanco Milk Creek S&G Grazing AllotmentDecision Signed Date: 05/13/2010 Legal Notice Date: 05/20/2010
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Legal Land DescriptionTownship 2 North, Range 90 West, portions of Sections 18 and 19 and Township 2 North, Range 91 West, portions of Sections 24-30.
Environmental Assessment · East Zone/Dillon Ranger District · updated 4/1/2010
NFS boundary around Wildernest, Mesa Cortina, Three Peaks and Maryland Creek subdivisions. The majority of the acres are in roadless · Summit, Colorado

Salvage of dead and dying lodgepole pine in the wildland-urban interface.

Fuels management
Scoping Start
02/04/2009
Objection Period Start
05/16/2009
Decision
01/2010 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
Cynthia Keller · cpkeller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (10)
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
North Summit Wildland Urban Interface Fuel Reduction ProjectDecision Signed Date: 01/28/2010
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 3/11/2010
Old Dillon Reservoir is situated about 2 miles southwest of the Town of Dillon, between I-70 and new Dillon Reservoir. · Summit, Colorado

Request for a special use authorization for construction, operation and maintenance of an enlargement to Old Dillon Reservoir. The existing reservoir will be increased in capacity from 10 surface acres to approximately 16 surface acres.

Land ownership managementSpecial use management
Scoping Start
01/24/2008
Comment Period
11/05/2009
Decision
02/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Paul Semmer · psemmer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Legal Land DescriptionSW1/4SE1/4 Sec 13, T5S, R78W, 6th P.M.
Environmental Assessment · West Zone/Rifle Ranger District · updated 3/3/2010
Approximately 3.8 miles south of the I-70 Rulison exit and 7 miles east of Parachute, CO · Garfield, Colorado

Joint BLM/FS project includes 0.5 mi of access road and 6.5 acres of road and pipeline disturbance on NFS lands, as part of the larger CCMPD. For more information, contact Jim Byers, Glenwood Energy Office, jim_byers@blm.gov, 970-947-5222

Minerals and geologySpecial use management
Scoping Start
05/11/2009
Comment Period
12/04/2009
Decision
02/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Jason Gross · jrgross@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
Cache Creek Master Development Plan for Oil and Gas ExplorationDecision Signed Date: 02/19/2010 Legal Notice Date: 03/03/2010
ForestsWhite River National Forest
DistrictsWest Zone/Rifle Ranger District
Legal Land DescriptionApproximately 1,544 acres of Federal and private surface and mineral ownership within portions of Sections 17, 19-20, T7S, R94W
Environmental Assessment · West Zone/Sopris Ranger District · updated 1/19/2010
This project area is located in the Thompson Creek drainage north of Twin Peaks. The project area is located south of NFSR 300.4 and north of NFSR 321.1. · Pitkin, Colorado

Timber management using even or uneven aged treatments on spruce/fir stands in the Thompson Creek area.

Forest products
Scoping Start
10/22/2008
Comment Period
10/13/2009
Decision
12/2009 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Travis Bruch · tbruch@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Timber Sales (Green)
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT8S, R90W, Sections 35 & 36; T9S, R90W, Sections 1, 2, and 11; T8S, R89W, Section 31; and T9S, R89W, Section 6
Environmental Assessment · East Zone/Dillon Ranger District · updated 12/30/2009
National Forest lands in Summit County from Silverthorne north to Green Mountain Reservoir · Summit, Colorado

Salvage of up to 4000 acres of beetle-killed lodgepole

Fuels managementForest products
Scoping Start
11/04/2008
Comment Period
09/23/2009
Decision
12/2009 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
Cynthia Keller · cpkeller@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
Lower Blue Forest Health and Fuels ProjectDecision Signed Date: 12/17/2009
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Impact Statement · East Zone/Holy Cross Ranger District · updated 12/30/2009
Vail Mountain · Eagle, Colorado

Improvements include a new maintenance facility, restaurant, new and upgraded lifts in Sun-up and Sundown bowls, race terrain and lift construction on Golden Peak, and snowmaking.

Recreation managementSpecial use management
NOI in Federal Register
11/16/2007
DEIS NOA in Federal Register
06/26/2009
FEIS NOA in Federal Register
12/24/2009
Decision
12/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Don Dressler · drdressler@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsWhite River National Forest
DistrictsEast Zone/Holy Cross Ranger District
Environmental Assessment · West Zone/Sopris Ranger District · updated 7/27/2009
Approximately 1 mi. west of Marble, just north of Road 314 · Gunnison, Colorado

Analyzing a proposed plan of operations to harvest mineral materials from a rock scree area. Authorization would be through a special use permit. Surface rock would be manually gathered and palletized for 1-2 months during the summer each year.

Minerals and geology
Scoping Start
09/18/2008
Comment Period
03/01/2009
Decision
07/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Skye Sieber · ssieber@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
Conger Rock Harvesting ProjectDecision Signed Date: 07/17/2009 Legal Notice Date: 07/26/2009
ForestsWhite River National Forest
DistrictsWest Zone/Sopris Ranger District
Legal Land DescriptionT11S, R88W, Sec. 21, SE 
Environmental Assessment · West Zone/Blanco Ranger District · updated 3/30/2009
Blanco Ranger District · Rio Blanco, Colorado

Analyze the following grazing allotments for permit reissuance: Hay Flats, Middle Miller, North Elk, Seven Lakes, Salt Box, West Miller, and East Miller

Grazing management
Scoping Start
02/06/2007
Comment Period
01/08/2009
Decision
03/2009 (Estimated)
Implementation
04/2009 (Estimated)
Project documents
Mary Cunningham · mlcunningham@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsWhite River National Forest
DistrictsWest Zone/Blanco Ranger District
Environmental Assessment · East Zone/Dillon Ranger District · updated 9/24/2008
Copper Mountain Resort Corn parking lot on east side of Hwy 91 · Summit, Colorado

Expand size of Corn Lot parking area along with potential bicycle and hiking trrailhead and trail improvements; analyze potential stream health improvement projects for Tenmile Creek

Special use managementWatershed managementRecreation management
Scoping Start
06/27/2007
Comment Period
07/01/2008
Decision
09/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Roger Poirier · rpoirier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Dispersed Recreation Mgmt.; Special Use Authorizations; Watershed Improvements
Copper Mtn Resort Tenmile Creek Facilities Improvements & Restoration ProjDecision Signed Date: 09/08/2008
ForestsWhite River National Forest
DistrictsEast Zone/Dillon Ranger District
Environmental Assessment · West Zone/Blanco Ranger District · updated 9/10/2007
Areas of noxious weeds across the Forest · Eagle; Garfield; Mesa; Moffat; Pitkin; Rio Blanco; Routt; Summit, Colorado

This EA will analyze various combinations of integrated pest management for noxious weed control across the White River NF.

Vegetation management (other than forest products)
Scoping Start
11/21/2005
Comment Period
06/13/2007
Decision
08/2007 (Estimated)
Implementation
08/2007 (Estimated)
Project documents
Glenn Adams · gradams@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
ForestsWhite River National Forest
DistrictsWhite River National Forest All Units