Decision Memo · Washburn Ranger District · updated 5/29/2026
Project includes 11.5 miles of existing pipeline system, the pumping station, and associated improvements on Forest Service lands north of US Highway 2. · Bayfield, Wisconsin
The proposal is to re-issue a special use authorization for a new term for Enbridge Energy Limited Partnership's existing pipeline system, pumping station, and associated improvements.
Special use management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Chequamegon-Nicolet National Forest · updated 3/24/2026 · decision 3/2026 (Estimated)
Across the Eagle River Florence and Lakewood Laona Districts · Forest, Wisconsin
Wisconsin Public Service (WPS) is working with the CNNF to create a master special use permit that will include all electric (overhead and buried) lines currently occupying national forest lands. More information: https://usfs-public.box.com/s/dgnxbmvidx1z3jiktldnzh0vsydjuzn3
Special use management
NEPA Start Date
9/20/2025
Categorical Exclusion · Lakewood-Laona Ranger District · updated 2/2/2026
Eight sites near Mountain and Laona, Wisconsin. Section 32, Township (T) 31 North (N), Range (R) 17 East (E); Section 13, T35N, R15E; Section 14, T35N, R15E; Sections 22, 25, and 27, T31N, R16E; Section 5, T36N, R15E; Section 12, T35N, R14E · Forest; Oconto, Wisconsin
Wisconsin Public Service (WPS) is requesting a special use permit to install or upgrade utilities at eight sites on the Lakewood-Laona Ranger District. The total of all eight sites include about 8.72 acres of underground installation and 10.41 acres of overhead removal.
Special use management
NEPA Start Date
12/19/2025
Finding/Decision Date
2/2/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 2/2/2026 |
Environmental Assessment · Medford-Park Falls Ranger District · updated 6/30/2025
Town of Grover, Township 31 North, Range 2 West, Section 7, Taylor County, Wisconsin. · Taylor, Wisconsin
This project consists of expansion of an existing gravel pit to meet road construction, re-construction, and maintenance needs in the project vicinity. This is an existing pit that has an additional source of gravel that has not been developed.
Minerals and geology
Scoping Start
09/2021 (Estimated)
Comment Period
11/2021 (Estimated)
Objection Period Start
01/2022 (Estimated)
Decision
10/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/30/2025
Lost Land Lake Area · Sawyer, Wisconsin
Install new underground cable within aboveground right-of-way of Upper A Road ending at an existing junction box on Landing Camp Road to increase reliability and reduce wildfire risk. Removal of section of electrical line in another area.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/30/2025
Great Divide and Washburn ranger districts, except for wilderness and research natural areas and project-specific avoidance areas identified by specialists. · Ashland; Bayfield; Sawyer, Wisconsin
Proposal for 180 Adventure, LLC requesting a 5-year permit to use Forest lands in the Washburn and Great Divide ranger districts for orienteering (on foot), biking, and canoeing/kayaking for Stubborn Mule Adventure Race
Special area management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/16/2025
Begins south of the intersection of Wisconsin Highway 182 and Forest Road 144 and proceeds in a southeasterly direction along FR 144 to Round Lake Boat Landing Road. · Price, Wisconsin
Price Electric Cooperative is proposing to upgrade an existing undeground electrical line along FR 144 in Price County. The proposal includes boring or trenching approximately 4 miles of undeground electrical line in Price Electic's current ROW.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T40N, R2E, Section 12, 13; T40N, 3E, Sections 16, 17, 18, 21, 27, and 28 |
Decision Memo · Great Divide Ranger District · updated 5/29/2025
Namakagon Mountain Bike trail Cluster. East of Cable Wi, on south side of County Highway M. Trailheads are located approximately 7.75 and 10.75 miles east of Cable, Wi on County Highway M. · Bayfield; Sawyer, Wisconsin
The Chequamegon Area Mountain Bike Association (CAMBA) proposes allowed use of Class 1 eBikes on CAMBA-maintained mountain bike trails on the Great Divide Ranger District May 15 through September 30, 2025, to study social impacts of area eBike use.
Recreation management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 5/29/2025
Approximately 69 locations across the 10 counties. See website for project descriptions, exact locations, and maps. · Ashland; Bayfield; Florence; Forest; Langlade; Oconto; Price; Sawyer; Taylor; Vilas, Wisconsin
Watershed projects to improve aquatic organism passage and infrastructure safety and resiliency: culvert replacement/removal, remnant logging dam removal, trail bridge removal, dam spillway repair, and road segment reroute and decommissioning.
Watershed management
Decision
05/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Species Habitat Improvements; Road Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 5/29/2025
Parking lots will be along town roads maintained by the Town of Grover, FR 558, 119, 118, 116, 571, 572. · Taylor, Wisconsin
The Town of Grover is proposing to construct six parking areas and expand one current parking area along the Ice Age Trail in Taylor County. The parking lots will be constructed to accommodate approximately 2 vehicles, and improve safety and access.
Recreation managementRoad management
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Road Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 5/28/2025
The Jones Springs area, legal T33N, R14 and R15E; T32N, R14 and 15 E. · Langlade; Oconto, Wisconsin
This recreation area was heavily impacted by the 2019 blowdown. This project is reviewing the recreation opportunities in the area to see if any changes are needed.
Recreation management
Scoping Start
04/2023 (Estimated)
Comment Period
05/2023 (Estimated)
Objection Period Start
07/2023 (Estimated)
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 5/28/2025
T40N, R3E, Sections 23-26, Price County, WI · Price, Wisconsin
The project will consist of reestablishing a two-way fish passage and reconnect the ecosystems of the Pike Lake Chain of Lakes and the South Fork Flambeau River.
Watershed management
Scoping Start
12/2019 (Estimated)
Decision
12/2020 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · R9 - Eastern Region All Units · updated 5/28/2025
Approximately six miles along Forest Road 439 (North Boundary Road) · Bayfield, Wisconsin
The Town of Bell has plans to improve Forest Road 439 (North Boundary Road) and has requested that the Forest Service prepare a timber sale to remove the merchantable trees within the 50-foot road right-of-way.
Road management
Decision
06/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 06/29/2016 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T49N R6W Sections 1-6 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 5/27/2025
Scattered though the district · Forest; Oconto, Wisconsin
CCI Systems, Inc needs permit for existing line to reconstruct and continue maintenance across the district.
Special use management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Area Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 5/21/2025
Four sites on Great Divide and Medford-Park Falls Ranger Districts: Day Lake Campground, Namekagon Campground, Chippewa Campground, and Lakeview site on Mondeaux Flowage. · Ashland; Bayfield; Taylor, Wisconsin
Improvement of public fishing access in four sites by replacing existing piers with accessible, permanent piers. The project also includes improvement of trail access, and restoration of shoreline surrounding piers.
Recreation management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 5/14/2025
Forest Road 182 segment northeast of Clam Lake · Ashland, Wisconsin
A 1.22-mile reroute is proposed to improve the operation of the road and avoid a wetland that is regularly in need of gravel application.
Road management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Road Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T43N R4@ Sections 22, 23, 26, 27 |
Decision Memo · Eagle River-Florence Ranger District · updated 5/6/2025
North of State Hwy 70 E and west of Forest Road 2150 near Perch Lake. · Florence, Wisconsin
The purpose of this project is to reroute a section of trail that continuously gets flooded in the spring. There would be new trail construction of approximately 1 mile in length and 2-3 feet in width.
Recreation management
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N R16E Section 20 and 21 |
Decision Memo · Eagle River-Florence Ranger District · updated 5/1/2025
T41N R16E Sections 6 & 7, T41N R15E Sections 1& 12 · Florence, Wisconsin
Hemlock Lake wildlife openings are in Florence County near FS Rd 2446 and LeRoy Creek. There are 12 wildlife openings, totaling 64 acres, that would be prescribed burned to enhance wildlife habitat.
Wildlife, fish, rare plantsFuels management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 5/1/2025
49 miles of road within the Alvin Township · Forest, Wisconsin
The Town of Alvin has requested that the Forest Service conduct a timber sale to remove merchantable trees within the road right of ways. This is for safer travel and easier snow removal.
Road management
Decision
05/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 05/01/2025 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T41N, R13E, Sections 20, 25, 28-29,33-34; T41N, R14E, Sections 21-23, 25-32, 34, 36; T40N, R13E, Sections 3, 9-16, 21-22, 27-28, 33; T40N, R14E, Sections 1-2, 4, 10-11, 13-18, 20, 22-24, 26-29, 32-36. |
Decision Memo · Lakewood-Laona Ranger District · updated 4/30/2025
T33N, R16E, Section 23, Oconto County, WI · Oconto, Wisconsin
CenturyLink would bury fiber optic cable along Oconto County F.
Special use management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 4/30/2025
Forest and Oconto Counties · Forest; Oconto, Wisconsin
This project would replace culverts across Forest and Oconto Counties.
Watershed management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 4/30/2025
Pit is off Military Road between Lower Nine Mile and Seven Mile Lakes. · Oneida, Wisconsin
Expand the current gravel pit a little over 2 acres.
Minerals and geology
Scoping Start
02/2022 (Estimated)
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 4/30/2025
Bachman road and Jones springs areas. · Langlade; Oconto, Wisconsin
Add recreation site roads to the Motorized Visitor Use Map, which already exist.
Recreation management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 4/30/2025
Project is located at Townships 31-37 North and Ranges 12-17 East. · Forest; Langlade; Oconto, Wisconsin
Lakewood-Laona Ranger District is planning on thinning red pine plantation across the district.
Forest products
Comment Period
01/2025 (Estimated)
Objection Period Start
03/2025 (Estimated)
Decision
09/2025 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Washburn Ranger District · updated 4/29/2025
Birch Grove Campground on FR435 on the Washburn Ranger District near Washburn WI · Bayfield, Wisconsin
Creation of a new group camping site(s) near Birch Grove Campground on the Washburn Ranger District
Recreation management
Scoping Start
10/2017 (Estimated)
Comment Period
10/2018 (Estimated)
Objection Period Start
02/2019 (Estimated)
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management; Scenery Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Bayfield County, WI. T49N, R6W, Section 36 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 4/29/2025
Multiple locations, for more details see Legal Description document. Proposal involve a total of 3,658.58 acres of federal land to be exchanged for a total of 4,349.58 acres of non-federal lands. · Ashland; Florence; Forest; Langlade; Oneida; Price; Vilas, Wisconsin
Proposed land exchange with the Wisconsin Board of Commissioners of Public Lands under the authority of the Weeks Act of March 1, 1911, Federal Land Exchange Facilitation Act of 1988 and Federal Land Policy and Management Act of 1976 (FLPM).
Land acquisition
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Decision Decided Date | 09/01/2021 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Northern Great Lakes Visitor Center · updated 4/29/2025
Northern Great Lakes Visitor Center, County Hwy G., Bayfield, WI · Bayfield, Wisconsin
The purpose of this project is to create a more sustainable and economical facility by decreasing the Center's energy use. The project includes updating the building's lighting, siding, ventilation, insulation and the installation of solar panels.
Facility management
Decision
05/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Facility Maintenance; Solar |
| Decision Decided Date | 05/15/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Northern Great Lakes Visitor Center |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 4/29/2025
Pine barrens habitat in and around the Moquah Barrens Wildlife Management Area; 6 miles northeast of Iron River, WI. · Bayfield, Wisconsin
The purpose of this project is to restore and enhance native vegetation sites in the barren vegetation communities on the Washburn Ranger District. This proposed activities include native seed and tree planting and site preparation.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
02/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 4/29/2025
Project is located on the North Country Trail between Delta and Mellen in Ashland and Bayfield Counties, WI. · Ashland, Wisconsin
Proposal to reroute trail out of wet areas to higher ground close to original trail; and repair/replacement of bridges along the trail on the Great Divide District. The trail reroutes on the Washburn District are in the Rainbow Lakes Wilderness Area.
Recreation management
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Decision Decided Date | 06/30/2017 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 4/29/2025
Birch Grove Campground, Birch Grove Trail, Hoist Lake, Horse Trails loop A, ATV/Snowmobile Trails, and roads north of Hwy 2, Bayfield County, WI. · Bayfield, Wisconsin
A storm on July 21 caused widespread wind damage. Roads, trails and developed recreation sites are in need of maintenance to remove the damaged trees and repair damaged infrastructure.
Recreation managementRoad management
Decision
09/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Trail Management; Road Maintenance |
| Decision Decided Date | 09/09/2016 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 3/7/2025
T31N R16E Sections 23,31,32,33,& 35 · Oconto, Wisconsin
Spectrum Mid America LLC proposes to install new underground fiber optic cable within existing ROW's near the Town of Mountain
Special use management
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Spectrum Mid-America LLC-Town of Mountain Fiber Installation | Decision Signed Date: 03/05/2025 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 3/4/2025
T38N R15E Section 19, 20, 21, 24, and 25; T38N R16E Section 18, 19, 20, 21, 28, 29, 33, and 34 · Florence, Wisconsin
Installation of buried fiber optic cable near the Town of Fence to provide high-speed internet to rural America and to enhance/upgrade surrounding network and reduce redundancy along the right of way Rock Creek, Newald Tower, and Morgan Lake Road.
Special use management
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 3/4/2025
Located on Eagle River-Florence, Lakewood-Laona, and Medford-Park Falls Districts. · Forest; Oneida; Price; Taylor; Vilas, Wisconsin
To authorize requests for eight Special Use Permit applications. Six are new permit applications for year-round motorized access to private inholdings. Two are reissuance of previous permits for dam maintenance and environmental data collection.
Special use management
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 2024 Special Use Application Project - FY24 Spring Batch | Decision Signed Date: 03/03/2025 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 1/10/2025
Clam Lake area · Bayfield; Sawyer, Wisconsin
Snowmobile trail 8 reroute in the Clam Lake area.
Recreation management
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 12/30/2024
Multiple locations across the districts, see map of proposed zones on project webpage. Exact locations within the zones will be decided in cooperation with APHIS following field evaluation. · Ashland; Bayfield; Oconto; Price; Sawyer; Taylor, Wisconsin
Project to release Emerald Ash Borer (EAB) biocontrol species to mitigate EAB impacts in coordination with APHIS. APHIS has administered EAB biocontrol since 2007, using three parasitoid wasp species. Native planting is proposed at one site.
Vegetation management (other than forest products)
Decision
12/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Northern Great Lakes Visitor Center |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 11/22/2024
The project is located approximatley 1/2 mile west of FR 119 and 2 miles south of Perkinstown in Taylor County. · Taylor, Wisconsin
The proposal is to replace the current bridge over Joseph Creek along the Perkinstown ATV Trail. The current bridge is failing and undersized. The bridge is located approximately 1/2 mile from FR 119.
Watershed management
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | (SW �; NE �; Sec 8; T31N; R2W, Grover Township, Taylor County) |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 9/27/2024
Located across four districts. · Ashland; Bayfield; Oconto; Sawyer; Vilas, Wisconsin
To authorize requests for 10 special use permits on Forest Service Lands.
Special use management
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Medford-Park Falls Ranger District · updated 8/29/2024
Project is located in the northwest portion of the Forest within Taylor County in T32N, R2-3W and T33N, R1-3W. · Price, Wisconsin
This project is primarily a vegetation management project with focus on mid to late successional hardwood forest. Primary purpose is to maintain forest health and diversity. Project will also include a transportation analysis.
Vegetation management (other than forest products)Forest productsRoad management
Comment Period
03/30/2023
Objection Period Start
04/11/2024
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 8/15/2024
The project will take place between FR 554 and FR 121 in the existing right of way of FR 119. · Taylor, Wisconsin
Clark Electric is proposing to convert 11,280 feet of overhead utility line to underground along FR 119. The conversion will take place in Clark Electric's current right of way. One segment will be relocated from Lake Marion to the 119 right of way.
Special use management
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T31N, R2W, Secs. 4,8,9,16,17 |
Decision Memo · Lakewood-Laona Ranger District · updated 7/17/2024
T36N R16E Sec 12,13 · Forest, Wisconsin
Snowmobile Trail Reroute moving off a paved road
Recreation management
Scoping Start
08/2024 (Estimated)
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/3/2024
Project Code 323 - 2.8 miles south and west of Lost Land Lake. Project Code 324 - 2.4 miles north of STH 77 between Lost Land and Teal Lakes. Project Code 325 - 1.4 miles east of Teal Lake. · Sawyer, Wisconsin
About 6.6 miles of two-phase 6A CW overhead powerline will be replaced with single-phase 1/o AL underground powerline for a total of 1.76 acres of disturbance. Aging facilities will be replaced allowing for new load balancing in the area.
Special use management
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 7/3/2024
Right of Ways for State Highway 77, County Road S, Sams Lane, Forest Roads 164, 174, 308, and 161 south of Clam Lake, WI. · Sawyer, Wisconsin
Installation of underground fiber optic cable in portions of National Forest System land along State Highway 77, County Road S, Sams Lane, and Forest Roads 164, 174, 308, and 1661.
Special use management
Comment Period
05/15/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 7/1/2024
Birch Grove Campground is on FR 435 about 7 miles west of Washburn. T49N, R6W, Section 36, Bayfield County, WI. · Bayfield, Wisconsin
The proposal is to convert 2 existing single sites into double sites and construct a picnic shelter near West Twin Lake.
Recreation management
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 6/28/2024
Johnson Springs Dam is about 5 miles NE of Drummond, WI located off FR1855 in T45N R7W Sec 22. Schunenberg Springs Dam is about miles WSW of Drummond, WI in T44N, R8W, Sec 4. · Bayfield, Wisconsin
Proposal to remove the dams at Johnson and Schunenberg Springs. Restoring them to free-flowing cold-water systems will improve the brook trout habitat and eliminate the threat of structural failure caused by beaver activity and extreme weather events
Watershed management
Decision
06/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/26/2024
Right of way of Highway 70 in Price County Wisconsin · Price, Wisconsin
Lac du Flambeau has requested a special use permit to install underground fiber optic cable on Forest Service land along the right of way of Highway 70. The proposal includes installing approximately 13 miles of underground cable.
Special use management
Decision
01/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T40N R4E Sec. 28, 29, 32, T39N R1E Sec. 1, 2, 3, 12, T39N R2E Sec. 1, 2, 3, 4, 5, 6, T39N R3E Sec. 3, 4, 5, 6 and 12. |
Environmental Assessment · Great Divide Ranger District · updated 6/25/2024
Southwest portion of the Great Divide Ranger District. · Sawyer, Wisconsin
Vegetation treatment to improve health, productivity, and resiliency of northern hardwood, spruce, pine balsam fir, birch, and aspen stands. Wildlife, fisheries, and rare plant habitat management. Fuels treatments. Road network improvements.
Road managementForest productsWatershed managementFuels managementWildlife, fish, rare plants
Comment Period
11/15/2023
Objection Period Start
03/12/2024
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 6/18/2024
Scattered throughout the north of US Hwy 2: Pollinator Habitat actions are within existing upland openings; Canada Rice Grass actions are located at or near existing population sites. · Bayfield, Wisconsin
Project is to enhance pollinator habitat and Canada Rice Grass (Piptatherum canadense) a Regional Forester Sensitive Species. Proposal is to create/plant seed sources for adjacent habitat enhancement and for collection and propagation at other sites.
Wildlife, fish, rare plants
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/4/2024
Medford land base of the CNNF in Taylor County, Wisconsin. The project is within road right of ways along CTY M, CTY D, FR 112, FR 116, and FR 108 near Perkinstown. · Taylor, Wisconsin
Bug Tussel is proposing to install 12.9 miles of fiber optic communication lines in Taylor County on Forest Service owned land. Bug Tussel will bore or trench fiber optic along the road (112,116,108, CTY M and D) right of ways within the county.
Special use management
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T31N R1W Sec. 9, T32N R1W Sec. 31, T31N R2W Sec. 1, T32N R2W Sec. 2, 3, 10, 15, 22, 33, 35, 36 T33N R2W Sec. 10, 14, 15, 16, 17, 18, 23, 26, 34, 35 T33N R3W Sec. 13 |
Decision Memo · Medford-Park Falls Ranger District · updated 5/29/2024
Coring will be completed at one site, located at 45.759804, -90.112642. The site is located at the intersection of FR 131, 132, and trail 118-120. · Price, Wisconsin
The USFS and Wisconsin Geological and Natural History Survey (WGNHS) are proposing to drill one borehole to collect and describe the sediment in Price County to better understand the regional hydrogeology.
Minerals and geology
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T38N R3E Sec 21 |
Decision Memo · Eagle River-Florence Ranger District · updated 5/28/2024
ERFL Ranger District and LKLN Ranger District · Forest, Wisconsin
The Town of Hiles has identified a need to remove trees from the road rights-of-way. Furthermore, approximately 50.66 acres of dead and/or dying balsam fir and spruce patches along Fournier Road but outside of the 50 feet ROW need to be cleared.
Road managementFuels management
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Road Maintenance |
| Town of Hiles Hazard and High-Risk Vegetation Removal | Decision Signed Date: 05/23/2024 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 5/28/2024
Lost Lake Cabins in Florence County · Florence, Wisconsin
The purpose of this project is to replace a water or waste water disposal system. The septic wastewater system at Lost Lake Cabins needs replacement due to being outdated and a health and safety hazard to recreationists.
Facility management
Decision
05/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Lost Lake Cabin Septic Replacement Decision Memo | Decision Signed Date: 05/23/2024 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T39N R15E Section 12 |
Decision Memo · Medford-Park Falls Ranger District · updated 4/9/2024
Taylor County winter sports area, west of Perkinstown on FR 121 and FR 119 · Taylor, Wisconsin
Currently, Taylor County maintains the Perkinstown Winter Sports Area west of Perkinstown for multiple winter recreational opportunities. The current special use permit has expired and needs to be reauthorized.
Special use management
Decision
04/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 04/09/2024 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T31N R2W Sections 7-9 and 16-18 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 3/28/2024
East side of the forest in Forest and Florence Counties. · Florence; Forest, Wisconsin
Exchanging land on the east side of the forest. Lakewood-Laona Ranger District in Forest County would be exchanging land for land in Eagle River-Florence Ranger District.
Land acquisition
Decision
01/1970 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Purchases |
| Decision Decided Date | 07/02/2026 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 3/26/2024
To authorize requests for fourteen special use permits on Forest Service Lands. · Ashland; Bayfield; Forest; Oconto; Sawyer; Taylor, Wisconsin
Proposal to authorize requests for 13 road special use permits on Forest Service Lands. Requests for access to private inholdings across National Forest System lands because there is no access other than crossing federal ownership.
Special use management
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 3/26/2024
Scattered locations across the Forest. See location maps by district on project website · Ashland; Bayfield; Florence; Forest; Price; Sawyer; Taylor; Vilas, Wisconsin
Proposal to improve watershed conditions including replacing 29 culverts that do not meet Forest Service standards, removal of 7 culverts, 5 bridge replacements and 2 road projects to improve drainage.
Watershed managementWildlife, fish, rare plants
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 3/26/2024
Multiple sites along the North Country Trail in Great Divide and Washburn Ranger Districts · Ashland; Bayfield, Wisconsin
Three to five backpacker campsites would be developed or improved to provide long-distance hikers a consistent experience when they hike the North Country Trail in Wisconsin.
Recreation management
Decision
05/2021 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 3/21/2024
Seven black ash-dominated wetland stands scattered across Forest and Florence Counties on National Forest land, · Florence; Forest, Wisconsin
The Joint Chiefs project would underplant a select group of diverse tree species seedlings in black ash-dominated stands in preparation for the decline in ash populations brought about by emerald ash borers (EAB). Actions would occur on 115 acres.
Vegetation management (other than forest products)
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | ERFL Ranger District T38N R13W, Sections 12, 13, 14 in Forest County; T38N R14W, Sections 8, 11 in Forest County; T38N R15W, Section 12 in Florence County; T39N R15W, Sections 22, 27 in Florence Count |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 2/9/2024
South of Drummond, near FR222 and FR218, T. 44 N., R. 8 W., Sections 23 & 24, Bayfield County, WI · Bayfield, Wisconsin
Bayfield Electric has requested to bury an existing power line to a customer. Action is to remove about 500 feet of cross-country overhead powerline and install approximately 1030 feet of underground line along FR 218 and existing driveway.
Special use management
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 12/27/2023
FR 131 between 507 and 136 · Price, Wisconsin
The Town of Worcester applied for, and received funding, for culvert installation and road maintenance on FR 131 (Sheep Ranch Road). Road maintenance will include ditching, surfacing, installation and replacement of culverts.
Road management
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Town of Worcester RAC | Decision Signed Date: 12/13/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T38N R2E Sec 24 |
Decision Memo · Medford-Park Falls Ranger District · updated 12/14/2023
Longhorn timber sale, North of HWY 70 and FR 513 · Price, Wisconsin
This project will treat hazard fuels adjacent to private property that are not currently covered in the Chequamegon Red Pine EA, 12 additional acres have been identified for treatment. Treatment includes reducing conifer vegetation.
Fuels management
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T39N R2E Sec. 2 and 3 and T40N R2E Sec. 34 and 35 |
Decision Memo · Lakewood-Laona Ranger District · updated 12/7/2023
Lakewood-Laona Ranger District · Forest; Langlade; Oconto, Wisconsin
This project would salvage timber on the district under certain criteria and design features. Each site will have a specialist review.
Vegetation management (other than forest products)
Decision
12/2023 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 11/17/2023
Mountain bike trail system near Cable and Seeley, Wisconsin. · Bayfield, Wisconsin
Restore trails in the Treasures Trace segments of the CAMBA mountain bike trail system to the sustainable standards to which they were originally constructed and reroute some section from timber sale haul routes to single-track routes.
Recreation management
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Chequamegon Area Mountain Bike Association Trail Maintenance, Rehab | Decision Signed Date: 10/12/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 10/31/2023
Lakewood-Laona Ranger District, Oconto County, T32N, R16E, Section 28. · Oconto, Wisconsin
Wisconsin Public Service is proposing to install a new 55-foot utility pole. The new pole will be 47.5 feet above ground. This proposal is located within the right-of-way of the existing utility line in T32N-R16E, Section 28.
Special use management
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 10/31/2023
Town of Mountain, Oconto County, along County Highway W. · Oconto, Wisconsin
Issue SUP to install 5.05 miles (approximately 6.1 acres) of underground fiber optic line along County Highway W in Oconto County Wisconsin.
Special use management
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31N, R16E, Section 1; T31N, R17E, Sections 5,6; T32N, R17E, Sections 12-14,22,28,32,33 |
Decision Memo · Lakewood-Laona Ranger District · updated 10/31/2023
Forest County Highway S · Forest, Wisconsin
Project is located on Forest County S
Special use management
Decision
09/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Spectrum Mid-America LLC Fiber Forest County, LKLN, 2023 | Decision Signed Date: 09/07/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 10/31/2023
Woodlawn Road in Forest County, WI · Forest, Wisconsin
The Town of Freedom will be upgrading Woodlawn Road. The right-of way would be cleared, road paved, and ditches installed.
Road management
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 10/30/2023
Wilson Flowage Non-Motorized Area T38N R2E Sec. 1, 2, 3, 10, 11, 14 T39N R2E Sec 35 · Price, Wisconsin
The USFS is proposing to enhance shoreline habitat, parking opportunities, and improve aquatic habitat within the Wilson flowage non-motorized area in Price County.
Wildlife, fish, rare plants
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T38N R2E Sec. 1, 2, 3, 10, 11, 14 T39N R2E Sec 35 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 9/27/2023
Located on four districts. · Ashland; Bayfield; Forest; Oconto; Taylor; Vilas, Wisconsin
To authorize requests for seven special use permits on Forest Service Lands. New permit requests include 4 new road permits and 1 log landing. Reissuance includes a processing plant and salt shed.
Special use management
Decision
07/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (11), 36 Cfr 220.6(D)(11); 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 9/21/2023
Medford Land base, FR 108/ CTY Highway M intersection. North from County M approximately quarter mile. East side of FR 108 · Taylor, Wisconsin
Taylor Electric Cooperative (TEC) is proposing to install new underground electric cable from the south side of CTH M going north 1275 feet along Knuth Rd (FR 108). Cable location would be on the east edge of the gravel road (FR 108).
Special use management
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | SE 1/4, SE 1/4, Section 36, T32N, R2W, Taylor County |
Decision Memo · Washburn Ranger District · updated 8/25/2023
Sun Bowl (153 acres near Valhalla), 241 Habitat Treatment Unit (48 acres in the Moquah Barrens), 419 Pocket Barrens (37 acres) & Badger Pocket Barrens (48 acres) are near FR 236, north of Ino, WI. · Bayfield, Wisconsin
Proposal is to improve barrens habitat at 4 locations. Surveys show areas are overgrown with brush/trees decreasing their habitat suitability. Restoration activities may include prescribed burning, mowing, biomass removal and/or mastication.
Vegetation management (other than forest products)
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Barrens Habitat Improvement | Decision Signed Date: 08/25/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 8/24/2023
CAMBA Mountain Bike Trail System - Namakagon Cluster · Forest, Wisconsin
Restore trails in the Namakagon Cluster of the CAMBA mountain bike trail system to the sustainable standards to which they were originally constructed and reroute some sections from timber sale haul routes to single-track routes.
Recreation management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 8/9/2023
Legal is Township 34 North, Range 15 east, Section 21. Along Highway 32. · Forest, Wisconsin
Replacing the old wire with new wire along Hwy 32.
Special use management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 6/15/2023
Bass Lake (near Two Lakes Campground); Esox Lake (North of Drummond); Mirror Lake (East of Iron River); Bladder Lake (East of Iron River); Camp Two Lake (South of Iron River); Drummond Lake · Bayfield, Wisconsin
Proposal to improve fish habitat by adding large woody debris into lakes over the next 10 years (1-2 lakes/year). Woody structure may include tree drops, half-logs, pyramid-type brush shelters, and/or fish cribs.
Wildlife, fish, rare plants
Decision
05/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/15/2023
Locations across the Chequamegon Nicolet National Forest · Ashland; Bayfield; Florence; Forest; Langlade; Sawyer; Taylor, Wisconsin
Proposal to conduct forest wide watershed improvements including replacing 30 culverts that do not meet Forest Service standards, replace, and rehabilitate three road and trail bridges, and improve drainage at two road locations.
Watershed managementWildlife, fish, rare plants
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 5/26/2023
Line runs N-S and is to the west of Lac Vieux Desert Lake. · Vilas, Wisconsin
ATC has identified a need to remove shrub and tree branches that are encroaching upon Line 6530 landline corridor from Conover substation in Conover, WI to the Mass substation in Mass, MI. Work occurring in the CNNF totals approx. six linear miles.
Special use management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission |
| Decision Decided Date | 05/26/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T41N, R11E, Section 6; T42N R11E, Sections 7, 18, 19, 30, 31 |
Decision Memo · Medford-Park Falls Ranger District · updated 5/25/2023
East of Hay Creek on trail 111, approximately 1 mile south of FR 153 · Price, Wisconsin
Improvement of Flambeau Trail 111 includes placing interlocking concrete blocking starting at the top of the hill and running approximately 220 feet west towards the bridge on Hay Creek.
Recreation managementWatershed management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T40N R1E Sec 12 |
Decision Memo · Eagle River-Florence Ranger District · updated 5/22/2023
Located on the Eagle River District · Forest; Oconto, Wisconsin
This project is in partnership with the Northern Research Station. Part of a larger research study to plant climate adapted species into in a northern hardwood stand under different harvest conditions.
Climate change adaptationVegetation management (other than forest products)
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T38N R13E Section 21 |
Decision Memo · Washburn Ranger District · updated 5/15/2023
Wildcat Motorized trail south of the Town of Drummond to Lake Owen Station Road. · Bayfield, Wisconsin
A 0.11-mile reroute on the snowmobile trail to avoid a lowland area. The proposal no longer includes adding ATV/UTV use from Town of Drummond south to Lake Owen Station Road. ATV/UTV use is still under review and will be covered in a future project.
Recreation management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Wildcat Trail Reroute | Decision Signed Date: 05/15/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 4/21/2023
Project is listed along Military Road. · Vilas, Wisconsin
Issue a new special use permit to Spectrum Mid-America LLC for installing 2' fiber optic cable and 30 "flush ground vaults".
Special use management
Decision
04/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 3/31/2023
Two Lakes Campground is about 5 miles southeast of Drummond, WI on FR 213 (Lake Owen Scenic Drive).T 44 N, R 7 W, Section 13, Bayfield County, WI. · Bayfield, Wisconsin
Proposal to decommission 6 older closed vault toilets with failed linings and replace them with two new sets of toilets that meet Americans with Disabilities Act standards to address the shortage of facilities available to campground users.
Facility management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Facility Maintenance |
| 2023 Two Lakes Vault Toilet Replacements | Decision Signed Date: 03/31/2023 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 3/15/2023
Taylor County at T. 31 N., R. 2 W., section 23 of the Medford-Park Falls Ranger District within Chequamegon-Nicolet National Forest, North of FR 118. · Taylor, Wisconsin
Midway Telephone Company proposes to move a copper cable (1.25 inch conduit) to a new location on the north side of FR 118 in response to a bridge construction on Mckenzie Creek. The cable will be placed with directional boring.
Special use management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T. 31 N., R. 2 W., section 23 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 3/15/2023
Various locations on four districts across the forest. · Bayfield; Florence; Forest; Oconto; Oneida; Price; Taylor; Vilas, Wisconsin
Proposal to decommission seven inactive wells at recreation sites and the disposal of buildings and improvements at six acquired properties. Policy and State law require proper abandonment of wells when inactive. The properties are in poor condition.
Recreation managementFacility management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 2/16/2023
Lakewood-Laona Ranger District, Forest County, T35 N, R15E, Section 18 · Forest, Wisconsin
Special Use Permit for installation of new underground electrical facilities. Replacement of existing overhead line to underground along north side of County Highway T between Blackwell Junction Road and Nicolet State Trail.
Special use management
Decision
01/2023 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 1/20/2023
East side of the forest. · Florence; Forest; Oconto; Vilas, Wisconsin
This project would expand 16 existing gravel pits on the east side of the forest.
Minerals and geology
Comment Period
11/20/2021
Decision
01/2022 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Eagle River-Florence Ranger District · updated 1/5/2023
Spread across the entire Eagle River-Florence Ranger District · Florence; Forest; Oneida; Vilas, Wisconsin
The Aspen-Spruce-Fir Restoration Project (ASFR) proposes to treat pockets and areas of dead, dying, diseased, and other hazard trees across the entire ERFL district. Up to 9,200 acres are proposed for active management actions.
Forest productsVegetation management (other than forest products)Fuels management
Comment Period
07/09/2022
Objection Period Start
09/17/2022
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Scenery Management; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 12/27/2022
Across all districts on Chequamegon Nicolet National Forest · Bayfield; Florence; Forest; Oconto; Price; Taylor, Wisconsin
The Forest is proposing to authorize requests for 12 special use permits on Forest Service Lands. Eight of the twelve requests are renewals. Seven requests are for roads, three for dry fire hydrants and two for cultivation of hay.
Special use management
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 2022 Special Use Permits - Batch 1 Decision Memo | Decision Signed Date: 11/04/2022 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 12/27/2022
Project actions are scattered though out the Lakewood-Laona Ranger District. · Forest; Langlade, Wisconsin
Wisconsin Public Service would be installing two new underground electrical lines and other facilities.
Special use management
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 12/7/2022
One property is located north of Mineral Lake. The other is located just west of Clam Lake. · Ashland; Sawyer, Wisconsin
Two properties, one on Mineral Lake and one on the West Fork of the Chippewa River, have buildings that need to be decommissioned. Recreational improvements are also proposed.
Recreation management
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Facility Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 10/24/2022
Site 1: Hoffman: Adjacent to the Hoffman Creek Flowage. Located at the end of FR550. Site 2: Buffalo Farms: Adjacent to FR144. Site 3: Willow Springs: South of FR 130 and west of the Willow River. Adjacent to FR130D/B. · Price, Wisconsin
The purpose of the project is to diversify existing vegetation with native plant species for the purposes of preventing non-native invasive species from establishing on the landscape and to enhance habitat for native pollinator species.
Wildlife, fish, rare plants
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | : Site 1: T38N R1E section 13 SWQ, Site 2: T40N R2E section 24 NEQ, Site 3: T38N R4E section 11 NWQ |
Decision Memo · Medford-Park Falls Ranger District · updated 9/28/2022
T31N, R2W, Sections 17, 20 and 29 · Taylor, Wisconsin
Clark Electric Cooperative proposes to install and bury approximately 9,924 feet long of 7.2kv overhead primary distribution line along the existing ROW on the west side of Wintersports Road to replace an overhead line.
Special use management
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 8/17/2022
T40N, R4E, Sections 18 & 19 · Vilas, Wisconsin
Price Electric Cooperative is proposing to install primary underground electric cable and facilities within Vilas County, WI of the Medford-Park Falls Ranger District for access by a land-locked private property.
Special use management
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 8/17/2022
T40N R2E Section 14 and 23, Township of Eisenstein, Price County, WI, Newman and Camp 4 Creek South of FR 182, directly off 1175A and 1175AA · Price, Wisconsin
Restoration of the stream channel on Newman and Camp 4 Creeks through the lowering of gravel bars. This will improve and support native Brook Trout habitat and populations.
Wildlife, fish, rare plants
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 8/17/2022
T38N, R1E, sec 24, T38N, R2E, sec 19 & 20, FR 550, FR 139, and FR 506I T38N, R3E, sec 30 & 31, FR 503 and FR 131 T37N, R3E, sec 15 & 22 FR 132, FR 132UU, and FR 132RR · Price, Wisconsin
Chequamegon Communication Cooperative, Inc. aka Norvado proposes to install an underground fiber optic cable to improve service to rural areas within Price County Wisconsin.
Special use management
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T38N, R1E, sec 24, T38N, R2E, sec 19 & 20, T38N, R3E, sec 30 & 31, T37N, R3E, sec 15 & 22 |
Decision Memo · Lakewood-Laona Ranger District · updated 7/17/2022
This project is near the Oconto Seed Orchard. · Langlade; Oconto, Wisconsin
The company would replace the overhead powerlines with underground lines.
Special use management
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/29/2022
23 locations across the National Forest · Ashland; Bayfield; Florence; Forest; Oconto; Price; Sawyer; Taylor; Vilas, Wisconsin
Proposal to replace 23 aging stream crossing structures within the Forest Service road and trail systems. Two of the sites are replacements or rehabilitation of road bridges. The other 21 sites are replacements of culverts.
Wildlife, fish, rare plantsWatershed management
Decision
05/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 6/6/2022
T. 44 N., R. 8 W., Sections 23 & 24, Town of Drummond, Bayfield County WI. About 4 miles south of Drummond. · Bayfield, Wisconsin
Norvado has requested an amendment to their permit to install about 1,029 feet of new fiber optic line across Forest Service land within an existing corridor. The route is near FR 218 in Drummond Township, Bayfield County, WI.
Special use management
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 5/28/2022
Langlade and Oconto Counties. · Langlade; Oconto, Wisconsin
Salvaging timber from the storm damaged areas in Langlade and Oconto Counties.
Forest products
Comment Period
01/05/2020
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 5/18/2022
The maintenance of a large wildlife openings at the Brule River Opening (T41NR15E, Section 24 and T41NR16E Section 19). The area is a remnant farm field near the Brule River in Florence County, Wi. · Florence, Wisconsin
To maintain a wildlife opening by the Brule River and extend fire boundaries to the Brule River to act as a natural fire line instead of creating dozer dug control lines. Using the Brule River as a fire control line will better protect firefighters.
Wildlife, fish, rare plantsFuels management
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 4/5/2022
South-central part of Great Divide Ranger District. · Sawyer, Wisconsin
The Sawyer County Forestry and Parks Department has submitted a proposal to rehabilitate a nine-mile segment of ATV/Snowmobile Trail 5 - Fishtrap Trail.
Recreation management
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Decision Decided Date | 04/05/2022 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 4/5/2022
Half-mile section of Trail 21 from Forest Road 622 going east to the intersection with Trail 3. · Sawyer, Wisconsin
The Sawyer County Snowmobile Alliance has submitted a proposal to reconstruct the trail on steep hills on a 0.5-mile segment of snowmobile trail.
Recreation management
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 3/31/2022
Within the Wintergreen Ski Trail System just north of State Hwy 70. · Price, Wisconsin
Project Cancelled: Designation of a snowshoe trail system within the area of the Wintergreen Ski Trail area. Construction consists of clearing forest debris from marked trail.
Recreation management
Scoping Start
12/2021 (Estimated)
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 2/28/2022
Sites are located north of US Hwy 2 and about 15 miles west of Washburn, WI. Two sites are along FR 237, the others are along FR424. · Bayfield, Wisconsin
The Forest Service and Wisconsin Geological Natural History Survey (WGNHS) are proposing to drill up to 4 boreholes to collect and describe the sediment in the Bayfield Peninsula to better understand the area hydrogeology.
Minerals and geology
Decision
02/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 2/1/2022
Developed recreation sites on all ranger districts across the Chequamegon-Nicolet National Forest. · Ashland; Bayfield; Florence; Forest; Langlade; Oconto; Oneida; Price; Sawyer; Taylor; Vilas, Wisconsin
The Recreation Facility Strategy prioritizes developed recreation site investments. Proposal has varying actions at 72 sites (from increased amenities to decreased maintenance) and removal of amenities at 22 sites to convert them to general forest.
Facility managementRecreation management
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 1/27/2022
Located in the southeast corner of the district, legal is Township 31 Norther, Range 17East, Sections 27, 28, 33, and 34. · Oconto, Wisconsin
This project would use burning to restore and maintain pine barrens in the southeast corner of the district.
Vegetation management (other than forest products)
Decision
01/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 1/18/2022
Snowmobile Trail 8 Spider Lake and Namakagon townships. · Bayfield; Sawyer, Wisconsin
Due to changes in access to private land, a new connector route is needed.
Recreation management
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 1/14/2022
Various locations on the Great Divide Ranger District. · Ashland; Bayfield; Sawyer, Wisconsin
Authorize requests for four new road permits.
Special use management
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 12/23/2021
Forestwide · Ashland; Bayfield; Florence; Forest; Langlade; Oconto; Oneida; Price; Sawyer; Taylor; Vilas, Wisconsin
We propose to allow prompt treatment (using a variety of tools) of oak wilt infection centers wherever found as soon as possible following discovery to slow and control the spread of oak wilt on Forest lands.
Vegetation management (other than forest products)
Comment Period
07/20/2021
Objection Period Start
10/26/2021
Decision
12/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 10/18/2021
Project located in T31N R1W section 14 R2W Section 13, Township of Grover, Taylor County, WI, FR117, FR553, W156362; T39N R3E, Section 13, 14, 21, 22, 23, 27, 28, and 33, Price County, Wisconsin · Price, Wisconsin
Temporarily move the snowmobile trail to the Lake 11 Timber Sale haul road location to address timber sale for public safety. Reroute of a portion of Snowmobile Trail 120 near FR132 and FR519 to eliminate wetland crossing.
Recreation management
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 9/30/2021
The private property is 40 acres in NWSE, Section 11, T37N, R3E. It is surrounded by Federal land on four sides. · Price, Wisconsin
Reauthorization request of 20-yr permit for year-round access to private property. Action was in the 2021 Special Use Permit Scoping Letter. It's now a standalone project because environmental review was in progress when the others were completed.
Special use management
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Sections 11 and 12, T37N, R3E, Price County, WI |
Decision Memo · Great Divide Ranger District · updated 9/29/2021
Gates Lake near Glidden · Ashland, Wisconsin
A re-route of 0.54-mile segment of Forest Road 167 is proposed. The proposed reroute will follow high ground around Gates Lake, including Forest Road W232416. It will remove a 0.16-mile road segment from Gates Lake.
Watershed managementRoad management
Decision
09/2021 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Road Improvements/Construction; Travel Management; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 9/29/2021
Several locations scattered throughout the district. · Ashland; Bayfield; Sawyer, Wisconsin
Low-intensity prescribed fire will be used to meet goals and objectives for management areas 8E (Existing and Candidate Research Natural Areas), 8F (Special Management Areas), and 8G (Old Growth and Natural Feature Complexes).
Wildlife, fish, rare plants
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 9/9/2021
Two separate requests about 10 miles south of Iron River, WI. One in T45N, R8W, Section 31 action is near County Highway A. Second is in 44N, R8W, Section 6, along north sides of Tar and Lost Roads. · Bayfield, Wisconsin
Bayfield Electric Cooperative has requested an amendment to their permit. Request is to install underground 15KV power cables for two new customers at differing locations within the Drummond Township, Bayfield County, WI.
Special use management
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 2021 Bayfield Electric New Service | Decision Signed Date: 09/08/2021 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 9/8/2021
Snowmobile Trail 21 from Forest Road 203 to North Scheers Road · Sawyer, Wisconsin
The Sawyer County Snowmobile ATV Alliance has submitted a proposal to allow ATVs to use a portion of Snowmobile Trail 21 from Forest Road 203 to North Scheers Road. Three gates and a culvert will need to be installed. Alliance will do maintenance.
Recreation management
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 8/18/2021
T37N, R12E, Sec 6, Forest County, Wisconsin · Forest, Wisconsin
Request for the reauthorization of a 20-yr permit for year-round access to private property and hauling of timber from private property during frozen ground conditions within the Argonne Experimental Forest on the Chequamegon-Nicolet National Forest
Special use management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 8/10/2021
Various locations across the National Forest. · Ashland; Bayfield; Florence; Forest; Langlade; Oconto; Price; Sawyer; Taylor, Wisconsin
Authorize requests for 14 special use permits. 8 road use permits (5 new and 3 renewal), 1 well permit renewal, 1 storage shed permit renewal,1 sign renewal, 1 dock renewal, and 2 recreation event permits(1 new and 1 renewal)
Special use management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.12 (11), 36 Cfr 220.6(D)(11); 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 2021 Special Use Permit | Decision Signed Date: 08/05/2021 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 7/20/2021
T33N, R2W, Sections 34 & 35; T32N, R2W, Sections 2 & 3 · Taylor, Wisconsin
USFS and WGNHS propose to study the hydrogeology of the North Fork Yellow River Watershed near the Bend ore deposit in Taylor County to better understand the geology and groundwater connections in this area.
Special use management
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/13/2021
Nicolet side of the forest. · Forest; Oconto; Oneida, Wisconsin
Project is located along roads on the Nicolet side of the forest. WPS is maintaining and upgrading their lines.
Special use management
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 7/13/2021
Trail would be located between the North Country Trail and the Town of Drummond. The connector trail includes an old railroad grade and the northwest section of the Drummond Woods Trail. · Bayfield, Wisconsin
Proposal is to open one-mile of trail on an old railroad grade from the North Country Trail to the Town of Drummond. The action involves brushing, tree removal and sign installation.
Recreation management
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| North Country Trail - Town of Drummond Connector | Decision Signed Date: 07/13/2021 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T45N, R7W, Section 33, Bayfield County, WI |
Decision Memo · Washburn Ranger District · updated 7/8/2021
About 13 miles west of Drummond, WI. Along County Highway N. · Bayfield, Wisconsin
The Forest has received a request to bury about 1,800 feet of existing overhead powerline near County Hwy N. Proposal addresses recent changes from high water in this area including raising/widening of County Hwy N and dying trees.
Special use management
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T45N, R8W, Section 31, Bayfield County, WI |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/30/2021
Watershed improvement projects are scattered across the four districts · Ashland; Bayfield; Forest; Oconto; Price; Sawyer; Vilas, Wisconsin
Watershed improvement projects: culvert replacements to reduce erosion and improve fish/aquatic passage, installation of a hardened trail crossing, road reconstruction with improved drainage, and replacement or rehab of road and trail bridges.
Watershed managementWildlife, fish, rare plants
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Approximately 30 locations across the seven counties. See website for project descriptions, exact locations, and map. |
Decision Memo · Washburn Ranger District · updated 4/2/2021
Project is located along Terwilliger Rd. near the Northern Great Lakes Visitor Center. Bayfield County, WI at T. 47 N., R. 5 W., section 2 · Bayfield, Wisconsin
Xcel Energy has requested to upgraded transmission line infrastructure within existing permitted area by replacing the single-circuit 34.5kV line on single-circuit poles with new double-circuit 34.5kV/34.5kV lines on double-circuit poles.
Special use management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Northern Great Lakes Visitor Center |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 4/1/2021
West side of HWY 55 near Rogers Lake in Argonne, Wi · Forest, Wisconsin
In early August 2020, a derecho (blowdown) occurred on the ERFL Ranger District. Significant timber damage occurred leaving many trees dead, dying, or damaged. This resulted in safety and fuels concern. Recently, a new pocket of ~36 acres was found
Fuels managementForest productsVegetation management (other than forest products)
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage) |
| 2020 HWY 55 West Blowdown | Decision Signed Date: 03/17/2021 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 3/30/2021
Project is located in the Town of Grover (T32N, R2W) along Winter Sports Road (FR 119)starting at Spruce Lake Road going north to Beaver Creek Road (FR 121) and then a short distance east. · Taylor, Wisconsin
This is a proposal by Clark Electric Cooperative to convert about 4 1/4 miles of overhead electric line to underground electric wires within their existing utility corridor in order to provide a safer and more reliable electric service.
Special use management
Scoping Start
05/2018 (Estimated)
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 3/14/2021
West side of Hwy 32, south of Laona. · Forest, Wisconsin
WPS would replace a faulted line along side of Hwy 32.
Special use management
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 12/28/2020
Rangeline Road area · Forest, Wisconsin
Rerouting a snowmobile trail around a wet area.
Recreation management
Comment Period
11/18/2020
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Eagle River-Florence Ranger District · updated 12/28/2020
7 miles east of Eagle River, stretching south from Highway 70 to Highway 32 (or the southern border of the Argonne Exp. Forest) and stretching approximately 4-7 miles wide. · Forest; Oneida; Vilas, Wisconsin
Move forest vegetation to desired conditions, provide an efficient road system, continue Forest research projects, maintain public safety related to wildfire, maintain hunter hiking trails, and contribute toward wood products demand.
Wildlife, fish, rare plantsRoad managementForest products
Comment Period
05/28/2019
Objection Period Start
03/23/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Trail Management; Road Maintenance; Research And Development; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R11E; T40N, R12E; T39N, R11E; T39N, R12E; T38N, R11E; and T38N, R12E |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 12/22/2020
T40N,R2E,Sec18 STH 182; T40N,R1E,Sec13 East Road; T40N,R2E,Sec2,11&12 STH 182, Blockhouse Lake Rd; T39N,R1E,Sec1&12 Wintergreen Lk Rd; T40N,R1W,Sec26, WI-13; T47N,R5W,Sec2 Cty Hwy G · Bayfield; Price, Wisconsin
CenturyLink proposes to upgrade and supply existing and future customers with high speed internet/telephone services. This will bring high-performance, low-cost broadband service to underserved rural communities in the area.
Special use management
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 12/22/2020
About 13 miles west of Drummond, WI. Along County Highway N. · Bayfield, Wisconsin
Burial of about 1,525feet of existing overhead powerline in their existing permitted corridor along County Highway N. Proposal addresses recent changes from high water in this area including raising/widening of County Hwy N and dying trees.
Special use management
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T45N, R8W, Section 34, Bayfield County, WI |
Decision Memo · Medford-Park Falls Ranger District · updated 12/7/2020
From the Mondeaux Flowage, northwest to Price County · Taylor, Wisconsin
Designation of a snowmobile trail connection between a Taylor County trail in the vicinity of Mondeaux Flowage and a southern Price County snowmobile trail system using primarily existing travel corridors.
Recreation management
Comment Period
07/04/2013
Decision
11/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Taylor to Price County Snowmobile Trail Connector | Decision Signed Date: 11/26/2013 Legal Notice Date: 12/05/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T33N, R1W and R2W |
Decision Memo · Eagle River-Florence Ranger District · updated 11/30/2020
Huff Creek area in Forest County, Morgan lake area in Florence County, and Lac Vieux Desert area in Vilas county. · Florence; Forest; Vilas, Wisconsin
In August 2020, a derecho (blowdown) occurred across ERFL. Significant timber damage occurred leaving many trees damaged. This created a safety and fuels concern; the impacted trees need to removed as quickly as possible to reduce those risks.
Fuels managementVegetation management (other than forest products)Forest products
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 11/18/2020
Diamond Roof Area · Langlade; Oconto, Wisconsin
This project would reconstruct and maintain Diamond Roof Road to provide a safe travelway.
Road management
Decision
10/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 10/28/2020
South Branch of the Oconto River on the southwest side of the district. · Langlade; Oconto, Wisconsin
Build a trail to connect two existing routes.
Recreation management
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Medford-Park Falls Ranger District · updated 10/27/2020
The project location is about 20 miles southeast of Park Falls, WI and adjacent to the eastern boundary of Price County. · Price, Wisconsin
Vegetation and transportation management projects primarily for restoring a landscape of uneven aged northern hardwoods, treatment for reducing threat of emerald ash borer, and other vegetation treatments to improve forest resiliency.
Forest productsRoad managementVegetation management (other than forest products)
NOI in Federal Register
01/12/2010
DEIS NOA in Federal Register
03/23/2012
FEIS NOA in Federal Register
09/28/2012
Decision
09/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green) |
| Park Falls Hardwoods Record of Decision | Decision Signed Date: 09/28/2012 Legal Notice Date: 10/04/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Primarily the eastern sections of T37N, R3E; T38N, R3E; and T39N, R3E |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 10/25/2020
This pit is located in the Highway W area, between Pat Lake and the second branch of the Oconto River. · Oconto, Wisconsin
This projects gravel pit expansion will provide road material for removing the blowdown form the 2019 Blowdown storm.
Road management
Decision
10/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Eagle River-Florence Ranger District · updated 10/23/2020
Between the towns of Eagle River and Florence, Wisconsin · Florence; Forest, Wisconsin
A supplement is being prepared to remedy inadequacies in the the disclosure of cumulative effects for specific Regional Forester Sensitive Species
Road managementVegetation management (other than forest products)Forest products
NOI in Federal Register
05/25/2005
DEIS NOA in Federal Register
01/27/2006
FEIS NOA in Federal Register
09/22/2006
Decision
09/2006 (Estimated)
Implementation
10/2006 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Northwest Howell | Decision Signed Date: 09/15/2006 Legal Notice Date: 09/23/2006 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T38&39N, R13&14E, Forest County; and T38&39N, R15&16E, Florence Conunty, WI. |
Decision Memo · Medford-Park Falls Ranger District · updated 10/22/2020
This project is located on and surrounding the Ice Age National Scenic Trail between Taylor County Highway E, and southwest to where the trail intersects State Highway 64. · Taylor, Wisconsin
New Vision Wilderness has requested a re-issuance of their Special Use Permit to use the Ice Age National Scenic Trail and adjacent dispersed campsites along the trail to operate a therapeutic based outdoor rehabilitation program for youth.
Special use management
Decision
10/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 10/22/2020
Project is located in Taylor County in the Town of Grover (T32N, R2W, Sec 33) along County Highway M · Taylor, Wisconsin
Clark Electric Cooperative proposes to install approximately 680 feet of 7.2 KV buried cable inside conduit. Clark Electric Cooperative also proposes to remove 2,700 feet (7.2KV) overhead line within a 40 foot wide ROW located west of highway ROW.
Special use management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Eagle River-Florence Ranger District · updated 10/22/2020
Ten miles northeast of Eagle River · Forest; Vilas, Wisconsin
This project proposes to manipulate northern hardwood forest vegetation composition and structure, and road access to manage the Fishel area closer to desired forest conditions as defined in the 2004 Chequamegon-Nicolet LRMP.
Road managementForest productsVegetation management (other than forest products)
NOI in Federal Register
03/22/2006
DEIS NOA in Federal Register
05/25/2007
FEIS NOA in Federal Register
03/07/2008
Decision
02/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N R11E Sec. 1, 12, 13, 14, 23, 24; T41N R11E Sec. 25, 36; T40N R12E Sec. 1-12, 17, 18; T41N R12E Sect. 1, 2, 11-17, 19-36; T42N R12E Sec. 36; T41N R13E Sec. 5-10, 15-21, 29-32; T42N R13E Sec. 31 |
Decision Memo · Great Divide Ranger District · updated 10/16/2020
T40N R5W Section 14, T40N R5W Section 13, and T40N R4W Section 18 · Sawyer, Wisconsin
Fiberoptic cable will be installed along Forest Road 308 in three locations in the existing , cleared right-of-way using a vibratory plow and directional bore.
Special use management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 10/14/2020
Multiple locations across the Forest · Bayfield; Florence; Forest; Oconto; Oneida; Price; Taylor; Vilas, Wisconsin
Authorize requests for 29 special use permits; no additional construction is needed. Proposal includes: 8 new road permits and the reissuance of 13 road use permits, 1 water line permit, 1 research study permit and 6 recreation permits.
Special use management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 9/28/2020
Beaverdam Lodge Complex is located about six miles west of Mellen in northern Wisconsin, Township 45 North, Range 4 West, section 36. · Ashland, Wisconsin
Proposed action/undertaking: decommission dilapidated Beaverdam Lake buildings; designate and/or repair access roads for dam and spillway testing, inspection, maintenance, or repair; and implement ongoing dam maintenance and repairs.
Facility management
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Great Divide Ranger District · updated 9/22/2020
See attached location map. · Ashland; Bayfield; Sawyer, Wisconsin
To provide mineral material for the next 10-20 years for infrastructure maintenance and other activities, we propose to expand 4 existing gravel pit sites, develop 6 new gravel pit sites and do final reclamation of 1 temporary borrow pit site.
Minerals and geology
Comment Period
04/23/2020
Objection Period Start
06/27/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 8/4/2020
Project is located around Pigeon Lake about 3 miles west of Drummond, WI in Bayfield County · Bayfield, Wisconsin
Proposal is to allow Wisconsin Geological and Natural History Survey (WGNHS) to drill eight wells, collect and describe the sediment, and install monitoring wells around the Lake to better understand the area hydrogeology.
Minerals and geologySpecial use management
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T45N, R8W, Sections 26-28 and 33-35 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/8/2020
1,550 feet of road starting at the end of FR 1921, then skid trail to private property in Town of Grand View. · Bayfield, Wisconsin
Joseph A. Gallo has submitted a proposal for use of the abovementioned road to access private property.
Special use management
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Washburn Ranger District · updated 6/30/2020
3065 acres in Bayfield County located on Washburn RD · Bayfield, Wisconsin
Project is to take action to slow the spread of gypsy moth infestations on the Washburn Ranger District. The proposal involves aerial application of a gypsy moth mating disruptant (known as pheromones) in one treatment block (3065 acres).
Vegetation management (other than forest products)
Comment Period
03/18/2020
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T44N, R87W, Sections. 16-21 and 28-30 |
Decision Memo · Great Divide Ranger District · updated 6/30/2020
The proposed snowshoe trail maintenance would be located near the cross-country ski trail located at the Mukwonago parking lot off WI-77. · Bayfield, Wisconsin
Use the footprint of an existing network of temporary roads, decommissioned snowmobile trails and FR302 to create two loop trails for snowshoe use. A wooden trail map would be created. Route marker signs would be placed to mark the trail.
Recreation management
Decision
06/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T41N R6W Sections 4 & 5 |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 4/22/2020
Parts of the Great Divide and Medford-Park Falls Ranger District in various areas. Concentrations of damage in the Moose Lake vicinity (GD RD) and Gates Lake vicinity (MPF RD). · Ashland; Price; Sawyer, Wisconsin
Salvage of timber and forest restoration projects following an early September 2014 wind and rain storm event.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)
Comment Period
01/31/2015
Objection Period Start
06/09/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 4/2/2020
Near FR 182 (starting at FR 152 and heading east to FR 144). Project is located in T40N, R2E, Sections 11, 12, 14, 15, 16, 17, and 18, Price County Wisconsin. · Price, Wisconsin
A proposal by Price Electric Cooperative to improve about 4 miles of overhead electric line in order to provide a safer and more reliable electric service. The proposal includes rerouting two segments of existing overhead line closer to FR 182.
Special use management
Decision
12/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 2019 Price Electric Line Rebuild- FR 182 | Decision Signed Date: 12/12/2019 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 3/19/2020
T44N R6W Sections 1 and 12 · Bayfield, Wisconsin
Avoid springs and steep slopes by constructing 320 feet of new trail and installing two water bars.
Recreation management
Decision
03/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 3/18/2020
20-foot right of way on maintenance level 1 road from Weidt Road about 1,470 feet to private property being accessed. · Bayfield, Wisconsin
Ghost Lake Road Association submitted a proposal for use of a maintenance level 1 road, requesting a 20-year permit for a 20-foot right of way for year round use - from Weidt Road about 1,470 feet to private property being accessed.
Special use management
Decision
01/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 2/9/2020
Lakewood-Laona Ranger District · Forest; Langlade; Oconto, Wisconsin
In July, 2019, a storm with strong winds hit Langlade and Oconto Counties. The Forest Service is creating 200ft fuel breaks by removing dead and down trees along road corridors and the boundary between private and public land. See Post-Decision tab
Forest products
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 1/31/2020
Crossing is at Shawano Creek and an old road, legal is Township 34 North, Range 16 East, Section 31. · Forest, Wisconsin
Removing a culvert on an old non-system road to restore stream flow and stabilize the banks.
Watershed management
Decision
01/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
Driveways off of Forest Roads 213, 670, and 679. · Bayfield; Sawyer, Wisconsin
Authorization for the use and improvement of 3 existing routes to accommodate access to 3 private land parcels on the Great Divide Ranger District
Special use managementRoad management
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T42N R5W S19 and 20, T42N R5W S2, and T44N R6W S8 |
Decision Memo · Washburn Ranger District · updated 12/10/2019
Bayfield County T45N, R8W, Sections 26 and 35 · Bayfield, Wisconsin
An amendment to the Special Use Permit to relocate an existing powerline that is being affected by high water in Pigeon Lake with a new underground line along FR228. Proposal includes the removal of old infrastructure.
Special use management
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Bayfield Electric Pigeon Lake Line Burial 2019 | Decision Signed Date: 07/31/2019 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
About 10 miles east of Cable, WI. · Bayfield, Wisconsin
An amendment to Bayfield Electric Special Use Permit to maintain and reconstruct 7 mile of existing line. Actions may include replacing overhead line with underground line, installing of associated structures, maintenance or upgrades of existing line
Special use management
Comment Period
11/12/2013
Decision
12/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T44N R6W Sec 36; T44N R5W Sec 31; T43N R5W Sec 6, 7, 17, 18, 20, 21 |
Environmental Assessment · Great Divide Ranger District · updated 12/10/2019
It is located east and south of Clam Lake, WI in Ashland and Sawyer counties; includes portions of townships Chippewa, Draper, Gordon, Marengo, Round Lake, Shanagolden, Spider Lake, and Winter. · Ashland; Sawyer, Wisconsin
This proposal would use timber management to move the forest towards the forest plan desired conditions. It would include timber harvest, prescribed burning, reforestation, modifications of the transportation system and wildlife habitat improvements.
Wildlife, fish, rare plantsForest productsRoad management
Comment Period
01/05/2018
Objection Period Start
03/22/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | It includes portions of the Townships 40-44 North and Ranges 3-5 West. |
Decision Memo · Washburn Ranger District · updated 12/10/2019
This project is located in the vicinity of County Hwy N just west of Drummond, Wisconsin. · Bayfield, Wisconsin
This project was developed as a part of the Community Wildfire Protection Plan (CWPP) for the Towns of Barnes and Drummond.The project proposes to treat hazardous ladder fuels; it may include the piling and burning of fuels.
Vegetation management (other than forest products)Fuels management
Comment Period
08/23/2013
Decision
12/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| CWPP County N Fuel Recuction Project | Decision Signed Date: 12/12/2013 Legal Notice Date: 12/18/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Bayfield County, Wisconsin T44N, R7W, Sec.5 & 6; T45N, R7W, Sec. 31 & 32; and T45N, R8W, Sec. 36 |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
Some of the areas within 450 feet of Frames, Springbrook and Waboo Creeks and the Marengo River that are dominated by aspen. · Ashland, Wisconsin
Convert aspen stands within the 450 foot riparian areas of cold-water streams (Frames and Waboo) and the Marengo River to longer-lived species by girdling some of the aspen trees and underplanting white pine
Special area managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Special Area Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Washburn Ranger District · updated 12/10/2019
The site is located on the west side of FR394 (Pigeon Lake road), between Pigeon Lake and Mountain lake about 5 miles west of Drummond, Wisconsin. · Bayfield, Wisconsin
The Forest Service is proposing to develop a gravel source, known as the Eureka site, on the Chequamegon-Nicolet National Forest (CNNF).
Minerals and geology
Comment Period
02/18/2014
Objection Period Start
08/30/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| EUREKA GRAVEL SOURCE DEVELOPMENT PROJECT | Decision Signed Date: 10/31/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Townships 45 North, Range 8 West, Sections 27, 28, 33, and 34 |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
The area of the Forest Lodge Historic District Special Management Area known as the cow pasture. · Bayfield, Wisconsin
Conduct a prescribed burn on the 3-acre grassy opening known as the Forest Lodge cow pasture as a first step in reducing hazardous fuels, re-establishing fire on the landscape, treating non-native invasive species, and restoring native species.
Special area managementVegetation management (other than forest products)Fuels management
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Rangeland Vegetation Improvements; Special Area Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T43N R6W S15 |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 12/10/2019
Forest-wide · Ashland; Bayfield; Florence; Forest; Oconto; Oneida; Price; Sawyer; Taylor; Vilas, Wisconsin
The forest proposes to treat cut stumps with borax to prevent colonization by Heterobasidion annosum, a root disease of pine and other conifers.
Forest products
Comment Period
06/17/2011
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Products Sales; Timber Sales (Salvage); Timber Sales (Green) |
| Heterobasidion Root Disease Control | Decision Signed Date: 11/15/2012 Legal Notice Date: 11/24/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Forest-wide |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
1/4 mile west of Moose Lake along Forest Circle Drive · Sawyer, Wisconsin
Authorization to convert a portion of an existing distribution line from overhead to underground and install a new section of underground distribution line along Forest Circle Drive.
Special use management
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Jump River Electric Rebuild Project | Decision Signed Date: 12/08/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T41N R6W S24 |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
Morgan Falls/St. Peters Dome Trailhead · Ashland, Wisconsin
Flood damage repair, reconstruction and realignment, including trailhead parking area relocation and expansion, trail segment construction, reconstruction, and repair, construction and installation of boardwalk over Morgan Creek and more
Recreation management
Decision
07/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T45N R4W Section 30 |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
Along Lakewoods Resort Golf Course southern boundary starting from FR 207 and heading west approximately 750 feet. · Bayfield, Wisconsin
Re-route a short section of snowmobile trail off a private golf-course and onto National Forest land
Recreation management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T43N R6W S21 |
Decision Memo · Great Divide Ranger District · updated 12/10/2019
0.81 of a mile of Snowmobile Trail 90 located adjacent to the Marengo River. · Sawyer, Wisconsin
Snowmobile Trail 90 Reroute
Recreation management
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T44N, R6W, Sections 26 and 27 |
Decision Memo · Lakewood-Laona Ranger District · updated 10/3/2019
Waupee Dam Repair is located at Township 32 North, Range 17 East, Section 21. · Oconto, Wisconsin
This project will repair Waupee Dam by replacing the pipe, filter material, drop inlet, and wing walls. It will also repair the emergency spillway.
Wildlife, fish, rare plants
Decision
05/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 10/3/2019
The connecter trail would be from the current bike trail to Boulder Lake boat landing parking lot. The parking area would be just south of Highway 64 on Van Alstine Road (Forest Road #3268). · Langlade, Wisconsin
Parking lot and trail connector construction
Recreation management
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 9/30/2019
Project is located in four locations on the Medford-Park Falls and Washburn Ranger Districts. More detailed maps will be provided on the project web page. · Bayfield; Price; Taylor, Wisconsin
Renewal of 4 special use Forest road permits to access private land. Renewal of 1 special use well permit to provide water to private residence.
Special use management
Decision
09/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 9/30/2019
Two proposed drilling locations are located on the northern portion of the Washburn Ranger District near Moquah Barrens · Bayfield, Wisconsin
The Forest Service and Wisconsin Geological Natural History Survey (WGNHS) are proposing to drill two boreholes, collect and describe the sediment, and install monitoring wells in the Bayfield Peninsula to better understand the area hydrogeology
Minerals and geology
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 9/27/2019
Multiple locations on Great Divide and Washburn Ranger Districts · Bayfield, Wisconsin
An amendment to the Special Use Permit to replace existing overhead powerline with a new underground line within the existing utility corridor right-of-way. Proposal includes the removal of overhead supporting infrastructure.
Special use management
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 9/8/2019
Diamond Roof and Otter Lake areas. · Forest; Oconto, Wisconsin
This project would expand current gravel pits to provide needed road maintenance material and for other uses.
Minerals and geology
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/24/2019
Transmission line is located in Price and Taylor Counties with the portion on National Forest being on the eastern side of the Taylor County portion of the Medford-Park Falls Ranger District. · Taylor, Wisconsin
Xcel Energy is planning to rebuild their W3477 electric transmission line, a portion of which is located on National Forest. The line would be the same voltage (69 kV), but taller poles would be installed to meet current line requirements.
Special use management
Decision
06/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 6/16/2019
Tracy's place is south of Mountain, WI on Highway 32. Trail 55544 is south of Flower Lake by the Marinette County. · Oconto, Wisconsin
New ATV route to business under a special use permit and relocating trail 55544 to Forest Road 2327 due to poor trail conditions.
Recreation management
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Tracy's Place ATV Access SUP | Decision Signed Date: 05/28/2019 |
| Crooked Lake Trail Reroute. | Decision Signed Date: 06/12/2019 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 6/8/2019
Culverts would be on Forbes, Hay, Rat, tributary to Knowles, and tributary to Kingstone creek, also South Branch Oconto River. · Forest; Langlade; Oconto, Wisconsin
This project would replace ineffective culverts on the Eagle River-Florence and Lakewood-Laona Ranger Districts in Forest, Langlade, and Oconto Counties.
Watershed management
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Great Divide Ranger District · updated 6/6/2019
FR 383 segment from North Country Trail to FR 383B. FR 150 segment south of FR 199. Snowmobile Trail 25 segment north of FR 199C to FR 187. Marengo River Bank southwest of FR 384C · Ashland; Bayfield, Wisconsin
As a result of the July 11, 2016, flood damage, the district is proposing to decommission and restore segments of Forest Road 383 and Forest Road 150, realign a segment of Snowmobile Trail 25, and stabilize a section of the Marengo River bank.
Watershed managementRecreation managementRoad management
Comment Period
11/21/2018
Objection Period Start
02/09/2019
Decision
06/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Trail Management; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 5/1/2019
Road right of way in Forest, Oconto, Oneida, and Vilas Counties · Forest; Oconto; Oneida; Vilas, Wisconsin
Wisconsin Public Service (WPS) is replacing overhead with underground electric lines in Forest, Oconto, Oneida, and Vilas Counties.
Special use management
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Washburn Ranger District · updated 4/5/2019
Project is located approximately seven miles northeast of Iron River, Wisconsin and in the Townships of Barksdale, Clover, Iron River, Keystone, Pilsen, Port Wing, Tripp, and Washburn. · Bayfield, Wisconsin
Vegetation and transportation management in the northern part of the District. Management actions would include clearcut and shelterwood systems to regenerate oak, aspen, and pine, and thinnings to promote growth and vigor in pine plantations.
Wildlife, fish, rare plantsForest productsFuels managementRoad managementVegetation management (other than forest products)
Comment Period
08/08/2018
Objection Period Start
02/09/2019
Decision
04/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Townships 47, 48 and 49 North Ranges 6, 7 and 8 West, 4th Principal Meridian |
Decision Memo · Medford-Park Falls Ranger District · updated 4/3/2019
Township 40 North, Ranges 1 and 2 East, Town of Eisenstein, Price County, Wisconsin. · Price, Wisconsin
Cheesehead19 is a proposal from the University of Wisconsin to conduct research to better determine how forest vegetation and management influence the atmosphere and affect weather patterns on a local scale.
Special use management
Decision
03/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Research And Development |
| Chequamegon Heterogeneous Ecosystem Energy-balance Study Enabled by a High-density Extensive Array of Detectors (CHEESEHEAD19) Flux Tower Installation | Decision Signed Date: 03/01/2019 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 4/3/2019
Town of Cleveland, Township 32 North, Range 3 West, Section 25; Town of Grover, Township 32 North, Range 2 West, Section 30; and Town of Ford, Township 31 North, Range 3 West, Sections 12, 13, and 24. · Taylor, Wisconsin
Treat some lowland ash stands by under-planting other lowland hardwood and conifer species in anticipation of over-story loss of ash trees from Emerald Ash Borer (EAB), a non-native, invasive pest that results in mortality of all native ash species.
Vegetation management (other than forest products)
Decision
03/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 4/2/2019
Lakewood-Laona Ranger District · Forest, Wisconsin
Correct aspen age to meet the forest plan
Forest products
Comment Period
05/25/2018
Objection Period Start
12/06/2018
Decision
04/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 3/22/2019
A number of roads across the Washburn District in Bayfield County and the North Country Trail. · Bayfield, Wisconsin
Repair and maintenance of roads throughout the District and a bridge replacement on the North Country Trail following the 2018 flood event in Bayfield County, WI. Actions on the roads include resurfacing, grading, culvert replacement and ditch work.
Recreation managementRoad management
Decision
03/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Road Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 3/18/2019
Surprise Lake T32N, R17E, Section 32 and North Branch Of The Oconto (north of Wabeno)T32N, R14E, Section 1. · Forest; Oconto, Wisconsin
WPS wants to energize the newly installed Centurylink cable near Sunrise Lake and north of Wabeno.
Special use management
Decision
03/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 2/25/2019
T43N R6W Section 17 · Ashland, Wisconsin
A special use permit authorizing the use and maintenance of an existing road (24-foot right-of-way) to access private land for a 20-year time period is proposed. Additional gravel will be placed and grading done on the existing roadway.
Special use management
Decision
02/2019 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 2/11/2019
This project is located in Township 37 North, Range 3 East, Sections 13-15, Price County, Wisconsin. · Taylor, Wisconsin
Amend Special Use Utility Permit to allow replacement of existing electric line in Price County.
Special use management
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 1/29/2019
Town of Molitor, Township 32 North, Range 1 West, Section 17 and in the Town of Chelsea, Township 32 North, Range 1 East, Section 16, Taylor County, Wisconsin. · Taylor, Wisconsin
Amendments to an existing permit issued to Taylor Elect6ric Cooperative that would allow an upgraded electric line to be installed, a new buried line to be installed, and Special Use Permits to private landowners for road access to their property.
Special use management
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 12/6/2018
Township 35 North, Range 13 East, Section 29. · Forest, Wisconsin
The project would expand the gravel pit to provide gravel for road maintenance in that area.
Minerals and geology
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 12/6/2018
T32N, R17E, Section 32 and T34N, R14E, Section 1. · Forest; Oconto, Wisconsin
Adding WPS line to energize the new CenturyLink fiber cables.
Special use management
Scoping Start
01/2019 (Estimated)
Decision
02/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 10/12/2018
Township 38 North, Range 3 East, Sections 34 and 35. · Price, Wisconsin
Relocation of a snowmobile trail to resolve water quality and soil impact issues.
Recreation management
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · R9 - Eastern Region All Units · updated 9/26/2018
Northern Great Lakes Visitor Center and Eagle Lake Rd, Bayfield County, WI. T46N R8W Section 4 and T47N R5W Section 2. · Bayfield, Wisconsin
Chequamegon Telephone Cooperative, Inc., dba Norvado, has proposed installing approximately 2,000 feet of fiber optic cable and associated equipment on National Forest System lands in Bayfield County, Wisconsin.
Special use management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 8/28/2018
Near Marengo Lake Road (FR 384), Town of Grandview, the section runs between FR 202 and FR 384. · Bayfield, Wisconsin
To replace about 3,000 ft of existing overhead powerline with a new underground line within the existing utility corridor. New buried cable would be within the existing right-of-way. Proposal includes the removal of overhead supporting infrastructure
Special use management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T 44 North, R 5 West, Sec 4, Bayfield County, WI |
Environmental Impact Statement · Lakewood-Laona Ranger District · updated 8/21/2018
Northeast Langlade, Northwest Oconto and South Forest Counties · Forest; Langlade; Oconto, Wisconsin
Vegetation and Road Management Project (to access click on "Analysis" for the Draft EIS). If you are having trouble viewing these documents in Internet Explorer please try a different web browser such as Chrome, FireFox or other web browser.
Forest products
NOI in Federal Register
05/29/2015
DEIS NOA in Federal Register
12/30/2017
FEIS NOA in Federal Register
03/29/2018
Objection Period Start
04/01/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 8/15/2018
Trail is near Armstrong Creek in the far north east corner of the district. Legal is T36N, R16E, Sections 1 and 12. · Forest, Wisconsin
Construction of a snowmobile trail.
Recreation management
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/26/2018
9 existing road across the west side of the National Forest · Ashland; Bayfield; Price; Sawyer; Taylor, Wisconsin
9 Landowners have requested year round, motorized access to private inholdings within the Forest using existing routes. The primary need is that there is no other way to reach the private parcels other than crossing federal ownership.
Special use management
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/19/2018
At the existing culvert crossing of the trail and McKenzie Creek in Taylor County, Grover Township, Township 31 North, Range 2 West, Section 27. · Taylor, Wisconsin
Culvert removal and installation of a bridge on Perkinstown Motorized Trail.
Recreation management
Decision
06/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/14/2018
Town of Eisenstein, Township 40 North, Range 2 East, Sections 24 and 25. · Price, Wisconsin
Developing a proposal to reroute the Smith Rapids Equestrian Trail in order to avoid 3 stream crossing structures, one of which is currently closed. Proposed reroute will be from Smith Rapids Campground north into the Buffalo Farms area.
Recreation management
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 6/10/2018
T31-43N, R11-17E, Nicolet National Forest · Florence; Forest; Langlade; Oconto; Oneida; Vilas, Wisconsin
This project NEPA would cover destructive events on the Nicolet National Forest.
Forest products
Comment Period
08/25/2015
Objection Period Start
05/2016 (Estimated)
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 6/10/2018
Lakewood-Laona Ranger District · Forest; Oconto, Wisconsin
Bury power lines to replace old over head lines and one new line would be installed.
Special use management
Decision
02/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 4/9/2018
Along roads in Ashland and Oconto Counties · Ashland; Oconto, Wisconsin
Installing fiber optic cable for less than 15 miles in Ashland and Oconto Counties.
Special use management
Decision
03/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 3/29/2018
Various locations across district. · Ashland; Sawyer, Wisconsin
Multiple test holes would be dug at several locations to determine if an area has the potential for gravel pit expansion or development. See map.
Minerals and geology
Decision
01/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 3/29/2018
T41N, R6W, Section 8, 9, 16 and 17 · Sawyer, Wisconsin
Relocate about one mile of ATV Trail #5 located east of Forest Road 320 and north of Forest Road 164 or Moose Lake Road.
Recreation management
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 3/21/2018
Forest and Oconto Counties. · Forest; Oconto, Wisconsin
Replace five culvert throughout the district in Forest and Oconto Counties.
Watershed management
Scoping Start
01/2018 (Estimated)
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 1/24/2018
Two different areas include the southeast part of Lakewood and Bear Lake areas. · Oconto, Wisconsin
The road are in need of heavy maintenance and pull outs to increase safety.
Road management
Scoping Start
01/2018 (Estimated)
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 1/24/2018
Pit location is off Forest Road 2136, just east of the Town of Blackwell. · Forest, Wisconsin
Expansion of the pit to provide material for roads and trail maintenance.
Minerals and geology
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 11/16/2017
This trail reroute is in the Town of Westboro, Township 33 North, Range 1 East, Section 5, Taylor County, Wisconsin. · Taylor, Wisconsin
Reroute of existing snowmobile trail to avoid large wetland crossing. Reroute uses existing motorized travel corridors.
Recreation management
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 11/9/2017
Township 33 North, Range 17 East, Sections 12 and 13. · Oconto, Wisconsin
Current trail would be rerouted onto two different forest service roads, with .25 of trail construction.
Recreation management
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 10/22/2017
Nelligan Lake area · Oconto, Wisconsin
Mechanical seedbed scarification for oak and white pine seed production in nine stands for about 230 acres.
Forest products
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 8/25/2017
Township 32 North, Range 3 West, Section 24, Taylor County, Wisconsin about 20 miles northwest of Medford Wisconsin. · Price; Taylor; Vilas, Wisconsin
Restoration and improvement of nesting habitat for wood turtle, a state threatened and Regional Forester Sensitive Species (RFSS) on the Cheqamegon-Nicolet National Forest.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Decision
08/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 8/24/2017
Forest Lodge is located eight miles east of Cable, Wisconsin on the Chequamegon-Nicolet National Forest in northern Wisconsin. · Ashland, Wisconsin
A new septic system would be installed to service the five buildings at Forest Lodge that will have potable water service.
Facility management
Decision
08/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Parts of Townships 40-44 North, R 3-7 West |
Decision Memo · Washburn Ranger District · updated 8/3/2017
There are two segments of line proposed for replacement: 1) about 1.3 miles along Blue Moon Road (FR 365), and 2) about 8 miles in the corridors near US Hwy 2. · Bayfield, Wisconsin
This is a proposal by Bayfield Electric Cooperative, Inc. to convert about 9.3 miles of overhead electric line to underground electric wires within their existing utility corridor in order to provide a safer and more reliable electric service.
Special use management
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/28/2017
Various flood damage locations in the Great Divide and Washburn ranger districts. · Ashland; Bayfield; Sawyer, Wisconsin
Flood damage repairs on multiple sites in the Great Divide and Washburn ranger districts from July 11, 2016, storm event.
Recreation managementRoad management
Decision
07/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Road Improvements/Construction; Travel Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/20/2017
This action is located the Great Divide, Medford-Park Falls and Washburn Ranger Districts. · Ashland; Bayfield; Price; Sawyer; Taylor, Wisconsin
Reissuance of 27 Special Use Permits. One for the Fifield Township to display and maintain a sign and 26 separate existing permits for the continued use and maintenance of roads that access private property. No additional construction is proposed.
Special use management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 7/18/2017
Near Bear Paw Lake. · Oconto, Wisconsin
Rerouting the snowmobile trail off private land and onto closed Forest Service roads.
Recreation management
Scoping Start
11/2016 (Estimated)
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/18/2017
Along roads in Price, Florence and Forest Counties. · Florence; Forest; Price, Wisconsin
Installing fiber optic cable for less than 11 miles in Price, Florence and Forest Counties.
Special use management
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/18/2017
T39N, R3E; T40N, R4E; T40N, R11E, Price and Vilas County, Wisconsin · Price; Vilas, Wisconsin
Frontier North Inc. has proposed the installation of approximately four miles of fiber optic cable and associated improvements on the CNNF on the in Price, Vilas, and Oneida Counties. The installation method will be vibratory plowing or boring.
Special use management
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 7/18/2017
T44N, R7W, Section 31, SWNW, Bayfield County for access to private land on Wilipyro Lake. · Bayfield, Wisconsin
Proposal to approve issuance of special use permit for the use of existing National Forest System road in order to access private property
Special use management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Medford-Park Falls Ranger District · updated 7/18/2017
The project area is located in the northern portion of Taylor County on the Medford-Park Falls Ranger District, of the Chequamegon-Nicolet NF, approximately 10 miles northwest of Medford, Wisconsin. · Taylor, Wisconsin
Timber harvest and forest regeneration activities for aspen are being considered along with associated ground based access. Some road construction,reconstruction, maintenance and decommissioning proposals will be considered.
Forest productsRoad management
Comment Period
07/07/2016
Objection Period Start
04/13/2017
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Biomass; Road Decommissioning; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 7/18/2017
T40N, R3E, Section 17, Price County for access to private land on Nettie B Lake. T33N, R1W, Section 13, Taylor County for access to private land on the Mondeaux River, north of the Mondeaux Dam. · Price; Taylor, Wisconsin
Proposal to approve issuance of special use permits for the use of existing National Forest System roads and motorized trails in order to access private property.
Special use management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Eagle River-Florence Ranger District · updated 7/18/2017
The project area is in the southeastern portion of the District, stretching from east of Morgan Lake Campground to HWY 55. · Florence; Forest, Wisconsin
Move forests to desired conditions, contribute toward wood products demand, provide an efficient road system, increase public safety related to wildfire potential, enhance wood turtle habitat,and maintain Mud Lake hunter hiking trail and openings.
Wildlife, fish, rare plantsForest productsRecreation management
Comment Period
05/31/2016
Objection Period Start
12/17/2016
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T38N, R16E; T38N, R15E; T38N, R14E; and T38N, R13E |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/18/2017
Township 34 North, Range 14 East, Sections 7, 8, and 9. · Forest, Wisconsin
North Branch Oconto River restoration, removing the Remnant Dam and replacing road stream crossings
Watershed management
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 7/18/2017
Location of trail is east of Chequamegon Waters Flowage in T31N, R2W and T32N, R2&3W in the Towns of Cleveland and Grover. · Taylor, Wisconsin
Based on a safety audit report, the Forest Service is proposing to address safety concerns on about 3,000 feet of the trail where widening and reshaping is needed. Also being considered is the addition of about 1.6 miles of trail on existing roads.
Recreation management
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Washburn Ranger District · updated 7/18/2017
The north end of the Washburn Ranger District. Concentrations of damage in the Twin Lakes and Birch Grove Campground area · Bayfield, Wisconsin
Salvage of timber and forest restoration projects following the July 21, 2016 wind and rain storm event. This proposal is to treat approximately 3,000 acres of damaged timber, based on an aerial imagery analysis.
Forest products
Comment Period
01/23/2017
Objection Period Start
04/10/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 7/18/2017
T39N, R11E, Sec 1, 2, 11, 12, 14, 23, 26, 34; T40N, R11E, Sec 34, 35, 35; T40N, R12E, Sec 28, 29 · Forest; Oneida; Vilas, Wisconsin
Installation of approximately 5.8 miles of underground electric cable and the removal of approximately 1.5 miles of overhead electric lines to improve electric reliability to rural communities.
Special use management
Decision
04/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/18/2017
T31N, R16E, Section 3; T32N, R15E, Section 8; T32N, R16E, Section 21; Oconto County, Wisconsin · Oconto, Wisconsin
Installation of approx. 8,448 feet of underground electric line within the existing road right-of -way on Oconto Hwy T, old Hwy 32,and Tar Dam Road.
Special use management
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 7/18/2017
Nicolet side of the forest · Forest, Wisconsin
Update powerlines
Special use management
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 5/18/2017
South Branch of the Oconto River in Langlade County. Township 32 North, Range 14 East, Section 12.Stoney Creek is in Forest County, Township 35 North, Range 15 East, Section 10. · Forest; Langlade, Wisconsin
Replacing the culverts at the crossing of the South Branch of the Oconto River/Forest Road 2122 and Stoney Creek/ Forest Road 2136.
Watershed management
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Decision Decided Date | 05/18/2017 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 3/30/2017
T44N R7W Sections 26, 27, 34, & 35, Bayfield County, WI · Bayfield, Wisconsin
Proposal to install approximately 1.4 miles of underground fiber optic cable and associated equipment. All of the installation would be adjacent to existing roadways. This project would provide faster and more reliable internet service.
Special use management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 1/18/2017
Forest System lands along Bayfield County Highway M in T43N R6W Sections 17, 18, 19, and 20. · Bayfield, Wisconsin
Proposal to relocate a powerline from a cross-county location to along Bayfield Co. Hwy. M. The existing line was built in wetlands, relocating the line would reduce impacts to wetlands, and improve access for future maintenance.
Special use management
Decision
01/2017 (Estimated)
Implementation
02/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 12/15/2016
Lakewood-Laona District · Forest; Oconto, Wisconsin
Culverts are located throughout the Lakewood-Laona District.
Watershed management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Great Divide Ranger District · updated 12/12/2016
Forest Lodge Historic District and areas across the Great Divide District (e.g. North Country Trail, Porcupine Lake Wilderness, Rock Lake Trail, Forest Lodge Nature Trail, and recreation sites). · Ashland; Bayfield; Sawyer, Wisconsin
Proposal to issue a long term lease under the Historic Preservation Act for the Occupancy and Use of Forest Lodge Historic District for education, interpretation, & research to create a premier center for environmental leadership and conservation.
Heritage resource managementSpecial use management
Comment Period
08/25/2016
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Heritage Resource Management; Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 12/8/2016
This proposal involves a line that has already been constructed on Forest System lands in T44N R8W Sections 24, Bayfield County, WI. · Bayfield, Wisconsin
Proposal to authorize 200' of an existing power line through an amendment to Bayfield Electric's current permit. The line was installed around 1950 without Forest Service approval and is not covered under the Bayfield Electric's existing permit.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 11/8/2016
Townships of Spider Lake and Round Lake, Sawyer County, WI. · Sawyer, Wisconsin
The proposal is to allow the install of about 10 miles of underground fiber optic cable, 700 ft. of copper cable and associated equipment. Most of the installation would be adjacent to existing roadways or within existing utility corridors.
Special use management
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 10/19/2016
Individual red and jack pine stands north of Hwy 2 in Bayfield County, WI. · Bayfield, Wisconsin
The proposal to improvement of the health of the stands affected by the storm includes harvest of the damaged timber and reforestation of affected stands. Prompt salvage, site preparation, and hazardous fuel reduction.
Fuels managementVegetation management (other than forest products)Forest products
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 10/13/2016
This project is located in parts of Sections 2 and 12 in T33N, R2W, part of Section 18 in T33N, R1E, and part of Section 1 in T32N, R1W of Taylor County, WI, Towns of Westboro and Molitor. · Taylor, Wisconsin
Salvage and thinning harvest of trees as a result of July 2016 storms.
Forest products
Decision
10/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 10/7/2016
The Great Divide District sections are near Lake Five Road and Ryans Lane Road in Cable, WI. The Washburn sections include Finger Lake Road in Delta, WI and Lake Owen Station Road in Drummond, WI. · Bayfield, Wisconsin
An amendment to the Special Use Permit to maintain and reconstruct electric lines: approximately 3.9 miles of line replacement, 3.2 miles of underground line installation, and 2.9 miles of overhead line removal.
Special use management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 9/23/2016
parts of Section 3, T38N R15E; Section 25 and 36, T39N R15E · Florence, Wisconsin
The Grandma Lake area was affected by a windstorm on 7/11/16. Strong winds pushed over tree and created an area of high fuel levels and stunted timber production. This project will increase forest health and make sure stands stay w/in FP guidelines
Forest productsVegetation management (other than forest products)
Decision
08/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 9/23/2016
The North Reservoir Salvage project area is located on the Eagle River-Florence Ranger District in Florence County (in T41N R12E). · Florence, Wisconsin
The project will treat about 232 acres of northern hardwoods through a salvage harvest this fall and winter. The North Reservoir Salvage project area was affected by a windstorm in July/August of 2016.
Forest productsVegetation management (other than forest products)
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 9/1/2016
The project is located along Forest Road 132 in T37N, R3E, parts of Sections 15, 22, and 27, in the Town of Emery, Price County, Wisconsin. · Price, Wisconsin
Price Electric Cooperative, Inc. (PEC) is requesting approval to upgrade / rebuild about 9300 feet of electric lines on the Chequamegon-Nicolet National Forest in Price County, WI
Special use management
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 8/31/2016
This project is located in the southeast corner of the Lakewood Ranger District, just north of highway 64. · Oconto, Wisconsin
This project would use mechanical site preparation for a paper birch stand, creating a better seedbed for replanting paper birch.
Forest products
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 8/18/2016
Lakes Include: Lake Three, Potter, Day, Little Clam, Mineral, Eas t& West Twin, Spillerburg, Gates, Black, Camp Four, Wilson, Two Axe, Ghost, Club, Coffee, Buffalo, Taylor, Twin Lakes, and Crystal · Ashland; Bayfield; Sawyer, Wisconsin
Proposal to improve habitat in 20 lakes across the district by adding woody shoreline and submerged structure (e.g. fish cribs, pyramid type brush shelter, half log structures, or tree drops). This 10 year proposal would treat 1-3 lakes a year.
Wildlife, fish, rare plants
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 8/8/2016
Township 33 North, Range 1 West, Section 22, off of FR 569E, Town of Westboro, in Taylor County, WI. · Taylor, Wisconsin
The US Forest Service is proposing to issue a special use permit that would authorize operation of all-terrain vehicles, snowmobiles, and other low impact vehicles on existing routes in order to access private property.
Special use management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 7/11/2016
Individual red pine stands scattered across the Washburn, Great Divide and Medford-Park Falls Ranger Districts. · Ashland; Bayfield; Price; Sawyer; Taylor, Wisconsin
To conduct thinning of individual red pine stands located across the Washburn, Great Divide and Medford - Park Falls Ranger Districts. The primary purpose of the project is to increase the growth and vigor of red pine stands across the forest.
Forest products
Comment Period
05/21/2015
Objection Period Start
03/12/2016
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/29/2016
This project is located approximately 12 miles east of Park Falls in T40N, R2E, Section 14, Price County, WI. · Taylor, Wisconsin
The US Forest Service is proposing to remove an existing concrete water level control structure (dam) and surrounding fill material on the lower reaches of Camp Four Springs and restore the area to historic flood plain elevation.
Wildlife, fish, rare plantsWatershed management
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 6/28/2016
Near private parcels N1/2 SE1/4, Section 36, T42N, R11E and NW1/4 SW1/4, Section 31, T42N, R12E · Vilas, Wisconsin
A private landowner has requested a Special Use Permit allowing motorized access over an existing closed road, Forest Road 2543, for a length of 1,420 feet north from Highway 17 and then 50 feet to the east and 50 feet to the west.
Special use management
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 2016 Tollroge Properties, LLC - Special Use Permit | Decision Signed Date: 05/20/2016 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 6/13/2016
T34N, R16E, Section 28 Northeast of Turtle Lake. · Forest, Wisconsin
Programmatic project to maintain wildlife openings on the Lakewood-Laona Ranger District.
Wildlife, fish, rare plants
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 6/6/2016
About 5 miles southeast of Clam Lake, Wisconsin on Hwy 77. T42N R5W Sec. 14 · Sawyer, Wisconsin
The proposal is to remediate the resource damage that resulted from the breach of the Ike Lake Dam that deposited sedimentation in the creek bed and erosion of the creek banks.
Watershed management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 5/26/2016
Project is located at T31N, R16E, Sec 25, 36; T33N, R15E, Sec 11; T34N, R14E, Sec 7 · Forest; Oconto, Wisconsin
Installation of approximately .7 miles of underground electric cable and the removal of approximately .5 miles of overhead electric lines to improve electric reliability to rural communities.
Special use management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 5/26/2016
Road-stream crossings scattered across the Great Divide Ranger District. Spring Brook Dam is located at SW1/4; SW1/4; Sec26; T45N; R4W, Ashland County. · Ashland; Bayfield; Sawyer, Wisconsin
Repair, replace and/or maintain 8 culverts and the removal of the Spring Brook Dam to restore the flow of waters into natural channels.
Watershed managementRoad management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 5/25/2016
Fifteen stream locations across the western Ranger Districts of the Chequamegon-Nicolet National Forest. · Ashland; Bayfield; Price; Sawyer; Taylor, Wisconsin
Stream habitat maintenance and restoration on 15 Class I and II trout stream systems. Stream restoration would include brushing and placement and maintenance of brush bundles/mats within the stream channel.
Wildlife, fish, rare plantsWatershed management
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 4/28/2016
Along Forest Road 2197, south of Anvil Lake · Vilas, Wisconsin
The Forest Service has identified a need to construct and designate a segment of trail, as well as designate an existing corridor as snowmobile trail in response to an existing segment of snowmobile trail no longer able to be used.
Recreation management
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 4/13/2016
Little Cranberry Lake Pit #40006 at T40N R3W S14 SWSW, S15 SESE, and S22 NENE Trout Lake FR715 Pit at T41N R6W S21 NENE FR 204 Barrow Pit #40026 at T43N R5W S30 NESW · Bayfield; Sawyer, Wisconsin
3 areas across the District would be inventoried for potential gravel. Up to 20 holes approximately 8 x 6 feet in size spaced about 200 feet apart dug with an excavator, studied for gravel, and filled in shortly after digging.
Minerals and geology
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| 2016 Gravel Prospecting | Decision Signed Date: 04/13/2016 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 4/6/2016
Small 1 to 5 acre openings scattered across the central portion of the Great Divide Ranger District. · Ashland; Bayfield; Sawyer, Wisconsin
Improvement of existing upland openings by hand-cutting, mowing, or burning
Wildlife, fish, rare plants
Decision
04/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 3/25/2016
T41N R6W Sections 15, 17, 21, and 22 in Sawyer County, Wisconsin along the north side of Forest Road 164, also known as Moose Lake Road · Sawyer, Wisconsin
Installation of approximately 1.5 miles of underground fiber optic cable along the north side of Forest Road 164, also known as Moose Lake Road. The proposed route is adjacent to an existing underground copper cable.
Special use management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| FR164 CenturyLink Fiber Optic | Decision Signed Date: 11/30/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T41N R6W S 15, 17, 21, and 22 |
Decision Memo · Lakewood-Laona Ranger District · updated 3/10/2016
Town of Riverview. · Oconto, Wisconsin
Renewal of a permit for a transfer station and removal of hazard trees.
Special use management
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 2/16/2016
North side of Deerskin River, along Forest Road 2523B · Vilas, Wisconsin
Removal of a 1936 fish hatchery within the Deerskin River that is a Class 1 trout stream valued for its native brook trout and as an important recreational resource.
Watershed management
Decision
02/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 1/28/2016
Permits scattered through the Nicolet National Forest · Florence; Forest; Oconto, Wisconsin
Several special use permit renewals on the Eagle River-Florence and Lakewood-Laona Districts
Special use management
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 12/15/2015
Pits are located throughout the district. · Forest; Oconto, Wisconsin
These pits would be tested for mineral sources.
Minerals and geology
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 11/12/2015
Parts of T31-41N, R1W-3W, R1E-R4E · Price; Taylor; Vilas, Wisconsin
The purpose of this project is to use mechanical methods or prescribed fire to restore and enhance wildlife openings to prevent natural selection succession to woody plants and by using native species when planting for wildlife habitat improvement.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 10/21/2015
T39N, R1E, Section 13 · Oneida, Wisconsin
This project will allow the snowmobile re-route of the Three Lakes Snowmobile Trail #5 that currently follows Forest Road (FR) 2178 (Military Rd.) in Oneida County on the Eagle River-Florence Ranger District, Chequamegon-Nicolet National Forest.
Recreation management
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T39N, R11E, Section 13 |
Decision Memo · Lakewood-Laona Ranger District · updated 9/13/2015
Engelking trail along Engelking Road near Armstrong Creek and Windfall Lake trail is along Highway 52 near Windfall Lake. · Forest, Wisconsin
The widening is needed to create safer riding on the Engelking and Windfall Lake Snowmobile Trails.
Recreation management
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 8/24/2015
Lakes include: Anodanta, Arrowhead, Bass Lake, Canthook, Cisco, East & West Twin, Happles, Hoist, Horseshoe, Long, Lund, Northeast, Perch, Pigeon, Pine, Sawdust, Silver, Star, Steelhead, & Wilderness · Bayfield, Wisconsin
Proposal to improve habitat in 21 lakes across the district by adding woody shoreline and submerged structure (e.g. fish cribs, pyramid type brush shelter, half log structures, or tree drops). This 10 year proposal would treat 1-3 lakes a year.
Wildlife, fish, rare plants
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Washburn Fish Habitat Improvement Project | Decision Signed Date: 08/24/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Located in parts of: T44N, R7W; T45N, R7W; T45N, R8W; T46N, R7W; T46N, R8W; T47 N, R7W; T48N, R6W; T48N, R7W; T49N, R6W |
Decision Memo · Eagle River-Florence Ranger District · updated 8/13/2015
Legal location is Township 40 North, Range 13 East, Sections 11, 12 and 13. The local area is the intersection of Highway 70 and 55. · Forest, Wisconsin
This project would temporarily reroute a snowmobile trail while logging equipment is using the area.
Recreation management
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 7/16/2015
Legal area is T33N, R17E, Section 13 on the east boundary of the District. · Oconto, Wisconsin
Temporary and permanent private land access on Forest service trails and roads
Special use management
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Strecok Private Land Access SUP Project | Decision Signed Date: 06/15/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 7/2/2015
Pine Lake boat dock on the north west side of the lake. The lake is T37N, R12E, Section 16. · Forest, Wisconsin
Issue an special use permit for installing and maintaining an additional dock at Pine Lake.
Special use management
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Pine Lake Association | Decision Signed Date: 06/23/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 6/25/2015
The requested access is located off of Forest Road 130 in T38N, R3E, SE ¼ of Section 24 about 18 miles east of Phillips, WI. · Price, Wisconsin
Little Willow Hunting Club is requesting a special use permit for use of two existing roads on National Forest System land to access a timber sale and cabin on their property which lies to the east of the Forest boundary.
Special use management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/22/2015
Various location on the West side of the Chequamegon Nicolet NF. · Ashland; Bayfield; Price; Sawyer; Taylor, Wisconsin
The forest proposes the renewal of various expired or expiring road special use permits on the west side of the Chequamegon-Nicolet National Forest.
Special use management
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 6/16/2015
The power line is about a mile long and runs from East Horseshoe Road to West Horseshoe Road. · Bayfield, Wisconsin
Removal of an overhead power line in the Town of Drummond, Wisconsin. The line served a cabin off of West Horseshoe Road. The cabin has been removed and power is no longer need to the site.
Special use management
Decision
03/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Bayfield Power Line Removal Project | Decision Signed Date: 03/06/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T 44N, R7 W, Section 14 |
Decision Memo · Washburn Ranger District · updated 5/29/2015
Eight miles east of Iron River, WI. · Bayfield, Wisconsin
The Cooperative mistakenly installed a generator at the Ino Tower facility without approval. Proposal is to amend an existing permit to allow for the generator and associated equipment within the fenced area. Footprint (fenced area) remains the same.
Special use management
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Chequamegon Communications Cooperative Inc. Ino Tower Generator Project | Decision Signed Date: 04/10/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 5/29/2015
The campground is located along the shores of Lake Owen about 4 miles southeast of Drummond, Wisconsin. · Bayfield, Wisconsin
Campground maintenance proposal includes: upgrading 2 hand pump wells to solar; replacement of Lake Owen boat launch; day use parking area creation; replacing 3 older toilet buildings; dump station alarm installation; and capping of an old well.
Recreation management
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Decision Decided Date | 05/28/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T44N, R7W, Sec. 13 and 14, Bayfield County, WI. |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 5/26/2015
Argonne and Harshaw Experimental Forests · Forest; Oneida, Wisconsin
This research is looking at the effect of warming winters on the sustainability of US forests.
Vegetation management (other than forest products)
Comment Period
05/2015 (Estimated)
Objection Period Start
07/2015 (Estimated)
Decision
07/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 5/18/2015
Armstrong Creek near the east boundary of the district. · Forest, Wisconsin
Culvert replacement on unnamed tributary to Armstrong Creek/FR 2163, Haymeadow Creek/FR 2205, Lilypad Creek/FR 2424, Lauterman Lake outlet/Lautermen Lake ski trail, and South branch of the Popple River/FR 2162A
Watershed management
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Decision Decided Date | 05/18/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 5/11/2015
Hwy 63 corridor south of Drummond, Wisconsin · Bayfield, Wisconsin
Community Wildfire Protection Plan project to reduce ladder and surface fuels located within 200 feet of each side of Hwy 63. Ladder fuels treatments improve health and vigor of the timber stands by removing brush and tree vegetation competition.
Vegetation management (other than forest products)Fuels management
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Highway 63 CWPP Project | Decision Signed Date: 05/11/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 4/27/2015
Mosquito Creek Crossings on Hwy 32 and Diamond Roof Road. · Oconto, Wisconsin
Improve two of Mosquito Creeks Crossings at Hwy 32 and Diamond Roof Road.
Watershed management
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Mosquito Creek Crossing | Decision Signed Date: 04/27/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 4/27/2015
Township 40 North, Range 12 East, Section 27 · Forest, Wisconsin
This project would add more fish cribs the Butternut Lake.
Wildlife, fish, rare plants
Decision
04/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 4/17/2015
Sawdust Lake located adjacent to FR 241 about 6.5 miles east of Iron River, Wisconsin. · Bayfield, Wisconsin
Proposal to maintain / restore the Sawdust Lake dispersed camping site. Activities include: maintenance on the roads and boat launch, leveling campsites, erosion control, blocking off of illegal use, and installation of wilderness toilets.
Recreation managementRoad management
Decision
04/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Road Maintenance; Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T 47 N, R 7 W, Section 8 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 4/6/2015
Southeast boundary of the district, T31N, R17E, Section 1 · Oconto, Wisconsin
An additional burn unit would be added to the original Lakewood Southeast Project.
Fuels managementForest products
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 3/16/2015
Sections of Cisco Lake Road (FR 397) and Nymphia Lake Road (FR 224) located north of Drummond Wisconsin. · Bayfield, Wisconsin
Proposal to improve roads and watersheds by restoring proper drainage at three sites. Road maintenance to minimize watershed impacts includes: gravel surfacing, crowning the road, re-establishment of outlet ditches, and installing/replacing culverts.
Road managementWatershed management
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Watershed Improvements |
| Cisco Lake and Nymphia Lake Road Maintenance: Culverts Decision Memo | Decision Signed Date: 03/16/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T 45N, R7W, Sec. 13, 21, and 28 |
Decision Memo · Great Divide Ranger District · updated 3/13/2015
Road-stream crossings scattered across the Great Divide Ranger District · Ashland; Bayfield; Sawyer, Wisconsin
Repair, replace and/or maintain culverts and bridges along existing roads and trails with identified drainage problems at 15 sites. Stabilize about 1.5 miles of FR 383 and 0.25 miles of FR 378A to reduce road surface erosion and sedimentation.
Road managementWatershed management
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Watershed Improvements |
| 2015 GD Road and Stream Crossings Repair and Maintenance | Decision Signed Date: 03/06/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 3/13/2015
Crystal Lake and the red and jack pine stand 1/8 mile south of the boat launch. Stand is accessed via Forest Roads 211 and 1391. · Bayfield, Wisconsin
Build and install fish structures with the DNR and volunteers. Proposal includes trees donated by an adjacent private land owner and the harvest of 70 jack pine trees, ranging in DBH from 4" to 10", from Forest Service lands south of Crystal Lake.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T43N R7W S5 |
Decision Memo · Great Divide Ranger District · updated 3/13/2015
Specific sites on the Great Divide Ranger District as requested and approved in advance. Sites under consideration include a portion of the Forest Lodge site on Lake Namakagon and Mineral Lake launch. · Ashland; Bayfield, Wisconsin
Special Use authorization for Northland College to conduct educational and/or research programs, activities, tours, and fundraising events at Forest Lodge and other sites across the Great Divide Ranger District.
ResearchSpecial use management
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3); 32.11, 7 Cfr 1B.3(A) (4); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Research And Development |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 3/9/2015
This project is located on the ANR Pipeline on the east boundary of the Lakewood Ranger District. · Oconto, Wisconsin
Repair of heavy erosion and devegetation due to off road vehicle use of the pipeline area.
Watershed management
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| 2015 Pipeline Rehabilitation-Erosion control Site 2 | Decision Signed Date: 03/09/2015 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Northern Great Lakes Visitor Center · updated 3/2/2015
Northern Great Lakes Visitor Center, Bayfield County WI · Bayfield, Wisconsin
The proposal is to improve 25 acres of habitat at the Northern Great Lakes Visitor Center; activities include prescribed burning, site preparation for tree planting, tree planting, plowing/tilling open grasslands, and planting native seed.
Wildlife, fish, rare plants
Decision
04/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Northern Great Lake Visitor Center Restoration Project | Decision Signed Date: 04/15/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Northern Great Lakes Visitor Center |
| Legal Land Description | Not Applicable |
Decision Memo · Northern Great Lakes Visitor Center · updated 3/2/2015
Northern Great Lakes Visitor Center, Bayfield County WI · Bayfield, Wisconsin
Proposal to improve 180 acres of habitat at the Northern Great Lakes Visitor Center in the next 10 years; activities include prescribed burning, site preparation planting, tree and native seed planting, plowing/tilling, and grazing for NNIS control.
Wildlife, fish, rare plants
Decision
02/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Northern Great Lakes Visitor Center |
| Legal Land Description | T47N R5W Sec 2 W 1/2 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 1/23/2015
This project is located in parts of T39-40N, R1-3E in Price County, WI (Flambeau Trail)and in parts of T40-43N, R3-4W in Ashland and Sawyer Counties (Dead Horse Run Trail), WI. · Ashland; Price; Sawyer, Wisconsin
Trail reconstruction for allowance of utility terrain vehicles < 65 inches in width (UTVs). Activities include widening of corners and reshaping or resurfacing the trail tread.
Recreation management
Decision
01/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 1/23/2015
Town of Hammel, T31N, R1W, Section 6. · Taylor, Wisconsin
Replacement / burial of electric line along Red Pine Road to improve service, access for maintenance, and to reduce impacts from stream/water crossings with old line.
Special use management
Decision
01/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 12/3/2014
Cut areas are scatted around Diamond roof. · Oconto, Wisconsin
Removal of dead and dying trees from a wind event
Forest products
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 12/3/2014
NST in Lakewood to Sullivan Springs Road · Oconto, Wisconsin
Add ATV trails from the Nicolet State Trail (NST) in the Lakewood Area to Sullivan Springs Road.
Recreation management
Comment Period
02/27/2014
Objection Period Start
04/2014 (Estimated)
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T32N, R16E, Sections 1, 3, 11, and 12; T33N, R16E, Section 36 |
Decision Memo · Lakewood-Laona Ranger District · updated 11/1/2014
This project is located on the east boundary of the district adjacent to the pipeline. · Oconto, Wisconsin
This project would provide the permitee with motorized access to their private land
Special use management
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 10/29/2014
Great Divide is Ashland County, Sec. 31, T41N R4W; and Sawyer County, Sec. 17, and 30-32 T41N R6W, and Sec. 29, T41N R5W. Medford-Park Falls District is Price County, Sec. 10, and 12,T39N R1E · Ashland; Price; Sawyer, Wisconsin
The salvage harvest of approximately 184 acres and thinning harvest of 38 acres of red pine in stands damaged by a windstorm in September 2014. Project includes fuel treatments, site preparation, and red pine planting for regeneration.
Forest productsFuels management
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage) |
| 2014 Red Pine Salvage Project | Decision Signed Date: 10/28/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Eagle River-Florence Ranger District · updated 10/20/2014
Morgan Lake Campground · Florence, Wisconsin
Designate Morgan Lake Campground for ATV use.
Recreation management
Comment Period
04/18/2014
Objection Period Start
10/14/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 10/2/2014
Line rebuild would occur along Mondeaux Avenue (Forest Road 102) in the Town of Chelsea (T32N R1E), parts of Sections 5 and 6. · Taylor, Wisconsin
To improve reliability of electric service to customers in the Mondeaux Flowage and North Twin Lake area, Taylor Electric Coop. has requested to renew/amend their permits in order to replace existing lines and bury about 1500' of new line.
Special use management
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 8/22/2014
Oconto River · Oconto, Wisconsin
Improve nesting habitat for turtles.
Wildlife, fish, rare plants
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Turtle Nesting Site Update | Decision Signed Date: 08/14/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 8/15/2014
North of Namekagon Lake, about 7 miles southeast of Drummond, Wisconsin. · Bayfield, Wisconsin
The salvage harvest of approximately 50 acres of trees and individual tree selection harvest of 70 acres of northern hardwood in stands damaged by a windstorm in August 2013. Project includes fuel treatments and site preparation for regeneration.
Fuels managementForest products
Decision
08/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Timber Sales (Green) |
| Pioneer Road Salvage Project | Decision Signed Date: 08/15/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T44N, R6W, Sec 27 and 28 |
Decision Memo · Lakewood-Laona Ranger District · updated 7/25/2014
Nicolet National Forest · Florence; Forest; Langlade; Oconto; Oneida; Vilas, Wisconsin
The project will add logs, log structures and root wads to the programmatic fisheries program.
Wildlife, fish, rare plants
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Revised Nicolet Waterways Restoration Project | Decision Signed Date: 07/14/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 7/23/2014
Pigeon Lake Hunter Walking Trail: T45N R8W Sec. 34, 35 & T44N R8W Sec. 2, 3. Star Lake Hunter Walking Trail: T45N R7W Sec. 2, 3, 10, 11, 12 · Bayfield, Wisconsin
The proposal is to maintain approximately 14 miles on two hunter walking trails and nine upland openings totaling approximately 30 acres. The trail corridors and upland openings proposed under this project already exist; no new construction.
Wildlife, fish, rare plants
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Hunter Walking Trail Project | Decision Signed Date: 07/22/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/30/2014
Various location on the West side of the Chequamegon Nicolet NF. · Ashland; Bayfield; Vilas, Wisconsin
Four applicants have requested special use authorizations to access private land across the National Forest. The proposal is to authorize access to private land; proposal consists of existing road improvement and less than 500' of new construction.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 6/28/2014
Tie Mill Road Connector is by Grandma Lake. Windsor to Carey Dam Road ATV Connector is south of Highway 70. · Florence; Forest, Wisconsin
Tie Mill would reconstruct forest roads 2402 and 71916 for use by ATV's and UTV's.Windsor Dam Road to Carey Dam Road ATV Connector would reconstruct forest roads 2174F and 612434 for ATV's and UTV's.
Recreation management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Tie Mill and Windsor DamATV Connectors | Decision Signed Date: 06/27/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 6/27/2014
This project is located at Star Lake Road in Oconto County. · Oconto, Wisconsin
Wisconsin Public Service Corporation will replace and upgrade electric distribution lines within the southern Star Lake Road Right-of-way (Forest Road 2117 in Oconto County.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 5/30/2014
Shadow Lake part is located parallel to Highway 64 south Shadow Lake. Thelen is located just north of the old zoo,south of Lakewood on the west side of Highway 32. · Oconto, Wisconsin
The Shadow Lake part would construct .3 mile connector between ATV/UTV trails (one on Shadow Lake Road and the other Blue Spruce Road). The Thelen part will widen an existing ATV trail (across from Thelen Road)just south of Lakewood.
Recreation management
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Shadow Lake is T31N, R15E, Section 2, N1/2 and Thelen is T32N, R16E, Section 17, NE 1/4. |
Decision Memo · Lakewood-Laona Ranger District · updated 5/24/2014
Area around Ludington Lake, off Forest Road 2361 and 2127. · Forest, Wisconsin
Project would expand several gravel pits to provide gravel for the roads in the area.
Minerals and geology
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Ludington pit is T35N, R14E, Section 29 (by Ludington Lake)and the other unnamed pit is located at T35N, R14E, Section 9 (off Forest Road 21217). |
Decision Memo · Washburn Ranger District · updated 4/15/2014
Existing boat launches on the Washburn and Great Divide Ranger Districts within Bayfield County, WI. · Bayfield, Wisconsin
Re-issue two Outfitter and Guide Special use Permits to individuals for operation of outfitter and guide services from existing boat launches on National Forest land for 5 year periods. Each individual has been under permit and is in good standing.
Special use management
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Reissuance of Outfitter Guide Permits | Decision Signed Date: 04/15/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 3/27/2014
Project is located on the south side of Spur Lake Road (FR 136), just off of the intersection with FR 136G in T38N, R2E, Section 1, NENW,Price Co., WI. · Price, Wisconsin
Issue a special use permit to Wisconsin Geological and Natural History Survey (WGNHS) for conversion of an existing well/drilling site to a long term water monitoring well.
Special use management
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Medford-Park Falls Ranger District · updated 3/25/2014
This project is located on and surrounding the Ice Age National Scenic Trail between Taylor County Highway E, and southwest to where the trail intersects State Highway 64. · Taylor, Wisconsin
New Vision Wilderness has requested a re-issuance of their Special Use Permit to use the Ice Age National Scenic Trail and adjacent dispersed campsites along the trail to operate a therapeutic based outdoor rehabilitation program for youth.
Special use management
Comment Period
12/19/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| New Vision Wilderness Special Use Permit Reissuance | Decision Signed Date: 02/05/2014 Legal Notice Date: 02/06/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 2/27/2014
The proposed project area is west of the community of Ino in Bayfield County Wisconsin · Bayfield, Wisconsin
Proposal is to reauthorize the existing facilities; issuing a new Communications Use Lease for a new term. Existing facility includes a tower, several structures in a fenced area, and access road. This proposal does not involve new construction.
Special use management
Comment Period
11/29/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Chequamegon Communication Cooperative, Inc. Permit Re-Issue | Decision Signed Date: 02/10/2014 Legal Notice Date: 02/15/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T47N R7W Sec 29, Bayfield County, WI |
Decision Memo · Eagle River-Florence Ranger District · updated 2/10/2014
East of Lily Pad Road. · Forest, Wisconsin
Move the Lily Pad Snowmobile Trail off of a main road and onto Forest Service back roads to solve safety issues.
Recreation management
Comment Period
11/04/2013
Decision
01/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Lily Snowmobile Trail Relocation, Phase II | Decision Signed Date: 01/17/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R14E, Section 14. |
Decision Memo · Washburn Ranger District · updated 2/2/2014
A number of recreation sites and trails across the Washburn Ranger District, Bayfield County, WI. · Bayfield, Wisconsin
Washburn Ranger District, prepared a Decision Memo for the Washburn Recreation Project: Kimball Road Re-route of Snowmobile Trail 15. The decision Memo for all the other 2012 Recreation Projects was signed on July 02, 2013.
Recreation management
Comment Period
10/20/2012
Decision
01/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Trail Management |
| Washburn Recreation Projects | Decision Signed Date: 07/02/2013 Legal Notice Date: 07/06/2013 |
| Kimball Road Re-route: Washburn Recreation Project | Decision Signed Date: 01/24/2014 Legal Notice Date: 01/30/2014 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Remove toilet T49N R7W Sec17; Create ATV trail T49N R7W Sec17 & 20; Create ski trail, install and remove toilet T49N R5W Sec7; motorized trail T45N R7W Sec 31; Snowmo. trail re-route T44N, R7W, Sec34. |
Decision Memo · Eagle River-Florence Ranger District · updated 11/5/2013
Northwest of the North Branch of the Popple River and west of Highway 55. Near the Headwaters wilderness. · Forest, Wisconsin
Improvements of Forest Road 2411 would include bring in fill and installing culverts.
Special use management
Comment Period
08/07/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forest Road 2411 Special Use Permit | Decision Signed Date: 09/27/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 11/5/2013
Riley Creek north of the Popple River · Florence, Wisconsin
This project would cut alder along Riley Creek to create better habitat for American woodcock and Golden winged warbler.
Wildlife, fish, rare plants
Comment Period
03/06/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Riley Creek Alder shearing-brushing Project | Decision Signed Date: 09/10/2013 Legal Notice Date: 09/10/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T38N, R15E, Section 13 |
Environmental Assessment · Lakewood-Laona Ranger District · updated 9/26/2013
Lakewood-Laona Ranger District · Forest; Langlade; Oconto, Wisconsin
Apply Bt (biologic control) to control dispersal of gypsy moth from infested recreation and administrative sites.
Recreation managementVegetation management (other than forest products)
Comment Period
08/16/2010
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| 2010 Lakewood-Laona gypsy moth control | Decision Signed Date: 09/23/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31-38N, R12-18E |
Environmental Assessment · Lakewood-Laona Ranger District · updated 9/26/2013
Diamond roof to Engels Road · Oconto, Wisconsin
Designate ATV's on existing snowmobile trail.
Recreation management
Comment Period
01/31/2013
Decision
08/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Diamond Roof ATV Route | Decision Signed Date: 08/15/2013 Legal Notice Date: 08/15/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T33N, R15E, Section 18 |
Environmental Assessment · Eagle River-Florence Ranger District · updated 9/26/2013
Grubhoe Area · Florence, Wisconsin
This project would relocated part of the Grubhoe ATV Trail.
Recreation management
Comment Period
02/17/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T39N. R15E, Section 13 |
Environmental Impact Statement · Lakewood-Laona Ranger District · updated 9/26/2013
Southeast part of the Lakewood-Laona District, to the southeast of the Town of Mountain · Oconto, Wisconsin
This proposal would use timber management, prescribed fire, and planting to move the forest toward the forest plan desired conditions. It would include timber harvest, prescibed burning, stand tending and reforestation, access, and wildlife habitat.
Vegetation management (other than forest products)Forest productsRoad management
NOI in Federal Register
04/07/2011
DEIS NOA in Federal Register
10/19/2012
FEIS NOA in Federal Register
08/29/2013
Decision
08/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31-32N, R17E. |
Decision Memo · Medford-Park Falls Ranger District · updated 8/30/2013
Parts of Ashland, Bayfield, Price, Sawyer, Taylor, and Vilas counties · Ashland; Bayfield; Price; Sawyer; Taylor; Vilas, Wisconsin
The Forest Service proposes programmatic maintenance of authorized roads and right of ways. This project would include grading, removal of vegetation, surfacing, and maintaining or replacing culverts.
Road management
Comment Period
05/30/2013
Comment Period
05/30/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | parts of T31-49N, R1-4E, and R1-8W |
Decision Memo · Eagle River-Florence Ranger District · updated 7/23/2013
Military Road · Oneida; Vilas, Wisconsin
The current trail would be relocated to provide a safer trail for snowmobilers by reducing hills and curves in the trail.
Recreation management
Comment Period
02/24/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Military Road Snowmobile Relocation | Decision Signed Date: 07/23/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R11E, Sections 35 and 36; T39N, R11E, Sections 1, 2, 11-14. |
Decision Memo · Lakewood-Laona Ranger District · updated 7/10/2013
Eagle River-Florence and Lakewood-Laona Ranger Districts · Forest, Wisconsin
The Forest Service would dig test holes and expand existing pits, one on Lakewood-Laona and one on Eagle River-Florence.
Minerals and geology
Comment Period
02/05/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Nicolet Pits Testing and Expansion | Decision Signed Date: 07/09/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | T35N, R16E, Section 34; T39N, R13E, Section 21 |
Environmental Assessment · Medford-Park Falls Ranger District · updated 6/27/2013
North and west of the Mondeaux Flowage in Taylor County, WI. · Taylor, Wisconsin
Request for prospecting for valuable ore deposits with ground geophysical surveys and potential follow-up with bed-rock core sampling.
Minerals and geology
Comment Period
11/03/2012
Decision
06/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Township 33 North, Range 1 West |
Decision Memo · Eagle River-Florence Ranger District · updated 6/17/2013
Phelps Area · Vilas, Wisconsin
The snowmobile trail needs to be relocated to move it off private land. The private landowner no longer wants the trail on thier property. It would be relocated on forest.
Recreation management
Comment Period
02/24/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T42N, R11E, Section 27 and 34 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/7/2013
Price County: T38N, R2E, Section1 (NENW) along Spur Lake Rd (FR 136). Oconto County: T31N, R16E, Section 23 (SWNE) along Bagley Rapids Rd ( FR 2111). · Oconto; Price, Wisconsin
The Wisconsin Geological and Natural History Survey (WGNHS) is requesting to drill holes into bedrock at 2 Forest locations. This drilling is part of a statewide project to collect data on the ground temperatures with depth in Wisconsin.
Special use managementMinerals and geologyResearch
Comment Period
05/04/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations; Research And Development |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Lakewood-Laona Ranger District |
Environmental Assessment · Lakewood-Laona Ranger District · updated 5/31/2013
Nicolet side of the forest · Florence; Forest; Langlade; Oconto; Oneida; Vilas, Wisconsin
Create 3 nesting site for turtles (Regional Forester Sensitive Species) on the Nicolet side of the forest.
Wildlife, fish, rare plants
Comment Period
12/22/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Population Enhancements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Eagle River-Florence and Lakewood-Laona Ranger Districts |
Decision Memo · Lakewood-Laona Ranger District · updated 5/26/2013
East side of the Chequamegon-Nicolet National Forest · Florence; Forest; Langlade; Oconto; Vilas, Wisconsin
Replacement of culverts on roads and trails to improve water quality and safety.
Watershed management
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | T32N, R14E; T33N, R15E; T38N, R15E; T38N, R16E; T39N, R12E; T42N, R11E; |
Decision Memo · Lakewood-Laona Ranger District · updated 5/18/2013
Whiffen Lane · Oconto, Wisconsin
Renewal of a 5 year permit
Special use management
Comment Period
04/08/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Mountain Meadows Ranch Outfitter and Guide Permit Project | Decision Signed Date: 05/17/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31N, R16E, Sections 4, 5, 8, 9, 16 and 17 |
Environmental Assessment · Medford-Park Falls Ranger District · updated 5/9/2013
South and east of Perkinstown, WI in parts of T31N, R1W and R2W, and parts of T32N, R1W and R2W. · Taylor, Wisconsin
Aerial dispersal of Bacillus thuringiensis var. kurstaki or Btk and disparlure (a synthetic phermone resulting in mating disruption) on NF System lands in Taylor County, WI for gypsy moth control.
Vegetation management (other than forest products)
Comment Period
02/14/2013
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| 2013 Taylor County Gypsy Moth Slow the Spread Project | Decision Signed Date: 05/01/2013 Legal Notice Date: 05/09/2013 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
Decision Memo · Eagle River-Florence Ranger District · updated 3/18/2013
Highway 55 and the North Branch of the Popple River · Forest, Wisconsin
Special Use Permit would be for long term access to private property.
Special use management
Comment Period
02/05/2013
Decision
03/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T38N, R13E, Section 12; T38N, R14E, Section 7 |
Environmental Assessment · Lakewood-Laona Ranger District · updated 2/26/2013
Lakewood District · Oconto, Wisconsin
ATV routes and trails would be added to the Lakewood Ranger District.
Recreation management
Comment Period
09/07/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31-33N, R15-16E |
Decision Memo · Lakewood-Laona Ranger District · updated 2/26/2013
Nicolet National Forest · Florence; Forest; Langlade; Oconto; Oneida; Vilas, Wisconsin
This project would restore and improve rivers, streams, and creeks under a programatic waterway program for the Nicolet side of the forest.
Wildlife, fish, rare plants
Comment Period
12/22/2012
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Lakewood-Laona and Eagle River-Florence Ranger Districts |
Decision Memo · Medford-Park Falls Ranger District · updated 2/1/2013
Town of Grover, Taylor County, WI, off of Hay Meadow Rd · Taylor, Wisconsin
The Ice Age National Scenic Trail north of Hay Meadow Road (FR 572) has numerous existing boardwalk and puncheon sections that are ineffective and unsafe. The Forest Service is proposing to replace existing boardwalk and other structures.
Recreation management
Comment Period
12/20/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T32N, R2W, Section 23 |
Decision Memo · Medford-Park Falls Ranger District · updated 12/13/2012
Town of Chelsea, Taylor County, Wisconsin · Taylor, Wisconsin
The Forest Service is proposing to designate a portion of Forest Road 103B for snowmobile trail use which would complete the bypass of the unavailable private land, leaving the trail system intact. FR 103B is currently open to public motorized use.
Recreation managementRoad management
Comment Period
10/25/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Bunker Road Snowmobile Trail Re-route | Decision Signed Date: 12/05/2012 Legal Notice Date: 12/13/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T32N, R1E, Sections 7 and 8 |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 12/6/2012
Forest-wide · Ashland; Bayfield; Florence; Forest; Langlade; Oneida; Price; Sawyer; Taylor; Vilas, Wisconsin
This project has been cancelled. The Forest is required to update its motor vheicle use map annually. As this is purely an administrative action, it no longers requires NEPA.
Recreation management
Decision
01/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Forest-wide |
Decision Memo · Eagle River-Florence Ranger District · updated 11/23/2012
Trail relocation is nearLily Pad Lake · Forest, Wisconsin
Phelps would constuct/designated .15 miles of trail and Lily Pad Road would designate 2 existing corridors to remove the trail from private land onto public land.
Recreation management
Comment Period
07/11/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R14E, Section 15 |
Decision Memo · Lakewood-Laona Ranger District · updated 10/3/2012
Lakewood · Oconto, Wisconsin
Replaces annual permits with a 5 year permit. No changes in factilities or activities.
Recreation management
Comment Period
08/23/2012
Decision
10/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| 2013-2017 Chili Ski-In 5 year | Decision Signed Date: 10/03/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T35N, R16E, Section 34, NESE |
Decision Memo · Lakewood-Laona Ranger District · updated 8/20/2012
South branch of the Oconto River · Langlade; Oconto, Wisconsin
Improve fish habitat by adding hiding cover, installing brush bundles, flush sediments, and scour deeper pools.
Wildlife, fish, rare plants
Comment Period
07/14/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31N, R15E, Sections 7, 8, 15, 17, and 18; T31N, R14E, Section 12 |
Decision Memo · Lakewood-Laona Ranger District · updated 7/21/2012
T31N-T43N, R17E-R11E; T36N, R8E, Section 8. · Florence; Forest; Langlade; Oconto; Oneida; Vilas, Wisconsin
This project would perform routine maintenance on roads, trails, utility corridors, and right-of-ways. This project is programic maintenance for both Eagle River-Florence and Lakewood-Laona Ranger Distircts. No construction or reconstruction
Road management
Comment Period
05/09/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Maintenance of roads, trails, utility cooridors, and right-of-way (ROWS) | Decision Signed Date: 07/12/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District; Lakewood-Laona Ranger District |
| Legal Land Description | Eagle River-Florence and Lakewood-Laona Ranger Districts |
Environmental Assessment · Great Divide Ranger District · updated 7/2/2012
About 5 miles southeast of Grandview, WI near Forest Road 378. · Bayfield, Wisconsin
This action would restore a segment of Twentymile Creek by removing the old abandoned railroad grade crossing.
Watershed management
Comment Period
04/20/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| 20 Mile Creek Restoration | Decision Signed Date: 06/27/2012 Legal Notice Date: 07/02/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | The grade crosses 20 Mile Creek in T44N, R5W, Section 6. |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/25/2012
Forest-wide · Ashland; Bayfield; Forest; Price; Sawyer; Taylor; Washburn, Wisconsin
The Forest originally proposed an amendment to its 2004 Plan related to off-road vehicles (ORV). Recent State law and rule changes no longer require any changes to Plan standards, and minor definition changes will be "administrative" (2012 Rule).
Land management planning
Comment Period
04/2012 (Estimated)
Objection Period Start
05/2012 (Estimated)
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Forest-wide |
Environmental Assessment · Lakewood-Laona Ranger District · updated 6/19/2012
Hemlock Spring northeast of Townsend · Oconto, Wisconsin
This project conitues dredging the spring pond by increasing the size of the disposal areas, building a berm, maintenance of access roads, and laying a dredge line.
Wildlife, fish, rare plants
Comment Period
04/01/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T33N, R15E, Section 1 |
Environmental Assessment · Washburn Ranger District · updated 4/13/2012
Project is located east of Highway 63 in the Town of Drummond, Bayfield County, Wisconsin. · Bayfield, Wisconsin
In July 2011, High winds damaged about 900 acres of timber on the District. The Forest Service is proposing to treat up to 600 acres of damaged timber through a salvage harvest. Access would use existing roads, trails, and 2 mile of temporary road
Forest products
Comment Period
09/09/2011
Decision
04/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T44N, R7W, Sections 1-3, 8-11 and 16 |
Decision Memo · Great Divide Ranger District · updated 3/30/2012
The general location is 10 miles north of Loretta along County Highway GG. · Ashland, Wisconsin
The Forest Service is proposing to build a connector ATV trail to connect two legs of an ATV route on FR 164.
Recreation management
Decision
03/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Section 15 of T41N, R4W, Ashland County, Wisconsin |
Decision Memo · Lakewood-Laona Ranger District · updated 3/9/2012
Langlade · Langlade; Oconto, Wisconsin
This project would issue a 5-year permit to replace the annual permit. There is no changes to the activities or location. The only change is administrative.
Recreation management
Decision
03/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Wolfman Triathlon | Decision Signed Date: 03/09/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31N, R14E, Sections 1 and 12; T31N, R15E, Sections 7, 18 and 19 |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 3/8/2012
Various areas across four ranger districts: Medford-Park Falls, Eagle River-Florence, Great Divide, and Lakewood-Laona · Ashland; Bayfield; Florence; Forest; Sawyer, Wisconsin
The agency proposes to manage its ruffed grouse management areas (RGMAs) to improve and enhance early successional habitat. About 6,000 of 31,000 acres comprising twelve RGMAs are proposed for habitat improvement.
Forest productsVegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
10/15/2010
Decision
03/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Various |
Decision Memo · Medford-Park Falls Ranger District · updated 3/7/2012
Southwest of Mondeaux Flowage on Park Road (FR 1563) in Taylor County, WI. · Taylor, Wisconsin
Re-route of a small portion of a snowmobile trail from one side of a road r-o-w to the other because of hazardous ice buildup which causes a spring to back up and flow over the road surface and freeze (instead of through the established culvert).
Recreation managementRoad management
Decision
03/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Glacial Springs Snowmobile Trail Re-route | Decision Signed Date: 03/02/2012 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Township 33 North, Range 1 West, Section 23 |
Environmental Assessment · Lakewood-Laona Ranger District · updated 2/17/2012
Trail would follow the Rat River · Forest, Wisconsin
This new trail is on an abondoned railroad grade and roads. The project would include clearing brush and downed trees, pulling up railroad ties, and removing an old dump. Culverts, gates, signs, picnic tables, and benches would be installed.
Recreation management
Comment Period
11/01/2011
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T35N, R15E, Sections 8, 9, 13, 14, and 16. |
Decision Memo · Lakewood-Laona Ranger District · updated 2/9/2012
Mountain lakes, east of Highway 32 · Oconto, Wisconsin
Above average rainfall as flooded part of the orginial trail. The trail would be rerouted to aviod the low area. There would be .55 miles moved onto existing corridors and .18 miles of trail construction.
Recreation management
Decision
02/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T32N, R16E, Section 20 and 29 |
Decision Memo · Medford-Park Falls Ranger District · updated 1/11/2012
The blowdown is located north of County M and Perkinstown in Section 14, T. 32 N., R. 2 W., about 15 miles NW of Medford, WI. · Taylor, Wisconsin
Salvage harvest of about 21 acres of blown over trees in an area planned for a re-route and river crossing of the Ice Age National Scenic Trail.
Facility managementWatershed managementForest products
Decision
11/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Scenery Management; Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
Environmental Impact Statement · Eagle River-Florence Ranger District · updated 9/19/2011
Northwest portion of the Eagle River-Florence Ranger District, south of the Wisconsin-Michigan border, east of Highway 45, and north of County Highway A. · Vilas, Wisconsin
Approximately 8,430 acres of timber harvesting, 240 acres of opening improvement, 35 acres of planting, 55 acres of prescribed fire, 31 miles of unauthorized road decommissioning, 6 miles of road closures, and 0.8 miles of new road construction.
Forest productsWildlife, fish, rare plantsFuels managementVegetation management (other than forest products)Road management
NOI in Federal Register
08/13/2010
DEIS NOA in Federal Register
04/08/2011
FEIS NOA in Federal Register
08/12/2011
Decision
08/2011 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Special Products Sales; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T41N, R11E; T41N, R12E; T42N, R11E; and T42N, R12E |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 8/31/2011
Forest-wide · Ashland; Bayfield; Florence; Forest; Langlade; Oconto; Oneida; Price; Sawyer; Taylor; Vilas; Washburn, Wisconsin
Updating the 2010 motor vehicle use map to reflect current needs and conditions for designated motor vehicle use on the Forest, pursuant to direction at 36 CFR 212.50
Road managementRecreation management
Comment Period
11/20/2010
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Chequamegon-Nicolet National Forest 2011 Motor Vehicle Use Map Update | Decision Signed Date: 07/26/2011 Legal Notice Date: 08/05/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Forest-wide |
Environmental Assessment · Lakewood-Laona Ranger District · updated 7/22/2011
Lakewood-Laona Ranger District · Forest; Langlade; Oconto, Wisconsin
Treat oak wilt infested sites by breaking root graphs. Regenerate oak stands. Treat newly identified oak wilt with per set trigger pionts.
Vegetation management (other than forest products)
Comment Period
05/07/2011
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Lakewood-Laona Oak Wilt Control Project | Decision Signed Date: 07/18/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T 38-31N, R12-17E |
Decision Memo · Medford-Park Falls Ranger District · updated 7/15/2011
The road is located south of FR 103/567 in Section 15, T32N, R1W, Taylor County, Wisconsin. The private property to be accessed lies in Section 22. · Taylor, Wisconsin
The project is new issuance of a Special Use authorization to allow a motorized access road to the John Egle property. The request consists of use of a road for access through Federal land.
Special use management
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Special Use Road Permit to New Page Corporation | Decision Signed Date: 07/12/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | SWSE 1/4 of T32N, R1W, Section 15. |
Decision Memo · Lakewood-Laona Ranger District · updated 7/7/2011
Lakewood-Laona Ranger District · Forest; Langlade; Oconto, Wisconsin
Clearing vegetation to maintain scenic vistas on various locations throughout the district.
Recreation management
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T38-31N, R12-17E |
Decision Memo · Eagle River-Florence Ranger District · updated 7/6/2011
A strip acress the southern portion of the District about 6 miles long and 1/2 mile wide, from Van Zile Lake in the southwest to Morgan Lake in the northeast. · Florence, Wisconsin
Salvage harvest of approximately 237 acres of tornado blowdown, 17 acres of mechanical site preparation and planting red pine, and 19 acres of selection harvesting in hardwood types.
Forest productsVegetation management (other than forest products)
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Mister Burns Tornado Salvage Project | Decision Signed Date: 07/06/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T 38N, R 15E, Sections 12, 13, 14, 22, 23, 27, 28, and 31; T 38N, R 16E, Section 7. |
Decision Memo · Great Divide Ranger District · updated 6/30/2011
FR 709 between Ike and Kelly lakes and near the West Fork Chippewa River in Sawyer County, Wisconsin. One mile southeast of Highway 77 and 1 mile north of FR 176. · Sawyer, Wisconsin
Special uses authorization to allow use of Federal land for access to private property.
Road managementSpecial use management
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| June 2011 Special Use Road Permit To Private Landowner | Decision Signed Date: 06/30/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T42N R5W S13, 14, and 23 |
Decision Memo · Washburn Ranger District · updated 6/29/2011
Seven lakes across the Washburn Ranger District: Anodanta Lake, Cisco Lake, Happles Lake, Lund Lake, Star Lake, Steelhead Lake and Silver Lake · Bayfield, Wisconsin
The Washburn Fish Habitat Improvement Project would improve habitat in seven lakes by increasing the amount of woody structure available to fish, amphibians, turtles, and other wildlife.
Wildlife, fish, rare plants
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Washburn Fish Habitat Improvement Project Decision Memo | Decision Signed Date: 05/16/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T45N, R7W, Section 5, 9 10, 11, 15, & 21: T46N, R8W, Section 9 & 15 |
Decision Memo · Washburn Ranger District · updated 6/28/2011
The north end of the Washburn Ranger District near the Moquah Barrens, Long Lake, and the Highway County Road C · Bayfield, Wisconsin
Authorization for the Ashland Chamber of Commerce to hold the annual Superior Vista Bike Tour on National Forest System lands and facilities on the Washburn Ranger District. This is a five year renewal permit.
Special use managementRecreation management
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T48N, R6W, Section 1; T47N, R7W, Section 2; T49N, R6W, Section 6; and T49N, R6W, Sections 11 and 14 |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 6/27/2011
Chequamegon-Nicolet National Forests, forest wide · Ashland; Bayfield; Florence; Forest; Oconto; Oneida; Price; Sawyer; Taylor; Vilas, Wisconsin
The forest proposes to update its 2009 NNIP control decision to consider about 800 new occurrences of weeds and unwanted plants, on and off the forest.
Vegetation management (other than forest products)
Comment Period
04/28/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Non-Native Invasive Plant Project Amendment | Decision Signed Date: 06/22/2011 Legal Notice Date: 06/23/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | forest -wide |
Decision Memo · Lakewood-Laona Ranger District · updated 6/15/2011
Whiting Creek area · Forest, Wisconsin
Remove the road crossing on an unnamed tributary to Whiting Creek, by removing the road fill and culvert, installing erosion control, and resoring the site on a non-system road. An excavator would be used.
Wildlife, fish, rare plants
Decision
04/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T36N, R15E, Section 4, S 1/2 |
Decision Memo · Lakewood-Laona Ranger District · updated 6/10/2011
Lakewood-Laona District wide · Forest; Langlade; Oconto, Wisconsin
Remove encroaching vegetation form established openings.
Wildlife, fish, rare plants
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31-37N, R12-17E |
Environmental Assessment · Great Divide Ranger District · updated 6/2/2011
Township 40 North, Range 2 West, Sections 7, 18, 19, & 30; Township 40 North, Range 3 West, Sections 1-4, 9-16, & 22-27 · Price; Sawyer, Wisconsin
The project involves aerial application of a gypsy moth mating disruptant (known as pheromones) in one treatment block (8450 acres). The objective is to saturate the area with enough pheromone to confuse male gypsy moths and prevent them reproducing.
Vegetation management (other than forest products)
Comment Period
02/17/2011
Decision
05/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| 2011 Gypsy Moth Control-Slow the Spread Environmental Assessment | Decision Signed Date: 05/18/2011 Legal Notice Date: 05/25/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Southeast corner of the Great Divide District |
Decision Memo · Eagle River-Florence Ranger District · updated 5/11/2011
Argonne Experimental Forest, 9 miles southeast of Three Lakes, Wisconsin · Forest, Wisconsin
Harvest of 70 acres of northern hardwood forest types within the Argonne Experimental Forest. The Cutting Methods study has been ongoing since 1951 with harvesting occurring every 10 years.
Forest productsVegetation management (other than forest products)Research
Decision
05/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T38N, R12E, parts of Sections 22, 23, 27, and 28 |
Decision Memo · Lakewood-Laona Ranger District · updated 5/3/2011
Between Bass Lake and Richardson Creek · Forest, Wisconsin
Plant and protect native cedar seedlings in an old cedar swamp.
Vegetation management (other than forest products)
Decision
05/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Richerson Cedar Restoration | Decision Signed Date: 05/03/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T34N, R14E, Section 11, NE 1/4 |
Decision Memo · Eagle River-Florence Ranger District · updated 4/18/2011
East side of the Eagle River-Florence Ranger District · Florence, Wisconsin
Three large openings would be improved by discing and seeding with native grass and forb seed to provide nesting habitat for two Regional Forester's Sensitive Species - upland sandpiper and LeConte's sparrow.
Wildlife, fish, rare plants
Decision
04/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| 2011 Large Openings Imrprovement Project | Decision Signed Date: 04/18/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T41N, R16E, Sections 35 & 36; T39N, R15E, Section 13; and T38N, R15E, Section 24 |
Environmental Assessment · Great Divide Ranger District · updated 4/7/2011
Great Divide RD, Ashland County, Clam Lake area, Day Lake · Ashland, Wisconsin
Conduct one or more winter drawdowns of Day Lake to reduce excessive vegetation to improve the fishery and drop trees along the shoreline to provide fish structure.
Wildlife, fish, rare plants
Comment Period
05/12/2010
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Day Lake Drawdown Decision Notice and Finding of No Significnt Impact | Decision Signed Date: 06/25/2010 Legal Notice Date: 07/02/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T43N, R3W, Sections 19, 20, and 30 |
Environmental Assessment · Medford-Park Falls Ranger District · updated 4/7/2011
Fourteen miles east of the city of Park Falls, WI · Price, Wisconsin
The Forest proposes to cooperatively burn adjacent private grasslands in conjuction with prescribed fire fuel reduction actions on the Forest's "Vanderveen Buffalo Ranch". Requested by adjacent landowners under the Wyden Act authority. About 34 ac.
Fuels management
Comment Period
01/21/2010
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | National Fire Plan - Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Grassland Management Fuels Reduction Project | Decision Signed Date: 03/30/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T40N, R2E, S 24 |
Environmental Assessment · Washburn Ranger District · updated 4/7/2011
The north end of the Washburn Ranger District near the Moquah Barrens. Seven miles east of the Town of Iron River, WI. · Bayfield, Wisconsin
The District is proposing to create habitat for the federally endangered Kirtland’s Warbler. The project involves a 263 acre block of jack pine that will be regenerated, prescribed burned and planted to create one large block of young jack pine.
Wildlife, fish, rare plants
Comment Period
06/28/2010
Decision
12/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Timber Sales (Green) |
| Kirtland's Warbler Habitat Improvement Project Decision Notice | Decision Signed Date: 12/06/2010 Legal Notice Date: 12/08/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T47N, R7W, Sections 3 -5, 8, 9 16, 33 & T48N, R8W, Section 33 |
Environmental Impact Statement · Medford-Park Falls Ranger District · updated 4/7/2011
The location of the projects are in various areas on the Medford landbase north of County Highway M · Taylor, Wisconsin
Timber harvest proposals to regenerate/restore aspen within areas to be managed for early successional forest (2004 Chequamegon-Nicolet Land and Resource Management Plan - Record of Decision). Proposal includes associated road projects.
Forest productsRoad management
NOI in Federal Register
06/26/2007
DEIS NOA in Federal Register
07/11/2008
FEIS NOA in Federal Register
10/24/2008
Decision
10/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
Environmental Assessment · Washburn Ranger District · updated 4/7/2011
Red pine stands scattered across the Washburn Ranger District · Bayfield, Wisconsin
Approximately 6000 acres of red pine stands across the Washburn District would be thinned to improve growth and vigor. In conjuction with thinning, in some areas thinning slash would be removed to reduce hazardous fuels.
Forest products
Comment Period
12/16/2009
Decision
02/2011 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Green) |
| Washburn Red Pine Thinning Project | Decision Signed Date: 02/23/2011 Legal Notice Date: 02/28/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Red pine stands across the Washburn Ranger District. For stand locations reference maps on Forest website or contact District office |
Decision Memo · Medford-Park Falls Ranger District · updated 4/6/2011
About 8 miles west of the town of Westboro, Taylor County, WI · Taylor, Wisconsin
This proposal would authorize a special use access to allow Robert and Christine Young access across federal land to their private inholding. Approx 0.2 mile/0.1 acres.
Special use management
Decision
03/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Area Management |
| March 2011 Young Road SUP | Decision Signed Date: 03/09/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T33N, R1W, Section 11 |
Environmental Impact Statement · Eagle River-Florence Ranger District · updated 3/28/2011
The project area is located along the eastern portion of the Eagle River-Florence Ranger District, south of State Highway 139 approximately 14 miles southwest of Florence, WI. · Florence, Wisconsin
Duplicate project of 32745.
Forest productsWatershed managementRoad management
NOI in Federal Register
09/24/2008
DEIS NOA in Federal Register
05/01/2009
FEIS NOA in Federal Register
10/16/2009
Decision
09/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T 39N, R15 and 16E |
Environmental Impact Statement · Eagle River-Florence Ranger District · updated 3/28/2011
Eastern portion of the District, approximately 14 miles southwest of Florence, Wisconsin. · Florence, Wisconsin
Vegetation management on approximately 3326 acres, road decommissioning of 20 miles of unauthorized roads, reconstruction and classification of 4 miles of unclassified roads, and 1.4 miles of new road construction that would be closed after use
Road managementForest products
NOI in Federal Register
09/24/2008
DEIS NOA in Federal Register
05/01/2009
FEIS NOA in Federal Register
10/19/2009
Decision
09/2009 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T39N, R15E and 16E |
Decision Memo · Lakewood-Laona Ranger District · updated 1/14/2011
Southeast area of the Lakewood District · Oconto, Wisconsin
Cut and remove uprooted, leaning, and blowndown trees.
Vegetation management (other than forest products)
Decision
01/2011 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Hide and Seek Salvage | Decision Signed Date: 01/14/2011 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T31N, R17, Sections 3-5, 10, 11, and 14 |
Decision Memo · Eagle River-Florence Ranger District · updated 12/20/2010
City of Eagle River, WI in Vilas County · Vilas, Wisconsin
Authorization to be issued to the City of Eagle River for the construction, maintenance, and continued use of approximately 70 feet of NFS land. The crushed limestone bike trail segment will be 8 feet wide and may include two 2-foot shoulders.
Special use management
Decision
12/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Special Use Authorizaton for City of Eagle River Bike Trail | Decision Signed Date: 12/20/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R10E, S28 |
Environmental Impact Statement · Great Divide Ranger District · updated 12/20/2010
Portions of the NFS lands in MA's 1B, 3B, and 4A on the Great Divide Ranger District between Cable and Clam Lake, WI · Ashland; Bayfield; Sawyer, Wisconsin
Management of vegetation to improve forest health and vigor and for the enhancement of wildlife habitat; Ladder fuels reduction; Improvement of the transportation system.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plantsRoad managementForest products
NOI in Federal Register
01/23/2009
DEIS NOA in Federal Register
11/27/2009
FEIS NOA in Federal Register
11/12/2010
Decision
11/2010 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T42N R4W Secs 3-6,7-10,14-20, 30; T42N R5W Secs 1-24; T42N R6W Secs 1-19,21-24; T43N R4W Secs 19-21,28-34; T43N R5W Secs 8-9,13-14,16-20,23-24,26-27, 29-36; T43N R6W Secs 21-23,26-28,32-35. |
Decision Memo · Medford-Park Falls Ranger District · updated 12/16/2010
The road is located in Price County WI in T38N, R3E, S36, SENE. · Price; Taylor, Wisconsin
Issuance of a special use road permit for private land access. Access was granted in same location to a previous landowner.
Special use management
Decision
12/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| December 2010 Herman Special Use Road Permit Authorization | Decision Signed Date: 12/10/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
Decision Memo · Medford-Park Falls Ranger District · updated 11/23/2010
The proposed bridge location is located on the Ice Age National Scenic Trail on the South Fork of the Yellow River, about 3 1/2 miles northeast of Perkinstown · Taylor, Wisconsin
Construction of a foot bridge across the South Fork Yellow River on the Ice Age National Scenic Trail. This project includes a small re-route of the trail to access the river crossing at a location that is suitable for the foot bridge.
Recreation management
Decision
11/2010 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Yellow River Bridge and Re-route of Ice Age Trail | Decision Signed Date: 11/22/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Part of Section 14, T32N, R2W. |
Decision Memo · Medford-Park Falls Ranger District · updated 10/26/2010
Taylor County: North of Perkinstown off of Forest Road 112. Price County: Newman Springs Gravel Pit. · Price; Taylor, Wisconsin
Issuance of special use permit to Wisconsin Geological and Natural History Survey (WGNHS) and U.S. Geological Survey (USGS) for the construction of two to four groundwater monitoring wells in Price and Taylor Co. WI.
Special use management
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Taylor County: T33N R2W NESE Sec 27 and/or SWNE Sec 34. Price County: T40N R2E NENW Sec 14. |
Decision Memo · Lakewood-Laona Ranger District · updated 9/15/2010
Honey Creek Padus area · Forest, Wisconsin
Salvage of dead and dying blowdown trees on approximately 190 acres.
Vegetation management (other than forest products)
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
Decision Memo · Washburn Ranger District · updated 9/9/2010
Stands are located on the southern end of the district near the Town of Drummond (Pigeon Lake) · Bayfield, Wisconsin
The proposed project consists of the removal small balsam trees (majority of the trees are between 3-6 inches in diameter) on approximately 100 acres within two red pine stands.
Fuels management
Decision
09/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Washburn Balsam Removal Project Decision Memo | Decision Signed Date: 09/09/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Township 45 North, Range 8 West, Section 17 /18 and Township 44 North, Range 8 West, Section 11 |
Decision Memo · Lakewood-Laona Ranger District · updated 8/20/2010
Black Bear and 100 Miler · Forest, Wisconsin
Three segments of trail location would be relocated to address safety and resource concerns.
Recreation management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| 2010 Snowmobile Trail Locations | Decision Signed Date: 08/18/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T37N, R12E, Sections 1 and 2; T37N, R13E, Sections 6 and 7; T34N, R14E, Sections 7 and 19 |
Decision Memo · Lakewood-Laona Ranger District · updated 8/20/2010
Mountain Lake Road · Oconto, Wisconsin
Improve/construct and designate existing roads and trails for ATV use. The new trail would go from Mountain Lakes Road to the Nicolet State Trail.
Recreation management
Decision
08/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T32N, R16E, Sections 28, 29, 32, and 33 |
Decision Memo · Lakewood-Laona Ranger District · updated 8/20/2010
Sawyer Lake area · Oconto, Wisconsin
This project would issue a five year special use permit for a annual walk/run on the national forest. The permit would include an annual mowing and temporary signing.
Recreation management
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T32N, R14E, Sections 15, 16, 21, and 22 |
Decision Memo · Eagle River-Florence Ranger District · updated 8/12/2010
Approximately four miles southwest of Alvin, and 16 miles east of Eagle River, Wisconsin. · Forest, Wisconsin
Removal of the 150-foot long dike and dam (whistle tube), and restoration of the tributary to a natural stream.
Watershed management
Decision
07/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Alvin Creek Water Control Structure Removal | Decision Signed Date: 07/07/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R13E, Section 16 |
Decision Memo · Eagle River-Florence Ranger District · updated 8/12/2010
Northwest Forest County in the vicinity of Alvin, Wisconsin · Forest, Wisconsin
Approximately 2.6 miles of Forest System road (FR 2461A and FR 2481) would be designated as an ATV route; road surfaces would be hardened with gravel; and directional and regulatory signs would be installed.
Road managementRecreation management
Decision
08/2010 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Travel Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T 41N, R13E, Sections 5, 7, and 8 |
Decision Memo · Great Divide Ranger District · updated 8/3/2010
22 miles east of Hayward, WI · Sawyer, Wisconsin
Authorize a new special use of a road and trail to access a private inholding. About one-half mile of existing road and one-third mile of existing snomobile trail would be affected. Use includes maintenance of surface and culverts, and brushing.
Special use management
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| July 2010 Speacial Use Road Permits | Decision Signed Date: 07/21/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T41N; R6W; Sec 1,12; Sawyer County, WI |
Decision Memo · Medford-Park Falls Ranger District · updated 8/3/2010
About 5 miles east of the town of Gilman, Taylor County, Wisconsin. · Taylor, Wisconsin
The Wisconsin 273rd Army National Guard has requested a permit to conduct one-time manuevers on National Forest lands. The scope of the request is for up to 20, unmounted (on-foot) training operations to be completed over a weekend (Sat-Sun).
Special use management
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| 273rd Wisconsin National Guard Specuail Use Authorization | Decision Signed Date: 07/30/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T31N, R3W, Sections 23 and 26. |
Environmental Assessment · Lakewood-Laona Ranger District · updated 7/30/2010
Kazmer Lake · Forest, Wisconsin
Improve/construct and designate approxmately 3.5 miles of existing roads and trails. The new trail would be for use by ATVs from the Nicolet State Trail to the Town of Blackwell.
Recreation management
Comment Period
12/15/2008
Decision
07/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T35N, R15E, Sections 16, 17, 18, 19, 20 |
Environmental Impact Statement · Lakewood-Laona Ranger District · updated 7/1/2010
Center of project area lies about 5 miles south of the town of Laona, WI. · Forest, Wisconsin
This proposal would use timber management to move the forest toward Plan desired conditions. It would include 6,703 acres of timber harvest, as well as stand tending and reforestation, access, road decommisioning, and wildlife habitat management.
Forest products
NOI in Federal Register
02/25/2009
DEIS NOA in Federal Register
10/09/2009
FEIS NOA in Federal Register
05/28/2010
Decision
05/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Green) |
| Honey Creek-Padus Project | Decision Signed Date: 05/11/2010 Legal Notice Date: 05/17/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | T35N, R 14-16E |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 6/25/2010
Forest-wide · Ashland; Bayfield; Florence; Forest; Langlade; Oconto; Price; Sawyer; Taylor; Vilas, Wisconsin
The forest proposes to put in place SLAM (SLow Ash Mortality) actions developed by the Science Lab to contain emeral ash borer infestations on the forest.
Vegetation management (other than forest products)
Decision
01/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Emerald Ash Borer Initial Defense | Decision Signed Date: 01/18/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Chequamegon / Nicolet National Forest All Units |
| Legal Land Description | Forest-wide |
Environmental Impact Statement · Medford-Park Falls Ranger District · updated 6/14/2010
The locations of the projects are in various areas on the Park Falls landbase north of Sate Highway 70 · Price, Wisconsin
Timber harvest proposals to maintain and restore forest type composition, age, and structure as outlined in the Forest Plan. The area is primarily to be managed for conifer species, but hardwood and aspen are well represented within the landscape.
Recreation managementForest productsRoad management
NOI in Federal Register
09/18/2007
DEIS NOA in Federal Register
11/07/2008
FEIS NOA in Federal Register
06/19/2009
Decision
06/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Camp Four Vegetation Project | Decision Signed Date: 06/05/2009 Legal Notice Date: 06/19/2009 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
Decision Memo · Eagle River-Florence Ranger District · updated 6/14/2010
Lost Lake Camp, 5 miles northeast of Long Lake, 3 miles southeast of Tipler, Wisconsin · Florence, Wisconsin
Work will include foundation repair or replacement, bringing utilities up to code, floor repair, replacement of fixtures as needed, replacement of board & batten siding, and window fixture repair/replacement.
Facility managementHeritage resource managementRecreation management
Decision
04/2009 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T39N, R16E, Section 12 |
Decision Memo · Medford-Park Falls Ranger District · updated 6/14/2010
Mondeaux flowage located approximately 14 miles northwest of Medford in Taylor County Wisconsin. · Taylor, Wisconsin
Repair of Mondeaux Dam concrete facing and over winter drawdowns of water levels for habitat improvement.
Wildlife, fish, rare plants
Decision
02/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Species Habitat Improvements; Facility Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T33N, R1W and R1E ; T32N, R1E |
Decision Memo · Eagle River-Florence Ranger District · updated 6/4/2010
Approximately one mile northeast of Anvil Lake, adjacent to Forest Road 2490 · Forest, Wisconsin
Approval to grant a five-year special use permit to the USGS for construction of a monitoring well.
Special use managementWatershed management
Decision
05/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T40N, R12E, Section 7 SWSE |
Environmental Assessment · Washburn Ranger District · updated 3/31/2010
Various sites on the Washburn Ranger District · Bayfield, Wisconsin
The Forest proposes to treat 5 sites on the Washburn Ranger District (about 7,700 acres) using aerially-dispersed pheromone flakes to disrupt gypsy moth mating. This action is tiered to the 1996 Gypsy Moth Management EIS and Decision (USDA).
Vegetation management (other than forest products)
Comment Period
01/11/2010
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| 2010 Gypsy Moth Control - Slow the Spread Decision Notice | Decision Signed Date: 03/30/2010 Legal Notice Date: 03/31/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T44N, R7W, S25-27,34-36; T45N, R7W, S9-16,21-24; T46N, R8W, S23-24, T46N, R7W, S8,17,20,29; t47N, R6W, S7,17-18; T47N, R7W, S11-14; T48N, R8W, S25,36. |
Decision Memo · Washburn Ranger District · updated 3/31/2010
Three campgrounds throughout the Washburn Ranger District · Bayfield, Wisconsin
Proposed changes to three developed recreation sites : Bladder Lake, Birch Grove, and Perch Lake. These changes are being proposed in the interest of improving the quality of recreation opportunity being providing to the public.
Recreation management
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Washburn Campground Improvements Decision Memo | Decision Signed Date: 03/30/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Bladder Lake (T.48N., R.7W., Section 31), Birch Grove (T.49N., R.6W., Section 36), and Perch Lake (T.45N., R.7W, Section 8) |
Decision Memo · Washburn Ranger District · updated 3/25/2010
South end of the Washburn Ranger District in the Township of Drummond · Bayfield, Wisconsin
Proposal to conduct prescribed burns and mechanical treatment on 55 acres in both Bearsdale Springs (35 acres) and Johnson Springs (20 acres) wetland impoundments. A partial drawdown of the Johnson Spring Pond may be necessary.
Wildlife, fish, rare plants
Decision
03/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Bearsdale and Johnson Springs Habitat Improvement and Maintenance Project | Decision Signed Date: 03/05/2010 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | The Bearsdale Springs units are located in T44 N, R8 W, Section 8, SE ¼ and Section 17, NE ¼ . The Johnson Springs units are located in T45N, R7W, Section 22, W ½ |
Environmental Assessment · Medford-Park Falls Ranger District · updated 1/5/2010
Located about 15 miles southeast of the city of Park Falls, Wisconsin · Price, Wisconsin
Creation and long-term maintenance of lowland bog, shrubland and grassland-forb wildlife habitat in the Riley lake Wildlife Management Area, through periodic burning, roller-chopping, mowing, and cutting on 2,825 acres of the nearly 5,000 acre area.
Forest productsWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
03/19/2009
Decision
05/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Special Area Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | Sections 17-20,30,31 T39N R3E; abd sections 13,24,25,36 T39N R2E; Price County, WI |
Decision Memo · Medford-Park Falls Ranger District · updated 12/30/2009
The affected campground lies 18 miles north and west of the city of Medford, WI. · Taylor, Wisconsin
Proposal to replace the existing, but inadequate potable water and waste water system in an agency campground.
Facility managementRecreation management
Decision
09/2009 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T32N, R3W, Section 25, Taylor County, WI |
Environmental Impact Statement · Washburn Ranger District · updated 11/1/2009
Moquah Barrens on the north end of the Washburn District · Bayfield, Wisconsin
To restore a portion of the pine barren ecosystem through changing the vegetation composition / structure and managing fire as an essential ecosystem process. Activities include timber harvest, biomass, mechanical treatment, and prescribed fire.
Vegetation management (other than forest products)
NOI in Federal Register
12/15/2008
DEIS NOA in Federal Register
07/02/2009
FEIS NOA in Federal Register
10/16/2009
Decision
10/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Area Management |
| Northwest Sands Record of Decision | Decision Signed Date: 10/16/2009 Legal Notice Date: 10/21/2009 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | T.49N, R.7W, S 23-26, 35, 36; T.49N, R.6 W, S 19-22, 37-33; T.48N, R.8 W, S 12, 13, 24, 25, 36; T.48N, R.7W, S 1-5, 7-11, 14-23, 26-36; T.48N, R6W, S 2, 4-6, 10-16, 21--27; T.47N, R.7W, S 3-10, 15-22 |
Decision Memo · Medford-Park Falls Ranger District · updated 6/24/2009
Project is located on the Medford unit of the Medford-Park Falls Ranger District, just north of County Road M and about 2 miles east of Perkinstown, WI. · Taylor, Wisconsin
Commercial thinning of about 70 acres of white spruce to promote forest health and vigor.
Forest products
Comment Period
04/16/2009
Decision
05/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Green) |
| Medford Spruce Thinning | Decision Signed Date: 05/26/2009 Legal Notice Date: 06/04/2009 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District |
| Legal Land Description | T32N, R2W, Section 36 |
Environmental Impact Statement · Great Divide Ranger District · updated 3/31/2009
10 miles NW of Glidden, Wisconsin · Ashland, Wisconsin
A Revised EIS is being prepared for the Cayuga Vegetation Management Action to remedy inadequacies in cumulative effects analysis of specific Regional Forester Sensitive Species
Road managementWatershed managementForest products
NOI in Federal Register
03/21/2006
DEIS NOA in Federal Register
05/09/2008
FEIS NOA in Federal Register
12/05/2008
Decision
02/2009 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Developed Site Management; Forest Vegetation Improvements; Noxious Weed Treatments; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Cayuga Project | Decision Signed Date: 02/24/2009 Legal Notice Date: 02/26/2009 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | T42N, R4W, Sec 4; T43N, R2W, Sec 6-8, 16-20, 29; T43N, R3W, Sec1-18,23; T43N, R4W, Sec 1-3, 10-24, 27-33; T44N, R3W, Sec 19-23, 26-35; T44N, R4W, Sec 23-27, 34-36. |
Environmental Assessment · Chequamegon / Nicolet National Forest All Units · updated 6/27/2007
Washburn RD, Bayfield County, WI and Great Divide RD, Ashland County, WI · Ashland; Bayfield, Wisconsin
Application of pheremone flakes on up to 1,000 acres on two sites to disrupt gypsy moth mating.
Wildlife, fish, rare plants
Comment Period
01/09/2007
Decision
02/2007 (Estimated)
Implementation
07/2007 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Harzardous Waste Compliance Actions |
| 2007 Gypsy Moth Slow-the-Spread | Decision Signed Date: 02/28/2007 Legal Notice Date: 02/28/2007 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District; Washburn Ranger District |
| Legal Land Description | T50N R7W Sec. 34-36 and T49N R7W Sec. 1-4, 9-10; T43N R4W Sec. 14-15,22-23,27 |